Anda di halaman 1dari 52

DASAR APLIKASI ALAT BERAT

DAN
PERENCANAAN PEMELIHARAAN

1
MODUL PELATIHAN
• PENGANTAR
• SIFAT FISIK MATERIAL
• ANALISA BEBAN & TENAGA

11/30/22 2
PENGANTAR MANAJEMEN ALAT-ALAT BERAT

LATAR
BELAKANG MAX. PRODUCTIVITY
MANAJEMEN MINIMUM COST ROI
ALAT-ALAT
BERAT

11/30/22 3
4

PENGANTAR MANAJEMEN ALAT-ALAT BERAT


CONTROL GOAL
POPULASI ALAT BERAT
* Jenis Alat & Kapasitasnya
MANAJEMEN
* Komposisi Alat EFISIENSI
PEMILIHAN
ALAT * Jumlah Alat ALAT
* Biaya Pemilikan Alat
(ANALISA
* Biaya Opersi Alat
INVESTASI ALAT)
* Biaya Persatuan Produksi Alat

PENGOPERASIAN ALAT
* Utilisasi Alat
MANAGEMENT MANAJEMEN * Aplikasi Alat PRODUKTIVITA
ALAT-ALAT APLIKASI DAN * Sistem pengoperasian S ALAT & BIAYA
BERAT PRODUKSI ALAT * Biaya Operasi Alat OPERASI
* Safety
* Pelatihan Operator

PELAYANAN ALAT
* Technology Alat
* Program Perawatan
MANAJEMEN * Work Shop, Tools & KETERSEDIAAN
PERAWATAN Equipment ALAT & BIAYA
DAN SUKU * Suku Cadang & PERBAIKAN
CADANG Consumable Goods
* Safety
* Pembinaan Mekanik
* Pembinaan Part Man
11/30/22
ALUR PROSES PENAMBANGAN
Start

Top Soil
Removal

No
Vegetation

Yes

Top Soil Land


Handling Clearing

Material
OB Removal
Characteristic

Direct Ripping Medium-Large Drilling


Digging Dozing Bulldozer Blasting

Waste Hyd. Excavator


Excavating Dozer Shovel
Wheel Loader
Waste Road Grader
Transportation Maintenance Compactor

Disposal/ Small-Medium
Waste Dump Bulldozer

End
11/30/22 5
PENGANTAR MANAJEMEN ALAT-ALAT BERAT

PROSES MAKRO PRODUKSI (OVERBURDEN REMOVAL)

1. Waste Excavation : Drill-Blast, Ripp. Dozing, Loading


2. Waste Transportation : Hauling, Grading dll
3. Commodity Excavation : Loading, Ripping-Dozing, Spreading
4. Commodity Transportation : Hauling, Grading, Spreading
5. Road Construction & Maintenance : Grading, Compacting, Spreading dll.
6. General Work : Pumping, Spreading dll
7. Pit Rehabilitation : Loading, Spreading, Planting dll

11/30/22 6
MEMAHAMI
SIFAT FISIK MATERIAL

11/30/22 7
SIFAT FISIK MATERIAL

Salah satu kondisi yang mempengaruhi operasional di


lapangan adalah Sifat fisik dan karakteristik material.
Sehingga hal ini berpengaruh terhadap :

 Pemilihan jenis alat yang akan digunakan dan


 taksiran serta kapasitas produksi yang
dibutuhkan
 Perhitungan volume pekerjaaan
 Kemampuan kerja alat

11/30/22 8
SIFAT FISIK MATERIAL

FAKTOR YANG MEMPENGARUHI PEMILIHAN DAN


PEMAKAIAN ALAT - ALAT BERAT

 SIFAT FISIK DAN KARAKTERISTIK MATERIAL


1. Pengembangan dan Penyusutan Material
2. Berat Material
3. Bentuk Material
4. Kohesivitas Material
5. Kekerasan Material
6. Daya-dukung Material

