Anda di halaman 1dari 21

ANGGARAN ALIRAN TUNAI PROJEK CILI FERTIGASI

BAGI PROJEK DI KG. SIK DALAM BAGI TAHUN 2022

JENIS PROJEK : CILI FERTIGASI


JUMLAH : 8,000 POLIBEG
PESERTA : 3 ORANG

TAHUN 2022
PERKARA
MUSIM 1 MUSIM 2
A. ALIRAN WANG MASUK
Hasil Pengeluaran (Kg) 22,000 22,000
Hasil Jualan (Kg) @RM10 /kg 220,000.00 220,000.00
Jumlah Pendapatan Kasar 220,000.00 220,000.00

B. ALIRAN WANG KELUAR


KOS PERBELANJAAN PEMBANGUNAN
Kos Pembangunan 85,000.00 0.00
Kos Operasi 24,000.00 24,000.00
Kos Pengeluaran 50,000.00 50,000.00

JUMLAH KOS PENGELUARAN 159,000.00 74,000.00


PENDAPATAN BERSIH 61,000.00 146,000.00
GASI
2022

JUMLAH

44,000
440,000.00
440,000.00

85,000.00
48,000.00
100,000.00

233,000.00
207,000.00
ANGGARAN ALIRAN TUNAI MUSIM 1

JENIS PROJEK : CILI FERTIGASI


JUMLAH : 11,000 POLIBEG
PESERTA : 3 ORANG

BULAN
PERKARA
1 2
A. ALIRAN WANG MASUK
Hasil Pengeluaran (Kg) 0 0
Hasil Jualan (Kg) @RM10 /kg 0.00 0.00
Jumlah Pendapatan Kasar 0.00 0.00

B. ALIRAN WANG KELUAR


KOS PERBELANJAAN PEMBANGUNAN
Kos Pembangunan 85,000.00 0.00
Kos Operasi 4,000.00 4,000.00
Kos Pengeluaran 50,000.00 0.00

JUMLAH KOS PERBELANJAAN 139,000.00 4,000.00


PENDAPATAN/ LEBIHAN - 139,000.00 - 135,000.00
SIM 1

BULAN
3 4 5 6

0 0 0 22,000
0.00 0.00 0.00 220,000.00
0.00 0.00 0.00 220,000.00

0.00 0.00 0.00 0.00


4,000.00 4,000.00 4,000.00 4,000.00
0.00 0.00 0.00 0.00

4,000.00 4,000.00 4,000.00 4,000.00


- 131,000.00 - 127,000.00 - 123,000.00 97,000.00
ANGGARAN ALIRAN TUNAI MUSIM 2

JENIS PROJEK : CILI FERTIGASI


JUMLAH : 11,000 POLIBEG
PESERTA : 3 ORANG

BULAN
PERKARA
7 8
A. ALIRAN WANG MASUK
Hasil Pengeluaran (Kg) 0 0
Hasil Jualan (Kg) @RM10 /kg 0.00 0.00
Jumlah Pendapatan Kasar 0.00 0.00

B. ALIRAN WANG KELUAR


KOS PERBELANJAAN PEMBANGUNAN
Kos Pembangunan 0.00 0.00
Kos Pengeluaran 4,000.00 4,000.00
Kos Operasi dan Penyelenggaraan 50,000.00 0.00

JUMLAH KOS PERBELANJAAN 54,000.00 4,000.00


KOS PENDAPATAN MUSIM 1 97,000.00 97,000.00
PENDAPATAN/ LEBIHAN 43,000.00 93,000.00
SIM 2

BULAN
9 10 11 12

0 0 0 22,000
0.00 0.00 0.00 220,000.00
0.00 0.00 0.00 220,000.00

0.00 0.00 0.00 0.00


4,000.00 4,000.00 4,000.00 4,000.00
0.00 0.00 0.00 0.00

4,000.00 4,000.00 4,000.00 4,000.00


97,000.00 97,000.00 97,000.00 97,000.00
93,000.00 93,000.00 93,000.00 313,000.00
ANGGARAN ALIRAN TUNAI MUSIM 1

JENIS PROJEK : CILI FERTIGASI


JUMLAH : 6,000 POLIBEG
PESERTA : 3 ORANG

BULAN
PERKARA
9 10
A. ALIRAN WANG MASUK
Hasil Pengeluaran (Kg) 0 0
Hasil Jualan (Kg) @RM10 /kg 0.00 0.00
Jumlah Pendapatan Kasar 0.00 0.00

