Anda di halaman 1dari 13

Addendum ANDAL, RKL-RPL

Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

DAFTAR ISI

KATA PENGANTAR........................................................................................... i
DAFTAR ISI......................................................................................................... ii
DAFTAR TABEL................................................................................................. vi
DAFTAR GAMBAR............................................................................................. xi

BAB I PENDAHULUAN
1.1 LATAR BELAKANG..................................................................................... 1-1
1.2 TUJUAN DAN MANFAAT RENCANA KEGIATAN...................................... 1-2
1.3 IDENTIFIKASI PEMRAKARSA DAN PENYUSUN STUDI.......................... 1-3

BAB II DESKRIPSI RENCANA KEGIATAN


2.1 Deskripsi Kegiatan Eksisting........................................................................ 2-1
2.1.1 Lokasi Kegiatan.................................................................................. 2-1
2.1.2 Sejarah Pengembangan dan Kegiatan yang Telah Berjalan.............. 2-4
2.1.3 Kesesuaian Lokasi Rencana Kegiatan Dengan Tata Ruang............. 2-4
2.1.4 Penggunaan Lahan............................................................................ 2-10
2.1.5 Fasilitas Pelabuhan............................................................................ 2-15
2.1.5.1 Fasilitas Pelabuhan Sisi Darat.............................................. 2-15
2.1.5.2 Fasilitas Pelabuhan Sisi Perairan......................................... 2-24
2.1.6 Operasional Pelabuhan Eksisting....................................................... 2-30
2.1.6.1 Operasional Pelabuhan Sisi Perairan................................... 2-32
2.1.6.2 Operasional Pelabuhan Sisi Darat........................................ 2-39
2.1.6.3 Penyediaan Sarana Pendukung........................................... 2-41
2.1.6.4 Mobilisasi Kendaraan Darat.................................................. 2-43
2.1.6.5 Pemakaian Tenaga Kerja Operasional................................. 2-45
2.1.6.6 Kegiatan Mitra Usaha........................................................... 2-45
2.1.7 Pengelolaan dan Pemantauan Lingkungan (Termasuk Izin PPLH)... 2-46
2.2 Deskripsi Rencana Pengembangan............................................................ 2-47
2.2.1 Lokasi Kegiatan.................................................................................. 2-47
2.2.2 Penggunaan Lahan............................................................................ 2-48
2.2.3 Deskripsi Rencana Pengembangan................................................... 2-63
2.2.3.1 Kegiatan Konstruksi.............................................................. 2-63

Daftar Isi ii
Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

2.2.3.2 Kegiatan Operasi.................................................................. 2-73


2.2.3.2 Jadwal Rencana Kegiatan.................................................... 2-93

BAB III DESKRIPSI RONA LINGKUNGAN


3.1 Komponen Lingkungan Hidup...................................................................... 3-1
3.1.1 Fisik Kimia.......................................................................................... 3-1
3.1.1.1 Iklim...................................................................................... 3-1
3.1.1.2 Kualitas Udara...................................................................... 3-4
3.1.1.3 Kebisingan............................................................................ 3-7
3.1.1.4 Geologi................................................................................. 3-10
3.1.1.5 Hidrologi................................................................................ 3-13
3.1.1.5 Oceanografi.......................................................................... 3-13
3.1.1.6 Bathimeter............................................................................ 3-17
3.1.1.7 Kualitas Air............................................................................ 3-19
3.1.2.1 Tata Ruang........................................................................... 3-25
3.1.2.1 Transportasi.......................................................................... 3-37
3.1.3 Biologi .............................................................................................. 3-54
3.1.3.1 Flora dan Fauna Darat.......................................................... 3-54
3.1.3.2 Biota Air................................................................................ 3-59
3.1.4 Sosial Ekonomi Budaya...................................................................... 3-67
3.1.4.1 Kependudukan...................................................................... 3-67
3.1.4.2 Sosial Ekonomi..................................................................... 3-68
3.1.4.3 Sosial Budaya....................................................................... 3-71
3.1.4.4 Persepsi Masyarakat............................................................ 3-77
3.1.5 Kesehatan Masyarakat....................................................................... 3-80
3.1.5.1 Parameter Lingkungan yang Diperkirakan Terkena Dampak 3-83
3.1.5.2 Proses dan Potensi Terjadinya Pemajanan......................... 3-83
3.1.5.3 Potensi Besarnya Dampak Timbulnya Penyakit................... 3-84
3.1.5.4 Karakteristik Spesifik Penduduk yang Beresiko................... 3-85
3.1.5.5 Sumber Daya Kesehatan...................................................... 3-86
3.1.5.6 Kondisi Sanitasi Lingkungan................................................. 3-91
3.1.5.7 Status Gizi............................................................................ 3-94
3.1.5.8 Perbaikan Gizi Masyarakat................................................... 3-95
3.1.5.9 Angka Kematian (Mortalitas)................................................ 3-96
3.2 Kegiatan Sekitar........................................................................................... 3-98

