No Document MPI-04-TA-CPP-02-034
No. Revisi 0
PROJECT : MPI-03-02-2019
NUMBER
CONTRACT : 207/EP3800/2019-S0
NUMBER
0 IFR 17/05/19 MHF MR IZ
No. Revisi 0
DAFTAR ISI
2
Document No. MPI-04-TA-CPP-02-034
No. Revisi 0
1. Informasi Umum...............................................................................................4
2. Ruang Lingkup Kerja........................................................................................4
3. Referensi.......................................................................................................... 4
4. Tenaga Kerja....................................................................................................5
5. Persyaratan Personel.......................................................................................5
6. Alat Pelindung Diri............................................................................................5
7. Peralatan APD Khusus.....................................................................................5
8. Bahaya dan Risiko............................................................................................6
9. Peralatan Kerja.................................................................................................6
10. Bahan Habis Pakai...........................................................................................6
11. Prosedur........................................................................................................... 6
12. Catatan dan Laporan........................................................................................9
13. Lampiran…………….........................................................................................9
1. INFORMASI UMUM
Dokumen ini berlaku untuk instalasi, pengetesan dan pemeliharaan instrument dalam
proyek Turn Around (TA) di Central Processing Plant (CPP) Gundih 2019 yang dilakukan
oleh PT.Mipcon Prima Industri.
Prosedur ini ditujukan sebagai panduan pemeliharaan dan pengetesan/kalibrasi field
instrument setelah shutdown atau dalam keadaan plant running. Panduan ini diperlukan
untuk meyakinkan bahwa instrument tersebut mampu berfungsi dengan baik, sesuai
3
Document No. MPI-04-TA-CPP-02-034
No. Revisi 0
dengan data spesifikasi dari manufaktur dan mendukung proses yang berjalan di CPP
Gundih.
3. REFERENSI
3.1 Gambar P&ID untuk Shutdown Valve dan Blowdown Valve yang terkait.
3.2 Shutdown Valve dan Blowdown Valve Datasheet.
3.3 Kode dan Standar
ANSI American National Standard Institute
ISA 84 Standard for Safety Instrumented System
IEC International Electrotechnical Commission
61508 & 61511 Safety Instrumented System
IEEE Institute of Electrical and Electronic Engineers
1451 Instrumentation & Measurement
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
OSHA Occupational Safety & Health Association
PUlL2011 Persyaratan Umum Instalasi Listrik
4. TENAGA KERJA
Instrument engineer : 1 orang
Supervisor Instrument : 1 orang/ shift
Teknisi Instrument : 5 orang/ shift
Helper Instrument : 8 orang/ shift
Safetyman/ Rescuer : 1 orang/ shift
4
Document No. MPI-04-TA-CPP-02-034
No. Revisi 0
5. PERSYARATAN PERSONIL
a. Personil telah mengerti dan memahami dengan baik antara prosedur & JSA
b. Personil yang terlibat dalam pekerjaan ini dalam keadaan sehat. Khusus untuk
pekerja confined space wajib tidak memiliki riwayat penyakit jantung, tidak
memiliki gangguan pernafasan dan pendengaran.
c. Personil harus dilengkapi dengan alat pelindung diri standard untuk pekerjaan
yang dimaksud.
d. Untuk pekerja confined space harus menggunakan air line respirator ketika
bekerja di dalam vessel.
e. Personil harus disiplin, taat pada peraturan dan prosedur, tidak ceroboh, lalai,
tergesa-gesa dan tidak mengambil resiko dalam melaksanakan pekerjaan.
f. Selalu Induction dan Safety Meeting Sebelum Bekerja
8. BAHAYA RESIKO
Mengacu pada Dokumen No. MPI-02-TA-CPP-01-021 “JSA Pekerjaan SDV” dan MPI-02-
TA-CPP-01-022 “JSA Pekerjaan BDV”
9. PERALATAN KERJA
a. Adjustable Wrench
b. Kunci Pas-Ring
5
Document No. MPI-04-TA-CPP-02-034
No. Revisi 0
c. Screw Driver
d. Multimeter Tester
e. Contact cleaner
f. Scaffolding/Crane bila diperlukan.
11. PROSEDUR
Instrument
Mipcon
No. Revisi 0
7
Document No. MPI-04-TA-CPP-02-034
No. Revisi 0
CALIBRATED
Tag No : …………………........…
By : …………………........…
Date : …………….….........…..
8
Document No. MPI-04-TA-CPP-02-034
No. Revisi 0
13. LAMPIRAN