LAPORAN TUGAS

DESAIN BANGUNAN BETON

Disusun Oleh :

1. Rifaldi Rahmansyah 01.2019.1.05909


2. Aji Priatmojo 01.2019.1.05843

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN


INSTITUT TEKNOLOGI ADHI TAMA SURABAYA
2021
LEMBAR PENGESAHAN

LAPORAN INI DIBUAT UNTUK MENDUKUNG NILAI


DESAIN BANGUNAN BETON

Disusun Oleh:
1. Rifaldi Rahmansyah 01.2019.1.05909
2. Aji Priatmojo 01.2019.1.05843

Mengetahui :

Dosen Pengampu

Eka Susanti, ST., MT


NIP : 991106

ii
DAFTAR ISI

COVER ......................................................................................................................................i

LEMBAR PENGESAHAN ...................................................................................................... ii

DAFTAR ISI ............................................................................................................................iii

BAB I PENDAHULUAN ........................................................................................................ 1

1.1 Data Perencanan ........................................................................................................ 1

BAB II PERENCANAAN PLAT............................................................................................. 3

2.1 Data Plat Lantai & Atap A1 ...................................................................................... 3

2.1.1 Preliminary Tebal Plat Lantai A1 ................................................................. 3

2.1.2 Pembebanan Plat Lantai A1.......................................................................... 3

2.1.3 Momen Plat Lantai A1.................................................................................. 4

2.1.4 Penulangan Plat Lantai A1 ........................................................................... 4

2.1.5 Preliminary Tebal Plat Atap A1 ................................................................... 6

2.1.6 Pembebanan Plat Atap A1 ............................................................................ 6

2.1.7 Momen Plat Atap A1 .................................................................................... 6

2.1.8 Penulangan Plat Atap A1 .............................................................................. 7

2.2 Data Plat Lantai & Atap A2 ...................................................................................... 9

2.2.1 Preliminary Tebal Plat Lantai A2 ................................................................. 9

2.2.2 Pembebanan Plat Lantai A2.......................................................................... 9

2.2.3 Momen Plat Lantai A2................................................................................. 10

2.2.4 Penulangan Plat Lantai A2 .......................................................................... 10

2.2.5 Preliminary Tebal Plat Atap A2 .................................................................. 12

2.2.6 Pembebanan Plat Atap A2 ........................................................................... 12

iii
2.2.7 Momen Plat Atap A2 ................................................................................... 13

2.2.8 Penulangan Plat Atap A2 ............................................................................. 13

BAB III PERENCANAAN BALOK ANAK .......................................................................... 18

3.1 Data Balok B-1 Atap ................................................................................................ 18

3.1.1 Pembebanan Balok - B1 Atap...................................................................... 19

3.1.2 Momen Balok - B1 Atap.............................................................................. 20

3.1.3 Penulangan Balok – B1 Atap ....................................................................... 20

3.1.4 Penulangan Tumpuan .................................................................................. 21

3.1.5 Penulangan Lapangan ................................................................................. 22

3.1.6 Penulangan Geser Balok Anak B – 1 Atap .................................................. 24

3.2 Data Balok B-2 Atap ................................................................................................ 26

3.2.1 Pembebanan Balok – B2 Atap ..................................................................... 26

3.2.2 Momen Balok - B2 Atap.............................................................................. 27

3.2.3 Penulangan Balok – B2 Atap ....................................................................... 28

3.2.4 Penulangan Tumpuan .................................................................................. 28

3.2.5 Penulangan Lapangan ................................................................................. 30

3.2.6 Penulangan Geser Balok Anak B – 2 Atap .................................................. 32

3.3 Data Balok B-3 Atap ................................................................................................ 34

3.3.1 Pembebanan Balok – B3 Atap ..................................................................... 35

3.3.2 Momen Balok - B3 Atap.............................................................................. 36

3.3.3 Penulangan Balok – B3 Atap ....................................................................... 36

3.3.4 Penulangan Tumpuan .................................................................................. 37

3.3.5 Penulangan Lapangan ................................................................................. 38

3.3.6 Penulangan Geser Balok Anak B – 3 Atap .................................................. 40

iv
3.4 Data Balok B-4 Atap ................................................................................................ 42

3.4.1 Pembebanan Balok – B4 Atap ..................................................................... 42

3.4.2 Momen Balok - B4 Atap.............................................................................. 43

3.4.3 Penulangan Balok – B4 Atap ....................................................................... 44

3.4.4 Penulangan Tumpuan .................................................................................. 44

3.4.5 Penulangan Lapangan ................................................................................. 46

3.4.6 Penulangan Geser Balok Anak B – 4 Atap .................................................. 48

3.5 Data Balok B-5 Atap ................................................................................................ 50

3.5.1 Pembebanan Balok – B5 Atap ..................................................................... 50

3.5.2 Momen Balok - B5 Atap.............................................................................. 52

3.5.3 Penulangan Balok – B5 Atap ....................................................................... 52

3.5.4 Penulangan Tumpuan .................................................................................. 52

3.5.5 Penulangan Lapangan ................................................................................. 54

3.5.6 Penulangan Geser Balok Anak B – 5 Atap .................................................. 56

3.6 Data Balok B-1 Lantai .............................................................................................. 58

3.6.1 Pembebanan Balok - B1 Lantai ................................................................... 58

3.6.2 Momen Balok – B1 Lantai .......................................................................... 59

3.6.3 Penulangan Balok – B1 Lantai .................................................................... 60

3.6.4 Penulangan Tumpuan .................................................................................. 60

3.6.5 Penulangan Lapangan ................................................................................. 62

3.6.6 Penulangan Geser Balok Anak B – 1 Lantai ............................................... 64

3.7 Data Balok B-2 Lantai .............................................................................................. 66

3.7.1 Pembebanan Balok – B2 Lantai .................................................................. 67

3.7.2 Momen Balok – B2 Lantai .......................................................................... 68

v
3.7.3 Penulangan Balok – B2 Lantai .................................................................... 68

3.7.4 Penulangan Tumpuan .................................................................................. 69

3.7.5 Penulangan Lapangan ................................................................................. 70

3.7.6 Penulangan Geser Balok Anak B – 2 Lantai ............................................... 72

3.8 Data Balok B-3 Lantai .............................................................................................. 74

3.8.1 Pembebanan Balok – B3 Lantai .................................................................. 75

3.8.2 Momen Balok – B3 Lantai .......................................................................... 76

3.8.3 Penulangan Balok – B3 Lantai .................................................................... 77

3.8.4 Penulangan Tumpuan .................................................................................. 77

3.8.5 Penulangan Lapangan ................................................................................. 79

3.8.6 Penulangan Geser Balok Anak B – 3 Lantai ............................................... 80

3.9 Data Balok B-4 Lantai .............................................................................................. 82

3.9.1 Pembebanan Balok – B4 Lantai .................................................................. 83

3.9.2 Momen Balok – B4 Lantai .......................................................................... 84

3.9.3 Penulangan Balok – B4 Lantai .................................................................... 85

3.9.4 Penulangan Tumpuan .................................................................................. 85

3.9.5 Penulangan Lapangan ................................................................................. 87

3.9.6 Penulangan Geser Balok Anak B – 4 Lantai ............................................... 88

3.10 Data Balok B-5 Lantai ............................................................................................ 90

3.10.1 Pembebanan Balok – B5 Lantai ................................................................ 91

3.10.2 Momen Balok – B5 Lantai ........................................................................ 92

3.10.3 Penulangan Balok – B5 Lantai .................................................................. 93

3.10.4 Penulangan Tumpuan ................................................................................ 93

3.10.5 Penulangan Lapangan ............................................................................... 95

vi
3.10.6 Penulangan Geser Balok Anak B – 4 Lantai ............................................. 96

BAB IV PERENCANAAN BALOK INDUK ........................................................................ 99

4.1 Data Balok Induk Melintang B6 – A Atap ............................................................... 99

4.1.1 Pembebanan Balok Induk Melintang B6 – A Atap ..................................... 99

4.1.1.1 Beban Terpusat (pada ujung portal) P1 ........................................... 100

4.1.1.2 Beban Terpusat (pada tengah portal) P2 .......................................... 100

4.1.1.3 Beban Terpusat (pada tengah portal) P3 .......................................... 100

4.1.1.4 Beban Terpusat (pada tengah portal) P4 .......................................... 100

4.1.1.5 Beban Terpusat (pada ujung portal) P5 ........................................... 100

4.1.1.6 Beban Merata Q ............................................................................... 101

4.1.2 Momen – Momen Balok Induk Melintang B6-A Atap (Hasil Output SAP2000

2D Portal) .................................................................................................... 101

4.1.3 Penulangan Balok Induk Melintang B6 – A Atap ....................................... 102

4.1.4 Penulangan Tumpuan 1 ................................................................................ 102

4.1.5 Penulangan Lapangan ................................................................................... 103

4.1.6 Penulangan Tumpuan 2 ................................................................................ 105

4.1.7 Penulangan Geser (pada ujung kiri balok induk atap) Hasil Output SAP2000

2D Portal ....................................................................................................... 106

4.1.8 Penulangan Geser (pada ujung kanan balok induk atap) Hasil Output SAP2000

2D Portal ....................................................................................................... 108

4.2 Data Balok Induk Melintang B6 – A Lantai............................................................ 110

4.2.1 Pembebanan Balok Induk Melintang B6 – A Lantai .................................. 111

4.2.1.1 Beban Terpusat (pada ujung portal) P1 ........................................... 111

4.2.1.2 Beban Terpusat (pada tengah portal) P2 .......................................... 111

vii
4.2.1.3 Beban Terpusat (pada tengah portal) P3 .......................................... 112

4.2.1.4 Beban Terpusat (pada tengah portal) P4 .......................................... 112

4.2.1.5 Beban Terpusat (pada ujung portal) P5 ........................................... 112

4.2.1.6 Beban Merata Q ............................................................................... 112

4.2.2 Momen – Momen Balok Induk Melintang B6-A Lantai (Hasil Output SAP2000

2D Portal) .................................................................................................. 113

4.2.3 Penulangan Balok Induk Melintang B6 – A Lantai .................................... 113

4.2.4 Penulangan Tumpuan 1 ................................................................................ 114

4.2.5 Penulangan Lapangan ................................................................................... 115

4.2.6 Penulangan Tumpuan 2 ................................................................................ 117

4.2.7 Penulangan Geser (pada ujung kiri balok induk atap) Hasil Output SAP2000

2D Portal ....................................................................................................... 118

4.2.8 Penulangan Geser (pada ujung kanan balok induk atap) Hasil Output SAP2000

2D Portal ....................................................................................................... 119

BAB V PERENCANAAN KOLOM ...................................................................................... 122

5.1 Input Data – Data Kolom........................................................................................ 122

5.2 Analisa Perencanaan Kolom dengan Software PCACol ........................................ 122

5.3 Hasil Output PCACol ............................................................................................. 126

DAFTAR PUSTAKA ............................................................................................................. 130

viii
BAB 1

PENDAHULUAN

1.1 Data Perencanaan


● Jarak Portal :5m
● Perletakan : A = Jepit
B = Jepit
C = Jepit
● Jarak Kolom : L1 = 6 m
L2 = 7 m
● Tinggi Kolom : h1 = 5,5 m
h2 = 4,5 m
● Mutu Bahan : Beton : f”c = 30 Mpa
Baja : fy =240 Mpa
● Jumlah Portal : 8 portal
● Beban hidup, dimisalkan lantai gedung untuk : Kantor

1
2
BAB 2

PERENCANAAN PLAT

2.1 Data Plat Lantai & Atap A1


● Fc : 30 Mpa
● Fy : 240 Mpa
● Ly : 5000 mm
● Lx : 3500 mm
● Penentuan jenis plat
𝑙𝑛𝑦 5000
𝛽= = = 1.43 < 2.5, 𝑚𝑎𝑘𝑎 𝑚𝑒𝑛𝑢𝑛𝑗𝑢𝑘𝑘𝑎𝑛 𝑏𝑎ℎ𝑤𝑎 𝑝𝑙𝑎𝑡 2 𝑎𝑟𝑎ℎ
𝑙𝑛𝑥 3500

2.1.1 Preliminary Tebal Plat Lantai A1


𝑓𝑦 240
𝑙𝑛×[0.8+ ] 5000×[0.8+ ]
~ ℎ𝑚𝑎𝑥 = 36+5×𝛽[𝛼𝑚−0.2] = 36+5×1.43[0.6−0.2] = 123,53 𝑚𝑚
1500 1500

𝑓𝑦 240
𝑙𝑛×[0.8+ ] 5000×[0.8+ ]
100 1500
~ℎ 𝑚𝑖𝑛 = = = 98,25 𝑚𝑚
36+9×𝛽 36+9×1.43

Tebal direncanakan harus memenuhi syarat h min < h < h max, maka dipilih
tebal plat sebesar 100 mm

2.1.2 Pembebanan Plat Lantai A1


Beban Hidup : Ruang Kantor = 2,4 Kn/m² = 244,73 Kg/m²
Beban Mati : Beban Sendiri = 0.23 Kn/m² = 234,53 Kg/m²
Beban Keramik & Spesi = 78,5169 Kg/m²
Beban Plafond = 48,9456 Kg/m² +
Total Beban Mati = 361,99 Kg/m²

3
Beban Ultimate (qu)
𝑞𝑢 = (1.2 × 𝐷𝐿) + (1.6 × 𝐿𝐿) = (1.2 × 361,99) + (1.6 × 244.73) = 825,92 𝐾𝑔/𝑚²

Jadi beban ultímate (qu) yang diterima oleh plat lantai A1 sebesar 825,92 Kg/m²

2.1.3 Momen Plat Lantai A1


Berdasarkan tabel Marcus 13.3.2.II Plat 2 arah, terdapat perhitungan momen
Plat Terjepit Elastis
Dari tabel 13.3.2.II didapat nilai x dari Ly/Lx = 1.43, yaitu sebagai berikut
:
▪ MLx (+) = MTx (-) = 50
▪ MLy (+) = 38
▪ MTy (-) = 38

▪ 𝑀𝑙𝑥 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 825,92 × 3,5² × 50 = −505,89 𝐾𝑔. 𝑚


▪ 𝑀𝑙𝑦 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 825,92 × 3,5² × 38 = 384,48 𝐾𝑔. 𝑚
▪ 𝑀𝑡𝑦 = −0.001𝑞𝑙𝑥²𝑥 = −0.0001 × 825,92 × 3,5² × 38 = −384,48 𝐾𝑔. 𝑚

2.1.4 Penulangan Plat Lantai A1


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240
0.85𝑓′𝑐 600 0.85 × 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 𝛽1 = 0.85 = 0,065
𝑓𝑦 600 + 𝑓𝑦 240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Penulangan Rencana : Tul. Arah X =ᴓ25 mm & Y = ᴓ10 mm


1 1
𝑑𝑥 = ℎ − 𝑠 − ∅𝑥 = 100 − 20 − × 25 = 67,5 𝑚𝑚
2 2
1 1
𝑑𝑦 = ℎ − 𝑠 − ∅𝑥 − ∅𝑦 = 100 − 20 − 25 − × 10 = 50 𝑚𝑚
2 2

● Penulangan Plat Arah x (untuk daerah Tumpuan & Lapangan)


MTx = MLx = 5058986,62 Nmm²
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4

4
𝑀𝑢𝑥 5058986,62
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×67,5² = 1,38

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,38)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.0059
𝑓𝑦 240

