Anda di halaman 1dari 45

REPUBLIK INDONESIA

KEMENTERIAN PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA

SATUAN KERJA
PELAKSANAAN JALAN NASIONAL
PROVINSI GORONTALO

PAKET :
PENGGANTIAN JEMBATAN LEMITO - MOLOSIPAT
JEMBATAN PATIALNGGIO (KM. 252+325)
JEMBATAN POPAYATO II (KM. 252+325)

ASBUILD DRAWING
OKTOBER 2013
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH XI

SATUAN KERJA PELAKSANAAN JALAN NASIONAL


PROVINSI GORONTALO

PAKET :
PENGGANTIAN JEMBATAN MARISA - LEMITO
( JEMBATAN PATILANGGIO )
KM 186 + 450

ASBUILD DRAWING
OKTOBER 2013
PETA LOKASI PROYEK PROVINSI GORONTALO (51)

JL. STRATEGIS NASIONAL RENCANA (TERSAMBUNG)


JL. STRATEGIS NASIONAL RENC. (Blm. TERSAMBUNG)
JALAN NASIONAL
JALAN PROVINSI

PKN (PUSAT KEGIATAN NASIOANAL)

PKW (PUSAT KEGIATAN WILAYAH) 5 TH. PERTAMA

PKW (PUSAT KEGIATAN WILAYAH) 5 TH. KEDUA


016 PKSN (PUSAT KEGIATAN STRATEGIS NASIONAL)
005 5 TH. PERTAMA.
004 PKSN (PUSAT KEGIATAN STRATEGIS NASIONAL)
5 TH. KEDUA.

001 021 NO RUAS

015 BATAS PROVINSI


BATAS KABUPATEN

IBUKOTA PROVINSI
018 003
KOTA
017
IBUKOTA KABUPATEN
014 002 IBUKOTA KECAMATAN

DAERAH TUJUAN WISATA NASIONAL / INTERNASINAL :


008
WISATA ALAM /SUNGAI/DANAU/GUNUNG / T. NASIONAL

012 WISATA BUDAYA

009 009 K007 WISATA PANTAI


013 K
WISATA MUSEUM / PENDIDIKAN
011 010
SK.
006 MENHUB KETERANGAN
I II III IV TH. 2002
K
BANDAR UDARA KLAS I / PUSAT
PENYEBARAN PRIMER
BANDAR UDARA KLAS II / PUSAT
PENYEBARAN SEKUNDER
BANDAR UDARA KLAS III / PUSAT
006 PENYEBARAN TERSIER
BANDAR UDARA KLAS IV

BANDAR UDARA KLAS V

PELABUHAN INTERNASIONAL

PELABUHAN NASIONAL

PELABUHAN REGIONAL

PENGGANTIAN JEMBATAN MARISA-LEMITO


JEMBATAN PATILANGGIO

KM . 186 + 450
GAMBAR EXISTING
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 01 09
PENINGKATAN JEMBATAN MARISA - LEMITO
PETA SITUASI
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 1500
PROVINSI GORONTALO Site Engineer General Superintendent

PETA SITUASI U

SIMBOL DAN LEGENDA

AZIMUTH
PATOK KILO METER

DAERAH MILIK JALAN SAWAH

NORT (Y) R A WA

EAST (X) WADUK

BANGUNAN / RUMAH MUKA TANAH ASLI

BANGUNAN YANG DIGUSUR PADANG RUMPUT/ALANG-ALANG

MESJID KEBUN KELAPA

GEREJA SEMAK BELUKAR

KUBURAN ISLAM LADANG

KUBURAN KRISTEN KEBUN KARET

RAMBU LALU LINTAS HUTAN SEKUNDER

MUKA AIR NORMAL SALURAN DIPERKERAS SEBELAH KIRI DAN KANAN

MUKA AIR BANJIR SALURAN DIPERKERAS SEBELAH KANAN

KABUPATEN/KOTA MADYA SALURAN DIPERKERAS SEBELAH KIRI

KECAMATAN TIANG PENUNTUN

KOTA LAIN PATOK TRIANGULASI

BATAS KABUPATEN/KOTA MADYA BENCH MARK (BM)

JALAN PROPINSI DIAMETER

JALAN KABUPATEN/KOTAMADYA ELEVASI (KETINGGGIAN)

JALAN KERETA API TEMBOK PENAHAN TANAH

LEBAR JALAN (B = Bp + 2Bs) GORONG-GORONG RENCANA

LEBAR PERKERASAN GORONG-GORONG YANG SUDAH ADA

LEBAR BAHU JALAN JEMBATAN RENCANA

LEBAR DASAR SALURAN JEMBATAN YANG SUDAH ADA

AS JALAN (CENTER LINE) GORONG-GORONG KOTAK (BOX CULVERT)

STATION

KANAN/KIRI

KILO METER

SUNGAI/ANAK SUNGAI

GARIS KETINGGIAN (KONTUR)


Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan SITUASI TRACE DAN 02 09
PENINGKATAN JEMBATAN MARISA - LEMITO POTONGAN MEMANJANG JALAN
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO DARI STA.0+000 - 0+313 Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

