SSOP Zulu

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


SSOP Zulu Field

a
Jonly

in
Sinulingga
Tier - 1 Tier - 1

m
ta
er
HSSE PE Subsurface

tP
HR Operation
PSCM Project

en
E&I

em
PHE – PHE ONWJ – PHE WMO- PPEJ- BSP PEP – UTC
SSOP Leader : Achmad Mansur

ag
an
• Wahyu Jatmiko
Subsurface Team

Wells Team

Advisor & Facilitator


HSSE – PSCM – HR Team
Surface Facility Team
• M Iqbal •Eja Pratomo
• Haris Gunawan
M
• Shanty Ilona •Bintarto H • Rahmat • Edi Purnomo
• Pepi S. Mustafid • Roy Sitorus •Heru T.W Keslani • Setyoko Misman
e

• Aditya H • Alvin W. •Decky A • Esti • Jaswadi


dg

• Bambang P • Ichromi Zamzami •I Nyoman H Paramita • Artono


• Untung BS • Nugroho Marsiyanto •Winanto • Kaisa • Tunggal Purwoko
• Agus Triyanto
le

• Farid Rochmandianto • David Yulian Kusuma Mesaya • Alamsyah


• Ahmad Najihal Amal • Rolly A •Audra L • Andri Y
• Wahyu Sutresno
w

• M. Fajar Sany •Hanto Yananto • Aris Robani


• Riza Syahputra
no

• Edhu Mario P • Aswin Kurniawan • Iwan Trisnadi


• Sylvan Abdinni • Restu P
• Andi Adiwiarta • Bonar Marbun
• Jaswadi
K

• Erlangga Siregar
•I Ketut Sujata • Harris Prabowo
• Bambang Mujihardi • Metrik Kresna
• Sumadi • Dicky
• Saladin Hari Sulaimansyah
• Riza Agustiana • Harris Prabowo
• Mashari
• Boma Geni
• Doli Bragoba

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Outline
 Executive Summary

a
in
 Zulu Field Overview

m
 Project Summary

ta
er
• Subsurface

tP
• Wells

en
• Surface Facility
 Limit Diagram & Bubble Plot

em
 Need BOD Support

ag
 Discussion
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Executive Summary

a
• Zulu Field saat ini berproduksi sebesar 3000 bopd dan memberi kontribusi sebesar 8% dari

in
produksi total PHE ONWJ.

m
• Potensi penambahan produksi sebesar 9000 bopd dan 2 mmcfd dengan cadangan tersisa

ta
di Zulu area sebesar 20.56 MMBO dan 3 BCF akan di recover sepanjang tahun 2014 –

er
2019 melalui:

tP
 Infill drilling sejumlah 15 sumur,

en
 ESP change out sejumlah 4 sumur per tahun,

em
Program penanganan gas lock di 11 sumur,
 Water control, stimulasi dan sand control di 6 sumur,

ag
 Pilot wireline & dual ESP di 4 sumur,
 Program reverse coning.

an
• Potensi penambahan cadangan di South New Development area sebesar 15.6 MMBO
M
dengan laju alir awal sebesar 4000 bopd di tahun 2020.
e
dg

• Fasilitas pendukung produksi terpasang di Zulu secara garis besar masih mampu
mengakomodasi produksi saat ini dari Zulu. Dengan adanya penambahan produksi maka
le

diperlukan peningkatan fasilitas minyak dan flow assurance.


w
no

• Total biaya yang diperlukan untuk melaksanakan project hasil workshop SSOP PHE
K

ONWJ, Zulu area pada tahun 2014 – 2020 diperlukan biaya sebesar US$ 406.67 million.

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Zulu Field Overview
Field History
• Discovered in 1974 by ZZZ-1 wildcat well
• Start Up Prod : 1986

a
• 8 Platforms and 67 development wells

in
• Producing Zone : Baturaja (SSOP Focus),

m
ZU-24, TAF

ta
er
Well and Facility

tP
• 2D seismic data and 3D Seismic data (10%)
• Current Online platform: ZUA, ZUD and ZUG

en
• Active wells: 21 wells

em
• Current Prod: 3200 bopd (Baturaja 100%)

ag
History of Zulu Study

an
• OOIP/OGIP: 857 MMBO and 123 BCF (98%
BRF)
M
• Cum Oil/Gas: 36.2 MMBO and 77 BCF
e

• Current RF: 4.2% (Oil) and 62% (Gas)


dg

Baturaja Reservoir Challenges


le

• Big Inplace and Low Recovery


w

• Low reservoir Pressure


no

• Heavy Oil and high viscosity


K

• Some area still covered by 2D seismic


1 Km
Baturaja Depth Structure

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Production Highlight

a
in
Well Reactivation phase 2
(26 active wells)

m
54 Active wells Well Reactivation phase 1

ta
(16 active wells)

er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


DIAGRAMMATIC ZULU - FLOW STATION & NUI

Gas From AVSA
16 ML‐18” Fuel 
a
in
m
ta
er
tP
13.8 KV
en
em
ag
13.8 KVA

an
M
e
dg
le
w

Legends :
no

Gas Lift
Crude
K

Gas
3 Phase
Electric
power

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Reservoir and Production Data

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


REKAPITULASI HASIL WORKSHOP
SSOP PHE ONWJ – Zulu

99

a
in
Sticky

m
Notes
(Idea’s)

ta
er
tP
en
Grouping Idea’s Into Category

em
ag
an Subsurface Wells   
Surface 
M
Facilities
(28) (40) (31)
e
dg
le

Project One Sheet


w

(12 POS)
no
K

Subsurface Wells Surface


Facilities
4 POS 3 POS 5 POS

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Workshop

a
Sistem Sinergi Optimalisasi Produksi

in
m
(SSOP)

ta
er
PHE ONWJ

tP
Zulu Field

en
em
ag
an
M
e

Project Summary
dg
le
w

Subsurface Group
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


SUBSURFACE FISH BONE
2015 2016 2017 2018 2019 2020

a
in
m
GGR Study

ta
er
tP
en
New Development

em
ag
an
M
e

Infill
dg
le
w
no
K

Reverse Coning

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 SUBSURFACE OPPORTUNITIES

EST. BIAYA 
NO. POS TUJUAN EST. GAIN WAKTU REMARK
(MM USD)
1.Meningkatkan understanding Studi diusulkan akan 