Karena hasil ρ min = 0.0058 <ρ perlu = 0.0059< ρ max = 0.048, maka
digunakan ρ pakai = 0.0059
Sehingga luas tulangan yang diperlukan adalah :
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.0059 × 1000 × 67,5 = 401,59 𝑚𝑚²
𝐴𝑠 401,59
Σ𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = 0.25×3.14×25² = 0,8, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 1 𝑏𝑎𝑡𝑎𝑛𝑔
0.25×𝜋×𝑑²
1000×𝐴𝑑 1000×319,9
𝑠= 𝐴𝑠−𝑥
= 401,59
= 1221,7 𝑚𝑚 − − − 1000 𝑚𝑚

𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)


𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 200 mm.
Jadi pada penulangan plat arah X dipasang Tul. Lentur ᴓ25-200 mm,
dengan,
1000 × 𝐴𝑑 1000 × 490,62
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 2453,1 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 419,92 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 200
● Cek Momen Nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 2453,1 ×240
𝑎= 0,85×𝑓′𝑐×𝑏
= 0,85×30×1000 = 23,1 𝑚𝑚
𝑎 23,1
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (2453,1 × 240) × (67,5 − ) = 32943759,2 𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 2943759,2 = 29649383,3 𝑁𝑚𝑚² > 𝑀𝑢 = 5058986,62 𝑁𝑚𝑚²


● Penulangan Plat Arah y (untuk daerah Tumpuan & Lapangan)
MTy = MLy = 3844829,83 Nmm²
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢𝑥 4106847.87
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×53² = 1,83

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,83)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.0079
𝑓𝑦 240

Karena hasil ρ min = 0.0058 <ρ perlu = 0.0079< ρ max = 0.048, maka
digunakan ρ pakai = 0.0079
Sehingga luas tulangan yang diperlukan adalah :
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.0079 × 1000 × 53 = 419,18 𝑚𝑚²
𝐴𝑠 419,18
𝛴𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = = 5,34, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 6 𝑏𝑎𝑡𝑎𝑛𝑔
0.25 × 𝜋 × 𝑑² 0.25 × 3.14 × 10²
1000×𝐴𝑑 1000×78,5
𝑠= 𝐴𝑠−𝑥
= 419,18
= 187,3 𝑚𝑚 − − − 150 𝑚𝑚

5
𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 150 mm.
Jadi pada penulangan plat arah Y dipasang Tul. Lentur ᴓ10-150 mm,
dengan,
1000 × 𝐴𝑑 1000 × 78,5
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 523,3 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 419,18 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 150
● Cek Momen Nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 523,2×240
𝑎= 0,85×𝑓′𝑐×𝑏
= 0,85×25×1000 = 4,93 𝑚𝑚
𝑎 4,93
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (523,3 × 240) × (53 − ) = 6347479,2𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 6347479,2 = 5712731,3 𝑁𝑚𝑚² > 𝑀𝑢 = 4106847.87 𝑁𝑚𝑚²

2.1.5 Preliminary Tebal Plat Atap A1


𝑓𝑦 240
𝑙𝑛×[0.8+ ] 5000×[0.8+ ]
~ ℎ𝑚𝑎𝑥 = 36+5×𝛽[𝛼𝑚−0.2] = 36+5×1.43[0.6−0.2] = 123,53 𝑚𝑚
1500 1500

𝑓𝑦 240
𝑙𝑛 × [0.8 + 100] 5000 × [0.8 + 1500]
~ℎ 𝑚𝑖𝑛 = = = 98,25 𝑚𝑚
36 + 9 × 𝛽 36 + 9 × 1.43
Tebal direncanakan harus memenuhi syarat h min < h < h max, maka dipilih tebal plat
sebesar 100 mm

2.1.6 Pembebanan Plat Atap A1


Beban Hidup : atap datar, berbubung, dan lengkung= 0.96 Kn/m² = 97,89 Kg/m²
Beban Mati : Beban Sendiri = 0,23 Kn/m² = 234,53 Kg/m²
Beban Waterproofing = 0,1 Kn/m² = 10,197 Kg/m²
Beban Plafond = 0,48 Kn/m² = 48,9456 Kg/m² +
Total Beban Mati = 293,67Kg/m²
Beban Ultimate (qu)
𝑞𝑢 = (1.2 × 𝐷𝐿) + (1.6 × 𝐿𝐿) = (1.2 × 293,67) + (1.6 × 97,89) = 565,32 𝐾𝑔/𝑚²

Jadi beban ultímate (qu) yang diterima oleh plat lantai A1 sebesar 565,32 Kg/m²

2.1.7 Momen Plat Atap A1


Berdasarkan tabel Marcus 13.3.2.II Plat 2 arah, terdapat perhitungan momen
Plat Terjepit Elastis

6
Dari tabel 13.3.2.II didapat nilai x dari Ly/Lx = 1.43, yaitu sebagai berikut
:
▪ MLx (+) = MTx (-) = 50
▪ MLy (+) = 38
▪ MTy (-) = 38

▪ 𝑀𝑙𝑥 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 565,32 × 3,5² × 50 = −346,26 𝐾𝑔. 𝑚


▪ 𝑀𝑙𝑦 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 565,32 × 3,5² × 38 = 263,16 𝐾𝑔. 𝑚
▪ 𝑀𝑡𝑦 = −0.001𝑞𝑙𝑥²𝑥 = −0.0001 × 565,32 × 3,5² × 38 = −263,16𝐾𝑔. 𝑚

2.1.8 Penulangan Plat Atap A1


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240
0.85𝑓′𝑐 600 0.85 × 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 𝛽1 = 0.85 = 0,065
𝑓𝑦 600 + 𝑓𝑦 240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Penulangan Rencana : Tul. Arah X & Y = ᴓ8 mm


1 1
𝑑𝑥 = ℎ − 𝑠 − ∅𝑥 = 100 − 40 − × 8 = 58 𝑚𝑚
2 2
1 1
𝑑𝑦 = ℎ − 𝑠 − ∅𝑥 − ∅𝑦 = 100 − 40 − 80 − × 8 = 48 𝑚𝑚
2 2

● Penulangan Plat Arah x (untuk daerah Tumpuan & Lapangan)


MTx = MLx = 3462595,3 Nmm²
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢𝑥 3462595,3
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×56² = 1,38

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,38)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.0059
𝑓𝑦 240

Karena hasil ρ min = 0.0058 <ρ perlu = 0.0059< ρ max = 0.048, maka
digunakan ρ pakai = 0.0059
Sehingga luas tulangan yang diperlukan adalah :
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.0059 × 1000 × 56 = 331,26 𝑚𝑚²

7
𝐴𝑠 331,26
𝛴𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = 0.25×3.14×8² = 6,6, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 7 𝑏𝑎𝑡𝑎𝑛𝑔
0.25×𝜋×𝑑²
1000×𝐴𝑑 1000×50,24
𝑠= = = 151,7 𝑚𝑚 − − − 150 𝑚𝑚
𝐴𝑠−𝑥 331,26

𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)


𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 150 mm.
Jadi pada penulangan plat arah X dipasang Tul. Lentur ᴓ8-150 mm,
dengan,
1000 × 𝐴𝑑 1000 × 50,24
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 334,9 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 331,26 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 150
● Cek Momen Nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 334,9×240
𝑎= 0,85×𝑓′𝑐×𝑏
= 0,85×30×1000 = 3,15𝑚𝑚
𝑎 3,15
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (334,9 × 240) × (56 − ) = 4374806,2 𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 4374806,2 = 3937325,6 𝑁𝑚𝑚² > 𝑀𝑢 = 3462595,3 𝑁𝑚𝑚²

● Penulangan Plat Arah y (untuk daerah Tumpuan & Lapangan)


MTy = MLy = 2631572,42 Nmm²
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢𝑥 2631572,42
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×48² = 1,43

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,43)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.0061
𝑓𝑦 240

Karena hasil ρ min = 0.0058 <ρ perlu = 0.0061< ρ max = 0.048, maka
digunakan ρ pakai = 0.0061
Sehingga luas tulangan yang diperlukan adalah :
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.0061 × 1000 × 48 = 294,02 𝑚𝑚²
𝐴𝑠 294,02
𝛴𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = 0.25×3.14×8² = 5,6, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 6 𝑏𝑎𝑡𝑎𝑛𝑔
0.25×𝜋×𝑑²
1000×𝐴𝑑 1000×50,24
𝑠= 𝐴𝑠−𝑥
= 294,02
= 170,87 𝑚𝑚 − − − 150 𝑚𝑚

𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)


𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 150 mm.
Jadi pada penulangan plat arah Y dipasang Tul. Lentur ᴓ10-150 mm,
dengan,

8
1000 × 𝐴𝑑 1000 × 50,24
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 334,93 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 294,02 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 150
● Cek Momen Nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 334,93,5×240
𝑎= 0,85×𝑓′𝑐×𝑏
= 0,85×30×1000 = 3,15 𝑚𝑚
𝑎 3,15
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (334,93 × 240) × (48 − ) = 3731734,21 𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 3731734,21 = 3358560,79 𝑁𝑚𝑚² > 𝑀𝑢 = 2631572,42 𝑁𝑚𝑚²

2.2 Data Plat Lantai & Atap A2


● Fc : 30 Mpa
● Fy : 240 Mpa
● Ly : 5000 mm
● Lx : 3000 mm
● Penentuan jenis plat
𝑙𝑛𝑦 5000
𝛽= = = 1.67 < 2.5, 𝑚𝑎𝑘𝑎 𝑚𝑒𝑛𝑢𝑛𝑗𝑢𝑘𝑘𝑎𝑛 𝑏𝑎ℎ𝑤𝑎 𝑝𝑙𝑎𝑡 2 𝑎𝑟𝑎ℎ
𝑙𝑛𝑥 3000

2.2.1 Preliminary Tebal Plat Lantai A2


𝑓𝑦 240
𝑙𝑛×[0.8+ ] 5000×[0.8+ ]
~ ℎ𝑚𝑎𝑥 = 36+5×𝛽[𝛼𝑚−0.2] = 36+5×1,67[0.6−0.2] = 122,03 𝑚𝑚
1500 1500

𝑓𝑦 240
𝑙𝑛 × [0.8 + 100] 5000 × [0.8 + 1500]
~ℎ 𝑚𝑖𝑛 = = = 94,11 𝑚𝑚
36 + 9 × 𝛽 36 + 9 × 1,67
Tebal direncanakan harus memenuhi syarat h min < h < h max, maka dipilih tebal plat
sebesar 100 mm

2.2.2 Pembebanan Plat Lantai A2


Beban Hidup : Ruang Kantor = 2,4 Kn/m² = 244,73 Kg/m²

9
Beban Mati : Beban Sendiri = 0.23 Kn/m² = 234,53 Kg/m²
Beban Keramik & Spesi = 78,5169 Kg/m²
Beban Plafond = 48,9456 Kg/m² +
Total Beban Mati = 361,99 Kg/m²
Beban Ultimate (qu)
𝑞𝑢 = (1.2 × 𝐷𝐿) + (1.6 × 𝐿𝐿) = (1.2 × 361,09) + (1.6 × 244.73) = 825.95 𝐾𝑔/𝑚²

Jadi beban ultímate (qu) yang diterima oleh plat lantai A1 sebesar 825,95 Kg/m²

2.2.3 Momen Plat Lantai A2


Berdasarkan tabel Marcus 13.3.2.II Plat 2 arah, terdapat perhitungan momen
Plat Terjepit Elastis
Dari tabel 13.3.2.II didapat nilai x dari Ly/Lx = 1.67, yaitu sebagai berikut
:
▪ MLx (+) = MTx (-) = 58
▪ MLy (+) = 36
▪ MTy (-) = 36

▪ 𝑀𝑙𝑥 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 825,95 × 3² × 58 = −460,53 𝐾𝑔. 𝑚


▪ 𝑀𝑙𝑦 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 825,95 × 3² × 36 = 285,85 𝐾𝑔. 𝑚
▪ 𝑀𝑡𝑦 = −0.001𝑞𝑙𝑥²𝑥 = −0.0001 × 825,95 × 3² × 36 = −285,85 𝐾𝑔. 𝑚

2.2.4 Penulangan Plat Lantai A2


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240
0.85𝑓′𝑐 600 0.85 × 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 𝛽1 = 0.85 = 0,065
𝑓𝑦 600 + 𝑓𝑦 240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Penulangan Rencana : Tul. Arah X =ᴓ22 mm & Y = ᴓ10 mm


1 1
𝑑𝑥 = ℎ − 𝑠 − ∅𝑥 = 100 − 25 − × 22 = 64 𝑚𝑚
2 2
1 1
𝑑𝑦 = ℎ − 𝑠 − ∅𝑥 − ∅𝑦 = 100 − 25 − 22 − × 10 = 48 𝑚𝑚
2 2

10
● Penulangan Plat Arah x (untuk daerah Tumpuan & Lapangan)
MTx = MLx = 4605315,98 Nmm²
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢𝑥 4605315,98
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×64² = 1,41

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,41)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.0060
𝑓𝑦 240

Karena hasil ρ min = 0.0058 <ρ perlu = 0.0060< ρ max = 0.048, maka
digunakan ρ pakai = 0.0060
Sehingga luas tulangan yang diperlukan adalah :
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.0060 × 1000 × 64 = 385,72 𝑚𝑚²
𝐴𝑠 385,72
𝛴𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = 0.25×3.14×22² = 1,02, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 2 𝑏𝑎𝑡𝑎𝑛𝑔
0.25×𝜋×𝑑²
1000×𝐴𝑑 1000×379,94
𝑠= 𝐴𝑠−𝑥
= 385,72
= 985,01 𝑚𝑚 − − − 900 𝑚𝑚

𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)


𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 200 mm.
Jadi pada penulangan plat arah X dipasang Tul. Lentur ᴓ22-200 mm,
dengan,
1000 × 𝐴𝑑 1000 × 379,94
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 1899,7 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 333,33 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 200

● Cek Momen Nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 1899,7×240
𝑎= = = 17,9 𝑚𝑚
0,85×𝑓′𝑐×𝑏 0,85×30×1000
𝑎 17,9
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1899,7 × 240) × (64 − ) = 25103502,9 𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 25103502,9 = 22593152,7 𝑁𝑚𝑚² > 𝑀𝑢 = 4605315,98 𝑁𝑚𝑚²

● Penulangan Plat Arah y (untuk daerah Tumpuan & Lapangan)


MTy = MLy = 2588471,99 Nmm2
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢𝑥 2588471,99
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×48² = 1,55

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,55)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.0066
𝑓𝑦 240

11
Karena hasil ρ min = 0.0058 <ρ perlu = 0.0066< ρ max = 0.048, maka
digunakan ρ pakai = 0.0066
Sehingga luas tulangan yang diperlukan adalah :
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.0066 × 1000 × 48 = 320,2 𝑚𝑚²
𝐴𝑠 320,2
𝛴𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = 0.25×3.14×10² = 4,08, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 5𝑏𝑎𝑡𝑎𝑛𝑔
0.25×𝜋×𝑑²
1000×𝐴𝑑 1000×78,5
𝑠= = = 245,14 𝑚𝑚 − − − 200 𝑚𝑚
𝐴𝑠−𝑥 320,2

𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)


𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 200 mm.
Jadi pada penulangan plat arah Y dipasang Tul. Lentur ᴓ10-200 mm,
dengan,
1000 × 𝐴𝑑 1000 × 78,5
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 392,5 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 320,2 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 200

● Cek Momen Nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 392,5×240
𝑎= 0,85×𝑓′𝑐×𝑏
= 0,85×30×1000 = 3,69 𝑚𝑚
𝑎 3,69
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (392,5 × 240) × (48 − ) = 4347607,1 𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 4347607,1 = 3912846,35 𝑁𝑚𝑚² > 𝑀𝑢 = 2858471,99 𝑁𝑚𝑚²

