PEKERJAAN ELEKTRONIK
2024
DAFTAR ISI
METODE PELAKSANAAN ................................................................................................................ 1
1. PERSIAPAN : ............................................................................................................................ 1
2. PELAKSANAAN : .................................................................................................................... 1
3. CHECK LIST BERSAMA (VISIT TOUR) : ............................................................................. 1
4. PEKERJAAN TEST PARTIAL: ............................................................................................... 2
5. PEKERJAAN TEST & COMMISIONING : ............................................................................. 2
6. PEKERJAAN SERAH TERIMA I : .......................................................................................... 2
7. PEKERJAAN SERAH TERIMA II : ......................................................................................... 2
PEKERJAAN ELEKTRICAL ............................................................................................................. 3
1. PEKERJAAN ELEKTRICAL ( PANEL, TRAFO, KABEL FEEDER, LAMPU, KABEL TRAY,
PENANGKAL PETIR ) ................................................................................................................. 3
1.1. MATERIAL UTAMA ( PANEL, TRAFO ) ..................................................................... 3
1.2. KABEL FEEDER.............................................................................................................. 5
1.3. PEKERJAAN PENERANGAN & STOP KONTAK ........................................................ 7
1.4. PEMASANGAN TRAY ELECTRICAL .......................................................................... 9
1.5. PEKERJAAN PENANGKAL PETIR ............................................................................. 10
PEKERJAAN ELEKTRONIK .......................................................................................................... 11
2. PEKERJAAN ELEKTRONIK ( TELEPHONE & DATA, TATA SUARA, CCTV, MATV,
SYSTEM FIRE ALARM ) ........................................................................................................... 11
2.1. PEKERJAAN TELEPHONE & DATA .......................................................................... 11
2.2. TATA SUARA ................................................................................................................ 13
2.3. PEKERJAAN CCTV ...................................................................................................... 15
2.4. PEKERJAAN MATV ..................................................................................................... 17
2.5. PEKERJAAN INSTALASI FIRE ALARM .................................................................... 19
PEKERJAAN MEKANIKAL ............................................................................................................ 21
3. PEKERJAAN MEKANIKAL ( PLUMBING AIR BERSIH, AIR PANAS, AIR BEKAS &
KOTOR, PLUMBING HYDRANT, TATA UDARA ) ............................................................... 21
3.1. PEKERJAAN PLUMBING AIR BERSIH ..................................................................... 21
3.2. PEKERJAAN PLUMBING AIR PANAS ...................................................................... 23
3.3. PEKERJAAN PLUMBING AIR BEKAS, AIR KOTOR & VENT ............................... 25
3.4. PEKERJAAN PLUMBING HYDRANT ........................................................................ 27
3.5. PEKERJAAN TATA UDARA ....................................................................................... 29
1. PERSIAPAN :
Pembuatan Site Office dan Gudang
Proses Approval Shop Drawing
Proses Approval Material
Persiapan Administrasi :
- Form – Form
- Berita Acara
- Laporan
2. PELAKSANAAN :
Membuat Action Plan
Membuat Mock Up (bila diperlukan)
Mengajukan Ijin Pelaksanaan
Melaksanakan Pekerjaan mengacu pada:
- Ijin Kerja yang sudah disetujui
- Shop Drawing yang sudah di Approval
- Mock Up yang ada & sudah di Approval
- Instruksi Kerja (IK)
- Kondisi Lapangan
Material
- MVDP
- Incoming
- Outgoing
- TRAFO
- Kapasitas : -
- Type :-
- Kabel TM
- Kabel power & Kabel kontrol
- Dinabolt
- Mur baut
- Skoen
Peralatan
- Kunci ring & pas
- Tang press
- Palu
- Ramset
- Bor beton
- Obeng
- Scafolding/tangga
Material
- Kabel Feeder :
- Kabel N2XSY - Kabel NA2XY
- Kabel NYY - Kabel NYM
- Kabel FRC - Kabel BC
- Isolasi
- Scoen
- Kabel Ties
Peralatan
- Obeng
- Palu
- Bor
- Tang
- Kunci pas
- Scafolding/tangga
Material
- Saklar.
- Stop Kontak.