86 86

85 85

84 84

83 83

82 82

81 81

80 80

79 79

+78.000 +78.000
0+000 0+050 0+100 0+150 0+163 0+213 0+263 0+313
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan SITUASI 04 09
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL GORONG-GORONG Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 500

U
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan SITUASI SUNGAI DAN 03 09
PENINGKATAN JEMBATAN MARISA - LEMITO POTONGAN MEMANJANG
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA SIT.1 : 1000, SKALA H 1 : 1000, SKALA V 1 : 100
PROVINSI GORONTALO Site Engineer General Superintendent

88 88

87 87

86 86

85 85

84 84

82 82

81 81

80 80

79 79

bp. +78.000 +78.000


NOMOR TITIK/PATOK A.1 A.2 A.3 AS A.4 A.5 A.6

JARAK / JARAK

0
LANGSUNG
50 50 45.4 6.6 50 50 50
002
053

052

001
003

051
4. 542

TANGGUL SUNGAI

059. 48
931. 58
324. 58
000. 58
978. 48
784. 48
552. 48
951. 48

DASAR SUNGAI

306. 18
195. 18
875. 18
645. 18
773. 18
243. 18
372. 18
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan TYPIKAL 05 09
PENINGKATAN JEMBATAN MARISA - LEMITO GORONG-GORONG
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO ARAMCO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

POTONGAN MEMANJANG

POTONGAN MELINTANG
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 06 09
POTONGAN SUNGAI PADA
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL GORONG-GORONG Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 07 09
POTONGAN MELINTANG
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL JALAN Tanggal
JEMBATAN PATILANGGIO DARI STA.0+000 - 0+313 Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

CL CL
ELEVASI STA ELEVASI

+79.000 B.1 AS +79.000

+79.000 B.2 B.5 +79.000

+79.000 B.3 B.6 +79.000

+79.000 B.4 B.7 +79.000


15 10 5 0 5 10 15 15 10 5 0 8 15
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan POTONGAN MELINTANG 08 09
PENINGKATAN JEMBATAN MARISA - LEMITO SUNGAI
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

A.1

+ 79.000
Jarak 8.20 1.50 6.80 7.10 1.20 5.8 5.40 11.00

Elevasi

918. 48

297. 18
417. 18
059. 48
778. 48
937. 48

542. 58
306. 18

670. 58
A.2

+ 79.000
Jarak 6.60 1.40 7.00 6.40 1.70 4.60 4.80 8.80

Elevasi

195. 18
560. 58

766. 18

260. 58
319. 48

931. 58

626. 18

749. 48
630. 58

A.3

+ 79.000
Jarak 6.00 1.40 5.20 6.20 1.30 3.00 2.40 10.20

Elevasi
733. 58
774. 58
195. 18
875. 18
785. 18
013. 58
324. 58
813. 58
221. 58
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan POTONGAN MELINTANG 09 09
PENINGKATAN JEMBATAN MARISA - LEMITO SUNGAI
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

A.4

+ 79.000
Jarak 8.80 7.30 2.20 1.50 5.00 5.30 1.40 8.20

Elevasi

363. 48
685. 48
784. 48
304. 48
605. 18
773. 18
183. 18
193. 48
115. 48

A.5

+ 79.000
Jarak 7.20 7.20 2.60 1.40 5.50 5.50 1.30 6.80

Elevasi

552. 48
481. 48
364. 18
243. 18
674. 18
871. 48

343. 48
921. 48
873. 48

A.6

+ 78.000
Jarak 5.70 6.70 2.60 1.40 5.50 5.50 1.30 8.00

Elevasi
602. 48

669. 38
043. 18

951. 48
264. 18
372. 18
601. 48

780. 48

888. 38
GAMBAR STRUKTUR
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
POTONGAN MEMANJANG 01 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

CL

Tiang Beton Pratekan Ø 40 cm Tiang Beton Pratekan Ø 40 cm


L = 30 m, t = 75 mm, 16 batang L = 30 m, t = 75 mm, 16 batang

C C
0,00 50 100 150 200 250 300 0,00 50 100 150 200 250 300
0,00 0,00

H 2,00 H 2,00

4,00 4,00

6,00 6,00

8,00 8,00

10,00 10,00

12,00 12,00

14,00 14,00

16,00 16,00

18,00 18,00

20,00 20,00

22,00 22,00

24,00 24,00

26,00 26,00

28,00 28,00

30,00 30,00
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
POTONGAN MELINTANG 02 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

Tiang Beton Pratekan Ø 40 cm


L = 30 m, t = 75 mm, 16 batang
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
03 13
PENINGKATAN JEMBATAN MARISA - LEMITO DENAH JEMBATAN
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DENAH DAN DETAIL 04 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PONDASI PANCANG Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

DAFTAR TULANGAN SENGKANG PER TIANG

KETERANGAN :
T I P E A B

DIAMETER (mm') 20 12 - Ø 12 mm = 7,54 m= 6,69 Kg (U-24)