2.2.5 Preliminary Tebal Plat Atap A2


𝑓𝑦 240
𝑙𝑛×[0.8+ ] 5000×[0.8+ ]
1500
~ ℎ𝑚𝑎𝑥 = 36+5×𝛽[𝛼𝑚−0.2] = 36+5×1.67[0.6−0.2]
1500
= 122,03 𝑚𝑚
𝑓𝑦 240
𝑙𝑛×[0.8+ ] 5000×[0.8+ ]
100 1500
~ℎ 𝑚𝑖𝑛 = = = 94,11 𝑚𝑚
36+9×𝛽 36+9×1.67

Tebal direncanakan harus memenuhi syarat h min < h < h max, maka dipilih tebal plat
sebesar 100 mm

2.2.6 Pembebanan Plat Atap A2


Beban Hidup : atap datar, berbubung, dan lengkung= 0.96 Kn/m² =97,89 Kg/m²
Beban Mati : Beban Sendiri = 0,23 Kn/m² = 234,53 Kg/m²
Beban Waterproofing = 0,1 Kn/m² = 10,197 Kg/m²
Beban Plafond = 0,48 Kn/m² = 48,9456 Kg/m² +

12
Total Beban Mati = 293,67 Kg/m²
Beban Ultimate (qu)
𝑞𝑢 = (1.2 × 𝐷𝐿) + (1.6 × 𝐿𝐿) = (1.2 × 293,67) + (1.6 × 97,89) = 565,32 𝐾𝑔/𝑚²

Jadi beban ultímate (qu) yang diterima oleh plat lantai A2 sebesar 565,32 Kg/m²

2.2.7 Momen Plat Atap A2


Berdasarkan tabel Marcus 13.3.2.II Plat 2 arah, terdapat perhitungan momen
Plat Terjepit Elastis
Dari tabel 13.3.2.II didapat nilai x dari Ly/Lx = 1.67, yaitu sebagai berikut
:
▪ MLx (+) = MTx (-) = 58
▪ MLy (+) = 36
▪ MTy (-) = 36

▪ 𝑀𝑙𝑥 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 565,32 × 3² × 58 = −295,10 𝐾𝑔. 𝑚


▪ 𝑀𝑙𝑦 = +0.001𝑞𝑙𝑥²𝑥 = +0.0001 × 565,32 × 3² × 36 = 183,16 𝐾𝑔. 𝑚
▪ 𝑀𝑡𝑦 = −0.001𝑞𝑙𝑥²𝑥 = −0.0001 × 565,32 × 3² × 36 = −183,16𝐾𝑔. 𝑚

2.2.8 Penulangan Plat Atap A2


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240
0.85𝑓′𝑐 600 0.85 × 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 𝛽1 = 0.85 = 0,065
𝑓𝑦 600 + 𝑓𝑦 240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Penulangan Rencana : Tul. Arah X = ᴓ16 mm & Y = ᴓ8 mm


1 1
𝑑𝑥 = ℎ − 𝑠 − ∅𝑥 = 100 − 40 − × 16 = 52 𝑚𝑚
2 2
1 1
𝑑𝑦 = ℎ − 𝑠 − ∅𝑥 − ∅𝑦 = 100 − 40 − 16 − × 8 = 40 𝑚𝑚
2 2

● Penulangan Plat Arah x (untuk daerah Tumpuan & Lapangan)


MTx = MLx = 2950979,17 Nmm²

13
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢𝑥 2950979,17
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×52² = 1,36

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,36)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.00584
𝑓𝑦 240

Karena hasil ρ min = 0.0058 <ρ perlu = 0.00584< ρ max = 0.048, maka
digunakan ρ pakai = 0.00584
Sehingga luas tulangan yang diperlukan adalah :
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.00584 × 1000 × 52 = 303,93 𝑚𝑚²
𝐴𝑠 303,93
𝛴𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = 0.25×3.14×16² = 1,51, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 2 𝑏𝑎𝑡𝑎𝑛𝑔
0.25×𝜋×𝑑²
1000×𝐴𝑑 1000×200,96
𝑠= 𝐴𝑠−𝑥
= 303,93
= 661,2 𝑚𝑚 − − − 600 𝑚𝑚

𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)


𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 200 mm.
Jadi pada penulangan plat arah X dipasang Tul. Lentur ᴓ16-200 mm,
dengan,
1000 × 𝐴𝑑 1000 × 200,96
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 1004,8 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 303,93 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 200

● Cek Momen Nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 1004,8×240
𝑎= 0,85×𝑓′𝑐×𝑏
= 0,85×30×1000 = 9,46 𝑚𝑚
𝑎 9,46
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1004,8 × 240) × (52 − ) = 11399623,9 𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 11399623,9 = 10259661,5 𝑁𝑚𝑚² > 𝑀𝑢 = 2950979,2 𝑁𝑚𝑚²

● Penulangan Plat Arah y (untuk daerah Tumpuan & Lapangan)


MTy = MLy = 1831642,243 Nmm²
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢𝑥 1831642,243
𝑅𝑛𝑥 = 0.8×𝑏×𝑑² = 0.8×1000×40² = 1,43

1 (2×𝑚×𝑅𝑛𝑥) 1 (2×9,4×1,43)
𝜌 𝑝𝑒𝑟𝑙𝑢 = 𝑚 [√1 − ] = 9,4 [√1 − ] = 0.0061
𝑓𝑦 240

Karena hasil ρ min = 0.0058 <ρ perlu = 0.0061< ρ max = 0.048, maka
digunakan ρ pakai = 0.0061
Sehingga luas tulangan yang diperlukan adalah :

14
𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑 = 0.0061 × 1000 × 40 = 245,59 𝑚𝑚²
𝐴𝑠 245,59
𝛴𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 = = 0.25×3.14×8² = 4,88, 𝑑𝑖𝑏𝑢𝑙𝑎𝑡𝑘𝑎𝑛 𝑗𝑎𝑑𝑖 5 𝑏𝑎𝑡𝑎𝑛𝑔
0.25×𝜋×𝑑²
1000×𝐴𝑑 1000×50,24
𝑠= 𝐴𝑠−𝑥
= 245,59
= 204,57 𝑚𝑚 − − − 200 𝑚𝑚

𝑠1 = 2 × ℎ = 2 × 100 = 200 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)


𝑠2 = 450 𝑚𝑚 (SNI 2847-2019,pasal 9.12.5.4)
Jarak dipilih yang terkecil, s pakai = 200 mm.
Jadi pada penulangan plat arah Y dipasang Tul. Lentur ᴓ8-200 mm,
dengan,
1000 × 𝐴𝑑 1000 × 50,24
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = = = 251,2 𝑚𝑚² > 𝐴𝑠 𝑝𝑒𝑟𝑙𝑢 = 245,59 𝑚𝑚²
𝑠 𝑝𝑎𝑘𝑎𝑖 200

● Cek Momen Nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖×𝑓𝑦 251,2×240
𝑎= 0,85×𝑓′𝑐×𝑏
= 0,85×30×1000 = 2,36 𝑚𝑚
𝑎 2,36
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (251,2 × 240) × (40 − ) = 2340252,49 𝑁𝑚𝑚²
2 2

∅𝑀𝑛 = 0,9 × 2340252,49 = 2106227,24 𝑁𝑚𝑚² > 𝑀𝑢 = 1831642,24 𝑁𝑚𝑚²

15
16
17
BAB 3
PERENCANAAN BALOK ANAK

3.1 Data Balok – B1 Atap


● Lx :3m
● Ly :5m
● Tebal plat : 10cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

18
3.1.1 Pembebanan Balok – B1 Atap
● qD Plat = 293,67 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 97,8912 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 22 cm (SNI 2847-2019)
b = 2/3*h = 2/3*22 = 14,67 cm ----- 15 cm
Jadi pakai dimensi balok 15x22 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,15 x 0,22) = 0,77 Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 32
2
× 293,674 × (1 − (1 )) = 387,65 𝐾𝑔/𝑚²
2 52
3

Total beban mati QD = 0,77 + 387,65 = 388,42 Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1
1 𝑙𝑥 2
qL ekuivalen plat = 2 × 𝑞 × (1 − (12 ))
𝑙𝑦 2
3

1 2
1 3
× 97,89 × (1 − (21 2 )) = 129,22 𝐾𝑔/𝑚²
2 5
3

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (388,42) + 1,6 (129,22)
= 672,85 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B1 Atap sebesar 672,85 Kg/ m²

19
3.1.2 Momen Balok – B1 Atap
1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 672,85 × 52 = 1682,134 = 16821348 𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 672,85 × 52 = 1051,334 = 10513342 𝑁𝑚𝑚2
16 16 𝑚2

3.1.3 Penulangan Balok – B1 Atap


● Tinggi balok : 220 mm
● Tebal penutup beton : 40 mm
● Tulangan Pokok : 13 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;

1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 220 − 40 − 10 − 13 = 163,5 𝑚𝑚
2

20
3.1.4 Penulangan Tumpuan
● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 16821348
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×150×163,52 = 5,24

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 5,24
= (1 − √1 − )
9,4 240

= 0,024
Dipakai : ρ perlu = 0.024>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
𝑓𝑦240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,024 × 150 × 163,5
𝐴𝑠 = 606,4 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
606,4
𝑛= × 𝜋 × 132
0.25
𝑛 = 4,57 dibulatkan menjadi 5
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 5 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 663,32 𝑚𝑚2 dipakai tulangan 5D13

21
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 663,32 𝑚𝑚² > 606,4 𝑚𝑚² (𝑂𝐾)
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 663,32 × 240
𝑎= = = 41,6
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 150
𝑎 41,6
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (663,32 × 240) × (163,5 − )
2 2
𝑀𝑛 = 22715931,4 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 22715931,4 = 20444338,2 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 20444338,2 𝑁𝑚𝑚² > 16821348 𝑁𝑚𝑚² (𝑂𝐾)

3.1.5 Penulangan Lapangan


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚= = = 9,4
0.85×𝑓𝑐 0.85×30

𝑀𝑢 𝑙 10513342
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×150×163,52 = 3,27

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).3,27
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.014
9,4 240

22
Dipakai : ρ perlu = 0.014>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
𝑓𝑦240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,014 × 150 × 163,5
𝐴𝑠 = 359,73 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
359,73
𝑛 = × 𝜋 × 132
0.25
𝑛 = 2,67 dibulatkan menjadi 3
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 3 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 397,99 𝑚𝑚2 dipakai tulangan 3D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 397,99 𝑚𝑚² > 359,73 𝑚𝑚² (𝑂𝐾)
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 397,99 × 240
𝑎= = = 24,97
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 150
𝑎 24,97
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (397,99 × 240) × (163,5 − )
2 2
𝑀𝑛 = 14424664,8 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 14424664,8 = 12982198 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 12982198 𝑁𝑚𝑚² > 10513342 𝑁𝑚𝑚² (𝑂𝐾)

23
3.1.6 Penulangan Geser Balok Anak B-1 Atap
 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 6728,5 × 5 = 16821,34 N = 16,82 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 150 × 163,5 = 22388,15 N = 22,38 kN
6 6
𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 16,82 𝑘𝑁 ≤ 0,5 × 0,75 × 22,38 = 8,39 kN … . . (not ok)
 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
8,39 𝑘𝑁 ≤ 16,82 𝑘𝑁 ≤ 0,75 × 22,66 = 16,79 kN … … (not ok)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 150 × 163,5 = 8175 N = 8,2 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
16,79 𝑘𝑁 ≤ 16,82 𝑘𝑁 ≤ 0.75 × (22,38 + 8,2) = 22,92 𝑘𝑁 … … . (𝑜𝑘)
 Gambar kondisi gaya geser

 Hitung Jarak

16,82 8,39
𝑥1 = = = 124,7 𝑐𝑚
2,5 𝑥
𝑥2 = 250 𝑐𝑚
*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80
mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×163,5
𝑉𝑠 = = = 49,88 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 8,2 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 150×80
𝐴𝑣 𝑚𝑖𝑛 = = = 16,66 𝑚𝑚2 ≤ 𝐴𝑣 = 100,48 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

24
Kontrol jarak
S = 80 mm < s max = d/2 = 163,5/2 = 81,75 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(∅𝑉𝑐 − 0,5 × ∅𝑉𝑐) (16,99 − 8,49)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 0,04 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 163,5)
𝑠= = = 153,31 𝑚𝑚 === 150 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 40
Kontrol jarak
S = 150 mm < s max = d/2 = 163,5/2 = 81,75 mm (not ok)
S = 150 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 150 mm tidak memenuhi persyaratan s
= 150 mm < s max = d/2 = 81,75 mm, maka digunakan s max = d/2 =
81,75 mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(∅𝑉𝑐 − 0,5 × ∅𝑉𝑐) (16,99 − 8,49)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 0,04 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 163,5)
𝑠= = = 153,31 𝑚𝑚 === 150 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 0,04
Kontrol jarak
S = 150 mm < s max = d/4 = 163,5/4 = 40,87 mm (not ok)
S = 150 mm < s max = 600 mm (ok)
Karen jika menggunanakan s = 150 mm tidak memenuhi persyaratan s
= 150 mm < s max = d/4 = 40,87 mm, maka digunakan s max = d/4 =
40,87 mm atau dibulatkan jadi s = 40 mm

 Gambar penulangan geser balok anak B-1 atap

25
3.2 Data Balok – B2 Atap
● Lx :3m
● Ly :5m
● Tebal plat : 10cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

3.2.1 Pembebanan Balok – B2 Atap


● qD Plat = 293,67 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 97,8912 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

26
● Preliminary h balok
h = L/21 = 500/21 = 17,85 cm ---- 22 cm (SNI 2847-2019)
b = 2/3*h = 2/3*22 = 14,67 cm ----- 20 cm
Jadi pakai dimensi balok 20x22 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,2 x 0,22) = 1,03Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
2

1
1 32
2
× 293,674 × (1 − (1 )) = 361,22 𝐾𝑔/𝑚²
2 52 2

Total beban mati QD = 1,03 + 2x361,22 = 723,47Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1
1 𝑙𝑥 2
qL ekuivalen plat = 2 × 𝑞 × (1 − (12 ))
𝑙𝑦 2
2

1
1 32
2
× 97,89 × (1 − (1 )) = 120,41 𝐾𝑔/𝑚²
2 52 2

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (723,47) + 1,6 (120,41)
= 1060,81 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B2 Atap sebesar 1060,81 Kg/ m²

3.2.2 Momen Balok – B2 Atap

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1060,81 × 52 = 1682,134 = 26520316 𝑁𝑚𝑚2
10 10 𝑚²

27
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1060,81 × 52 = 1051,334 = 16575198 𝑁𝑚𝑚2
16 16 𝑚2

3.2.3 Penulangan Balok – B2 Atap

● Tinggi balok : 220 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 13 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 220 − 40 − 10 − 13 = 163,5 𝑚
2

3.2.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4

28
𝑀𝑢 𝑡 26520316
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×165,52 = 6,2

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 6,2
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,03
Dipakai : ρ perlu = 0.029>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
𝑓𝑦240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,03 × 200 × 163,5
𝐴𝑠 = 984,2 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
984,2
𝑛= × 𝜋 × 132
0.25
𝑛 = 7,4 dibulatkan menjadi 8
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 8 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1061,32 𝑚𝑚2 dipakai tulangan 8D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1061,32 𝑚𝑚² > 984,2 𝑚𝑚² (𝑂𝐾)