11/30/22 9
SIFAT FISIK MATERIAL
1. Pengembangan dan Penyusutan

*)sandstone
BANK LOOSE
1.65* COMPACT
1.00* 1.22*

11/30/22 10
SIFAT FISIK MATERIAL

1. PENGEMBANGAN DAN PENYUSUTAN


a. KEADAAN ASLI / BANK CUBIC METER ( BCM )
b. KEADAAN GEMBUR / LOOSE CUBIC METER ( LCM )
c. KEADAAN PADAT / COMPACT CUBIC METER ( CCM )

Contoh Pasir

BCM X 1,1 LCM X 0,86 CCM

X 0,95

11/30/22 11
SIFAT FISIK MATERIAL
JENIS MATERIAL KONDISI PERUBAHAN KONDISI BERIKUTNYA
AWAL
KONDISI ASLI KONDISI KONDISI
GEMBUR PADAT
(A) 1.00 1.11 0.95
SAND (B) 0.90 1.00 0.86
(C) 1.05 1.17 1.00
(A) 1.00 1.25 0.90
SANDY CLAY (B) 0.80 1.00 0.72
(C) 1.11 1.39 1.00
(A) 1.00 1.43 0.90
CLAY (B) 0.70 1.00 0.63
(C) 1.11 1.59 1.00
(A) 1.00 1.18 1.08
GRAVELLY SOIL (B) 0.85 1.00 0.91
(C) 0.93 1.09 1.00
(A) 1.00 1.13 1.03
GRAVELS (B) 0.88 1.00 0.91
(C) 0.97 1.10 1.00
SOLID OR (A) 1.00 1.42 1.29
RUGGED GRAVELS (B) 0.70 1.00 0.91
(C) 0.77 1.10 1.00
BROKEN LIMESTONE, (A) 1.00 1.65 1.22
SANDSTONE AND (B) 0.61 1.00 0.74
OTHER SOFT ROCKS (C) 0.82 1.35 1.00
BROKEN GRANITE,BASALT (A) 1.00 1.70 1.31
AND OTHER HARD ROCKS (B) 0.59 1.00 0.77
(C) 0.76 1.35 1.00
(A) 1.00 1.75 1.40
BROKEN ROCKS (B) 0.57 1.00 0.80 KETERANGAN :
(C) 0.71 1.24 1.00
(A) 1.00 1.80 1.30 (A). ASLI/BANK
BLASTED BULKY ROCKS (B) 0.56 1.00 0.72 ( B). GEMBUR/LOOSE
(C) 0.77 1.38 1.00 ( C). PADAT/COMPACT
Tabel 1. FAKTOR KONVERSI VOLUME TANAH/MATERIAL

11/30/22 12
SIFAT FISIK MATERIAL

LATIHAN 1.
Bila 300 BCM tanah biasa (Sandy Clay) digemburkan , maka berapa
volumenya sekarang ?
Jawab :
Dari table faktor konversi didapat data bahwa perubahan tanah asli ke gembur
adalah = 1.25
Maka volume gembur = volume asli x 1.25
300 x 1.25 = 375 LCM ( loose cubic meter )

LATIHAN 2.
Ada 400 LCM tanah biasa asli (Sandy Clay) yang sudah digemburkan , dan
apabila tanah ini dipadatkan dengan Compactor maka berapa volumenya
sekarang ?
Jawab :
Dari table faktor konversi didapat data bahwa tanah dari gembur kepadat
adalah = 0,72
Maka volume Padat = volume gembur x Factor
400 x 0,72 = 288 CCM ( compact cubic meter )

11/30/22 13
SIFAT FISIK MATERIAL

LATIHAN 3.
Untuk keperluan menaksir biaya yg dibutuhkan, seorang petugas bagian perencanaan
minta bantuan anda untuk bersama-sama menghitung.
Datanya adalah sbb.
Nama Project : Pengurukan dan penggalian tanah biasa untuk gudang di Jakarta
Volume : Tanah galian 60.000 BCM , Timbunan 800.000 CCM
Keterangan : 40% tanah galian dapat digunakan untuk tanah timbunan, sisanya harus dibeli
dari Bekasi , harga tanah sampai diproject Rp. 15.000,- per truck , isinya 5 m3