Daftar Isi iii


Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

BAB IV EVALUASI KEGIATAN EKSISTING DAN IDENTIFIKASI KOMPONEN


LINGKUNGAN TERKENA DAMPAK
4.1 Evaluasi terhadap Lingkup Kegiatan beserta Dampak Lingkungan yang
Dikelola Berdasarkan AMDAL Sebelumnya................................................. 4-1
4.2 Evaluasi terhadap Kinerja dan Efektivitas RKL-RPL yang Telah Dilakukan. 4-8
4.3 Evaluasi Perubahan Kegiatan....................................................................... 4-22
4.3.1 Tahap Konstruksi................................................................................. 4-26
4.3.1.1 Penurunan Kualitas Udara.................................................... 4-26
4.3.1.2 Peningkatan Kebisingan........................................................ 4-31
4.3.1.3 Gangguan Flora Darat........................................................... 4-34
4.3.1.4 Terbukanya Kesempatan Kerja dan Berusaha...................... 4-36
4.3.1.5 Potensi Konflik Sosial............................................................ 4-37
4.3.1.6 Timbulnya Persepsi Masyarakat........................................... 4-38
4.3.1.7 Gangguan Kesehatan Masyarakat........................................ 4-39
4.3.2 Tahap Operasional.............................................................................. 4-40
4.3.2.1 Penurunan Kualitas Udara.................................................... 4-40
4.3.2.2 Penurunan Kualitas Air.......................................................... 4-41
4.3.2.3 Gangguan Biota Air............................................................... 4-43
4.3.2.4 Terbukanya Kesempatan Kerja dan Berusaha...................... 4-45
4.3.2.5 Potensi Konflik Sosial............................................................ 4-46
4.3.2.6 Timbulnya Persepsi Masyarakat........................................... 4-47
4.3.2.7 Peningkatan Arus Lalulintas Orang, Penumpang, Barang.... 4-48
4.3.2.8 Gangguan Kamtibmas........................................................... 4-52
4.3.2.9 Pengembangan Wilayah....................................................... 4-52
4.3.2.10 Peningkatan Kegiatan Ekonomi............................................ 4-54
4.3.2.11 Sanitasi Lingkungan.............................................................. 4-54
4.3.2.12 Gangguan Kesehatan Masyarakat........................................ 4-55

BAB V RENCANA PENGELOLAAN LINGKUNGAN DAN PEMANTAUAN


LINGKUNGAN
5.1 Rencana Pengelolaan Lingkungan (RKL).................................................... 5-1
5.2 Rencana Pemantauan Lingkungan (RPL).................................................... 5-22
5.3 Jumlah dan Izin PPLH.................................................................................. 5-40

Daftar Isi iv
Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

BAB VI SURAT PERNYATAAN

DAFTAR PUSTAKA
LAMPIRAN

Daftar Isi v
Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

DAFTAR TABEL

Tabel 1. 1 Tim Penyusun dan Tenaga Ahli...................................................... 1-4

Tabel 2. 1 Rincian Penggunaan Lahan pada Lokasi Kegiatan........................ 2-11


