PENGELOLAAN LINGKUNGAN
PT. VALE INDONESIA Tbk.
September, 20131
Alur Presentasi
Sekilas tentang perusahaan
Visi & Misi
Penambangan & Pemurnian Bijih
Pengelolaan Dampak Lingkungan
Pengelolaan kualitas udara
Pengelolaan limbah B3
Pengelolaan batuan penutup/disposal
Pengelolaan kualitas air
Rehabilitasi lahan pasca tambang
INDONESIA
INDONESIA
TOMINI BAY
118,387 ha
- Sulawesi Tengah
PALU
36,635 ha
KOLONEDALE
- Sulawesi Tenggara
35,486 ha
Total = 190,509 ha
TOLO BAY
SOROAKO
MAKASSAR
BAHODOPI
LATAO
MATARAPE
LASOLO
SUASUA
BONE
BAY
PAOPAO
KENDARI
POMALAA
TOROBULU
INDONESIA
Petea
Lampesue N&S
WB EB
Processing Plant
Lingkona
Mahalona
Malili
Towuti Lake
Tanamalia
Lasubonti
Lingke
Lengkobale
INDONESIA
MISI
Mengubah sumberdaya alam menjadi kesejahteraan dan pembangunan yang
berkelanjutan
INDONESIA
Kepemilikan Saham
VALE
61%
20%
Sumitomo
Metal Mining
19%
Public Float
INDONESIA
INDONESIA
Ferruginous
zone
Saprolite zone
Bedrock pinnacle
INDONESIA
INDONESIA
Eksplorasi &
Perhitungan cadangan.
Perencanaan
Tanah pucuk
& tanah
penutup
ROM/Bijih
Penyaringan
Material off
grade
Pasca Tambang
Penyimpanan
REHABILITASI
Pengolahan
Aliran material off grade
Aliran bijih
INDONESIA
Ilustrasi Penambangan
Sebelum penambangan
Kompartemen-A
Top Soil
Over Burden
Soft Saprolite
Blue Zone
Kompartemen-B
INDONESIA
Ilustrasi Penambangan
Land clearing
Kompartemen-A
Top Soil
Over Burden
Soft Saprolite
Blue Zone
Kompartemen-B
INDONESIA
Ilustrasi Penambangan
Pengupasan topsoil
Kompartemen-A
Top Soil
Over Burden
Soft Saprolite
Blue Zone
INDONESIA
Ilustrasi Penambangan
Penyimpanan topsoil untuk digunakan kembali
INDONESIA
Ilustrasi Penambangan
Pengupasan tanah penutup
Kompartemen-A
Over Burden
Soft Saprolite
Blue Zone
INDONESIA
Ilustrasi Penambangan
Penambangan bijih nikel
Kompartemen-A
To Screening Station
Soft Saprolite
Blue Zone
INDONESIA
Ilustrasi Penambangan
Lahan pasca tambang & penambangan kompartemen berikutnya
Kompartemen-A
Blue Zone
Kompartemen-B
Sistem Penambangan
Backfilling/Penimbunan kembali
Kompartemen-A
Blue Zone
DISPOSAL
INDONESIA
INDONESIA
INDONESIA
3 ea Dryer Kilns
HSFO
-1
5 ea Reduction Kilns
HSFO, Coal
Dry Ore Storage
Liquid
Sulphur
F. Matte
1380 C
300 kT
@27% Ni
E.L
E.L
Silica
Matte Granulation
3 ea P.S Converters
Ship to Japan
INDONESIA
INDONESIA
INDONESIA
100
50%
YTD
Q1_13
2012
2011
2010
2009
0%
2008
2007
10%
2006
20
2005
20%
2004
40
2003
30%
2002
60
2001
40%
2000
80
1999
60%
Particulates (Tonnes)
Particulate/Nickel Matte
ratio (%)
120
INDONESIA
Kiln 2,3
Kiln 1
Kiln 1
Kiln 2
Kiln 3
Sesudah
K1,2,3 after replaced by ESP
INDONESIA
Sebelum
(2005)
Tanur peleburan (Furnace)
Sesudah (2005)
INDONESIA
Pengelolaan Limbah B3
INDONESIA
INDONESIA
INDONESIA
INDONESIA
INDONESIA
Su
=
30
kPa
3.4
m
depth
Su
=
90
kPa
9.4 m depth
INDONESIA
20
40
60
80
100
120
140
160
180
200
220
240
260
520
510
510
500
Elevation (m)
500
1.12
490
490
480
480
470
470
460
460
450
450
440
440
430
430
420
0
20
40
60
80
100
120
140
160
180
200
220
240
420
260
Distance (m)
Material
#:
1
Description:
Ballast
Material
Model:
MohrCoulomb
Wt:
20
Cohesion:
10
Phi:
34
Piezometric
Line:
0
Material
#:
2
Description:
O verburden
Material
Model:
UndrainedPhiZero
Wt:
17
C ohesion:
35
Piezometric
Line:
0
Material
#:
3
Description:
Medium
Stiff
to
Stiff
Soil
Model:
UndrainedPhiZero
Wt:
17
Cohesion:
75
Piezometric
Line:
0
Material
#:
4
Description:
V ery
Soft
to
Soft
