WORK METHOD STATEMENT – ERECTION WAY

JOTUN WATER BASED


PRODUCTION FACILITY PROJECT

003-WMS-JI-MI-MAU-ACS-WB-XI-22

Approved
Rev. Description Date Prepare by Checked by
by

0 Issued for November


Approval 30th, 2022
Eko B. Hartanto
METODE KERJA
(METHOD OF WORK)
No Dokumen 003-WMS-JI-MI-MAU-
ERECTION WAY ACS-WB-XI-22
(No. Document)

1. Referensi
1. Gambar Kerja (Shop Drawings)

2. Alat
1. Auto Level
2. Sipatan (Marking Ink)
3. Vibro roller
4. Wheel Loader
5. Excavator PC 200/ PC 50

Jalan akses sementara yang dimaksud adalah jalan erection yang digunakan untuk
jalur truk- crane dalam memasang struktur baja bangunan. Disini erectionway ini
di desain hanya untuk kondisi maju atau mundur truck-crane (tidak untuk kondisi
bermanuver).
The temporary access road referred to is the erection way used for the truck-
crane lane in installing the steel structure of the building. Here the erection
way is designed only for move or reverse condition of the truck-crane (not
formaneuvered conditions).
Langkah-langkah pekerjaannyasebagai berikut :
Sequance of the work are as follows:

No Langkah Pekerjaan
1 Berkoordinasi dengan pihak Meinhardt dan Jotun Untuk memulai Pekerjaan

Coordinate with Meinhardt teams and Jotun to start the Work


2 Gambar Kerja

Shop drawing
3 Cek Lokasi Kerja / Survey Lapangan

Check Work Locations / Field Survey


4 Mengidentifikasi potensi bahaya yang akan timbul

Identify potential hazards that will arise


5 Mempersiapkan APD yang harus digunakan dan alat-alat pengaman yg
lainnya yang berkaitan dengan pekerjaan tersebut.

JOTUN WATER BASED Hal 2 dari 7


PRODUCTION FACILITY PROJECT
METODE KERJA
(METHOD OF WORK)
No Dokumen 003-WMS-JI-MI-MAU-
ERECTION WAY ACS-WB-XI-22
(No. Document)

Preparing PPE that will be used and the others safety tools that related with
the job
6 Pekerjaan persiapan
• Briefing scope pekerjaan
• Mobilisasi alat dan material
• Potong kepala pancang yang terdapat di jalur jalan sementara, dengan
elevasi potongnya sudahditentukan sebelumnya.
• Stripping area lahan yang akan dijadikan jalur jalan sementara dan
dipastikansemua vegetasi telah dibuang.

Preparation work
• Working scope briefing
• Mobilization of tools and material
• Cut the pile-heads in the temporary access lane, with the elevation
cut in advance.
• Stripping area that will be used as a temporary accesslane and make
sure that all vegetation has been removed

7 Pekerjaan timbunan
• Timbunan dasar menggunakan material batu kapur dengan ketebalan
sesuai dengan gambar rencanaatau sampai batas ataskepala pancang
yang sudah dipotong.
• Hamparan timbunan batu kapur tersebut kemudian padatkan
menggunakan Vibro Roller dengan di rollsaja tanpa diberi getaran.
• Setelah timbunan batu kapur selesai di padatkan selanjutnya di gunakan
timbunan dengan material basecoarse (ukuran 3-7cm) dengan ketebalan
sesuai dengan gambar kerja
• Pemadatan timbunan basecourse tersebut menggunakan Vibro roller
dengan di roll, tanpa adanya getaran

Fill Works
• Sub-base using limestone material with a thickness according to the
plan drawings or up to the top of the head of the pile that has been cut.
• The limestone heaps are then compacted using a Vibro Roller by simply
rolling them without vibration.
• After the limestone pile has been compacted, then use basecoarse

JOTUN WATER BASED Hal 3 dari 7


PRODUCTION FACILITY PROJECT
METODE KERJA
(METHOD OF WORK)
No Dokumen 003-WMS-JI-MI-MAU-
ERECTION WAY ACS-WB-XI-22
(No. Document)

material (3-7cm) with a thickness according to the working drawings.


• Compaction of the basecourse heaps using Vibro rollers by rolling
them, without any vibration

Untuk menghindari resiko kerusakan pada kepala pancang yang dilewati oleh Rafter
crane, maka digunakan plat kapal/baja yang ditempatkan tepat diatas yang terdapat
titik pancang yang sudah dipotong sebelumnya. Penempatan plat kapal ini wajib
dilakukan.

To avoid the risk of damage to the pile-head stake by the rafter crane, a steel plate
is placed directly above where there is a pile that has been cut before. Placement of
the steel plate is mandatory placed.

