SATUAN KERJA
PELAKSANAAN JALAN NASIONAL
PROVINSI GORONTALO
PAKET :
PENGGANTIAN JEMBATAN LEMITO - MOLOSIPAT
JEMBATAN PATIALNGGIO (KM. 252+325)
JEMBATAN POPAYATO II (KM. 252+325)
ASBUILD DRAWING
OKTOBER 2013
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH XI
PAKET :
PENGGANTIAN JEMBATAN MARISA - LEMITO
( JEMBATAN PATILANGGIO )
KM 186 + 450
ASBUILD DRAWING
OKTOBER 2013
PETA LOKASI PROYEK PROVINSI GORONTALO (51)
IBUKOTA PROVINSI
018 003
KOTA
017
IBUKOTA KABUPATEN
014 002 IBUKOTA KECAMATAN
PELABUHAN INTERNASIONAL
PELABUHAN NASIONAL
PELABUHAN REGIONAL
KM . 186 + 450
GAMBAR EXISTING
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 01 09
PENINGKATAN JEMBATAN MARISA - LEMITO
PETA SITUASI
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 1500
PROVINSI GORONTALO Site Engineer General Superintendent
PETA SITUASI U
AZIMUTH
PATOK KILO METER
NORT (Y) R A WA
STATION
KANAN/KIRI
KILO METER
SUNGAI/ANAK SUNGAI
86 86
85 85
84 84
83 83
82 82
81 81
80 80
79 79
+78.000 +78.000
0+000 0+050 0+100 0+150 0+163 0+213 0+263 0+313
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan SITUASI 04 09
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL GORONG-GORONG Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 500
U
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan SITUASI SUNGAI DAN 03 09
PENINGKATAN JEMBATAN MARISA - LEMITO POTONGAN MEMANJANG
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA SIT.1 : 1000, SKALA H 1 : 1000, SKALA V 1 : 100
PROVINSI GORONTALO Site Engineer General Superintendent
88 88
87 87
86 86
85 85
84 84
82 82
81 81
80 80
79 79
JARAK / JARAK
0
LANGSUNG
50 50 45.4 6.6 50 50 50
002
053
052
001
003
051
4. 542
TANGGUL SUNGAI
059. 48
931. 58
324. 58
000. 58
978. 48
784. 48
552. 48
951. 48
DASAR SUNGAI
306. 18
195. 18
875. 18
645. 18
773. 18
243. 18
372. 18
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan TYPIKAL 05 09
PENINGKATAN JEMBATAN MARISA - LEMITO GORONG-GORONG
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO ARAMCO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
POTONGAN MEMANJANG
POTONGAN MELINTANG
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 06 09
POTONGAN SUNGAI PADA
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL GORONG-GORONG Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 07 09
POTONGAN MELINTANG
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL JALAN Tanggal
JEMBATAN PATILANGGIO DARI STA.0+000 - 0+313 Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
CL CL
ELEVASI STA ELEVASI
A.1
+ 79.000
Jarak 8.20 1.50 6.80 7.10 1.20 5.8 5.40 11.00
Elevasi
918. 48
297. 18
417. 18
059. 48
778. 48
937. 48
542. 58
306. 18
670. 58
A.2
+ 79.000
Jarak 6.60 1.40 7.00 6.40 1.70 4.60 4.80 8.80
Elevasi
195. 18
560. 58
766. 18
260. 58
319. 48
931. 58
626. 18
749. 48
630. 58
A.3
+ 79.000
Jarak 6.00 1.40 5.20 6.20 1.30 3.00 2.40 10.20
Elevasi
733. 58
774. 58
195. 18
875. 18
785. 18
013. 58
324. 58
813. 58
221. 58
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan POTONGAN MELINTANG 09 09
PENINGKATAN JEMBATAN MARISA - LEMITO SUNGAI
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
A.4
+ 79.000
Jarak 8.80 7.30 2.20 1.50 5.00 5.30 1.40 8.20
Elevasi
363. 48
685. 48
784. 48
304. 48
605. 18
773. 18
183. 18
193. 48
115. 48
A.5
+ 79.000
Jarak 7.20 7.20 2.60 1.40 5.50 5.50 1.30 6.80