Pertanyaan : Berapa biaya yg diperlukan untuk membeli tanah

Jawab :
40% x 60.000 Bcm = 24.000 bcm x 0.9 = 21.600 ccm
800.000 ccm – 21.600 ccm =778.400 ccm = 1.081.976 lcm
1.081.976 / 5 m3 = 216395 rate x Rp 15.000 = Rp. 3,24 M

11/30/22 14
SIFAT FISIK MATERIAL
2. Berat Material

Pasir-besi coal

11/30/22 15
SIFAT FISIK MATERIAL
Kg / M3 Kg / M3
MATERIAL
Tanah Asli Tanah Gembur
Liat 2015 1650
Liat gembur, kering 1840 1485
Liat gembur, basah 2075 1725
Liat campur, kerikil, kering 1650 1185
Liat campur, kerikil, basah 1840 1725
Tanah biasa kering 1780 1185
Tanah biasa basah 2075 1725
Tanah dan batu 2290 1725
Kerikil kering 1900 1425
Kerikil basah 2250 2015
Pasir batu 2550 1580
Pasir kering 1600 1125
Pasir lembab 1900 1680
Pasir basah 2075 1840
Pasir & kerikil kering 2015 1725
Pasir & kerikil basah 2250 2015
Hancurkan batu   1600
Batu besar 2600 1725
Lapisan olah 1365 960

Tabel 2. BERAT MATERIAL

11/30/22 16
SIFAT FISIK MATERIAL
3. Bentuk Butiran Material

Butiran

kasar halus

11/30/22 17
SIFAT FISIK MATERIAL
4. Kohesivitas Material

Pasir Tanah liat

11/30/22 18
SIFAT FISIK MATERIAL
5. Kekerasan Material
Material dalam istilah geologi dibagai dalam 3 macam :

• BATUAN BEKU  Keras, Padat, Kompak dan Masif.


• BATUAN SENDIMEN  Berlapis, hasil pengendapan dengan tingkat
butiran yang beraneka ragam.
• BATUAN METAMORF  Umumnya disebut sebagai Batuan Malihan,
berfoiasi (semacam lapisan), Tekanan dan Suhu
mempengaruhi proses pembentukannya.

Nilai Kekerasan Material


Secara umum diukur dengan menggunakan RIPPER METER atau SEISMIC
TEST METER nilai kekerasan ditunjukkan dalam satuan M/detik ( satuan
Seismic Wave Velocity Batuan )

11/30/22 19
SIFAT FISIK MATERIAL

Contoh metode tes seismeik (pantulan) kekerasan batuan

Power Source Geophone


A B C D E
G.L.

D1 Top Soil

D2 2nd Layer

D3 3rd Layer

11/30/22 20
SIFAT FISIK MATERIAL

Contoh hasil tes seismik


Contoh Hasil Test Seismic

496 m/sec 1152 m/sec

2034 m/sec
A B m/sec
1686

Pada gambar hasil Seismic Wave Velocity grafik vertikal menunjukkan Kedalaman
lapisan (m) dan grafik horizontal menunjukkan jarak pengukuran (m).
Gambar A didapatkan Velocity lapisan 1 = 496 m/sec. Dan Lapisan 2 = 2034 m/sec.
Gambar B didapatkan Velocity lapisan 1 = 1152 m/sec. Dan Lapisan 2 = 1686 m/sec.
Sehingga bisa disimpulkan type alat berat yang cocok dan jumlah masing-masing
type sesuai volume yang diketahui.

