PART A - TO BE COMPLETED BY CREW | BAGIAN A – DIISI DENGAN LENGKAP OLEH AWAK KAPAL
Vessel’s Name / Nama Kapal Report No./ Nomor laporan
TK.TAISIR ....
Reporting date / Tanggal pelaporan Incident date / Tanggal kejadian
01 Januari 2021 26 Desember 2020
Type of Damage | Jenis kerusakan Equipment/Structure Name | Nama Peralatan/Bangunan
Ancillary Machinery | Permesinan Pendukung AUX.Engine
Vessel stopped due to damage? Period / Periode
Kapal berhenti karena kerusakan? From date-time /dari tanggal-jam : .... / ....
Yes/Ya No/Tidak To date-time/sampai tanggal-jam : .... / ....
Problem identification | Identifikasi permasalahan
Kerusakan van belt AE DongFeng
LF-D 033 / May 2017 Written By : SK Approved By: VP/DPA Retention period: 5 years
Form Code LF-D 033
DAMAGE AND DEFECT REPORT Revision 04/2019
Laporan Kerusakan dan Kekurangan Review date 13 Jul 2019
Page 2 of 2
PART B – TO BE COMPLETED BY OFFICE’S STAFF | BAGIAN B – DIISI LENGKAP OLEH STAF KANTOR
Root cause | Akar permasalahan
....
Material used | Material yang digunakan Brief description of work. Please attach LF-E005 Working report (or Service report if job conducted by
third party)
.... Penjelasan singkat pekerjaan. Lampirkan LF-E005 Laporan pekerjaan (atau Laporan perbaikan jika
dilakukan pihak ketiga)
....
Evidence (photo or reference – attach separate sheet if required) | Bukti pendukung (foto atau rujukan – lampirkan lembar
tambahan jika dibutuhkan)
LF-D 033 / May 2017 Written By : SK Approved By: VP/DPA Retention period: 5 years