HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 2-Sep PASIR KASAR 1 450,000 450,000 Volume = Truk
2 3-Sep PASIR KASAR 3 450,000 1,350,000
3 4-Sep PASIR KASAR 4 450,000 1,800,000
4 5-Sep PASIR KASAR 1 450,000 450,000
7-Sep PASIR KASAR 1 450,000 450,000
5 8-Sep PASIR KASAR 5 450,000 2,250,000
6 9-Sep PASIR KASAR 5 450,000 2,250,000
7 10-Sep PASIR KASAR 5 450,000 2,250,000
8 11-Sep PASIR KASAR 2 450,000 900,000
9 12-Sep PASIR KASAR 5 450,000 2,250,000
10 13-Sep PASIR KASAR 2 450,000 900,000
11 14-Sep PASIR KASAR 2 450,000 900,000
12 15-Sep PASIR KASAR 5 450,000 2,250,000
13 7-Oct PASIR KASAR 1 450,000 450,000
PASIR KASAR 1 450,000 450,000
PASIR KASAR 1 450,000 450,000
PASIR KASAR 1 450,000 450,000
14 8-Oct PASIR KASAR 3 450,000 1,350,000
15 9-Oct PASIR KASAR 2 450,000 900,000
16 10-Oct PASIR KASAR 5 450,000 2,250,000
17 14-Oct PASIR KASAR 6 450,000 2,700,000
18 16-Oct PASIR KASAR 2 450,000 900,000
19 18-Oct PASIR KASAR 2 450,000 900,000
20 19-Oct PASIR KASAR 1 450,000 450,000
21 23-Oct PASIR KASAR 1 450,000 450,000
22 24-Oct PASIR KASAR 1 450,000 450,000
23 25-Oct PASIR KASAR 1 450,000 450,000
24 27-Oct PASIR KASAR 2 450,000 900,000
25 28-Oct PASIR KASAR 3 450,000 1,350,000
26 29-Oct PASIR KASAR 1 450,000 450,000
27 30-Oct PASIR KASAR 3 450,000 1,350,000
28 31-Oct PASIR KASAR 1 450,000 450,000
29 1-Nov PASIR KASAR 2 450,000 900,000
30 6-Nov PASIR KASAR 3 450,000 1,350,000
31 7-Nov PASIR KASAR 2 450,000 900,000
32 9-Nov PASIR KASAR 4 450,000 1,800,000
33 10-Nov PASIR KASAR 3 450,000 1,350,000
34 11-Nov PASIR KASAR 4 450,000 1,800,000
35 12-Nov PASIR KASAR 2 450,000 900,000
36 13-Nov PASIR KASAR 4 450,000 1,800,000
37 14-Nov PASIR KASAR 1 450,000 450,000
38 15-Nov PASIR KASAR 2 450,000 900,000
39 16-Nov PASIR KASAR 3 450,000 1,350,000
40 17-Nov PASIR KASAR 5 450,000 2,250,000
41 18-Nov PASIR KASAR 3 450,000 1,350,000
42 19-Nov PASIR KASAR 3 450,000 1,350,000
43 20-Nov PASIR KASAR 3 450,000 1,350,000
44 21-Nov PASIR KASAR 1 450,000 450,000
45 22-Nov PASIR KASAR 3 450,000 1,350,000
46 23-Nov PASIR KASAR 3 450,000 1,350,000
47 24-Nov PASIR KASAR 3 450,000 1,350,000
48 25-Nov PASIR KASAR 5 450,000 2,250,000
49 26-Nov PASIR KASAR 2 450,000 900,000
50 27-Nov
51 28-Nov PASIR KASAR 3 450,000 1,350,000
52 29-Nov PASIR KASAR 1 450,000 450,000
53 30-Nov PASIR KASAR 1 450,000 450,000
54 1-Dec PASIR KASAR 2 450,000 900,000
55 2-Dec PASIR KASAR 2 450,000 900,000
56 3-Dec PASIR KASAR 3 450,000 1,350,000
57 4-Dec PASIR KASAR 4 450,000 1,800,000
58 5-Dec PASIR KASAR 4 450,000 1,800,000
59 6-Dec PASIR KASAR 3 450,000 1,350,000
60 7-Dec PASIR KASAR 2 450,000 900,000
61 9-Dec PASIR KASAR 2 450,000 900,000