a
   mengenai heterogenitas di dilakukan oleh ekspatriat 

in
   karbonat reservoir konsultan (geophysicist, 
2.Mengidentifikasi solusi untuk Q2 2015 ‐Q2 2017 geologist, dan RE) yang 

m
1 GGR Studi     masalah gas lock 4 berpengalaman dalam 

ta
3. Mengevaluasi implementasi karbonat reservoir, 
    program pressure maintenance Pressure maintenance, 

er
dan EOR selama 2 tahun

tP
 1. Menambah produksi PHE ‐ 2015 : 3 sumur infill

en
     ONWJ dan meningkatkan ‐ 2016 : 4 sumur infill
     recovery Lapangan Zulu ‐ 2017 : 4 sumur infill

em
2 Infill 155 16.7 MMBO Q1 2015 ‐ Q3 2018 ‐ 2018 : 4 sumur infill
‐ Initial oil rate : 700
   BOPD/well

ag
 1. Menambah produksi PHE ONWJ ‐ Membangun 2 platform
     dan meningkatkan recovery
     Lapangan Zulu an    baru ZUL dan ZUM.
‐ 10 sumur development
M
New  2. Development di South area   dan 1 sumur injektor
3 183.5 15.6 MMBO Q1 2017 ‐ Q1 2020
e

Development ‐ Pipa produksi baru
dg

  sepanjang 4 km dan pipa
  injeksi sepanjang 2.5 km
le

1. Memproduksi sisa gas yang ada ‐ Reaktivasi ZUE platform 
w

    di dalam gas cap melalui ‐ Melakukan RST log
no

    sumur‐sumur di ZUE platform ‐ Melakukan well
    dengan menggunakan wellhead    intervention
K

4 Reverse Coning     compressor 10.38 3 BCF Q1 2015 ‐ Q4 2016


2. Mempertahankan dan
    memastikan base production
    tidak ada gangguan gas lock

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-1 : GGR STUDY AFTER 3D SEISMIC

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

- Studi yang sekarang masih menggunakan data 2D seismic. 3D seismic akan dieksekusi pada bulan - Meningkatkan understanding mengenai heterogenitas di
September 2014, sehingga diperlukan studi update berdasarkan hasil 3D seismic baru karbonat reservoir
- Berdasarkan hasil 2 sumur inf ill di 2013 menunjukkan heterogenitas di karbonat reservoir lapangan Zulu - Mengidentifikasi solusi untuk masalah gas lock
- Banyak sumur existing yang mengalami masalah gas lock - Mengevaluasi implementasi program pressure maintenance

a
in
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

m
- Karakterisasi karbonat reservoir lebih baik secara lateral USD 4,000,000 - Resiko : Menghasilkan perhitungan OOIP yang lebih rendah
dan vertikal - Mitigasi : Development plan yang ekonomis berdasarkan

ta
- Meningkatkan confidence level terhadap perhitungan hasil perhitungan OOIP yang baru
cadangan minyak di Zulu

er
- Menghasilkan simulasi reservoir yang lebih akurat (history
matching dan f orecast production including pressure

tP
maintenance case)
- Menghasilkan action plan untuk mengatasi masalah gas lock

en
2 0 15 2 0 16 2 0 17

em
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

ag
1 3D seismic availability dan interpretasi Shanty I.

2 Internal review Shanty I.

3 Approval internal, partner, dan SKK Migas Pepi S. M.


an
M
4 Tender dan aw ard kontrak PSCM

5 Eksekusi studi dan monitoring Pepi S. M.


e
dg

6 Final report Pepi S. M.

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
le

SUPPORTING DATA ANALYSIS


w

- Data dan interpretasi - 3D seismik data dan interpretasi


3D seismik akan available di bulan Juni 2015
no

- Procurement proses sesuai jadw al


- Data core dan log - Studi ini diusulkan akan dilakukan
(akan diprogramkan oleh ekspatriat konsultan
K

di sumur appraisal ZUL-1) (geophysicist, geologist, dan RE)


- Data pressure pada yang berpengalaman dalam
sumur inf ill yang baru karbonat reservoir, pressure
(akan dimulai 2016) maintenance, dan EOR selama 2
tahun

Wahyu Jatm iko Achm ad Zailani

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-2 : INFILL

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

- Recovery factor Zulu saat ini masih rendah sekitar 4% - Menambah produksi PHE ONWJ dan meningkatkan
- Berdasarkan hasil log dan produksi dari 3 sumur ZUA-10, ZUA-3ST, dan ZUG-10 masih terdapat undrained oil recovery Lapangan Zulu
di zona Batu Raja

a
in
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

m
- 15 sumur infill dengan penambahan cadangan sebesar 16.7 Well cost : USD 150,000,000 - Resiko : - Mendapat reservoir dengan kualitas yang tidak baik

ta
MMBO Facility cost :USD 5,000,000 - Performa sumur baru tidak sesuai dengan

er
dan laju alir minyak aw al sebesar 700 BOPD / sumur yang diharapkan karena ada masalah gas lock
- Evaluasi post drill termasuk update existing model - Loss circulation pada saat pemboran

tP
- Pilot infill untuk memproduksi cycle-3 - Mitigasi : - Menggunakan geosteering dan mengebor pilot w ell
- Pemasangan LPS dan Poseidon untuk
meminimalisir masalah gas lock

en
- Membuat analisa drilling hazard termasuk studi
geomekanik

em
2 0 15 2 0 16 2 0 17 2 0 18 2 0 19

ag
KEGIATAN / ACTIVITY / TASK PIC
2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12

1 Internal review Wahyu Jamiko


an
M
2 Peer dan partner review Wahyu Jamiko
e

3 Approval internal, partner, dan SKK Migas Wahyu Jamiko


dg

4 Eksekusi pengeboran D&C


le

5 Start up produksi PE
w

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
no

- Fullfield simulation - Life time pompa sebesar 4 tahun NPV = USD 46 m


K

- Kontrak rig (2 unit per tahun) IRR = 62%


- RST at inactive
POT = 2019
platform (align
Asumsi harga minyak = USD 85 /bbl
w ith platform reactivation)
Opex USD 5/ boe

Wahyu Jatm iko Achm ad Zailani

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-3 : NEW DEVELOPMENT

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

- Recovery f actor Zulu saat ini masih rendah sekitar 4% - Menambah produksi PHE ONWJ dan meningkatkan
- Berdasarkan hasil simulasi reservoir, pada bagian selatan Zulu menunjukkan masih banyak undrained potential recovery Lapangan Zulu
- Development di South area

HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

a
in
- 2 Platf orm dengan 10 sumur pengembangan dengan Well cost : USD 100,000,000 - Resiko : - Mendapat reservoir dengan kualitas yang tidak baik
penambahan cadangan sebesar 15.6 MMBO dengan laju alir minyak Pipeline cost : USD 13,500,000 - Perf orma sumur baru tidak sesuai dengan

m
aw al sebesar 4,000 BOPD (kapasitas f asilitas) Platf orm cost : USD 54,000,000 yang diharapkan karena ada masalah gas lock
1 Injector w ell : USD 10,000,000 - Loss circulation pada saat pemboran
Pipa injector w ell sepanjang 2.5 km : - Mitigasi : - Mengebor appraisal w ell

ta
USD 6,000,000 - Menggunakan geosteering dan mengebor pilot w ell
- Pemasangan LPS dan Poseidon untuk

er
meminimalisir masalah gas lock
- Membuat analisa drilling hazard termasuk studi

tP
Geomekanik

2 0 16 2 0 17 2 0 18 2 0 19 2020 2021

en
KEGIATAN / ACTIVITY / TASK PIC
8 10 12 2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12 2 4 6

em
1 Mengebor appraisal w ell Shanty, Pepi, Iqbal

2 GGR studi setelah 3D seismic Shanty, Pepi, Iqbal

ag
3 Internal, peer, dan partner review Wahyu Jatmiko

4 Approval internal, partner, dan SKK Migas Wahyu Jatmiko

an
5 FEED Project M
6 Tender dan kontrak PSCM

7 Long lead item (pipa, SDV, dll) Project


e

8 EPCI Project
dg

9 Drilling D&C
le

10 Start up produksi PE
w

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
no

- Advance logging tool, - Untuk pengeboran 10 sumur menggunakan 1 rig NPV = USD 32 m
DST, PVT, SCAL, dan Start up kedua platf orm bersamaan pada Januari IRR = 22%
K

core data di appraisal 2020. POT = 2025


w ell - Proses di PSCM sesuai jadw al Asumsi harga minyak = USD 85 /bbl
- GGR studi setelah - Hasil appraisal w ell dan interpretasi 3D seismic Opex USD 5/ boe
seismic 3D dan appraisal menunjukkan hasil yang match dengan prediksi
w ell - Tersedia resources yang cukup dan kompeten
- Surf ace f acilities akan mengakomodir tambahan
produksi gross maksimum 10,000 BFPD dari
platf orm baru Wahyu Jatm iko Achm ad Zailani

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-4 : REVERSE CONING

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

- Sumur-sumur di ZUE platform terletak di area gas cap - Memproduksi sisa gas yang ada di dalam gas cap melalui
- Base production mengalami gangguan karena masalah gas lock sumur-sumur di ZUE platform dengan menggunakan
- Future plan Zulu akan melakukan pengeboran dan pembangunan platf orm baru w ellhead compressor
- Mempertahankan dan memastikan base production tidak ada

a
gangguan gas lock

in
m
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

ta
- Mengalirkan gas sebesar 2 MMSCFD dari ZUE platform ke Wellw ork cost di 4 sumur : USD 1,000,000 - Resiko : - Liquid akan terproduksi bersamaan dengan
Zulu Junction 2 unit Low Pressure System rental cost : gas production

er
USD 1,500/unit/day selama 4 tahun - Potensi penambahan f lare gas
Platf orm reactivation cost : USD 5,000,000 - Mitigasi : - Melakukan RST log pada sumur yang akan kita

tP
All cost is OPEX cost produksi untuk mengetahui current GWC (gas
w ater contact) dan mengetahui konektivitas
- Eksekusi project ini menunggu hasil dari LPS di sumur

en
minyak

em
2 0 15 2 0 16 2 0 17 2 0 18 2 0 19
KEGIATAN / ACTIVITY / TASK PIC
2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12 2 4 6 8 10 12

ag
1 OGIP & Gas RF validation Iqbal

an
2 Pemilihan sumur kandidat Iqbal & Roy

3 Run RST Iqbal & Roy


M
4 ZUE reactivation w ell E&I Team
e

5 Well intervention at selected w ell Roy


dg

7 LPS (Low pressure System) installation Roy


le

8 Start-up Roy
w

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
no

- Kondisi Platform ZUE - Sumur gas di ZUE tidak mampu NPV = USD 1 m
mengalirkan gas secara natural, IRR = 19%
K

- Kondisi terakhir dari sumur


sehingga perlu menggunakan LPS POT = 2019
ZUE (perf oration depth,
untuk memproduksikan gas tersebut Asumsi harga gas = USD 6.7 /MMBTU
plug, SSD)
+ esc 3% pa
- Current GWC
Opex USD 5/ boe

Wahyu Jatm iko Achm ad Zailani

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Workshop

a
Sistem Sinergi Optimalisasi Produksi

in
m
(SSOP)

ta
er
PHE ONWJ

tP
Zulu Field

en
em
ag
an
M
e

Project Summary
dg
le
w

Wells Group
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


WELLS FISH BONE
2014 2015 2016
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

a
in
m
ta
Water Control &

er
Stimulation

tP
en
em
ag
an
M
e
dg
le

Pilot Wireline and Dual


w

ESP
no
K

Gas Lock Handling

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q2 2013 WELL OPPORTUNITIES

a
Cum Gain

in
EST. BIAYA until
NO. POS TUJUAN WAKTU Remarks

m
(MM USD) economic
limit (MMBO)

ta
er
tP
• Meningkatkan produksi dengan menghilangkan
• Penambahan produksi dari
Gas Lock fenomena gas lock di sumur-sumur ESP Q4 2014 - Q3
1 1.36 1.24 11 sumur yang mengalami

en
handling • Mengurangi biaya penggantian ESP dengan 2015
gas lock problem
peningkatan ESP runlife

em
ag
• Water control dengan
• Meningkatkan produksi dengan mengurangi water surfactant huff n puff di 1

an
Water Control & cut dan stimulasi Q4 2014 - Q2 sumur
2 1.27 1.55
Stimulation • Menghindari downtime sumur dan kerusakan 2015 • Stimulasi matrix acid di 4
M
surface facility akibat produksi pasir yang tinggi sumur
• Sand control di 1 sumur
e
dg

