Anda di halaman 1dari 89

Hendra

Aritmatika
Tahun Jumlah Penduduk R Tn-To Pn (Pn-Pr)^2
2012 126379 0 0 126379 108880877
2013 133785 7406 1 130267.2 42855353
2014 133248 -537 2 134155.4 7066027.24
2015 144836 11588 3 138043.6 1512900
2016 145820 984 4 141931.8 26195971.2
Rata-rata 136813.6 3888.2 2 134155.4 37302225.7
Jumlah 684068 19441 10 670777 186511129
STD-R 3451.4481273807
r^2 0.6008115486
r 0.7751203446

Geometrik
Tahun Jumlah Penduduk R N Pn (Pn-Pr)^2
2012 126379 0 0 126379 108880877
2013 133785 0.0553574765 1 129869.16 48225209
2014 133248 -0.0040300793 2 133455.71 11275411.7
2015 144836 0.0800077329 3 137141.31 107393.663
2016 145820 0.0067480455 4 140928.69 16933975.9
Rata-rata 136813.6 0.0276166351 2 133554.78 37084573.5
Jumlah 684068 0.1380831757 10 667773.88 185422867
STD-R 3970.0898864099
r^2 0.4687274172
r 0.6846367045

Linear
Tahun Jumlah Penduduk X X^2 Y Y^2
2012 126379 1 1 126379 1.5972E+10
2013 133785 2 4 133785 1.7898E+10
2014 133248 3 9 133248 1.7755E+10
2015 144836 4 16 144836 2.0977E+10
2016 145820 5 25 145820 2.1263E+10
Rata-rata 136813.6 3 11 136813.6 1.8773E+10
Jumlah 684068 15 55 684068 9.3866E+10
STD 2075.0129561041
r^2 0.8920689694
r 0.9444940283
a 121833.7
b 4993.3
Logaritmik
Tahun Jumlah Penduduk X Ln X Y Y Ln X
2012 126379 1 0 126379 0
2013 133785 2 0.69314718 133785 92732.6956
2014 133248 3 1.09861229 133248 146387.89
2015 144836 4 1.38629436 144836 200785.33
2016 145820 5 1.60943791 145820 234688.236
Rata-rata 136813.6 3 0.95749835 136813.6 134918.83
Jumlah 684068 15 4.78749174 684068 674594.152
STD-R 2479.961268836
r^2 0.8383580609
r 0.9156189496
a 125196.60202349
b 12132.6558881535

Eksponensial
Tahun Jumlah Penduduk X Y Ln Y X Ln Y
2012 126379 1 126379 11.747041 11.7470406
2013 133785 2 133785 11.803989 23.6079786
2014 133248 3 133248 11.799967 35.399902
2015 144836 4 144836 11.883357 47.5334294
2016 145820 5 145820 11.890128 59.4506413
Rata-rata 136813.6 3 136813.6 11.824897 35.5477984
Jumlah 684068 15 684068 59.124483 177.738992
STD 2084.9188513706
r^2 0.891271845
r 0.944071949
a 122422.513869279
b 0.0365543345
ln a 11.715233569

Metode STD R
Aritmatik 3451.4481273807 0.7751203446
Geometrik 3970.0898864099 0.6846367045
Regresi Linear 2075.0129561041 0.9444940283 METODE TERPILIH
Eksponensial 2084.9188513706 0.944071949
Logaritma 2479.961268836 0.9156189496

Tahun X Jmlh Penduduk SR


2012 1 126379 4524 22622
2013 2 133785 4790 23948
2014 3 133248 4770 23851
2015 4 144836 5185 25926
2016 5 145820 5220 26102
2017 6 151794 5434 27171
2018 7 156787 5613 28065
2019 8 161780 9707 28959
2020 9 166773 10006 29852 27.6411469
2021 10 171767 10306 30746

2022 176760 10606 31640


11
2023 12 181753 10905 32534
2024 13 186747 11205 33428
2025 14 191740 11504 34321
2026 15 196733 11804 35215
2027 16 201727 12104 36109
2028 17 206720 12403 37003 34.2618928
2029 18 211713 12703 37897
2030 19 216706 13002 38790
2031 20 221700 13302 39684
2032 21 226693 13602 40578

2033 231686 13901 41472


22
2034 23 236680 14201 42366
2035 24 241673 14500 43259
2036 25 246666 14800 44153
2037 26 251660 15100 45047
2038 27 256653 15399 45941

tahap 1

tahap 2
(Pn-P)^2
0
12374916.84
823374.76
46136697.76
15118099.24
14890617.72
74453088.6

(Pn-P)^2
0
15333781.5
43144.28174
59208258.46
23924901.42
19702017.13
98510085.66

XY Pn (Pn-Pr)^2 (Pn-P)^2
126379 126827 99732180 200704
267570 131820.3 24933045 3860046
399744 136813.6 0 12713503
579344 141806.9 24933045 9175447
729100 146800.2 99732180 960792
420427.4 136813.6 49866090 5382098
2102137 684068 2.49E+08 26910492
(Ln X)^2 Pn (Pn-Pr)^2 (Pn-P)^2
0 125196.6 1.35E+08 1398065
0.480453014 133606.3 10286656 31927.17
1.206948961 138525.7 2931241 27853979
1.921812056 142016 27065324 7952206
2.590290394 144723.4 62564278 1202623
1.239900885 136813.6 47560428 7687760
6.199504424 684068 2.38E+08 38438799

X^2 Pn (Pn-Pr)^2 (Pn-P)^2


1 126980.4 96692120 361663.7
4 131707.9 26067678 4314143
9 136611.5 40835.43 11313282
16 141697.7 23854036 9849182
25 146973.2 1.03E+08 1329770
11 136794.1 49974252 5433608
55 683970.7 2.5E+08 27168041
DEBIT
2038 1.783333
KEBUTUHAN
AIR 100 L/o/hari
air limbah 80% dari kebutuhan air
penduduk 45941 jiwa (udah 30% nya)
Q 3675268 L/hari
3675.268 m3/hari
0.042538 m3/s 2.55227
42.53783 L/s < melebihi kapasitas
kapasitas 50 L/s

2028
KEBUTUHAN
AIR 100 L/o/hari
air limbah 80% dari kebutuhan air
penduduk 37003 jiwa (udah 30% nya)
Q 2960228 L/hari
2960.228 m3/hari
0.034262 m3/s 2.055714
34.26189 L/s < melebihi kapasitas
kapasitas 50 L/s

Qmax 34.26189 Lps


0.034262 m3/s
Qmax 42.53783 Lps
0.042538 m3/s
mendekati 1 r^2
Contoh perhitungan : 3 Analsis metode terpilih : linear misal
Data Awal : Cari x dan dapet jumlah penduduk.
non-domestik cipta karya

Perhitungan jadi 2 tabel untuk 2 periode


Jumlah dr kebocoran, HU lala, domestik, non-domestik total kebutuhan air
Kebutuhan air umum

Penentuan jalur
Menurut R 150L/hari
45941 Penduduk
Domestik 2037 5512902 Domestik 2027
Liter
Periode 2 Periode 1
Total non&dom 5832896 Total non&dom
Hidran Kebakaran 583289.61 Hidran Kebakaran
Tata kota 583289.61 Tata kota
Operasional IPAM 291644.81 Operasional IPAM
Kebocoran 1166579 Kebocoran
Total kebutuhan air 8457699 L/hari Total kebutuhan air
Penggunaan Lahan
Perkantoran

Pertokoan/Pasar

Sekolah

37003
4440341.304
Liter

4755605.304
475560.5304
475560.5304 Rumah Sakit
237780.2652
951121.0608
6895627.6908 L/hari
Hotel

Masjid/Sarana Ibadah
Periode 1
Lokasi ** Jumlah Unit Standar kebutuhan Peningkatan/Periode
Dinkes 320 Pegawai 60 30
Pusat Pertokoan Sari- 827 m2 12 5
Pusat Oleh-oleh Kart 4492 m2
Neverland Trade Cen 538 m2

RS Daerah 600 Bed 200 5


RS Mata 500 Bed
Hotel A 7 Bed 150 5

luas bus besar 31.25 1000 m2 Kebutuhan nondom


Periode 2
Jumlah akhir Kebutuhan air Jumlah akhir Kebutuhan air
350 21000 380 22800
832 9984 837 10044
4497 53964 4502 54024
543 6516 548 6576

605 121000 610 122000


505 101000 510 102000
12 1800 17 2550

315264.00 Periode 2 319994.000


mendekati 1 r^2
Contoh perhitungan : 3 Analsis metode terpilih : linear misal
Data Awal : Cari x dan dapet jumlah penduduk.
non-domestik cipta karya

Perhitungan jadi 2 tabel untuk 2 periode


Jumlah dr kebocoran, HU lala, domestik, non-domestik total kebutuhan air
Kebutuhan air umum

Penentuan jalur
Menurut R 150L/hari
45941 Penduduk
Domestik 2037 5512902 Domestik 2027
Liter
Periode 2 Periode 1
Total non&dom 5724320 Total non&dom
Hidran Kebakaran 572432 Hidran Kebakaran
Tata kota 572432 Tata kota
Operasional IPAM 286216 Operasional IPAM
Kebocoran 1144864 Kebocoran
Total kebutuhan air 8300264 L/hari Total kebutuhan air
Penggunaan Lahan
Perkantoran

Pertokoan/Pasar

Sekolah

37003
4440341.304
Liter

4648089.304
464808.9304
464808.9304 Rumah Sakit
232404.4652
929617.8608
6739729.4908 L/hari
Hotel
Periode 1
Lokasi ** Jumlah Unit Standar kebutuhan Peningkatan/Periode
Dinkes 320 Pegawai 60 30
Pusat Pertokoan Sari- 827 m2 12 5
Pusat Oleh-oleh Kart 4492 m2

RS Daerah 600 Bed 200 5


RS Mata
Hotel A 7 Bed 150 5

luas bus besar 31.25 1000 m2 Kebutuhan nondom


Periode 2
Jumlah akhir Kebutuhan air Jumlah akhir Kebutuhan air
350 21000 380 22800
832 9984 837 10044
4497 53964 4502 54024

605 121000 610 122000

12 1800 17 2550

207748.00 Periode 2 211418.000


tahap 1
0.058 m3/s 1 inch = 2.54 cm
tahap 2 0.0254 m
0.072 m3/s 2 5.08
22 55.88
D saat Qm 0.431113 m
D standar 0.4572 m 998364
18 inch 1012494
Qfull 0.084212 m3/s
vfull 0.512428 m/s
Tahun L/hari Total
pemukiman fasum infiltrasi L/hari L/s
2028 2960227.536 315264.00 327549.154 3603041 35 41.70186
2038 3675268.096 319994.00 399526.21 4394788 50 50.86561

Pn Fpuncak Qmin Qr Qmax Qmin Qr Qmax


L/s m3/s
Tahap I 37003 2.8 15 42 117.6 0.015 0.042 0.1176
Tahap II 45941 2.7 18.5185185 50 135 0.018519 0.050 0.135
DATA PERENCANAAN
Parameter Simbol Satuan Besaran
Debit tahap I
Ø Minimum Qmin 0.015 n 0.013
m3/det
Ø Rata – rata Qr 0.042 S 0.0008
Ø Maksimum Qmaks 0.118
Debit tahap II
Ø Minimum Qmin 0.019
m3/det
Ø Rata – rata Qr 0.050 4320
Ø Maksimum Qmaks 0.135 4.32
Jumlah Bar Screen - 2 buah
Kecepatan melalui bars vbar m/det 1
screen
Kemiringan dari
75 ᵒ
vertical
Diameter batang f mm 10
Konstanta untuk besi
b 1.79
bulat
Panjang penampang
p 50 mm
batang