11/30/22 21
SIFAT FISIK MATERIAL
m3/hr Estimasi Produktivitas Ripping Bulldozer
2600
D575A

2400

2200

2000

1800

1600
D475A

1400

1200

D375A
1000

D275A
800
D355A

600
D155AX
D155A
400

200

500 1000 1500 2000 2500 3000 4000 ( m/s )

11/30/22
Grafik 1. Tingkat Estimasi Produktivitas Ripping Bulldozer 22
SIFAT FISIK MATERIAL
6. Daya Dukung Tanah
Daya Tekan Alat
(Ground-Pressure

Daya Dukung Material

11/30/22 23
SIFAT FISIK MATERIAL

Dump Truck
L limit Possible
Wheel Loader

Dozer Shovel

Single eng
Motor Scraper Twin Eng

Towed Scraper

Hydraulic Excavator

Bulldozer

Crawler Dump

Swamp Dozer

Man

1 2 3 4 5 6 10 15
Cone Indexqc ( kg/cm3 )

Tabel 4. Daya- dukung tanah vs jenis alat- berat.


11/30/22 24
SIFAT FISIK MATERIAL

CONE INDEX JENIS ALAT DAYA TEKAN ALAT

2 Extra Swamp Dozer 0.25 – 0.30

2–4 Swamp Dozer 0.20 – 0.30

4–5 Small Bulldozer 0.30 – 0.60

5–8 Medium Bulldozer 0.60 – 0.80

7 – 10 Large Bulldozer 0.70 – 1.30

10 –13 Motor Scraper 1.30 – 2.83

15 Dump Truck 3.20


Tabel 5. Daya Dukung Tanah Untuk Alat-alat Berat Kamotsu

11/30/22 25
SIFAT FISIK MATERIAL

Tabel 6. Spesifikasi Alat dan Jarak Angkut Material

Bulldozer

Wheel Loader

Towed Scraper

Motor Sraper

Dump Truck

(m)
0 100 200 300 400 500 1000 1500 2000 2500

Hauling Distance

11/30/22 26
Analisa Beban
&
Tenaga

11/30/22 27
ANALISA BEBAN & TENAGA

TAHAPAN ANALISA YG DILAKUKAN

1. MENENTUKAN BEBAN TOTAL MESIN / ALAT

2. MENETUKAN TENAGA YG TERSEDIA atau KOMBINASI


DRAW BAR PULL dgn KECEPATAN

3. MEMERIKSA TRAKSI KRITIS MESIN UTK MENENTUKAN


TENAGA TARIK YG DIGUNAKAN

4. MEMBANDINGKAN BEBAN TERHADAP TENAGA TARIK YG


DIGUNAKAN / PEMILIHAN GIGI ( SPEED )

5. MENGADAKAN KOREKSI TENAGA YG TERSEDIA, APABILA


MESIN BEROPERASI PADA KETINGGIAN TERTENTU

11/30/22 28
ANALISA BEBAN & TENAGA
PEKERJAAN / KEGIATAN
PERALATAN YANG DIGUNAKAN CLEARING TOP SOIL ROAD OVER BURDEN MINING PROCESSING DELIVERY
GRUBBING REMOVAL CONSTRUCTION REMOVAL PLANT SHIPPING

** ** ** **
BULLDOZER
D65E, D85E, D155A, ....
* *
** ** **
BULLDOZER (RIPPER)
D85E, D155A, D375A,....
*
** ** ** ** ** ** **
HIDRAULIC EXCAVATOR
PC200, PC300, .....