- Recessed Mounted
- Surface Mounted
- Flood Light
- Kabel Instalasi
Peralatan
- Obeng
- Tangga
- Bor
- Kunci pas
- Scafolding/tangga
Material
- Kabel Ladder
- Kabel Tray
Peralatan
- Obeng
- Tang
- Palu
- Tangga
- Bor beton
- Kunci pas
o Metode Kerja
Material
- Air Termial
- Tiang Penyangga
- Pipa Conduit
- Pipa Splitzen
Peralatan
- Obeng
- Tang
- Kunci pas
- Palu
- Bor
- Scafolding/tangga
o Metode Kerja
Material
- Box MDF - BC
- LSA - Kabel Grounding NYA 35 mm
- MDF - Outlet Telephone
- Outlet Data - Kabel ITC 2 x 2 x 0,6 mm
- Kabel CAT 6 - PABX
- Pipa Conduit - UPS
- DSS CONSOLE
Peralatan
- Tang, Tang krone, Tang Krimping.
- Obeng.
- Bor Tangan
- Kunci pas
- Tangga
- Isolasi
Material
- Kabel Grounding BC 6m - Ceiling Speaker 6 w
- Ceiling Speaker 3 w - Kabel NYMHY 2 x 1,5mm²
- Digital Matrix Mixer - Emergency Message
- Emergency Mic Panel(Sirine)
- CD/MMC/USB PLAYER - Horn Speaker
- Wall Box Speaker - Coloumn Speaker
- Pipa Conduit - Paging Mic W/Chime
- Attenuator - Terminal Block
- Mixer Amplifier - UPS
- MDF-SS
Peralatan
Material
Peralatan
- Tang, Tang krone, Tang Krimping.
- Obeng.
- Bor Tangan
- Kunci pas.
- Cutter.
- Tangga
Material
- Splitter 4 Way
- Splitter 2 Way
- Coupler 4 Way
- Booster
- Antena TV UHF
- Outlet TV
- Coaxial cable RG 6
- Pipa Conduit
Peralatan
- Tang, Tang krone, Tang Krimping.
- Obeng.
- Bor Tangan
- Cutter.
- Kunci pas.
- Tangga
Material
Peralatan
- Tang, obeng.
- Bor Tangan.
- Kunci pas.
- Gergaji.
- Cutter.
- Tangga / Scafolding.
Material
Peralatan
- Gergaji
- Pemanas pipa
- Amplas
- Lem
- Shell tape
- Bor beton
- Kunci pipa
- Scafolding/tangga
Material
Peralatan
- Gergaji
- Pemanas pipa
- Amplas
- Lem
- Shell tape
- Bor beton
- Kunci pipa
- Scafolding/tangga
Material
- Material Utama
o ROOF DRAIN
o ROOF DRAIN
o SEPTIC TANK
o POMPA SUMPIT
o GREASE TRAP
- Pipa
- Fitting
- Aksesoris
Peralatan
- Gergaji
- Pemanas pipa
- Amplas
- Lem
- Shell tape
- Bor beton
- Kunci pipa
- Scafolding/tangga
Pembuatan shop drawing instalasi pipa air buang kotor, air kotor & vent.
Cek jalur instalasi pemipaan sesuai dengan shop drawing.
Pasang sparing sesuai dengan type saniter ( jika saniter telah ditentukan ).
Pasang pipa air buang kotor, air kotor & vent, sesuai dengan shop drawing.
Pemasangan pipa harus memperhatikan kemiringan pipa & dihitung BOP
sesuai standar.
Pasang material utama sesuai shop drawing.
Lakukan test tekan.
Test commissioning.
Material
- Pipa Hydrant
- Sprinkler Head
- Fire Hose
- Fire Hydrant Box
- Hose Nozzle, Rack.
- Hydrant Valve
- Alarm Check Valve
- Automatic Air Valve
- Water Flow Switch
- Pressure Gauge
- Gate, Check Valve
Peralatan
- Gerinda - Gergaji
- Amplas - Las Listrik
- Lem -
- Shell tape
- Bor beton
- Kunci pipa
- Scafolding/tangga
Material
- Unit AC (indoor & Outdoor)
- Pipa refrigerant
- Isolasi Pipa
- Kabel power & Kabel kontrol
- Pipa drainase
- Fitting & Accessories
- Ducting
- Dinabolt
- Mur baut
Peralatan
- Kunci pas
- Tang press
- Palu
- Ramset
- Bor beton
- Obeng
- Scafolding/tangga
Material
- Material Utama : Exhaust Fan
- Ducting
- Mur baut
- Pipa Pembuangan
- Kabel power
o Metode Kerja