DINAS KESEHATAN
Alamat : Jl. Rotan, Petisah Tengah, Kec.
Medan Petisah, Kota Medan, Sumatera Utara 20111
JALAN
LABORATORIUM DAN
PEMERINTAH KOTA MEDAN
KITCHEN
P= 5 m PEKERJAAN
RGD
RUANG ADMINITRASI LOKASI
P= 11 m P= 10 m
MENYETUJUI
P= 8 m P= 10 m
BK BK BK
WC
P= 12 m
JALAN
RUANG PEJABAT PELAKSANA TEKNIS
KEPALA PUSKESMAS
PUSKESMAS KEGIATAN (PPTK)
IPAL
P= 5 m SUKARAMAI
P= 2 m P= 2 m
P= 5 m P= 2 m
BK
................................................
NIP ............... ................ .......
JALAN JALAN JALAN
LEGENDA IPAL
SYMBOL KETERANGAN JUMLAH
BK BAK KONTROL 4 BUAH
PIPA 4" Baru 40 m
PIPA 3" Baru 15 m DETAIL ENGINEERING DESIGN
PIPA 2" Baru 11 m
Bobokan Keramik 21 m
LAYOUT IPAL Bobokan Beton 5m
SCALE : 1 : NTS Pembongkaran Paving 30 m
IPAL Pembongkaran Paving Area IPAL 36 m2
P= ...
ARAH PANAH & PANJANG PIPA -------
A3
PEMERINTAH KOTA MEDAN
PEKERJAAN
LOKASI
BAR SCREEN
PUSKESMAS SUKARAMAI
FINE SCREEN
MENYETUJUI
................................................
NIP ............... ................ .......
PONDASI EQUALISASI
DUDUKAN MESIN PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
IPAL
................................................
NIP ............... ................ .......
IPAL
A3
PEMERINTAH KOTA MEDAN
PEKERJAAN
OUTPUT
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
(IPAL)
BAR SCREEN
LOKASI
PUSKESMAS SUKARAMAI
FINE SCREEN
MENYETUJUI
................................................
NIP ............... ................ .......
PONDASI EQUALISASI
DUDUKAN MESIN PEJABAT PELAKSANA TEKNIS
IPAL KEGIATAN (PPTK)
................................................
NIP ............... ................ .......
IPAL
A3
PEMERINTAH KOTA MEDAN
PEKERJAAN
PUSKESMAS SUKARAMAI
MENYETUJUI
BAK KONTROL
SEPTICTANK
LIMBAH CAIR KAMAR
MANDI/CLOSET
................................................
NIP ............... ................ .......
SHOWER
WATER
PEJABAT PELAKSANA TEKNIS
FLOW METER
WASTAFEL KEGIATAN (PPTK)
WC WATER
FLOW METER
VALVE
BAK KONTROL
BODY FRP t 8-10 mm
LIMBAH CAIR CHLORINATOR
WASTAFEL, WC
KE SALURAN
BAR SCREN FINE SCREN
KOTA
IPAL
A3
PEMERINTAH KOTA MEDAN
PEKERJAAN
LOKASI
PUSKESMAS SUKARAMAI
MENYETUJUI
................................................
NIP ............... ................ .......
................................................
NIP ............... ................ .......
IPAL
A3
700
150 400 150
700
PEMERINTAH KOTA MEDAN
75
Fin.Plester PEKERJAAN
150
75
Ukr. 550x550x80 PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
A A (IPAL)
400
400
700
700
LOKASI
PUSKESMAS SUKARAMAI
75
PIPA PVC Ø 4"
150
75
B
MENYETUJUI
LAYOUT BAK KONTROL 75 75 TAMPAK ATAS BAK KONTROL
SCALE : 1 : 20 SCALE : 1 : 20 PEJABAT PEMBUAT KOMITMEN (PPK)
80
Besi Ø8 - 100 Besi Ø8 - 100
Penutup Plat Beton
Penutup Plat Beton Ukr. 550x550x80 Penutup Plat Beton
550 550
Ukr. 550x550x80 Ukr. 550x550x80
+ 0.100 + 0.100
M.T.A ± 0.000 M.T.A ± 0.000 ................................................
NIP ............... ................ .......