0,6 a 2300 628


- D 20 mm = 25,80 m= 63,63 Kg (U-39)
b
PANJANG ( mm' )
c
d - VOLUME BETON : 0,049 M^3/M'
0,1 0,15 KAIT 2 X ( mm' ) 280 -
0,1 - MUTU BETON K 250
JUMLAH (mm') 2580 628
LANTAI KERJA K-125
1 x 10 1 x 12
JUMLAH TULANGAN
TULANGAN UTAMA PRATEKAN 10 12

TOTAL PANJANG SELURUH


25,80 7,54
TULANGAN ( m' )

1,6

0,075

0,075 0,4

0,4
SPIRAL Ø12-15 CM(B)

10Ø20(A)
KETERANGAN :

- TIANG BETON PRATEKAN TIPE KELAS C


DETAIL KEPALA TIANG DAN TUMPUAN POTONGAN A - A - MOMEN CRACK IZIN = 9 TN.M
SKALA 1 : 20
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan DENAH 05 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO TIANG PANCANG BETON Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

TIANG MIRING 1 : 10
Ø 40 CM, T=7.5 CM; L= 30 M

TIANG TEGAK BETON PRATEKAN


Ø 40 CM, T=7.5 CM; L= 30 M

DENAH TIANG PANCANG BETON PRATEKAN


SKALA 1 : 40

CATATAN :

- PANJANG TOTAL TIANG 320 M' / ABUTMENT


Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
PENULANGAN 06 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL ABUTMENT Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

TYPE A10 A6 A9 A2/A3 TYPE F1/F2/A5/A7 F3/F4 A1/A8 A2/A3 A4


BENTUK BENTUK
TULANGAN TULANGAN
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
PENULANGAN PELAT 07 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL INJAK DAN WING WALL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

TYPE W1 W2 W3 W4/W5
BENTUK
TULANGAN

TYPE S1 S2 S3 S4
BENTUK
TULANGAN
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
PENULANGAN PELAT 08 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL LANTAI JEMBATAN Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

TYPE S1/S3 S2 S4
BENTUK
TULANGAN
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 09 13
PENINGKATAN JEMBATAN MARISA - LEMITO TAMPAK DAN
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO PENULANGAN LANTAI Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

C
L

CL

TAMPAK & POT. MEMANJANG


SKALA 1 : 100

DIAFRAGMA
POTONGAN MELINTANG
SKALA 1 : 50

C
L
C
L

CL
PENULANGAN LANTAI
SKALA 1 : 50
DENAH
SKALA 1 : 100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
PENULANGAN 10 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL GELAGAR INDUK Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent

c
d

b
a

c
d

b
a
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan

PENINGKATAN JEMBATAN MARISA - LEMITO RENCANA OPRIT


11 13
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 400
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DET TIMBUNAN DAN 12 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PAS BATU OPRIT Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 30

RENCANA TIMBUNAN OPRIT


SKALA 1 : 30

RENCANA PAS. BATU OPRIT ARAH MARISA


SKALA 1 : 30

Pot IV - IV
SKALA 1 : 30

Pot III - III


Pot II - II SKALA 1 : 30
Pot I - I SKALA 1 : 30

SKALA 1 : 30
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DET TIMBUNAN DAN 13 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PAS BATU OPRIT Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 30

RENCANA TIMBUNAN OPRIT


SKALA 1 : 30

RENCANA PAS. BATU OPRIT ARAH PALU


SKALA 1 : 30

Pot IV - IV
SKALA 1 : 30

Pot III - III


Pot II - II SKALA 1 : 30
Pot I - I SKALA 1 : 30

SKALA 1 : 30
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA

SATUAN KERJA
PELAKSANAAN JALAN NASIONAL
PROVINSI GORONTALO

PAKET :
PENGGANTIAN JEMBATAN LEMITO - MOLOSIPAT

JEMBATAN POPAYATO II (KM. 252+325)

ASBUILD DRAWING
OKTOBER 2013
PETA LOKASI PROYEK PROVINSI GORONTALO (51)

JL. STRATEGIS NASIONAL RENCANA (TERSAMBUNG)


JL. STRATEGIS NASIONAL RENC. (Blm. TERSAMBUNG)
JALAN NASIONAL
JALAN PROVINSI

PKN (PUSAT KEGIATAN NASIOANAL)

PKW (PUSAT KEGIATAN WILAYAH) 5 TH. PERTAMA

PKW (PUSAT KEGIATAN WILAYAH) 5 TH. KEDUA


016 PKSN (PUSAT KEGIATAN STRATEGIS NASIONAL)
005 5 TH. PERTAMA.
004 PKSN (PUSAT KEGIATAN STRATEGIS NASIONAL)
5 TH. KEDUA.

