Rumus yang akan kita gunakan adalah m enurut ICI-Explosives
Batas bawah
1. H = 60 x d = 60*0,08=4,8
2. B = 25 x d=25*0,08 = 2
3. S = 1 x B= 1*2= 2
4. J = 8 x d=8*0,08=0,64
5. T = 20 x d=20*0,08=1,6
6. L = H + J=4,8+0,64=5,44
7. PC = L – T=5,44-1,6=3,84
8. Vs = B x S x H=2*2*4,8=19,2
9. Vs total = Vs x n=19,2*72=1.382,4
10. VL total = n x Vs = 1.382,4 = 1.588,9
SF 0,87
11. W = VL total x ρ = 1.588,9 *2,54=4.035,9
12. W handak = PC x ρd= 3,84*4,98=19,12
13. W handak total = W handak x n=19,12*72=1.376,8
14. PF = W handak total = 1.376,8 = 0,996
Vs total 1.382,4
Batas atas
1. H = 140 x d
2. B = 40 x d
3. S = 1,5 x B
4. J = 12 x d
5. T = 30 x d
6. L = H + J
7. PC = L – T
8. Vs = B x S x H
9. Vs total = Vs x n
10. VL total = n x Vs
SF
11. W = VL total x ρ
12. W handak = PC x ρd
13. W handak total = W handak x n
14. PF = W handak total
Vs total
Dimana :
H = tinggi jenjang (m)
B = Burden (m)
S = Spasi (m)
J = subdrilling (m)
T = Stemming (m)
L = kedalaman Lubang ledak (m)
PC = isian lubang ledak (m)
Vs = Volume solid atau insitu (m3)
VL = Volume loose (m3)
n = jumlah lubang ledak
SF = Sweling factor
W = berat batuan (ton)
W handak = berat bahan peledak (kg)
ρ = berat jenis atau densitas batuan (ton/ m3)
ρd = berat jenis atau densitas pengisian bahan peledak (kg/
m)
PF = Powder Factor ( Kg/ m3)

Pada suatu area peledakan batu andesit akan dilakukan


peledakan dengan jumlah lubang ledak 72 lubang dan
diameter lubang ledak adalah 3,5 inci. Dari hasil penelitian
sebelumnya diketahui bahwa faktor berai batu andesit
tersebut 87%, apabila densitas batu andesit (p) 2,54
ton/m3 dan bahan peledak yang digunakan ANFO yang
berdensitas(pd) 4,98 kg/m.