29
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1061,32 × 240
𝑎= = = 49,9
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 49,9
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1061,23 × 240) × (163,5 − )
2 2
𝑀𝑛 = 35285348 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 35285348 = 31756814 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 31756814 𝑁𝑚𝑚² > 26520316 𝑁𝑚𝑚² (𝑂𝐾)

3.2.5 Penulangan Lapangan


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 16575198
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×163,52 = 3,87

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).3,87
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.017
9,4 240

Dipakai : ρ perlu = 0.017>ρ min = 0,0058 (OK)

30
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
𝑓𝑦240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,017 × 200 × 163,5
𝐴𝑠 = 575,7 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
575,7
𝑛 = × 𝜋 × 132
0.25
𝑛 = 4,27 dibulatkan menjadi 5
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 5 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 663,32 𝑚𝑚2 dipakai tulangan 6D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 663,32 𝑚𝑚² > 575,7 𝑚𝑚² (𝑂𝐾)
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 663,32 × 240
𝑎= = = 31,21
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 31,21
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (663,32 × 240) × (163,5 − )
2 2
𝑀𝑛 = 23544166,8 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 23544166,8 = 21189750,1 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 21189750,1 𝑁𝑚𝑚² > 16575198 𝑁𝑚𝑚² (𝑂𝐾)

31
3.2.6 Penulangan Geser Balok Anak B-2 Atap
 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 10608,12 × 5 = 26520,31 N = 26,52 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 200 × 163,5 = 22388,15 N = 22,38 kN
6 6
𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 26,52 𝑘𝑁 ≤ 0,5 × 0,75 × 22,38 = 8,39 kN … . . (not ok)
 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
8,39 𝑘𝑁 ≤ 26,52 𝑘𝑁 ≤ 0,75 × 22,38 = 16,79 kN … … (not ok)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 200 × 163,5 = 8175 N = 8,2 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
16,79 𝑘𝑁 ≤ 26,52 𝑘𝑁 ≤ 0.75 × (22,38 + 8,2) = 22,92 𝑘𝑁 … … . (𝑛𝑜𝑡 𝑜𝑘)
 Kondisi 4
1
∅(𝑉𝑐 + 𝑉𝑠min) ≤ Vu ≤ ∅(Vc + × √fc × bw × d)
3
1
22,92 𝑘𝑁 ≤ 26,52 𝑘𝑁 ≤ 0,75 × (22,38 + × √30 × 200 × 163,5 = 33,59 𝑘𝑁 … . (𝑜𝑘)
3

 Gambar kondisi gaya geser

 Hitung Jarak
26,52 8,39
𝑥1 = = = 79,09𝑐𝑚
2,5 𝑥
26,52 16,79
𝑥2 = = = 158,27 𝑐𝑚
2,5 𝑥
26,52 22,92
𝑥3 = = = 216,06 𝑐𝑚
2,5 𝑥
𝑥4 = 2,5 𝑚𝑒𝑡𝑒𝑟

32
*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80
mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×163,5
𝑉𝑠 = = = 49,88𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 8,2 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 150×80
𝐴𝑣𝑚𝑖𝑛 = = = 16,66 𝑚𝑚2 ≤ 𝐴𝑣 = 100,48 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontrol jarak
S = 80 mm < s max = d/2 = 163,5/2 = 81,75 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(𝑉𝑢 − ∅𝑉𝑐) (26,52 − 16,79)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 12,97 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 163,5)
𝑠= = = 476,36 𝑚𝑚 === 400 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 12,97
Kontrol jarak
S = 400 mm < s max = d/2 = 163,5/2 = 81,75 mm (not ok)
S = 400 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 400 mm tidak memenuhi persyaratan s
= 400 mm < s max = d/2 = 81,75 mm, maka digunakan s max = d/2 =
81,75 mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(𝑉𝑢 − ∅𝑉𝑐) (26,52 − 16,79)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 12,97 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 163,5)
𝑠= = = 304,87 𝑚𝑚 === 300 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 12,97
Kontrol jarak
S = 300 mm < s max = d/4 = 163,5/4 = 40,87 mm (not ok)
S = 300 mm < s max = 600 mm (ok)

33
Karena jika menggunanakan s = 300 mm tidak memenuhi persyaratan s
= 300 mm < s max = d/4 = 40,87 mm, maka digunakan s max = d/4 =
40,87 mm atau dibulatkan jadi s = 40 mm

 Gambar penulangan geser balok anak B-2 Atap

3.3 Data Balok – B3 Atap


● Lx : 3,5 m
● Ly :5m
● Tebal plat : 10cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

34
3.3.1 Pembebanan Balok – B3 Atap
● qD Plat = 293,67 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 97,8912 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 24 cm (SNI 2847-2019)
b = 2/3*h = 2/3*24= 16 cm ----- 20 cm
Jadi pakai dimensi balok 20x24 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,2 x 0,24) = 1,12Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
2

1
1 3,52
2
× 293,674 × (1 − ( 1 )) = 388,02 𝐾𝑔/𝑚²
2 52 2

Total beban mati QD = 1,12 + 2x388,02 = 777,16Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1 2
1 𝑙𝑥
qL ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
2

1
1 3,52
2
× 97,89 × (1 − ( 1 )) = 129,34 𝐾𝑔/𝑚²
2 52 2

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (777,16) + 1,6 (129,34)
= 1139,53 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B3 Atap sebesar 1139,5Kg/ m²

35
3.3.2 Momen Balok – B3 Atap

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1139,53 × 52 = 2848,83 = 28488297𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1139,53 × 52 = 1780,52 = 17805185 𝑁𝑚𝑚2
16 16 𝑚2

3.3.3 Penulangan Balok – B3 Atap

● Tinggi balok : 240 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 13 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 240 − 40 − 10 − 13 = 183,5 𝑚𝑚
2

36
3.3.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 28488297
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×185,52 = 5,28

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 5,28
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,024
Dipakai : ρ perlu = 0.024>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
𝑓𝑦240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,024 × 200 × 183,5
𝐴𝑠 = 916,23 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
916,23
𝑛= × 𝜋 × 132
0.25
𝑛 = 6,81 dibulatkan menjadi 7
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 7 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 928,65 𝑚𝑚2 dipakai tulangan 7D13

37
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 928,65 𝑚𝑚² > 916,23 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 928,65 × 240
𝑎= = = 43,7
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 43,7
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (928,65 × 240) × (183,5 − )
2 2
𝑀𝑛 = 36027942 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 36027942 = 32425147 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 32425147 𝑁𝑚𝑚² > 28488297 𝑁𝑚𝑚² (𝑂𝐾)

3.3.5 Penulangan Lapangan


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 17805185
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×183,52 = 3,3

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).3,3
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.014
9,4 240

38
Dipakai : ρ perlu = 0.014>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
𝑓𝑦240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,014 × 200 × 183,5
𝐴𝑠 = 543,2 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
543,2
𝑛 = × 𝜋 × 132
0.25
𝑛 = 4,09 dibulatkan menjadi 5
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 5 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 663,32 𝑚𝑚2 dipakai tulangan 3D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 663,32 𝑚𝑚² > 543,2 𝑚𝑚² (𝑂𝐾)
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 663,32 × 240
𝑎= = = 31,21
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 31,21
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (663,32 × 240) × (183,5 − )
2 2
𝑀𝑛 = 26728126 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 26728126 = 24055314 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 24055314 𝑁𝑚𝑚² > 17805185 𝑁𝑚𝑚² (𝑂𝐾)

39
3.3.6 Penulangan Geser Balok Anak B-3 Atap
 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 11395 × 5 = 28488,29 N = 28,48 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 200 × 183,5 = 25126 N = 25,12 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 28,48 𝑘𝑁 ≤ 0,5 × 0,75 × 25,12 = 9,42 kN … . . (𝑛𝑜𝑡 𝑜𝑘)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
9,42 𝑘𝑁 ≤ 28,48 𝑘𝑁 ≤ 0,75 × 25,12 = 18,84 kN … … (𝑛𝑜𝑡 𝑜𝑘)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 200 × 183,5 = 9175 N = 9,17 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
18,84 𝑘𝑁 ≤ 28,48 𝑘𝑁 ≤ 0.75 × (25,12 + 9,17) = 25,72 𝑘𝑁 … … . (𝑛𝑜𝑡 𝑜𝑘)
 Kondisi 4
1
∅(𝑉𝑐 + 𝑉𝑠min) ≤ Vu ≤ ∅(Vc + × √fc × bw × d)
3
1
25,72 𝑘𝑁 ≤ 28,48 𝑘𝑁 ≤ 0,75 × (25,12 + × √30 × 200 × 183,5 = 37,70 𝑘𝑁 … . (𝑜𝑘)
3
 Gambar kondisi gaya geser

 Hitung Jarak
28,48
𝑥1 = = 9,42 = 82,68𝑐𝑚
2,5
28,48 18,84
𝑥2 = = = 165,37 𝑐𝑚
2,5 𝑥
28,48 25,72
𝑥3 = = = 225,77 𝑐𝑚
2,5 𝑥
𝑥4 = 2,5 𝑚𝑒𝑡𝑒𝑟

*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80


mm

40
 Hitung tulangan geser yang dibutuhkan pada tiap kondisi
 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×183,5
𝑉𝑠 = = = 55,91 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 12,36 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 200×80
𝐴𝑣𝑚𝑖𝑛 = = = 22,22 𝑚𝑚2 ≤ 𝐴𝑣 = 100,48 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontrol jarak
S = 80 mm < s max = d/2 = 183,5/2 = 91,75 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukupmemadai

 Kondisi 4
(𝑉𝑢 − ∅𝑉𝑐) (28,48 − 18,84)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 12,85 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 183,5)
𝑠= = = 307,59 𝑚𝑚 === 300 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 12,85
Kontrol jarak
S = 300 mm < s max = d/2 = 183,5/2 = 91,75 mm (not ok)
S = 300 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 300 mm tidak memenuhi persyaratan s
= 300 mm < s max = d/2 = 91,75 mm, maka digunakan s max = d/2 =
91,75 mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(𝑉𝑢 − ∅𝑉𝑐) (28,48 − 18,84)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 12,85 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 183,5)
𝑠= = = 307,59 𝑚𝑚 === 300 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 12,85
Kontrol jarak
S = 300 mm < s max = d/4 = 183,5/4 = 45,87 mm (not ok)
S = 300 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 300 mm tidak memenuhi persyaratan s
= 300 mm < s max = d/4 = 45,87 mm, maka digunakan s max = d/4 =
45,87 mm atau dibulatkan jadi s = 40 mm

41
 Gambar penulangan geser balok anak B-3 Atap

3.4 Data Balok – B4 Atap


● Lx : 3,5 m
● Ly :5m
● Tebal plat : 10cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

3.4.1 Pembebanan Balok – B4 Atap


● qD Plat = 293,67 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 97,8912 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

42
● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 26 cm (SNI 2847-2019)
b = 2/3*h = 2/3*26= 17,33 cm ----- 22 cm
Jadi pakai dimensi balok 22x26 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,22 x 0,26) = 1,34Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
2

1
1 3,52
2
× 293,674 × (1 − ( 1 )) = 388,02 𝐾𝑔/𝑚²
2 52 2

Total beban mati QD = 1,12 + 2x388,02 = 777,34Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1
1 𝑙𝑥 2
qL ekuivalen plat = 2 × 𝑞 × (1 − (12 ))
𝑙𝑦 2
2

1
1 3,52
2
× 97,89 × (1 − ( 1 )) = 129,34 𝐾𝑔/𝑚²
2 52 2

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (777,34) + 1,6 (129,34)
= 1139,79 Kg/m²

Jadi beban ultímate (qu) yang diterima oleh balok B4 atap sebesar 1139,70 Kg/ m²

3.4.2 Momen Balok – B4 Atap

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1139,79 × 52 = 2849,48 = 28494770𝑁𝑚𝑚2
10 10 𝑚²

43
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1139,79 × 52 = 1780,92 = 17809231 𝑁𝑚𝑚2
16 16 𝑚2

3.4.3 Penulangan Balok – B4 Atap

● Tinggi balok : 260 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 13 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 260 − 40 − 10 − 13 = 203,5 𝑚𝑚
2

3.4.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 28494770
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×220×203,52 = 3,9

44
● Rasio tulangan yang dibutuhkan
1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 3,9
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,017
Dipakai : ρ perlu = 0.017>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
𝑓𝑦240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,017 × 220 × 203,5
𝐴𝑠 = 795,8 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
795,8
𝑛= × 𝜋 × 132
0.25
𝑛 = 5,99 dibulatkan menjadi 6
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 6 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 795,99 𝑚𝑚2 dipakai tulangan 6D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 795,99 𝑚𝑚² > 786,59 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 795,99 × 240
𝑎= = = 34,05
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 220

45
𝑎 34,05
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (795,99 × 240) × (203,5 − )
2 2
𝑀𝑛 = 35623445,3 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 35623445,3 = 32061100 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 32061100 𝑁𝑚𝑚² > 28494770 𝑁𝑚𝑚² (𝑂𝐾)

3.4.5 Penulangan Lapangan


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 17809231
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×220×203,52 = 2,44

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).2,44
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.011
9,4 240

Dipakai : ρ perlu = 0.011>ρ min = 0,0058 (OK)


0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
𝑓𝑦240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

46
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,011 × 220 × 203,5
𝐴𝑠 = 480,02 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
480,02
𝑛 = × 𝜋 × 132
0.25
𝑛 = 3,61 dibulatkan menjadi 4
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 4 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 530,66 𝑚𝑚2 dipakai tulangan 4D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 530,66 𝑚𝑚² > 480,02 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 530,66 × 240
𝑎= = = 22,7
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 220
𝑎 22,7
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (530,66 × 240) × (203,5 − )
2 2
𝑀𝑛 = 24471787 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 24471787 = 22024608 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 22024608 𝑁𝑚𝑚² > 17809231 𝑁𝑚𝑚² (𝑂𝐾)

47
3.4.6 Penulangan Geser Balok Anak B-4 Atap
 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 11397,90 × 5 = 28494,77 N = 28,49 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 220 × 203,5 = 27865 N = 27,86 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 28,49 𝑘𝑁 ≤ 0,5 × 0,75 × 27,86 = 10,44 kN … . . (𝑛𝑜𝑡 𝑜𝑘)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
10,44 𝑘𝑁 ≤ 28,49 𝑘𝑁 ≤ 0,75 × 27,86 = 20,89 kN … … ( 𝑛𝑜𝑡 𝑜𝑘)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 220 × 203,5 = 10175 N = 10,17 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
20,89 𝑘𝑁 ≤ 28,49 𝑘𝑁 ≤ 0.75 × (27,86 + 10,17) = 28,53 𝑘𝑁 … … . (𝑜𝑘)
 Gambar kondisi gaya geser

 Hitung Jarak
28,49 10,44
𝑥1 = = = 91,61𝑐𝑚
2,5 𝑥
28,49 20,89
𝑥2 = = = 183,30 𝑐𝑚
2,5 𝑥
𝑥3 = 2,5 𝑚𝑒𝑡𝑒𝑟
*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80
mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×205,5
𝑉𝑠 = = = 61,94 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 16,42 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 220×80
𝐴𝑣 𝑚𝑖𝑛 = = = 24,44 𝑚𝑚2 ≤ 𝐴𝑣 = 100,48 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