62 10-Dec PASIR KASAR 3 450,000 1,350,000
63 12-Dec PASIR KASAR 4 450,000 1,800,000
64 14-Dec PASIR KASAR 2 450,000 900,000
65 15-Dec PASIR KASAR 2 450,000 900,000
66 16-Dec PASIR KASAR 1 450,000 450,000
67 18-Dec PASIR KASAR 3 450,000 1,350,000
TOTAL 182 31,500,000 81,900,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 2-Sep PASIR HALUS 1 700,000 700,000 Volume = Truk
2 12-Sep PASIR HALUS 1 700,000 700,000
3 13-Sep PASIR HALUS 1 700,000 700,000
4 27-Sep PASIR HALUS 2 700,000 1,400,000
5 28-Sep PASIR HALUS 2 700,000 1,400,000
6 3-Oct PASIR HALUS 1 700,000 700,000
7 5-Oct PASIR HALUS 2 700,000 1,400,000
8 6-Oct PASIR HALUS 1 700,000 700,000
9 7-Oct PASIR HALUS 1 700,000 700,000
10 15-Oct PASIR HALUS 1 700,000 700,000
11 17-Oct PASIR HALUS 1 700,000 700,000
12 19-Oct PASIR HALUS 1 700,000 700,000
13 20-Oct PASIR HALUS 1 700,000 700,000
14 21-Oct PASIR HALUS 1 700,000 700,000
15 23-Oct PASIR HALUS 1 700,000 700,000
16 1-Nov PASIR HALUS 1 700,000 700,000
17 3-Nov PASIR HALUS 1 700,000 700,000
3-Dec PASIR HALUS 1 700,000 700,000
TOTAL 21 12,600,000 14,700,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 2-Sep KERIKIL 1 500,000 500,000 Volume = Truk
2 3-Sep KERIKIL 1 500,000 500,000
3 4-Sep KERIKIL 1 500,000 500,000
4 4-Oct KERIKIL 1 500,000 500,000
5 5-Oct KERIKIL 1 500,000 500,000
6 6-Oct KERIKIL 1 500,000 500,000
7 8-Oct KERIKIL 1 500,000 500,000
8 13-Oct KERIKIL 1 500,000 500,000
9 14-Oct KERIKIL 1 500,000 500,000
10 20-Oct KERIKIL 1 500,000 500,000
TOTAL 10 5,000,000 5,000,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 2-Sep BATU MERAH 4000 400 1,600,000
2 2-Oct BATU MERAH 3000 350 1,050,000
3 3-Oct BATU MERAH 4000 350 1,400,000
4 18-Oct BATU MERAH 2000 400 800,000
5 29-Oct BATU MERAH 3000 400 1,200,000
6 3-Nov BATU MERAH 1000 400 400,000
7 7-Nov BATU MERAH 1000 400 400,000
8 15-Nov BATU MERAH 1000 400 400,000
9 26-Nov BATU MERAH 500 400 200,000
10 1-Dec BATU MERAH 500 400 200,000
11 23-Dec BATU MERAH 500 400 200,000
TOTAL 20,500 4,300 7,850,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 3-Sep Semen 10 47,500 475,000 Tonasa 50 kg
2 4-Sep Semen 20 47,500 950,000 Tonasa 50 kg
3 5-Sep Semen 4 47,500 190,000 Tonasa 50 kg
4 8-Sep Semen 30 47,500 1,425,000 Tonasa 50 kg
5 9-Sep Semen 40 48,500 1,940,000 Tonasa 50 kg
6 11-Sep Semen 60 48,500 2,910,000 Tonasa 50 kg
7 16-Sep Semen 50 48,500 2,425,000 Tonasa 50 kg
Semen 50 48,500 2,425,000 Tonasa 50 kg
8 26-Sep Semen 25 48,500 1,212,500 Tonasa 50 kg
9 30-Sep Semen 50 48,500 2,425,000 Tonasa 50 kg
Semen 50 42,000 2,100,000 Tonasa 40 kg
10 13-Oct Semen 15 42,000 630,000 Tonasa 40 kg
