Anda di halaman 1dari 6

PT JAYA KONSTRUKSI MP, Tbk.

TES RESULT SUMMARY


OF EMBANKMENT MATERIAL
EX JERUK SAWIT, KARANGANYAR
I. MATERIAL RESOURCES
Jeruk Sawit Quarry
II. AGGREGATE GRADING
Percent Passing By
Weight
Actual Grading
100
97.36
90.31
81.13
47.94
33.86
22.73
14.87

Sieve Analysis
ASTM (mm)
19
9.5
4.75
2.00
0.84
0.42
0.15
0.075

Imperial
3/4"
3/8"
No. 4
No. 10
No. 20
No. 40
No. 100
No. 200

III. AGGREGATE PROPERTIES


PROPERTY
Plastic Index
(AASTHO T90 - 70)
Liquid Limit
(AASTHO T89 - 68)
Plastic Limit
(AASTHO T89 - 68)
CBR at 100% Dry Density
after 4 day soaking
(AASTHO T99 Method D)
CBR at 95% Dry Density
after 4 day soaking
(AASTHO T99 Method D)
IV. COMPACTION RESULT
1. Specivic Gravity
2. Max. Dry Density
3. Optimum Moisture Content
V. SOIL CLASIFICATION
1. Retained No.4
2. Passing No. 200
Disetujui
Direksi PU
PJBH-SK

TEST RESULT

REQUIREMENTS

NP

NP

NP

28.5

6.0 % Min.

19.0

:
:
:

2.51 t/m
1.560 t/m
17.0 %

:
:

9.69 %
14.87 %

Diperiksa Oleh
Konsultan Supervisi
PT. ANUGERAH KRIDAPRADANA (JO)

Ditest Oleh
Kontraktor Pelaksana
PT. JAYA KONSTRUKSI MP

(Christianto Budi Raharjo)

(Arif Budiarto)

(Hardaning Laksono)

PT JAYA KONSTRUKSI MP, Tbk.


1.
2.
3.
4.
5.
6.
7.

Nama kegiatan
Jenis benda uji
Sumber Material
Metode pengambilan contoh
Metode uji
Hasil pengujian
Kontraktor

:
:
:
:
:
:
:

Pekerjaan Timbunan Jalan Tol Kartasura Karanganya


Tanah
eks. Jeruk Sawit, Karanganyar PT. Cahaya Indra Laks
Laboratorium BPIK
SNI
Diterima/Baik
PT Jaya Konstruksi MP, Tbk.

SUMMARY HASIL PENGUJIAN


TANAH TIMBUNAN EKS. JERUK SAWIT PT CAHAYA INDRA LAKSANA

1. CBR
a. Untuk dry 95%
b. Untuk dry 100%

:
:

2. Pengujian Proctor
a. Kadar Air Optimum
b. dry maksimum

:
:

3. Pengujian Batas-batas Atterberg


a. Batas cair (LL)
b. Batas plastis (PL)
c. Indeks plastisitas (IP)

:
:
:

4. Berat Jenis Tanah

19.0 %
28.5 %

17.00 %
1.56 ton/m3

Non Plastis
Non Plastis
Non Plastis
2.51 ton/m3

Disetujui
Direksi PU

Diperiksa Oleh
Konsultan Supervisi

PJBH-SK

PT. ANUGERAH KRIDAPRADANA (JO)

(Christianto Budi Raharjo)

(Arif Budiarto)

Ditest Oleh
Kontraktor Pelaksana

PT. JAYA KONSTRUKSI MP

(Hardaning Laksono)

AL
YAR

Ditest Oleh
Kontraktor Pelaksana
PT. JAYA KONSTRUKSI MP, Tbk.

(Hardaning Laksono)

n Jalan Tol Kartasura Karanganyar

ranganyar PT. Cahaya Indra Laksana

AN
HAYA INDRA LAKSANA

Ditest Oleh
Kontraktor Pelaksana
PT. JAYA KONSTRUKSI MP, Tbk.

(Hardaning Laksono)

Anda mungkin juga menyukai