Tabel 2. 2 Kolam Putar.................................................................................... 2-25
Tabel 2. 3 Kapal Tambat.................................................................................. 2-26
Tabel 2. 4 Kolam Parkir................................................................................... 2-27
Tabel 2. 5 Ukuran Kapal.................................................................................. 2-29
Tabel 2. 6 Fasilitas Eksisting Pelabuhan......................................................... 2-31
Tabel 2. 7 Tipe dan Jenis Kapal yang Beroperasi di Pelabuhan Ulee Lheue.. 2-33
Tabel 2. 8 Jadwal Keberangkatan dan Kedatangan Kapal Ferry Ro-Ro Lintasan
Ulee Lheue – Balohan.................................................................... 2-34
Tabel 2. 9 Produktivitas Keberangkatan Penumpang, Barang dan Kendaraan
Lintasan Ulee Lheue – Balohan Periode 2010 - 2017.................... 2-35
Tabel 2. 10 Produktivitas Kedatangan Penumpang, Barang dan Kendaraan
Lintasan Balohan – Ulee Lheue Periode 2010 – 2017................... 2-36
Tabel 2. 11 Jadwal Keberangkatan Kapal Cepat Express Bahari Lintasan
Ulee Lheue – Balohan Sabang....................................................... 2-36
Tabel 2. 12 Produktivitas Angkutan Penumpang KM Express Bahari Lintasan
Ulee Lheue – Balohan Periode 2010 - 2017................................... 2-37
Tabel 2. 13 Jadwal Keberangkatan dan Kedatangan Kapal Ferry Lintasan
Ulee Lheue – Lamteng Kab. Aceh Besar........................................ 2-38
Tabel 2. 14 Produktivitas Angkutan Penumpang, Barang dan Kendaraan
Lintasan Ulee Lheue – Lamteng Periode 2011 – 2017.................. 2-38
Tabel 2. 15 Kunjungan Kapal di Pelabuhan Penyeberangan Ulee Lheue......... 2-39
Tabel 2. 16 Kebutuhan Air Bersih Kegiatan Operasional Eksisting................... 2-41
Tabel 2. 17 Tenaga Kerja Operasional Pelabuhan Ulee Lheue Eksisting......... 2-45
Tabel 2. 18 Rincian Kegiatan Pengembangan Pelabuhan Penyeberangan
Ulee Lheue...................................................................................... 2-50
Tabel 2. 19 Rincian Luasan Lahan Terbangun Pengembangan....................... 2-52
Tabel 2. 20 Perincian Saran Utama dan Penunjang Gedung Terminal Pelabuhan
Ulee Lheue...................................................................................... 2-54

Daftar Tabel vi
Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

Tabel 2. 21 Perkiraan Tenaga Kerja Konstruksi................................................ 2-64


Tabel 2. 22 Kebutuhan Air Kegiatan Konstruksi Pengembangan...................... 2-65
Tabel 2. 23 Alat Berat yang Digunakan Untuk Konstruksi................................. 2-67
Tabel 2. 24 Material yang Digunakan untuk Konstruksi..................................... 2-67
Tabel 2. 25 Kebutuhan Tenaga Kerja Operasional Pelabuhan Ulee Lheue...... 2-74
Tabel 2. 26 Perkiraan Penggunaan Air Bersih................................................... 2-77
Tabel 2. 27 Timbulan Sampah........................................................................... 2-78
Tabel 2. 28 Proyeksi Keberangkatan Penumpang Lintas Ulee Lheue - Balohan 2-82
Tabel 2. 29 Proyeksi Keberangkatan Penumpang Lintas Ulee Lheue - Balohan 2-83
Tabel 2. 30 Proyeksi Pertumbuhan Barang Lintasan Ulee Lheue – Balohan.... 2-83
Tabel 2. 31 Proyeksi Pertumbuhan Barang Lintasan Balohan– Ulee Lheue..... 2-83
Tabel 2. 32 Proyeksi Jumlah Angkutan Kendaraan Campuran Lintasan
Ulee Lheue - Balohan..................................................................... 2-84
Tabel 2. 33 Proyeksi Jumlah Angkutan Kendaraan Campuran Lintasan
Balohan– Ulee Lheue..................................................................... 2-84
Tabel 2. 34 Proyeksi Jumlah Keberangkatan Penumpang Lintasan
Balohan– Ulee Lheue (KM Express Bahari)................................... 2-85
Tabel 2. 35 Proyeksi Jumlah Kedatangan Penumpang Lintasan
Balohan– Ulee Lheue (KM Express Bahari)................................... 2-85
Tabel 2. 36 Proyeksi Keberangkatan Penumpang Lintasan
Ulee Lheue - Lamteng.................................................................... 2-85
Tabel 2. 37 Proyeksi Angkutan Barang Lintasan Ulee Lheue – Lamteng......... 2-86
Tabel 2. 38 Proyeksi Pertumbuhan Kendaraan Campuran Lintasan
Ulee Lheue – Lamteng.................................................................... 2-86
Tabel 2. 39 Proyeksi Load Factor Angkutan Penumpang KMP Ferry Ro-ro
Lintasan Ulee Lheue - Balohan....................................................... 2-87
Tabel 2. 40 Proyeksi Load Factor Angkutan Kendaraan Campuran KMP
Ferry Ro-Ro Lintasan Ulee Lheue - Balohan.................................. 2-87
Tabel 2. 41 Proyeksi Load Factor Angkutan Penumpang KM Express Bahari
Lintasan Ulee Lheue - Balohan....................................................... 2-88
Tabel 2. 42 Proyeksi Kunjungan Kapal di Pelabuhan Penyeberangan
Ulee Lheue...................................................................................... 2-89
Tabel 2. 43 Jenis Survey dalam Pelaksanaan Ideal Pekerjaan Pengerukan.... 2-90
Tabel 2. 44 Jenis Material Tanah dan Kapal Keruk........................................... 2-91
Tabel 2. 45 Tabulasi Volume Pengerukan......................................................... 2-92
Tabel 2. 46 Jadwal Pelaksanaan Rencana Pengembangan Pelabuhan