• Mengurangi loss production dengan minimalisasi


le

downtime well
w

Pilot Wireline • Meningkatkan run life sumur dengan pemasangan Q4 2014 – Q4 • Pilot wireline ESP di 2 sumur
3 6.2 1.07
and Dual ESP dual ESP dan tambahan data untuk melihat 2015 • Pilot dual ESP di 2 sumur
no

pengaruh penempatan ESP di atas dan dibawah


perforasi terhadap gas lock.
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-1 : Gas Lock Handling

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

• Meningkatnya frequency terjadinya kondisi gas lock pada sumur-sumur ESP di Zulu • Meningkatkan produksi dengan menghilangkan fenomena gas lock
• Gas lock menyebabkan penurunan produksi dan diindikasikan menyebabkan menurunnya ESP runlife di sumur-sumur ESP
• Dibutuhkan data penunjang baik reservoir maupun surface untuk mengkonfirmasi penyebab gas lock • Mengurangi biaya penggantian ESP dengan peningkatan ESP

a
• Kebutuhan untuk dapat memantau dan melakukan intervensi ESP secara real time. runlife

in
m
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

ta
• Penambahan produksi 850 BOPD (ZUG-6, ZUG-2, ZUA-1, 1. Inhouse

er
• Resiko: Peningkatan resiko di platform karena tambahan
ZUA-7, ZUA-4, ZUA-9, ZUA-10, ZUG-1, ZUG-3, ZUD-2, ZUD-
2. 810,000 USD (for 6 months and 3 equipment & personel

tP
9)
platforms)
3. 150,000 USD

en
4. Inplace in current contract • Mitigasi:
5. Inhouse - Melakukan safety assestment

em
6. 400,000 USD per w ell
2 0 14 2 0 15 2 0 16

ag
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

an
1 DIFA ( w ell ZUD-4 & ZUD-7)
a. Pengumpulan data history
M
Roy
sumuran
b. Dismantle, inspection and failure
e
Roy
analysis
dg

2 Casing Venting System


a. Studi banding ke PEP asset 1
le

Roy
(Ramba/ Jambi)
b.Pemasangan electronic pressure
w

Bintarto
transmitter untuk pengukuran gas
no

c. Pengumpulan data actual sumur


Roy/Bintarto
gas lock dan Studi
K

d. Pengadaan & Trial LPS/ WHC Roy/Bintarto


e. Monitoring dan review Roy/Bintarto
Surveillance Gas Lock - Run Sigma
log untuk mengidentifikasi actual
3 Haris
fluid level dibaw ah ESP packer
(ZUA-1)

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-1 : Gas Lock Handling (Cont’d)

2 0 14 2 0 15 2 0 16
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

a
in
4 ESP monitoring

m
a. Pemasangan liftw atcher Roy

ta
b. Pemasangan dan kalibrasi
Bintarto
ampchart pada sumur-sumur ESP

er
PBU test dengan menggunakan

tP
5 Roy
existing ESP DMT
6 Wellservice - gas zone shut off

en
a. Run sigma log/RST pada sumur
Haris

em
existing yang memiliki Y-tool

b. Menutup zona gas Haris

ag
7 Review hasil akhir Roy/Haris

DATA PENDUKUNG /
ASUMSI / ASSUMPTION an
ANALISA KEEKONOMIAN / ECONOMIC
Project Leader Project Owner
M
SUPPORTING DATA ANALYSIS
e

• Depth structure, w ell • Success ratio: 75%


• NPV10: 5,000,000 USD
dg

correlation, w ell history, • Oil price: 85 USD / bbl


• IRR > 100%
gas and fluid rate, • Opex 5 USD/boe
• POT: 2015
le

Total cost: 1,360,000 USD


w
no

Biaya berdasarkan 6 bulan trial


Jika program berhasil, akan ada Achm ad Mansur
Achm ad Zailani
K

opsi untuk memperpanjang sew a (Manager Petroleum


(Senior Manager Subsurface)
tiap tahun atau membangun Engineering)
sistem permanen

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-2 : Water Control & Stimulation

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

• Water cut yang tinggi di sumur existing


• Meningkatkan produksi dengan mengurangi w ater cut dan
• Produktivitas yang rendah di beberapa sumur
stimulasi
• Terdapat produksi pasir dari sumur ZUD-1
• Menghindari dow ntime sumur dan kerusakan surf ace f acility akibat
produksi pasir yang tinggi

a
in
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

m
• Penambahan produksi sebesar 800 bopd (w ater control 350
1. 70,000 USD • Resiko :
bopd, matrix acid 300 bopd, sand control 150 bopd)

ta
- Water cut increase
2. 800,000 USD (200,000 USD per w ell) - Skin increase

er
3. 400,000 USD
• Mitigasi:
- Diverter utilization

tP
en
2 0 14 2 0 15 2 0 16
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

em
1 Water control

a. Pengumpulan data history sumuran Roy

b. Pengadaan & Trial Surf actant huf f n

ag
Roy
puf f (1 pattern) sumur ZUG-9
c. Monitor perf ormance sumur ZUD-2,
ZUG-6, ZUG-3 dan ZUG-8 (analisa Roy

an
spektrum f luida)
2 Stimulasi matrix acidizing
M
a. Pengumpulan data history sumuran Roy

b. Eksekusi 4 sumur (ZUA-9, ZUA-2,


e
Roy
ZUD-9, ZUG-1)
dg

3 Sand control

a. Studi pemilihan metode sand control Roy


le

b. Pengadaan & Eksekusi sand control


Roy
di sumur (ZUD-1)
w

4 Review hasil akhir Roy/Haris


no

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
K

• Depth structure, w ell • Oil price: 85 USD / bbl


• NPV10: 9,000,000 USD
correlation, w ell history, • Opex 5 USD/boe
• IRR > 100%
gas and f luid rate,
• POT: 2015

Total cost: 1,270,000 USD

Achm ad M ans ur
Achm ad Zailani
(M anage r Pe trole um
(Se nior M anage r Subs urface )
Engine e ring)

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-3 : Pilot Wireline & Dual ESP

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

• Tingginya cost (1M USD) dan w aktu tunggu yang lama (1 tahun) untuk penggantian ESP di Zulu
• Mengurangi loss production dengan minimalisasi dow ntime w ell
• Meningkatkan run lif e sumur dengan pemasangan dual ESP dan
tambahan data untuk melihat pengaruh penempatan ESP di atas
dan dibaw ah perf orasi terhadap gas lock.