,6
PEJABAT PELAKSANA TEKNIS
01
PIPA PVC Ø 4" PIPA PVC Ø 4"
Ø1
KEGIATAN (PPTK)
IPAL
BAK KONTROL
SCALE : 1 : 20 DIM 400x400 ALL'S BMR-C
A3
B
PEMERINTAH KOTA MEDAN
Sloof 300x200
Besi 6Ø12 Cor Beton
200 Sengkang Ø8-200 Urugan Sirtu PEKERJAAN
200
+ 0.200
Stek Besi
Ø8-200 L.500mm + 0.100
500
± 0.000
300
- 0.100 PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
(IPAL)
200
1900
1500
1100
1900
Tanah Asli
A A Tanah Urug LOKASI
1000
600
- 0.700 PUSKESMAS SUKARAMAI
200
600
DETAIL A MENYETUJUI
SCALE : 1 : 25
PEJABAT PEMBUAT KOMITMEN (PPK)
200
B 1500 200 600 200
1900 800
3100
DETAIL A
................................................
1900 800 NIP ............... ................ .......
1500
+ 0.200 + 0.200
+ 0.100 + 0.100
PEJABAT PELAKSANA TEKNIS
± 0.000 ± 0.000 KEGIATAN (PPTK)
- 0.100 - 0.100
- 0.700 - 0.700
- 0.800 - 0.800
POTONGAN A-A
SCALE : 1 : 25
IPAL
A3
Besi Ø8 - 100
Tutup Plat Beton t=80mm
Pipa 4"
+ 0.100
1500 ± 0.000
150 525 150 525 - 0.110
150
B D
PEMERINTAH KOTA MEDAN
150
C FINE SCREEN BAR SCREEN C PEKERJAAN
- 0.850
500
800
- 0.950
A A - 1.000
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
(IPAL)
150
150 500 150
LOKASI
D 800
PUSKESMAS SUKARAMAI
DENAH POTONGAN D
EQUALISASI SCALE : 1 : 25
Besi Ø8 - 100 SCALE : 1 : 25
Tanah Urug
FINE SCREN BAR SCREN
Pas. Batu Bata
Fin. Plester aci
Lantai Rabat Beton - 0.85
Pasir Urug
- 0.95 ................................................
Tanah Asli NIP ............... ................ .......
- 0.100
1300
150 525 150 525 150 PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
B 1500
1400 2600
Waremesh m6 1 lapis Waremesh m6 1 lapis
400 Atau Besi Ø 6 - 150 Cor Beton 400 315 200 Atau Besi Ø 6 - 150
+ 0.100 + 0.100
................................................
± 0.000 ± 0.000 NIP ............... ................ .......
0
10
Ø1
1100 2300
POTONGAN B-B
POTONGAN A-A SCALE : 1 : 25
SCALE : 1 : 25
A3
340 340 Pas. Batu Bata
Fin. Cat + 1.000
PEMERINTAH KOTA MEDAN
+ 0.800
2300 300
500 375 300 450 300 375 + 0.550 PEKERJAAN
260 300
950
A A PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
500
± 0.000
250
(IPAL)
1000
1000
350
200
B B - 0.350
500
440
- 0.500 LOKASI
340 340
340 340 Pas. Batu Bata + 1.000 + 1.000
+ 1.000 Fin. Cat + 1.000
+ 0.800
+ 0.800 + 0.800
300
+ 0.600
+ 0.550 + 0.550
200
- 0.220
- 0.350
950
- 0.350
950
- 0.500
- 0.500
- 0.550 PEJABAT PELAKSANA TEKNIS
- 0.550 Pas. Batu Bata
Pas. Batu Bata Trasram Fin. Cat KEGIATAN (PPTK)
Trasram Fin. Cat
- 0.850 150 290 150 260 150 Cor Beton
- 0.850 Cor Beton
Pasir Urug t=5cm
Pasir Urug t=5cm 1000
Tanah Dipadatkan
Tanah Dipadatkan 500 500
500 150 1500 150
2300
................................................
NIP ............... ................ .......
IPAL
TAMPAK DEPAN
SCALE : 1 : 40 DETAIL ENGINEERING DESIGN
A3
hollow zingalum
40x40x2,3mm + 3.785
+ 3.450
+ 3.235
PEKERJAAN
hollow hollow
40x40x2,3mm 40x40x2,3mm PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
(IPAL)
hollow LOKASI
MENYETUJUI
± 0.000
DENAH CANOPY
SCALE : 1 : 35
................................................
NIP ............... ................ .......
zingalum
zingalum hollow PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
+ 3.785
+ 3.785
40x40x2,3mm
+ 3.450
+ 3.450
+ 3.235
+ 3.235
................................................