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
15
C -Rate
o f
Increase:
1
Limiting
C:
20
Piezometric
Line:
0
Material
#:
5
Description:
Stiff
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
50
C-Rate
of
Increase:
5
Limiting
C:
75
Piezometric
Line:
0
Material
#:
6
Description:
V ery
Stiff
Soil
Model:
SFnDepth
Wt:
17
C -Top
of
Layer:
130
C-Rate
of
Increase:
5
Limiting
C :
200
Piezometric
Line:
0
Material
#:
7
Description:
Bedrock
Model:
SFnDepth
Wt:
17
C -Top
of
Layer:
120
C-Rate
of
Increase:
5
Limiting
C:
350
Piezometric
Line:
0
Material
#:
8
Description:
Firm
to
Medium
Stiff
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
45
C -Rate
o f
Increase:
5
Limiting
C:
60
Piezometric
Line:
0
260
520
510
510
510
510
500
500
500
490
490
20
40
60
80
100
120
140
180
200
220
240
1.21
490
Elevation (m)
160
Elevation (m)
520
260
520
20
40
60
80
100
120
140
160
180
200
220
240
500
0.93
490
480
480
470
470
460
460
450
450
450
440
440
440
440
430
430
430
430
420
420
260
420
480
480
470
470
460
460
450
20
40
60
80
100
120
140
160
180
200
220
240
Distance (m)
Material
#:
1
Description:
Ballast
Material
Model:
MohrCoulomb
Wt:
20
Cohesion:
10
Phi:
34
Piezometric
Line:
0
Material
#:
2
Description:
Overburden
Material
Model:
UndrainedPhiZero
Wt:
17
Cohesion:
35
Piezometric
Line:
0
Material
#:
3
Description:
Medium
Stiff
to
Stiff
Soil
Model:
UndrainedPhiZero
Wt:
17
Cohesion:
75
Piezometric
Line:
0
Material
#:
4
Description:
Very
Soft
to
Soft
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
15
C-Rate
of
Increase:
1
Limiting
C:
20
Piezometric
Line:
0
Material
#:
5
Description:
Stiff
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
50
C-Rate
of
Increase:
5
Limiting
C:
75
Piezometric
Line:
0
Material
#:
6
Description:
Very
Stiff
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
130
C-Rate
of
Increase:
5
Limiting
C:
200
Piezometric
Line:
0
Material
#:
7
Description:
Bedrock
Model:
SFnDepth
Wt:
17
C-Top
o f
Layer:
120
C-Rate
of
Increase:
5
Limiting
C:
350
Piezometric
Line:
0
Material
#:
8
Description:
Firm
to
Medium
Stiff
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
45
C-Rate
of
Increase:
5
Limiting
C:
60
Piezometric
Line:
0
20
40
60
80
100
120
140
160
180
200
220
240
Distance (m)
Material
#:
1
Description:
Ballast
Material
Model:
MohrCoulomb
Wt:
20
C ohesion:
10
Phi:
34
Piezometric
Line:
0
Material
#:
2
Description:
Overburden
Material
Model:
UndrainedPhiZero
Wt:
17
Cohesion:
35
Piezometric
Line:
0
Material
#:
3
Description:
Medium
Stiff
to
Stiff
Soil
Model:
UndrainedPhiZero
Wt:
17
Cohesion:
75
Piezometric
Line:
0
Material
#:
4
Description:
Very
Soft
to
Soft
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
15
C-Rate
of
Increase:
1
Limiting
C:
20
Piezometric
Line:
0
Material
#:
5
Description:
Stiff
Soil
Model:
SFnDepth
Wt:
17
C -Top
of
Layer:
50
C-Rate
of
Increase:
5
Limiting
C:
75
Piezometric
Line:
0
Material
#:
6
Description:
Very
Stiff
Soil
Model:
SFnDepth
Wt:
17
C-Top
o f
Layer:
130
C-Rate
of
Increase:
5
Limiting
C:
200
Piezometric
Line:
0
Material
#:
7
Description:
Bedrock
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
120
C-Rate
of
Increase:
5
Limiting
C:
350
Piezometric
Line:
0
Material
#:
8
Description:
Firm
to
Medium
Stiff
Soil
Model:
SFnDepth
Wt:
17
C-Top
of
Layer:
45
C-Rate
of
Increase:
5
Limiting
C :
60
Piezometric
Line:
0
420
260
INDONESIA
Rekomendasi Geoteknik
No.