a
in
m
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

ta
• Penambahan produksi sebesar 800 BOPD (ZUA-8, ZUG-7,
1. 3,400,000 USD
ZUG-5, ZUG-2) • Resiko :

er
- Solid dapat menghambat aliran f luida diantara shroud-ESP
2. 2,800,000 USD

tP
• Mitigasi:
- Pengukuran solid content di zona yang sama

en
2 0 14 2 0 15 2 0 16

em
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

1 Wireline retreivable ESP

ag
a. Desain WR ESP Haris

an
b. Feasibility study Haris
c. Pengadaan & eksekusi WR ESP
Haris
(2 w ell)
M
2 Dual ESP installation
e
a. Desain dual ESP Haris
dg

b. Pengadaan & eksekusi dual ESP


Haris
installation (2 w ell)

3 Review hasil akhir Haris/Roy


le

4 Rencana f ollow up ZUA-5, ZUB Haris/Roy


w

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


no

ASUMSI / ASSUMPTION Project Leader Project Owner


SUPPORTING DATA ANALYSIS

• Depth structure, w ell • Success ratio: 75%


K

• NPV10: 5,000,000 USD


correlation, w ell history, • Oil price: 85 USD / bbl
• IRR 65%
gas and f luid rate, • Opex 5 USD/boe
• POT: 2016

Total cost: 6,200,000 USD

Achm ad Mans ur
Achm ad Zailani
(Manage r Pe trole um
(Se nior Manage r Subs urface )
Engine e ring)

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Workshop

a
Sistem Sinergi Optimalisasi Produksi

in
m
(SSOP)

ta
er
PHE ONWJ

tP
Zulu Field

en
em
ag
an
M
e

Project Summary
dg
le
w

Surface Facility Group


no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


SURFACE FISH BONE
2014 2015 2016 2017
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

a
in
m
ta
Engineering

er
Study

tP
en
em
Process Safety

ag
an
M
Plant Optimization
e
dg
le

Crude Transportation
w

& Fluid Handling


no
K

Power Generation Upgrade

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q2 2013 SURFACE FACILITY OPPORTUNITIES

No POS Tujua n Es t. Bi a ya Es t. Ga i n Wa ktu  Rema rk


1 Engi neeri ng Study Ka ji a n menyel uruh untuk memperta ha nka n  USD 820,000 Q4 2014 ‐ 

a
kes i na mbunga n, keha nda l a n, da n kes el a ma ta n  Q2 2015

in
opera s i  produks i  s a a t i ni  da n potens i  peni ngka ta n 
produks i  di  ma s a  menda ta ng, denga n mel a kuka n:

m
ta
 Re‐Ha zop a nd Ha zop/Ha zi d Reva l i da ti on

er
Study crude bl endi ng a nd chemi ca l  trea tment

tP
Study menyel uruh terka i t peni ngka ta n ga s  terproduks i  

en
di  l a pa nga n ZULU
Studi  engi neeri ng untuk: 

em
1.res i zi ng pi pel i ne 16" PCP ‐ MMF s es ua i  denga n 
renca na  produks i  l a pa nga n ZULU & PAPA

ag
2.mema s ti ka n opera s i  produks i  s ei ri ng renca na  
pengemba nga n l a pa nga n ZULU da l a m kondi s i  a ma n 

an
terka i t kondi s i  pi pel i ne PCP‐MMF, MMF‐CP s a a t i ni
M
Si mul a s i  bl endi ng crude Zul u denga n Arjuna
e

Revi s i  s tudi  kel a ya ka n "ZULU Power Devel opment"


dg

Crude Tra ns porta ti on a nd  Menja mi n ba hwa  s el uruh fa s i l i ta s  produks i  da pa t  Q4 2014 ‐ 
le

2 Fl ui d Ha ndl i ng memenuhi  kebutuha n produks i  hi ngga  2021. USD 2,400,000 Q4 2015
w

Memenuhi  kebutuha n da ya  l i s tri k di  a rea  ZULU terka i t  Q4 2014 ‐ 


pengemba nga n l a pa nga n ZULU & Meni ngka tka n  Q4 2017
no

3 Power Genera ti on Upgra de keha nda l a n s i s tem pemba ngki t da ya USD 40,900,000


Memenuhi  s el uruh kebutuha n proces s  s a fety di   Q4 2014 ‐ 
K

4 Proces s  Sa fety l a pa nga n ZULU USD 465,000 Q4 2015


Menja mi n ba hwa  pera l a ta n produks i  di  a rea  ZULU  Q4 2014 ‐ 
5 Pl a nt Opti mi za ti on s es ua i  denga n profi l  produks i  hi ngga  2021. 1200000 Q4 2015
Total USD 44,965,000

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-1 : Engineering Study

LA TA R BELA KA NG / BA CKGROUND TUJUA N / OBJECTIVES

Peralatan dan f asilitas produksi di ZULU area sudah relatif tua (dikembangkan mulai tahun 1986) dan • Mempertahankan kesinambungan, kehandalan, dan keselamatan
dibutuhkan jaminan kehandalan operasi, sebagai berikut: operasi produksi saat ini (3100 BOPD)
1. Terkait dengan parameter operasi produksi saat ini yang berbeda dengan desain operasi produksi • memastikan kemampuan f asilitas dan perralatan produksi di ZULU

a
sebelumnya maka diperlukan perubahan seting parameter kontrol dan saf ety devices area dalam rangka antisipasi upaya peningkatan & pengembangan

in
lapangan ZULU (melalui reaktivasi platf orm dan penggantian ESP
sesuai dengan program subsurf ace sampai dengan tahun 2021)

m
2. Fluida ZULU memiliki tingkat viskositas yang tinggi (2700-15000 cP)

ta
Upaya untuk menurunkan viskositas f luida ZULU agar diperoleh:
1. Optimasi konsumsi chemical dispersing agent (viscosity reducer)

er
berikut metode blending system & rasio crude : w ater
2. Peningkatan kapasitas alir f luida ZULU dengan kondisi tekanan