Daftar Tabel vii


Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

Penyeberangan Ulee Lheue........................................................... 2-94

Tabel 3. 1 Data Temperatur Tahun 2014-2017............................................... 3-1


Tabel 3. 2 Kelembaban Rata-Rata (%) Tahun 2014-2017.............................. 3-2
Tabel 3. 3 Curah Hujan Bulanan di Wilayah Studi........................................... 3-2
Tabel 3. 4 Penyinaran Matahari (%) Tahun 2016-2017................................... 3-3
Tabel 3. 5 Kecepatan dan Arah Angin Rata-rata............................................. 3-3
Tabel 3. 6 Hasil Pengukuran Kualitas Udara................................................... 3-4
Tabel 3. 7 Hasil Pengukuran Tingkat Kebisingan............................................ 3-7
Tabel 3. 8 Hasil Analisis Logam Berat di Dalam Sedimen............................... 3-13
Tabel 3. 9 Elevasi Muka Air Rencana.............................................................. 3-14
Tabel 3. 10 Perbandingan Tinggi Gelombang Signifikan (Hs) terhadap Periode
Gelombang (T)................................................................................ 3-16
Tabel 3. 11 Tinggi dan Perode Gelombang Berdasarkan Kedalaman Perairan 3-17
Tabel 3. 12 Hasil Analisis Kualitas Air Tanah.................................................... 3-19
Tabel 3. 13 Hasil Analisis Kualitas Air Laut....................................................... 3-22
Tabel 3. 14 Hasil Analisis Kualitas Air Limbah................................................... 3-24
Tabel 3. 15 Pola Penggunaan Lahan di Kota Banda Aceh Tahun 2017........... 3-32
Tabel 3. 16 Penggunaan Lahan Eksisting dengan Rencana Pengembangan
Pelabuhan Ulee Lheue................................................................... 3-33
Tabel 3. 17 Kondisi Ruas Jalan Terkait Pelabuhan Ulee Lheue....................... 3-39
Tabel 3. 18 Koordinat Lokasi Pengamatan Lalu Lintas..................................... 3-43
Tabel 3. 19 Ekivalen Mobil Penumpang (Emp) untuk Jalan 2/2 TT................... 3-44
Tabel 3. 20 Ekivalen Mobil Penumpang (Emp) untuk Jalan 4/2 T dan 4/2 TT. . 3-45
Tabel 3. 21 Ekivalensi Mobil Penumpang.......................................................... 3-45
Tabel 3. 22 Volume Lalu Lintas Pada Ruas Jalan Terkait Kegiatan.................. 3-49
Tabel 3. 23 Karakteristik Tingkat Pelayanan Jalan............................................ 3-51
Tabel 3. 24 Perhitungan Kapasitas Jalan Pada Ruas Terkait Kegiatan............ 3-52
Tabel 3. 25 Volume per Kapasitas (VCR) Ruas Jalan Eksisting....................... 3-52
Tabel 3. 26 Perusahaan, Jumlah dan Daya Angkut Kapal di Pelabuhan
Ulee Lheue...................................................................................... 3-53
Tabel 3. 27 Jenis Tanaman di Depan Gedung.................................................. 3-55
Tabel 3. 28 Jenis Tanaman di Area Rencana Perluasan Tempat Parkir........... 3-55
Tabel 3. 29 Jenis Tanaman di RTH................................................................... 3-55
Tabel 3. 30 Jenis Tanaman di Sekitar Mushola................................................. 3-56
Tabel 3. 31 Jenis Tanaman di Sisi Kiri Mushola................................................ 3-57