Jarak bukaan antar bar b 30 mm

Kondisi aliran dalam incoming conduit tahap II


D teori 0.54571586 m
21.48 inch 1 in 2.54 cm
D standar 22 inch 0.0254 m
0.5588 m
Qfull 0.14380477 m3/s
vfull 0.58577735 m/s rata2 min
saat aliran maksimum 0.93877275 0.3476936 0.12877541
d/D 0.76 0.42 0.25
v/vfull 1.16 0.9 0.65
vmax 0.680 m/s 0.527 m/s 0.381 m/s
dmax 0.425 m 0.235 m 0.140 m
dia conduit 0.5588 m
slope conduit 0.0008 periode 1
v1 max 0.58577735 m/s
d1 max 0.424688 m
v1 rata2 0.52719962 m/s
d1 rata2 0.234696 m
v1min 0.38075528 m/s
d1 min 0.1397 m
1. barscreen bukaan bersih
Qmax 0.0675 m3/s b 30
A 0.0675 m2 w 8
L 0.15894021 m sudut 75
n 4.29800701 Qmax 0.0575
5 batang beta 1.79
w 18 cm
wc 23 cm
0.23 m n 25.315789
Ls 0.49038746 26
volum sampah 0.11664 m3/hari s 27
bahan tersaring 0.419904 m3/hari Lt 810
A. kedalaman aliran tiap debit 0.81
Kedalaman (d1) ytmax 0.0709877
Debit
Tahap I Tahap II yi 0.0685688
Maks 0.327 0.375 vhmax 0.8385737
Rata 0.117 0.139 hv 0.0358413
Min 0.042 0.051 hl 0.0106367
B. kedalaman aliran aktual dan kecepatan di sec. 2 saat debit puncak R 0.0602995
Kedalaman (d2) S 0.0050259
Debit
Tahap I Tahap II fribord 0.0141975
Maks 0.4090 0.4500
Rata 0.1990 0.2200
Min 0.1240 0.1320

v2 (m/det)
Debit
Tahap I Tahap II
Maks 0.62506644 0.65217391
Rata 0.45881582 0.49407115
Min 0.26297335 0.30498219
C. kecepatan di bar rack dengan bukaan bersih
vbar (m/det)
Debit
Tahap I Tahap II
Maks 0.90452429 0.94375111
Rata 0.66394551 0.71496296
Min 0.3805448 0.44133516
D. headloss di rack
hL (m)
Debit
Tahap I Tahap II
Maks 0.01306777 0.01422578
Rata 0.00704086 0.00816447
Min 0.00231298 0.00311099
E. kedalaman dan kecepatan setelah bar rack
d3 (m)
Debit
Debit
Tahap I Tahap II
Maks 0.3940 0.4580
Rata 0.1910 0.2100
Min 0.1220 0.1290

v3 (m/det)
Debit
Tahap I Tahap II
Maks 0.64886339 0.64078223
Rata 0.47803323 0.65545838
Min 0.26728439 0.3120748

2. barscreen 50% clogging


v barscreen 0.5-1 m/s

d’2 (m)
Debit
Tahap I Tahap II
Maks 0.5040 0.5820
Rata 0.2500 0.2840
Min 0.1440 0.1570

v’2 (m)
Debit
Tahap I Tahap II
Maks 0.50724638 0.50425818
Rata 0.36521739 0.38273117
Min 0.22644928 0.25641815

hL (m)
Debit
Tahap I Tahap II
Maks 0.1100 0.1240
Rata 0.0590 0.0740
Min 0.0220 0.0280

v'3 (m/det)
Debit
Tahap I Tahap II
Maks 1.2962963 1.28865979
Rata 0.93333333 0.97809077
Min 0.5787037 0.65529082

Upstream Channel V bar Downstream Channel Headloss


Kondisi
d2 (m) v2 (m/det) (m/det) d3 (m) v3 (m/det) (m)
Tahap I
Q maks
· Clean rack 0.4090 0.6251 0.9045 0.3940 0.6489 0.0131
· 50% clogging 0.5040 0.5072 0.0000 0.3940 0.6489 0.1100
Q rata-rata
· Clean rack 0.1990 0.4588 0.6639 0.1910 0.4780 0.0070
· 50% clogging 0.2500 0.3652 0.0000 0.1910 0.4780 0.0590
Q min
· Clean rack 0.1240 0.2630 0.3805 0.1220 0.2673 0.0023
· 50% clogging 0.1440 0.2264 0.0000 0.1220 0.2673 0.0220
Tahap II
Q maks
· Clean rack 0.4500 0.6522 0.9438 0.4580 0.6408 0.0142
· 50% clogging 0.5820 0.50425818 0 0.4580 0.6408 0.1240
Q rata-rata
· Clean rack 0.2200 0.4941 0.7150 0.2100 0.6555 0.0082
· 50% clogging 0.2840 0.38273117 0 0.2100 0.6555 0.0740
Q min
· Clean rack 0.1320 0.3050 0.4413 0.1290 0.3121 0.0031
· 50% clogging 0.1570 0.25641815 0 0.1290 0.3121 0.0280
0.4649

Parameter Besaran Satuan


Jumlah 2 unit
Lebar Bukaan 0.23 m
Jumlah batang 5 batang
Tinggi 1.5 m
Free board 0.2 m
tahap I
vfull 0.5857774 m/s rata2 min
saat alira 0.8177754 0.2920626 0.1043081
d/D 0.68 0.41 0.25
v/vfull 1.14 0.9 0.65
vmax 0.668 m/s 0.527 m/s 0.381 m/s
dmax 0.380 m 0.229 m 0.140 m
10-50
8-10

mm
m
KRITERIA DESAIN
Parameter Simbol Satuan Besaran Sumber
Waktu detensi td detik 45 – 90 Metcalf &Eddy
Kecepatan horizontal vh m/det 0,24 – 0,4 Edward JM
Kecepatan mengendap
· Diameter 0,2 mm Ft/mnt 3,2 – 4,2 Metcalf &Eddy
· Diameter 0,15 mm 2–3
Specific gravity grit gs 1,5 – 2,7 Qasim
Specific gravity material organik 1,02 Qasim

0,021198 -
Over flow rate debit maks OR m3/m2/det Tom D Reynold
0,02353
Jumlah grit yang disisihkan m3/106/m3 5 – 200 Qasim
Head loss melalui grit hL % 30 – 40 Qasim
Jumlah bak minimal unit 2 Kawamura

DATA PERENCANAAN
Parameter Simbol Satuan Besaran
Jumlah bak N 2 unit
Debit tahap I
Ø Minimum Qmin 0.0150
m3/det
Ø Rata – rata Qr 0.0420
Ø Maksimum Qmaks 0.1176
Debit tahap II
Ø Minimum Qmin 0.0185
m3/det
Ø Rata – rata Qr 0.0500
Ø Maksimum Qmaks 0.1350
Waktu detensi td detik 65
Kecepatan horizontal Vh m/det 0.325

Kecepatan pengendapan
Vs ft/mnt 4.2
(f = 0.2 mm)
in/menit 50
Koefisien Mannning N 0.013
Head loss di
proporsional weir (%
hL % 35
tinggi muka air maks di
saluran Grit chamber)
Jumlah grit disisihkan M m3/106 m3 45

PERHITUNGAN
Q 0.0675 m3/s 0.021420001
OR 45000 gpd/ft3
0.02142 m3/m2 det
Asurface 3.15126 m2
Across 0.207692 m2
V 4.3875 m3
d 1.3923 m 1.392300039 m
w tiap bak 0.149172 m 0.15 m
p 21.125 m 21 m
kontrol desain
V 4.385745 m3 vh 0.3232061966 m/s
td 64.974 s
OR 0.021429 memenhi
volum bak terisi
Volume Terisi (m3)
Debit
Tahap I Tahap II
Maks 3.8204713 4.3857451
Rata 1.364454 1.62435
Min 0.487305 0.6016111
tinggi muka air dalam bak
d (m)
Debit
Tahap I Tahap II
Maks 1.212848 1.3923
Rata 0.43316 0.5156667
Min 0.1547 0.1909877
kecepatan horizontal
Vh (m/det)
Debit
Tahap I Tahap II
Maks 0.3232062 0.3232062
Rata 0.3232062 0.3232062
Min 0.3232062 0.3232062

struktur influen
efluen bar screen headloss saluran bar screen
parameter simbol nilai satuan Debit
lebar saluran l 0.23 m
kedalaman saat maksimum d 0.458 m Maks
kecepatan saat maksimum v 0.64 m/s Rata
Min
dimensi saluran grit
parameter simbol nilai satuan
lebar saluran l 0.15 m
kedalaman saat maksimum d 1.4 m
kecepatan horizontal v 0.325 m/s struktur ef
a
h
w
y
Q
b
sisa ruang
y/a
x/b
x
Debit v3 (m/det)
Tahap I
Maks 0.648863
Rata 0.478033
Min 0.267284

headloss saluran bar screen ke grit chamber perbedaan elevasi headloss grit chamber
headloss (m) Debit deltaz (m) Debit headloss (m)
Tahap I Tahap II Tahap I Tahap II Tahap I
-0.017682903 -0.0171 Maks -0.03376 -0.03264 Maks 0.012839
-0.006889901 -0.01817 Rata -0.01315 -0.03468 Rata 0.014664
0.0019165372 0.000462 Min 0.003659 0.000881 Min 0.020076

proportional weir headloss di proportional weir


0.025 m 0.08202 ft Debit headloss (m)
1.3923000387 m 4.567858 ft Tahap I Tahap II
0.15 m 0.49212 ft Maks 0.424497 0.487305
0.12 m 0.393696 ft Rata 0.151606 0.180483
0.0675 m3/s 2.383695 cfs Min 0.054145 0.066846
0.3688323586 ft 0.111682 m
0.0191587809 m
4.8
0.2734
0.0305339786 m
v3 (m/det)
Tahap II
0.640782
0.655458
0.312075

grit chamber
headloss (m) tahap I tahap II
Tahap II min rata-rata max min rata-rata max
0.012711 R 0.050512 0.0639307 0.070632 0.053852 0.065477 0.071166
0.014204
0.018433

kedalaman air dalam saluran outlet kedalaman air di saluran efluen


b 0.111682 m Debit y1(m)
q 0.604392 m/s Tahap I Tahap II
y2 0.5 m asumsi Maks 0.559157 0.576688
ambang peN 1 buah Rata 0.507929 0.511201
lebar salurb 0.15 m Min 0.501018 0.501551
kedalaman 0.79589 m
uran efluen Debit q
Tahap I Tahap II
Maks 0.526493 0.604392
Rata 0.188033 0.223849
Min 0.067155 0.082907

udh termasuk freeboard 12% buat friction losses dan 15 cm buat free fall
Volume
Volume
% air Q inflow Q outflow V inflow V outflow kumulatif
Waktu kumulatif
buangan (m3/jam) (m3/jam) (m3) (m3) outflow
inflow (m3)
(m3)
05.00-06.00 3.79 458.44 551.96 458.44 458.44 551.96 551.96
06.00-07.00 5.01 606.01 551.96 606.01 1064.45 551.96 1103.92
07.00-08.00 5.91 714.87 551.96 714.87 1779.32 551.96 1655.88
08.00-09.00 5.91 714.87 551.96 714.87 2494.20 551.96 2207.84
09.00-10.00 5.4 653.18 551.96 653.18 3147.38 551.96 2759.80
10.00-11.00 5.05 610.85 551.96 610.85 3758.23 551.96 3311.76
11.00-12.00 4.65 562.46 551.96 562.46 4320.69 551.96 3863.72
12.00-13.00 4.65 562.46 551.96 562.46 4883.16 551.96 4415.68
13.00-14.00 4.85 586.66 551.96 586.66 5469.81 551.96 4967.64
14.00-15.00 4.85 586.66 551.96 586.66 6056.47 551.96 5519.60
15.00-16.00 4.85 586.66 551.96 586.66 6643.12 551.96 6071.56
16.00-17.00 5.38 650.76 551.96 650.76 7293.89 551.96 6623.52
17.00-18.00 6.1 737.86 551.96 737.86 8031.74 551.96 7175.47
18.00-19.00 4.32 522.55 551.96 522.55 8554.29 551.96 7727.43
19.00-20.00 4.32 522.55 551.96 522.55 9076.84 551.96 8279.39
20.00-21.00 3.53 426.99 551.96 426.99 9503.83 551.96 8831.35
21.00-22.00 2.93 354.41 551.96 354.41 9858.24 551.96 9383.31
22.00-23.00 2.6 314.50 551.96 314.50 10172.74 551.96 9935.27
23.00-24.00 2.6 314.50 551.96 314.50 10487.23 551.96 10487.23
Storage
kumulatif
(m3)