tP
operasi saat ini

en
3. Potensi peningkatan gas terproduksi di ZULU seiring penambahan produksi (reaktivasi w ell, ZUD-1 Studi menyeluruh terkait dengan permasalahan gas terproduksi,
Back online, dan Reverse conning) dapat menyebabkan beberapa permasalahan, sbb: dengan tujuan antara lain:
- Kenaikan tekanan operasi di production separator V -001 - Pemanf aatan gas outlet V -001 sebagai f uel gas turbine

em
- Limit f laring di seluruh lapangan ONWJ (5 MMSCFD) generator set (TGS-001) dengan tujuan:
- Kapasitas control valve di gas outlet V -001 1. mengurangi emisi methan (Enviromental issue)
2. mengurangi konsumsi f uel gas dari Zelda (CNOOC)

ag
- Evaluasi peralatan di f asilitas ZULU untuk handling gas
terproduksi

an
- Review batasan f laring di seluruh lapangan ONWJ dengan tim
environment.
M
4. Kondisi pipeline PCP-MMF & MMF-CP mengalami w all thinning:
Melakukan perhitungan engineering untuk :
- Dalam inspeksi pipeline PCP-MMF sebelumnya (REF ILI year 1992) ditemukan internal metal loss di
1. memastikan operasi produksi seiring rencana pengembangan
e

beberapa titik dengan maksimum penipisan 70%


lapangan ZULU dalam kondisi aman terkait kondisi pipeline PCP-
dg

- Di titik 10 kM dari MMF, ditemukan metal loss hingga 80% sehingga MA WP turun menjadi 97 Psig
MMF, MMF-CP
(ekuivalen 37000 BFPD)
2. optimasi rencana penggantian pipa sepanjang 32 kM dari PCP ke
MMF dengan mempertimbangkan rencana pengembangan kapasitas
le

produksi
w

5. A rjuna crude memiliki komposisi spesif ik dimana kontribusi ZULU crude saat ini dibatasi ±15% memastikan pengaruh/dampak rencana peningkatan produksi
no

lapangan ZULU tidak membuat A rjuna Crude of f spec (TA N


Number)
K

6. Beberapa ESP di ZULU mengalami masalah gas lock dan LPS adalah salah satu opsi untuk memastikan bahw a resiko instalasi low pressure system di NUI
menyelesaikan masalah tersebut. ZULU dapat diterima (A LA RP)

7.ZULU tidak memiliki cadangan pembangkit listrik Meningkatkan kehandalan sistem pembangkit listrik di ZULU

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-1 : Engineering Study (cont’d)

HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

• Laporan revalidasi HAZOP termutakhirkan USD 100,000

a
• Laporan study optimasi chemical, metode blending, & rasio
USD 75,000

in
Crude : w ater

m
• Laporan study permasalahan peningkatan gas terproduksi USD 100,000

ta
• Laporan kalkulasi engineering penggantian pipeline PCP-
USD 120,000
MMF

er
• Laporan simulasi blending crude ZULU dengan Arjuna USD 75,000

tP
• Rekomendasi process safety terkait installasi low
USD 50,000
pressure system di NUI ZULU

en
• Laporan studi kelayakan "ZULU Pow er Development"
USD 300,000
termutakhirkan

em
USD 820,000
2 0 14 2 0 15 2 0 16

ag
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

1
Re-Hazop and Hazop/Hazid
Margaretha T
an
M
Revalidation
Study crude blending and chemical
2 Asw in Kurniaw an
e

treatment
dg

Study menyeluruh terkait


3 peningkatan gas terproduksi di Winanto
le

lapangan ZULU
w

Studi engineering untuk:


no

1.resizing pipeline 16" PCP - MMF


sesuai dengan rencana produksi
lapangan ZULU & PAPA
K

4 2.memastikan operasi produksi Hanto Yananto


seiring rencana pengembangan
lapangan ZULU dalam kondisi aman
terkait kondisi pipeline PCP-MMF,
MMF-CP saat ini

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-1 : Engineering Study (cont’d)

2 0 14 2 0 15 2 0 16
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

Simulasi blending crude Zulu


5 Winanto/Asw in K
dengan Arjuna
Melakukan process saf ety

a
assessment untuk installasi Low
6 Margaretha T

in
Pressure System (mini
compressor) di NUI ZULU

m
Revisi studi kelayakan "ZULU
7 Agus Triyanto
Pow er Development"

ta
DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC
ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS

er
1 Dokumen HAZOP • HAZOP dilaksanakan sesuai

tP
terakhir jadw al

2 Dokumen study/Hasil • Document support tersedia menurunkan biaya chemical

en
lab (REF ??) terkait
ZULU Crude &
Blending

em
3 • Engineering • Document support tersedia pengurangan biaya pembelian gas sebesar
Document f asilitas • Data f orecast produksi bisa USD 1.7 mio/year
produksi ZUJ1 P/F dijadikan data komitmen

ag
• Gas Properties
(Methane Number)

an
• TGS requirement
• Data Operasi
• Profil forecast
M
produksi lapangan
ZULU
e

4. • Profil forecast • Document support tersedia penurunan size (asumsi dari 16" ke 12")
dg

produksi lapangan • Data f orecast produksi bisa dapat mengurangi biaya proyek sebesar USD
ZULU & PAPA (P90) dijadikan data komitmen 4 mio
• Engineering
le

Document
w

(Bathymetri, EQL,
Fluid Properties, dll)
no

5 • Forecast produksi • Document support tersedia Kualitas Arjuna Crude terkontrol untuk
seluruh lapangan • Data f orecast produksi bisa menjaga ICP
K

ONWJ (Ref xx) dijadikan data komitmen


• Fluid properties each
Arjuna crude And
Zulu Crude

Restu P I Made Sukrajaya


(Engineering Manager) (Senior Manager E&I)

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-2 : Crude Transportation & Fluid Handling

