Problem solving
This material is licensed by Lean Management Institute (LMI) to PMIM and its affiliates to use for PMI internal
business purposes pursuant to the master agreement between LMI and PMIM dated 1 July 2010.
Use of these materials by PMI's consultants is restricted under the master agreement.
All PMI employees must return the materials to PMI if they cease employment with PMI.
Version 1.1
August 29, 2013 HIGHLY CONFIDENTIAL – For PMI internal use only
Content
• What is it?
• How is it used?
• Why is it used?
• What and how is it measured?
• Supporting materials
• Job instructions
• Examples from PMI
2
HIGHLY CONFIDENTIAL – For PMI internal use only
What is it?
Problem solving
• Problem Solving adalah cara terstruktur berpikir dan bertindak untuk menutup
kesenjangan antara tingkat kinerja saat ini dan tingkat kinerja yang diinginkan.
3
HIGHLY CONFIDENTIAL – For PMI internal use only
What is it on a philosophical level?
Problem
Go and see for yourself to thoroughly Solving
understand the situation (genchi genbutsu) (CI & Learning)
Philosophy
(Long-term Thinking)
4
HIGHLY CONFIDENTIAL – For PMI internal use only
What is it on a cultural level?
5
HIGHLY CONFIDENTIAL – For PMI internal use only
Problem Solving and Continuous Innovation
• Sebagai contoh, di Toyota, masalah dipandang sebagai hal yang baik. Anda
harus berterima kasih kepada orang untuk membawa masalah untuk
perhatian Anda. Ini memberikan kesempatan untuk melakukan perbaikan.
6
HIGHLY CONFIDENTIAL – For PMI internal use only
What is it on a practical level?
7
HIGHLY CONFIDENTIAL – For PMI internal use only
What is it on a practical level?
8
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
1. Persepsi Masalah
9
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
2. Memperjelas masalah
•Sebelum Anda mengidentifikasi akar penyebab, Anda harus benar-benar
memahami masalah, dan proses yang memiliki masalah. Ada beberapa
teknik yang dapat membantu untuk memahami situasi saat ini, masalah
yang ada dan hubungan antara keduanya:
Example:
10
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
3. Point of Penyebab
•Jika Anda mencapai kesepakatan tentang persepsi masalah, anda mencoba
untuk menemukan lokasi di mana masalah berasal. The Point of Cause (POC).
Ini akan membawa Anda dari titik hulu di mana Anda mengidentifikasi
masalah.
•Anda mengidentifikasi masalah dengan menggunakan Pareto, histogram atau
Spaghetti Chart
Example:
11
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
12
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
Root Cause Analysis
4. 1 5 x Why? analysis
• Practical example, my car won’t start!
13
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
Root Cause Analysis
4. 2 Analisis Pareto
•Peringkat penyebab diidentifikasi dari tinggi ke rendah efeknya (frekuensi x dampak).
•Cara baca Pareto menyatakan bahwa 80% dari efeknya akan disebabkan oleh (paling)
20% penyebab.
contoh:
20 100%
18 90%
16 80%
A a n ta l m a a l
14 70%
12 60%
10 50%
8 40%
6 30%
4 20%
2 10%
0 0%
Aantal Cummulatief 14
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
Root Cause Analysis
4. 1 4M Analysis
• Bagaimana membuat Diagram 4 M
• Ketika membangun Diagram a 4M pastikan setiap orang dalam tim setuju pada kata-kata dari pernyataan masalah. Tambahkan informasi
sebanyak mungkin tentang "apa", "di mana", "kapan," dan "berapa banyak" masalah. Tanyakan, "Apa semua kemungkinan penyebab masalah?"
Man/Operator good work habits, Was the document properly interpreted? – Was the information properly circulated to all the functions? –
necessary skills, Was the proper training to perform the task administered to the person? – Did the environment influence
punctuality, and no the actions of the individual? – Are there distractions in the workplace? – Is fatigue a mitigating factor? - Is
unscheduled his work efficiency acceptable? - Is he responsible/accountable? - Is he qualified? - Is he experienced? –
absenteeism. How much experience does the individual have in performing this task?