JOTUN WATER BASED Hal 4 dari 7


PRODUCTION FACILITY PROJECT
METODE KERJA
(METHOD OF WORK)
No Dokumen 003-WMS-JI-MI-MAU-
ERECTION WAY ACS-WB-XI-22
(No. Document)

JOTUN WATER BASED Hal 5 dari 7


PRODUCTION FACILITY PROJECT
METODE KERJA
(METHOD OF WORK)
No Dokumen 003-WMS-JI-MI-MAU-
ERECTION WAY ACS-WB-XI-22
(No. Document)

JOTUN WATER BASED Hal 6 dari 7


PRODUCTION FACILITY PROJECT
METODE KERJA
(METHOD OF WORK)
No Dokumen 003-WMS-JI-MI-MAU-
ERECTION WAY ACS-WB-XI-22
(No. Document)

DAFTAR JUMLAH TENAGA


KERJA
(List of Labour)
Supervisor 1 Person
Surveyor 1 Person
Asisten Surveyor 1 Person
Safety Man 1 Person
Pekerja As Required
Operator Alat 2 Persons

JOTUN WATER BASED Hal 7 dari 7


PRODUCTION FACILITY PROJECT
34/MAU-MR/R0

WORKSHEET JSA (Job Safety Analysis )

Work : No. JSA : Consultan Tanda Tangan


Erection Way Name :
Tanggal : 30-Nov-2022 Position :
Date :
Production Manager Tanda Tangan
Name : Rudy Praha Jati
Work equipment : PPE in Used
: : Position : Site Manager
Auto Level, Marking Ink, Vibro roller, Safety Helmet, Vest, Safety Shoes, Safety Gloves, Date : 30-Nov-2022
Wheel Loader, Excavator PC 200/ PC 50 Mask, Safety Glass Safety Officer Tanda Tangan
Name : Marbawi
Date : 30-Nov-2022

ACTIVITY / WORK HAZARDS CONTROL OF HAZARDS

1. Work preparation
·· Work without a work permit and JSA
Employees do not fill absences
·· Work permits are prepared in advance
Workers must attend briefings and fill in absences
· PPE is not standard · Make sure all workers use mandatory PPE when working
· Inspect and use standard PPE
· Workers do not understand about work · Providing an understanding of working safely through safety talk
··Identify hazards
Work not according to plan
·
·
JSA is prepared and socialized to workers
Make sure workers understand the drawings and working methods
· Identifikasai bahaya survey lapangan · Stumble · Make sure the work area is posted Warning Sign
· Make sure to be careful when conducting field surveys
· Hit by heavy equipment · Ensure workers are at a safe distance from heavy equipment
· Smokedust
Inhale · wearing a mask
· inhalation · wearing a mask
· Wear PPE appropriate to the job

2. Excavator Mobilization
·· Excavators operate without commands
The excavator hit the worker
·· Operators must follow safety talk
Make sure the operator has an SIO
·· Make sure the machine already has an SIA
Make sure workers are within a safe radius when working close
together with heavy equipment
· Make sure the Excavator mobilization location is safe from
worker traffic
· Ensure that no material interferes with access

3 Placement of limestone material · Muscle stretching · Adjust the size of the stone when lifting
to the work area · Use rolli for moning
more than one person keep a minimum distance of 3 meters.
· Pinched · Avoid pinch points
· Avoid pinch points
Use gloves
· Make sure the people doing the work are people
· The eye was hit by a splash of shards of material
limestone
· experienced person and wear safety glasses
· Make sure before work is carried out personal protective equipment
available and suitable for the job
· Use standard PPE that has been required.
· around the work before starting to carry out work.
Look

4 Preparation of pole cutting equipment · Equipment falls · Providing an understanding of working safely through Safety Talk
stake · When necessary,
Concentrate, provide a toolbox
· Wear ear plugs use transport aids
· Hearing · wearing a mask
· dust exposure ·
5 Cutting around the pile on the elevation · Hearing · Wear ear plugs
marking · Eye disorders · wearing a mask
Use glasses
· hit exposure
dust · Make sure the working distance is safe
· mired · Do not work in rainy or drizzly/slippery weather
· crushed · Avoid pinch points.
· electrocuted · Use the correct fittings for outdoors.
· · Electrical equipment is always checked and registered.
· Field supervisor ensures stakes >2m are tied before
· The fall of the pile. · cutting stakes.
· Pierced · Immediately after cutting the iron rebar stakes are covered with
Plastic Hose (Hose) or on the barricade

6 Implementation of material stockpile works


Limestone
· Buried materials
· Make sure there is no material and trash in the hole to be
enrollment was carried out
· Make sure the work area is suitable for backfilling
·· Make sure there is no stagnant water in the work area
Install signs and barriers at the excavation site
· Land subsidence
·· Ensure perlayer compaction
Make sure the match using a stamper tool

·· The worker was hit by an excavator swing


·· The top pile is made flat
Keep a safe distance with the swing range
The excavator is out of control
· Inspect for possible leaks
oil, fuel before operation

· Workers enter the excavation


·· Make sure all instruments are in good condition
Install signs and barriers at the excavation site

7 House Keeping
· Trip
· Place material according to size and type.

· Slip
· Make sure the work is not done in rainy or drizzling weather
conditions

· Make sure the trash is put in the trash