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

Kondisi pipa dari ZUJ1-PCP-MMF-CP saat ini tidak dapat dioperasikan secara optimal, disebabkan: • Mempertahankan kesinambungan, kehandalan, dan keselamatan
operasi produksi saat ini (29000 BFPD, 4200 BOPD)
1. Dalam inspeksi pipeline PCP-MMF sebelumnya (REF ILI year 1992) ditemukan internal metal loss di
• Maintenance pipeline ZUJ1-PCP

a
beberapa titik dengan maksimum penipisan 70%

in
2. Telah dilakukan internal coating pada pipeline PCP-MMF sehingga program ILI tidak dapat dilakukan • untuk mengakomodir potensi kenaikan produksi lapangan ZULU
dan PCP

m
3. Atas dasar alasan 1 & 2 saat ini hanya mampu mengalirkan 32000 BFPD dengan tekanan operasi • Untuk menjamin f low ability f luida ZULU hingga Central Plant

ta
maksimum 150 Psig

er
4. Chemical dispersing agent pada f luida ZULU menyulitkan pemisahan air di PCP melew ati ambang batas
pembuangan • Dapat melakukan aktivitas pigging di pipeline NUI ZULU

tP
5. Pipeline MMF-CP mengalami metal loss hingga 80%

en
6. Fasilitas pigging di ZUA & ZUD tidak dapat mengakomodir aktivitas pigging karena mengalihkan arah
aliran dari ZUJ1 ke ZUA menjadi dari ZUA ke ZUJ1

em
7. Pipeline NUI ZULU telah lama tidak di pigging

ag
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

'- pigging 20" ZuJ1 - PCP


an • Pig Stuck:
- siapkan High Pressure Pump
M
USD 100,000
- gunakan Pig Locator untuk mengetahui posisi pig
- siapkan 20" spool untuk segmental replacement
- Pigging 16" MOL PCP - MMF
e

- siapkan 16" spool untuk segmental replacement


dg

USD 100,000 - Refer to SOP pigging 20" ZUJ1 - PCP


• Produksi minyak ZULU akan tertunda sampai ke AA
le

- Fasilitas pigging ZUA-ZUD dapat mengakomodir kegiatan


pigging
USD 400,000
w
no

- Pigging pipeline NUI area ZULU

USD 100,000
K

- Sistem w ater treatment di PCP mampu menghandle fluida


ZULU tanpa melew ati ambang batas USD 1,600,000

- Meningkatkan f low ability & mengurangi konsumsi chemical


USD 100,000

USD 2,400,000

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-2 : Crude Transportation & Fluid Handling

2 0 14 2 0 15 2 0 16
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

1 Pigging 20" ZuJ1 - PCP Natalie SD

a
in
2 Pigging 16" PCP - MMF Natalie SD

m
Modifikasi fasilitas pigging di ZUA &
3 Natalie SD
ZUD

ta
Lakukan progressive pigging dan
dilanjutkan pigging rutin di area NUI

er
4 Bintarto H
Zulu (ZUA-ZUD, ZUD-ZUJ1, ZUG-
ZUJ1)

tP
Memperbaiki sistem w ater treatment

en
5
di PCP:

em
- chemical improvement Asw in K

ag
- reaktivasi depurator Michael O

an
Memasang mechanical mixer sesuai
6 Totok HP
hasil studi item 2 POS 1
M
DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC
ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
e

1 Laporan ILI tahun 1992 TAR dilakukan Oktober 2015


dg

untuk pipeline PCP-


MMF
le

2 Hasil studi crude Hasil studi menyatakan bahw a


w

blending and chemical mechanical mixer perlu dipasang


no

treatment

3 Hasil studi pasir yang


K

terperangkap di
segment pipeline ZUJ1-
PCP

Iskandar Zulkarnain Taufik Aditiyaw arm an


(Project Manager) (Senior Manager Project)

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-3 : Power Generation Upgrade

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

Peningkatan konsumsi daya listrik di ZULU seiring rencana peningkatan produksi di masa datang. Estimasi memenuhi kebutuhan daya listrik terkait reaktivasi dan pembangunan NUI baru (ZUL & ZUM)
kekurangan daya listrik sebesar:

- jangka pendek (hingga 2016): 800 kW (total konsumsi 2800 kW)


-Jangka menengah (hingga 2021): 1900 kW (total konsumsi 3900 kW)

a
ZULU tidak memiliki cadangan pembangkit listrik utama yang dapat dioperasikan secara terus menerus meningkatkan kehandalan sistem pembangkit daya di area ZULU, dengan mencegah terjadinya black out yang mengakibatkan berhentinya

in
produksi dalam jangka w aktu lama.

m
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

ta
1. Tambahan daya listrik sebesar 1 MW, pada jangka pendek

er
USD 2,500,000

tP
2. Mengembalikan kapasitas turbin generator sesuai kapasitas
desain (2 MW) USD 500,000

en
3. Kehandalan dan ketersediaan daya listrik sesuai kebutuhan
lapangan ZULU di jangka menengah USD 37,900,000

em
USD 40,900,000
2 0 14 2 0 15 2 0 16 2 0 17
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

ag
Memperbaharui Aux generator agar
dapat dioperasikan secara terus
1 Tonny Soeharsono

an
menerus atau rental gas engine 1
MW M
Penggantian engine pada saat PM
2 Hilfan Kalendra
50000 jam
e
dg

Memasang sistem pembangkit listrik


3 (TGS) dengan konfigurasi 2 x 100% Tonny Soeharsono
le

atau 3 x 50%
w

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
no

1 Forecast produksi
hingga 2021
K

Tonny Soeharsono Taufik Aditiyaw arm an


(Project Manajer) (Senior Manager Project)

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-4 : Process Safety

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

Pada f ield visit area ZULU ditemukan: • Mempertahankan kesinambungan, kehandalan, dan Keselamatan
operasi produksi saat ini (3100 BOPD)
1. Beberapa sumur tidak menggunakan SDV di annulus line, bila terjadi kebakaran di sumur maka
Hydrocarbon masih dapat release melalui annulus. Maka perlu ditambahkan SDV beserta isolation
valvenya

a
2. tidak ada insulating gasket di riser dan launcher/receiver sehingga pipeline dapat menghabiskan anoda

in
korban platf orm atau sebaliknya

3. Lokasi sensing PSHL di dow nstream choke valve

m
4. tidak ada penangkal petir di area ZULU

ta
5. sistem perpipaan di ZULU belum menerapkan standar color coding PHE ONWJ

er
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

• memenuhi kebutuhan process saf ety USD 90,000

tP
• meningkatkan kinerja Cathodic protection pada masing-
USD 150,000
masing segmen pipeline dan platf orm)

en
• meningkatkan umur kerja ESP USD 100,000

• Fasilitas produksi di seluruh area ZULU terlindungi dari petir USD 50,000

em
• identif ikasi perpipaan lebih mudah USD 75,000

USD 465,000

ag
2 0 14 2 0 15 2 0 16
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

an
Memasang SDV di annulus line dan
1 Budi Rif ai
isolation valve
Memasang insulating gasket di
2 Natalie SD
seluruh riser di area ZULU
M
Melakukan evaluasi terhadap sistem
3 Roy Arthur Sitorus
proteksi ESP di area ZULU
e