48
Kontrol jarak
S = 80 mm < s max = d/2 = 205,5/2 = 102,75 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(∅𝑉𝑐 − 0,5. ∅𝑉𝑐) (20,89 − 10,44)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 10,12 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 203,5)
𝑠= = = 610,16 𝑚𝑚 === 500 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 10,12
Kontrol jarak
S = 500 mm < s max = d/2 = 203,5/2 = 101,75 mm (not ok)
S = 500 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 500 mm tidak memenuhi persyaratan s
= 500 mm < s max = d/2 = 101,75 mm, maka digunakan s max = d/2 =
101,75 mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(∅𝑉𝑐 − 0,5. ∅𝑉𝑐) (20,89 − 10,44)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 10,12 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 203,5)
𝑠= = = 610,16 𝑚𝑚 === 500 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 20,12
Kontroljarak
S = 500 mm < s max = d/4 = 203,5/4 =50,87 mm (not ok)
S = 500 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 500 mm tidak memenuhi persyaratan s
= 500 mm < s max = d/4 = 51,87 mm, maka digunakan s max = d/4 =
50,87 mm atau dibulatkan jadi s = 40 mm

49
 Gambar penulangan geser balok anak B-4 Atap

3.5 Data Balok – B5 Atap


● Lx : 3,5 m
● Ly :5m
● Tebal plat : 10cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

3.5.2 Pembebanan Balok – B5 Atap


● qD Plat = 293,67 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

50
● qL Plat = 97,8912 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 28 cm (SNI 2847-2019)
b = 2/3*h = 2/3*28= 18,67 cm ----- 20 cm
Jadi pakai dimensi balok 20x28 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,20 x 0,2) = 1,31Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1
1 𝑙𝑥 2
qD ekuivalen plat = 2 × 𝑞 × (1 − (12 ))
𝑙𝑦 2
3

1
1 3,52
× 293,674 × (1 − (21 )) = 429,98 𝐾𝑔/𝑚²
2 52 3

Total beban mati QD = 1,31 + 429,98 = 431,30Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1
1 𝑙𝑥 2
qL ekuivalen plat = 2 × 𝑞 × (1 − (12 ))
𝑙𝑦 2
3

1
1 3,52
2
× 97,89 × (1 − ( 1 )) = 143,33 𝐾𝑔/𝑚²
2 52 3

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (431,30) + 1,6 (143,33)
= 746,88 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B4 atap sebesar 746,88 Kg/ m²

51
3.5.2 Momen Balok – B5 Atap

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 746,88 × 52 = 1867,22 = 18672175𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 746,88 × 52 = 1167,01 = 11670109 𝑁𝑚𝑚2
16 16 𝑚2

3.5.3 Penulangan Balok – B5 Atap

● Tinggi balok : 280 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 13 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 280 − 40 − 10 − 13 = 223,5 𝑚𝑚
2

3.5.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85

52
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 18672175
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×223,52 = 2,33

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 2,33
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,010
Dipakai : ρ perlu = 0.010>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
𝑓𝑦240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,010 × 200 × 223,5
𝐴𝑠 = 457,12 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
457,12
𝑛= × 𝜋 × 132
0.25
𝑛 = 3,44 dibulatkan menjadi 4
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 4 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 530,66 𝑚𝑚2 dipakai tulangan 4D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 530,66 𝑚𝑚² > 457,12 𝑚𝑚² (𝑂𝐾)

53
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 530,66 × 240
𝑎= = = 24,97
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 24,97
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (530,66 × 240) × (223,5 − )
2 2
𝑀𝑛 = 26874390 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 26874390 = 24186951 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 24186951 𝑁𝑚𝑚² > 18672175 𝑁𝑚𝑚² (𝑂𝐾)

3.5.5 Penulangan Lapangan


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 11670109
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×223,52 = 1,46

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).1,46
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.062
9,4 240

Dipakai : ρ perlu = 0.062 >ρ min = 0,0058 (OK)

54
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
𝑓𝑦240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,062 × 200 × 223,5
𝐴𝑠 = 280,22 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
280,22
𝑛 = × 𝜋 × 132
0.25
𝑛 = 2,11 dibulatkan menjadi 3
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 3 × 0,25 × 𝜋 × 132
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 397,99 𝑚𝑚2 dipakai tulangan 3D13
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 397,99 𝑚𝑚² > 280,22 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 397,99 × 240
𝑎= = = 18,7
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 18,7
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (397,99 × 240) × (223,5 − )
2 2
𝑀𝑛 = 20453957 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 20453957 = 18408561 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 18408561 𝑁𝑚𝑚² > 11670109 𝑁𝑚𝑚² (𝑂𝐾)

55
3.5.6 Penulangan Geser Balok Anak B-5 Atap
 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 7468,87 × 5 = 18672,17 N = 18,67 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 200 × 223,5 = 30603 N = 30,60 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 18,67 𝑘𝑁 ≤ 0,5 × 0,75 × 30,60 = 11,47 kN … . . (not ok)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
11,47 𝑘𝑁 ≤ 18,67 𝑘𝑁 ≤ 0,75 × 30,60 = 22,95 kN … … (ok)
 Gambar kondisi gaya geser

 Hitung Jarak
18,67 11,47
𝑥1 = = = 153,58𝑐𝑚
2,5 𝑥
𝑥2 = 2,5 𝑚𝑒𝑡𝑒𝑟
*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80
mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3

56
𝐴𝑣×𝐹𝑦×𝑑 157×240×223,5
𝑉𝑠 = = = 67,97 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 16,42 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 200×80
𝐴𝑣𝑚𝑖𝑛 = = = 22,22 𝑚𝑚2 ≤ 𝐴𝑣 = 100,48 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontrol jarak
S = 80 mm < s max = d/2 = 223,5/2 = 111,75 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(∅𝑉𝑐 − 0,5. ∅𝑉𝑐) (18,67 − 11,47)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 9,59 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 223,5)
𝑠= = = 644,08 𝑚𝑚 === 500 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 9,59
Kontrol jarak
S = 500 mm < s max = d/2 = 223,5/2 = 111,75 mm (not ok)
S = 500 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 500 mm tidak memenuhi persyaratan s
= 500 mm < s max = d/2 = 111,75 mm, maka digunakan s max = d/2 =
111,75 mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(∅𝑉𝑐 − 0,5. ∅𝑉𝑐) (18,67 − 11,47)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 9,59 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 223,5)
𝑠= = = 412,21 𝑚𝑚 === 400 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 9,59
Kontrol jarak
S = 400 mm < s max = d/4 = 223,5/4 =55,87 mm (not ok)
S = 400 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 400 mm tidak memenuhi persyaratan s
= 400 mm < s max = d/4 = 55,87 mm, maka digunakan s max = d/4 =
55,87 mm atau dibulatkan jadi s = 40 mm

57
 Gambar penulangan geser balok anak B-5 Atap

3.6 Data Balok – B1 Lantai


● Lx :3m
● Ly :5m
● Tebal plat : 10 cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

3.6.1 Pembebanan Balok – B1 Lantai


● qD Plat = 361,993 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 244,728 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

58
● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 22 cm (SNI 2847-2019)
b = 2/3*h = 2/3*22= 14,67 cm ----- 15 cm
Jadi pakai dimensi balok 15x22 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,22 x 0,15) = 0,7739 Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 32
2
× 361,993 × (1 − (1 )) = 477,83 𝐾𝑔/𝑚²
2 52 3

Total beban mati QD = 0,7739 + 477,83 = 478,60 Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1
1 𝑙𝑥 2
qL ekuivalen plat = 2 × 𝑞 × (1 − (12 ))
𝑙𝑦 2
3

1 2
1 3
× 244,728 × (1 − (21 2 )) = 323,040 𝐾𝑔/𝑚²
2 5
3

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (478,60) + 1,6 (323,040)
= 1091,192 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B1 lantai sebesar 1091,192 Kg/ m²

3.6.2 Momen Balok – B1 Lantai

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1091,192 × 52 = 2727,98 = 27279800𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1091,192 × 52 = 1704,98 = 17049875𝑁𝑚𝑚2
16 16 𝑚2

59
3.6.3 Penulangan Balok – B1 Lantai

● Tinggi balok : 220 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 16 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 220 − 40 − 10 − 16 = 162 𝑚𝑚
2

3.6.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4

60
𝑀𝑢 𝑡 27279800
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×150×1622 = 8,66

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 8,66
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,046
Dipakai : ρ perlu = 0.046>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
𝑓𝑦240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,046 × 150 × 164
𝐴𝑠 = 1119,95 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
1119,95
𝑛= × 𝜋 × 162
0.25
𝑛 = 5,5 dibulatkan menjadi 6
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 5 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1205,76 𝑚𝑚2 dipakai tulangan 6D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1205,76 𝑚𝑚² > 1119,95 𝑚𝑚² (𝑂𝐾)

61
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1205,76 × 240
𝑎= = = 75,65
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 150
𝑎 75,65
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1205,76 × 240) × (162 − )
2 2
𝑀𝑛 = 35933259 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 35933259 = 32339933 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 32339933 𝑁𝑚𝑚² > 27279800 𝑁𝑚𝑚² (𝑂𝐾)

3.6.5 Penulangan Lapangan


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 17049875
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×150×1622 = 5,4

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).5,4
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.025
9,4 240

Dipakai : ρ perlu = 0.025 >ρ min = 0,0058 (OK)

62
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
𝑓𝑦240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,025 × 150 × 162
𝐴𝑠 = 623,42 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
623,42
𝑛 = × 𝜋 × 162
0.25
𝑛 = 3,1 dibulatkan menjadi 4
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 4 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 803,84 𝑚𝑚2 dipakai tulangan 4D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 803,84 𝑚𝑚² > 623,42 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 803,84 × 240
𝑎= = = 50,43
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 150
𝑎 50,43
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (803,84 × 240) × (162 − )
2 2
𝑀𝑛 = 26388103 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 26388103 = 23749293 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 23749293 𝑁𝑚𝑚² > 17049875 𝑁𝑚𝑚² (𝑂𝐾)

63
3.6.6 Penulangan Geser Balok Anak B-1 Lantai
 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 10911,91 × 5 = 27279,7 N = 27,27 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 150 × 162 = 22182,7 N = 22,18 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 27,27 𝑘𝑁 ≤ 0,5 × 0,75 × 22,18 = 8,31 kN … . . (not ok)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
8,31 𝑘𝑁 ≤ 27,27 𝑘𝑁 ≤ 0,75 × 22,18 = 16,63 kN … … (ok)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 150 × 162 = 8100 N = 8,1 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
16,62 𝑘𝑁 ≤ 27,27 𝑘𝑁 ≤ 0.75 × (22,18 + 8,1) = 22,71 𝑘𝑁 … … . (𝑛𝑜𝑡 𝑜𝑘)
 Kondisi 4
1
∅(𝑉𝑐 + 𝑉𝑠min) ≤ Vu ≤ ∅(Vc + × √fc × bw × d)
3
1
22,71 𝑘𝑁 ≤ 27,27 𝑘𝑁 ≤ 0,75 × (22,18 + × √30 × 150 × 162 = 33,29 𝑘𝑁 … . (𝑜𝑘)
3
 Gambar kondisi gaya geser

 Hitung jarak
27,27 8,31
𝑥1 = = = 76,27𝑐𝑚
2,5 𝑥
27,27 16,63
𝑥2 = = = 152,45 𝑐𝑚
2,5 𝑥
27,27 22,71
𝑥3 = = = 208,19 𝑐𝑚
2,5 𝑥
𝑥4 = 2,5 𝑚𝑒𝑡𝑒𝑟

64
*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80
mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×162
𝑉𝑠 = = = 76,30 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 8,1 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 150×80
𝐴𝑣𝑚𝑖𝑛 = = = 16,66 𝑚𝑚2 ≤ 𝐴𝑣 = 157 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontrol jarak
S = 80 mm < s max = d/2 = 162/2 = 81 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(𝑉𝑢 − ∅𝑉𝑐) (27,27 − 0,75 × 22,18)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 14,19 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 162)
𝑠= = = 435,47 𝑚𝑚 === 400 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 14,19
Kontrol jarak
S = 400 mm < s max = d/2 = 162/2 = 81 mm (not ok)
S = 400 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 200 mm tidak memenuhi persyaratan s
= 400 mm < s max = d/2 = 81 mm, maka digunakan s max = d/2 = 82
mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(𝑉𝑢 − ∅𝑉𝑐) (27,27 − 0,75 × 22,18)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 14,19 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 162)
𝑠= = = 435,47 𝑚𝑚 === 400 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 14,19
Kontrol jarak
S = 400 mm < s max = d/4 = 162/4 = 40,5 mm (not ok)
S = 400 mm < s max = 600 mm (ok)

65
Karena jika menggunanakan s = 400 mm tidak memenuhi persyaratan s
= 400 mm < s max = d/4 = 41 mm, maka digunakan s max = d/4 = 41
mm atau dibulatkan jadi s = 40 mm

 Gambar penulangan geser balok anak B-1 lantai

3.7 Data Balok – B2 Lantai


● Lx :3m
● Ly :5m
● Tebal plat : 10 cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

66
3.7.1 Pembebanan Balok – B2 Lantai
● qD Plat = 361,993 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 244,728 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

● Preliminary h balok
h = L/21 = 500/21 = 17,85 cm ---- 22 cm (SNI 2847-2019)
b = 2/3*h = 2/3*22= 14,67 cm ----- 20 cm
Jadi pakai dimensi balok 20x22 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,22 x 0,2) = 1.0319 Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 32
2
× 361,993 × (1 − (1 )) = 445,25 𝐾𝑔/𝑚²
2 52 3

Total beban mati QD = 2 x (1,0319 + 445,25) = 891,53 Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1 2
1 𝑙𝑥
qL ekuivalen plat = 2 × 𝑞𝑑 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 32
2
× (244,728 × 5) × (1 − (1 )) = 301,01 𝐾𝑔/𝑚²
2 52 3

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (891,53) + 1,6 (301,01)
= 1551,467 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B2 lantai sebesar 1551,467 Kg/ m²

67
3.7.2 Momen Balok – B2 Lantai

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1551,467 × 52 = 3878,66 = 38786696 𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1551,467 × 52 = 2424,16 = 24241685𝑁𝑚𝑚2
16 16 𝑚2

3.7.3 Penulangan Balok – B2 Lantai

● Tinggi balok : 220 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 16 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 220 − 40 − 10 − 16 = 162 𝑚𝑚
2

68
3.7.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 38786696
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×1622 = 9,23

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 9,23
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,05
Dipakai : ρ perlu = 0.05 >ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
𝑓𝑦240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Luas tulangan yang diperlukan


𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,05 × 200 × 162
𝐴𝑠 = 1635,5 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
1635,5
𝑛= × 𝜋 × 162
0.25
𝑛 = 8,13 dibulatkan menjadi 9
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 9 × 0,25 × 𝜋 × 162

69
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1808,6 𝑚𝑚2 dipakai tulangan 8D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1808,6 𝑚𝑚² > 1598,30 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1808,6 × 240
𝑎= = = 85,1
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 85,1
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1808,6 × 240) × (162 − )
2 2
𝑀𝑛 = 51847384 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 51847384 = 46662646 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 46662646 𝑁𝑚𝑚² > 38786696 𝑁𝑚𝑚² (𝑂𝐾)

3.7.5 Penulangan Lapangan


● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 24241685
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×1622 = 5,77

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).5,77
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.027
9,4 240

Dipakai : ρ perlu = 0.027 >ρ min = 0,0058 (OK)

70
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
𝑓𝑦240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Luas tulangan yang diperlukan


𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,0267 × 200 × 162
𝐴𝑠 = 895,97 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
895,97
𝑛 = × 𝜋 × 162
0.25
𝑛 = 4,45 dibulatkan menjadi 5
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 5 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1004,8 𝑚𝑚2 dipakai tulangan 5D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1004,8 𝑚𝑚² > 895,97 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1004,8 × 240
𝑎= = = 47,28
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 47,28
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1004,8 × 240) × (162 − )
2 2
𝑀𝑛 = 33365223 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 33365223 = 30028700 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 27818426,80 𝑁𝑚𝑚² > 24241685 𝑁𝑚𝑚² (𝑂𝐾)

71
3.7.6 Penulangan Geser Balok Anak B-2 Lantai
 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 15514,67 × 5 = 38786,69 N = 38,78 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 200 × 162 = 29577,01 N = 29,57 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 38,78 𝑘𝑁 ≤ 0,5 × 0,75 × 29,57 = 11,09 kN … . . (not ok)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
11,09𝑘𝑁 ≤ 38,78 𝑘𝑁 ≤ 0,75 × 29,57 = 22,18 kN … … (not ok)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 200 × 162 = 10800 N = 10,8 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
22,18 𝑘𝑁 ≤ 38,78 𝑘𝑁 ≤ 0.75 × (29,57 + 10,8) = 30,28 𝑘𝑁 … … . (𝑛𝑜𝑡 𝑜𝑘)
 Kondisi 4
1
∅(𝑉𝑐 + 𝑉𝑠min) ≤ Vu ≤ ∅(Vc + × √fc × bw × d)
3
1
30,28 𝑘𝑁 ≤ 38,78 𝑘𝑁 ≤ 0,75 × (29,57 + × √30 × 200 × 162 = 44,38 𝑘𝑁 … . (𝑜𝑘)
3
 Gambar kondisi gaya geser

72
 Hitung Jarak
38,78 11,09
𝑥1 = = = 71,49𝑐𝑚
2,5 𝑥
38,78 22,18
𝑥2 = = = 142,96𝑐𝑚
2,5 𝑥
38,78 30,28
𝑥3 = = = 195,2𝑐𝑚
2,5 𝑥
𝑥4 = 2,5 𝑚𝑒𝑡𝑒𝑟

*digunakan sengkang 2 kaki Ø10 mm, dengan Av = 157 mm2, gunakan s = 80


mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×162
𝑉𝑠 = = = 76,30 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 10,8 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 200×80
𝐴𝑣𝑚𝑖𝑛 = = = 22,22 𝑚𝑚2 ≤ 𝐴𝑣 = 157 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontrol jarak
S = 80 mm < s max = d/2 = 162/2 = 81 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(𝑉𝑢 − ∅𝑉𝑐) (38,78 − 0,75 × 29,57)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 22,13 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 162)
𝑠= = = 279,12 𝑚𝑚 === 200 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 22,13
Kontrol jarak
S = 200 mm < s max = d/2 = 162/2 = 81 mm (not ok)
S = 200 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 200 mm tidak memenuhi persyaratan s
= 200 mm < s max = d/2 = 81 mm, maka digunakan s max = d/2 = 81
mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

73
 Kondisi 5
(𝑉𝑢 − ∅𝑉𝑐) (38,78 − 0,75 × 29,57)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 22,13 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 162)
𝑠= = = 279,12𝑚𝑚 === 200 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 22,13
Kontrol jarak
S = 200 mm < s max = d/4 = 164/4 = 41 mm (not ok)
S = 200 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 200 mm tidak memenuhi persyaratan s
= 200 mm < s max = d/4 = 40,5 mm, maka digunakan s max = d/4 =
40,5 mm atau dibulatkan jadi s = 40 mm

 Gambar penulangan geser balok anak B-2 lantai

3.8 Data Balok – B3 Lantai


● Lx : 3,5 m
● Ly :5m
● Tebal plat : 10 cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

74
3.8.1 Pembebanan Balok – B3 Lantai
● qD Plat = 361,993 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 244,728 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 24 cm (SNI 2847-2019)
b = 2/3*h = 2/3*24= 16 cm ----- 20 cm
Jadi pakai dimensi balok 20x24 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,24 x 0,2) = 1,125 Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1
1 𝑙𝑥 2
qD ekuivalen plat = × 𝑞 × (1 − (12 ))
2 𝑙𝑦 2
3

1
1 3,52
2
× 361,993 × (1 − ( 1 )) = 478.28 𝐾𝑔/𝑚²
2 523

75
Total beban mati QD = 2 x (1,125 + 478,28) = 957,69 Kg/m²

Beban hidup plat (ekuivalen plat atap A2)


1 2
1 𝑙𝑥
qL ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 3,52
2
× 244.728 × (1 − ( 1 )) = 323.34 𝐾𝑔/𝑚²
2 52 3

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (957,69) + 1,6 (323,34)
= 1666,58 Kg/m²

Jadi beban ultímate (qu) yang diterima oleh balok B3 lantai sebesar 166,58 Kg/ m²

3.8.2 Momen Balok – B3 Lantai

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1666,58 × 52 = 4166,46 = 41664681𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1666,58 × 52 = 2604,04 = 26040426 𝑁𝑚𝑚2
16 16 𝑚2

76
3.8.3 Penulangan Balok – B3 Lantai

● Tinggi balok : 240 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 16 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 240 − 40 − 10 − 16 = 182 𝑚𝑚
2

3.8.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 41664682
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×1822 = 7,86

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 7,86
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,04
Dipakai : ρ perlu = 0.04>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240

77
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Luas tulangan yang diperlukan


𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,04 × 200 × 184
𝐴𝑠 = 1472,73 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
1472,73
𝑛= × 𝜋 × 162
0.25
𝑛 = 7,32 dibulatkan menjadi 8
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 8 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1607,68 𝑚𝑚2 dipakai tulangan 8D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1607,68 𝑚𝑚² > 1472,73 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1607,68 × 240
𝑎= = = 75,65
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 75,65
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1607,68 × 240) × (182 − )
2 2
𝑀𝑛 = 55627876 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 55627876 = 50065088 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 50065088 𝑁𝑚𝑚² > 41664682 𝑁𝑚𝑚² (𝑂𝐾)

78
3.8.5 Penulangan Lapangan
● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 26040426.24
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×1822 = 4,91

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).4,91
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.022
9,4 240

Dipakai : ρ perlu = 0.022>ρ min = 0,0058 (OK)


0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,022 × 200 × 182
𝐴𝑠 = 835,43 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
835,43
𝑛 = × 𝜋 × 162
0.25
𝑛 = 4,15 dibulatkan menjadi 5
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 5 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1004,8 𝑚𝑚2 dipakai tulangan 5D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1004,8 𝑚𝑚² > 835,43 𝑚𝑚² (𝑂𝐾)

79
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1004,8 × 240
𝑎= = = 47,28
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 47,28
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1004,8 × 240) × (182 − )
2 2
𝑀𝑛 = 38188263,3 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 38188263,3 = 34369436 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 34369436 𝑁𝑚𝑚² > 26040426 𝑁𝑚𝑚² (𝑂𝐾)

3.8.6 Penulangan Geser Balok Anak B-3 Lantai


 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 16665,87 × 5 = 41664,68 N = 41,66 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 200 × 182 = 33593,65 N = 33,22 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 41,66 𝑘𝑁 ≤ 0,5 × 0,75 × 33,22 = 12,46 kN … . . (not ok)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
12,46 𝑘𝑁 ≤ 41,66 𝑘𝑁 ≤ 0,75 × 33,22 = 24,92 kN … … (not ok)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 200 × 182 = 12133,33 N = 12,13 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
24,92 𝑘𝑁 ≤ 41,66𝑘𝑁 ≤ 0.75 × (33,22 + 12,46) = 34,02 𝑘𝑁 … … . (𝑛𝑜𝑡 𝑜𝑘)
 Kondisi 4

80
1
∅(𝑉𝑐 + 𝑉𝑠min) ≤ Vu ≤ ∅(Vc + × √fc × bw × d)
3
1
34,02 𝑘𝑁 ≤ 41,66 𝑘𝑁 ≤ 0,75 × (33,22 + × √30 × 200 × 182 = 49,86 𝑘𝑁 … . (𝑜𝑘)
3
 Gambar Kondisi Gaya Geser

 Hitung Jarak
41,66 12,46
𝑥1 = 𝑥1 = = = 74,77 𝑐𝑚
2,5 𝑥
41,66 24,92
𝑥2 = 𝑥1 = = = 149,54 𝑐𝑚
2,5 𝑥
41,66 34,02
𝑥3 = 𝑥1 = = = 204,15 𝑐𝑚
2,5 𝑥
𝑥4 = 2,5 𝑚𝑒𝑡𝑒𝑟

*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80


mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×182
𝑉𝑠 = = = 85,72 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 12,13 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 200×80
𝐴𝑣𝑚𝑖𝑛 = = = 22,22 𝑚𝑚2 ≤ 𝐴𝑣 = 157 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontrol jarak
S = 80 mm < s max = d/2 = 162/2 = 81 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(𝑉𝑢 − ∅𝑉𝑐) (41,66 − 0,75 × 24,92)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 22,32 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 182)
𝑠= = = 307,18 𝑚𝑚 === 300 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 22,32

81
Kontrol jarak
S = 300 mm < s max = d/2 = 162/2 = 81 mm (not ok)
S = 300 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 300 mm tidak memenuhi persyaratan s
=300 mm < s max = d/2 = 81 mm, maka digunakan s max = d/2 = 81
mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(𝑉𝑢 − ∅𝑉𝑐) (41,66 − 0,75 × 24,92)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 22,32 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (100,48 × 240 × 182)
𝑠= = = 307,18 𝑚𝑚 === 150 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 22,32
Kontrol jarak
S = 300 mm < s max = d/4 = 162/4 = 40,5 mm (not ok)
S = 300 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 300 mm tidak memenuhi persyaratan s
= 300 mm < s max = d/4 = 40,5 mm, maka digunakan s max = d/4 =
40,5 mm atau dibulatkan jadi s = 40 mm

 Gambar penulangan geser balok anak B-3 lantai

3.9 Data Balok – B4 Lantai


● Lx : 3,5 m
● Ly :5m
● Tebal plat : 10 cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

82
3.9.1 Pembebanan Balok – B4 Lantai
● qD Plat = 361,993 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 244,728 Kg/m² (sesuai pembebanan plat SNI 2847-2020)

● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 26 cm (SNI 2847-2019)
b = 2/3*h = 2/3*26= 17,33 cm ----- 22 cm
Jadi pakai dimensi balok 22x26 cm

● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,26 x 0,22) = 1,341 Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 3,52
2
× 361,993 × (1 − ( 1 )) = 478.28 𝐾𝑔/𝑚²
2 523

Total beban mati QD = 2 x (1,125 + 478,28) = 957,69 Kg/m²

83
Beban hidup plat (ekuivalen plat atap A2)
1 2
1 𝑙𝑥
qL ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 3,52
2
× 244.728 × (1 − ( 1 )) = 323.34 𝐾𝑔/𝑚²
2 52 3

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (957,69) + 1,6 (323,34)
= 1666,58 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B3 lantai sebesar 166,58 Kg/ m²

3.9.2 Momen Balok – B4 Lantai

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1666,58 × 52 = 4167,11 = 41671155.03 𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1666,58 × 52 = 2604,44 = 26044471.9 𝑁𝑚𝑚2
16 16 𝑚2

84
3.9.3 Penulangan Balok – B4 Lantai

● Tinggi balok : 260 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 16 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 260 − 40 − 10 − 16 = 202 𝑚𝑚
2

3.9.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 41671155.03
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×220×2022 = 5,8

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 5,8
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,027
Dipakai : ρ perlu = 0.027>ρ min = 0,0058 (OK)

0.85 ∙ 𝑓 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

85
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,027 × 220 × 202
𝐴𝑠 = 1236,29 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
1236,29
𝑛= × 𝜋 × 162
0.25
𝑛 = 6,15 dibulatkan menjadi 7
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 7 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1406,72 𝑚𝑚2 dipakai tulangan 7D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1406,72 𝑚𝑚² > 1236,29 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1406,72 × 240
𝑎= = = 60,18
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 220
𝑎 60,18
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1406,72 × 240) × (202 − )
2 2
𝑀𝑛 = 58038926 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 58038926 = 52235033 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 52235033 𝑁𝑚𝑚² > 41671155.03 𝑁𝑚𝑚² (𝑂𝐾)

86
3.9.5 Penulangan Lapangan
● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 26044471.9
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×220×2022 = 3,62

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).3,62
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.016
9,4 240

Dipakai : ρ perlu = 0.016 >ρ min = 0,0058 (OK)


0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,016 × 220 × 202
𝐴𝑠 = 727,58 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
727,58
𝑛 = × 𝜋 × 162
0.25
𝑛 = 3,62 dibulatkan menjadi 4
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 4 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 803,84 𝑚𝑚2  dipakai tulangan 4D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 803,84 𝑚𝑚² > 727,58 𝑚𝑚² (𝑂𝐾)

87
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 803,84 × 240
𝑎= = = 34,38
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 220
𝑎 34,38
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (803,84 × 240) × (202 − )
2 2
𝑀𝑛 = 35652984 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 35652984 = 32087686 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 32087686 𝑁𝑚𝑚² > 26044471.9 𝑁𝑚𝑚² (𝑂𝐾)

3.9.6 Penulangan Geser Balok Anak B-4 Lantai

 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 16668,46 × 5 = 41671,15 N = 41,67 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 220 × 202 = 40567,98 N = 40,56 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 41,67 𝑘𝑁 ≤ 0,5 × 0,75 × 40,56 = 15,21 kN … . . (not ok)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
15,21 𝑘𝑁 ≤ 41,67 𝑘𝑁 ≤ 0,75 × 40,56 = 30,42 kN … … (not ok)
 Kondisi 3
1 1
𝑉𝑠 𝑚𝑖𝑛 = × 𝑏𝑤 × 𝑑 = × 220 × 202 = 14813,33 N = 14,81 kN
3 3
∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅(𝑉𝑐 + 𝑉𝑠min)
30,42 𝑘𝑁 ≤ 41,67 𝑘𝑁 ≤ 0.75 × (40,56 + 15,21) = 41,53 𝑘𝑁 … … . (𝑛𝑜𝑡 𝑜𝑘)

88
 Kondisi 4
1
∅(𝑉𝑐 + 𝑉𝑠min) ≤ Vu ≤ ∅(Vc + × √fc × bw × d)
3
1
41,53 𝑘𝑁 ≤ 41,67 𝑘𝑁 ≤ 0,75 × (40,56 + × √30 × 200 × 202 = 55,35 𝑘𝑁 … . (𝑜𝑘)
3
 Gambar Penulangan Gaya Geser

 Hitung Jarak
41,67 15,21
𝑥1 = 𝑥1 = = = 91,25 𝑐𝑚
2,5 𝑥
41,67 30,42
𝑥2 = 𝑥1 = = = 182,5 𝑐𝑚
2,5 𝑥
41,66 41,53
𝑥3 = 𝑥1 = = = 249,16 𝑐𝑚
2,5 𝑥
𝑥4 = 2,5 𝑚𝑒𝑡𝑒𝑟

*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80


mm

 Hitung tulangan geser yang dibutuhkan pada tiap kondisi


 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×202
𝑉𝑠 = = = 95,14 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 14,81 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 220×80
𝐴𝑣𝑚𝑖𝑛 = = = 24,44 𝑚𝑚2 ≤ 𝐴𝑣 = 157 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontroljarak
S = 80 mm < s max = d/2 = 202/2 = 101 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai
 Kondisi 4
(𝑉𝑢 − ∅𝑉𝑐) (41,66 − 0,75 × 40,56)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 14,99 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 202)
𝑠= = = 507,64 𝑚𝑚 === 300 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 14,99

