Minggu 5 – Sesi 7
Your client, Husky Air, has given your team the authority to develop the project's scope. The
project's scope defines the project work. It includes the work boundaries and deliverables that
you wiII deliver to your client. In addition, you will create a work breakdown structure
(WBS) that will be used to create your project's schedule and budget in your next assignment.
Please provide a professional-looking document that includes the following:
1. Project name, project team name, and the names of the members of your project team
Husky’s Air Pilot Tracker adalah sistem yang digunakan di Bandara Internasional tertentu untuk
melacak keberadaan pilot yang pernah take off dan landing di Bandara tersebut, jadwal
penerbangan pilot dan reporting. Sistem ini akan menampilkan informasi basic pilot; nama,
alamat, no identitas pilot, maskapai, total hours flight dalam 1 hari, rating / poin, dan sebagainya.
Selain itu, informasi tambahan yang ingin dilihat adalah informasi nomor penerbangan, profil
penumpang maskapai dari nomor penerbangan, dan history lainnya.
Summary nya bisa diambil dalam bentuk reporting untuk analisa dan kebutuhan audit. Reporting
disajikan dalam bentuk dashboard dan detail reporting yang bisa di generate dengan berbagai
filter.
Desired Value
1. Transparansi: Husky Air mencoba untuk transparansi akan data pilot yang berkegiatan
di Bandara Internasional untuk meningkatkan keamanan dan memberikan value
tambahan untuk penumpang yaitu rasa aman dan jaminan legalitas pilot yang bekerja
dibawah maskapai yang bersangkutan.
2. Accessible: Husky Air ingin menyajikan data yang transparan, accountable, dan mudah
diakses oleh semua pihak terkait. Hasil akhir dari sistem ini adalah reporting yang bisa
dibaca oleh siapapun, dimanapun, dengan memanfaatkan teknologi digital dan mobile.
Matrik
MOV Summary: Project ini akan berjalan sesuai dengan time frame dan value yang sudah
ditentukan jika didukung oleh stakeholder terkait. Karena proses ini tidak akan mengganggu
proses operasional as is, sehingga efektifitas sumber daya yang terlibat harus dimaksimalkan.
Recommendation: Pengerjaan sistem bisa dilakukan paralel dengan proses operasional sehingga
research yang sudah dilakukan bisa divalidasi kembali dengan proses operasional as is yang
sedang berjalan saat pengembangan sistem dilakukan. Update progress juga perlu dilakukan
setiap 1 minggu sekali untuk memastikan project still on track dengan scope yang masih terjaga.
List of Resource:
1. SDM
a. Project Manager
b. System Analyst
c. Business Analyst
d. Back-end Developer
e. Front-end Developer
f. Tester / Quality Assurance
2. Teknologi
a. Hardware (Laptop, monitors, servers, mobile devices)
b. Software License
3. Fasilitas
a. Ruangan khusus untuk team member project
b. Ruang meeting untuk update dan kolaborasi
c. Dedicated connection untuk testing
4. Lain-lain
a. Alat tulis kantor
b. Proyektor dan Smart board
ISYS6310 – Information System Project Management
List of Cost in Rupiah:
This should be based on the project life cycle and the systems development life cycle. You
should begin by creating a hierarchical chart that defines all of the project and system
development phases. The system development phases will depend largely on the development
approach you use (Waterfall or Agile). After you have identified all project phases, the next step
in developing a DSC is to identify at least one project or product deliverable for each phase.
A UCD defines the high-level features and functionality that the application system should
include. Although Figure 5.5 provides an example of a use case, you can build one:
d. Draw a connecting line to identify the actors who will make use of a particular use case.
Using Microsoft Project@, create a work breakdown structure (WBS) by listing all of the project
life cycle and systems development life cycle phases and the associated deliverables that you
defined in the DSC. Be sure to work through the MPS tutorial first. Also, be sure to Follow the
work package concept shown in Figures 5.8 and 5.9. Your WBS should include:
a. Milestones for each phase and deliverable-Achieving a milestone will tell everyone
associated with the project that the phase or deliverable was completed satisfactorily.
b. Activities Flasks-Define a set of activities or tasks that must be completed to produce
each deliverable.
c. Resource Assignments-Assign people and other appropriate resources to each activity.
https://binusianorg-
my.sharepoint.com/personal/yosia_wijayanto_binus_ac_id/_layouts/15/guestaccess.aspx?
docid=013a88125b02945aa82601130b6688abc&authkey=AfNjg2dBeyxzNv4uTEsrWzw&e=O8
5Jtf
Team Member:
Adi Gunawan
Aldila Firamdania
Daisy Tamara