Melakukan benchmark terhadap


dg

standard dan common practice


4 Heri Haruman
terkait installasi penangkal petir di
Of f shore area
le

Mematuhi standard color coding PHE


5 Bintarto H/A sw in K
ONWJ di area ZULU
w

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
no

1 • Engineering TAR dilakukan pada oktober 2015


Document f asilitas
produksi NUI ZULU
K

2 PHEONWJ-L-SPE-001 Eksekusi item 1,2, dilakukan


latest Revision setelah izin individual shut dow n
didapat

Eksekusi item 3 dilakukan


bersamaan dengan TAR

I Nyom an Har tanu Ani Sur ak hm an


(We s t Ope r ations M anage r ) (Se nior M anage r Ope r ations )

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


PT. PERTAMINA HULU ENERGI SSOP PHE ONWJ Q3 2014 POS-5 : Plant Optimization

LATAR BELAKANG / BACKGROUND TUJUAN / OBJECTIVES

Potensi peningkatan gas terproduksi di ZULU seiring penambahan produksi (reaktivasi w ell, ZUD-1 Back mendapatkan data flow rate flare gas yang akurat sesuai kondisi
online, dan Reverse conning) operasi

a
dapat mengganti orifice secara online

in
Kapasitas shipping pump ZULU (33,000 BFPD) lebih kecil dari profil produksi hingga 2021 sebesar 42,000 meningkatkan maksimum flow rate shipping pump ZUJ1 menjadi
BFPD 50,000 BFPD

m
Meningkatkan kehandalan crude delivery dari ZULU

ta
er
HASIL BESARAN / DELIVERABLES BIAYA / COST RESIKO dan MITIGASI / RISK & MITIGATION

tP
• Data flow gas terproduksi yang akurat USD 100,000

en
• kapasitas shipping pump naik hingga 50,000 BFPD USD 100,000

• Sistem shipping pump ZULU mampu mendeliver hingga

em
USD 1,000,000
50,000 BFPD
USD 1,200,000

ag
2 0 14 2 0 15 2 0 16
KEGIATAN / ACTIVITY / TASK PIC
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6

Mengganti junior orifice di gas outlet


an
M
1 production separator V-001 dengan Bintarto H
senior orifice
e

Mengganti konfigurasi piping di


dg

2 Bintarto H
suction dan discharge pompa

Mengganti Pompa P-001 A dan P-


le

3 001 E untuk memenuhi kapasitas Januddin


w

50,000 BFPD
no

DATA PENDUKUNG / ANALISA KEEKONOMIAN / ECONOMIC


ASUMSI / ASSUMPTION Project Leader Project Owner
SUPPORTING DATA ANALYSIS
K

1 Forecast produksi Produksi hingga 2021 akan


hingga 2021 menjadi 42,000 BFPD

I Nyom an Hartanu Ani Surakhm an


(West Operations Manager) (Senior Manager Operations)

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Workshop

a
Sistem Sinergi Optimalisasi Produksi

in
m
(SSOP)

ta
er
PHE ONWJ

tP
Zulu Field

en
em
ag
an
M
e
dg
le
w

Limit Diagram & Bubble Plot


no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


OVERALL LIQUID LIMIT DIAGRAM

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


OVERALL POWER LIMIT DIAGRAM

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


BUBBLE PLOT

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


BUBBLE PLOT

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Zulu Oil Production Forecast

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Zulu Liquid Production Forecast

a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


a
in
m
ta
er
tP
en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


RUTE SITE VISIT

a
in
m
ta
er
ZULU QUARTERS BSP ZULU JUNCTION

tP
en
em
ag
an
M
e
dg
le
w
no
K

ZULU GOLF

44
Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM
Lokasi  :  Zulu Quarters
OPPORTUNITY  FOR IMPROVEMENT RECOMENDATION PIC REMARKS
Lampu emergency 

a
Lampu emergency banyak yang  Melakukan penggantian Binta sudah dalam proses 

in
lampu emergency rto order.

m
tidak berfungsi.

ta
er
Perlu merapikan cable 

tP
dan pewarnaan jalur Inprogress
pipa (color coding) untuk

en
merapikan cable 
Binta
Flowline dan cable tray karatan memudahkan dan pengecetan

em
rto
pengaturan dan ulang pipa (color 
coding). 

ag
meminimalisir potential 
hazard
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Lokasi  :  Zulu Junction
OPPORTUNITY  FOR IMPROVEMENT RECOMENDATION PIC REMARKS
Memasang cover agar  Inprogress, 

a
mengurangi potensi ESD  Binta pemasangan cover 

in
ESD Button tidak dilengkapi cover

m
button teraktifkan secara rto di seluruh ESD 
button Zulu area.

ta
tidak sengaja.

er
Tidak terdapat COLOR CODING  Standarisasi color coding  Sudah masuk

tP
Binta
dan pemasangan arah dalam POS Surface 
rto

en
dan Arah aliran aliran Facility

em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Lokasi  :  NUI
OPPORTUNITY  FOR IMPROVEMENT RECOMENDATION PIC REMARKS
Melakukan evaluasi Sudah masuk

a
Tidak ada pressure switch untuk

in
terhadap sistem proteksi Roy dalam POS Surface 
mematikan ESP di wellhead

m
ESP di area ZULU Facility

ta
Melakukan perbaikan Perbaikan ampere 

er
Binta chart sudah
Ampere chart ESP tidak berfungsi. dan kalibrasi existing 

tP
rto inprogress.
ampere chart ESP

en
em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Workshop

a
Sistem Sinergi Optimalisasi Produksi

in
m
(SSOP)

ta
er
PHE ONWJ

tP
Zulu Field

en
em
ag
an
M
e
dg
le
w

Need BOD Support


no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


Need BOD Support

a
1. HWU Utilization Alignment with PHE WMO or barge

in
m
utilization alignment with CNOOC

ta
er
tP
2. Treat ESP change out as regular wellwork (without

en
AFE)

em
ag
an
M
e
dg
le
w
no
K

Diunduh oleh: Rifqi Ahmad Bakri - Tuesday, July 2, 2019 1:16 PM


a
in
m
ta
er
tP
End of Presentation