-93.52
39.47 0.14 m3/s
-123.44 504 32x2 32x -883.7406
-286.36 x1 = 4.936
-387.58 x2 = -5.936
-446.47 V= 895.74 m3
-456.97 Qr = 0.14 m3/s = 504 m3/jam
-467.48
-502.17 td = 1.7772632 jam 6398.1474
-536.87 A= 447.87032 m2 < kondisi jika kedalaman airnya 2m
-571.57 d= 23.885884 m
-670.37 tcone = 1433.153 mm = 1.433153 m
-856.27 Vlimas 35.32311 m3 < kondisi rumus V nya 12x^3 < liat dari rumus dari laporan ka
-826.86
-797.44
-672.47
-474.93 V= 895.74 m3
-237.46 A= 447.87032 m2
0.00 s= 21.162947 m
t= 4
a= 12

4𝑥^2+96𝑥+768= V
hasil equation rumus sebelah

x= 1.26
b= 25.26

l= 25.26
p= 17.730416
h= 2
h = x+1
h= 5.936
a= 17.808
b= 14.808

< liat dari rumus dari laporan ka ber

6𝑥+768= V
ation rumus sebelah
Parameter Simbol Besaran Satuan
Debit
Debit min Qmin 0.017 m3/s
Debit rata-rata Qrata 0.028 m3/s
Debit maksimum Qmax 0.048 m3/s
Waktu detensi td 7200 detik
Efisiensi Pompa h 70 %
Koef. Kekasaran
C 100 -
pipa

RATA-
MAX MIN
RATA
V 345.6 m3 V 201.6 m3 V
p 16 m p 16 m p
l 10 m l 10 m l
As 160 m2 As 160 m2 As
d 2.16 m d 1.26 m d
2.5 m 1.5 m
h 2.16 m h 1.26 m h

Parameter Simbol Besaran Satuan


Debit tahap I
Ø Minimum Qmin 0.015
m3/det
Ø Rata – rata Qr 0.042 8 m3/menit
Ø Maksimum Qmaks 0.1176 8.1
Debit tahap II
Ø Minimum Qmin 0.018519
m3/det
Ø Rata – rata Qr 0.05
Ø Maksimum Qmaks 0.135

td max 30
Waktu detensi 7200 detik
1200 menit
Efisiensi Pompa h 75 %
Koef. Kekasaran
C 100 -
pipa

Volume V 972 m3 972


p 20
l 20
luas permukaan As 400
kedalaman bak d 2.43
2
Ketinggian muka
Debit air (h)
Tahap I Tahap II
Maks 1.0584 1.2150
Rata 0.3780 0.4500
Min 0.1350 0.1667

dia pipa pompa 10 inch 0.203 m


debit pompa 0.0675 m3/s 0.083
67.5 l/s 0.015
rata2 0.025 0.231846
vmax 2.086614 m/s memenuhi
vrata2 0.77282
Htot
pipa di bak ekualisasi 3
pipa horizontal 7
ketinggian prased 3
panjang pipa 13
D pipa 0.109503 m
0.1524 m
Hstatis 1m
Hf 0.708883 m 0.282311896 m
Hm
Jenis alat Jumlah K V (m/det) h (m)
Elbow 90 2 0.3 2.086613632 0.133149
Gate valve 2 0.07 2.086613632 0.031068
Y-tee 2 0.7 2.086613632 0.31068
Check valve 2 1 2.086613632 0.443828
Total 0.918725

Hv 0.221914 m
TDH 2.422951 m
HP 29.37867 HP.hour

1 HP 0.75 kWh
29.3786666395 hp 22.034 kWh

10
2.2034
122.4 m3
16 m
10 m
160 m2
0.765 m
2.5 m
0.765 m
Parameter Satuan Besaran Sumber
Sedimentasi primer dilanjutkan dengan pengolahan sekunder
Waktu detensi (td) jam 1,5-2,5
Laju overflow (vOR)
Metcalf &
laju rata-rata m3/m2.hari 30-50
Eddy, 2003
laju jam puncak m3/m2.hari 80-120
Beban permukaan (Weir loading)
m3/m.hari 125-500
Sedimentasi primer dengan resirkulasi waste activated sludge
Waktu detensi (td) jam 1,5-2,5
Laju overflow (vOR)
Metcalf &
laju rata-rata m3/m2.hari 24-32
Eddy, 2003
laju jam puncak m3/m2.hari 48-70
Beban permukaan (Weir loading)
m3/m.hari 125-500
Prasedimentasi rectangular
Kedalaman m 3-4,9
Metclaf &
Panjang m 15-90
Eddy, 2003
Lebar m 24-Mar
Rasio P:L 1-7,5
Qasim, 1999
Rasio L:H 4,2-25
Penyisihan
% 50-70
konsentrasi SS Metcalf &
Penyisihan Eddy, 1991
% 25-40
konsentrasi BOD
Kemiringan dasar, S % 2-Jan Qasim, 1999

PERHITUNGAN
debit per 2 bak Q 2160 m3/hari
luas permukaan As 54 m2
lebar L 4.242640687 m
4m
panjang P 12.72792206 m
13 m
luas aktual A actual 52 m2
ketinggian air h 3.5 m
volum V 182 m3
CHECK OR 41.53846154 m3/m2.hari < memenuhi
td 0.084259259 hari
2.022222222 jam < memenuhi
OR 34.89230769 m3/m2.hari
td 0.100308642
2.407407407

LUMPUR
A b
BOD 0.018 0.02
TSS 0.0075 0.014

perhitungan
%BOD 34.6007604563 %
%TSS 56.4691281415 %
BOD 1166.4 kg/hari
TSS 1207.05882353 kg/hari
Primary sludge
TSSsl 681.615593802 kg/hari
BODsl 403.583269962 kg/hari
Qsl 13.2352542486 m3/hari

%removal
tahap I 34.8923076923
I TSS 64%
BOD 35%
41.5384615385
II TSS 60%
BOD 33%
Debit I 3628.8 m3/hari
II 4320 m3/hari
BOD I 798.336 kg/hari
II 1166.4 kg/hari
TSS I 933.8823529 kg/hari
II 1207.058824 kg/hari

karakteristik primary sludge


BOD5 I 279.4176 kg/hari 518.9184
II 384.912 kg/hari
TSS I 597.6847059 kg/hari 336.1976470588
II 724.2352941 kg/hari
Qlumpur I 11.60552827 m3/hari
II 14.06282125 m3/hari 142.7
0.000162764 m3/s
0.000264046

Dia. pipa lumpu 0.000132023 m


Parameter Simbol Parameter Satuan
Bentuk Rectangular I
Debit Rata-Rata Qrata 4320 m3/hari 3628.8 m3/hari
Jumlah bak 2 Buah
Overflow rate OR 40 m /m2.hari
3

p:l 3
Kedalaman Air h 3 m
Freeboard 0.5 m tahap I
BOD Influen 270 mg/L 220 mg/L
TSS Influen 279.41176471 mg/L 257.3529 mg/L
Konsentrasi Solid 5%
Spesific Gravity 1.03 kg/l
Kemiringan S 0.02
Koefiesien Discharge Cd 0,584 257.35
Sudut V-notch 900 279.411

Struktur Inlet

Parameter Simbol Besaran Satuan

Ukuran saluran inlet P 1


L 4
Pipa inlet
pipa inf. dari ekualisasi P 0.203
kedalaman air d 3
orifice P 0.3 6 unit masing-masing bak
L 0.34
baffle jarak 1.5 depan orifice
T 0.6

Perhitungan
kapasitas tiap orifice q 0.0041666667 m3/s
Aorifice 0.102 m2
hL 0.0002362521
v 0.2450980392 m/s

struktur efluen
Q supernatan
Qrata2 I 3617.1944717 m3/hari 0.041866 m3/s
II 4305.9371788 m3/hari 0.049837 m3/s
v notch 90 o
pipa out 558 mm
p notch 0.15 m
jaral antar notch 0.2 m
weir loading 200 m3/m2 hari
lw 8m
n
32 buah
qv Tahap I 0.0013083024 m3/s
Tahap II 0.0015574136 m3/s
H Tahap I 0.090069937 m
Tahap II 0.0965735489 m
kontrol desain
Vo Tahap I 226.07465448
Tahap II 269.12107367
saluran efluen
lebar 0.5 m
Kedalaman Air 0.5 m
outlet 0.5 m
Y2 0.5 m
q' 0.0062296545
L outlet 7m
Y1 0.5122558844 m
d total 0.8147070613 m

83
325
TSS mg/L
257.35 92.646 tahap I
279.411 111.7644 Tahap II
TSS 35-...
BOD 40-60
Parameter Simbol Besaran Satuan BOD 83.024 mg/l
Debit tahap I tahap I 220 35%
m3/hari
Ø Rata – rata Qr 3628.8 tahap II 270 40%
Debit tahap II
m3/hari
Ø Rata – rata Qr 4320
influen BOD 2 bak 0.0500
tahap I BODi 143 mg/L
Tahap II BODii 162 mg/L
Temperatur T 27 oC TSS mg/L E removal 30% Debit
92.646 tahap I 64.8522 mg/L 234.3379
perhitungan 111.7644 Tahap II 78.23508 mg/L 282.6958
beban
pengolahan L 349.92 kg/hari
Lv 0.1 kg BOD/m3. hari
volum V 3499.2 m3
td 0.81 hari
19.44 jam
h 5m
As 699.84 m2
p 35
L 20
A 700
BODef 48.6 mg/L
E 70 %
laju lumpu 0.03 m3/jiwa.tahun
akumulasi 1378.226 m3/tahun 3.77596 m3/hari
ketebalan 1.968894 m/tahun
t 0.846499 tahun
10.15799 bulan
3613.415 m3/hari
Kriteria Desain
Parameter Simbol Besaran
waktu detensi td 5-10 hari
Kedalaman h 2.5-4 m
Koef. K K 0.6-0.8 d-1
0.3-0.4
Partikulat BOD BODpart. mgBOD5/mg
SS

0.8-1.2 kg
koef. a a O2/kg BOD5

dengan operasi aerator dengan kecepatan tinggi:


Diameter
Kedalaman Diameter terpengaruh
(m) anti
Daya (HP) operasi
erotion
normal (m)
Teroksigenasi Teraduk plate
5-10 2.0-3.6 45-50 14-16 2.6-3.4
15-25 3.0-4.3 60-80 19-24 3.4-4.8
30-50 3.8-5.2 85-100 27-32 4.8-6.0

B. Data Perencanaan
Berikut data perencanaan yang direncanakan dalam mendesain kolam fakultatif
Parameter Simbol Besaran Satuan
Debit rata-rata Qr 4320 m3/hari 2160 m3/hari
0.05 m3/detik 2 bak
Jumlah
O 45941 jiwa
penduduk
Influen BOD So 48.6 mg/L 55
Temperature T 27 o
C
SS 50 mg/L
kgBOD/
L
104.976 d
S 410.52158482

perhitungan E BOD 52%


td 5 hari
BOD eff 23.44694619 Sludge
terlarut 8.44694619 mg/L annual acc 2297.043 m3/year 6.293267 m3/hari
partikulat 15 mg/L thickness 0.745793 m/year
total 23.44694619 mg/L 2.237379 m/3 year
E BOD 0.517552548 Ds 0.745793 m
Ls 350 kgBOD/ha.day
V 10800 m3
h 3.5 TSS mg/L E removal 70% Debit
A 3085.714286 m2 64.8522 tahap I 19.45566 mg/L 70.179
p 56 m 78.23508 Tahap II 23.47052 mg/L 84.66111
l 55 m
3080
a 1 kg O2/kgBOD5
RO 108.6611925 kg O2/day
4.527549686 kgO2/jam
alfa 0.8
beta 0.95
cL 1 mg/l
OL 1.34394828 kg O2/kWh
Oefield 0.806368968 kg O2/kWh
P 5.614737007 kW
power level 0.519883056 W/m3

power level 3 W/m3


P mixing 32400 W
32.4 kW
3607.125 m3/hari
BOD BODi 2 bak
BODii 23.44695
Q 4320 m3/hari 2160
T 27
solubility Cs 7.97 mg/l 3 year
td 2 hari
k 2.5
b 0.07
Y 0.65

