PT BLASOSEM PUTRA
PRODUCTION & PRODUCTION MONITORING, EVALUATION
PRODUCTION
1. FLEET MANAGEMENT :
1. PRODUCTIVITY
1. LOADING PREPARATION
2. BROKEN MATERIAL INVENTORY (DRILLING & BLASTING)
2. UTILIZATION
1. SHIFT PREPARATION
2. MAN-POWER SETTING
3. KEHADIRAN OPERATOR
4. EQUIPMENT ALOCATION
3. AVAILABILITY
1. KETERSEDIAAN EQUIPMENT
4. SAFETY
1. KESIAPAN SEMUA INFRASTRUKTUR KERJA
2. ROAD MAINTENANCE
3. DISPOSAL PREPARATION & MAINTENANCE
4. LIGHTING PREPARATION
5. DRAINAGE & DEWATERING
2
PT BLASOSEM PUTRA
PROJECT CONTROL
GROSS PROFIT
Revenue/Production Cost
Wait/ No Operator
3
PT BLASOSEM PUTRA
Meningkatkan Productivity
4
PT BLASOSEM PUTRA
PRODUCTION (PRODUKSI)
Meningkatkan PRODUKSI :
1. Meningkatkan Produktivitas
2. Meningkatkan Physical Availability
3. Meningkatkan Use of Availability
N = Jumlah alat
Jumlah alat harus sebanding dengan volume pekerjaan
5
PT BLASOSEM PUTRA
UTILIZATION & AVAILABILITY
1. AVAILABILITY
Adalah : Tingkat ketersediaan alat untuk siap dioperasikan.
Dinyatakan satuan prosen
2. UTILIZATION/UTILISASI
Adalah : Tingkat ketersediaan waktu yang bisa dimanfaatkan untuk
beroperasi, dinyatakan dalam satuan prosen
RUMUS :
WH + S WH
PA = X 100 % UA = X 100 %
WH + S + R WH + S
6
PT BLASOSEM PUTRA
MENINGKATKAN UTILIZATION & AVAILABILITY
RUMUS :
WH + S WH
PA = X 100 % UA = X 100 %
WH + S + R WH + S
WH (Working Hours) = Waktu yang digunakan alat untuk bekerja
(produktif atau tidak produktif)
R (Repair & Maint hours) = Waktu yang digunakan untuk perawatan dan perbaikan
S (Standby hours) = Kondisi dimana alat tidak digunakan padahal dalam
kondisi available
MOHH (Machine On Hand Hour) = W + R + S ; waktu yang tersedia selama periode waktu tertentu
BUS = Breakdown Un Schedule ; waktu alat rusak yang tidak direncana
BS = Breakdown Schedule ; waktu alat rusah yang sudah terencana
Stand by = Delay + Idle
Delay time = Waktu hilang yang dapat di kendalikan
Idle time = Waktu hilang yang tidak dapat di kendalikan
Meningkatkan PA : Meningkatkan UA :
1. Mengurangi waktu R (Repair & Maintenance 1. Mengurangi waktu Stand by
Equip.) 2. Mengurangi waktu hilang
2. Meningkatkan MTBF dan MTTR 3. Meningkatkan koordinasi dan
3. Meningkatkan Skill Mekanik supervisi
7
PT BLASOSEM PUTRA
MENINGKATKAN UTILIZATION & AVAILABILITY
KONSEP PEMBAGIAN WAKTU DALAM 24 JAM
TOTAL 24 HOURS ( Total Jam Tersedia = MOHH )
MAINTENANCE HOURS (JAM UNTUK
AVAILABLE HOURS (AV/PA) / JAM KERJA YANG TERSEDIA
PERAWATAN)
UN PRODUCTIVE
TYRE
SCHEDULE NON PRODUCTIVE HOURS HOURS
SCHEDULE MAINTENANCE MAINTENANCE
MAINTENANC (Jam Stand by Alat) (Jam Kerja
HOURS
E Produktif)
IDLE TIME DELAY TIME
BS (Breakdown Maintenance Working Time
( Waktu stand by yg tdk dapat (Waktu stand by yg
Schedule) Time Time (Jam kerja efektif)
di kontrol ) dapat di kontrol)
- Overhaul - Periodic - Rain ( Hujan ) - Shift Change
- Change Service - Slippery - Wait blasting
component - PPM - Demo ( Strike ) - Wait exc/truck ( PA )
- PPU - Bahaya - Wait exc/truck (UA )
- PAP - Holiday & Shutdown - Meal & rest
BUS - Customer problem - Wait operator
(Breakdown - No Location - Fuel
Un Schedule) - Dusty (Debu) - No Support
Time - Commisioning - Moving equipment Working Hours
- Front/Disp
Preparation
- No Material
- Wait survey
- Tyre check
- Safety talk
- Friday pray
8
PT BLASOSEM PUTRA
EQUIPMENT (JUMLAH & LIMIT CAPACITY)
9
PT BLASOSEM PUTRA
EQUIPMENT (JUMLAH & LIMIT CAPACITY)
Jumlah
No Lokasi Klas. Tipe
Alat
1.1 Tambang Excavator
KOMATSU PC 1250SP-7 5
CONTOH KOMATSU PC 400 2
KOMATSU PC 200 2
CAT 345 2
11
11
PT BLASOSEM PUTRA
MANPOWER (PERHITUNGAN KEBUTUHAN)
Perhitungan Manpower dengan menggunakan Faktor
Parameter
ITEM Faktor
( Hari & % )
Menjadi faktor pengali
Jumlah Hari Aktif 359 untuk kebutuhan
Jumlah Hari Efektif 231 1,32
Manpower
CONTOH PERHITUNGAN
No Lokasi Klas. Tipe Jumlah Alat Faktor Tot MP Round Up
1.1 Tambang Excavator
KOMATSU PC 1250SP-
5 1,32 6,60 7
7
KOMATSU PC 400 2 1,32 2,64 3
KOMATSU PC 200 2 1,32 2,64 3
CAT 345 2 1,32 2,64 3
11 14,52 16
12
PT BLASOSEM PUTRA
MANPOWER (PERHITUNGAN KEBUTUHAN)
Perhitungan Manpower dengan menggunakan Faktor dan Pola Kerja
Pola Kerja :
1. Satu Shift ( Normal shift )
2. Dua Shift ( Long shift )
3. Tiga Shift ( 1 hari Long shift )
Normal Shift ( satu shift )
No Lokasi Klas. Tipe Jumlah Alat Faktor Tot MP Round Up
1.1 Tambang Excavator
KOMATSU PC 1250SP-7 5 1,32 6,60 7
KOMATSU PC 400 2 1,32 2,64 3
CAT 345 2 1,32 2,64 3
11 14,52 16
13
PT BLASOSEM PUTRA
TERIMAKASIH