1. WATER MANAGEMENT
• CATCHMENT AREA, DRAINAGE, TIRISAN (OPEN CHANNEL), RAIN, SUMP,
PUMP, POND, ETC.
2. WASTE MANAGEMENT
• OVERBURDEN, SOIL, MUD DI PIT ATAUPUN DI DISPOSAL
3. MINE PLAN DAN MINE SCHEDULE
• WORKING GEOMETRY, SLOPE STABILITY, ETC.
• MINE INFRASTRUCTURE (SUMP, RAMP, ROM, WORKSHOP, PITSTOP, ETC)
• MINE SCHEDULE
MATERIAL LUMPUR TAMBANG TERBUKA
BERDASARKAN KEBERADAANNYA, LUMPUR TERBAGI MENJADI DUA :
1. AKIBAT EROSI PROSES PENAMBANGAN:
• LUMPUR CAIR, YANG TERKUMPULL DI PIT SUMP.
BOOSTER
PUMP PUMP 1
1\\\
SEBELUM SUMP AREA SUMP AREA RANGKAIAN AREA OUT LET AREA
SYARAT MUD HANDLING BY PUMP
MF290, menyemprot air & mud untuk mencegah pengendapan mud
sehingga terbentuk constant densitas material terpompa
Constant
Clearing Head or Dredger, sebagai penghancur Density
ukuran batuan agar pompa tdk tersumbat
Water MF 420
Agitator
Size
Breaker
2. SUMP AREA
“water agitator” , outlet pump from RL-90
Lumpur Alluvial
FRONT LOADING (LUMPUR ‘PEJAL’)
DISPOSAL (LUMPUR CAIR DAN PEJAL)
PENGELOLAAN LUMPUR CAIR
Sump N1 pit North
Trucking
Trucking
PENGELOLAAN LUMPUR PEJAL PADA BENCH DISPOSAL
200
Dumping
75 m
50 m
50 m
50 m
450
25 m
20 m 120
Dumping
Material Keras
(impermeable)
Lumpur (‘solu’)
20 m
TERIMA
KASIH
WATERSHEET
OPEN CHANNEL
MIP 2018
Desember 2018
Pit – Inpit Design
N N
N
BACK
DRAINAGE ROAD
BERM