Se 3.907824 mg/l soluble BOD Xvss 10.46739 mg/L


X 11.14073 mg/l cell concentration soluble bo 3.907824
Le 14.38011 mg/l BOD efluen efuen part 6.280432
h 2.5 VSSe 0.586174
A 3456 m2 BOD5 part 0.351704
1728 total BOD 4.259529 mg/l
p 40 Efisiensi 81.83333 %
l 40 < untuk 4 bak total
1600
RO2 58753.11 g/day 0.3348 g/day RO2 for nitrification
58.75311 kg/day
2.448046 kg/jam F/M
asumsi aeratornya bisa nyuplai 1.8 kg O2/kWh (oxygen transfer rate under standar test
alfa 0.8
beta 0.95
cL 1 mg/l
oxygen tranOL 1.343948 kg O2/kWh
power 1.821533 kW
triton aerator-mixer 3 W/m3
power mxi 25920 W
25.92 kW
< BOD keluar dari sedimentasi
Hence Volume of each tank (V) 4000 m3
For liquid depth 4 mtr.
Area at mid depth 1000 m2
Length shall be L=2B
Hence mid depth width B=(area/2)1/2 22.4 mtr.
Hence mid length L- 44.7 mtr.
Side slope of pond is 1V :2.5 H 1.5 mtr.
Depth for Sludge 0.5 mtr.
bottom below Mid depth 2.25 mtr.
Free Board 0.5 mtr.
Top of embankment above mid depth 2.75
Hence total top length(L) 53.0 mtr. 1621.489
Hence total top width(W) 30.6 mtr.
Area at top 1621 m2
Hence total bottom length (L) 38.0 mtr.
Hence total bottom width(W) 15.6 mtr.
Area at Bottom 593 m2
. Kriteria Desain
Tabel Kriteria Desain Clarifier
Parameter Satuan Besaran Sumber
m3/m2har Metcalf
Over flow rate 12-32
i & Eddy
kg/m2
Solid Loading 15-150 Qasim
hari
Radius m 3-60 Qasim
Metcal
Kedalaman bak m 3,5-5
& Eddy

B. Data Perencanaan
Tabel Data Perencanaan Clarifier
Parameter Simbol Besaran Satuan
Debit rata-rata Qr 4320 m3/hari
Volume lumpur Qs 14.062821245 m3/hari

perhitungan
Q 4305.937 m3/hari
2152.969 m3/hari
89.70702 m3/jam
0.024919 m3/s
A 168.2007 m2
D 14.63791 m
15 m
A aktual 176.625
OR 12.18949
SL 45.71059

sedimentasi 2 bak
tr 1 day 78.06397109
DL 2m 0.078063971 g/hari 2.16 L/hari
A 1080 0.00216 m3/hari
Ssi 61.14073 mg/L
M 28493.35 kg/year 78.06397 kg/hari
Mfs 8548.005 kg/year
Mvs 19945.34 kg/year
(M)n 40603.02 kg/3 taun
Ds 0.236449 m
A 1080
h 2.236449 2.5 Year Vt ratio Ds
p 33 0.5 163.7224 0.0601367844 0.150342
l 33 1 303.0471 0.1113120662 0.27828
A total 1089 1.5 423.3709 0.1555081227 0.38877
V 2722.5 2 528.8967 0.1942687531 0.485672
t 1.260417 day 2.5 622.8978 0.2287962695 0.571991
3 707.9236 0.2600270333 0.650068
3.5 785.9593 0.2886902836 0.721726
4 858.5511 0.3153539524 0.788385
4.5 926.9033 0.3404603456 0.851151
< debit lumpur di clarifier
Parameter Simbol Satuan Besaran Sumber

Kecepatan horizontal vh m/menit 2–6 Qasim, 1985


Waktu kontak t menit 20 – 60 Qasim, 1985
Dosis - mg/l 3-10 Qasim, 1985

Parameter Simbol Besaran Satuan


Kapasitas rata – rata
· Debit awal 4320
· Primary sludge 14.06282125 54.466821245
· Supernatan gravity thickener Qr 0 m /hari
3

· Supernatan anaerobic digester 0


· Supernatan sludge drying bed 18.737
· Lumpur sekunder 21.667 < LUMPUR RBC?
Kapasitas maksimum
· Debit awal 8640
· Primary sludge 366
· Supernatan gravity thickener 855
Qmaks m3/hari
· Supernatan anaerobic digester 83
· Supernatan sludge drying bed 180
· Lumpur sekunder 2132

Jumlah unit - 1 unit


Waktu kontak 50 menit
Perbandingan panjang : lebar baffle P:L 15:1
Jumlah saluran baffle 3
Lebar saluran baffel 1.25 m

266.7144

17.7 76.464
28.22 121.9104
Pengaliran

Maksimum
Rata - rata

6159.6672 3079.834
debit inf ke desinfeksi 4316.00737876 m3/hari
2158.00368938 m3/hari < dibikin 2 bak 0.024977 m3/s
Volume bak kontak 74.9306836589 m3 1.498614 m3/menit
Lebar saluran 1.25 m
Panjang 18.75 m
panjang saluran bafle total 55 m
kedalaman air di bak (d) 1.0899008532 m
Luas 2 bak kontak desin 140.625 m2

kontrol desain
td 25 menit < memenuhi
Vh 2.2 m/menit < memenuhi
turbulensi (Nre) R 0.397217 m
Nre 18205.79 < kurang dari 100000

Kebutuhan kaporit
sisa klorin Ct 155.83 mg/l menit< cari lagi ini apa
6.2332 mg/l
kaporit butuh K 38.4322 kg/hari

struktur inlet
hL 3.92548081E-05 m
struktur outlet
asumsi
tinggi weir 1m
hL weir 0.0899008532 m
panjang weir (L) 0.2220712391 m
kecepatan horizontal (vh) 0.9166666667 m/menit
Debit tiap bak
d air di Tinggi air Waktu
Panjang v
atas weir di dalam kontak
m3/hari m3/det weir (m) (m/menit)
(m) bak (m) (menit)

61294 0,709 2,06 0,057 3,06 5,56 25,35


2158.004 0.024977 0.089901 0.222071 1.089901 0.916667 25

primary sludge
0.000215 m3/s
18.576
secondary sludge
Parameter Simbol Besaran Satuan
Periode
pengeringan td 10-15 hari
maksimum
Ketebalan lapisan hs 230-300 mm
pasir
Ketebalan lapisan hsl 150-300 mm
lumpur
Panjang L 6-30 m
Lebar W 6-10 m

Parameter Simbol Besaran Satuan

Total debit Lumpur Qw 21.667 m3/hari

Total beban solid S 802.29 kg/hari


Periode td 10 hari
pengeringan
Ketebalan lapisan hsl 300 mm
lumpur
Ketebalan lapisan hs 225 mm
pasir

Volume V 216.67 m3 sludge cak


Luas A 722.23333333 m2 tahap I
Panjang rencana L 9 m
Lebar rencana W 8 m volum lumpur
Luas Tiap Bed Abed 72 m2 tahap I
Jumlah unit U 10.031018519 unit
10 unit debit resirkulasi
Kedalaman D 1 m

Ketebalan lapisan
pasir
coarse gravel 200
medium gravel 75
fine gravel 75
350
90%
777.3246 kg/hari

volum lumpur
2.9333 m3/hari

debit resirkulasi
18.7337
waste steam debit BOD TSS
outlet prased 3617.19 279.5 597.68
resirkulasi lumpur 18.737
RENCANA ANGGARAN BIAYA (RAB)

UNIT KERJA : DIREKTORAT CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KEGIATAN : PENYEDIAAN INFRASTRUKTUR SANITASI DALAM PENGOLAHAN AIR LIMBAH DI KOTA SURAKARTA
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) MOJOSONGO, SURAKARTA
LOKASI : KECAMATAN JEBRES, KOTA SURAKARTA

JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

1 2 3
I. Pekerjaan Persiapan 188,447,859.02
II. Pekerjaan Screening 1,043,264.65
III. Pekerjaan Bak Pengendap Awal 337,130,455.69
IV. Pekerjaan Tangki Ekualisasi 344,261,336.47
V. Pekerjaan Kolam Anaerobik 437,666,149.07
VI. Pekerjaan Aerated Facultative Lagoon 1,578,064,960.62
VII. Pekerjaan Aerated Lagoon 3,431,594,427.86
VIII. Pekerjaan Sludge Drying Bed 925,846,329.18
IX. Pekerjaan Bak Desinfeksi 173,544,366.55
X Pekerjaan Mekanikal dan Elektrikal 2,176,000.00
XI. Pekerjaan Paving 812,827,631.00
XII. Pekerjaan Pagar 85,340,325.65
XIII. Pekerjaan Pintu Gerbang Masuk 48,926,967.02
XIV. Pekerjaan Drainase 17,598,453.57
JUMLAH 8,384,468,526.34
Biaya Tak Terduga 670,757,482.11
PPN 10% 905,522,600.84
TOTAL 9,960,748,609.29
DIBULATKAN 9,960,800,000.00
TERBILANG : Sembilan Milyar Sembilan Ratus Enam Puluh Juta Delapan Ratus
Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB)

UNIT KERJA : DIREKTORAT CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KEGIATAN : PENYEDIAAN INFRASTRUKTUR SANITASI DALAM PENGOLAHAN AIR LIMBAH DI KOTA SURAKARTA
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) MOJOSONGO, SURAKARTA
LOKASI : KECAMATAN JEBRES, KOTA SURAKARTA