Semen 50 49,000 2,450,000 Tonasa 50 kg
Semen 50 49,000 2,450,000 Tonasa 50 kg
Semen 25 49,000 1,225,000 Tonasa 50 kg
Semen 10 49,000 490,000 Tonasa 50 kg
Semen 25 49,000 1,225,000 Tonasa 50 kg
11 17-Oct Semen 30 42,000 1,260,000 Tonasa 40 kg
Semen 30 48,500 1,455,000 Tonasa 50 kg
12 18-Oct Semen 5 42,000 210,000 Tonasa 40 kg
13 19-Oct Semen 3 42,000 126,000 Tonasa 40 kg
14 20-Oct Semen 10 42,000 420,000 Tonasa 40 kg
15 22-Oct Semen 5 41,000 205,000 Tonasa 40 kg
Semen 5 41,000 205,000 Tonasa 40 kg
16 23-Oct Semen 5 41,000 205,000 Tonasa 40 kg
17 24-Oct Semen 5 41,000 205,000 Tonasa 40 kg
18 26-Oct Semen 3 41,000 123,000 Tonasa 40 kg
Semen 2 49,000 98,000 Tonasa 50 kg
Semen 1 49,000 49,000 Tonasa 50 kg
19 30-Oct Semen 3 39,000 117,000 Bosowa 40 kg
20 1-Nov Semen 2 41,000 82,000 Tonasa 40 kg
Semen 10 43,000 430,000 Tonasa 40 kg
21 2-Nov Semen 4 43,000 172,000 Tonasa 40 kg
22 3-Nov Semen 4 41,000 164,000 Bosowa 40 kg
23 4-Nov Semen 4 40,000 160,000 Bosowa 40 kg
Semen 4 53,000 212,000 Tonasa 50 kg
23 5-Nov Semen 5 52,400 262,000 Tonasa 50 kg
24 6-Nov Semen 10 40,000 400,000 Bosowa 40 kg
25 8-Nov Semen 2 53,000 106,000 Tonasa 50 kg
26 9-Nov Semen 2 53,000 106,000 Tonasa 50 kg
27 10-Nov Semen 2 45,000 90,000 Tonasa 40 kg
28 13-Nov Semen 1 53,000 53,000 Tonasa 50 kg
29 14-Nov Semen 1 43,000 43,000 Bosowa 40 kg
30 15-Nov Semen 2 42,500 85,000 Bosowa 40 kg
31 17-Nov Semen 3 45,000 135,000 Tonasa 40 kg
32 18-Nov Semen 2 42,500 85,000 Bosowa 40 kg
33 19-Nov Semen 2 42,500 85,000 Bosowa 40 kg
34 20-Nov Semen 2 42,500 85,000 Bosowa 40 kg
35 26-Nov Semen 3 42,500 127,500 Bosowa 40 kg
36 22-Dec Semen 10 41,000 410,000 Bosowa 40 kg
TOTAL 746 2,267,400 34,918,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 12-Sep Besi 100 41,000 4,100,000 Besi 8 Full
2 Besi 200 59,000 11,800,000 Besi 10 full
3 30-Sep Besi 200 59,000 11,800,000 Besi 10 full
4 Besi 200 41,000 8,200,000 Besi 8 Full
5 8-Oct Besi 300 40,000 12,000,000 Besi 8 Full
TOTAL 1000 240,000 47,900,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 12-Sep PAPAN 2 500,000 1,000,000 Volume = M
2 14-Sep PAPAN 2 500,000 1,000,000 M = 60 Batang
3 26-Sep PAPAN 2 600,000 1,200,000
4 28-Sep PAPAN 1 500,000 500,000
5 30-Sep PAPAN 8 600,000 4,800,000
6 1-Oct PAPAN 1 600,000 600,000
7 3-Oct PAPAN 1.5 600,000 900,000
8 13-Oct PAPAN 2 600,000 1,200,000
TOTAL 19.5 4,500,000 11,200,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 3-Sep BALOK 10 10,000 100,000 Beli 10 Batang
2 10-Sep BALOK 1 700,000 700,000
3 12-Sep BALOK 1 500,000 500,000
4 26-Sep BALOK 1 600,000 600,000
5 28-Sep BALOK 20 4,000 80,000 Beli 20 batang
6 1-Oct BALOK 1 700,000 700,000