NIP ............... ................ .......
hollow
40x40x2,3mm
hollow IPAL
40x40x2,3mm
+ 0.200
+ 0.200
± 0.000
± 0.000
TAMPAK DEPAN
SCALE : 1 ; 35
TAMPAK SAMPING KANAN
SCALE : 1 ; 35
A3
Kawat Pengikat DETAIL A Pengikat Besi Ø 8
Pipa Besi Ø1/2" + 1.350
+ 1.300
Plate t=5mm
Nuts 12mm PEMERINTAH KOTA MEDAN
Kunci Gembok
Kawat Harmonika PEKERJAAN
Kawat Harmonika Kawat Harmonika
Pengaku Besi Ø 8
Kait Harmonika DETAIL KUNCI PAGAR
SCALE : 1 : 10
DETAIL A
TAMPAK MUKA DALAM SCALE : 1 : 20
SCALE : 1 : 20
150
+ 1.350 Ø6 - 200 + 1.350
................................................
+ 1.300 4Ø6 + 1.300 NIP ............... ................ .......
150
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
Pengaku Besi Ø 8
DETAIL SLOOF
Kawat Harmonika SCALE : NTS
Pipa Besi Ø 1"
TAMPAK SAMPING
SCALE : 1 : 20
A3
B
800 2000 2000 800
PEKERJAAN
800
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
(IPAL)
LOKASI
PUSKESMAS SUKARAMAI
1000
2000
MENYETUJUI
1000 1000
A ................................................
NIP ............... ................ .......
................................................
NIP ............... ................ .......
800
IPAL
A3
PEMERINTAH KOTA MEDAN
PEKERJAAN
LOKASI
PUSKESMAS SUKARAMAI
MENYETUJUI
................................................
NIP ............... ................ .......
................................................
NIP ............... ................ .......
IPAL
A3
PEMERINTAH KOTA MEDAN
PEKERJAAN
LOKASI
NOK ATAP NOK ATAP
RENG X BAJA RINGAN RENG X BAJA RINGAN
ATAP ZINCALUME ATAP ZINCALUME PUSKESMAS SUKARAMAI
553
RENG X BAJA RINGAN RENG X BAJA RINGAN
ATAP ZINCALUME ATAP ZINCALUME
1774
1774
MENYETUJUI
PROFIL C BAJA RINGAN PROFIL C BAJA RINGAN
1221
1221
100x50x20 100x50x20 PEJABAT PEMBUAT KOMITMEN (PPK)
RING BALK 150x150 RING BALK 150x150
5174
2350
2350
................................................
2750
2750
NIP ............... ................ .......
PASANGAN BATA PASANGAN BATA
FINISH CAT FINISH CAT
1500
1500
DETAIL A Keramik Dinding Keramik Dinding Keramik Dinding
PAS. BATU BATA PAS. BATU BATA
KEGIATAN (PPTK)
LANTAI RABAT BETON T=100mm LANTAI RABAT BETON T=100mm
PAS. BATU BATA TRASSRAM PAS. BATU BATA TRASSRAM
150 150 150 150
400
400
SLOOF 150x150mm SLOOF 150x150mm
±0.000 ±0.000
SALURAN SALURAN
100 400 150
650
TANAH URUG TANAH URUG
TANAH ASLI TANAH ASLI
POTONGAN A POTONGAN B
SCALE : 1 : 30 SCALE : 1 : 30
IPAL
A3
RABAT BETON
T=100mm PEMERINTAH KOTA MEDAN
T=50mm
KERAMIK DINDING PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
(IPAL)
LOKASI
PUSKESMAS SUKARAMAI
PAS. BATU BATA
TRASSRAM
tumpuan
SLOOF 150x150
Ø10-120
RABAT BETON
400
MENYETUJUI
SALURAN
100 400 150
lapangan
Ø10-150
TANAH ASLI
500
................................................
NIP ............... ................ .......
TANAH URUG
tumpuan
PONDASI. BATU KALI PEJABAT PELAKSANA TEKNIS
Ø10-120
KEGIATAN (PPTK)
PASIR URUG
TANAH ASLI Besi 6Ø12
DIPADATKAN 200 Besi 4Ø12
200 Sengkang Ø8-200
Sengkang Ø8-200
150
200
150
500
................................................
NIP ............... ................ .......
DETAIL KOLOM DETAIL RING BALK
DETAIL A SCALE : 1 : 15 SCALE : 1 : 15
SCALE : 1 : 15
IPAL
A3