Rumus yang akan kita gunakan adalah m enurut ICI-Explosives Batas bawah 1. H = 60 x d = 60*0,08=4,8 2. B = 25 x d=25*0,08 = 2 3. S = 1 x B= 1*2= 2 4. J = 8 x d=8*0,08=0,64 5. T = 20 x d=20*0,08=1,6 6. L = H + J=4,8+0,64=5,44 7. PC = L – T=5,44-1,6=3,84 8. Vs = B x S x H=2*2*4,8=19,2 9. Vs total = Vs x n=19,2*72=1.382,4 10. VL total = n x Vs = 1.382,4 = 1.588,9 SF 0,87 11. W = VL total x ρ = 1.588,9 *2,54=4.035,9 12. W handak = PC x ρd= 3,84*4,98=19,12 13. W handak total = W handak x n=19,12*72=1.376,8 14. PF = W handak total = 1.376,8 = 0,996 Vs total 1.382,4 Batas atas 1. H = 140 x d 2. B = 40 x d 3. S = 1,5 x B 4. J = 12 x d 5. T = 30 x d 6. L = H + J 7. PC = L – T 8. Vs = B x S x H 9. Vs total = Vs x n 10. VL total = n x Vs SF 11. W = VL total x ρ 12. W handak = PC x ρd 13. W handak total = W handak x n 14. PF = W handak total Vs total Dimana : H = tinggi jenjang (m) B = Burden (m) S = Spasi (m) J = subdrilling (m) T = Stemming (m) L = kedalaman Lubang ledak (m) PC = isian lubang ledak (m) Vs = Volume solid atau insitu (m3) VL = Volume loose (m3) n = jumlah lubang ledak SF = Sweling factor W = berat batuan (ton) W handak = berat bahan peledak (kg) ρ = berat jenis atau densitas batuan (ton/ m3) ρd = berat jenis atau densitas pengisian bahan peledak (kg/ m) PF = Powder Factor ( Kg/ m3)
Pada suatu area peledakan batu andesit akan dilakukan
peledakan dengan jumlah lubang ledak 72 lubang dan diameter lubang ledak adalah 3,5 inci. Dari hasil penelitian sebelumnya diketahui bahwa faktor berai batu andesit tersebut 87%, apabila densitas batu andesit (p) 2,54 ton/m3 dan bahan peledak yang digunakan ANFO yang berdensitas(pd) 4,98 kg/m.