B. ALIRAN WANG KELUAR


KOS PERBELANJAAN PEMBANGUNAN
Kos Pembangunan 0.00 0.00
Kos Pengeluaran 8000.00 8000.00
Kos Operasi dan Penyelenggaraan 50000.00 0.00

JUMLAH KOS PERBELANJAAN 58,000.00 8,000.00


KOS PENDAPATAN MUSIM 2 - 35,000.00 - 10,000.00
PENDAPATAN/ LEBIHAN - 58,000.00 - 8,000.00
SIM 1

BULAN
11 12

0 22,000
0.00 220,000.00
0.00 220,000.00

0.00 0.00
8000.00 8000.00
0.00 0.00

8,000.00 8,000.00
- 10,000.00 290,000.00
- 8,000.00 212,000.00
BIL PERKARA KOS (RM) KOS SEBENAR
DI LADANG
1 KOS PEMBANGUNAN
i)Kerja- kerja Awalan Dan
5,000.00
Pembersihan Kawasan
ii) Pembinaan Sistem Fertigasi 80,000.00
85,000.00
JUMLAH KOS PEMBANGUNAN

2 KOS OPERASI (SEMUSIM)


i) Gaji Pengurusan / Kakitangan 24,000.00
ii) Utiliti dan Pengendalian 24,000.00
JUMLAH KOS OPERASI 48,000.00

3 KOS PENGELUARAN (SEMUSIM)


i) Benih Cili (11000 pokok) 1,000.00
ii) Polybeg 4,000.00
iii) Tray Semaian ' Plug' 1,000.00
iv) Peat Moss 1,000.00
v) Cocopeat (Serabut kelapa) 6,000.00
vi) Sekam Bakar 8,000.00
vii) Baja Fertigasi Set A dan Set B 24,000.00
viii) Racun Kimia 3,000.00
ix) Lain-lain keperluan 2,000.00
JUMLAH KOS PENGELUARAN 50,000.00
JUMLAH KESELURUHAN KOS
183,000.00
PERMULAAN

*jalan ladang, parit , pagar, sumber air, elektrik,


bangunan operasi, rumah pam sistem fertigasi, stor, pusat kumpul hasil
KOS
BIL. PERKARA KOS (RM) SEBENAR
(RM)

1 Jalan Ladang 5,000

2 Perparitan 5,000

3 Pagar Kawasan 5,000

4 Sumber Air 3,000

5 Sumber Elektrik 2,000

6 Bangunan Pejabat Operasi 15,000

7 Rumah Pam sistem Fertigasi 10,000

8 Stor Peralatan dan bahan input 7,500

9 Pusat pengumpulan Hasil 7,500

JUMLAH KOS 60,000


UNJURAN ALIRAN TUNAI BAGI TEMPOH 5 TAHUN

JENIS PROJEK : CILI FERTIGASI


JUMLAH : 11,000 POLIBEG
PESERTA : 3 ORANG

PERKARA 2022 2023


A. ALIRAN WANG MASUK
Hasil Pengeluaran (Kg) 44,000 44,000
Hasil Jualan (Kg) @RM10 /kg 440,000.00 440,000.00
Jumlah Pendapatan Kasar 440,000.00 440,000.00

B. ALIRAN WANG KELUAR


KOS PERBELANJAAN PEMBANGUNAN
Kos Pembangunan 85,000.00 5,000.00
Kos Operasi 48,000.00 48,000.00
Kos Pengeluaran 50,000.00 50,000.00

JUMLAH KOS PENGELUARAN 183,000.00 103,000.00


PENDAPATAN BERSIH 257,000.00 337,000.00
JUMLAH PENDAPATAN BERSIH 257,000.00 337,000.00
TERKUMPUL
POH 5 TAHUN

2024 2025 2026

44,000 44,000 44,000


440,000.00 440,000.00 440,000.00
440,000.00 440,000.00 440,000.00

85,000.00 5,000.00 85,000.00


48,000.00 48,000.00 48,000.00
50,000.00 50,000.00 50,000.00

183,000.00 103,000.00 183,000.00


257,000.00 337,000.00 257,000.00

257,000.00 337,000.00 257,000.00


ANGGARAN KEPERLUAN YANG DIPERLUKAN

BIL PERKARA KUANTITI HARGA (RM) KOS (RM)