HARGA
JUMLAH HARGA
No. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp.)
(Rp.)
1 2 3 4 5 6
I. Pekerjaan Persiapan
1 Pembersihan Lokasi 1 7580.00 M2 11,797.50 89,425,050.00
2 Pemasangan Bouwplank 2 1444.56 M' 63,010.75 91,022,809.02
3 Penyediaan Air Bersih Untuk Kerja dan Sanitasi 56 1 LS 8,000,000.00 8,000,000.00
Sub Total 188,447,859.02
II. Pekerjaan Screening
1 Galian tanah pondasi 4 0.78 M3 61,665.89 48,222.73
2 Urugan tanah kembali 5 0.31 M3 101,289.38 31,683.32
3 Urugan pasir bawah lantai kerja 5 cm 7 0.05 M3 286,687.50 13,187.63
4 Cor beton lantai kerja K - 100 = 5 cm 11 0.05 M3 1,129,977.50 51,978.97
5 Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter - 4.00 Btg 20,000.00 80,000.00
bawah lantai, jarak 75 cm
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 0.14 M3 1,028,924.60 141,991.59
b. Kolom beton 20X20 cm 26 0.02 M3 7,255,068.70 122,755.76
7 Pasangan Batu Bata 1 : 2, 1 Bata 31 0.92 M2 272,066.30 250,301.00
8 Plesteran 1 : 4, t = 15 mm 33 0.92 M2 52,807.06 48,582.50
9 Acian dinding luar 34 0.92 M2 29,431.60 27,077.07
10 Pipa Inlet SNI dia. 8" - 2.00 M' 113,742.05 227,484.10
Sub Total 1,043,264.65
III. Pekerjaan Kolam Ekualisasi
1 Galian tanah pondasi 4 972.00 M3 69,423.75 67,479,885.00
2 Urugan tanah kembali 5 388.80 M3 101,289.38 39,381,310.94
3 Urugan pasir bawai lantai kerja 5 cm 7 20.00 M3 286,687.50 5,733,750.00
4 Cor beton lantai kerja K - 100 = 5 cm 11 20.00 M3 1,129,977.50 22,599,550.00
5 Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter - 24.00 Btg 20,000.00 480,000.00
bawah lantai, jarak 75 cm
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 6.00 M3 1,028,924.60 6,173,547.60
b. Kolom beton 20X20 cm 26 6.24 M3 7,255,068.70 45,271,628.69
c. Balok Beton 20X20 cm 28 4.00 M3 5,677,891.45 22,711,565.80
7 Bekisting 19 10.00 M2 347,150.00 3,471,500.00
8 Pasangan Batu Bata 1 : 2, 1 Bata 31 36.52 M2 279,030.00 10,190,175.60
9 Plesteran 1 : 4, t = 15 mm 33 73.04 M2 52,807.06 3,857,027.66
10 Acian dinding luar 34 92.88 M2 25,630.00 2,380,514.40
11 Pompa 2.00 M' 50,000,000.00 100,000,000.00
12 Pipa Inlet SNI dia. 8" - 3.00 M' 450,000.00 1,350,000.00
13 Pipa Outlet SNI dia. 8" - 8.00 M' 450,000.00 3,600,000.00
14 Pipa Penguras SNI dia. 4" - 14.00 M' 175,000.00 2,450,000.00
Sub Total 337,130,455.69
IV. Pekerjaan Kolam Preliminary Sedimentation
1 Galian tanah pondasi 4 364.00 M3 82,310.25 29,960,931.00
2 Urugan tanah kembali 5 145.60 M3 22,252.73 3,239,996.76
3 Urugan pasir bawai lantai kerja 5 cm 7 5.40 M3 286,687.50 1,548,112.50
4 Cor beton lantai kerja K - 100 = 5 cm 11 32.40 M3 1,129,977.50 36,611,271.00
5 Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter - 45.00 Btg 20,000.00 900,000.00
bawah lantai, jarak 75 cm
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 16.20 M3 1,028,924.60 16,668,578.52
b. Kolom beton 20X20 cm 26 16.20 M3 7,255,068.70 117,532,112.94
c. Balok Beton 20X20 cm 28 16.20 M3 5,677,891.45 91,981,841.49
7 Bekisting 19 10.00 M2 347,150.00 3,471,500.00
8 Pasangan Batu Bata 1 : 2, 1 Bata 31 49.05 M2 279,030.00 13,686,421.50
9 Plesteran 1 : 4, t = 15 mm 33 124.64 M2 52,807.06 6,581,871.96
10 Acian dinding luar 34 94.76 M2 25,630.00 2,428,698.80
11 Pompa Lumpur 1.00 M' 15,000,000.00 15,000,000.00
11 Pipa Inlet SNI dia. 8" - 4.00 M' 450,000.00 1,800,000.00
12 Pipa Outlet SNI dia. 8" - 4.00 M' 450,000.00 1,800,000.00
13 Pipa Penguras SNI dia. 4" - 6.00 M' 175,000.00 1,050,000.00
Sub Total 344,261,336.47
V. Pekerjaan Kolam Anaerob
1 Galian tanah pondasi 4 1488.00 M3 82,310.25 122,477,652.00
2 Urugan tanah kembali 5 595.20 M3 22,252.73 13,244,821.92
3 Urugan pasir bawai lantai kerja 5 cm 7 24.80 M3 286,687.50 7,109,850.00
4 Cor beton lantai kerja K - 100 = 5 cm 11 24.80 M3 1,129,977.50 28,023,442.00
5 Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter - 45.00 Btg 20,000.00 900,000.00
bawah lantai, jarak 75 cm
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 52.08 M3 1,028,924.60 53,586,393.17
b. Kolom beton 20X20 cm 26 2.23 M3 7,255,068.70 16,178,803.20
c. Balok Beton 20X20 cm 28 1.23 M3 5,677,891.45 6,983,806.48
7 Bekisting 19 10.00 M2 347,150.00 3,471,500.00
8 Pasangan Batu Bata 1 : 2, 1 Bata 31 49.05 M2 279,030.00 13,686,421.50
9 Plesteran 1 : 4, t = 15 mm 33 124.64 M2 42,454.00 5,291,466.56
10 Acian dinding luar 34 94.76 M2 25,630.00 2,428,698.80
11 Pemasangan Liner 54 1399.68 M2 102,833.00 143,933,293.44
11 Pompa Lumpur 1.00 M' 15,000,000.00 15,000,000.00
12 Pipa Inlet SNI dia. 8" - 4.00 M' 450,000.00 1,800,000.00
13 Pipa Outlet SNI dia. 8" - 4.00 M' 450,000.00 1,800,000.00
14 Pipa Penguras SNI dia. 4" - 10.00 M' 175,000.00 1,750,000.00
Sub Total 437,666,149.07
VI. Pekerjaan Kolam Aerasi Fakultatif Lagoon
1 Galian tanah pondasi 4 11298.00 M3 82,310.25 929,941,204.50
2 Urugan tanah kembali 5 4519.20 M3 22,252.73 100,564,514.82
3 Urugan pasir bawai lantai kerja 5 cm 7 123.67 M3 286,687.50 35,455,052.68
4 Cor beton lantai kerja K - 100 = 5 cm 11 123.67 M3 1,129,977.50 139,745,931.68
Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter
5
bawah lantai, jarak 75 cm - 45.00 Btg 20,000.00 900,000.00
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 47.25 M3 1,028,924.60 48,616,687.35
b. Kolom beton 20X20 cm 26 2.03 M3 7,255,068.70 14,691,514.12
c. Balok Beton 20X20 cm 28 1.95 M3 5,677,891.45 11,071,888.33
7 Bekisting 19 10.00 M2 347,150.00 3,471,500.00
8 Pasangan Batu Bata 1 : 2, 1 Bata 31 49.05 M2 279,030.00 13,686,421.50
9 Plesteran 1 : 4, t = 15 mm 33 124.64 M2 42,454.00 5,291,466.56
10 Acian dinding luar 34 94.76 M2 25,630.00 2,428,698.80
11 Pemasangan Liner 54 2473.43 M2 102,833.00 254,350,080.29
11 Pompa Lumpur 1.00 M' 15,000,000.00 15,000,000.00
12 Pipa Inlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
13 Pipa Outlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
14 Pipa Penguras SNI dia. 4" - 6.00 M' 175,000.00 1,050,000.00
Sub Total 1,578,064,960.62
VII. Pekerjaan Kolam Aerated Lagoon
1 Galian tanah pondasi 4 34560.00 M3 69,423.75 2,399,284,800.00
2 Urugan tanah kembali 5 13824.00 M3 22,252.73 307,621,670.40
3 Urugan pasir bawai lantai kerja 5 cm 7 172.80 M3 286,687.50 49,539,600.00
4 Cor beton lantai kerja K - 100 = 5 cm 11 172.80 M3 1,129,977.50 195,260,112.00
5 Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter - 45.00 Btg 20,000.00 900,000.00
bawah lantai, jarak 75 cm
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 47.25 M3 1,028,924.60 48,616,687.35
b. Kolom beton 20X20 cm 26 2.03 M3 7,255,068.70 14,691,514.12
c. Balok Beton 20X20 cm 28 1.95 M3 5,677,891.45 11,071,888.33
7 Bekisting 19 10.00 M2 347,150.00 3,471,500.00
8 Pasangan Batu Bata 1 : 2, 1 Bata 31 49.05 M2 279,030.00 13,686,421.50
9 Plesteran 1 : 4, t = 15 mm 33 124.64 M2 42,454.00 5,291,466.56
10 Acian dinding luar 34 94.76 M2 25,630.00 2,428,698.80
11 Pemasangan Liner 54 3456.00 M2 102,833.00 355,390,848.00
12 Pemasangan Strauss Pile 55 40.00 M 62,230.52 6,489,220.80
11 Pompa Lumpur 1.00 M' 15,000,000.00 15,000,000.00
13 Pipa Inlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
14 Pipa Outlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
15 Pipa Penguras SNI dia. 4" - 6.00 M' 175,000.00 1,050,000.00
Sub Total 3,431,594,427.86
VIII. Pekerjaan Kolam Sedimentasi 1750
1 Galian tanah pondasi 4 5445.00 M3 69,423.75 378,012,318.75 350
2 Urugan tanah kembali 5 2178.00 M3 22,252.73 48,466,435.05 350
3 Urugan pasir bawai lantai kerja 5 cm 7 108.00 M3 286,687.50 30,962,250.00 2450
4 Cor beton lantai kerja K - 100 = 5 cm 11 108.00 M3 1,129,977.50 122,037,570.00
5 Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter - 45.00 Btg 20,000.00 900,000.00
bawah lantai, jarak 75 cm
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 47.25 M3 1,028,924.60 48,616,687.35
b. Kolom beton 20X20 cm 26 2.03 M3 7,255,068.70 14,691,514.12
c. Balok Beton 20X20 cm 28 1.95 M3 5,677,891.45 11,071,888.33
7 Bekisting 19 10.00 M2 347,150.00 3,471,500.00
8 Pasangan Batu Bata 1 : 2, 1 Bata 31 49.05 M2 279,030.00 13,686,421.50
9 Plesteran 1 : 4, t = 15 mm 33 124.64 M2 42,454.00 5,291,466.56
10 Acian dinding luar 34 94.76 M2 25,630.00 2,428,698.80
11 Pemasangan Liner 54 2160.00 M2 102,833.00 222,119,280.00
12 Pemasangan Strauss Pile 55 36.00 M 62,230.52 6,240,298.72
11 Pompa Lumpur 1.00 M' 15,000,000.00 15,000,000.00
13 Pipa Inlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
14 Pipa Outlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
15 Pipa Penguras SNI dia. 4" - 6.00 M' 175,000.00 1,050,000.00
Sub Total 925,846,329.18
IX. Pekerjaan Bak Desinfeksi
1 Galian tanah pondasi 4 149.86 M3 61,665.89 9,241,334.59
2 Urugan tanah kembali 5 59.94 M3 22,252.73 1,333,929.52
3 Urugan pasir bawai lantai kerja 5 cm 7 7.03 M3 286,687.50 2,015,771.48
4 Cor beton lantai kerja K - 100 = 5 cm 11 7.03 M3 1,129,977.50 7,945,154.30
5 Pancangan kayu bulat dia. 10-12 cm, pj. 2 meter - 45.00 Btg 20,000.00 900,000.00
bawah lantai, jarak 75 cm
6 Beton bertulang K-225 :
a. Lantai beton 15 cm 23 47.25 M3 1,028,924.60 48,616,687.35
b. Kolom beton 20X20 cm 26 2.03 M3 7,255,068.70 14,691,514.12
c. Balok Beton 20X20 cm 28 1.95 M3 5,677,891.45 11,071,888.33
7 Bekisting 19 10.00 M2 347,150.00 3,471,500.00
8 Pasangan Batu Bata 1 : 2, 1 Bata 31 49.05 M2 279,030.00 13,686,421.50
9 Plesteran 1 : 4, t = 15 mm 33 124.64 M2 42,454.00 5,291,466.56
10 Acian dinding luar 34 94.76 M2 25,630.00 2,428,698.80
11 Pompa Pembubuh 2.00 M' 25,000,000.00 50,000,000.00
11 Pipa Inlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
12 Pipa Outlet SNI dia. 8" - 2.00 M' 450,000.00 900,000.00
13 Pipa Penguras SNI dia. 4" - 6.00 M' 175,000.00 1,050,000.00
Sub Total 173,544,366.55
X. Pekerjaan Mekanikal dan Elektrikal
1 Pasangan Lampu Pijar 25 Watt 52 30.00 BH 41,200.00 1,236,000.00
2 Pasangan Armatur Stop Kontak 50 20.00 BH 21,200.00 424,000.00
3 Pasangan Armatur Saklar Tunggal 51 30.00 BH 17,200.00 516,000.00
Sub Total 2,176,000.00
XI. Pekerjaan Paving
1 Pembuatan Paving sekeliling kolam 49 4048.40 M2 200,777.50 812,827,631.00
Sub Total 812,827,631.00
XII. Pekerjaan Pagar
1 Galian tanah biasa 4 115.20 M3 61,665.89 7,103,910.53
2 Urugan pasir bawah lantai kerja 5 cm 7 11.52 M3 286,687.50 3,302,640.00
3 Beton Mutu K275 kolom 26 2.03 M3 7,255,068.70 14,691,514.12
4 Bekisting kolom 19 12.60 M2 347,150.00 4,374,090.00
5 Pasangan Batu Bata 1 : 2, 1 Bata 31 49.05 M2 279,030.00 13,686,421.50
6 Sloof 15/20 Beton 24 7.00 m2 4,151,693.70 29,061,855.90
7 Plesteran 1 : 4, t = 15 mm 33 73.04 M2 42,454.00 3,100,840.16
8 Pengecatan 47 288.00 M2 34,788.38 10,019,053.44
Sub Total 85,340,325.65
XIII. Pekerjaan Pintu Gerbang Masuk
1 Galian tanah pondasi 4 12.00 M3 61,665.89 739,990.68
2 Urugan tanah kembali 5 4.80 M3 22,252.73 106,813.08
3 Urugan pasir bawah lantai kerja 5 cm 7 0.60 M3 286,687.50 172,012.50
4 Beton Mutu K275 kolom 26 2.03 M3 7,255,068.70 14,691,514.12
5 Bekisting kolom 19 6.42 M2 253,370.15 1,626,636.36
6 Pasangan Batu Bata 1 : 2, 1 Bata 31 8.00 M2 279,030.00 2,232,240.00
7 Sloof 15/20 Beton 24 7.00 m2 4,151,693.70 29,061,855.90
8 Plesteran 1 : 4, t = 15 mm 33 6.97 M2 42,454.00 295,904.38
Sub Total 48,926,967.02
XIV. Pekerjaan Drainase
1 Galian tanah pondasi 4 30.00 M3 61,665.89 1,849,976.70
2 Urugan tanah kembali 5 12.00 M3 22,252.73 267,032.70
3 Urugan pasir bawah lantai kerja 5 cm 7 8.42 M3 286,687.50 2,413,908.75
4 Bekisting kolom 19 20.00 M2 253,370.15 5,067,403.00
5 Pasangan Batu Bata 1 : 2, 1 Bata 31 24.30 M2 279,030.00 6,780,429.00
6 Plesteran 1 : 4, t = 15 mm 33 28.73 M2 42,454.00 1,219,703.42
Sub Total 17,598,453.57
JUMLAH 8,384,468,526.34
Biaya Tak Terduga 670,757,482.11
PPN 10% 905,522,600.84
TOTAL 9,960,748,609.29
DIBULATKAN 9,960,800,000.00
TERBILANG : Sembilan Milyar Sembilan Ratus Enam Puluh Juta Delapan Ratus Ribu Rupiah
20740.8 622224 7466688
259.26 7777.8 93333.6
51.852 1555.56 18666.72
62.2224 1866.672 22400.064
11200.03 7601088.384
91213060.608

