Mapping Knowledge Area & Process
• Manajemen resiko merupakan salah satu knowledge area yang terjadi dalam
setiap tahapan proses manajemen proyek. Bandingkan dengan knowledge
area lainnya dalam tabel di bawah ini
Risk Management Overview
Suatu proses yang systimatis didalam mengidentifikasi,
menganalisis dan menyelesaikan masalah risiko yang akan
terjadi pada proyek, termasuk memaksimalkan probabili-
tas dan konsekuensi dari kejadian yang positif dan
meminimalkan probabilitas dan konsekwensi dari kejadian
yang kurang baik terhadap tujuan proyek (PMBOK ed
2004)
2 Risk Identification
TOTAL RISK
ECONOMIC RISK CONTRACTUAL RISK POLITICAL RISK CONSTRUCTION RISK MANAGEMENT RISK
Failure of Uncertainty
Inflation Invironmental Productivity
Payment In Labor
Uncertainty In
Equipment Delay Disputes Water Quality Control
Equipment
Coordination
Energy Shortage Public Disorder Breakdown Safety
Failure
Financial Demonstration
Owner Availability Mistakes
Uncertainty s
Tax rate
Designer Delay Protectionr
Changes
Curency Design
Permit Availabilities
Fluctuation Changes
Delay Site
Labor Disputes
Access
Title
Identifikasi Resiko
Risk
Management
Risk
Identification
Unpaid Project
Management Change in Technology Licences
Regulatory Market Risks Wrong in
Schedule Performance Patent Rights
Natural Hazards Operational Making Cash
Cost Risk Specific to Contractual
Postulated Environmental Impacts Flow Prediction
Cash Flow Technology Outsider Suit
Events Social Impacts Loss of Potential Design Force Majeure
Side Effecs Inflation Uncertainty in Labor Sheer Size or Complexity Government Act and
Completion Demonstration/ People Claim (Availability, Skill) of Project Regulation
Energy shortage Financial Uncertainty Uncertainty in Material Quality Control Construction Permits
War Failure of Payment Coordination Failure Defective Construction
Terrorist Act Government Act and Project Delay Safety
Monetary Crisis Regulation (Tax Ratio and Labor Importation Cost Productivity
Permits) Work Accident Cost Design Change
Uncertainty in Equipment Unsuitable Method
(Availability) Wrong to Read
Delay of Site Access (Permits) Specification
Currency Fluctuation/changes Wrong to Calculate Unit
Limited Number of Sub Con Price
NSC (Nominated Sub Wrong in Interpretating of
Contractor) Scope of work.
Perencanaan Manajemen Resiko