1.
2.
3.
Description
Original Disposal Information
Disposal Name
Type of Disposal
Plan Level
Operational Dumping :
Crest Limit
Dumping Limit
Lowest Point
Dumping Direction
Civil Material for Ballast
Dumped Material
Drainage System
Disposal Setting & Risk Matrix
ANO24 ANO27 DP Alignment
ANO24 DL on Sta. 0+085 RL +540 m
ANO27 DL on Sta. 0+195 RL +540 m
ANO28 ANO21 DP Alignment
ANO28 DL on Sta. 0+140 RL +530 m
ANO21 DL on Sta. 0+210 RL +530 m
Recommendation
Following Original Design
Dumping Material
Backward
Reduce Level
Proposed Boundary / Limit
Re-sloping
Change Management
Remark
ANO24 ANO27 DP and ANO28 ANO21 DP
Our Ref
Finger with the dumping limits are fully controlled
Level +540 m (including ballast material) for ANO24 ANO27 DP
Level +530 m (including ballast material) for ANO28 ANO21 DP
M11011-DP-M
L-4
L-4
24 (3)
24 (3)
1.23
1.21
Yes
L-4
L-4
No
24 (3)
24 (3)
INDONESIA
INDONESIA
INDONESIA
INDONESIA
INDONESIA
Lamangka
LC3
Lamangka
INDONESIA
Petea West
Petea
West
Petea
East
Petea East
INDONESIA
INDONESIA
RENCANA
REALISASI
9 unit
9 unit
Tambahan kapasitas
pengendapan baru
180 K m3
187,3 K m3
Pengerukan kolam
pengendapan
210 k m3
445 K m3
1.4 M (USD)
2.3 M (USD)
Pembangunan kolam
pengendapan
INDONESIA
Q1
Q2
Q3
Q4
Reclaim (Rp.)
Volume
Aktual
(BCM)
Total (Rp.)
4,722,416,546
738,226,734
215,546
34,415
2,793,685,002
1,277,259,999
164,595
73,003
9,531,588,281
487,559
681,019,277
10,197,083,475
5,821,091,181
738,226,734
8,312,345,642
2,898,728,924
1,277,259,999
681,019,277
0
0
0
0
0
0
19,728,671,757
Catatan:
Aktivitas pengendalian sediment diantaranya adalah pengerukan sedimen, pemompaan
lumpur, perbaikan saluran drainase, konstruksi tanggul, gabion, drop structures, check-dam,
dan riprap serta pembangunan fasilitas mine effluent.
Penambahan Kolam
Pengendapan 2012 Area LC#3
Peningkatan
kapasitas
fasilitas
pengelolaan
euent
catchment
area
LC#3:
1.
Saranga
16,500
m3
2.
Upper
Kockum
55,000
m3
3.
SS#11
7,000
m3
4.
SS#8
20,000
m3
5.
Pongsesa
60,200
m3
6.