001 021 NO RUAS

015 BATAS PROVINSI


BATAS KABUPATEN

IBUKOTA PROVINSI
018 003
KOTA
017
IBUKOTA KABUPATEN
014 002 IBUKOTA KECAMATAN

DAERAH TUJUAN WISATA NASIONAL / INTERNASINAL :


008
WISATA ALAM /SUNGAI/DANAU/GUNUNG / T. NASIONAL

012 WISATA BUDAYA

009 009 K007 WISATA PANTAI


013 K
WISATA MUSEUM / PENDIDIKAN
011 010
SK.
006 MENHUB KETERANGAN
I II III IV TH. 2002
K
BANDAR UDARA KLAS I / PUSAT
PENYEBARAN PRIMER
BANDAR UDARA KLAS II / PUSAT
PENYEBARAN SEKUNDER
BANDAR UDARA KLAS III / PUSAT
006 PENYEBARAN TERSIER
BANDAR UDARA KLAS IV

BANDAR UDARA KLAS V

PELABUHAN INTERNASIONAL

PELABUHAN NASIONAL

PENGGANTIAN JEMBATAN MARISA-LEMITO PELABUHAN REGIONAL

JEMBATAN POPAYATO

KM . 252 + 325
GAMBAR EXISTING
JEMBATAN POPAYATO
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 1 4
PENINGKATAN JEMBATAN MARISA - LEMITO
SITUASI JEMBATAN
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 2000
General Superintendent
PROVINSI GORONTALO Site Engineer

Y = 4.200.000 U

000. 006. 11 = X
000. 007. 11 = X
000. 008. 11 = X
000. 009. 11 = X
000. 000. 21 = X
000. 001. 21 = X
0 1 2 3 4 5 CM

0 40 60 100 M

Y = 4.100.000
KETERANGAN

+32
.00
0
+30
A

.00
0
+30
32

.00
+33

0
32 .545

.00
0
31 .299
2 . 16
2 8.9 5
2 8.7 51
3 9.0 95
32 1.9885
.10 7 GARIS POLYGON
31
32 8
.

+35
.87
1
32 365

.00
.

0
33 665

3
.11
6

2.7
3 2.2
64

3 1.9
3 1.7
71
JALAN DESA

2 8.9
8
2 8.6
94
P.0

2 8.8
3 2.0 08
6

6
11
40
1. P

3 1.8
2
C
13

80
3 1.9 99
109.

3 2.1 31
3 2.62

B
2. P

3 2.24

8
3 2.02
9

3
.6
7

2
3

3 1.6
3 1.9082
3 1.7 81
36.263

2 8.8 42
4

3 1.81
2 8.8292

.07
P.7

D
+ 14

6
471. 6 3 GARIS KETINGGIAN

3
36.479 0.00
0
3 36.583 + 13
5. P 014. 1 753. 6 33
154. 6 36.486 Ke Marisa 9.00
0
INTERVAL 1 M
P.6 624. 3 3 35.780
Y = 4.000.000 3 1.06 3. P 953. 6 3
5

32.866
3 1.7 36.599

32.371
385. 3333
062. 6 3

31.4
31.727
03

31.5
31.6 49
31.4 08
276. 3 3

28.5 63
3 1.0670

28.2 57
5

28.4 01
Ke Pa 3 1.9

71
lu

31.674
234. 1133 585.. 4 3
3 2.0742 013. 0 3 690 3
4 31.137 4. P 685. 1 3 213. 4

31
3 2.16 31.035 027. 3

E
3 2.0 5

31
.7
77 30.806 735. 11 3

28
3 1.6

32.487

.1
31.793 367. 1 3 PATOK KM JALAN

60
83

31.507

.7
3 1.4

31.326
458. 3

92
31.931 BM.00

28.129
38
3 1.4080
5 32.008 367. 11 3
881. 13

31
31.934 +3

F
056. 3
981. 1 5. X = 12.097,178

30
31.806 00
0

.9
.591
31.361 050. 1 3

31.386

.0
31.2
28.235 31.234
78
BM.01 Y = 3.999,887

28.284 31.0 49
27.981
31.237

29.214 27.793
31.182 28 32 42

31.175 31.009
31.362
X = 11.790,510 Z= 36.766 ARAH ALIRAN SUNGAI

30
30
Y = 3.970,754

31.111

.90
.77
30.675
30.800
6
.000
+32

3
27.819
27.974
28.170
Z= 31.683

31.068

31.140
BM ( BENCH MARK )

.58
9
.

30.999 30 .796
0 2 0
3

30 .621 7
0

27 .4307
+3

3 .6
.

277.7843
1 .0

2 0.5 83
.
00

57
30

5
.
30 423
+3

30 778
0 .0
00
+3 RUMAH

H
0.
00
0
Y = 3.900.000

+ 31 .0
00
TOKO

MESJID

Y = 3.800.000 MENARA TELKOMSEL


Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama SITUASI TRACE DAN
Koordinator Lapangan
POT. MEMANJANG JALAN 1 4
SATKER PELAKSANAAN JALAN NASIONAL PENINGKATAN JEMBATAN MARISA - LEMITO SKALA SITUASI 1 : 2000
KEMENTERIAN PEKERJAAN UMUM Tanggal
JEMBATAN POPAYATO SKALA H = 1 : 1250 OKT 2013
PROVINSI GORONTALO LOKASI SKALA V = 1 : 100
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 2000
PROVINSI GORONTALO Site Engineer General Superintendent

+ 31 .0
00
+3 Y = 3.900.000

H
0.
00
0 +3
0 .0

30
.77
00

8
30 423
.57
+3

. 5
1 .0
00

30 .683 3
30 .78

000. 001. 21 = X
000. 000. 21 = X
000. 009. 11 = X
000. 008. 11 = X
000. 007. 11 = X

30 .54 7
27 .430
.