Daftar Tabel viii


Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

Tabel 3. 32 Jenis Tanaman di Area Parkir......................................................... 3-57


Tabel 3. 33 Jenis Burung di Lokasi Kegiatan..................................................... 3-59
Tabel 3. 34 Jenis Burung di Lokasi Kegiatan Menurut AMDAL 2007................ 3-59
Tabel 3. 35 Jenis Nekton di Lokasi Kegiatan..................................................... 3-60
Tabel 3. 36 Hasil Pengukuran Phytoplankton.................................................... 3-61
Tabel 3. 37 Hasil Pengukuran Zooplankton....................................................... 3-63
Tabel 3. 38 Hasil Pengukuran Benthos............................................................. 3-65
Tabel 3. 39 Luas Wilayah dan Jumlah Penduduk Kecamatan Meuraxa........... 3-67
Tabel 3. 40 Jumlah Penduduk, Luas Wilayah, Kepadatan Penduduk
Gampong Ulee Lheue..................................................................... 3-68
Tabel 3. 41 Jumlah Penduduk Menurut Kelompok Umur di Kecamatan
Meuraxa Tahun 2017...................................................................... 3-68
Tabel 3. 42 Ketenagakerjaan............................................................................ 3-69
Tabel 3. 43 Jumlah Pencari Kerja pada Dinas Tenaga Kerja menurut
Pendidikan...................................................................................... 3-69
Tabel 3. 44 Sarana Pendidikan di Kecamatan Meuraxa.................................... 3-71
Tabel 3. 45 Agama dan Jumlah Pemeluk Agama.............................................. 3-72
Tabel 3. 46 Jumlah Sarana Ibadah.................................................................... 3-72
Tabel 3. 47 Jumlah Lembaga Sosial di Kecamatan Meuraxa............................ 3-74
Tabel 3. 48 Pola Penyakit Terbanyak di Kota Banda Aceh............................... 3-84
Tabel 3. 49 Jenis Penyakit Terbanyak di Puskesmas Meuraxa tahun 2017..... 3-85
Tabel 3. 50 Jumlah Penduduk Beresiko Berdasarkan Usia di Kota Banda Aceh 3-86
Tabel 3. 51 Sarana Pelayanan Kesehatan di Kecamatan Meuraxa.................. 3-88
Tabel 3. 52 Jenis dan Jumlah Tenaga Kesehatan di Kecamatan Meuraxa...... 3-90
Tabel 3. 53 Sumber Air Bersih Masyarakat....................................................... 3-93
Tabel 3. 54 Aliran Sampah................................................................................ 3-93
Tabel 3. 55 Pelayanan Pengangkutan Sampah................................................ 3-93

Tabel 4. 1 Evaluasi Kegiatan Eksisting dan Dampak yang Dikelola................ 4-2


Tabel 4. 2 Evaluasi Kinerja dan Efektivitas RKL-RPL yang Telah Dilakukan.. 4-11
Tabel 4. 3 Matriks Identifikasi Dampak Potensial............................................ 4-23
Tabel 4. 4 Perhitungan Konsentrasi Pencemar di Udara pada Persiapan dan
Pematangan Lahan......................................................................... 4-28
Tabel 4. 5 Hasil Perhitungan Laju Kuantitas Emisi pada Tahap Konstruksi.... 4-30
Tabel 4. 6 Prediksi Kondisi Kualitas Udara dari Kendaraan Pengangkut
Material pada Tahap Konstruksi..................................................... 4-30