** **
FRONT SHOVEL
PC650, PC1000, .....

** ** ** **
WHEEL LOADER
WA180,WA250, .....
* *
**
MOTOR GRADER
GD500, GD600, .....

**
COMPACTOR
BW172D, BW212D, .....

** **
DUMP TRUCK
HD325, HD465, .....
* *
** **
ARTICULATED DUMP TRUCK
HM400, .....
*
** ** ** ** **
NISSAN DUMP TRUCK
CWB 520LDN, .....
*
** ** **
POWER SCRAPER
WS16S,WS23S
( ** ) SUITABLE

( * ) POSSIBLE Jenis alat-berat vs tahapan penambangan


Tabel 5. Tabel Spesifikasi alat terhadap jenis pekerjaan

11/30/22 29
ANALISA BEBAN & TENAGA

FAKTOR YANG MEMPENGARUHI PEMILIHAN DAN PEMAKAIAN ALAT-


BERAT
1. BEBAN
a. Beban Dorong
b. Beban Potong
c. Beban Tarik
d. Tahanan Gelinding
e. Tahan Kelandaian
f. Beban Total
2. TENAGA
g. Tenaga tersedia
h. Pembatas Tenaga :
Traksi kritis dan
Attiude

11/30/22 30
ANALISA BEBAN & TENAGA

1.a . BEBAN DORONG

Gambar …. Beban dorong yang terjadi saat dozing

RUMUS :
BEBAN DORONG = KB x BD dimana : KB = Kapasitas Blade ( M 3
)
BD = Berat Material ( kg/m3 )

11/30/22 31
ANALISA BEBAN & TENAGA

1.b. BEBAN POTONG

Penampang
yg dipotong

BEBAN POTONG = q x dr ( kg )

dimana : q = luas penampang tanah yg dipotong ( cm2 )


dr = Shear strength

11/30/22 32
ANALISA BEBAN & TENAGA

1.c. BEBAN TARIK


ARCH SKIDDING

GROUND SKIDDING
BEBAN TARIK = BK x cq ( kg )

dimana : BK = Berat kayu ( kg )

Cq = Koofesien gesek
( Ground skidding = 0.90
( Arch skidding = 0.35

11/30/22 33
ANALISA BEBAN & TENAGA

1.d. TAHANAN GELINDING

TAHANAN GELINDING = w x r ( kg )

dimana : w = Berat kendaraan ( kg )


r = Koofesien tahanan gelinding

11/30/22 34
ANALISA BEBAN & TENAGA

LATIHAN 4
Berapa tahanan gelinding dari D 85A-18 yang sedang menarik Scraper RS
16 , pada pasir gembur. Bila diketahui
- Berat D 85A -12 = 22090 kg
- Berat RS 16 = 10500 kg
- Koofisien tahana gelinding = 0.12
Jawab :

TAHANAN GELINDING ( RR ) = w x r
= 10500 x 0,12
= 1260 kg
LATIHAN 5
Sama seperti diatas tetapi RS 16 nya dimuati tanah biasa dengan berat material
1725 kg/m3,muatan RS 16 adalah 16 m3. Berapa Rolling Resistace / Tahanan
Gelindingnya ???

Jawab :

TAHANAN GELINDING ( RR ) = w x r
= 38.100 x 0,12
= 4572 kg

11/30/22 35
LATIHAN 6
Sebuah Dump truck HD 200-2, digunakan untuk menarik Scraper RS 12,
bermuatan tanah biasa
Berat HD 200 = 20 ton
Berat RS 12 = 9,2 ton
Koofisien tahanan gelinding = 0,12
Berat material = 1725 kg/m3
Muatan Dumptruck HD 200 – 2 = 17 m3
Muatan Scraper RS 12 = 8 m3
Hitung tahanan Gelinding yang didedrita oleh Dump truck tsb.

Jawab :

11/30/22 36
ANALISA BEBAN & TENAGA

1.e. TAHANAN KELANDAIAN

TAHANAN KELANDAIAN = W x % k

dimana : W = Berat kendaraan ( kg )


% k = Kelandaian ( % )

11/30/22 37
ANALISA BEBAN & TENAGA

LATIHAN 6
Bila suatu Bulldozer D 50A – 16 mendaki bukit dgn kelandaian 25,9 % ,
berapakah tahanan kelandaian dozer tsb. ? Apabila berat D 50A -16 =
11.400 kg

Jawab : Tahanan Kelandaian = w x % k


= 11400 x 0,259
= 2952,6 kg

11/30/22 38
ANALISA BEBAN & TENAGA

LATIHAN 6
Bulldozer D 85E ss-2 digunakan untuk menarik Scrapper RS 16
bermuatan tanah biasa , kelandaian bukit 10 derajat, Berat D
85Ess-2 adalah 22 ton, sedangkan RS 16 + muatan = 29 ton.
Berapakah tahanan kelandaian yang diderita oleh Bulldozer tsb ?