27 .027
30
7
27 0.621
96
30 .589
BM.01

31
30

27
.000
+32 P.6

.99
X = 11.790,510

.140
9
31.068

30.77
28.170
.974
27.8193
30.906
Y = 3.970,754

30.800
30.675
5. P

31.111

G
P.7 Z= 31.683
31.237

31

31
31.362
BM.00 31.361

.0
+3

31.232

.3
5.

27.981
31.806

78
00 050. 1 3
0

86
31.934

F
X = 12.097,178 2. P 32.008 3 1.4

28
881. 13 981. 1 33

31
31.931

31
.2
3 1.4805

31.009 31.175
Y = 3.999,887 0

28.042 31.182
056. 11 3 3 1.6
31.793

27.793 29.214
38
P.0 83

30.949 28.7 84
1. P

28.129
367. 3

31.591 31.7
31.234 28.235
30.806 3 2.0

.192
.326
Z= 36.766

31.507
458. 11 3 31.035

60
3 2.1 77

32.487

E
367. 1 3 31.137 3 2.0765
735. 3
213. 4 33 685. 1 3 027. 01 3 3 1.94 4
3 1.0 2
690. 43 3 4. P 013. 1 3 3 1.7 65
Ke Pa
lu

31.674
234. 70

31.571
36.599

31.401
3 1.0

28.457
585. 3 3

28.263
062. 6 3 65

28.508
31.449
31.603
31.727
35.780 276. 3 3 Y = 4.000.000

32.371
385.

32.866
Ke Marisa 36.486 953. 6 33 3. P
36.583 154. 6 624. 3 3

3
36.479 3

2
753. 6 3 014. 1

.0

D
3 1.8
36.263

7
471. 6 3

2 8.6
3
6
2

3 1.9
3 1.6924
2 8.8 42
1
2 8.8882

3 2.02
3 1.7 03

3 2.24
7
B

3 2.62
000. 006. 11 = X

C
31
3 1.8 99
13

3 2.1 80
3 1.9.862

3 2.0
109.

2 8 .640
2 8 .911

3 2.2
2 8 .786
3 1 .908

3 2.7
3 1 94
71
64
33
.
32 116

+35
.
32 665

.00
31

0
.36
3 5 .87
3 2.1 1
2 1.9 08
2 9.0 87
288.7985
31 .95 5

+33
32 .165 1

.00
32 .299

0
+30
.54
5

.00
0
+30
.00
0
+32
.00
0
A

6.0

AS JEMBATAN + 31.586

MAB + 29.729

MAN + 28.229
DAS + 28.129

Bidang Persamaan
+ 26.000
NOMOR P.0 P.1 P.2 P.3 P.4 P.5 P.6 P.7
PATOK
JARAK /

0
JARAK 50 50 50 9 50 50 50

05
LANGSUNG
902
952
903

951

001
051

ELEVASI

684. 63
953. 63
585. 33
367. 13
439. 13
770. 23

532. 82
921. 82
482. 82
837. 82
412. 92

355. 13
475. 13
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama SITUASI TRACE DAN
Koordinator Lapangan 1 4
POT. MEMANJANG SUNGAI
SATKER PELAKSANAAN JALAN NASIONAL PENINGKATAN JEMBATAN MARISA - LEMITO SKALA SITUASI 1 : 2000
KEMENTERIAN PEKERJAAN UMUM Tanggal
JEMBATAN POPAYATO SKALA H = 1 : 1250 OKT 2013
PROVINSI GORONTALO LOKASI SKALA V = 1 : 100
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 2000
General Superintendent
PROVINSI GORONTALO Site Engineer

X = 11.900.000
G

asi r a Me K
E H
11.113

000. 001. 4 = Y
000. 009. 3 = Y
F + 31 .0
00
57.603

3. P
D 30
C .
00.803 30 778
784. 2 3 .
30 423
668. 2 3 5. 13 60.903 3 . 57
067. 1 3 19 37.703 3 0.6 5
+33
.00 173. 2 3 91.872 2 0.5 83
0 3 705. 1 3 683. 13 47.972 277.7843
526. 2 727. 1 3
3 623. 1133 07.182 27 .4307
+30 30 .02
.00 942. 2 291.. 8 2 32. 13 86.013
0 306. 1133 30 .621 7

881. 13
532 2 4

+3
+30 3

0.
944.. 8 2
.00
0 720. 2 921. 8 2 870. 13 99.903 30 .796

00
+32 805 8 2 482. 8 .58

0
.00 3 9. 03 9
0 362. 2

3
.
.11
04.113

2
6
685. 1 3
837. 8 2 9489. 72

.
309..11 3 754. 8 3 1

+3
104. 1

33 665
2878. 8 2

0 .0
412. 9 2 397. 72

32 365
014. 1
18 . 8 2

00
23 6 . 82

8
467. 24 8 2 175. 1 3

.10 7
281. 1 3 2402. 13
23

321.9885
23

13
428. 1 3

3 9.0 95
+3
172. 296. 476. 1 3

2 8.7 51
3 571. 1 3 900. 13

32
1 .0

2 8.9 5
3

31 .29
23 618. 1

109.

