Perhitungan Settlement Akibat Timbunan
q = 7,00 t/m2
Sc = (Cs x H/1 + eo) . log (pc/po) + (Cc x H/ 1+eo) . log ((po + ppcover Consolidated
No. Tebal Z eo Cs Cc pc po I p p+po Sc Sc (m)
Lapisan (m) (t/m3) (t/m2) (t/m2) (t/m2) (t/m2) (m) Cum.
H (m)
1 1 0.5 1,97 0,192 0,867 1,491 2,246 0,246 1,000 7,000 7,246 0,211 0,211
2 1 1.5 1,97 0,192 0,867 1,491 2,737 0,737 1,000 7,000 7,737 0,169 0,379
3 1 2.5 1,97 0,192 0,867 1,491 3,228 1,228 1,000 7,000 8,288 0,146 0,525
4 1 3.5 2,005 0,195 0,886 1,486 3,716 1,716 1,000 7,000 8,716 0,121 0,656
5 1 4.5 2,005 0,195 0,886 1,486 4,202 2,202 1,000 7,000 9,202 0,119 0,775
6 1 5.5 2,005 0,195 0,886 1,486 4,688 2,688 0,980 6,860 9,548 0,107 0,881
7 1 6.5 2,139 0,214 0,981 1,491 4,177 3,177 0,960 6,720 9,897 0,102 0,984
8 1 7.5 2,139 0,214 0,981 1,491 5,668 2,668 0,950 6,650 10,318 0,094 1,078
9 1 8.5 2,139 0,214 0,981 1,491 6,159 4,159 0,940 6,580 10,739 0,087 1,165
10 1 9.5 1,994 0,223 0,967 1,514 6,661 4,661 0,940 6,580 11,241 0,085 1,250
11 1 10.5 1,994 0,223 0,967 1,514 7,175 5,175 0,920 6,440 11,615 0,078 1,328
12 1 11.5 1,994 0,223 0,967 1,514 7,689 5,689 0,910 6,370 12,059 0,073 1,404
13 1 12.5 1,974 0,218 0,947 1,52 8,206 6,206 0,900 6,300 12,506 0,067 1,468
14 1 13.5 1,974 0,218 0,947 1,52 8,726 6,726 0,880 6,160 12,886 0,062 1,530
15 1 14.5 1,974 0,218 0,947 1,52 9,246 7,246 0,860 6,020 13,266 0,058 1,588
16 1 15.5 1,801 0,202 0,852 1,524 9,768 7,768 0,840 5,880 13,648 0,051 1,639
17 1 16.5 1,801 0,202 0,852 1,524 10,292 8,292 0,820 5,740 14,032 0,048 1,587
18 1 17.5 1,801 0,202 0,852 1,524 10,816 8,816 0,800 5,600 14,416 0,044 1,731
19 1 18.5 1,762 0,197 0,83 1,581 11,369 9,369 0,780 5,460 14,829 0,041 1,772
20 1 19.5 1,762 0,197 0,83 1,581 11,950 9,950 0,760 5,320 15,270 0,038 1,810
Rangkuman Hasil Perhitungan Tinggi Initial dan Tinggi Final.
Beban q Settlement akibat H-inital (m) H-Bongkar Tebal Settlement Tinggi Final/
(t/m2) q (m) Traffic (m) Pavement (m) Pavement (m) Finished grade
DESIGN CALCULATION (B+C)/1,9 GRAFIK DESIGN CALCULATION D-C-E+F-G
No.
A B C D E F G H
1 3 0,507 1,846 1,200 0,480 0,231 0,388
2 5 0,933 3,123 0,609 0,480 0,168 1,893
3 7 1,250 4,342 0,280 0,480 0,133 3,159
4 9 1,504 5,528 0,173 0,480 0,110 4,221
5 11 1,716 6,693 0,113 0,480 0,094 5,250
Catatan: Perhitungan didasarkan pada asumsi bahwa sat = timb
PENENTUAN TEBAL LAPISAN TANAH
LEMBEK YG MEMAMPAT