7 3-Oct BALOK Kemiri 125 4,000 500,000 Beli 125 batang
8 13-Oct BALOK 205 5,851 1,200,000 Beli 205 batang
TOTAL 364 2,523,851 4,380,000
KETERANGAN
M 4 2,500,000 2,500,000
Batang 360 23,851 1,880,000
364 2,523,851 4,380,000
9. NAMA MATERIAL : PIPA (SAT : Batang)
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 3-Sep PIPA WAVIN 2" 5 48,000 240,000
2 30-Sep PIPA 2" 1 25,000 25,000
PIPA 2" 4 23,000 92,000
3 13-Oct PIPA 3" 2 35,000 70,000
4 19-Oct PIPA 3" 5 32,500 162,500
5 26-Oct PIPA 3" 2 35,000 70,000
6 27-Oct PIPA 3" 3 35,000 105,000
7 1-Nov PIPA 3" 10 33,000 330,000
PIPA 3" 7 33,000 231,000
8 26-Nov PIPA 3" 1 35,000 35,000
9 19-Dec PIPA 2 6,500 13,000
TOTAL 42 341,000 1,373,500
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 2-Dec Cat Avian 1 kg 1 35,000 35,000
2 4-Dec Cat Avian 1 kg 1 35,000 35,000
3 5-Dec Cat Altex 1 kg 3 33,000 99,000
Cat Avian 1 kg 1 35,000 35,000
4 6-Dec Cat Yoko 8 25,000 200,000
5 7-Dec Cat Avian 1 kg 5 35,000 175,000
6 8-Dec Cat 48 33,000 1,584,000
7 23-Dec Cat Avian 1 kg 2 35,000 70,000
Cat Avian 1 kg 3 35,000 105,000 Hitam
Cat Avian 1 kg 3 35,000 105,000 Putih
8 24-Dec Cat Avian 1 kg 6 35,000 210,000 Hitam & Putih
Cat Avian 1 kg 2 35,000 70,000 Hitam & Putih
9 25-Dec Cat Avian 1 kg 2 35,000 70,000 Hitam & Putih
Cat Avian 1 kg 2 35,000 70,000 Hitam & Putih
10 28-Dec Cat Avian 1 kg 2 35,000 70,000
Total 89 511,000 2,933,000
HARGA JUMLAH
NO TANGGAL NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 2-Dec Tiner Avian 1 15,000 15,000
2 4-Dec Tiner Avian 1 15,000 15,000
3 5-Dec Tiner 1 17,500 17,500
4 6-Dec Tiner Avian 6 15,000 90,000
5 7-Dec Tiner 3 7,500 22,500
6 8-Dec Tiner Avian 18 14,500 261,000
7 23-Dec Tiner Avian 1 15,000 15,000
Tiner Avian 3 15,000 45,000
8 24-Dec Tiner Avian 1 15,000 15,000
Tiner Avian 3 15,000 45,000
9 25-Dec Tiner Avian 1 15,000 15,000
Tiner Avian 1 15,000 15,000
10 28-Dec Tiner Avian 1 15,000 15,000
TOTAL 41 189,500 586,000
Tanggal NAMA MATERIAL Jml Brg Sat Harga DEBET KREDIT SALDO KETERANGAN
Uang Masuk
> Via transfer Pak Aso 8,000,000 Tgl 04 November 2009
> Via Pak Aso 5,000,000 Tgl 23 November 2009
> Via Alvin 7,000,000 Tgl 24 November 2009
20,000,000
Saldo 20,000,000
1-Nov Semen Tonasa 40 kg 2 sak 41,000 82,000 19,918,000 Nota Bon tgl 25 Oktober 2009
Semen Tonasa 40 kg 10 sak 43,000 430,000 19,488,000 Nota Bon tgl 28 Oktober 2009
Pipa 3 inci 10 batang 33,000 330,000 19,158,000 nota bon tgl 29 oktober 2009
Pipa 3 inci 7 batang 33,000 231,000 18,927,000 nota bon tgl 30 oktober 2009
bensin 10 ltr 45,000 18,882,000 nota bon tgl 31 oktober 2009
Pasir Halus 1 truk 700,000 700,000 18,182,000
