Anda di halaman 1dari 9

HALAMAN PENGESAHAN

EVALUASI PEMBEBANAN GARDU DISTRIBUSI KA 38 DESA


WAIDOKO PADA PT. PLN (PERSERO) UP3 FLORES BAGIAN TIMUR

Disusun Oleh :
HABIBI RAHMAN RATULOLI
NIM : 1823735093

Diajukan Untuk Memenuhi Salah Satu Syarat Kelulusan


Program Studi DIII Teknik Listrik
Jurusan Teknik Elektro

Mengetahui/Menyetujui

Dosen Penguji
1. Ketua Tim Penguji : Ir. Yustinus S. B Ada, M.Kes (……………………..)
NIP. 19641125 199512 1 001
2. Penguji I : David Suban Koten, ST., MT (……………………..)
NIP. 19790726 200501 1 002
3. Penguji II : Mychael G. Pae, ST., M.Eng (……………………..)
NIP. 19931120 201903 1 009

Dosen Pembimbing
1. Markus D. Letik, ST., MT (……………………..)
NIP. 19650620 199103 1 001
2. Monalisa A. Malelak, S.T, M.T (……………………..)
NIP. 19860832 201404 2 001

Ketua Program Studi Ketua Jurusan

Ade Manu Gah, ST.,M.Eng Sumartini Dana, ST.,MT


NIP. 19860714 201903 1 010 NIP.19780323 200604 2 002

i
KATA PENGANTAR

Puji dan syukur penulis panjatkan atas kehadirat Tuhan Yang Maha Esa,
karena atas berkat dan rahmatnya penulis dapat menyelesaikan Tugas Akhir
dengan judul Evaluasi Pembebanan Gardu Distribusi KA 38 Desa Waidoko
Pada PT. PLN (Persero) UP3 Flores Bagian Timur.
Tugas Akhir ini tidak akan selesai jika tanpa campur tangan dari semua
pihak yang telah membantu penulis dalam menyusun Tugas Akhir ini. Pada
kesempatan ini penulis ingin mengucapkan rasa hormat dan terima kasih yang
sebesar-besarnya kepada :
1. Bapak Frans Mangngi, S.T, M.Eng, selaku Direktur Politeknik Negeri
Kupang.
2. Ibu Sumartini Dana, ST.,MT, selaku Ketua Jurusan Teknik Elektro Politeknik
Negeri Kupang.
3. Bapak Ade Manu Gah, ST.,M.Eng, selaku Ketua Program Studi Teknik
Listrik Politeknik Negeri Kupang.
4. Bapak Markus D. Letik, ST., MT, selaku Dosen Pembimbing 1 yang telah
membimbing penulis dalam mengerjakan Tugas Akhir ini.
5. Ibu Monalisa A. Malelak, S.T, M.T, selaku Dosen Pembimbing 2 yang telah
membimbing penulis dalam mengerjakan Tugas Akhir ini.
6. Bapak Ir. Yustinus S. B Ada, M.Kes, selaku Ketua Tim Narasumber.
7. Bapak David Suban Koten, ST., MT, selaku Narasumber I.
8. Bapak Mychael G. Pae, ST., M.Eng selaku Narasumber II.
9. Kedua orang tua dan saudara-saudara yang tercinta yang telah memberi
dukungan moril maupun material serta memotivasi penulis dalam
menyelesaikan Tugas Akhir ini.