Elevasi
552. 48
481. 48
364. 18
243. 18
674. 18
871. 48
343. 48
921. 48
873. 48
A.6
+ 78.000
Jarak 5.70 6.70 2.60 1.40 5.50 5.50 1.30 8.00
Elevasi
602. 48
669. 38
043. 18
951. 48
264. 18
372. 18
601. 48
780. 48
888. 38
GAMBAR STRUKTUR
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
POTONGAN MEMANJANG 01 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
CL
C C
0,00 50 100 150 200 250 300 0,00 50 100 150 200 250 300
0,00 0,00
H 2,00 H 2,00
4,00 4,00
6,00 6,00
8,00 8,00
10,00 10,00
12,00 12,00
14,00 14,00
16,00 16,00
18,00 18,00
20,00 20,00
22,00 22,00
24,00 24,00
26,00 26,00
28,00 28,00
30,00 30,00
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
POTONGAN MELINTANG 02 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL JEMBATAN Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
KETERANGAN :
T I P E A B
1,6
0,075
0,075 0,4
0,4
SPIRAL Ø12-15 CM(B)
10Ø20(A)
KETERANGAN :
TIANG MIRING 1 : 10
Ø 40 CM, T=7.5 CM; L= 30 M
CATATAN :
TYPE W1 W2 W3 W4/W5
BENTUK
TULANGAN
TYPE S1 S2 S3 S4
BENTUK
TULANGAN
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
PENULANGAN PELAT 08 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL LANTAI JEMBATAN Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
TYPE S1/S3 S2 S4
BENTUK
TULANGAN
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 09 13
PENINGKATAN JEMBATAN MARISA - LEMITO TAMPAK DAN
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN PATILANGGIO PENULANGAN LANTAI Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
C
L
CL
DIAFRAGMA
POTONGAN MELINTANG
SKALA 1 : 50
C
L
C
L
CL
PENULANGAN LANTAI
SKALA 1 : 50
DENAH
SKALA 1 : 100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
PENULANGAN 10 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL GELAGAR INDUK Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent
c
d
b
a
c
d
b
a
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
Pot IV - IV
SKALA 1 : 30
SKALA 1 : 30
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DET TIMBUNAN DAN 13 13
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PAS BATU OPRIT Tanggal
JEMBATAN PATILANGGIO Oktober 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 30
Pot IV - IV
SKALA 1 : 30
SKALA 1 : 30
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
SATUAN KERJA
PELAKSANAAN JALAN NASIONAL
PROVINSI GORONTALO
PAKET :
PENGGANTIAN JEMBATAN LEMITO - MOLOSIPAT
ASBUILD DRAWING
OKTOBER 2013
PETA LOKASI PROYEK PROVINSI GORONTALO (51)
IBUKOTA PROVINSI
018 003
KOTA
017
IBUKOTA KABUPATEN
014 002 IBUKOTA KECAMATAN
PELABUHAN INTERNASIONAL
PELABUHAN NASIONAL
JEMBATAN POPAYATO
KM . 252 + 325
GAMBAR EXISTING
JEMBATAN POPAYATO
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan 1 4
PENINGKATAN JEMBATAN MARISA - LEMITO
SITUASI JEMBATAN
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 2000
General Superintendent
PROVINSI GORONTALO Site Engineer
Y = 4.200.000 U
000. 006. 11 = X
000. 007. 11 = X
000. 008. 11 = X
000. 009. 11 = X
000. 000. 21 = X
000. 001. 21 = X
0 1 2 3 4 5 CM
0 40 60 100 M
Y = 4.100.000
KETERANGAN
+32
.00
0
+30
A
.00
0
+30
32
.00
+33
0
32 .545
.00
0
31 .299
2 . 16
2 8.9 5
2 8.7 51
3 9.0 95
32 1.9885
.10 7 GARIS POLYGON
31
32 8
.
+35
.87
1
32 365
.00
.
0
33 665
3
.11
6
2.7
3 2.2
64
3 1.9
3 1.7
71
JALAN DESA
2 8.9
8
2 8.6
94
P.0
2 8.8
3 2.0 08
6
6
11
40
1. P
3 1.8
2
C
13
80
3 1.9 99
109.
