Daftar Isi:
1. Komponen PLTU
2. Load shedding and restoration
3. Ringkasan teori
3.1. Motor induksi
3.1.1. Rumus dan macam motor Induksi:
3.1.2. Komponen instalasi motor induksi: Motor induksi sendiri, bantalan,
kontaktor, kopling
3.1.3. Cara asut, putaran variabel
3.1.4. Putaran variabel
3.1.5. Name plate
3.2. Generator sinkron
3.3. Motor sinkron Operasi dan Rawat PLTU 1
Daftar isi (lanjutan)
8. Alat sakel
phase bus
Bantalan
Sleeve bearing
Bantalan peluru
R2'run X2'run
R1 X1
Vt
R' 2run
1 s
I2'
Rm
Xm
s
Ih+e
Po
I nS
120 f1
s
nS n
V 3 E f f Fd p nS
(1.10)
Rel pemakaian sendiri
Di lokasi:
1. On atau off load tap changer?
SST 2. Run SST. On load tap changer (dengan
ototrafo?)
3. On load tap changer, untuk transmisi
PLTG 10 kali motor terbesar ?
20kV panjang +5% dan -15%!
[4] start 4. Start STT
Rel PS kemungkinan
diparalel dengan unit lain
(1.15)
Operasi dan Rawat PLTU 15
Saluran listrik pemakaian sendiri
Running Station
Service trafo
6 kV Transmission SS with
Station Interbus trafo 500/150 Kv
Service
150kV
6333.5 kW boiler feed pump
6 kV
Paralel Operation
Fascilities with Other
Operasi dan Rawat PLTU 16
Generating units.
General Description
1 Power Output
6 Speed Droop Setting 4,6 % 4,6 % 4,6 % 4,6 % 7,6 % 9,5 % 9,5 %
Free Governoor
7 Operation Mode Load Limit
(Boiler-Turbine Coordinate)
8 Boiler Manufacture Babcock Wilcock ( Radiant Boiler Natural Circulation Tower )
9 Turbin Manufacture Mitsubishi Heavy Industri ( Tandem Compund Quadraple Exhaust Reheat Condensing )
11 Generator Transformer Manufacture Mitsubishi Electric Company ( OFAF cooling Off Load Tap Changer )
Capability Curve
PF 0,85
400
Current : 19.253 A
Power Factor : 0,85
Phase :3
200
Frequency : 50 Hz
MEL
No of pole :2
MVAR
0 MW
200 400 600 Cooling System : Hydrogen at
Steady 5kg/cm2
state limit
Ecxitation Voltage : 590 V
UNDER EXCITATION
200
EXCITER
CAPABILITY CURVE
Operasi dan Rawat PLTU Brushless type , Output : 3300 KW,
19
DURATION OF
CONDITION MAX START-UP START-UP TIME START UP COST
UNIT No. TYPE st STOP
Turbin 1 Metal Temp. per YEAR up to 100% LOAD (in Million Rp. )
( hour )
0
COLD < 190 C >36 hours 3 times 17 hours 221
1-4 WARM 0
190 C - 370 C
0
8 - 36 hours 2 times 12 hours 170
0
HOT > 371 C < 8 hours 1 time 7.9 hours 102
0
COLD < 190 C > 36 hours 3 times 17 hours 324
5-7 WARM 0
190 C - 370 C
0
8 - 36 hours 2 times 12 hours 218
0
HOT > 371 C < 8 hours 1 time 7.9 hours 155
By Pass not
By Pass not
By Pass not
By Pass not
Available
Available
Available
Available
4 Start-Up Unit 5,3 5,3 9,9 14,2
5 Ramping 0% to 100% Load 4,1 4,1 4,1 5
TOTAL TIME (HOURS) 9,4 11,4 16 21,2
B. UNIT 5-7 (3 Unit Start)
Condensor Damage, Turbin Damage (Lub Oil Pump not
1 Consequence Minimum Impact running), Air Heater Damage, Steam Drum Boiler Drop (long
firing), Back-Up Battery Time LOW
Available
Available
Available
By Pass
By Pass
By Pass
By Pass
4 Start Unit 3,8 7,9 7,9 12
5 Ramping 0% to 100% Load 4,1 4,1 4,1 5
TOTAL TIME (HOURS) 7,9 7,9 12 17
Operasi dan Rawat PLTU 21
Required Power to Start-Up :
CONNECTED Load Demand Load
Motor
Operation Factor Power
ITEM Qty
Voltage ( kV )
Acceleration LOAD (Bus A+B)
Factor (kW) (kVAR) (kVA)
Time (Seconds) (kW) (kVA) (% )
1. UNIT 1-4 (for 1 unit)
a. Low Voltage LVS LOAD 1 0,38 1800 2250 80 0,80 1876 1389 2334
b. Auxiliary Boiler Start-Up 1 6 & 0,38 1000 1250 80 0,80 800 600 1000
c. Cooling Water Pump (CWP) 1 6 4 1500 1875 95 0,80 1425 1069 1781
e. Condesate Extraction Pump (CEP) 1 6 4 630 788 85 0,80 536 402 669
f. Boiler Feed Po. (BFP) 1 6 4 6342 7928 90 0,80 5708 4281 7135
g. Induced Draft Fan (IDF) 1 6 28 2255 2819 50 0,80 1128 846 1409
h. Force Draf Fan (FDF) 1 6 25 1393 1741 50 0,80 697 522 871
i. Primary Air Fan (PAF) 1 6 10 1322 1653 50 0,80 661 496 826
j. 1 ea. MILL to produce 100 MW 1 6 3 522 653 95 0,80 496 372 620
TRANSFER SST to UST at 80 MW
Power to Start-Up one plant of 400 MW 13325 9975 16646
Total Power to Start-Up 4 plants of 400 MW 39976 29926 49937
Same
50 Hz Action 50 Hz NORMAL OPERATION
EKL28PerHUBUNGSINGKAT.doc
EKL33NegatipGen.doc
2,500
2,375 CEP start SU-BFP start
2,250 Is = 7,14 x In ID Fan start
Is = 8,49 x In Is = 9,26 x In
2,125
2,000
Current (Amperes) at 10,5 kV
1,875
FD Fan start
1,750
CWP start Is = 9 x In
1,625
1,500
Is = 4,82 x
In
1,375
1,250
1,125
1,000
875
750
625 C3WP
500
375
250
125
0
Time (Second)
CWP
start
CEP start
SU-BFP start
FD Fan start
ID Fan start