2 .16 9
00
3 263. 13

8. 1

32 .545
4909.. 13
370. 2

17
80 7. 13

A
68 9. 82
X = 11.800.000 1
1 6. 82
04 . 82

4. P
2689. 13
08 23
991. 13
138.

5. P
B

ul a P e K
7.5

AS JEMBATAN + 31.586

MAB + 29.729

MAN + 28.229
DAS + 28.129

Bidang Persamaan
+ 25.000
NOMOR A B C D E F G H
PATOK
JARAK /

0
JARAK 30 26 30 12 24 28 28

03
65
68

LANGSUNG
89
871

221
051

TANGGUL

801. 23
809. 13
309. 13
306. 13
624. 13
870. 13
609. 03
386. 03

DASAR
SUNGAI

I S AVELE
597. 82
046. 82
246. 82
362. 82
921. 82
189. 72
918. 72
034. 72
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama POT. MEMANJANG JEMBATAN
Koordinator Lapangan 1 4
SKALA 1 : 100
SATKER PELAKSANAAN JALAN NASIONAL PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM POT. MELINTANG JEMBATAN Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO SKALA 1 : 100
LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 2000
PROVINSI GORONTALO Site Engineer General Superintendent

6.0
ARAH MARISA ARAH PALU

AS JEMBATAN + 31.586

PASANGAN BATU
MAB + 29.729

MAN + 28.229

DAS + 28.129

POTONGAN MEMANJANG JEMBATAN


SKALA 1 : 100

7.5

LANTAI PLAT

AS JEMBATAN + 31.586
TANGGUL + 31.603
TANGGUL + 31.326

MAB + 29.729 MAB + 29.729

MAN + 28.229 MAN + 28.229


DAS + 28.129 DAS + 28.129

POTONGAN MELINTANG JEMBATAN


SKALA 1 : 100
GAMBAR STRUKTUR
JEMBATAN PATILANGGIO
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama

SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN POPAYATO TAMPAK UMUM JEMBATAN


LOKASI
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO Site Engineer

2500 15000 2500

CL
CL CL
ARAH KE MOLINGKAPOTO 1200 2000 2000 2000
ARAH KE TOLINGGULA

MAB

GELAGAR BALOK T (GTI)

0055
0055
MAN
CL

1000 3500 3500 1000

POND. SUMURAN
Ø = 3000
L = 4000
n = 2 BH
005

0004
0004
2.0% 2.0%
057
002

500 3000 500 500 3000 500


4000 4000
058

Perlawanan Ujung Konus (kg/cm2) 450


Perlawanan Ujung Konus (kg/cm2) 1200 1200 1200 1200 1200 1200 1200
50 100 150 200 250 300 50 100 150 200 250 300
0 0

1 1

2 2
SKALA 1:100 SKALA 1:50

3 3

4 4 CATATAN :
1. PERLU MELAKUKAN PENYELIDIKAN TANAH DENGAN
5 5 ALAT BOR MESIN SEBELUM PELAKSANAAN PISIK.
2. SEMUA UKURAN DALAM MILIMETER KECUALI
6 6
500 1000 1500 2000 2500 3000 500 1000 1500 2000 2500 3000 ELEVASI DALAM METER.

) m( i s art enep na mal adek


3. MUTU BETON :

) m( i s art enep na mal adek


Jumlah Hambatan Lekat (kg/cm) Jumlah Hambatan Lekat (kg/cm) - LANTAI JEMBATAN K.300
2500 15000 2500
- ABUTMENT K.250
BRG C BRG
CL L CL - GELAGAR BETON BERTULANG TYPE T
- LANTAI KERJA K.125
005

052
005
- MUTU BETON SIKLOP K.175
- MUTU TULANGAN POLOS U-24

0002
- MUTU TULANGAN ULIR U-32
- Ø < 12 MM POLOS
- D > 12 MM ULIR
0005

0053
L EJ

0007
00011
00011

NAT AB CM

0053
SCUPPERS
0005

0002
005

4800

SKALA 1:100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama

SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN POPAYATO PENULANGAN BALOK T


LOKASI
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO

15000

1500 1500 1500 6000 1200 1200


D13-100 D13-200 D13-100 D13-200

002
002

Ø10-250(B7')

004
004

2Ø10(B8') Ø10-250(B7')
2Ø10(B8')

0501
0501

60
Ø10(B9) Ø10(B9)

001
001

B6 B5 B6 B5

085
Ø10-250 Ø10-250
055

B7 B7
2D25(B3) 2D25(B3)
3D25(B2) 3D25(B2)

053
053

7D25(B1) 7D25(B1)

