Anda di halaman 1dari 4

BAB I

PERSYARATAN UMUM DAN LINGKUP PEKERJAAN

PT. Phakpak Bumi Energi i


DAFTAR ISI

DAFTAR ISI ............................................................................................. i


BAB I PERSYARATAN UMUM DAN LINGKUP PEKERJAAN .......................... 1
1 UMUM ............................................................................................ 1
2 PERSYARATAN UMUM ....................................................................... 1
3 STANDAR DAN PERATURAN .............................................................. 1
4 LINGKUP PEKERJAAN ....................................................................... 2
4.1 Penyelidikan Tanah dan Uji Laboratorium .................................. 2
4.2 Pengukuran dan Setting Out .................................................... 2
4.3 Pekerjaan Persiapan, Pekerjaan Tanah, dan Pembongkaran ......... 3
4.4 Pekerjaan Pondasi .................................................................. 3
4.5 Pasangan Batu Kali ................................................................. 4
4.6 Bangunan/Struktur dan Pekerjaan Arsitektur ............................. 4
4.7 Pekerjaan Sipil Penunjang ....................................................... 5
4.8 Bangunan dan Struktur ........................................................... 6
4.9 Pekerjaan HVAC ..................................................................... 7
4.10 Pekerjaan Penerangan............................................................. 7
4.11 Pekerjaan Telekomunikasi ....................................................... 7
4.12 Pekerjaan Pintu Air ................................................................. 7
4.13 Pekerjaan Saringan (Trashrack) ............................................... 8
5 PERSYARATAN DESAIN STRUKTUR .................................................... 8
5.1 Umum ................................................................................... 8
5.2 Kriteria Beban ........................................................................ 9
5.3 Kombinasi Beban (Loading Combination) ................................. 11
5.4 Desain dan Detail ................................................................. 12
6 PERSYARATAN DESAIN ARSITEK ..................................................... 13
6.1 Stairs, Ladders dan Handrail .................................................. 13
7 PERSYARATAN-PERSYARATAN SIPIL LAINNYA ................................... 14
7.1 Drainase Air Hujan ................................................................ 14
7.2 Jalan ................................................................................... 14
8 MATERIAL BANGUNAN/STRUKTUR ................................................... 14

i
9 MUTU DAN KUALITAS..................................................................... 15

ii
BAB I
PERSYARATAN UMUM DAN LINGKUP PEKERJAAN

1 UMUM

Bagian ini akan menjelaskan secara detail mengenai persyaratan-


persyaratan desain dan pengadaan bahan, pemasangan, pelaksanaan
dan ruang lingkup pekerjaan untuk Proyek Pembangunan PLTM Lae Ordi
(2 x 5000 kW) Pakpak Bharat - Sumatera Utara.

2 PERSYARATAN UMUM

(1) Tata letak pembangkit yang ada pada Dokumen Lelang sebagai
acuan untuk tata letak dari pembangunan PLTM Lae Ordi (2 x 5000
kW) Pakpak Bharat - Sumatera Utara.

(2) Pekerjaan sipil akan dilaksanakan oleh Penyedia Barang dan Jasa.

(3) Penyedia Barang dan Jasa akan mendesain dan menyediakan serta
memasang semua pekerjaan seperti yang diuraikan di spesifikasi
ini.

(4) Penyedia Barang dan Jasa harus melakukan sesuai dengan


perletakan bangunan dan struktur, seperti yang ditunjukkan pada
gambar tata letak proyek yang sudah disetujui Pengguna Barang
dan Jasa.

Bangunan-bangunan dan struktur utama adalah sebagai berikut :

- Kantong Lumpur (Sandtrap)


- Pekerjaan Metal
- Access & Inspection Roads
- Landscape

3 STANDAR DAN PERATURAN

(1) Penyedia Barang dan Jasa harus tunduk dan mengikuti semua yang
disebutkan pada standar dan peraturan yang ada pada spesifikasi
ini.

(2) Standar dan peraturan yang dikeluarkan oleh Organisasi atau


Badan, yang spesifik dan disetujui oleh Pengguna Barang dan Jasa
harus diikuti untuk suatu desain maupun pabrikasi dan pelaksanaan
testing selama pelaksanaan pekerjaan, juga adalah bagian dari
spesifikasi ini.