89
Kontrol jarak
S = 300 mm < s max = d/2 = 202/2 = 101 mm (not ok)
S = 300 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 300 mm tidak memenuhi persyaratan s
= 300 mm < s max = d/2 = 101 mm, maka digunakan s max = d/2 = 101
mm atau lebih kecil dari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(𝑉𝑢 − ∅𝑉𝑐) (41,66 − 0,75 × 40,56)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 14,99 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 202)
𝑠= = = 507,64 𝑚𝑚 === 300 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 14,99
Kontrol jarak
S = 300 mm < s max = d/4 = 202/4 = 50,5 mm (not ok)
S = 300 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 300 mm tidak memenuhi persyaratan s
= 300 mm < s max = d/4 = 50,5 mm, maka digunakan s max = d/4 = 41
mm atau dibulatkan jadi s = 40 mm

 Gambar penulangan geser balok anak B-4 lantai

3.10 Data Balok – B5 Lantai


● Lx : 3,5 m
● Ly :5m
● Tebal plat : 10 cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa

90
3.10.1 Pembebanan Balok – B5 Lantai
● qD Plat = 361,993 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● qL Plat = 244,728 Kg/m² (sesuai pembebanan plat SNI 2847-2020)
● Preliminary h balok
h = L/21 = 500/21 = 23,809 cm ---- 28 cm (SNI 2847-2019)
b = 2/3*h = 2/3*28= 18,66 cm ----- 24 cm
Jadi pakai dimensi balok 24x28 cm
● Beban Mati
Beban sendri balok = 0,23 Kn/m3 x (bxh)
= (0,23 x 101,97) x (0,28 x 0,24) = 1,576 Kg/m²
Beban mati plat (ekuivalen plat atap A2)

1 2
1 𝑙𝑥
qD ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 3,52
2
× 361,993 × (1 − ( 1 )) = 478.28 𝐾𝑔/𝑚²
2 523

Total beban mati QD = 478,28 + 1,576 = 479,85Kg/m²

91
Beban hidup plat (ekuivalen plat atap A2)
1 2
1 𝑙𝑥
qL ekuivalen plat = 2 × 𝑞 × (1 − ( 2
1 2 ))
𝑙𝑦
3

1
1 3,52
2
× 244.728 × (1 − ( 1 )) = 323.34 𝐾𝑔/𝑚²
2 52 3

Beban Ultimate : Qu = 1,2QD + 1,6qL ekuivalen plat


= 1,2 (479,85) + 1,6 (323,34)
= 1093,18 Kg/m²
Jadi beban ultímate (qu) yang diterima oleh balok B5 lantai sebesar 1093,18 Kg/ m²

3.10.2 Momen Balok – B5 Lantai

1 1 𝐾𝑔
▪ 𝑀𝑡 = × 𝑊𝑢 × 𝑙𝑛2 = × 1093,18 × 52 = 2732,96 = 27329673 𝑁𝑚𝑚2
10 10 𝑚²
1 1 𝐾𝑔
▪ 𝑀𝑙 = × 𝑊𝑢 × 𝑙𝑛2 = × 1093,18 × 52 = 1708,104 = 17081046 𝑁𝑚𝑚2
16 16 𝑚2

92
3.10.3 Penulangan Balok – B5 Lantai

● Tinggi balok : 280 mm


● Tebal penutup beton : 40 mm
● Tulangan Pokok : 16 mm
● Tulangan Sengkang : 10 mm

Sehingga didapatkan tinggi efektif ;


1
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝 − ∅𝑡𝑢𝑙. 𝑠𝑒𝑛𝑔𝑘𝑎𝑛𝑔 − 𝑡𝑢𝑙. 𝑝𝑜𝑘𝑜𝑘
2
1
= 280 − 40 − 10 − 16 = 222 𝑚𝑚
2
3.10.4 Penulangan Tumpuan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 27329673
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×2222 = 2,88

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 2,88
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,012
Dipakai : ρ perlu = 0,012>ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

93
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,012 × 240 × 222
𝐴𝑠 = 682,29 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
682,29
𝑛= × 𝜋 × 162
0.25
𝑛 = 3,39 dibulatkan menjadi 4
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 4 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 803,84 𝑚𝑚2 dipakai tulangan 4D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 803,84,68 𝑚𝑚² > 682,29 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 803,84 × 240
𝑎= = = 31,52
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 240
𝑎 31,52
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (803,84 × 240) × (222 − )
2 2
𝑀𝑛 = 39787848 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 39787848 = 35809063 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 35809063 𝑁𝑚𝑚² > 27329673 𝑁𝑚𝑚² (𝑂𝐾)

94
3.10.5 Penulangan Lapangan
● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85
𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑙 17081046
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×240×2222 = 1,8

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4).1,8
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − ) = 0.0078
9,4 240

Dipakai : ρ perlu = 0.0078 >ρ min = 0,0058 (OK)


0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 × = 0,065
240 600 + 240
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,0078 × 240 × 222
𝐴𝑠 = 416.02 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
416,02
𝑛 = × 𝜋 × 162
0.25
𝑛 = 2,07 dibulatkan menjadi 3
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 3 × 0,25 × 𝜋 × 162
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 397,99 𝑚𝑚2 dipakai tulangan 3D16
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 397,99 𝑚𝑚² > 416,02 𝑚𝑚² (𝑂𝐾)

95
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 397,99 × 240
𝑎= = = 23,64
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 240
𝑎 23,64
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (397,99 × 240) × (222 − )
2 2
𝑀𝑛 = 30411026 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 30411026 = 27369923 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑙 = 27369923 𝑁𝑚𝑚² > 17081046 𝑁𝑚𝑚² (𝑂𝐾)

3.10.6 Penulangan Geser Balok Anak B-5 Lantai


 Vu = ½.wu.ln
1
𝑉𝑢 = 2 × 10931,86 × 5 = 27329,67 N = 27,32 kN

 Kondisi 1
1 1
𝑉𝑐 = × √𝑓𝑐 × 𝑏𝑤 × 𝑑 = × √30 × 240 × 222 = 48637,76 N = 48,63 kN
6 6

𝑉𝑢 ≤ 0,5∅𝑉𝑐 = 27,32 𝑘𝑁 ≤ 0,5 × 0,75 × 48,63 = 18,23 kN … . . (not ok)


 Kondisi 2
0,5∅𝑉𝑐 ≤ 𝑉𝑢 ≤ ∅𝑉𝑐
18,23 𝑘𝑁 ≤ 27,32 𝑘𝑁 ≤ 0,75 × 48,63 = 36,47 kN … … ( ok)
 Gambar Penulangan Gaya Geser

96
 Hitung Jarak
27,32 18,23
𝑥1 = 𝑥1 = = = 166,81 𝑐𝑚
2,5 𝑥
𝑥2 = 250 𝑐𝑚
*digunakan sengkang 2 kaki Ø10mm, dengan Av = 157 mm2, gunakan s = 80
mm
 Hitung tulangan geser yang dibutuhkan pada tiap kondisi
 Kondisi 3
𝐴𝑣×𝐹𝑦×𝑑 157×240×222
𝑉𝑠 = = = 104,56 𝑘𝑁 ≥ 𝑉𝑠𝑚𝑖𝑛 = 16,28 𝑘𝑁 (𝑜𝑘)
𝑠 80
𝑏𝑤×𝑠 240×80
𝐴𝑣𝑚𝑖𝑛 = = = 26,66 𝑚𝑚2 ≤ 𝐴𝑣 = 157 𝑚𝑚2 (𝑜𝑘)
3×𝑓𝑦 3×240

Kontroljarak
S = 80 mm < s max = d/2 = 222/2 = 111 mm (ok)
S = 80 mm < s max = 600 mm (ok)
Maka s = 80 mm cukup memadai

 Kondisi 4
(∅𝑉𝑐 − 0,5. ∅𝑉𝑐) (36,80 − 18,23)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 24,32 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 222)
𝑠= = = 343,96 𝑚𝑚 === 200 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 26,66
Kontrol jarak
S = 200 mm < s max = d/2 = 164/2 = 82 mm (not ok)
S = 200 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 200 mm tidak memenuhi persyaratan s
= 200 mm < s max = d/2 = 82 mm, maka digunakan s max = d/2 = 82
mm atau lebih kecildari s pada kondisi 3, yaitu s = 60 mm

 Kondisi 5
(∅𝑉𝑐 − 0,5. ∅𝑉𝑐) (36,80 − 18,23)
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 = = = 24,32 𝑘𝑁
∅ 0,75
(𝐴𝑣 × 𝑓𝑦 × 𝑑) (157 × 240 × 222)
𝑠= = = 343,96 𝑚𝑚 === 200 𝑚𝑚
𝑉𝑠 𝑝𝑒𝑟𝑙𝑢 26,66

Kontrol jarak
S = 200 mm < s max = d/4 = 222/4 = 55,5 mm (not ok)

97
S = 200 mm < s max = 600 mm (ok)
Karena jika menggunanakan s = 200 mm tidak memenuhi persyaratan s
= 200 mm < s max = d/4 = 55,5 mm, maka digunakan s max = d/4 =
55,5 mm atau dibulatkan jadi s = 40 mm

 Gambar penulangan geser balok anak B-5 lantai

98
BAB 4
PERENCANAAN BALOK INDUK

4.1 Data Balok Induk Melintang B6-A Atap


● Lx :3m
● Ly :5m
● Tebal plat : 10 cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa
● Prelim H Balok : L/21 = 500/21 = 23,8 cm --- 24 cm
● Prelim B Balok : 2/3h = 2/3*24 = 16 cm --- 20 cm
Jadi digunakan dimension balok 20 x 24 cm

4.1.1 Pembebanan Balok Induk Melintang B6-A Atap

99
4.1.1.1 Beban Terpusat ( pada ujung portal ) P1
 PL : q ekuivalen trapezium beban hidup * panjang balok anak
: 129,21*5 = 646,081 Kg
 PD : (q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (387,64 + 0,77)*5 = 1942,11 Kg

4.1.1.2 Beban Terpusat ( pada tengah portal ) P2


 PL : (2 x q ekuivalen trapezium beban hidup) * panjang balok anak
: (2*120,4)*5 = 1204 Kg
 PD : (2 x q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (2*361,21 + 1,03)*5 = 3617,34

4.1.1.3 Beban Terpusat ( pada tengah portal ) P3


 PL : (2 x q ekuivalen trapezium beban hidup) * panjang balok anak
: (2*129,33)*5 = 1293,9 Kg
 PD : (2 x q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (2*388,016 + 1,125)*5 = 3885,79

4.1.1.4 Beban Terpusat ( pada tengah portal ) P4


 PL : (2 x q ekuivalen trapezium beban hidup) * panjang balok anak
: (2*129,33)*5 = 1293,9 Kg
 PD : (2 x q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (2*388,016 + 1,125)*5 = 3885,79

4.1.1.5 Beban Terpusat ( pada ujung portal ) P5


 PL : q ekuivalen trapezium beban hidup * panjang balok anak
: 143,32*5 = 716,64 Kg

100
 PD : (q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (429,98 + 1,313)*5 = 2156,50 Kg

4.1.1.6 Beban Merata Q


 QL : 2 x q ekuivalen segitiga beban hidup

1
qL ekuivalen plat = 3 × 𝑞 × 𝑙𝑥

1
2× × 97,89 × 3 = 195,78 𝐾𝑔/𝑚²
3
 QD : 2 x q ekuivalen segitiga beban mati

1
qL ekuivalen plat = 3 × 𝑞 × 𝑙𝑥

1
2 × × 293,67 × 3 = 587,34 𝐾𝑔/𝑚
3

4.1.2 Momen – Momen Balok Induk Melintang B6-A Atap (Hasil Output SAP 2D Portal)

101
 Mt1 = -5680,11 Kg.m = 56801100 N.mm
 Ml = 4961,68 Kg.m = 49616800 N.mm
 Mt2 = -5779,68 Kg.m = 57796800 N.mm

4.1.3 Penulangan Balok Induk Melintang B6-A Atap


● Tinggi balok : 240 mm
● Tebal penutup beton : 40 mm
Sehingga didapatkan tinggi efektif ;
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝
= 240 − 40 = 200

4.1.4 Penulangan Tumpuan 1

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑡1 56801100
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×2002 = 8,87

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 8,887
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,047
Dipakai : ρ perlu = 0,047 >ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451

102
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Luas tulangan yang diperlukan


𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,047 × 200 × 200
𝐴𝑠 = 1907,065 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
1907,065
𝑛= × 𝜋 × 192
0.25
𝑛 = 6,7 dibulatkan menjadi 7
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 7 × 0,25 × 𝜋 × 192
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1983,65 𝑚𝑚2 dipakai tulangan 7D19
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1983,65 𝑚𝑚² > 1907,065 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1983,65 × 240
𝑎= = = 93,35
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 93,35
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1983,65 × 240) × (200 − )
2 2
𝑀𝑛 = 72995924 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 72995924 = 65696332,14 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 65696332,14 𝑁𝑚𝑚² > 56801100 𝑁𝑚𝑚² (𝑂𝐾)

4.1.5 Penulangan Lapangan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑙 49616800
𝑅𝑛 = = = 7,75
0.8×𝑏×𝑑² 0.8×200×2002

103
● Rasio tulangan yang dibutuhkan
1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 7,75
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,039
Dipakai : ρ perlu = 0,039 >ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Luas tulangan yang diperlukan


𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,039 × 200 × 200
𝐴𝑠 = 1589,24 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
1589,24
𝑛= × 𝜋 × 192
0.25
𝑛 = 5,6 dibulatkan menjadi 6
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 6 × 0,25 × 𝜋 × 192
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1700,31 𝑚𝑚2 dipakai tulangan 6D19
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1700,31 𝑚𝑚² > 1589,24 𝑚𝑚² (𝑂𝐾)

104
● Cek momen nomina
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1700,31 × 240
𝑎= = = 80,014
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 80,014
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1700,31 × 240) × (200 − )
2 2
𝑀𝑛 = 65288927,46 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 65288927,46 = 58760034,71 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 58760034,71 𝑁𝑚𝑚² > 49616800 𝑁𝑚𝑚² (𝑂𝐾)

4.1.6 Penulangan Tumpuan 2

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑡2 57796800
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×2002 = 9,03

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 9,03
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,048
Dipakai : ρ perlu = 0,048 >ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

105
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,048 × 200 × 200
𝐴𝑠 = 1954,58 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
1954,58
𝑛= × 𝜋 × 192
0.25
𝑛 = 6,8 dibulatkan menjadi 7
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 7 × 0,25 × 𝜋 × 192
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 1983,69 𝑚𝑚2 dipakai tulangan 7D19
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 1983,69 𝑚𝑚² > 1954,58 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 1983,69 × 240
𝑎= = = 93,35
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 93,35
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (1983,69 × 240) × (200 − )
2 2
𝑀𝑛 = 72995924 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 72995924 = 65696332 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 65696332 𝑁𝑚𝑚² > 57796800 𝑁𝑚𝑚² (𝑂𝐾)

4.1.7 Penulangan Geser (pada ujung kiri balok induk atap) Hasil Output SAP2000 2D
Portal

106
 Vu : 4551,14 Kg = 44631,665 N
 Gaya yang disumbangkan oleh beton
Vc = (√fc/6)*b*d = (√30/6)*200*200 = 36514,83 N

 Penulangan geser dalam daerah sepanjang d dari muka tumpuan (tumpuan)


Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (44631,665/0,6) - 18257,41 = 56128,68 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 > Vu = 4631,665 N