450 450
600 600

900 900

SKALA 1:20 SKALA 1:20

1500
1500

1500

1500 1500 1200 1200


D13-100 D13-200 D13-100 D13-200
002
002

B5' B5'
057

Ø10-250(B7') Ø10-250(B7')
2Ø10(B8') 2Ø10(B8')
055

2D25(B3)
0501

SKALA 1:50
052

058

Ø10-70 7D25(B1)
055

B7

c 2D25(B3)
a a a c 3D25(B2)
d d
7D25(B1)
b a
a
a a
b b 450
d c b c
b b
b
c d
d b
b
a
a
a
SKALA 1:20 SKALA 1:20

300
3D19(D1)

42Ø10-200(D2)
005

3D19(D1)

SKALA 1:20

CATATAN :
1. STANDAR KONSTRUKSI JEMBATAN MENGACU KEPADA
STANDAR TYPE BALOK T SPAN 15.00 M
2. KELAS MUATAN BM-100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama

JEMBATAN POPAYATO
PENULANGAN LANTAI DAN
SATKER PELAKSANAAN JALAN NASIONAL
LOKASI DETAIL TIANG SANDARAN
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO Site Engineer

100 CL 100
100 100
100 100
1000 3500 3500 1000 1000 100 100 100

100
001

PIPA Ø 3"

005
PLAT BAJA t=25 PIPA Ø 3"
100
002

TROTOAR TROTOAR

0521
PLAT BAJA T=25
D13-100
081

2.0% KERB BETON 2.0%

057
KERB BETON D13-200
02

2.0% 2.0%
ANGKER 4Ø22-200
002

D1
0521

3D19

051
002
05

Ø12-200
051

2.0%
001

KERB BETON
K.250
052

520 1200 1200 1200 1200 1200 1200 1200 520


002

05

SKALA 1:20 250


220 80
004

520 1200 1200 1200 1200 1200 1200 1200 520

CL
058

001

003
006
053

009
D2 D1
42Ø10-200 3D19

450
PIPA AIR Ø4"

002- 31 D
002- 31 D
D13-100

D13-100
SKALA 1:10

0084
3D19

Ø10-200
005

Ø12-200

3D19

300
Ø12-200
D2 D1
42Ø10-200 3D19

SKALA 1:10

SKALA 1:20
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama

SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN POPAYATO


PENULANGAN ABUTMENT
LOKASI
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO Site Engineer

KODE DIA TUL. JARAK DIAGRAM TULANGAN


TUL. TUL.
2500 600 300 1000 1000 7000/2
A1 22 100
A3/A3a
A2 13 200/300 A1
100
A3/A3a 16 200 A2 A5
A4
A4 22 150
C ABUTMENT
A5 13 200/300

A6 22 300 A8

0521
A7 22 150 A9
2.0%
A8 13 200
2.0% A6 A7
A9 13 200/300 A11
A10 A11a
D16-200(A14) C C PLAT INJAK C C A10 19 150

052
D16-150(A15) BRG BRG BRG
BRG 200X1700X7000/2
D13-200/300(A12) A11/A11a 16/19 200
1000 300

052
BRG A12
200 A12 13 200/300 A13
D13-200(A13)
500
A13 13 200 A18

0031
D16-150(A17)

002 002
D13-200
D16-150(A16) D19-150(A10) (A18) A14 16 200
A15
D13-200 1200 1200 1200 600
A15 16 150
A19
(A19)
A16 16 150 A14
A16
D13-200(A8) A17 16 150

005
A17
A18 13 200

A19 13 200

0573
D16-200(A11)

005
D19-200(A11a)
3 1
C

0074
D13-200(A8) D13-200(A8)

0055
1200 1200 1200 1200 1200 1200 1200
0002

D13-200/300(A9) 1000
2 2
C BRG C BRG C BRG C BRG C BRG C BRG C BRG C BRG

0002
D22-150(A7) D22-150(A7) C
D13-300/200(A2)
0004

D22-300(A6) D16-200(A3)
D22-150(A4) 3D13-300/200(A5)
3D13-200/300(A5)
0002

D22-150(A4)
D16-200(A3)

059
D16-200(A3)
PELAT INJAK

004
Ø13-200/300(A2)

008
500 1500 1500 500
D22-100(A1)
2000 7000 2000
1

11000

001
D16-200(A3a) D16-200(A3) LANTAI KERJA
D22-100(A1) 350 600 300
LANTAI KERJA
D16-200(A3a)
27D 22

C
D13-200 SKALA 1:50
D13-100 BRG
(A18)
058

D13-100

0004
002

D13-200 D13-200
054

(A19)
0001

500 3000 500 3000


800

SKALA 1:25 SKALA 1:25


SKALA 1:25
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama

SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN POPAYATO


PENULANGAN PONDASI SUMURAN
LOKASI
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO Site Engineer

C ABUTMENT

27D 22 (B5) 27D 22 (B5)

500 LANTAI KERJA


BETON K. 250

001
BETON K. 250 LANTAI KERJA

0001
0001
D13-150 (B1) D13-150 (B1)

D13-150 (B2) D13-150 (B2)

D13-200 (B3) D13-200 (B3)


