Perancangan Pabrik Kimia-PPK

Sem./SKS: 6 / 2

Monday, February 17, 2020 PPK 1


Satu dari beberapa
tahapan proyek Pabrik
Kimia adalah
Perancangan Pabrik
Kimia.

Monday, February 17, 2020 PPK 2


(Learning Objective CPD)
1. Dapat menjelaskan tahapan proyek industri kimia.
2. Dapat melakukan pengembangan deskripsi proses
pabrik kimia
3. Dapat menyusun diagram alir proses kualitatif,
kuantitatif dan Process Flow Diagram (PFD)

5. Dapat memilih lokasi Pabrik.

Monday, February 17, 2020 PPK 3


1. Tahapan Proyek Industri Kimia,
2. Tahapan Perancangan Pabrik kimia
3. Pemilihan Proses
4. Pengembangan Proses
5. Neraca Bahan dan Neraca Panas.
6. Diagram Alir Proses Kualitatif dan Kuantitatif
7. Process Flow Diagram,
8. Tata Letak Pabrik dan Alat Proses
9. Lokasi Pabrik

Monday, February 17, 2020 PPK 4


1. Biegler, L.T., Grossmann, I.E., Westerberg, A.W., "Systematic Methods
of Chemical Process Design," Prentice Hall, New Jersey (1997).
2. Douglas, J.M.,"Conceptual Design for Chemical Processes," McGraw-
Hill, New York (1988).
3. Ertas,A., Jones, J.C., “The Engineering Design Process,” Second ed.,
Wiley, N.Y. (1996).
4. Peters, M.S., Timmerhaus, K.D., West, R.E.,“Plant Design and
Economics for Chemical Engineers,” Fifth ed., McGraw-Hill, New York
(2003).
5. Perry, R.H., Green,D.W., "Perry's Chemical Engineers' Handbook," 8th
ed., McGraw-Hill, New York (2007).
6. Resnick,W.,"Process Analysis and Design for Chemical Engineers,"
McGraw-Hill, New York (1981).

Monday, February 17, 2020 PPK 5


7. Smith R., “Chemical Process Design and Integration”, John Wiley &
Sons Ltd, England (2005).
8. Rudd,D.F.,Powers,G.J.,Siirola,J.J.,"Process Synthesis," Prentice Hall,
New Jersey (1973).
9. Seider.W.D.,Seader,J.D.,Lewin,D,R.,"Process Design Principles," Wiley,
New York (1999).
10.Sinnott,R.K., "An Introduction to Chemical Engineering Design,"
Pergamon Press, Oxford (1983).
11.Turton,R.,Bailie,R.C.,Whiting,W.B.,Shaeiwitz,J.A.,"Analysis,Synthesis,
and Design of Chemical Processes", Second ed., Prentice Hall, New
Jersey (2003).
12.Ulrich,G.D.,"A Guide to Chemical Engineering Process Design and
Economics,"John Wiley, New York (1984).

Monday, February 17, 2020 PPK 6


1. Berperilaku islami.
2. Dosen dan mahasiswa hadir tepat waktu (toleransi
terlambat 15 menit).
3. Tidak menganggu perkuliahan.
4. Tugas diunggah ke Schoology

Monday, February 17, 2020 PPK 7


Tugas PPK
1. Penentuan Dosen Pembimbing secara acak.
2. Satu judul dikerjakan oleh 3 mhs (mengerjakan,
memeriksa dan menyetujui).
3. Bab I (Pendahuluan) dan sebagian Bab II (Deskripsi
Proses-diagram alir kualitatif).
4. Jumlah bimbingan ≥ 5 kali (dicatat pada Kartu
Bimbingan).
5. Hasil Bimbingan (nomor 3) dan Scan Kartu bimbingan
diunggah di Schoology mg ke-14.
6. Kartu bimbingan digunakan untuk melanjutkan
bimbingan jika TPP masuk di KRS

Monday, February 17, 2020 PPK 8


1. Presensi : 10%
2. Tugas-tugas : 20%
3. UTS : 30%
4. UAS : 40% +
Total : 100%

a. Presensi <75% (<11) tidak boleh ikut UAS, tidak boleh Ujian
Remidi.
b. Tidak ikut UAS  tidak ada nilai akhir.
c. Curang (UTS dan UAS)  tidak ada nilai akhir

Monday, February 17, 2020 PPK 9

Anda mungkin juga menyukai