16.8 216000000
PEMBERSIHAN LOKASI
VOLUME
barscreen 0.782 m3
ekualisasi 972 m3
prased 364
anaerob 6998.4 m3
fakultatif 11298 m3 10302
aerasi 34560 m3
sedimentasi 5445 m3
desinfeksi 149.8614 m3
59788.04

LUAS
barscreen 0.92
ekualisasi 400
prased 108
anaerob 1399.68
fakultatif 2473.429 3698
aerasi 3456
sedimentasi 2160
desinfeksi 140.625 11938
10138.65 18895 5048.4

BOWPLANK
horizontal 789.9
vertikal 654.66
ANALISA HARGA SATUAN PEKERJAAN SNI 2017

1 Pembersihan 1 m2 lapangan dan perataan

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Tenaga Kerja Pekerja OH 0.100 75,000.00 7,500.00
Mandor OH 0.05 85,000.00 4,250.00
Jumlah harga per-satuan pekerjaan 11,750.00

2 Pengukuran dan pemasangan 1 m' Bouwplank

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu Balok 5/7 m3 0.012 76,500.00 918.00
Pake 2"-3" kg 0.02 125,000.00 2,500.00
Kayu Papan 3/20 m3 0.007 138,500.00 969.50
Tenaga Kerja Pekerja OH 0.100 75,000.00 7,500.00
Tukang Kayu OH 0.1 75,000.00 7,500.00
Kepala tukang OH 0.010 70,000.00 700.00
Mandor OH 0.005 85,000.00 425.00
Jumlah harga per-satuan pekerjaan 20,512.50

3 Menggali 1 m3 tanah biasa sedalam 1 meter

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Tenaga Kerja Pekerja OH 0.750 70,000.00 52,500.00
Mandor OH 0.025 85,000.00 2,125.00
Jumlah harga per-satuan pekerjaan 54,625.00

4 Menggali 1 m3 tanah biasa sedalam 2 meter

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Tenaga Kerja Pekerja OH 0.900 70,000.00 63,000.00
Mandor OH 0.045 85,000.00 3,825.00
Jumlah harga per-satuan pekerjaan 66,825.00

5 Mengurug kembali 1 m3 galian


Mengurug kembali 1 m3 galian dihitung dari 1/3 dari indeks pekerjaan galian
0.333 66,825.00 22,252.73

6 Mengurug 1 m3 psir urug

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Pasir Urug M3 1.200 125,000.00 150,000.00
Tenaga Kerja Pekerja OH 0.900 70,000.00 63,000.00
Mandor OH 0.045 85,000.00 3,825.00
Jumlah harga per-satuan pekerjaan 216,825.00
7 Mengurug 1 m3 tanah urug untuk peninggian bangunan

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Pasir Urug M3 1.200 125,000.00 150,000.00
Tenaga Kerja Pekerja OH 0.250 70,000.00 17,500.00
Mandor OH 0.025 85,000.00 2,125.00
Jumlah harga per-satuan pekerjaan 169,625.00

8 Memadatkan 1 m3 tanah (per 20 cm)

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Tenaga Kerja Pekerja OH 0.500 70,000.00 35,000.00
Mandor OH 0.050 85,000.00 4,250.00
Jumlah harga per-satuan pekerjaan 39,250.00

9 Mengurug 1 m3 tanah urug dipadatkan

Kebutuhan Jumlah (Rp.)


a. Mengurug 1 m3 tanah urug untuk peninggian bangunan 169,625.00
b. Memadatkan 1 m3 tanah (per 20 cm) 39,250.00
Jumlah harga per-satuan pekerjaan 208,875.00

10 Memasang 1 m3 pondasi batu, campuran 1 SP : 4 PP

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Batu pondasi 1 m3 1.200 125,000.000 150,000.00
Semen portland kg 163.000 2,000.000 326,000.00
Pasir Pasang m3 0.520 138,500.000 72,020.00
Tenaga Kerja Pekerja OH 1.500 75,000.000 112,500.00
Tukang Batu OH 0.750 65,000.000 48,750.00
Kepala Tukang OH 0.075 70,000.000 5,250.00
Mandor OH 0.075 85,000.000 6,375.00
Jumlah harga per-satuan pekerjaan 720,895.00

11 Membuat 1 m3 beton mutu K-100 (beton bawah lantai fa=7,4 MPa)

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Semen portland kg 247.000 2,000.000 494,000.00
Pasir Pasang m3 0.869 138,500.000 120,356.50
Kerikil (maks. m3 0.999 219,000.000 218,781.00
Air liter 215.000 680.000 146,200.00
Tenaga Kerja Pekerja OH 1.650 75,000.000 123,750.00
Tukang Batu OH 0.275 65,000.000 17,875.00
Kepala Tukang OH 0.028 70,000.000 1,960.00
Mandor OH 0.083 85,000.000 7,055.00
Jumlah harga per-satuan pekerjaan 1,129,977.50

12 Membuat 1 m3 beton mutu K-150 (beton keliling bangunan fa=12.2 MPa)

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Semen portland kg 299.000 2,000.000 598,000.00
Pasir Pasang m3 0.799 138,500.000 110,661.50
Kerikil (maks. m3 1.017 219,000.000 222,723.00
Air liter 215.000 680.000 146,200.00
Tenaga Kerja Pekerja OH 1.650 75,000.000 123,750.00
Tukang Batu OH 0.275 65,000.000 17,875.00
Kepala Tukang OH 0.028 70,000.000 1,960.00
Mandor OH 0.083 85,000.000 7,055.00
Jumlah harga per-satuan pekerjaan 1,228,224.50

13 Membuat 1 m' kolom praktis beton bertulang (11 x 11 ) cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu Kelas III m3 0.002 3,731,000.000 7,462.00
Paku 5cm - 12 c kg 0.010 20,000.000 200.00
Besi beton polos kg 3.000 11,000.000 33,000.00
Kawat beton kg 0.450 12,000.000 5,400.00
Semen Portland kg 4.000 2,000.000 8,000.00
Pasir Pasang m3 0.006 138,500.000 831.00
Kerikil m3 0.009 219,000.000 1,971.00
Tenaga Kerja Pekerja OH 0.180 75,000.000 13,500.00
Tukang Batu OH 0.020 65,000.000 1,300.00
Tukang Kayu OH 0.020 75,000.000 1,500.00
Tukang Besi OH 0.020 70,000.000 1,400.00
Kepala Tukang OH 0.006 75,000.000 450.00
Mandor OH 0.009 85,000.000 765.00
Jumlah harga per-satuan pekerjaan 75,779.00

14 Membuat 1 m' ring balok beton bertulang

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu Kelas III m3 0.003 3,731,000.000 11,193.00
Paku 5cm - 12 c kg 0.020 20,000.000 400.00
Besi beton polos kg 3.130 11,000.000 34,430.00
Kawat beton kg 0.047 12,000.000 564.00
Semen Portland kg 5.500 2,000.000 11,000.00
Pasir Pasang m3 0.009 138,500.000 1,246.50
Kerikil m3 0.015 219,000.000 3,285.00
Tenaga Kerja Pekerja OH 0.297 75,000.000 22,275.00
Tukang Batu OH 0.033 65,000.000 2,145.00
Tukang Kayu OH 0.033 75,000.000 2,475.00
Tukang Besi OH 0.033 70,000.000 2,310.00
Kepala Tukang OH 0.010 75,000.000 750.00
Mandor OH 0.015 85,000.000 1,275.00
Jumlah harga per-satuan pekerjaan 93,348.50

15 Membuat 1 m3 beton mutu K-225, slump (12 ± 2) cm, w/c = 0.58

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Semen portland kg 371.000 2,000.000 742,000.00
Pasir Pasang m3 0.499 138,500.000 69,111.50
Kerikil (maks. m3 0.776 219,000.000 169,944.00
Air liter 215.000 680.000 146,200.00
Tenaga Kerja Pekerja OH 1.650 75,000.000 123,750.00
Tukang Batu OH 0.275 65,000.000 17,875.00
Kepala Tukang OH 0.028 75,000.000 2,100.00
Mandor OH 0.083 85,000.000 7,055.00
Jumlah harga per-satuan pekerjaan 1,278,035.50

16 Pembesian 10 kg dengan besi polos atau besi ulir

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Besi beton (polos kg 10.500 11,000.000 115,500.00
Kawat beton kg 0.150 12,000.000 1,800.00
Tenaga Kerja Pekerja OH 0.070 75,000.000 5,250.00
Tukang Besi OH 0.070 70,000.000 4,900.00
Kepala Tukang OH 0.007 75,000.000 525.00
Mandor OH 0.004 85,000.000 340.00
Jumlah harga per-10 kg satuan pekerjaan 128,315.00
Jumlah harga per-1 kg satuan pekerjaan 12,831.50

17 Memasang 1 m2 bekisting untuk pondasi

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu kelas III ( kg 0.040 3,731,000.000 149,240.00
Paku 5 cm - 10 c m3 0.300 20,000.000 6,000.00
Minyak bekistin m3 0.100 14,000.000 1,400.00
Tenaga Kerja Pekerja OH 0.520 75,000.000 39,000.00
Tukang Kayu OH 0.260 75,000.000 19,500.00
Kepala Tukang OH 0.026 70,000.000 1,820.00
Mandor OH 0.026 85,000.000 2,210.00
Jumlah harga per-satuan pekerjaan 219,170.00

18 Memasang 1 m2 bekisting untuk dinding

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu kelas III ( m3 0.030 3,731,000.000 111,930.00
Paku 5 cm - 12 c kg 0.400 20,000.000 8,000.00
Minyak bekistin liter 0.200 14,000.000 2,800.00
Balok kayu kelas m3 0.020 5,183,000.000 103,660.00
Dolken ky galam
btg 3.000 15,000.000 45,000.00
10 cm, pj. 4 mtr
Tenaga Kerja Pekerja OH 0.660 75,000.000 49,500.00
Tukang Kayu OH 0.330 75,000.000 24,750.00
Kepala Tukang OH 0.033 70,000.000 2,310.00
Mandor OH 0.033 85,000.000 2,805.00
Jumlah harga per-satuan pekerjaan 350,755.00

19 Memasang 1 m2 bekisting untuk kolom

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu kelas III ( m3 0.040 3,731,000.000 149,240.00
Paku 5 cm - 12 c kg 0.400 20,000.000 8,000.00
Minyak bekistin liter 0.200 14,000.000 2,800.00
Balok kayu kelas m3 0.015 5,183,000.000 77,745.00
Dolken ky galam
btg 2.000 15,000.000 30,000.00
10 cm, pj. 4 mtr
Tenaga Kerja Pekerja OH 0.660 75,000.000 49,500.00
Tukang Kayu OH 0.330 75,000.000 24,750.00
Kepala Tukang OH 0.033 70,000.000 2,310.00
Mandor OH 0.033 85,000.000 2,805.00
Jumlah harga per-satuan pekerjaan 347,150.00