Daftar Tabel ix
Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

Tabel 4. 7 Prakiraan Kebisingan dari Pekerjaan Persiapan dan Pematangan


Lahan.............................................................................................. 4-32
Tabel 4. 8 Koreksi Permukaan Perkerasan..................................................... 4-33
Tabel 4. 9 Perhitungan Prediksi Tingkat Kebisingan dari Mobilisasi Alat dan
Bahan Material................................................................................ 4-33
Tabel 4. 10 Prediksi Kondisi Peningkatan Kebisingan Dengan Adanya Kegiatan
Mobilisasi Alat dan Bahan Material................................................. 4-34
Tabel 4. 11 Luas Area Parkir............................................................................. 4-34
Tabel 4. 12 Rencana Pengembangan Area Parkir............................................ 4-34
Tabel 4. 13 Tanaman di Area Parkir.................................................................. 4-35
Tabel 4. 14 Perkiraan Tenaga Kerja Konstruksi................................................ 4-36
Tabel 4. 15 Hasil Perhitungan Laju Kuantitas Emisi Tahap Operasional.......... 4-40
Tabel 4. 16 Prediksi Kondisi Kualitas Udara dari Mobilisasi Kendaraan Darat
Pelabuhan Ulee Lheue................................................................... 4-41
Tabel 4. 17 Proyeksi Kendaraan di Pelabuhan Ulee Lheue Tahun 2023.......... 4-49
Tabel 4. 18 Tingkat Pelayaan Jalan Pada Saat Operasional Pelabuhan Ulee
Lheue Tahun 2023.......................................................................... 4-51
Tabel 4. 19 Evaluasi Perubahan Kegiatan......................................................... 4-56

Tabel 5. 1 Ringkasan Dampak-Dampak Penting............................................. 5-1


Tabel 5. 2 Matriks Rencana Pengelolaan Lingkungan Hidup (RKL)
Pelabuhan Penyeberangan Ulee Lheue......................................... 5-3
Tabel 5. 3 Matriks Rencana Pemantauan Lingkungan Hidup (RPL)
Pelabuhan Penyeberangan Ulee Lheue......................................... 5-23

Daftar Tabel x
Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

DAFTAR GAMBAR

Gambar 2. 1 Peta Administrasi Kota Banda Aceh.......................................... 2-2


Gambar 2. 2 Peta Lokasi Kegiatan................................................................. 2-3
Gambar 2. 3 Peta Kesesuaian Lokasi dengan RTRW.................................... 2-8
Gambar 2. 4 Peta Kesesuaian Lokasi dengan PIPPIB................................... 2-9
Gambar 2. 5 Pengunaan Lahan DLKr Sisi Darat............................................ 2-13
Gambar 2. 6 DLKr Sisi Darat dan DLKr Sisi Laut............................................ 2-14
Gambar 2. 7 Gedung Terminal........................................................................ 2-15
Gambar 2. 8 Gedung Perkantoran.................................................................. 2-16
Gambar 2. 9 Gang Way Darat......................................................................... 2-16
Gambar 2. 10 Movable Bridge.......................................................................... 2-16
Gambar 2. 11 Gerbang Utama dan Pos Jaga Awal.......................................... 2-17
Gambar 2. 12 Pos Periksa Tiket....................................................................... 2-17
Gambar 2. 13 Area Penimbangan Kendaraan.................................................. 2-18
Gambar 2. 14 Jalan Kendaraan Masuk/ Keluar Kapal..................................... 2-18
Gambar 2. 15 Instalasi Air Bersih...................................................................... 2-18
Gambar 2. 16 Fasilitas Pemadam Kebakaran.................................................. 2-19
Gambar 2. 17 Area Parkir Penumpang Roda 4................................................ 2-19
Gambar 2. 18 Area Parkir Penumpang Roda 2................................................ 2-19
Gambar 2. 19 Area Perkantoran....................................................................... 2-20
Gambar 2. 20 Tempat Pengolahan Air Limbah................................................ 2-20
Gambar 2. 21 Tempat Penampungan Limbah Padat....................................... 2-20
Gambar 2. 22 Fasilitas Usaha Perdagangan (Toko/ Kantin)............................ 2-21
Gambar 2. 23 Area Pengembangan Pelabuhan............................................... 2-21
Gambar 2. 24 Fasilitas Umum Lainnya............................................................. 2-21
Gambar 2. 25 Sistem Drainase......................................................................... 2-22
Gambar 2. 26 Tower Air.................................................................................... 2-22
Gambar 2. 27 Mushola...................................................................................... 2-22
Gambar 2. 28 Toilet........................................................................................... 2-23
Gambar 2. 29 Stasiun Karantina Pertanian....................................................... 2-23
Gambar 2. 30 Akses Jalan................................................................................ 2-23
Gambar 2. 31 Area Parkir Umum...................................................................... 2-24
Gambar 2. 32 Area Parkir Petugas DAMKAR, SAR, Polisi dan Ambulan........ 2-24

Daftar Gambar xi
Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

Gambar 2. 33 Area Parkir Staff......................................................................... 2-24


