Anda di halaman 1dari 2

NAMA : I Gusti Ayu Trisna Dewi

NPM : 1733122026

KLS : F1/REG.B/AKUNTANSI

MATA KULIAH : AUDITING II

WP-D3

PERSEDIAAN
KERTAS KERJA PEMERIKSAAN
Persediaan Barang Jadi
Per 31 Desember 2018

Informasi yang berhubungan dg persediaan barang jadi, sbb :


Jenis Jumlah B Bahan B.T.K BOP H Pokok Jumlah
unit Per-unit Per-unit Per-unit Per-unit Harga Pokok
(Rp) (Rp) (Rp) (Rp) (Rp)

Sklillets,15 4.800 1.920 700 380 3.000 14.400.000 ✓


Stewing Kettles 4 5.000 1.800 2.440 960 5.200 26.000.000 ✓
quarts
Industrial Tool 4.480 2.010 1.600 640 4.250
19.040.000 ✓
Boxes No.82
Equipment Boxes 2.000 5.250 3.000 1.250 9.500
No.12 19.000.000 ✓
Waterproof 2.960 1.520 840 440 2.800
Packing Boxes 8.288.000 ✓
No.61 2.400 5.300 3.000 1.200 9.500
Fishing Tackle 22.800.000 ✓
Boxes 840 18.800 7.000 2.800 28.600 24.024.000 ✓
Filling Cabinets
9.0 x 12.0 800 20.100 8.000 3.400 31.500 25.200.000 ✓
Filling Cabinets
9.0 x 15.0 640 4.000 4.500 1.800 10.300 6.592.000 ✓
Tape Containers
165.344.000
✓✓

Dari hasil perbandingan antar faktur-faktur penjualan dg bukti pengiriman yg


dilakukan selama beberapa hari sebelum tutup buku dan setelah tutup buku.
Diketahui bahwa : perusahaan telah menjual 200 Tape Containers kpd PT Gatra
Perkasa dg harga Rp 3.600.000, penjualan tsb telah dicatat, tetapi barangnya
masih dititipkan di gudang perusahaan. Brg tersebut termasuk dalam perhitungan
fisik persediaan pada akhir tahun dan tetap tinngal di gudang sampai tgl 3
Pebruari 2019.
Beberapa jenis brg telah diproduksi dan dimasukkan ke dalam persediaan, tetapi
belum seruhnya diperlakukan sbg persediaan.

Keterangan”
✓ : perkalian sudah benar
✓✓ : penjumlahan sudah benar

Usulan penyesuaian:

Anda mungkin juga menyukai