MANIFOLD
Diajukan Untuk Memenuhi Salah Satu Syarat Kelulusan Praktikum Teknik Produksi 1
Disusun Oleh :
Kelompok 3
Oppy Ayudila P 2613171006
Donny Reza Maulana 2613171028
Agung Setiawan 2613171041
Audreyana Beltsa 2613171044
Enola Dwi Putri A. A. 2613171054
= 72,4 mm.
13. Pouring Rate (R)
R = b√W
= 0,47√0,15
= 0,18189 kg/s.
14. Adjusted Pouring Rate, Ra (kg/s)
R
Ra =
KC
0,18189
=
1 x 0,85
= 0,213 kg/s.
15. Pouring Time, tp (s)
W
tp =
Ra
0,15 kg
=
0,213 kg/s
= 0,704 s.
16. a. Luas Penampang Melintang Sprue Exit, Ase (mm2)
W
Ase =
ρ.tp.C√2.g.ESH
0,15 kg
Ase =
2700 kg/m3 .0,704 s.0,85 √2.9,81m/𝑠2 .0,0724m
Ase = 0,000078 m2
Ase = 78 mm2.
Ase √𝐻𝑠𝑒+ℎ
Asi =
√𝐻si
78 𝑚𝑚2 √50+83,2
=
√50
= 127,31 mm2.
√Asi
ri =
𝜋
√127,3 𝑚𝑚2
Ri =
3,14
Ri = 6,367 mm.
√Ase
re =
𝜋
√78 𝑚𝑚2
Re=
3,14
Re= 4,98 mm.
17. Luas Penampang Ingate & Runner berdasarkan Gating Ratio 1:4:4
a. Luas penampang Runner, Ar (mm2)
4
Ar = x Ase
1
4
= x 78 mm2
1
= 312 mm2.
b. Lebar dan tinggi Runner (mm)
Ar = t x l
t = l = √𝐴𝑟 = √312 = 17,66 mm.
l atas = 17,66 - 2 = 15,66 mm.
l bawah = 17,66 + 2 = 19,66 mm.
18. Luas Penampang Ingate, Ag (mm2)
4
Ag = x Ase
1
4
Ag = x 78 mm2
1
Ag = 312 mm2.
1
tinggi ingate = x tinggi runner
4
1
tinggi ingate = x 17,66 mm
4
tinggi ingate = 4,415 mm.
19. Well Area, Aw (mm2)
Aw = 5 x Ase
= 5 x 78 mm2
= 390 mm2.
𝐴𝑤 390 𝑚𝑚2
Rw = √ =√ = 11,14 mm.
𝜋 3,14
𝑚
𝑉𝑟+𝐴𝑟 0,25 𝑠 +(3,12 𝑥 10−4 𝑚2 ) 2
Nrr = = = 1,37 𝑚 ⁄𝑘𝑔.
𝑅 0,18189 𝑘𝑔/𝑠
𝑚
𝑉𝑔+𝐴𝑔 0,25 +(3,12 𝑥 10−4 𝑚2 ) 2
𝑠
Nrg = = = 1,37 𝑚 ⁄𝑘𝑔.
𝑅 0,18189 𝑘𝑔/𝑠
Perhitungan Ingate:
17,66 mm
hing
1 w
h ingate = x tinggi runner
2
1
h ingate = x 17,66 mm
2
h ingate = 8,83 mm ≈ 10 mm.
w = h ingate + (4-6)
w = 10 + 4 = 14 mm.
96,4 mm
10 mm
20 mm
r = 5 mm