Gambar 2. 34 Alur Pelayaran dan Saluran Masuk Pelabuhan......................... 2-25
Gambar 2. 35 Kolam Pelabuhan....................................................................... 2-26
Gambar 2. 36 Dermaga Kapal Cepat................................................................ 2-26
Gambar 2. 37 Dermaga MB Kapal Feri............................................................. 2-27
Gambar 2. 38 Dermaga Kapal Pemerintah....................................................... 2-27
Gambar 2. 39 Breakwater................................................................................. 2-30
Gambar 2. 40 Pelabuhan Penyeberangan Ulee Lheue.................................... 2-31
Gambar 2. 41 Jenis Kapal Ferry Ro-Ro............................................................ 2-34
Gambar 2. 42 Pola Sirkulasi Keberangkatan Penumpang di Pelabuhan
Ulee Lheue................................................................................. 2-40
Gambar 2. 43 Pola Sirkulasi Kedatangan Penumpang di Pelabuhan
Ulee Lheue................................................................................. 2-40
Gambar 2. 44 Pola Sirkulasi Keberangkatan Kendaraan Menggunakan Kapal
di Pelabuhan Ulee Lheue........................................................... 2-41
Gambar 2. 45 Neraca Penggunaan Air Selama Operasional Eksisting............ 2-42
Gambar 2. 46 Pola Sirkulasi.............................................................................. 2-44
Gambar 2. 47 Rencana Pengembangan Pelabuhan........................................ 2-56
Gambar 2. 48 Tampak Depan Rencana Perluasan Terminal........................... 2-57
Gambar 2. 49 Tampak Samping Rencana Perluasan Terminal....................... 2-58
Gambar 2. 50 Denah Lantai 1 Rencana Perluasan Terminal........................... 2-59
Gambar 2. 51 Denah Lantai 2 Rencana Perluasan Terminal........................... 2-60
Gambar 2. 52 Denah Lantai 3 Rencana Perluasan Terminal........................... 2-61
Gambar 2. 53 Denah Lantai Atap Rencana Perluasan Terminal...................... 2-62
Gambar 2. 54 Tahapan Kegiatan Pengembangan Pelabuhan Ulee Lheue...... 2-63
Gambar 2. 55 Neraca Penggunaan Air pada Kegiatan Konstruksi
Pengembangan.......................................................................... 2-65
Gambar 2. 56 Bekisting Kolom.......................................................................... 2-70
Gambar 2. 57 Bekisting Pelat............................................................................ 2-71
Gambar 2. 58 Pola Sirkulasi Keberangkatan Penumpang di Pelabuhan
Ulee Lheue Setelah Pengembangan......................................... 2-75
Gambar 2. 59 Pola Sirkulasi Kedatangan Penumpang di Pelabuhan
Ulee Lheue Setelah Pengembangan......................................... 2-76
Gambar 2. 60 Neraca Penggunaan Air Bersih Selama Operasional................ 2-78
Gambar 2. 61 Trase alur pelayaran di pelabuhan Ulee Lhue........................... 2-80
Gambar 2. 62 Pola Arus Perairan dan Pelabuhan Ulee Lheue........................ 2-81

Daftar Gambar xii


Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

Gambar 2. 63 Peta Lokasi Kegiatan Kerja Keruk dan Lokasi Pembuangan


Hasil Pengerukan (Dumping Area)............................................. 2-93

Gambar 3. 1 Grafik hasil Pengukuran SO2..................................................... 3-5