Example:
Machines no breakdowns, Was the correct tool/tooling used? - Does it meet production requirements? - Does it meet process
defects, or capabilities? – Is the equipment affected by the environment? – Is the equipment being properly
unplanned maintained – Does the software or hardware need to be updated? – Was the machine properly
stoppages programmed? – Does the machine have an adequate guard? – Was the equipment used within its
capabilities and limitations? – Are all controls including emergency stop button clearly labeled and/or
color coded or size differentiated?
Material (Includes no defects or Is all needed information available and accurate? – Can information be verified or cross-checked? – Has
Raw Material, shortages any information changed recently / do we have a way of keeping the information up to date? – Was the
Consumables and material properly tested? – Was the material substituted? – Is the supplier’s process defined and
Information) controlled? - Was the raw material defective? - Was the raw material the wrong type for the job? – Was
the material contaminated? – Was the material handled properly (stored, dispensed, used & disposed)?
Method standardized Were the workers trained properly in the procedure? – Has a capability study ever been performed for
processes, this process? – Is the process under Statistical Process Control? – Are the work instructions clearly written
maintenance, and and complete? – Are mistake-proofing devices/techniques employed? - Is the work standard upgraded
management and to current revision? – Is the tooling adequately designed and controlled? – Is handling/packaging
adequately specified? – Was the process changed? – Was the design changed? – Was a process Failure
Modes Effects Analysis (FMEA) ever performed?
15
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
5. Counter-measures
• Menggunakan data untuk membuat keputusan untuk mendapatkan hasil usulan
tindakan terbaik (bukan solusi)
• Pastikan mempunyai alternative lainnya dan pastikan bahwa setiap akar penyebab
diidentifikasi dan dilakukan tindakan pencegahan.
• Identifikasi prioritas/peringkat, dilakukan tindakan perbaikan ke akar penyebab
berdasarkan usaha yang akan diimplementasikan dan keefektivan untuk
menyelesaikan masalah. Tentukan permasalahan tersebut dalam bentuk diagram
dan keefektifannya
Example:
Future State VSM Experiments Effort-Effect diagram
Action Resp. Due Evaluation of effect
High
Fasten Bolts Tom 12-jan Checked out ok
Clean Filter Susan 19-jan No abnormalities Long term Immediate
Clean Motor Nick 26-jan No abnormalities actions action
Was leaking,
Effect
Exchange Valve Tom 4-feb replaces
Change cleaning Only if
agent Susan 11-feb Checked out ok No action capacity
is readily
Exchange coolantSusam 18-feb No abnormalities available
Low
High Low
Effort
Example:
Time Chart
17
HIGHLY CONFIDENTIAL – For PMI internal use only
How is it used?
7. Standardize
• Problem Solving adalah, per definisi, Plan-Do-Check-Act adalah jenis aktivitas. Anda jangan
berhenti mengimplementasikan sampai masalah teratasi.
• Tetapi jika masalah teratasi Anda perlu memastikan bahwa masalah tersebut tidak akan muncul
lagi, berdasarkan standarisasi solusi.
• Anda dapat standarisasi melalui prosedur dan instruksi, atau melalui solusi Poka Yoke.
• .
Example:
18
HIGHLY CONFIDENTIAL – For PMI internal use only
What and how is it measured?
• Apa dan bagaimana hal itu dilakukan tergantung pada sifat dari masalah.
• Anda perlu untuk mengumpulkan satu set represenatative data. Jika data
yang tersedia, Anda bisa mengumpulkan contoh data secara tepat waktu
dan hemat biaya. Anda dapat membedakan Random Sampling, Sampling
sistematis, Stratified Sampling dan Cluster Sampling.
• Ada banyak variabel yang dapat diukur (waktu, suhu, kekuatan, (im)
kemurnian, kejadian, kesalahan, dll).
19
HIGHLY CONFIDENTIAL – For PMI internal use only
What and how is it measured?