Kupang, Oktober 2022


Penulis

ii
ABSTRAK

Pada dasarnya PT. PLN (Persero) UP3 Flores Bagian Timur mengalami
kendala dalam menyalurkan energi listrik kepada pelanggan. Kendala tersebut
dikarenakan adanya gangguan tegangan drop Jaringan Tegangan Rendah pada
pelanggan Gardu Distribusi KA 38 Desa Waidoko. Gardu Distribusi KA 38 Desa
Waidoko menyalurkan energi listrik dengan Daya 100 KVA, Tegangan Primer L-
L (Kv) 20 kV, Tegangan Sekunder L-L 400 V. Pelanggan Jaringan Tegangan
Rendah di Desa Waidoko sering mengalami tegangan drop yang mengakibatkan
peralatan elektronik dirumah pelanggan akan mengalami kerusakan akibat dari
masalah ini. Bila dibiarkan terus menerus maka akan berdampak buruk bagi
kualitas pelayanan dalam menyalurkan energi listrik oleh PT. PLN (Persero) UP3
Flores Bagian Timur. Dengan terjadinya masalah ini maka pihak PT. PLN
(Persero) UP3 Flores Bagian Timur perlu melakukan Evaluasi Pembebanan Gardu
Distribusi KA 38 Desa Waidoko, untuk melakukan perbaikan agar tidak terjadi
masalah seperti ini dikemudian hari. Masalah yang akan dibahas dalam penelitian
ini adalah mengetahui persentasi ketidakseimbangan beban pada Gardu Distribusi
KA 38 Desa Waidoko serta besar drop tegangan pada Jaringan Tegangan Rendah
Dari hasil penelitian ini pembebanan trafo Gardu Distribusi KA 38 Desa Waidoko
sebelum dilakukan pemerataan adalah Phasa R 14,0%, Phasa S 10,9%, dan Phasa
T 11%. Berdasarkan standar PLN presentase pembebanan tidak boleh lebih dari
10%. Hasil pemerataan didapatkan untuk Phasa R menjadi 0,13%, Phasa S
menjadi 0,02% dan Phasa T menjadi 0,09%.

Kata Kunci : Gardu Distribusi, Jaringan Tegangan Rendah.

iii
ABSTRACT

Basically PT. PLN (Persero) UP3 Flores Timur is experiencing problems


in distributing electrical energy to customers. The obstacle is due to the
interference of the Low Voltage Network voltage drop at the KA 38 distribution
substation in Waidoko Village. KA Distribution Substation 38 Waidoko Village
distributes electrical energy with a power of 100 KVA, Primary Voltage L-L (Kv)
20 kV, Secondary Voltage L-L 400 V. Low Voltage Network Customers in
Waidoko Village often experience voltage drops which result in electronic
equipment at the customer's house being damaged due to of this problem. If
allowed to continue it will have a bad impact on the quality of service in
distributing electrical energy by PT. PLN (Persero) UP3 Flores East. With the
occurrence of this problem, the PT. PLN (Persero) UP3 East Flores needs to
evaluate the Loading of the 38 Waidoko Village Distribution Substation, to make
improvements so that problems like this don't happen in the future. The problem
that will be discussed in this study is to determine the percentage of load
imbalance at the Distribution Substation 38 Waidoko Village and the magnitude
of the voltage drop on the Low Voltage Network. Phase S 10.9%, and Phase T
11%. Based on PLN standards, the percentage of loading should not be more than
10%. Equitable results were obtained for Phase R to 0.13%, Phase S to 0.02% and
Phase T to 0.09%.

Keywords: Distribution Substation, Low Voltage Network.

iv
DAFTAR ISI

HALAMAN PENGESAHAN i
KATA PENGANTAR ii
ABSTRAK iii
ABSTRACT iv
DAFTAR ISI v
DAFTAR GAMBARvii
DAFTAR TABEL viii
BAB I PENDAHULUAN 1
1.1 Latar Belakang 1
1.2 Rumusan Masalah 2
1.3 Tujuan Penulisan 2
1.4 Manfaat Penulisan 2
BAB II TINJAUAN PUSTAKA 3
2.1 Peneliti Terdahulu 3
2.2 Sistem Distribusi 4
2.3 Distribusi Primer 5
2.4 Distribusi Sekunder 7
2.5 Gardu Distribusi9
2.6 Jaringan Tegangan Rendah (JTR) 11
2.7 Drop Tegangan Atau Jatuh Tegangan 12
2.8 Ketidakseimbangan Beban 14
BAB III METODE PENELITIAN 18
3.1 Lokasi Dan Waktu Penelitian 18
3.2 Alat Dan Bahan 18
3.3 Sumber Data 18
3.4 Teknik Pengumpulan Data 19
3.5 Tahapan Penelitian 19
3.6 Teknik Analisis Data 19
3.7 Diagram Alur Penelitian 20