Fasilitas
Pengelolaan
Chromium
INDONESIA
1
4
Penambahan Kolam
Pengendapan 2012 Area Petea
INDONESIA
Peningkatan
kapasitas
fasilitas
pengelolaan
euent
catchment
area
Petea
East:
3
4
2
INDONESIA
INDONESIA
Rante Pond
Fiona Pond
Kathryn Pond
Petea Pond 2c
Loraine Pond
Petea Pond 6
Kathryn Pond
Wawono Pond
Hasan Pond
INDONESIA
Pemantauan Fasilitas
Pengendalian Sedimen
INDONESIA
INDONESIA
INDONESIA
INDONESIA
INDONESIA
INDONESIA
Fasilitas
pengelolaan
Fasilitas
pengelolaan
INDONESIA
Sensor debit
Titik injeksi
Arah aliran
Proses pengadukan
INDONESIA
INDONESIA
INDONESIA
Rehabilitasi Lahan
LAHAN PASCA TAMBANG
BACK FILLING
Reklamasi
Belum berhasil
PENATAAN LAHAN
KONSERVASI/PRESERVASI
Sumber plasma nutfah
Penelitian & pengembangan
Penyelamatan
Tanah Pucuk
PERBAIKAN LAHAN
Pembudidayaan Tanaman
Produktif
KAWASAN HPT/APL
Agroforestry
Restorasi
PEMELIHARAAN
Pemupukan lanjutan,
Pembersihan gulma,
Penyulaman
Pengendalian hama penyakit
PEMANTAUAN
INDONESIA
Ilustrasi Rehabilitasi
Penataan lahan dan penebaran topsoil
Kompartemen-A
Blue Zone
INDONESIA
Ilustrasi Rehabilitasi
Penanaman tanaman penutup tanah dan jenis-jenis pioneer
Kompartemen-A
Blue Zone
INDONESIA
Rehabilitasi Progresif
Petea-A
Activity
2004
2005
2006
2007
2008
2004
2005
2006
2007
2008
Mining
Backfilling
Rehabilitation
Anoa Valley
Activity
Mining
Backfilling
Rehabilitation
INDONESIA
INDONESIA
Pasca tambang
INDONESIA
INDONESIA
Foto-foto.. (lanjutan)
INDONESIA
04/22/2005
Foto-foto.. (lanjutan)
INDONESIA
INDONESIA
Foto-foto.. (lanjutan)
Sebelum Penanaman
2 bulan setelah
penanaman
4 Tahun
Setelah
Foto-foto.. (lanjutan)
INDONESIA
Foto-foto.. (lanjutan)
INDONESIA
Multikultur
INDONESIA
Pemeliharaan Tanaman
INDONESIA
Pengayaan Tanaman
INDONESIA
INDONESIA
INDONESIA
Suksesi/regenerasi Alami
INDONESIA
RENCANA
REALISASI
Pembukaan lahan
127,4 Ha
111,4 Ha
Rehabilitasi lahan
98,9 Ha
93.5 Ha
Pemeliharaan tanaman
230 Ha
230 Ha
100 Ha
130 Ha
5,0 juta
5,8 juta
INDONESIA
INDONESIA
Realisasi Reklamasi
Kwt-2, 2013
KEGIATAN
RENCANA
REALISASI
Pembukaan lahan
93,4 Ha
70,4 Ha
Rehabilitasi lahan
82,5 Ha
68,0 Ha
Pemeliharaan tanaman
45,5 Ha
50,4 Ha
37,5 Ha
40,2 Ha
3,1 juta
2,5 juta
INDONESIA
Inventarisasi
Jenis
(Data base)
Pen
entu
an
Prior
itas
Kon
serv
asi
ExSitu
Pembuatan
Arboretum
Peng
umpul
an
bijih
dan
perba
nyaka
n bibit
Penana
man
pada
lahan
pasca
tamban
g
(kanopi
30%)
INDONESIA
INDONESIA
Arboretum
INDONESIA
INDONESIA
INDONESIA
Jumlah pohon
(batang)
Luasan
(Ha)
2004 - 2007
499,500
450
2008
161,800
150
2009
25,400
25
2010
141,700
140
2011
150,000
150
2012
150,000
150
Total
1,128,400
915
INDONESIA
INDONESIA
INDONESIA
INDONESIA
INDONESIA
INDONESIA
Keterlibatan Masyarakat
INDONESIA
INDONESIA
INDONESIA
TERIMAKASIH