Example:
Performance Board
A3 Problem Solving
Working Group
20
HIGHLY CONFIDENTIAL – For PMI internal use only
Supporting Materials
• OPEN-material:
- OPEN book: A3
- OPEN book: Performance controlling
- OPEN book: Gemba walk
• Recommend books:
- The Toyota Way by Liker
- Understanding A3 Thinking by Sobek and Smalley
- Managing to Learn by John Shook
- Root Cause Analysis by Andersen and Fagerhaug
• Other resources
– Podcast: Problem Solving Is the Core of Successful Lean Transformations
– Internet: www.artoflean.com/
21
HIGHLY CONFIDENTIAL – For PMI internal use only
Job instruction
How to do Problem solving
22
HIGHLY CONFIDENTIAL – For PMI internal use only
Job instruction
How to do Problem solving
23
HIGHLY CONFIDENTIAL – For PMI internal use only
Philip Morris Operations
Detailed example from Krakow
Examples from the affiliates
24
HIGHLY CONFIDENTIAL – For PMI internal use only
Examples from PMI
Pareto of Tobacco Waste
Quantity (Kg/Mo)
800
60%
573.43
600 519.43
40%
400
20%
200 93.64 79.29
0 0%
Cut Filler Lamina ET Stem
Impact
3. Improve layout in Offset area 4 3
4 1 Handling Ambiguity
H igh
is 3
1 2 2 Use
Immediate
PMI Tools
s
Long term
y
actions
al
action
effectively
E ffec t
A n Enhance Project
3 Management
Only if
O T No action capacity
is readily
6. PLAN
L ow
available
SW 4 Link
High Low
between
Effort
Prototyping &
Action, Target, Objective, KPI, Deviation to Target, Timing, Next Steps, Who, Team
Industrialization
1 Establish RACI for all process steps, standardize ways on project info sharing and
updating, define which tools would be used for communication and ensure full
leted
2 functionality in order to have standardized communication, develop matrix at
mp
3 which
be co
step of the project which info is to be shared to whom and to which
extent where project leader ensures that the team is clear on project
4 milestones and deliverables and project activities are synchronized with all
To
involved
4. ROOT CAUSES ANALYSIS
7. FOLLOW UP ACTIONS
27
HIGHLY CONFIDENTIAL – For PMI internal use only
Examples from PMI
Material Manpower
Vital Few
Do we have a start up
Do not have a standard plan to standard method in place?
follow up action plan methods
Three categories:
•Method
•System
•People
29
HIGHLY CONFIDENTIAL – For PMI internal use only
OVF Analyses process
Effect – Effort Matrix
Inhibitors
1.System Capability
2.Communication
3.Granularity differences
4.No frozen market plans
5.Missing Specs
6.System Integration
7.Alignment
8.Two set of numbers
9.Calendar synchronization
10.Ownership / Involvement
30
HIGHLY CONFIDENTIAL – For PMI internal use only
OVF Analyses process
Inhibitors Root Causes Analyses – 5WHY
External example Automotive Supplier
Kaizen Boards, PDCA
Achievements
Improv
1.A Hoshin objective was set in injection moulding to attain best in class Good Shots Per Hour (GSPH) on a particular machine. Data for this target was
benchmarked and best in class performance tracked.
2.Problem solving lead to the implementation of many countermeasures to close the gap in performance.
3.Countermeasures are detailed on standard sheets and linked to identified problems for knowledge sharing with other facilities and teams
4.Progress is tracked against the goal throughout the project so team members can see the gap being closed.
Improvements
Target Set
linked to
kaizens
Purpose is
Performan
outlined
ce Tracked
Next Steps
1.Create a formal process to share information.
2.On the boards, include the impact the projects have on the company’s hoshin objectives.
32
HIGHLY CONFIDENTIAL – For PMI internal use only
External example Automotive Supplier
Kaizen Boards, PDCA
1.Kaizen boards detailing the progress and results of current continuous improvement activities are made visual.
2.The boards are aimed at sharing the knowledge learnt from the continuous improvement process, and to encourage yokoten across other areas.
3.Projects are linked to themes that have been identified critical based on the organisation’s hoshin objectives.
Next Steps
1.Create a formal process to share information.
2.On the boards, include the impact the projects have on the company’s hoshin objectives.
3.Measure plan versus actual. 33
HIGHLY CONFIDENTIAL – For PMI internal use only
External example Process Industry
Value Stream Mapping/Problem Solving
Value Stream Map of Forecasting Process Forecasting Board with VSM, Problem Solving Cards & Audits
Leadership team and forecasting stakeholders involved in the analysis of forecasting process
Achievements
1.Leadership team wanted to tackle their forecasting process by finding inefficiencies and opportunities to make this more accurate.
2.The forecasting team involved all members of the business who played a major role in the monthly forecasting process.