v
BAB IV HASIL DAN PEMBAHASAN 21
4.1 Gambaran Umum Lokasi Penelitian 21
4.2 Data Teknis Gardu Distribusi KA 38 Desa Waidoko 22
4.3 Data Pengukuran Besar Arus dan Tegangan Gardu Distribusi KA 38
Desa Waidoko 22
4.4 Perhitungan Pembebanan Trafo Gardu Distribusi KA 38 Desa Waidoko
24
4.5 Perhitungan Ketidakseimbangan Beban Trafo Pada Jaringan
Tegangan Rendah Gardu Distribusi KA 38 Desa Waidoko 30
4.6 Perhitungan Besar Drop Tegangan Pada Jaringan Tegangan Rendah
(JTR) Gardu Distribusi KA 38 Desa Waidoko 35
BAB V PENUTUP 40
5.1 Kesimpulan 40
5.2 Saran 41
DAFTAR PUSTAKA 42
LAMPIRAN 43

vi
DAFTAR GAMBAR

Gambar 2.1 Proses Penyaluran Tenaga Listrik Pada Konsumen


....................................................................................................................................
4
Gambar 2.2 Skema Saluran Sistem Radial 5
Gambar 2.3 Skema Rangkaian Loop Terbuka...................................................................6
Gambar 2.4 Skema Rangkaian Loop Tertutup 7
Gambar 2.5 Sambungan Pemakai Besar Dengan Gardu Distribusi Sendiri 8
Gambar 2.6 Penggunaan Satu Gardu Distribusi Untuk Sejumlah Pemakai 8
Gambar 2.7 Gardu Beton 9
Gambar 2.8 Gardu Kios 10
Gambar 2.9 Gardu Portal 10
Gambar 2.10 Gardu Cantol 11
Gambar 2.11 Rangkaian Pengganti Distribusi Listrik 13
Gambar 2.12 Rangkaian Vektor ∆V 13
Gambar 2.13 Vektor Diagram Arus 15
Gambar 3.1 Diagram Alur Penelitian 20

vii
DAFTAR TABEL

Tabel 4.1 Data Gardu Distribusi KA 38 Desa Waidoko 22


Tabel 4.2 Data Pengukuran Besar Arus Beban di Gardu Distribusi KA 38
Desa Waidoko 22
Tabel 4.3 Data Pengukuran Arus Beban sebelum Pemerataan Beban Gardu
Distribusi KA 38 Desa Waidoko 24
Tabel 4.4 Persentasi Pembebanan Gardu Distribusi KA 38 Desa Waidoko
Selama 3 Hari. 27
Tabel 4.5 Data Pengukuran Besar Arus Beban Sesudah Pemerataan Beban
Gardu Distribusi KA 38 Desa Waidoko. 29
Tabel 4.6 Kondisi Pembebanan Trafo Sebelum dan Sesudah Pemerataan 30
Tabel 4.7 Persentase Ketidakseimbangan Beban Sebelum dan
Sesudah Pemerataan Beban 34
Tabel 4.8 Data Pengukuran Antar Phasa Gardu Distribusi KA 38
Desa Waidoko Senin 13 Desember 2021 35
Tabel 4.9 Data Pengukuran Tegangan Pangkal Phasa-Netral 35
Tabel 4.10 Data Pengukuran Tegangan Phasa- Phasa 37
Tabel 4.11 Data Pengukuran Tegangan Pangkal Phasa-Netral dan
Tegangan Jurusan Phasa-Netral 38
Tabel 4.12 Persentase Drop Tegangan Sebelum Dan Sesudah Pemerataan
Beban 39

viii