20 Memasang 1 m2 bekisting untuk balok

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu kelas III ( m3 0.040 3,731,000.000 149,240.00
Paku 5 cm - 12 c kg 0.400 20,000.000 8,000.00
Minyak bekistin liter 0.200 14,000.000 2,800.00
Balok kayu kelas m3 0.015 5,183,000.000 77,745.00
Dolken ky galam
btg 2.000 15,000.000 30,000.00
10 cm, pj. 4 mtr
Tenaga Kerja Pekerja OH 0.660 75,000.000 49,500.00
Tukang Kayu OH 0.330 75,000.000 24,750.00
Kepala Tukang OH 0.033 70,000.000 2,310.00
Mandor OH 0.033 85,000.000 2,805.00
Jumlah harga per-satuan pekerjaan 347,150.00

21 Memasang 1 m2 bekisting untuk lantai

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kayu kelas III ( m3 0.040 3,731,000.000 149,240.00
Paku 5 cm - 12 c kg 0.400 20,000.000 8,000.00
Minyak bekistin liter 0.200 14,000.000 2,800.00
Balok kayu kelas m3 0.015 5,183,000.000 77,745.00
Dolken ky galam
btg 6.000 15,000.000 90,000.00
10 cm, pj. 4 mtr
Tenaga Kerja Pekerja OH 0.660 75,000.000 49,500.00
Tukang Kayu OH 0.330 75,000.000 24,750.00
Kepala Tukang OH 0.033 70,000.000 2,310.00
Mandor OH 0.033 85,000.000 2,805.00
Jumlah harga per-satuan pekerjaan 407,150.00

22 Membuat 1 m3 plat poer 100 X 100 X 20 cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 232.260 12,831.500 2,980,244.19
Memasang 1 m2 b m2 4.000 219,170.000 876,680.00
Tenaga Kerja Pekerja OH 0.700 75,000.000 52,500.00
Tukang Kayu OH 0.350 75,000.000 26,250.00
Kepala Tukang OH 0.035 70,000.000 2,450.00
Mandor OH 0.035 85,000.000 2,975.00
Jumlah harga per-satuan pekerjaan 5,219,134.69

23 Membuat 1 m3 plat lantai IPLT

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 194.000 12,831.500 2,489,311.00
Memasang 1 m2 b m2 4.000 219,170.000 876,680.00
Tenaga Kerja Pekerja OH 0.700 75,000.000 52,500.00
Tukang Kayu OH 0.350 75,000.000 26,250.00
Kepala Tukang OH 0.035 70,000.000 2,450.00
Mandor OH 0.035 85,000.000 2,975.00
Jumlah harga per-satuan pekerjaan 4,728,201.50

24 Membuat 1 m3 sloof beton 30 X 30 cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 222.800 12,831.500 2,858,858.20
Memasang 1 m2 b m2 6.800 219,170.000 1,490,356.00
Tenaga Kerja Pekerja OH 5.650 75,000.000 423,750.00
Tukang Batu OH 0.275 65,000.000 17,875.00
Tukang Besi OH 1.400 70,000.000 98,000.00
Kepala Tukang OH 0.323 75,000.000 24,225.00
Mandor OH 0.283 85,000.000 24,055.00
Jumlah harga per-satuan pekerjaan 6,215,154.70

25 Membuat 1 m3 kolom 30 X 30 cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 210.750 12,831.500 2,704,238.63
Memasang 1 m2 b m2 13.200 347,150.000 4,582,380.00
Tenaga Kerja Pekerja OH 0.180 75,000.000 13,500.00
Tukang Kayu OH 0.020 75,000.000 1,500.00
Tukang Batu OH 0.020 65,000.00 1,300.00
Tukang Besi OH 0.020 70,000.00 1,400.00
Kepala Tukang OH 0.006 70,000.000 420.00
Mandor OH 0.009 85,000.000 765.00
Jumlah harga per-satuan pekerjaan 8,582,354.13

26 Membuat 1 m3 kolom 20 X 20 cm (IPLT)

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 139.900 12,831.500 1,795,126.85
Memasang 1 m2 b m2 20.000 347,150.000 6,943,000.00
Tenaga Kerja Pekerja OH 0.180 75,000.000 13,500.00
Tukang Kayu OH 0.020 75,000.000 1,500.00
Tukang Batu OH 0.020 65,000.00 1,300.00
Tukang Besi OH 0.020 70,000.00 1,400.00
Kepala Tukang OH 0.006 70,000.000 420.00
Mandor OH 0.009 85,000.000 765.00
Jumlah harga per-satuan pekerjaan 10,035,047.35

27 Membuat 1 m3 balok lantai beton 30 X 30 cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 222.800 12,831.500 2,858,858.20
Memasang 1 m2 b m2 10.200 347,150.000 3,540,930.00
Tenaga Kerja Pekerja OH 6.350 75,000.000 476,250.00
Tukang Kayu OH 1.650 75,000.000 123,750.00
Tukang Batu OH 0.275 65,000.00 17,875.00
Tukang Besi OH 1.400 70,000.00 98,000.00
Kepala Tukang OH 0.333 70,000.000 23,310.00
Mandor OH 0.318 85,000.000 27,030.00
Jumlah harga per-satuan pekerjaan 8,444,038.70

28 Membuat 1 m3 balok beton 20 X 20 cm (IPLT)


Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)
Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 151.710 12,831.500 1,946,666.87
Memasang 1 m2 b m2 15.273 347,150.000 5,302,021.95
Tenaga Kerja Pekerja OH 6.350 75,000.000 476,250.00
Tukang Kayu OH 1.650 75,000.000 123,750.00
Tukang Batu OH 0.275 65,000.00 17,875.00
Tukang Besi OH 1.400 70,000.00 98,000.00
Kepala Tukang OH 0.333 70,000.000 23,310.00
Mandor OH 0.318 85,000.000 27,030.00
Jumlah harga per-satuan pekerjaan 9,292,939.32

29 Membuat 1 m3 plat lantai 12 cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 148.330 12,831.500 1,903,296.40
Memasang 1 m2 be m2 8.333 407,150.000 3,392,780.95
Tenaga Kerja Pekerja OH 0.700 75,000.000 52,500.00
Tukang Kayu OH 0.350 75,000.000 26,250.00
Kepala Tukang OH 0.035 70,000.000 2,450.00
Mandor OH 0.035 85,000.000 2,975.00
Jumlah harga per-satuan pekerjaan 6,658,287.85

30 Membuat 1 m3 plat lantai 10 cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Membuat 1 m3 be m3 1.000 1,278,035.500 1,278,035.50
Pembesian 1 kg dg kg 124.000 12,831.500 1,591,106.00
Memasang 1 m2 be m2 9.943 407,150.000 4,048,292.45
Tenaga Kerja Pekerja OH 0.700 75,000.000 52,500.00
Tukang Kayu OH 0.350 75,000.000 26,250.00
Kepala Tukang OH 0.035 70,000.000 2,450.00
Mandor OH 0.035 85,000.000 2,975.00
Jumlah harga per-satuan pekerjaan 7,001,608.95

31 Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC : 2 PP

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Bata merah buah 140.000 850.000 119,000.00
Semen Portland kg 43.500 2,000.000 87,000.00
Pasir Pasang m3 0.080 138,500.000 11,080.00
Tenaga Kerja Pekerja OH 0.600 75,000.000 45,000.00
Tukang Batu OH 0.200 65,000.000 13,000.00
Kepala Tukang OH 0.020 70,000.000 1,400.00
Mandor OH 0.030 85,000.000 2,550.00
Jumlah harga per-satuan pekerjaan 279,030.00

32 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 4 PP

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Bata merah buah 70.000 850.000 59,500.00
Semen Portland kg 11.500 2,000.000 23,000.00
Pasir Pasang m3 0.043 138,500.000 5,955.50
Tenaga Kerja Pekerja OH 0.300 75,000.000 22,500.00
Tukang Batu OH 0.100 65,000.000 6,500.00
Kepala Tukang OH 0.010 70,000.000 700.00
Mandor OH 0.015 85,000.000 1,275.00
Jumlah harga per-satuan pekerjaan 119,430.50

33 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Semen Portland kg 6.240 2,000.000 12,480.00
Pasir Pasang m3 0.024 138,500.000 3,324.00
Tenaga Kerja Pekerja OH 0.200 75,000.000 15,000.00
Tukang Batu OH 0.150 65,000.000 9,750.00
Kepala Tukang OH 0.015 70,000.000 1,050.00
Mandor OH 0.010 85,000.000 850.00
Jumlah harga per-satuan pekerjaan 42,454.00

34 Memasang 1 m2 acian

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Semen Portland kg 3.250 2,000.000 6,500.00
Tenaga Kerja Pekerja OH 0.150 75,000.000 11,250.00
Tukang Batu OH 0.100 65,000.000 6,500.00
Kepala Tukang OH 0.010 70,000.000 700.00
Mandor OH 0.008 85,000.000 680.00
Jumlah harga per-satuan pekerjaan 25,630.00

35 Memasang 1 m3 kontruksi kuda-kuda konvensional

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Balok Kayu m3 1.100 5,183,000.000 5,701,300.00
Besi Strip Tebal kg 15.000 11,000.000 165,000.00
Paku 12 cm kg 5.600 18,000.000 100,800.00
Tenaga Kerja Pekerja OH 4.000 75,000.000 300,000.00
Tukang Kayu OH 12.000 75,000.000 900,000.00
Kepala Tukang OH 1.200 70,000.000 84,000.00
Mandor OH 0.200 85,000.000 17,000.00
Jumlah harga per-satuan pekerjaan 7,268,100.00

36 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Balok Kayu Ulin m3 1.100 11,310,000.000 12,441,000.00
Paku 10 cm kg 1.250 20,000.000 25,000.00
Lem Kayu kg 1.000 15,300.000 15,300.00
Tenaga Kerja Pekerja OH 6.000 75,000.000 450,000.00
Tukang Kayu OH 20.000 75,000.000 1,500,000.00
Kepala Tukang OH 2.000 70,000.000 140,000.00
Mandor OH 0.300 85,000.000 25,500.00
Jumlah harga per-satuan pekerjaan 14,596,800.00

37 Memasang 1 m2 rangka langit-langit (60X60) cm, Kayu kelas II atau III

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kasau (5X7) cm m3 0.016 5,183,000.000 82,928.00
Paku 7cm - 10cm kg 0.250 20,000.000 5,000.00
Tenaga Kerja Pekerja OH 0.200 75,000.000 15,000.00
Tukang Kayu OH 0.300 75,000.000 22,500.00
Kepala Tukang OH 0.030 70,000.000 2,100.00
Mandor OH 0.010 85,000.000 850.00
Jumlah harga per-satuan pekerjaan 128,378.00

38 Memasang 1 m2 langit-langit dari kalsiboard ukuran (120X240) cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Kalsiboard tebal lbr 0.375 94,500.000 35,437.50
Paku 1cm - 2,5c kg 0.030 17,010.000 510.30
Tenaga Kerja Pekerja OH 0.070 75,000.000 5,250.00
Tukang Kayu OH 0.100 75,000.000 7,500.00
Kepala Tukang OH 0.010 70,000.000 700.00
Mandor OH 0.004 85,000.000 340.00
Jumlah harga per-satuan pekerjaan 49,737.80

39 Memasang 1 m2 langit-langit kalsiboard dan rangka

Kebutuhan Jumlah (Rp.)


a. Memasang 1 m2 rangka langit-langit (60 X 60) cm, kayu kelas II atau III 128,378.00
b. Memasang 1 m2 langit-langit dari kalsiboard ukuran (120 X 240) cm 49,737.80
Jumlah harga per-satuan pekerjaan 178,115.80