3.Initial step was to construct a value stream map of the current operations. Once this was done, team was able to construct an ideal future state.
4.Forecasting board was created to monitor their performance based on the ideal future state.
5.Inclusion of problem solving cards has been critical in highlighting problem and are addressed prior to the next cycle.
Next Steps
1.Once forecasting process is more stable, an updated current state value stream map will be created to determine the next phase of improvements.
2.Leadership team to showcase to the business the results of the project, with emphasis on the importance of the PDCA cycle.
3.Create clear standard work for steps within the forecasting process
34
HIGHLY CONFIDENTIAL – For PMI internal use only
External example Stadium Seating Mfg
Structured problem solving
Sample C4 board
Sample C4 board . Improvement tracking on FMDS Sample C4 cards Projects posted to share learning
Achievements
1.Each FMDS board features a C4 boards where C4 cards are readily accessible. The C4 card is a structured problem solving system to document and solve problems as
they arise in the work area. Improvements are categorized as either short term or long term.
2.The C4 board enables problem solving progression to be tracked visually and completed C4 cards can be stored for later reference
3.Each board features an “Improvements” management category where implemented improvements are tracked as a KPI. A reasonable target is set for each department
to help drive continuous improvement.
4.Problem solving activities are also completed during structured training (grad cert, cert III/IV level). These more complex problems are documented in detail and
posted on the Manufacturing Managers FMDS board for reference.
Next Steps
1.Further training of staff through cert III/IV/grad cert to develop problem solving skills
2.Develop story boards to be posted on production floor to summarize process and results of improvement activities
3.Integrate improvements/problem solving in to daily FMDS status reports 35
HIGHLY CONFIDENTIAL – For PMI internal use only
Tools to solve:
A3 Thinking
“When solving problems, dig at the roots instead of just
hacking at the leaves.”
Anthony J. D'Angelo
This material is licensed by Lean Management Institute (LMI) to PMIM and its affiliates to use for PMI internal
business purposes pursuant to the master agreement between LMI and PMIM dated 1 July 2010.
Use of these materials by PMI's consultants is restricted under the master agreement.
All PMI employees must return the materials to PMI if they cease employment with PMI.
Version 1.0 (LONG VERSION)
March, 22nd 2011
Process
Main Challenges Method to See Tool to Solve
People & Organization
Main Challenges
Method to See Tool to Solve
37
HIGHLY CONFIDENTIAL – For PMI internal use only
Agenda
• What is A3?
• Why A3 is an essential tool?
• How is the A3 thinking process used?
• Supporting materials
• Job instruction
• Examples from PMI
• Laporan A3 mendapatkan namanya dari ukuran kertas. Dalam bentuk form, laporan
ditulis pada selembar kertas A3 atau ukuran 11 "x 17“.
• Perencanaan A3 dimulai pada tahun 1960-an, sebagai Format system pemecahan
masalah Kualitas.
• Tidak ada satu template tetap, atau ukuran kotak. Kuncinya adalah bahwa A3 harus
menceritakan sebuah cerita yang lengkap, sebaiknya visual.
• Isinya menceritakan, ditata dari sisi kiri atas ke kanan bawah, yang siapa pun dapat
memahami.
• Ini memaparkan seluruh rencana untuk memecahkan masalah atau melakukan
perbaikan pada selembar kertas.
• Yang terpenting adalah proses berpikir di balik penulisan itu.
• Hal ini dapat digunakan untuk berbagi pembelajaran dan komunikasi best practices /
pembelajaran.
• Pada saat itu, ini adalah ukuran maksimum dari kertas yang dapat dikirim melalui fax
A3
Tool
Tool: PDCA process
• Communicating • Proposing improvements
UPLOAD DOWNLOAD
A3 – Short stoppages (Factory X)
Sharing Platform A3 – Short stoppages (Factory Y)
Secondary
Short
stoppages
Maker
Rod break
3. Afiliasi lainnya dapat belajar dari orang lain dan mengadopsi proses
berpikir.
• Ini adalah cara sederhana dan visual menunjukkan: pemecahan masalah, penulisan
proposal, pelaksanaan proyek, dan pengambilan keputusan tim.
• Ini adalah metodologi strategized yang membangun dialog untuk sampai ke akar
penyebab serta terlibat dan menyelaraskan organisasi.