Jawab :

Tahanan Kelandaian = w x % k
= ( 22000 + 29000 ) x 0,174
= …………… kg

11/30/22 39
ANALISA BEBAN & TENAGA

DERAJAT KONVERSI DERAJAT KONVERSI DERAJAT KONVERSI


(%) (%) (%)
1 1.8 11 19.0 21 35.8

2 3.5 12 20.8 22 37.5

3 5.2 13 22.5 23 39.1

4 7.0 14 24.2 24 40.2

5 8.7 15 25.9 25 42.3

6 10.5 16 27.6 26 43.8

7 12.2 17 29.2 27 45.4

8 13.9 18 30.9 28 47.0

9 15.6 19 32.6 29 48.5

10 17.4 20 34.2 30 50.0

Tabel …a. Konversi Derajat / % Kelandaian

11/30/22 40
ANALISA BEBAN & TENAGA

KEADAAN PERMUKAAN JALAN KOEFISIEN TAHANAN


GELINDING ( % )

Jalan terpelihara, ban tidak terbenam 2.00

Jalan terpelihara, ban agak terbenam 3.50

Ban terbenam, sedikit basah 5.00

Keadaan jalan jelek 8.00

Jalan berpasir gembur, jalan berkerikil 10.00

Keadaan jalan sangat jelek 15 - 20

Tabel …b. Konversi Derajat / % Kelandaian

11/30/22 41
ANALISA BEBAN & TENAGA

PENGARUH TAHANAN GELINDING & TAHANAN KELANDAIAN


TERHADAP ALAT

1. MENANJAK
• KENDARAAN RODA = TAHANAN KELANDAIAN + TAHANAN
GELINDING
• KENDARAAN RANTAI = TAHANAN KELANDAIAN

2. DATAR
• KENDARAAN RODA = TAHANAN GELINDING

• KENDARAAN RANTAI = NOL

3. MENURUN
• KENDARAAN RODA = TAHANAN GELINDING - TAHANAN
KELANDAIAN
• KENDARAAN RANTAI = MINUS TAHANAN KELANDAIAN

11/30/22 42
ANALISA BEBAN & TENAGA

LATIHAN 7
Bila suatu Bulldozer digunakan menarik scraper bermuatan tanah biasa disuatu
medan dengan kemiringan lapangan 5 % pada jalan berkerikil , koofisien
tahanan gelinding = 0,12 Berapakah tahanan yang terjadi terhadap Bulldozer
saat menarik scraper ?.
dengan catatan : Berat Tractor = 26
Berat Scraper = 16 ton
Muatan scraper = 4 ton

Jawab :
Tenaga yang dibutuhkan adalah = beban total yaitu Tahanan Tractor +
tahanan Scrapper

Tahanan Tactor hanya tahanan kelandaian (GR ) = W x % k


= 26000 x 5% = 1300 kg
Tahanan Scapper adalah tahanan gelinding + tahanan kelandaian
= ( W x r ) + ( W x %k ) = ( 20.000 x 0,12 ) + ( 20.000 x 5% )
= 2400 + 1000 = 3.400 kg.

Jadi tenaga yang dibutuhkan adalah = 1300 + 3400 = 4.700 KG.

11/30/22 43
ANALISA BEBAN & TENAGA

1.f. BEBAN TOTAL

TENAGA YANG TERSEDIA TERGANTUNG PADA HORSE


POWER ALAT ITU.