RACUN SERANGGA

1 Syngenta Pegasus 47.17 SC (250 ml) 5 75.00 375.00

2 Syngenta Match 050EC (250ml) 5 45.00 225.00

3 Clipper 20SL (1 liter) 5 78.00 390.00

4 Hextar Bison SC (1liter) 5 102.00 510.00

5  Dow Endure (500ml) 5 202.00 1,010.00

6 Roni 200 (500ml) 5 140.00 700.00

7 Syngenta Alika ZC (1liter) 5 119.00 595.00

8 Advansia Akosu 9.5 SC (500ml) 5 62.00 310.00

9 Colam ZC (1 liter) 5 92.00 460.00

10 Amatic 20 EC (1liter) 5 70.00 350.00

11 Farmcochem Dyna-Mec 19 (1liter) 5 49.00 245.00

12 Hextar Malathion 84 (1liter) 5 49.00 245.00

13 Amiko 10.8 EC (1liter) 5 85.00 425.00

JUMLAH 5,840.00
RACUN KULAT

14 Antracol 70WP (1kg) 5 40.00 200.00

15 Cuprorat FL ACM(4 liter) 5 200.00 1,000.00

16 Anconil 500 Ancom (4liter) 5 148.00 740.00

17 Nativo Trifloxystrobin 25% (250gm) 5 125.00 625.00

18 Amita 23sc (500ml) 10 100.00 1,000.00

19 Syngenta Score (500ml) 10 140.00 1,400.00


JUMLAH 4,965.00
BAJA

20 10 113.00 1,130.00
AG Calcium Nitrate (25kg)
21 AG FE EDTA/IRON (FERUM 13.2%) (1kg) 7 55.00 385.00

22 AG Pottasium Nitrate (25kg) 10 270.00 2,700.00

23 AG MKP 0-52-34 (25kg) 5 345.00 1,725.00

24 AG Magnesium Sulfate (25kg) 6 45.00 270.00

25 AG Boron/Hibor (500g) 7 30.00 210.00

26 Sulfate of Potash/SOP (25kg) 2 170.00 340.00

27 Ezigrow (4liter) 5 140.00 700.00

28 Miracle Super / Gam (500ml) 5 67.00 335.00

29 Folia (Wuxal Calsium) 4 350.00 1,400.00

30 Baja A + B 50 200.00 10,000.00

JUMLAH 19,195.00

SISTEM PENGAIRAN DAN SALIRAN

31 Poly Pipe/Tubing 16mm 30 120.00 3,600.00

32 Poly Pipe 32mm 6 300.00 1,800.00

33 Mikro Tiub 10 200.00 2,000.00

34 Arrow Dripper lock 145 mm 6000 0.30 1,800.00

35 Besi penyokong GI Pipe 4/8 (A) 2m x 6m 200 50.00 10,000.00

36 Water Pump Motor 2hp 2 800.00 1,600.00

JUMLAH 20,800.00

PENYEDIAAN TANAH DAN BENIH

37 Silver Shine Film (1.2m x 180m x 0.04mm) 40 80.00 3,200.00

38 Polybag (kg) 200 10.00 2,000.00

39 Media(guni) 16 50.00 800.00

40 Tray (unit) 60 5.00 300.00

41 Sekam padi (Lori) 4 400.00 1,600.00

42 Benih (Pack) 6 100.00 600.00

JUMLAH 8,500.00

43 PAPAN TANDA (4' X4') 1 700.00 700.00

JUMLAH 700.00

KESELURUHAN 60,000.00
ANGGARAN KEPERLUAN YANG DIPERLUKAN

BIL PERKARA UNIT KUANTITI HARGA (RM)