Gambar 3. 2 Grafik hasil Pengukuran CO....................................................... 3-6
Gambar 3. 3 Grafik hasil Pengukuran TSP..................................................... 3-6
Gambar 3. 4 Pengambilan Sample Kualitas Udara........................................ 3-7
Gambar 3. 5 Grafik Hasil Pengukuran Kebisingan......................................... 3-8
Gambar 3. 6 Pengambilan Sampel Kebisingan.............................................. 3-8
Gambar 3. 7 Peta Lokasi Sampling................................................................. 3-9
Gambar 3. 8 Peta Kemiringan Lereng Kota Banda Aceh............................... 3-11
Gambar 3. 9 Peta Geologi Kota Banda Aceh.................................................. 3-12
Gambar 3. 10 Pasang Surut Perairan Kolam Pelabuhan................................. 3-14
Gambar 3. 11 Vektor Kecepatan Arus Pada Saat Pasang............................... 3-15
Gambar 3. 12 Arah Angin Dominan dan Panjang Fetch................................... 3-16
Gambar 3. 13 Potongan A-A (Areal Sandar Kapal KMP)................................. 3-17
Gambar 3. 14 Potongan B-B (Bagian Areal Sandar Kapal Cepat)................... 3-18
Gambar 3. 15 Potongan C-C (Bagian Areal Sandar Kapal Keperluan Darurat) 3-18
Gambar 3. 16 Potongan D-D (Bagian Areal Alur Pelayaran)............................ 3-18
Gambar 3. 17 Grafik Pengukuran Fe................................................................ 3-20
Gambar 3. 18 Grafik Pengukuran CaCo3......................................................... 3-20
Gambar 3. 19 Grafik Pengukuran TSS............................................................. 3-23
Gambar 3. 20 Grafik Pengukuran Amonia........................................................ 3-23
Gambar 3. 21 Pengambilan Sampel Air Laut.................................................... 3-24
Gambar 3. 22 Peta Kesesuaian Ruang dengan RTRW Kota Banda Aceh....... 3-28
Gambar 3. 23 Peta Pola Ruang Kota Banda Aceh........................................... 3-30
Gambar 3. 24 Keterkaitan Ruang Antara Kegiatan dan Sekitarnya.................. 3-31
Gambar 3. 25 Peta Penggunaan Lahan............................................................ 3-35
Gambar 3. 26 Perubahan Lahan Kawasan Pelabuhan Tahun 2009 - 2018..... 3-36
Gambar 3. 27 Peta Jaringan Jalan.................................................................... 3-38
Gambar 3. 28 Foto Kondisi Jalan Terkait Pelabuhan Ulee Lheue.................... 3-40
Gambar 3. 29 Penampang Jalan Tipe 4/2 D (Jl. Iskandar Muda dan
Jl.Pelabuhan Ulee Lheue).......................................................... 3-41
Gambar 3. 30 Penampang Jalan Tipe 2/2 UD (Jl. Bts. Kota Banda Aceh/
Aceh Besar - Jln. Prof. Dr. Ibrahim Hasan dan

Daftar Gambar xiii


Addendum ANDAL, RKL-RPL
Pelabuhan Penyeberangan Ulee Lheue Provinsi Aceh

Jl. TPA Gampong Jawa)............................................................ 3-42


Gambar 3. 31 Titik Pengamatan Traffic Counting (TC)..................................... 3-44
Gambar 3. 32 Grafik Komposisi Kendaraan pada Ruas Jl. Iskandar Muda...... 3-46
Gambar 3. 33 Grafik Komposisi Kendaraan pada Ruas
Jln. Prof. Dr. Ibrahim Hasan....................................................... 3-46
Gambar 3. 34 Grafik Komposisi Kendaraan pada Ruas
JL. Residen Ibnu Sya’dan.......................................................... 3-47
Gambar 3. 35 Grafik Komposisi Kendaraan pada Ruas Jl. TPA Gampong Jawa 3-48
Gambar 3. 36 Alur Pelayaran Terkait Pelabuhan Ulee Lheue.......................... 3-54
Gambar 3. 37 Jenis Tanaman di Depan Gedung............................................. 3-55
Gambar 3. 38 Jenis Tanaman di RTH............................................................... 3-56
Gambar 3. 39 Jenis Tanaman di Sekitar Mushola............................................ 3-56
Gambar 3. 40 Jenis Tanaman di Sekitar Parkir Inap........................................ 3-57
Gambar 3. 41 Jenis Tanaman di Area Pengembangan Parkir Roda 2............. 3-58
Gambar 3. 42 Wawancara dengan Responden di Pelabuhan Ulee Lheue...... 3-80
Gambar 3. 43 Wawancara dengan Geuchik dan Staff Gampong Ulee Lheue. 3-80
Gambar 3. 44 Teori Simpul............................................................................... 3-82
Gambar 3. 45 Peta Kegiatan Sekitar................................................................. 3-100
Gambar 3. 46 Peta Batas Wilayah Studi........................................................... 3-101

Gambar 4. 1 Diagram Alir Identifikasi Dampak Tahap Konstruksi.................. 4-24


Gambar 4. 2 Diagram Alir Identifikasi Dampak Tahap Operasional............... 4-25

Gambar 5. 1 Peta Pengelolaan Lingkungan Hidup (RKL).............................. 5-21


Gambar 5. 2 Peta Pemantauan Lingkungan Hidup (RPL).............................. 5-39

Daftar Gambar xiv

Anda mungkin juga menyukai