Anda di halaman 1dari 4

DAFTAR ISI

Halaman
RINGKASAN EKSEKUTIF............................................................................i
KATA PENGANTAR.......................................................................................ii
DAFTAR ISI......................................................................................................iii
DAFTAR TABEL..............................................................................................iv
DAFTAR GAMBAR.........................................................................................v
DAFTAR LAMPIRAN.......................................................................................
BAB I PENDAHULUAN...................................................................................
1.1. Latar Belakang...........................................................................1
1.2. Tujuan Praktikum.......................................................................1
1.3. Ruang Lingkup dan Metoda Studi................................................
1.4. Pelaksana Studi............................................................................
1.5. Jadwal Waktu Studi.....................................................................
BAB II KEADAAN UMUM..............................................................................
2.1. Lokasi dan Luas Wilayah IUP yang Dimohon...........................3
2.2. Kesampaian Daerah dan Sarana Perhubungan Setempat............12
2.3. Keadaan Lingkungan Daerah.........................................................
BAB III GEOLOGI DAN KEADAAN ENDAPAN.........................................
3.1.Geologi Regional..........................................................................
3.1.1 Topografi dan Geomorfologi
3.1.2 Litologi
3.1.3 Struktut Geologi
3.2. Geologi Lokal
3.2.1 Topografi dan Geomorfologi
3.2.2 Litologi
3.2.3 Struktur geologi
3.2.4 Bentuk dan Penyebaran Endapan
3.2.5 Sifat dan Kualitas Endapan
BAB IV ESTIMASI SUMBER DAYA DAN CADANGAN
4.1. Estimasi Sumber Daya...............................................................21
v
4.1.1 Metoda............................................................................
4.1.2 Parameter Estimasi..........................................................
4.1.3 Permodelan.....................................................................
4.1.4 Jumlah dan Klasifikasi Sumber Daya..............................
4.1.5 Pernyataan Competent Person.........................................
4.2. Estimasi Cadangan.....................................................................22
4.2.1 Metoda
4.2.2 Parameter Estimasi
4.2.3 Jumlah dan Klasifikasi Cadangan
4.2.4 Pernyataan Competent Person
BAB V GEOTEKNIK, HIDROLOGI DAN HIDROGEOLOGI
5.1. Geoteknik.......................................................................................
5.1.1 Akuisisi Data
5.1.1.1 Jenis
5.1.1.2 Jumlah
5.1.1.3 Sebaran Data
5.1.2 Analisis Geoteknik
5.1.2.1 Kemampugalian dan Kemampugaruan
5.1.2.2 Kestabilan Lubang Bukaan Bawah Tanah
5.1.2.3 Kestabilan Lereng
5.1.3 Rekomendasi Geoteknik
5.1.3.1 Rekomendasi Penggalian dan Penggaruan
5.1.3.2 Rekomendasi Penyanggaan, Dimensi Front Produksi
5.1.3.3 Rekomendasi Geometri dan Dimensi Lereng
5.1.3.4 Rekomendasi Faktor Keamanan Statis dan Dinamis,
Probabilistas Longsor dan Tingkat Keparahan Longsor
5.1.3.5 Rekomendasi Pemantauan Geoteknik

5.2. Hidrologi - Hidrogeologi ...........................................................23


5.2.1 Akuisis Data
5.2.1.1 Jenis
5.2.1.2 Jumlah
5.2.1.3 Sebaran Data
v
5.2.2 Analisis Hidrologi – Hidrogeologi
5.2.2.1 Hidrologi
5.2.2.2 Hidrogeologi
5.2.3 Rekomendasi Hidrologi – Hidrogeologi
5.2.3.1 Rencana Penyaliran Tambang (dimensi sump, dimensi
ditch, horizontal/vertical drain, dimensi setting pond)
5.2.3.2 Kebutuhan Pompa

BAB VI RENCANA PENAMBANGAN..........................................................24


6.1 Sistem/Metoda dan Tata Cara Penambangan

v
v

Anda mungkin juga menyukai