3 HAL POKOK PENAMBANGAN TERBUKA

1. WATER MANAGEMENT
• CATCHMENT AREA, DRAINAGE, TIRISAN (OPEN CHANNEL), RAIN, SUMP,
PUMP, POND, ETC.
2. WASTE MANAGEMENT
• OVERBURDEN, SOIL, MUD DI PIT ATAUPUN DI DISPOSAL
3. MINE PLAN DAN MINE SCHEDULE
• WORKING GEOMETRY, SLOPE STABILITY, ETC.
• MINE INFRASTRUCTURE (SUMP, RAMP, ROM, WORKSHOP, PITSTOP, ETC)
• MINE SCHEDULE
MATERIAL LUMPUR TAMBANG TERBUKA
BERDASARKAN KEBERADAANNYA, LUMPUR TERBAGI MENJADI DUA :
1. AKIBAT EROSI PROSES PENAMBANGAN:
• LUMPUR CAIR, YANG TERKUMPULL DI PIT SUMP.

2. MATERIAL TANAH PENUTUPNYA SUDAH BERUPA LUMPUR (BAGIAN


ATAS):
a. TANAH PENUTUP ENDAPAN ALLUVIAL (LUMPUR PEJAL), TETAPI BUKAN
RAWA
b. TANAH PENUTUP ENDAPAN ALLUVIAL, MASIH BERUPA RAWA (LUMPUR
PEJAL DAN LUMPUR CAIR).
• KONDISI MIP DI TUTUPI ENDAPAN ALLUVIAL DAN SEBAGIAN BESAR WILAYAHNYA
BERUPA RAWA BERAIR.
PENGELOLAAN LUMPUR DI PERTAMBANGAN
1. PENGENDALIAN EROSI PROSES PENAMBANGAN
2. PENGELOLAAN LUMPUR DI ‘BOTTOM PIT’
a. KEBUTUHAN WORKING GEOMETRY
b. MUD REMOVAL (PUMPING AND TRUCKING)
3. PENGELOLAAN LUMPUR DI DISPOSAL :
a. LUMPUR PEJAL
b. LUMPUR CAIR
1. PENGENDALIAN EROSI PROSES PENAMBANGAN
1. EROSI SANGAT TERGANTUNG PADA :
• JENIS BATUAN SERTA KOMPAKSINYA
• MINE DESIGN (RAMP & DRAINAGE):
• KEMIRINGAN/GRADE DRAINAGE
• BENTUK RAMP DRAINAGE (LEBAR DRAINAGE, CHANNEL ATAUPUN BENTUK BERM SAJA)

2. DI PIT DIANJURKAN ➔TIDAK DIBUAT TOREHAN/CHANNEL SEBAGAI DRAINAGE


• BIDANG ALIRAN (CHANNEL) YANG SEMPIT AKAN MENINGKATKAN EROSI, GUNAKAN PELAPIS (BELT
CONVEYOR BEKAS) UNTUK MENGURANGI EFEK EROSINYA.
• TOREHANNYA (CHANNEL) DAPAT MENYEBABKAN DAERAH INFILTRASI AIR, SEHINGGA
MENGGANGGU KESTABILAN LERENG.
• SEBAIKNYA AIR MENGALIR DI PINGGIR/BAHU JALAN
• JALAN LEBIH MUDAH DI MAINTENANCE.

3. AIR TIDAK DIBIARKAN MENGALIR KETEBING TAMBANG ATAUPUN DISPOSAL:


• EROSI AKAN TINGGI DAN AKAN MENGGANGGU KESTABILAN LERENG (GUNAKAN ‘BERM’ SEBAGAI
PEMBATAS).
DEWATERING & MUD HANDLING BY PUMP
Water & Erotion Control : Sump : Multi Stage Sediment Pond / Waste Dump
• Catchments area • Water , Mud, Coal, etc. • Hooper Fed Boosting Pumps • Mud & water handling
• Water : Rainfall & Material Handling: • Pressure Boosting Pumps
ground water • Material size (Clearing Accessories :
• Civil Construction : Head) • Pipe
o Ditch, Air terjun • Constant density sump • Connector, etc
(water fall), (mud/water agitator).
Hambatan (rip rap) Primary Pump
o Mud Handling : • Housing & impeller
Mud Trap. • Priming System

BOOSTER

PUMP PUMP 1
1\\\

SEBELUM SUMP AREA SUMP AREA RANGKAIAN AREA OUT LET AREA
SYARAT MUD HANDLING BY PUMP
MF290, menyemprot air & mud untuk mencegah pengendapan mud
sehingga terbentuk constant densitas material terpompa

Constant
Clearing Head or Dredger, sebagai penghancur Density
ukuran batuan agar pompa tdk tersumbat

Water MF 420
Agitator

Size
Breaker

2. SUMP AREA
“water agitator” , outlet pump from RL-90

Terjadi pencampuran Air + lumpur

Air Keruh, walau jauh dr Agitor


Booster Pump (warman)
MUD HANDLING BY TRUCKING
MUD HANDLING BY TRUCKING
LUMPUR DI TAMBANG

Lumpur Cair (Rawa)

Lumpur Alluvial
FRONT LOADING (LUMPUR ‘PEJAL’)
DISPOSAL (LUMPUR CAIR DAN PEJAL)
PENGELOLAAN LUMPUR CAIR
Sump N1 pit North
Trucking

Mud pond WDNW

Trucking
PENGELOLAAN LUMPUR PEJAL PADA BENCH DISPOSAL

200

Dumping

75 m
50 m
50 m
50 m
450
25 m
20 m 120

Material Keras Lumpur (‘solu’)


(impermeable)
450
Dumping

Dumping

Material Keras
(impermeable)

Lumpur (‘solu’)

20 m
TERIMA
KASIH
WATERSHEET
OPEN CHANNEL
MIP 2018

Desember 2018
Pit – Inpit Design

N N

Topo Situasi Desember 2019 Topo Situasi Juni 2020


Pit – Inpit Design & Section

N
BACK

DRAINAGE ROAD

BERM

Anda mungkin juga menyukai