BETON CYCLOP K. 175 BETON CYCLOP K. 175 PONDASI SUMURAN

0002
0004
0002
D13-200 (B4) D13-200 (B4)

BETON K. 250

0001
0001
BETON K. 250

004
200 100 100 200 200 100 100 200

3000 750 3000 3500 3000 750

11000

D13-200 (B4)
D13-200 (B3)
SKALA 1:25
SKALA 1:25

D13-150 (B1)

005
27 D 22 (B5) D13-150 (B2)

TYPE B2 B1 B3 B4 B5

0003
BENTUK
TULANGAN

005
750 3000 3500 3000 750

11000

SKALA 1:50
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama

SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN POPAYATO


PENULANGAN DINDING SAYAP
LOKASI
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO Site Engineer

2500 450 450


1000 1000 7000/2

100

TYPE A B C D E F

0521
C ABUTMENT BENTUK
500 2.0% TULANGAN
2.0%
6-D16(E) 6-D16(E)

C C C C

052
BRG BRG PLAT INJAK BRG BRG
200X1700X7000/2

052
CL BRG 750 300

0031
1200 1200 1200 600
C

005
NF.D16-150(C)
FF.D16-150(B)
1200 1200 1200 1200 1200 1200 1200

0002
1000

0573
C C C C C C C C

005
BRG BRG BRG BRG BRG BRG BRG BRG

NF.D16-150(C) C

0004
FF.D16-150(F)

0074
D16-150(B)
0002

0055
NF.D16-150(A)
D16-200(C)
FF.D16-150(B) D16-150(B)
PELAT INJAK

0002
500 1500 1500 500

2000 7000 2000


3-D16(D) D16-150(A)
11000

004
3-D16(D)

008
SKALA 1:50

001
LANTAI KERJA
K. 125
LANTAI KERJA
003

D16-150(F)

0004
D16-150(A)

D16-150(B)

D16-150(B)

D16-150(C)
500 3000 500
750 3000 1750

SKALA 1:25

SKALA 1:25 300


SKALA 1:25
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama

SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN POPAYATO


EXPANSION JOINT, PERLETAKAN ROL & PELETAKAN SENDI
LOKASI
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO Site Engineer

380
305

R=5
00
ANGKER Ø25 ANGKER Ø25

60
30 30

02
02
03
03

5
52 52 52 52 52 52
52 52 52 52 52 52

03

03 52
03 52
30 30

02
02
230

250
40 240 40
50 130 50
320 350
330 230
400 450
430

37,5 37,5
50 50 230 50 50 37,5 37,5
230
05
04

05
05
04

Ø 30

Ø 30

03
Ø 30

032

031

081
60
052
053
054
042
004

081

05
05
430
380
04

05
04

SKALA 1:5 180 250


40 40 240 40 40 50 350 50

400
450

300 50 100
80
35 35
50 150 50 50 50 50 50

115 PLAT T=15 MM SKALA 1:5


051

LAP. ASPAL
05

57
05 001

002
003

LAS TITIK Ø 15 CATATAN :


L.150.150.16
05 001

PLAT LANDASAN ST. 37


ANGKER Ø25-200
DILAS PD. BAJA SIKU PEN ST. 52
001

LAS LISTRIK T=15 MM KELILING


003

GELAGAR BALOK T ABUTMENT


80

35 35
80

50 150 50 50 50 50 50

SKALA 1:10
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
SHOP DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan

PENINGKATAN JEMBATAN MARISA - LEMITO RENCANA OPRIT


8 10
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 400

m 54

asi r a Me K
m 03

ul a P e K
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
SHOP DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DET TIMBUNAN DAN 9 10
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PAS BATU OPRIT Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 30

0.40 0.40
9.00

04. 0
RENCANA TIMBUNAN OPRIT
SKALA 1 : 30

I II III IV

52. 1
IV

05. 1

00. 2

52. 2
III
II
I 16 9.56 12.00 7.44

45
RENCANA PAS. BATU OPRIT ARAH MARISA
SKALA 1 : 30

0.40 0.40 0.40 0.40


52. 1

05. 1

00. 2 0.46

52. 2
0.58 Pot IV - IV
SKALA 1 : 30
0.71
1.13 Pot III - III
Pot II - II SKALA 1 : 30
Pot I - I SKALA 1 : 30

SKALA 1 : 30
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
SHOP DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DET TIMBUNAN DAN 10 10
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PAS BATU OPRIT Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 30

0.40 0.40
9.00

04. 0
RENCANA TIMBUNAN OPRIT
SKALA 1 : 30

I II III IV

00. 1
IV

05. 1

00. 2

52. 2
III
II
I 10.00 8.00 8.00 4.00

30.00
RENCANA PAS. BATU OPRIT ARAH PALU
SKALA 1 : 30

0.40 0.40 0.40 0.40


00. 1

05. 1

00. 2 0.42

52. 2
0.58 Pot IV - IV
SKALA 1 : 30
0.71
1.13 Pot III - III
Pot II - II SKALA 1 : 30
Pot I - I SKALA 1 : 30

SKALA 1 : 30

Anda mungkin juga menyukai