PENYEDIAAN JASA PEKERJAAN MEI

DAN COMMISSIONING FASILITAS


PRODUKSI LAPANGAN AKASIA
BAGUS
No. Dok. : ABG-10-J8-LS-001
Vendor Data Requirement List (VDRL) Rev. : 01
Halaman : 1 dari 3

NAMA PEMILIK PROYEK : PT. PERTAMINA EP

NAMA PROYEK : PEMBANGUNAN FASILITAS PRODUKSI LAPANGAN


AKASIA BAGUS, PT PERTAMINA EP BBS & ABG
DEVELOPMENT PROJECT
LOKASI : AKASIA BAGUS

NO. KONTRAK : 010/SKP-ABG/PO/V/20


011/SKP-ABG/PO/V/20

A
01 26 Mei 2020 ABG-10-J8-LS-001 Agnes n dr
i Hendra AFF/SPD
TS
REV TANGGAL DESKRIPSI DISIAPKAN DIPERIKSA DISETUJUI DIPERIKSA DISETUJUI

REV. BAB HALAMAN DESKRIPSI KOMENTAR REVISI/TANGGAPAN


PENYEDIAAN JASA PEKERJAAN MEI
DAN COMMISSIONING FASILITAS
PRODUKSI LAPANGAN AKASIA
BAGUS
No. Dok. : ABG-10-J8-LS-001
Vendor Data Requirement List (VDRL) Rev. : 01
Halaman : 1 dari 3
01
PENYEDIAAN JASA PEKERJAAN MEI
DAN COMMISSIONING FASILITAS
PRODUKSI LAPANGAN AKASIA
BAGUS
No. Dok. : ABG-10-J8-LS-001
Vendor Data Requirement List (VDRL) Rev. : 01
Halaman : 1 dari 3

VDRL FOR PRESSURE GAUGE BIMA

NO DOC NUMBER DOCUMENT TITLE

1 ABG-10-J8-LS-001 Vendor Data Requirement List (VDRL)

2 ABG-10-J8-SC-01 Schedule Material

3 ABG-10-J8-PM-01 Project Organization Chart

4 ABG-10-J8-DW-002 General Arrangement Drawing

5 ABG-10-J8-DS-002 Pressure Gauges Data Sheet

6 ABG-10-J8-RE-001 Factory Acceptance Test (FAT) Report

7 ABG-10-J8-LT-001 Material Certificate

8 ABG-10-J8-LT-002 Instrument Test and Calibration Certificate

9 ABG-10-J8-LT-003 Certificate of Conformity

10 ABG-10-J8-LT-004 Certificate of Origin

11 ABG-10-J8-LT-005 Warranty Certificate

12 ABG-10-J8-PR-006 FAT Procedure

13 ABG-10-J8-PL-001 Inspection & Test Plan

14 ABG-10-J8-MN-001 Operation, Installation & Maintenance Manual

15 ABG-10-J8-DB-002 Catalog
PENYEDIAAN JASA PEKERJAAN MEI
DAN COMMISSIONING FASILITAS
PRODUKSI LAPANGAN AKASIA
BAGUS
No. Dok. : ABG-10-J8-LS-001
Vendor Data Requirement List (VDRL) Rev. : 01
Halaman : 1 dari 3

Anda mungkin juga menyukai