• Ini menumbuhkan dialog / diskusi terstruktur dengan semua pemangku kepentingan
dalam proses dan menciptakan solusi yang dapat diterima pekerja.
• Ini adalah tanggungjawab antara mentor, pemilik, dan semua pihak yang terlibat
lainnya untuk pemecahan masalah.
• Berfungsi sebagai alat pembelajaran organisasi yang mengembangkan pemikiran
pemecah masalah.
• Laporan A3 berisi fakta-fakta objektif, data teknis dan "resolve" masalah. Ini
menceritakan seluruh bagian.
• Menghasilkan penanggulangan yang efektif dan solusi berdasarkan fakta dan data.
• Mendorong Plan-Do-Check-Act melalui awal dari rencana aksi dan tindak lanjut.
43
HIGHLY CONFIDENTIAL – For PMI internal use only
How is the A3 thinking process used?
Questions to be asked when using the A3
44
HIGHLY CONFIDENTIAL – For PMI internal use only
45
HIGHLY CONFIDENTIAL – For PMI internal use only
How is the A3 thinking process used?
Problem Solving A3 - Title
Contoh:
1.Rendahnya tingkat kepemimpinan
2.NC Rod Wringkled masih belum memenuhi target
3.Sering terjadi selisih dalam pembayaran upah karyawan produksi
• Isu-isu lain:
1. Bagaimana masalah ditemukan?
2. Siapa yang terlibat?
3. Apa saja gejalanya?
4. Bagaimana performa masa lalu?
• Apakah ada tema yang jelas untuk laporan / proyek yang mencerminkan isi?
• Apakah proyek yang relevan dengan tujuan organisasi?
• Apakah proyek berkaitan dengan tujuan perusahaan?
• Apakah ada alasan lain untuk bekerja pada topik ini?
• Apa informasi lain yang mungkin berguna bagi para pembaca?
• Rangkai kondisi saat ini dengan cara yang sederhana sehingga dapat dipahami
oleh pembaca
• Apa masalahnya? Apa yang tidak masalah?
• Di mana hal-hal tersebut dilakukan hari ini?
• Bagaimana Anda bisa menggambarkan situasi? seberapa tinggi? berapa banyak
kesalahan? bagaimana variabelnya?- spesifik, gunakan fakta dan angka.
• Cobalah untuk menghindari teks. Menggambar representasi visual yang
menggambarkan unsur-unsur penting dari sistem atau proses
Bersifat kuantitatif
1. Mengumpulkan data melalui pengamatan langsung.
2. Meringkas informasi yang relevan sat ini.
• Apakah kondisi saat ini jelas dan logis digambarkan secara visual?
• Bagaimana kondisi saat ini bisa menjadi jelas bagi pembaca?
• Apakah kondisi masalah saat ini menggambarkan situasi yang harus diselesaikan?
• Apa masalah yang sebenarnya dalam kondisi saat ini?
• Adalah fakta-fakta dari situasi yang jelas, atau ada hanya pengamatan dan
pendapat?
• Apakah masalah diukur dalam beberapa cara atau itu terlalu kualitatif?
• Informasi apa yang membuat pembaca merasa menarik?
• Apakah hal itu jelas menunjukkan kemajuan yang telah dibuat atau apa tindakan
spesifik telah diambil?
• Apakah hal itu akurat dan obyektif?
Contoh:
- Mengurangi tingkat persediaan dengan X%
berdasarkan tanggal Y
FISHBONE ANALYSIS
FEBRUARY 2011
MARLBORO (RED) KS BOX 20 - TABAQUEIRA
MAN MACHINE
We Unreliable equipment
We think we need
add-on
systeem to manage
Not enough Skills add-on
information flow
add-on
METHOD MATERIAL
• Apa usulan untuk mencapai keadaan masa depan, target yang akan dicapai?
• Apa yang dikerjakan? Apa yang tidak dikerjakan?
• Bagaimana rekomendasi anda mengenai tindakan yang mempengaruhi akar
masalah dalam mencapai target?
• Tindakan apa yang akan diambil?
• Bagaimana dengan tanggal jatuh tempo untuk tindakannya?
• Siapa yang bertanggung jawab atas tindakan?