DALAM PROSES MEKANIKAL SELANJUTNYA HORSE POWER


AKAN BERUBAH MENJADI TENAGA TARIK
( DRAWBAR PULL )

11/30/22 44
ANALISA BEBAN & TENAGA
GRAFIK DRAWBAR PULL

11/30/22 45
ANALISA BEBAN & TENAGA

Gambar Grafik Rim Pull


11/30/22 46
ANALISA BEBAN & TENAGA

2.a. TAHANAN KRITIS

Crawler type tractor 2-wheel drive tractor 4-wheel drive tractor

Weight imposed on the


Total weight of tractor driving wheels Total weight of tractor

11/30/22 47
ANALISA BEBAN & TENAGA

2.b. TRAKSI KRITIS

TAHANAN KRITIS ( TK ) = W x ct ( kg )

dimana : W = Berat kendaraan pada


roda penggerak ( kg )
ct = Koofisien traksi

11/30/22 48
ANALISA BEBAN & TENAGA

Tabel 9. Koefisiensi Traksi (CT )

RODA BAN RANTAI KELABANG


TYPE DAN KEADAAN TANAH KARET (CRAWLER)
(RUBBER TYRE)

Beton Kering 0.95 0.45


Jalan kering berbatu, ditumbuk 0.70 -
Jalan basah berbatu, ditumbuk 0.65 -
Jalan datar kering, tidak 0.60 0.90
dipadatkan
Tanah kering 0.55 0.90
Tanah basah 0.45 0.85
Tanah gembur kering 0.40 0.60
Kerikil lepas / gembur 0.36 0.25
Pasir lepas 0.27 0.25
Tanah berlumpur 0.25 0.15

11/30/22 49
KETINGGIAN / ALTITUDE

Perubahan kadar oksigen dalam udara akan berpengaruh terhadap Horse


Power ( HP ) engine dari suatu alat yang beroperasi didaerah ketinggian
tertentu

Natural Aspirated
Diesel 4 tak alat tenaga diesel dengan jenis ini akan mengalami penurunan
tenaga sebesar 1 % pada setiap 100 m kenaikan diatas ketinggian 300 m
DPL
Diesel 2 tak alat tenaga diesel dengan jenis ini akan mengalami penurunan
tenaga sebesar 1 % pada setiap 100 m kenaikan diatas ketinggian 150 m
DPL
Turbo charger / Supercharger
Diesel 4 tak alat tenaga diesel dengan jenis ini akan mengalami penurunan
tenaga sebesar 1 % pada setiap 150 m kenaikan diatas ketinggian 1500 m
DPL

11/30/22 50
ANALISA BEBAN & TENAGA

LATIHAN 9
Sebuah Dozer D 60E-8 digunakan menarik Harrow merk Towner type 800 series, berat
D 60E-8 = 18 ton, berat Harrow = 4 ton , menurut pabrik Harrow type 800 akan
memberikan tahanan sebesar 4500 kg apabila ditarik ditempat rata.apablia D60E tsb
menarik ditempat yg mempunyai kelandaian 8 % , Mampukah alat tsb menarik nya ? Jika
di ketahui Koefisien traksinya 0,65.

Jawab :
Tahanan yg menjadi beban Dozer D 60E-8 adalah Tahanan Kelandaian + Tahanan
Harrow
Tahanan Kelandaian D60E-8 = w x r = 18.000 x 0.08
= 1.440 kg
Tahanan Harrow 4500 + ( 4000 x 8% ) = 4.820 Kg
Tahanan Total = 1440 + 4820 = 6260 kg.

Tenaga yang bermanfaat = Traksi kritis


TK = 18000 x 0,65 = 11700 kg

Kesimpulan Dozer D60E-8 mampu menarik Harrow sebab …………


11700 > 6260

11/30/22 51
CONGRETULATION
WE ARE
CHAMPION
Thank You

11/30/22 52