40 Memasang 1 m' lisplank ukuran (2 X 2/20) cm, papan ulin


Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)
Bahan Papan kayu ulin m3 0.011 6,912,500.000 76,037.50
Paku 5cm - 7cm kg 0.050 18,000.000 900.00
Tenaga Kerja Pekerja OH 0.100 75,000.000 7,500.00
Tukang Kayu OH 0.200 75,000.000 15,000.00
Kepala Tukang OH 0.020 70,000.000 1,400.00
Mandor OH 0.005 85,000.000 425.00
Jumlah harga per-satuan pekerjaan 101,262.50

41 Memasang 1 m' lisplank ukuran (2 X 2/20) cm, papan MC

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Papan kayuMC m3 0.011 11,310,000.000 124,410.00
Paku 5cm - 7cm kg 0.050 20,000.000 1,000.00
Tenaga Kerja Pekerja OH 0.100 75,000.000 7,500.00
Tukang Kayu OH 0.200 75,000.000 15,000.00
Kepala Tukang OH 0.020 70,000.000 1,400.00
Mandor OH 0.005 85,000.000 425.00
Jumlah harga per-satuan pekerjaan 149,735.00

42 Memasang 1 m2 lantai keramik ukuran ( 30 X 30 ) cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Keramik m2 1.000 52,000.000 52,000.00
Semen Portland kg 10.000 2,000.000 20,000.00
Pasir Pasang m3 0.045 138,500.000 6,232.50
Semen Warna kg 1.500 7,200.000 10,800.00
Tenaga Kerja Pekerja OH 0.620 75,000.000 46,500.00
Tukang Batu OH 0.350 75,000.000 26,250.00
Kepala Tukang OH 0.035 70,000.000 2,450.00
Mandor OH 0.030 85,000.000 2,550.00
Jumlah harga per-satuan pekerjaan 166,782.50

43 Memasang 1 m2 lantai keramik ukuran (20X20) cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Keramik m2 1.000 52,000.000 52,000.00
Semen Portland kg 10.400 2,000.000 20,800.00
Pasir Pasang m3 0.045 138,500.000 6,232.50
Semen Warna kg 1.620 7,200.000 11,664.00
Tenaga Kerja Pekerja OH 0.620 75,000.000 46,500.00
Tukang Batu OH 0.350 75,000.000 26,250.00
Kepala Tukang OH 0.035 70,000.000 2,450.00
Mandor OH 0.030 85,000.000 2,550.00
Jumlah harga per-satuan pekerjaan 168,446.50
44 Memasang 1 m2 dinding keramik ukuran (20 X 20) cm

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Keramik m2 1.000 52,000.000 52,000.00
Semen Portland kg 9.300 2,000.000 18,600.00
Pasir Pasang m3 0.018 138,500.000 2,493.00
Semen Warna kg 1.940 7,200.000 13,968.00
Tenaga Kerja Pekerja OH 0.600 75,000.000 45,000.00
Tukang Batu OH 0.450 75,000.000 33,750.00
Kepala Tukang OH 0.0450 70,000.000 3,150.00
Mandor OH 0.0300 85,000.000 2,550.00
Jumlah harga per-satuan pekerjaan 171,511.00

45 Memasang 1 m2 atap genteng metal

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Atap genteng met m2 1.020 95,000.000 96,900.00
Paku atap kg 0.200 21,600.000 4,320.00
Tenaga Kerja Pekerja OH 0.200 75,000.000 15,000.00
Tukang Kayu OH 0.100 75,000.000 7,500.00
Kepala Tukang OH 0.0100 70,000.000 700.00
Mandor OH 0.0100 85,000.000 850.00
Jumlah harga per-satuan pekerjaan 125,270.00

46 Pengecatan 1 m2 bidang kayu baru, 1 lapis cet dasar 2 lapis cat penutup

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Cat Menei kg 0.200 25,400.000 5,080.00
Plamir kg 0.150 15,000.000 2,250.00
Cet Dasar kg 0.170 20,000.000 3,400.00
Cat Penutup 2X kg 0.260 34,500.000 8,970.00
Tenaga Kerja Pekerja OH 0.070 75,000.000 5,250.00
Tukang Cat OH 0.090 70,000.000 6,300.00
Kepala Tukang OH 0.006 75,000.000 450.00
Mandor OH 0.003 85,000.000 212.50
Jumlah harga per-satuan pekerjaan 31,912.50

47 Pengecatan 1 m2 bidang tembok baru, 1 lapis plamir 1 lapis cat dasar 2 lapis cat penutup

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Plamir kg 0.100 15,000.000 1,500.00
Cat Dasar kg 0.100 20,000.000 2,000.00
Cat Penutup 2X kg 0.260 34,500.000 8,970.00
Tenaga Kerja Pekerja OH 0.020 75,000.000 1,500.00
Tukang Cat OH 0.063 70,000.000 4,410.00
Kepala Tukang OH 0.0063 75,000.000 472.50
Mandor OH 0.0025 85,000.000 212.50
Jumlah harga per-satuan pekerjaan 19,065.00

48 Pekerjaan 1 kg, besi + pengelasan

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Pipa GI kg 1.100 20,000.000 22,000.00
Cat Menei kg 0.080 25,400.000 2,032.00
Cat Kilap Penutu kg 0.080 34,500.000 2,760.00
Tenaga Kerja Pekerja OH 0.060 75,000.000 4,500.00
Tukang Besi OH 0.006 75,000.000 450.00
Kepala Tukang OH 0.0060 75,000.000 450.00
Mandor OH 0.0003 85,000.000 25.50
Jumlah harga per-satuan pekerjaan 32,217.50

49 Pekerjaan Paving 6cm hexagon

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Paving Holand 6 m2 1.050 77,000.000 80,850.00
Pasir Pasang kg 0.120 138,500.000 16,620.00
Tenaga Kerja Pekerja OH 0.240 75,000.000 18,000.00
Tukang Batu OH 0.080 65,000.000 5,200.00
Kepala Tukang OH 0.0080 70,000.000 560.00
Mandor OH 0.0120 85,000.000 1,020.00
Jumlah harga per-satuan pekerjaan 122,250.00

50 Pekerjaan Pasangan Armatur Stop Kontak

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Stop Kontak 250 bh 1.000 14,000.000 14,000.00
Alat Bantu kg 1.000 200.000 200.00
Tenaga Kerja Pekerja Pasang OH 1.000 7,000.000 7,000.00
Jumlah harga per-satuan pekerjaan 21,200.00

51 Pekerjaan Pasangan Armatur Saklar Tunggal

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Saklar Tunggal S bh 1.000 10,000.000 10,000.00
Alat Bantu kg 1.000 200.000 200.00
Tenaga Kerja Pekerja Pasang OH 1.000 7,000.000 7,000.00
Jumlah harga per-satuan pekerjaan 17,200.00

52 Pekerjaan Pasangan Lampu Pijar 25 Watt

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Lampu Pijar Sek. bh 1.000 25,000.000 25,000.00
Fitting Lampu Se bh 1.000 9,000.000 9,000.00
Alat Bantu kg 1.000 200.000 200.00
Tenaga Kerja Pekerja Pasang OH 1.000 7,000.000 7,000.00
Jumlah harga per-satuan pekerjaan 41,200.00

53 Pemasangan Waterstop

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Waterstop lebar m' 1.050 7,400.000 7,770.00
Tenaga Kerja Pekerja OH 0.240 75,000.000 18,000.00
Tukang Batu OH 0.080 65,000.000 5,200.00
Kepala Tukang OH 0.0080 70,000.000 560.00
Mandor OH 0.0120 85,000.000 1,020.00
Jumlah harga per-satuan pekerjaan 32,550.00

54 Pemasangan Geomembran 1.5 mm (liner)

Kebutuhan Satuan Indeks Harga (Rp.) Jumlah (Rp.)


Bahan Geomembran 1. m2 1.050 79,000.000 82,950.00
Tenaga Kerja Pekerja OH 0.199 75,000.000 14,925.00
Teknisi Geosynthe OH 0.026 120,000.000 3,156.00
Mandor OH 0.0212 85,000.000 1,802.00
Jumlah harga per-satuan pekerjaan 102,833.00
HARGA SATUAN KOTA SURAKARTA 2017
HARGA SATUAN
No. URAIAN SATUAN KETERANGAN
(Rp.)

Tenaga Kerja
1 Pekerja OH 66,000.00
2 Pekerja Pasang Listrik OH 82,500.00
3 Tukang Batu OH 82,500.00
4 Kepala Tukang batu OH 88,000.00
5 Tukang Kayu OH 82,500.00
6 Kepala Tukang Kayu OH 88,000.00
7 Tukang Besi profil / Tukang Las OH 82,500.00
Kepala Tukang Besi Profil / Tukang
8 OH 88,000.00
Las
9 Tukang Besi Beton OH 82,500.00
10 Kepala Tukang Besi Beton OH 88,000.00
11 Tukang Cat OH 82,500.00
12 Kepala Tukang Cat OH 88,000.00
13 Tukang Gali OH 82,500.00
14 Kepala Tukang Gali OH 88,000.00
15 Tukang Pipa OH 82,500.00
16 Kepala Tukang Pipa OH 88,000.00
17 Teknisi Bor OH 120,000.00
18 Teknisi Geosynthetic OH 125,000.00
19 Mandor OH 85,000.00

Bahan
1 Tanah Urug m3 76,500.00
2 Pasir Urug m3 200,000.00
3 Pasir Pasang / Beton m3 265,000.00
4 Kerikil 2/3 m3 300,000.00
5 Air liter 25.00
6 Batu Pondasi 15/20 m3 229,000.00
7 Bata Merah bh 840.00 kualitas II
8 Semen Portland kg 1,108.00 str tiga roda
9 Semen Warna kg 18,000.00
10 Besi Beton kg 10,700.00 U-32, ulir
11 Kawat Beton kg 17,300.00
12 Keramik Lantai 30X30 buah 5,700.00 DN warna/corak, anti slip
13 Keramik lantai 20X20 buah 2,800.00 DN warna/corak, anti slip
14 Keramik Dinding 20X25 buah 3,000.00 KIA
15 Kayu Bekisting (MC) m3 3,731,000.00
16 Balok MC m3 5,183,000.00
17 Balok Kuda-kuda m3 5,183,000.00
18 Papan 2/20 MC m3 3,731,000.00
19 Balok Ulin Kelas I m3 11,310,000.00
20 Papan Ulin 2/20 Kelas I m3 6,912,500.00
21 Paku Biasa kg 17,000.00
22 Paku Ulin kg 18,000.00
23 Paku Atap Metal kg 21,600.00
24 Paku Kalsiboard kg 24,000.00
25 Besi Strip kg 11,000.00 dia. 6
26 Lem Kayu ltr 82,500.00
27 Minyak Bekisting lt 6,400.00
28 Genteng Metal 0,25 mm lembar 64,080.00 str sakura
29 Kalsiboard 3,5 mm lembar 97,800.00 sakura roof
30 Cat Tembok kg 80,640.00 sanlex wonder
31 Cat Kilap kg 64,960.00 avian
32 Cat Dasar kg 67,200.00 alkali
33 Plamir kg 15,000.00 95100 per-3 kg
34 Cat Menei kg 25,400.00 Sunday
35 Kayu Dolken pj. 4 m' btg 15,000.00
36 Pipa GI medium + las kg 20,000.00
37 Paving Holand 6cm natural buah 1,750.00

38 Stop Kontak 250 Watt Sek "Broco" bh 14,400.00

39 Saklar Tunggal Sek "Broco" bh 13,200.00

40 Lampu Pijar Sek."Philip" 25 Watt bh 84,000.00

41 Fitting Lampu Sek."Broco" bh 10,800.00


Trapo Philip + TKO 1 x 36 watt
42 bh 42,000.00
Setara Universal
43 Alat Bantu Ls 200.00
Pancangan kayu bulat dia. 10-12
44 Btg 20,000.00
cm, pj. 2 meter
45 Waterstop lebar 200mm M' 7,400.00
46 Ijuk kg 5,800.00
47 Geomembrane 1.5mm M2 79,000.00
48 Beton readymix K-100 m3 806,000.00
49 tanaman bromelia plb 10,000.00
50 tanaman rumput gajah minim m2 20,000.00
thinner A lt 28,800.00
minyak cat lt 28,800.00
Strauss Pile + bor m 40,000.00
1M3 = 750 BUAH
UKURAN 3 2300 CONCRETE BLOK (CB15)/BATAKO LUBANG2

Anda mungkin juga menyukai