1 Silver Shine Film 1.2 m x 180 m x 0.04mm gulung 10 100.00
2 Polybag kg 100 10.00
3 Sekam Padi lori 2 450.00
4 Benih pack 3 100.00
5 Poly 32mm unit 3 300.00
6 Poly 16mm unit 5 150.00
7 Mikro Tiub gulung 5 200.00
8 Arrow Dripper lock 145 mm unit 3000 0.30
9 Media guni 8 50.00
10 Tray unit 30 5.00
11 Racun serangga (Amita 28sc) botol 5 100.00
12 Racun serangga score botol 5 100.00
13 Folia (wuxal calsium) botol 2 350.00
14 Besi penyokong GI Pipe 4/8 (A) 2m x 6m batang 100 50.00
15 Baja A + B set 25 200.00
16 Water Pump Motor 2hp unit 1 800.00
JUMLAH
KOS (RM)
1,000.00
1,000.00
900.00
300.00
900.00
750.00
1,000.00
900.00
400.00
150.00
500.00
500.00
700.00
5,000.00
5,000.00
800.00
19,800.00
20000
ANGGARAN KEPERLUAN YANG DIPERLUKAN

NAMA PESERTA : ROHANI BINTI MD ISA


JUMLAH POKOK :

BIL PERKARA UNIT KUANTITI HARGA (RM)


1 Silver Shine Film 1.2 m x 180 m x 0.04mm gulung 10 100.00
2 Polybag kg 150 10.00
3 Sekam Padi lori 2 600.00
4 Benih pack 2 100.00
5 Poly 32mm unit 2 300.00
6 Poly 16mm unit 5 150.00
7 Mikro Tiub gulung 10 200.00
8 Arrow Dripper lock 145 mm unit 3000 0.30
9 Media guni 10 50.00
10 Tray unit 30 5.00
11 Racun Rumpai Amita 23sc botol 5 100.00
12 Racun serangga (Amita 28sc) botol 5 100.00
13 Racun serangga Alanda 2.8 EC botol 5 80.00
14 Racun serangga score botol 5 100.00
15 Folia (wuxal calsium) botol 5 350.00
16 Tali panjang gulung 10 300.00
17 Besi penyokong GI Pipe 4/8 (A) 2m x 6m batang 150 50.00
18 Baja A + B set 25 200.00
19 Water Pump Motor 2hp unit 1 800.00
20 Jaring Hitam 2m x 30m unit 5 100.00
JUMLAH
KOS (RM)
1,000.00
1,500.00
1,200.00
200.00
600.00
750.00
2,000.00
900.00
500.00
150.00
500.00
500.00
400.00
500.00
1,750.00
3,000.00
7,500.00
5,000.00
800.00
500.00
29,250.00
19,400.00
SENARAI KERJA-KERJA ATAU DOKUMEN YANG DIPERLUKAN (CHECK LIST)

BIL. PERKARA CATATAN

1 Kertas Kerja
2 Slaid

3 Salinan Kad Pengenalan peserta (3 orang)


4 Salinan Espek (3 peserta)
5 Salinan T/s
6 SSM (Jika ada)
7 Salinan Geran tapak projek
8 Salinan Perjanjian sewa tapak
9 Salinan tanam semula (RISDA 7)
10 Salinan Ic Pekebun Kecil TS
BULAN
AKTIVIT LADANG
1 2 3 4 5 6 7 8 9 10 11 12
1) Pembersihan Kawasan
2)Penyediaan Tapak
3) penyediaan Semaian
4) Penanaman
5) Pembajaan
6) Kawalan Perosak
7) Kawalan Penyakit
8)Penyelenggaraan Tanaman
9) Penuaian
10) Aktiviti Lepas Tuai
11) Jualan dan Pemasaran
ANGGARAN PERUNTUKAN YANG DI MOHON

HARGA
JUMLAH
BIL. PERKARA KUANTITI SEUNIT
(RM)
(RM)
1 Disk Plough 1 7,500.00 7,500.00

2 Plough Batas 1 6,500.00 6,500.00

3 Rotor 80" 1 7,200.00 7,200.00

4 Baja 3: 15:15 50 175.00 8,750.00

5 Baja 12: 17: 17 50 190.00 9,500.00

6 Racun Rumpai pukal 10,000.00 10,000.00

7 Benih Tanaman 3000 1.50 4,500.00


Sistem Pengairan dan
8 Perpaipan pukal 6,050.00 6,050.00
Jumlah 60,000.00

Anda mungkin juga menyukai