3 2.1 31
3 2.62
B
2. P
3 2.24
8
3 2.02
9
3
.6
7
2
3
3 1.6
3 1.9082
3 1.7 81
36.263
2 8.8 42
4
3 1.81
2 8.8292
.07
P.7
D
+ 14
6
471. 6 3 GARIS KETINGGIAN
3
36.479 0.00
0
3 36.583 + 13
5. P 014. 1 753. 6 33
154. 6 36.486 Ke Marisa 9.00
0
INTERVAL 1 M
P.6 624. 3 3 35.780
Y = 4.000.000 3 1.06 3. P 953. 6 3
5
32.866
3 1.7 36.599
32.371
385. 3333
062. 6 3
31.4
31.727
03
31.5
31.6 49
31.4 08
276. 3 3
28.5 63
3 1.0670
28.2 57
5
28.4 01
Ke Pa 3 1.9
71
lu
31.674
234. 1133 585.. 4 3
3 2.0742 013. 0 3 690 3
4 31.137 4. P 685. 1 3 213. 4
31
3 2.16 31.035 027. 3
E
3 2.0 5
31
.7
77 30.806 735. 11 3
28
3 1.6
32.487
.1
31.793 367. 1 3 PATOK KM JALAN
60
83
31.507
.7
3 1.4
31.326
458. 3
92
31.931 BM.00
28.129
38
3 1.4080
5 32.008 367. 11 3
881. 13
31
31.934 +3
F
056. 3
981. 1 5. X = 12.097,178
30
31.806 00
0
.9
.591
31.361 050. 1 3
31.386
.0
31.2
28.235 31.234
78
BM.01 Y = 3.999,887
28.284 31.0 49
27.981
31.237
29.214 27.793
31.182 28 32 42
31.175 31.009
31.362
X = 11.790,510 Z= 36.766 ARAH ALIRAN SUNGAI
30
30
Y = 3.970,754
31.111
.90
.77
30.675
30.800
6
.000
+32
3
27.819
27.974
28.170
Z= 31.683
31.068
31.140
BM ( BENCH MARK )
.58
9
.
30.999 30 .796
0 2 0
3
30 .621 7
0
27 .4307
+3
3 .6
.
277.7843
1 .0
2 0.5 83
.
00
57
30
5
.
30 423
+3
30 778
0 .0
00
+3 RUMAH
H
0.
00
0
Y = 3.900.000
+ 31 .0
00
TOKO
MESJID
+ 31 .0
00
+3 Y = 3.900.000
H
0.
00
0 +3
0 .0
30
.77
00
8
30 423
.57
+3
. 5
1 .0
00
30 .683 3
30 .78
000. 001. 21 = X
000. 000. 21 = X
000. 009. 11 = X
000. 008. 11 = X
000. 007. 11 = X
30 .54 7
27 .430
.
27 .027
30
7
27 0.621
96
30 .589
BM.01
31
30
27
.000
+32 P.6
.99
X = 11.790,510
.140
9
31.068
30.77
28.170
.974
27.8193
30.906
Y = 3.970,754
30.800
30.675
5. P
31.111
G
P.7 Z= 31.683
31.237
31
31
31.362
BM.00 31.361
.0
+3
31.232
.3
5.
27.981
31.806
78
00 050. 1 3
0
86
31.934
F
X = 12.097,178 2. P 32.008 3 1.4
28
881. 13 981. 1 33
31
31.931
31
.2
3 1.4805
31.009 31.175
Y = 3.999,887 0
28.042 31.182
056. 11 3 3 1.6
31.793
27.793 29.214
38
P.0 83
30.949 28.7 84
1. P
28.129
367. 3
31.591 31.7
31.234 28.235
30.806 3 2.0
.192
.326
Z= 36.766
31.507
458. 11 3 31.035
60
3 2.1 77
32.487
E
367. 1 3 31.137 3 2.0765
735. 3
213. 4 33 685. 1 3 027. 01 3 3 1.94 4
3 1.0 2
690. 43 3 4. P 013. 1 3 3 1.7 65
Ke Pa
lu
31.674
234. 70
31.571
36.599
31.401
3 1.0
28.457
585. 3 3
28.263
062. 6 3 65
28.508
31.449
31.603
31.727
35.780 276. 3 3 Y = 4.000.000
32.371
385.
32.866
Ke Marisa 36.486 953. 6 33 3. P
36.583 154. 6 624. 3 3
3
36.479 3
2
753. 6 3 014. 1
.0
D
3 1.8
36.263
7
471. 6 3
2 8.6
3
6
2
3 1.9
3 1.6924
2 8.8 42
1
2 8.8882
3 2.02
3 1.7 03
3 2.24
7
B
3 2.62
000. 006. 11 = X
C
31
3 1.8 99
13
3 2.1 80
3 1.9.862
3 2.0
109.
