RENCANA ANGGARAN BIAYA PENYUSUNAN ANDALALIN

KEGIATAN PEMBANGUNAN PABRIK PT. SILVER SKYLINE INDONESIA


DI KABUPATEN GARUT

JUMLAH
NO URAIAN
ORANG
VOLUME Satuan BILLING RATE

A. Tenaga Ahli dan Penunjang

1 Ketua tim 1 3 BLN 9,000,000.00


2 Ahli transportasi 1 3 BLN 6,000,000.00
3 Ahli rekayasa lalulintas 1 3 BLN 6,000,000.00
4 Drafter AutoCAD/GIS 1 1 BLN 3,500,000.00
SUB TOTAL A

B BIAYA PERALATAN

1 Sewa Counter 2 Hari 50,000.00


2 Sewa Mobil+bensin 2 Hari 750,000.00
3 Sewa Drone 1 Hari 2,500,000.00
4 Rol Meter 2 Hari 50,000.00
5 Speedgun 2 Hari 200,000.00

SUB TOTAL B

C BIAYA REPRODUKSI LAPORAN

1 Laporan ANDALALIN Final 5 Exemplar 150,000.00

2 Draft ANDALALIN 20 Exemplar 125,000.00

SUB TOTAL C

D SURVEY LAPANGAN DAN ASISTENSI LAPORAN

1 Mobilisasi personil 1 Kend. 2 hari 750,000.00

2 Survei Lapangan lalin/Surveyor 4 orang 4 hari 300,000.00

3 Tunjangan lapangan tim ahli 3 orang 4 hari 350,000.00

4 Asistensi *) 2 kali 1 Ls. 5,000,000.00


SUB TOTAL D
E Rapat/Pembahasan ANDALALIN
1 Biaya Rapat/Pembahasan *) 2 Kali 25,000,000.00
2 Biaya Rekomendasi*) LS 30,000,000.00
SUB TOTAL E

JUMLAH

PPN 11%

TOTAL dengan PPN 11%

PEMBULATAN

Terbilang : Seratus Sembilan Puluh Empat Juta Seratus Ribu Rup

Keterangan :
*) Pembahasan/penilaian dan Rekomendasi Andalalin di dan dari Polda Jabar dan Dishub Jabar
Catatan : Biaya tersebut diatas sudah termasuk pajak yang berlaku (PPN 11%)
NESIA

JUMLAH HONOR

27,000,000.00
18,000,000.00
18,000,000.00
3,500,000.00

66,500,000.00

100,000.00
1,500,000.00
2,500,000.00
100,000.00
400,000.00

4,600,000.00

750,000.00
2,500,000.00

3,250,000.00

1,500,000.00
4,800,000.00
4,200,000.00
10,000,000.00
20,500,000.00 20,500,000

50,000,000.00

30,000,000.00

80,000,000.00

174,850,000.00 174,850,000
19,233,500.00 19,233,500
194,083,500.00 194,083,500
194,100,000.00 194,100,000
Empat Juta Seratus Ribu Rupiah
RENCANA ANGGARAN BIAYA PENYUSUNAN ANDALALIN
KEGIATAN PEMBANGUNAN PABRIK PT. SILVER SKYLINE INDONESIA
DI KABUPATEN GARUT

JUMLAH
NO URAIAN
ORANG
VOLUME Satuan BILLING RATE JUMLAH HONOR

A. Tenaga Ahli dan Penunjang

1 Ketua tim 1 3 BLN 18,000,000.00 54,000,000.00


2 Ahli transportasi 1 3 BLN 16,000,000.00 48,000,000.00
3 Ahli rekayasa lalulintas 1 3 BLN 16,000,000.00 48,000,000.00
4 Drafter AutoCAD/GIS 1 1 BLN 9,902,500.00 9,902,500.00
SUB TOTAL A 159,902,500.00

B BIAYA PERALATAN

1 Sewa Counter 2 Hari 75,000.00 150,000.00


2 Sewa Mobil+bensin 2 Hari 1,000,000.00 2,000,000.00
3 Sewa Drone 1 Hari 2,500,000.00 2,500,000.00
4 Rol Meter 2 Hari 50,000.00 100,000.00
5 Speedgun 2 Hari 200,000.00 400,000.00

SUB TOTAL B 5,150,000.00

C BIAYA REPRODUKSI LAPORAN

1 Laporan ANDALALIN Final 5 Exemplar 150,000.00 750,000.00


2 Draft ANDALALIN 20 Exemplar 125,000.00 2,500,000.00

SUB TOTAL C 3,250,000.00

D SURVEY LAPANGAN DAN ASISTENSI LAPORAN

1 Mobilisasi personil 1 Kend. 2 hari 750,000.00 1,500,000.00


2 Survei Lapangan lalin/Surveyor 4 orang 4 hari 300,000.00 4,800,000.00

3 Tunjangan lapangan tim ahli 3 orang 4 hari 350,000.00 4,200,000.00

4 Asistensi *) 2 kali 1 Ls. 5,000,000.00 10,000,000.00


SUB TOTAL D 20,500,000.00

E Rapat/Pembahasan ANDALALIN
1 Biaya Rapat/Pembahasan *) 2 Kali 25,000,000.00 50,000,000.00

2 Biaya Rekomendasi*) LS 30,000,000.00 30,000,000.00

SUB TOTAL E 80,000,000.00

JUMLAH 268,802,500.00

PPN 11% 29,568,275.00

TOTAL dengan PPN 11% 298,370,775.00

PEMBULATAN 298,400,000.00

Terbilang : Dua Ratus Sembilan Puluh Delapan Juta Empat Ratus Ribu Rupiah
*)
Pembahasa
n/penilaian
Keterangan
Catatan :
dan
:
Biaya
Rekomenda
tersebut
si Andalalin
diatas
di dan dari
sudah
Polda Jabar
termasuk
dan
pajakDishub
yang
Jabar
berlaku
(PPN 11%)

Anda mungkin juga menyukai