Pasir Kasar 2 truk 450,000 900,000 17,282,000
2-Nov Semen Tonasa 40 kg 4 sak 43,000 172,000 17,110,000
3-Nov Semen Bosowa 40 kg 4 sak 41,000 164,000 16,946,000
Pasir Halus 1 truk 700,000 700,000 16,246,000
Batu merah 1000 bj 400 400,000 15,846,000
Transport Makassar-bantaeng 1 orang 30,000 15,816,000
4-Nov Semen Bosowa 40 kg 4 sak 40,000 160,000 15,656,000
Semen Tonasa 50 kg 4 sak 53,000 212,000 15,444,000
5-Nov Semen Tonasa 50 kg 5 sak 52,400 262,000 15,182,000
Aqua Botol sedang 6 botol 3,500 21,000 15,161,000
6-Nov Pasir Kasar 3 truk 450,000 1,350,000 13,811,000
Semen Bosowa 40 kg 10 sak 40,000 400,000 13,411,000
Sewa molen 150000/hari 2,900,000 10,511,000 Selama 26 hari
7-Nov Transport Bantaeng Makassar 1 orang 30,000 10,481,000
Nota kurang jelas 14,500 10,466,500
Nota kurang jelas 50,000 10,416,500
Batu merah 1000 bj 400 400,000 10,016,500
Pasir Kasar 2 truk 450,000 900,000 9,116,500
8-Nov Semen Tonasa 50 kg 2 sak 53,000 106,000 9,010,500
9-Nov Semen Tonasa 50 kg 2 sak 53,000 106,000 8,904,500
Pasir Kasar 4 truk 450,000 1,800,000 7,104,500
Sewa molen 150000/hari 750,000 6,354,500 selama 5 hari
10-Nov Semen Tonasa 40 kg 2 sak 45,000 90,000 6,264,500
Pasir Kasar 3 truk 450,000 1,350,000 4,914,500
Transport Makassar-bantaeng 1 orang 30,000 4,884,500
11-Nov Pasir Kasar 4 truk 450,000 1,800,000 3,084,500
12-Nov Pasir Kasar 2 truk 450,000 900,000 2,184,500
Kopi susu 1 gls 5,000 5,000 2,179,500
the manis 1 gls 3,000 3,000 2,176,500
Aqua Botol sedang 2 btl 3,500 7,000 2,169,500
Kopi susu 4 gls 20,000 2,149,500
milo dingin 4 gls 20,000 2,129,500
Pulsa 25000 Alvin 27,000 2,102,500
13-Nov mata gergaji / stang 1 buah 15,000 2,087,500
Semen Tonasa 50 kg 1 sak 53,000 53,000 2,034,500
Pasir Kasar 4 truk 450,000 1,800,000 234,500
mata gergaji 1 buah 12,500 222,000
upah kerja 1 orang 45000/hari 765,000 (543,000) kerja 17 hari (dg Ramli)
upah kerja 1 orang 30000/hari 100,000 (643,000) DP upah (dg SAKA) Nota tgl 5 Nov 2009
upah kerja 1 orang 30000/hari 200,000 (843,000) kerja 10 1/2 (dg saka) nota tgl 7 Nov 2009
upah kerja 1 orang 30000/hari 60,000 (903,000) Kerja 2 hari (dg Saka) nota tgl 11 nov 2009
upah kerja 1 orang 30000/hari 150,000 (1,053,000) kerja 5 hari (dg Saka)
14-Nov pasir kasar 1 truk 450,000 450,000 (1,503,000)
Semen Bosowa 40 kg 1 sak 43,000 43,000 (1,546,000)
Transport Bantaeng Makassar 1 orang 30,000 (1,576,000)
15-Nov Batu merah 1000 bj 400 400,000 (1,976,000)
Pasir Kasar 2 truk 450,000 900,000 (2,876,000)
Semen Bosowa 40 kg 2 sak 42,500 85,000 (2,961,000)
16-Nov Pasir Kasar 3 truk 450,000 1,350,000 (4,311,000)
upah kerja 1 orang 45000/hari 585,000 (4,896,000) kerja 13 hari (dg Musa)