• Apa yang akan menjadi urutan pelaksanaan?
61
HIGHLY CONFIDENTIAL – For PMI internal use only
Example
Problem Solving A3
65
HIGHLY CONFIDENTIAL – For PMI internal use only
Supporting Material
• OPEN-material
- OPEN Book: Value Stream Mapping
- OPEN Book: Value Stream Management
- OPEN Book: Gemba Walk
- OPEN Book: Leader Standard Work
• Recommend books:
- Managing to Learn: Using the A3 Management Process by
John Shook
- Understanding A3 Thinking: A Critical Component of Toyota's
PDCA Management System by Durward K. Sobek II. & Art
Smalley
• Train the trainer services:
- OPEN-Academy
- Courses – A3 by LMI
• Support
- Coaching by Sensei’s
71
72
Cost booking
Logistic Cost
Automation
5. RF
1. Budgeting 3. Logistics cost bookings process
d.
4. Actuals reporting
ize
5. RF process
r it
io
pr
Process populated by inefficiencies that are reoccurring monthly, daily firefighting mode.
y
all
in
ef
3. GOALS / TARGETS
b
To
Zero surprises within monthly cycle and variance kept within plan.
•Establish process flow with cleared Roles and Responsibilities (RACI) and introduce
defined KPIs for easier performance monitoring.
•Ensure sustainability through people training , follow up and efficiency measurement. 7. FOLLOW UP
•Increase automation within the process steps (100% self billing, transportation
resolution) ensuring aligned and smooth cost control (R&R, reporting source and data).
- Kristel leading monthly meetings with project team members (3 rd week)
- EU SC dashboard monthly updated
- Prepare plan for improvement of other processes (April 2013)
- Follow up on KPIs as of Q2
Foster First Time Quality (FTQ)
within PM Poland (PMPL) through People Engagement
•QA is responsible for controlling and triggering corrective actions – not in line with FTQ idea.
Develop PMPL innovative, user-friendly visual
inspection application supporting FTQ.
2. CURRENT CONDITIONS •Visualization of NCs
•NCs assigned to machine
•Intuitive navigation
• Once per shift QA perform visual inspection on each link-up •Definitions of NCs easily available
•Application development with other affiliates to propose a
• VQI results from QA are available after 24 hours global solution
Target
• Corrective actions are taken after receiving results from QA
• NC (non-conformities) which should be eliminated immediately are not dealt with for
several shifts
• VQI in Q1 2012 is not in line with OB 2012 target Raising awareness and quality Visual management in the cockpit
of operators’ visual inspection (Team Leaders’ Office)
• Quality related rework and repack in 2011 amounted to 284 mio cigs •Standardization and training using TWI method
performed by shop floor people
•Standardization of sampling points in linkups
•Sustain: QA shop floor inspections connected with Visual management in the linkups.
3. GOALS / TARGETS training for operators
VQI results from regular visual inspection and QA assessment
• Increase level of shop floor employees engagement in FTQ visualized on-line at operator’s screen
• VQI index below 70 points in Q4 2012
• Reduce quality related internal repack and rework by 40% in 2012
Waste as a
• Material not conditioned • Visual inspection application difficult to navigate result of defects
properly
• NCs list in the application not in line with NCs specific No on-line feedback regarding NCs
for the given machine level and targets
No standard process on
material complaints • No automatic update of NCs in the visual inspection
application Visual inspection application not user-friendly.
No visualization of NC code.
Material
7. FOLLOW UP
Machine Project duration
•550 shop floor employees engaged and
trained with TWI method (internal
5. PROPOSED COUNTERMEASURE In order to foster FTQ the following measures will be taken: trainers)
1. Engage people in FTQ on shop floor. Define SMART 4. Implement visual management of VQI •76% internal repack and rework
machine targets with people from shop floor. •Visualisation in the linkups
•Visualisation in the cockpit (Team Leaders’ Office )
decrease in 2012 vs. 2011.
2. Provide people in shop floor with an innovative user-
friendly application in the linkups. •February 2013 - EU engagement
5. TWI (Training Within Industry) method to
workshop regarding PMPL application
3. Autonomous maintenance inspection to be used for be used for raising awareness and quality of
roll-out in MES 2.1
improvement of quality in linkups. visual inspection in shop floor.
Thanks