 Jarak antar tulangan


s = (Av*fy*d)/Vs = (157*240*200)/ 56128,68 = 134,26 mm --- 100 mm
jadi jarak sengkang ᴓ10-10mm (tumpuan)

 Penulangan geser dalam daerah diluar arak d dari muka tumpuan (lapangan)
Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N

107
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (44631,665/0,6) - 18257,41 = 56128,68 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 > Vu = 4631,665 N

 Diperlukan jarak geser minimum


S = d/2 = 200/2 = 100 mm
jadi jarak sengkang ᴓ10-10mm (lapangan)

4.1.8 Penulangan Geser (pada ujung kanan balok induk atap) Hasil Output SAP2000
2D Portal

 Vu : 4584,78 Kg = 44961,56N
 Gaya yang disumbangkan oleh beton
Vc = (√fc/6)*b*d = (√30/6)*200*200 = 36514,83 N

108
 Penulangan geser dalam daerah sepanjang d dari muka tumpuan (tumpuan)
Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (44631,665/0,6) - 18257,41 = 56128,68 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 > Vu = 44961,56 N

 Jarak antar tulangan


s = (Av*fy*d)/Vs = (157*240*200)/ 56128,68 = 134,26 mm --- 100 mm
jadi jarak sengkang ᴓ10-100 mm (tumpuan)
 Penulangan geser dalam daerah diluar arak d dari muka tumpuan (lapangan)
Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (44631,665/0,6) - 18257,41 = 56128,68 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 > Vu = 44961,56N

 Diperlukan jarak geser minimum


S = d/2 = 200/2 = 100 mm
jadi jarak sengkang ᴓ10-100 mm (lapangan)

109
Tabel 1.1 Hasil analisis penulangan lentur dan geser balok induk B6-A Atap
B6-A ATAP 20 x 24
KETERANGAN
Tumpuan 1/4L Lapangan 1/2L

Mutu Beton F'c 30 Mpa

Ukuran Balok 20 x 24
Tulangan atas 4D19 4D19
Tulangaan bawah 4D19 5D19
Tulangan tengah 3D19 -
Sengkang ø10-100 ø10-100
Selimut 50 mm

4.2 Data Balok Induk Melintang B6-A Lantai


● Lx :3m
● Ly :5m
● Tebal plat : 10 cm
● Mutu Beton (Fc) : 30 Mpa
● Mutu Baja (Fy) : 240 Mpa
● Prelim H Balok : L/21 = 500/21 = 23,8 cm --- 24 cm
● Prelim B Balok : 2/3h = 2/3*24 = 16 cm --- 20 cm
Jadi digunakan dimension balok 20 x 24 cm

110
4.2.1 Pembebanan Balok Induk Melintang B6-A Lantai

4.2.1.1 Beban Terpusat ( pada ujung portal ) P1


 PL : q ekuivalen trapezium beban hidup * panjang balok anak
: 323,04*5 = 1615,20 Kg
 PD : (q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (477,83 + 0,77)*5 = 2393,02 Kg

4.2.1.2 Beban Terpusat ( pada tengah portal ) P2


 PL : (2 x q ekuivalen trapezium beban hidup) * panjang balok anak
: (2*301,01)*5 = 1505,07 Kg

111
 PD : (2 x q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (2*445,25 + 1,03)*5 = 4457,67 Kg

4.2.1.3 Beban Terpusat ( pada tengah portal ) P3


 PL : (2 x q ekuivalen trapezium beban hidup) * panjang balok anak
: (2*323,34)*5 = 1616,73 Kg
 PD : (2 x q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (2*478,28 + 1,125)*5 = 4788,46 Kg

4.2.1.4 Beban Terpusat ( pada tengah portal ) P4


 PL : (2 x q ekuivalen trapezium beban hidup) * panjang balok anak
: (2*323,34)*5 = 1616,73 Kg
 PD : (2 x q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (2*478,28+ 1,341)*5 = 4789,54 Kg

4.2.1.5 Beban Terpusat ( pada ujung portal ) P5


 PL : q ekuivalen trapezium beban hidup * panjang balok anak
: 323,34*5 = 1616,73 Kg
 PD : (q ekuivalen trapezium beban mati + berat sendiri balok anak) *
panjang balok anak
: (478,28 + 1,576)*5 = 2399,29 Kg

4.2.1.6 Beban Merata Q


 QL : 2 x q ekuivalen segitiga beban hidup

1
qL ekuivalen plat = 3 × 𝑞 × 𝑙𝑥

1
2× × 97,89 × 3 = 195,78 𝐾𝑔/𝑚²
3
 QD : 2 x q ekuivalen segitiga beban mati

112
1
qL ekuivalen plat = 3 × 𝑞 × 𝑙𝑥

1
2 × × 293,67 × 3 = 587,34 𝐾𝑔/𝑚
3

4.2.2 Momen – Momen Balok Induk Melintang B6-A Lantai (Hasil Output SAP 2D Portal)

 Mt1 = -7498,51 Kg.m = 74985100 N.mm


 Ml = 6796,88 Kg.m = 67968800 N.mm
 Mt2 = -7552,05 Kg.m = 75520500 N.mm

4.2.3 Penulangan Balok Induk Melintang B6-A Lantai


● Tinggi balok : 240 mm
● Tebal penutup beton : 40 mm
Sehingga didapatkan tinggi efektif ;
𝑡𝑖𝑛𝑔𝑔𝑖 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 = 𝑡𝑖𝑛𝑔𝑔𝑖 𝑏𝑎𝑙𝑜𝑘 − 𝑡𝑒𝑏𝑎𝑙 𝑝𝑒𝑛𝑢𝑡𝑢𝑝
= 240 − 40 = 200

113
4.2.4 Penulangan Tumpuan 1

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 74985100
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×2002 = 11,7

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4) ∙ 11,7
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,075
Dipakai : ρ perlu = 0,075 >ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Luas tulangan yang diperlukan


𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,075 × 200 200
𝐴𝑠 = 3039,94 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
3039,94
𝑛= × 𝜋 × 192
0.25
𝑛 = 10,72 dibulatkan menjadi 11
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2

114
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 11 × 0,25 × 𝜋 × 192
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 3117,23 𝑚𝑚2 dipakai tulangan 11D19
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 3117,23 𝑚𝑚2 > 3039,94𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 3117,23 × 240
𝑎= = = 146,69
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 146,69
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (3117,23 × 240) × (200 − )
2 2
𝑀𝑛 = 94753939 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 94753939 = 85278545 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 85278545 𝑁𝑚𝑚² > 74985100 𝑁𝑚𝑚² (𝑂𝐾)

4.2.5 Penulangan Lapangan

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 67968800
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×2002 = 10,62

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4). 10,62
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,062
Dipakai : ρ perlu = 0,062 >ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦

115
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048

● Luas tulangan yang diperlukan


𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,062 × 200 × 200
𝐴𝑠 = 2512,95 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
2512,95
𝑛= × 𝜋 × 192
0.25
𝑛 = 8,86 dibulatkan menjadi 9
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 9 × 0,25 × 𝜋 × 192
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 2550,46𝑚𝑚2 dipakai tulangan 9D19
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 2550,46 𝑚𝑚² > 2512,95 𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 2550,46 × 240
𝑎= = = 120,02
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 120,02
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (2550,46 × 240) × (200 − )
2 2
𝑀𝑛 = 85688926,78 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 85688926,78 = 77120034 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 77120034 𝑁𝑚𝑚² > 67968800 𝑁𝑚𝑚² (𝑂𝐾)

116
4.2.6 Penulangan Tumpuan 2

● Untuk f’c < 30 Mpa, maka digunakan β1 = 0.85


𝑓𝑦 240
𝑚 = 0.85×𝑓𝑐 = 0.85×30 = 9,4
𝑀𝑢 𝑡 75520500
𝑅𝑛 = 0.8×𝑏×𝑑² = 0.8×200×2002 = 11,8

● Rasio tulangan yang dibutuhkan


1,4 1,4
𝜌 𝑚𝑖𝑛 = = = 0.0058
𝑓𝑦 240

1 2𝑚 ∙ 𝑅𝑛
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
𝑚 𝑓𝑦

1 2(9,4). 11,68
𝜌 𝑝𝑒𝑟𝑙𝑢 = (1 − √1 − )
9,4 240

𝜌 𝑝𝑒𝑟𝑙𝑢 = 0,077
Dipakai : ρ perlu = 0,077 >ρ min = 0,0058 (OK)
0.85 ∙ 𝑓 ′ 𝑐 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 𝛽1 ×
𝑓𝑦 600 + 𝑓𝑦
0.85 ∙ 30 600
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = × 0,85 ×
240 600 + 240
𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,06451
𝜌 𝑚𝑎𝑥 = 0.75 × 𝜌 𝑏𝑎𝑙𝑎𝑛𝑐𝑒𝑑 = 0,75 × 0,065 = 0,048
● Luas tulangan yang diperlukan
𝐴𝑠 = 𝜌 𝑝𝑎𝑘𝑎𝑖 × 𝑏 × 𝑑
𝐴𝑠 = 0,077 × 200 × 200
𝐴𝑠 = 3089,94 𝑚𝑚2
𝐴𝑠
𝑛 = × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
0.25
3089,94
𝑛= × 𝜋 × 192
0.25
𝑛 = 10,9 dibulatkan menjadi 11
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 𝑛 × 0,25 × 𝜋 × ∅ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 𝑝𝑜𝑘𝑜𝑘 2
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 11 × 0,25 × 𝜋 × 192

117
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 = 3117,23 𝑚𝑚2 dipakai tulangan 11D19
𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 > 𝐴𝑠 = 3117,23 𝑚𝑚2 > 3089,94𝑚𝑚² (𝑂𝐾)

● Cek momen nomina


𝐴𝑠 𝑝𝑎𝑘𝑎𝑖 × 𝑓𝑦 3117,23 × 240
𝑎= = = 146,69
0,85 × 𝑓′𝑐 × 𝑏 0,85 × 30 × 200
𝑎 146,69
𝑀𝑛 = (𝐴𝑠 × 𝑓𝑦) × (𝑑 − ) = (3117,23 × 240) × (200 − )
2 2
𝑀𝑛 = 94753939,51 𝑁𝑚𝑚2
∅𝑀𝑛 = 0,9 × 94753939,51 = 85278545,56 𝑁𝑚𝑚²
∅𝑀𝑛 > 𝑀𝑡1 = 85278545,56 𝑁𝑚𝑚² > 75520500 𝑁𝑚𝑚² (𝑂𝐾)

4.1.7 Penulangan Geser (pada ujung kiri balok induk lantai) Hasil Output SAP2000 2D
Portal

 Vu : -5785,47 Kg = 56736,36 N
 Gaya yang disumbangkan oleh beton
Vc = (√fc/6)*b*d = (√30/6)*200*200 = 36514,83 N

118
 Penulangan geser dalam daerah sepanjang d dari muka tumpuan (tumpuan)
Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (456736,36 /0,6) - 18257,41 = 76303,19 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 > Vu = 44961,56N

 Jarak antar tulangan


s = (Av*fy*d)/Vs = (157*240*200)/ 76303,19 = 98,76 mm --- 80 mm
jadi jarak sengkang ᴓ10-80mm (tumpuan)

 Penulangan geser dalam daerah diluar arak d dari muka tumpuan (lapangan)
Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (44631,665/0,6) - 18257,41 = 56128,68 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 > Vu = 44961,56N

 Diperlukan jarak geser minimum


S = d/2 = 200/2 = 100 mm
jadi jarak sengkang ᴓ10-10mm (lapangan)

4.1.8 Penulangan Geser (pada ujung kanan balok induk lantai) Hasil Output SAP2000
2D Portal

119
 Vu : 5803,56 Kg = 56913,77 N
 Gaya yang disumbangkan oleh beton
Vc = (√fc/6)*b*d = (√30/6)*200*200 = 36514,83 N

 Penulangan geser dalam daerah sepanjang d dari muka tumpuan (tumpuan)


Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (56913,77 /0,6) - 18257,41 = 76598,86 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 N > Vu = 56913,77 N

 Jarak antar tulangan


s = (Av*fy*d)/Vs = (157*240*200)/ 7396805,64 = 98,38 mm --- 80 mm
jadi jarak sengkang ᴓ10-80mm (tumpuan)

 Penulangan geser dalam daerah diluar arak d dari muka tumpuan (lapangan)
Vc yang digunakan = 0,5*Vc = 0,5*36514,83 = 18257,41 N

120
Vs = (Vu/0,6) - Vc yang digunakan
Vs = (56913,77 /0,6) - 18257,41 = 76598,86 N
Direncanakan sengkang 2 kaki dengan tul.geser ᴓ10, Av = 157 mm2
a = Av*fy/0.85*b*fc = 157*240/0,85*200*30 = 7,388
Vn = Av*fy(d-a/2) = 157*240*(200-7,388/2) = 7396805,64 N
ᴓVn > Vu = 0,9*7396805,64 = 6657125,08 N > Vu = 56913,77 N

 Diperlukan jarak geser minimum


S = d/2 = 200/2 = 100 mm
jadi jarak sengkang ᴓ10-100 mm (lapangan)
Tabel 1.2 Hasil analisis penulangan lentur dan geser balok induk B6-A Lantai
B6-A LANTAI 20 x 24
KETERANGAN
Tumpuan 1/4L Lapangan 1/2L

Mutu Beton F'c 30 Mpa

Ukuran Balok 20 x 24
Tulangan atas 4D19 2D19
Tulangaan bawah 3D19 4D19
Tulangan tengah - -
Sengkang ø10-80 ø10-100
Selimut 50 mm

121
BAB 5
PERENCANAAN KOLOM

5.1 Input Data – Data Kolom


 Mutu beton : 30 Mpa
 Mutu baja : 240 Mpa
 Direncanakan ukuran kolom 350 x 350 mm

5.2 Analisa Perencanaan Kolom dengan Software PCACol


 Load Service
 Input Beban Mati
 Momen atas = -5284,9 Kgf.m = 51,83 kN.m
 Momen bawah = -6067,7 Kgf.m = 59,51 kN.m
 Axial Force = -32816,77 Kgf.m = 321,83 kN.m

Momen atas

122
Momen Bawah

Axial Force

123
 Input Beban Hidup
 Momen atas = -1035 Kgf.m = 10,15 kN.m
 Momen bawah = - 1884,66 Kgf.m = 18,48 kN.m
 Axial Force = -5842,95 Kgf.m = 57,29 kN.m

Momen Atas

124
Momen Bawah

Axial Force

125
Load Service in PCAcol

5.3 Hasil Output PCAcol

126
127
128
Kesimpulan :
Adapun hasil dari perhitungan PCAcol, bahwa kolom dengan ukuran 350 x 350 mm cukup
kuat untuk menahan beban – beban yang diterima, dengan menggunakan tulangan transversal
8D19, cover selimut beton sebesar 50 mm, dan sengkang ø10-100 mm. Hal ini dapat
dibuktikan dengan melihat hasil dari fMn/Mu > 1 = fMn > Mu, yang artinya kolom tersebut
layak digunakan

129
DAFTAR PUSTAKA

SNI 1726 – 2019 Persyaratan Beton Struktur Untuk Bangunan Gedung

SNI 2847 – 2019 Persyaratan Beton Struktural Untuk Bangunan Gedung

SNI 1727 – 2020 Beban Desain Minimum dan Kriteria Terkait Untuk Bangunan Gedung dan

Struktur Lain

http://duniatekniksipil.web.id/396/grafik-kapasitas-profil-baja-baca-PCACol

130