17-Nov pasir kasar 5 truk 450,000 2,250,000 (7,146,000)
Semen Tonasa 40 kg 3 sak 45,000 135,000 (7,281,000)
sisa sewa direksi kit 200,000 (7,481,000)
18-Nov Pasir Kasar 3 truk 450,000 1,350,000 (8,831,000)
Semen Bosowa 40 kg 2 sak 42,500 85,000 (8,916,000)
19-Nov Pasir Kasar 3 truk 450,000 1,350,000 (10,266,000)
Semen Bosowa 40 kg 2 sak 42,500 85,000 (10,351,000)
upah kerja 1 orang 3000/hari 150,000 (10,501,000) kerja 5 hari (dg Saka)
20-Nov the kotak 2 kotak 4,500 9,000 (10,510,000) nota bon tgl 13 november 2009
Pasir Kasar 3 truk 450,000 1,350,000 (11,860,000)
Semen Bosowa 40 kg 2 sak 42,500 85,000 (11,945,000)
21-Nov bensin 11,11 liter 4,500 50,000 (11,995,000)
Kopi susu 1 gls 5,000 (12,000,000)
milo dingin 2 gls 5,000 10,000 (12,010,000)
Pasir Kasar 1 truk 450,000 450,000 (12,460,000)
upah kerja 1 orang 50000/hari 200,000 (12,660,000) kerja 4 hari (dg Ramli)
22-Nov Pasir Kasar 3 truk 450,000 1,350,000 (14,010,000)
23-Nov Pasir Kasar 3 truk 450,000 1,350,000 (15,360,000)
ayam goreng 4 potong 50,000 (15,410,000) makan sama pak polisi KAUR LANTAS
nasi putih 4 piring 16,000 (15,426,000) makan sama pak polisi KAUR LANTAS
sup ayam 2 porsi 15,000 (15,441,000) makan sama pak polisi KAUR LANTAS
es 1,000 (15,442,000) makan sama pak polisi KAUR LANTAS
upah kerja 1 orang 30000/hari 300,000 (15,742,000) kerja 10 hari (zainuddin)
24-Nov Pasir Kasar 3 truk 450,000 1,350,000 (17,092,000)
Transport Makassar-bantaeng 1 orang 30,000 (17,122,000)
25-Nov Pasir Kasar 5 truk 450,000 2,250,000 (19,372,000)
26-Nov Batu merah 500 bj 400 200,000 (19,572,000)
Pasir Kasar 2 truk 450,000 900,000 (20,472,000)
Semen Bosowa 40 kg 3 sak 42,500 127,500 (20,599,500)
Pipa 3 inci 1 btng 35,000 (20,634,500)
27-Nov (20,760,000) Libur Idul adha
28-Nov Pasir Kasar 3 truk 450,000 1,350,000 (22,110,000)
29-Nov Pasir Kasar 1 truk 450,000 450,000 (22,560,000)
30-Nov Pasir Kasar 1 truk 450,000 450,000 (23,010,000) Hutang Material
20,000,000 23,010,000 43,010,000
Tanggal NAMA MATERIAL Jml Brg Sat Harga Jumlah Harga KETERANGAN
HARGA JUMLAH
NO NAMA MATERIAL VOLUME KETERANGAN
SATUAN HARGA
1 PASIR KASAR 182 31,500,000 81,900,000
2 PASIR HALUS 21 12,600,000 14,700,000
3 KERIKIL 10 5,000,000 5,000,000
4 BATU MERAH 20,500 4,300 7,850,000
5 SEMEN 746 2,267,400 34,918,000
6 BESI 1000 240,000 47,900,000
7 PAPAN 19.5 4,500,000 11,200,000
8 BALOK 364 2,523,851 4,380,000
9 PIPA 42 341,000 1,373,500
10 CAT 89 511,000 2,933,000
11 TINER 41 189,500 586,000
TOTAL 23014.5 59,677,051 212,740,500
Keterangan
Batu Merah 4000 400 1,600,000 Tanggal 2 Sep 2009 Via Ibu Indah
211,140,500
Jumlah
Tanggal NAMA MATERIAL Jml Brg Sat Harga KETERANGAN