1. KONDISI PERENCANAAN
Wilayah perencanaan berada di Kota Pekanbaru.
Data perencanaan yang digunakan sebagai berikut:
Luas Catchment area (A) 981.75 Ha
Panjang Saluran Utama (L) 2500 m
35
30
Intensitas Hujan
25
R 2T
(mm/jam)
20 R 5T
R 10T
15 R 25T
R 50T
10 R 100T
0
0 5 10 15 20 25 30
t (Jam)
to = 30 menit
td = 20.83 menit
tc = 50.83 menit
Cs = 0.83
It = 21.61 mm/jam
3
Qin = 36.71 m /dt
Tabel 10. Debit Limpasan
Hujan Q
t (menit) m3/dt Hidrograph
0 0 50
20.83 36.71
50.83 36.71 45
101.67 0
40
35
30
25
Q in (m3/dt)
20
Hidrograph
15
10
0
0 20 40 60 80 100 120
t (menit)
t Q in Vol in Vol in kum Q out Vol out V. out kum Tp. Awal Tp. Akhir Elevasi Kontrol
(menit) (m3/det) (m3) (m3) (m3/det) (m3) (m3) (m3) (m3) (m)
0.00 0.00 0 0 0 0 0 0 0 0 Oke
5.00 3.61 541.65 541.65 26.67511274 4001.26691 4001.26691 541.65 -3459.6172 -0.531594536 Oke
10.00 7.22 1624.95 2166.60 26.67511274 8002.53382 12003.8007 2166.60 -9837.202 -1.511555324 Oke
15.00 26.43 5048.17 7214.77 26.67511274 8002.53382 20006.3346 7214.77 -12791.561 -1.965513357 Oke
20.83 36.71 11050.26 18265.03 26.67511274 9336.28946 29342.624 18265.03 -11077.595 -1.70215047 Oke
25.00 36.71 9177.95 27442.98 26.67511274 6668.77818 36011.4022 27442.98 -8568.4207 -1.316598138 Oke
30.00 36.71 11013.54 38456.52 26.67511274 8002.53382 44013.936 38456.52 -5557.4112 -0.853935339 Oke
35.00 36.71 11013.54 49470.07 26.67511274 8002.53382 52016.4698 49470.07 -2546.4017 -0.39127254 Oke
40.00 36.71 11013.54 60483.61 26.67511274 8002.53382 60019.0037 60483.61 464.607802 0.071390258 Oke
45.00 36.71 11013.54 71497.15 26.67511274 8002.53382 68021.5375 71497.15 3475.6173 0.534053057 Oke
50.83 36.71 12849.13 84346.29 26.67511274 9336.28946 77357.8269 84346.29 6988.46171 1.073826322 Oke
55.00 33.70 8801.81 93148.10 26.67511274 6668.77818 84026.6051 93148.10 9121.49068 1.401581236 Oke
60.00 30.09 9569.14 102717.24 26.67511274 8002.53382 92029.1389 102717.24 10688.1011 1.642301944 Oke
65.00 26.48 8485.84 111203.08 26.67511274 8002.53382 100031.673 111203.08 11171.4121 1.716566085 Oke
70.00 22.87 7402.55 118605.63 26.67511274 8002.53382 108034.207 118605.63 10571.4238 1.624373658 Oke
75.00 19.26 6319.25 124924.88 26.67511274 8002.53382 116036.74 124924.88 8888.13611 1.365724664 Oke
80.00 15.65 5235.95 130160.82 26.67511274 8002.53382 124039.274 130160.82 6121.54911 0.940619102 Oke
85.00 12.04 4152.65 134313.47 26.67511274 8002.53382 132041.808 134313.47 2271.66277 0.349056972 Oke
90.00 8.43 3069.35 137382.82 26.67511274 8002.53382 140044.342 137382.82 -2661.5229 -0.408961726 Oke
95.00 4.81 1986.05 139368.87 26.67511274 8002.53382 148046.876 139368.87 -8678.0079 -1.333436991 Oke
100.00 1.20 902.75 140271.62 26.67511274 8002.53382 156049.41 140271.62 -15777.792 -2.424368824 Oke
101.67 0.00 60.18 140331.80 26.67511274 2667.51127 158716.921 140331.80 -18385.12 -2.825003117 Oke
1.716566085 Oke
Kesimpulan :
Area Tangkapan Hujan = 9.82 km2
Intensitas Hujan Periode Ulang 5 th = 21.61 mm/jam
Debit Puncak Air Masuk = 36.71 m3/dtk
Luasan Kolam = 6508 m2
Kedalaman Efektif Kolam = 2.1 m
Dimensi Output Efektif = 4 m lebar
2.1 m kedalaman
Cadangan