Anda di halaman 1dari 15

PRAKTIK KERJA DTY

PROSES PEMBUATAN BENANG DTY (DRAWN TEXTURED YARN)

YUDI SAEPUL BAHRI 2014 01 001


BAHAN PEMBUAT BENANG DTY
Checking POY :

Kondisi POY

Identitas POY

POY (Parteality Oriented Yarn)


Tahapan Pembuatan
DTY
1. Penarikan (Drafting)
2. Pemanasan (Heating)
3. Pemuntiran (Twisting)
4. Penggulungan (Winding)
PROSES PEMBUATAN
BENANG DTY
LOADING
SPLICING Standar Presure
Denier Pressure (Bar)

125 3.5

160 4.0

250 4.5

>300 5.0

Standar Penekanan

Denier Penekanan

75 1 kali

100 1 kali

150 1.5 kali


THREADING
Alur Proses THREADING:
1. Creel
2. Yarn Cutter
3. Input Feed Roller
4. Primary Heater (150 s/d 250 C)
5. Sledge
6. Colling Plate (Sledge Track)
7. Positorq
8. Intermediet Feed Roller
9. Final Heater (50 s/d 230 C)

10. Output Feed Roller
11. MetOil (TM-308-BN)
12. Take-Up Guide
13. Winding Head / Bowl (Spindle)
14. Advance Package Suport / Penyangga Doffing
15. Texture Package
16. Suction Tubes
17. Pume Extract Ducting
18. Maintenance Platform
MISTHREADING
DOFFING SMART DOFF

Perhitungan Waktu Dofing


5100 x 9000
=
400 x 150 x 60

5100
=
400

T = 12.75 12 jam 75 menit


SEGREGASI DAN PC SEGREGASI
PACKING / PENGEMASAN BENANG DTY

Grade Batas Berat (gram)

WE 4850 s/d 5150

WA 1000 s/d 4849

B 999 s/d 500

C 99 s/d 500
BARCODE AND TRANSFER
Perhitungan Benang Per-Hari
PD = 60 24 216
9000 x 1000

Efisiensi Dari Mesin DTY



= x 100%

216
= x 100%
16
= 86,5 %
Pengiriman Benang DTY
TERIMAKASIH
ATAS PERHATIANNYA

WASSALAMUALAIKUM Wr. Wb

Anda mungkin juga menyukai