2 8 .640
2 8 .911
3 2.2
2 8 .786
3 1 .908
3 2.7
3 1 94
71
64
33
.
32 116
+35
.
32 665
.00
31
0
.36
3 5 .87
3 2.1 1
2 1.9 08
2 9.0 87
288.7985
31 .95 5
+33
32 .165 1
.00
32 .299
0
+30
.54
5
.00
0
+30
.00
0
+32
.00
0
A
6.0
AS JEMBATAN + 31.586
MAB + 29.729
MAN + 28.229
DAS + 28.129
Bidang Persamaan
+ 26.000
NOMOR P.0 P.1 P.2 P.3 P.4 P.5 P.6 P.7
PATOK
JARAK /
0
JARAK 50 50 50 9 50 50 50
05
LANGSUNG
902
952
903
951
001
051
ELEVASI
684. 63
953. 63
585. 33
367. 13
439. 13
770. 23
532. 82
921. 82
482. 82
837. 82
412. 92
355. 13
475. 13
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama SITUASI TRACE DAN
Koordinator Lapangan 1 4
POT. MEMANJANG SUNGAI
SATKER PELAKSANAAN JALAN NASIONAL PENINGKATAN JEMBATAN MARISA - LEMITO SKALA SITUASI 1 : 2000
KEMENTERIAN PEKERJAAN UMUM Tanggal
JEMBATAN POPAYATO SKALA H = 1 : 1250 OKT 2013
PROVINSI GORONTALO LOKASI SKALA V = 1 : 100
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 2000
General Superintendent
PROVINSI GORONTALO Site Engineer
X = 11.900.000
G
asi r a Me K
E H
11.113
000. 001. 4 = Y
000. 009. 3 = Y
F + 31 .0
00
57.603
3. P
D 30
C .
00.803 30 778
784. 2 3 .
30 423
668. 2 3 5. 13 60.903 3 . 57
067. 1 3 19 37.703 3 0.6 5
+33
.00 173. 2 3 91.872 2 0.5 83
0 3 705. 1 3 683. 13 47.972 277.7843
526. 2 727. 1 3
3 623. 1133 07.182 27 .4307
+30 30 .02
.00 942. 2 291.. 8 2 32. 13 86.013
0 306. 1133 30 .621 7
881. 13
532 2 4
+3
+30 3
0.
944.. 8 2
.00
0 720. 2 921. 8 2 870. 13 99.903 30 .796
00
+32 805 8 2 482. 8 .58
0
.00 3 9. 03 9
0 362. 2
3
.
.11
04.113
2
6
685. 1 3
837. 8 2 9489. 72
.
309..11 3 754. 8 3 1
+3
104. 1
33 665
2878. 8 2
0 .0
412. 9 2 397. 72
32 365
014. 1
18 . 8 2
00
23 6 . 82
8
467. 24 8 2 175. 1 3
.10 7
281. 1 3 2402. 13
23
321.9885
23
13
428. 1 3
3 9.0 95
+3
172. 296. 476. 1 3
2 8.7 51
3 571. 1 3 900. 13
32
1 .0
2 8.9 5
3
31 .29
23 618. 1
109.
2 .16 9
00
3 263. 13
8. 1
32 .545
4909.. 13
370. 2
17
80 7. 13
A
68 9. 82
X = 11.800.000 1
1 6. 82
04 . 82
4. P
2689. 13
08 23
991. 13
138.
5. P
B
ul a P e K
7.5
AS JEMBATAN + 31.586
MAB + 29.729
MAN + 28.229
DAS + 28.129
Bidang Persamaan
+ 25.000
NOMOR A B C D E F G H
PATOK
JARAK /
0
JARAK 30 26 30 12 24 28 28
03
65
68
LANGSUNG
89
871
221
051
TANGGUL
801. 23
809. 13
309. 13
306. 13
624. 13
870. 13
609. 03
386. 03
DASAR
SUNGAI
I S AVELE
597. 82
046. 82
246. 82
362. 82
921. 82
189. 72
918. 72
034. 72
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN ASBUILD DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama POT. MEMANJANG JEMBATAN
Koordinator Lapangan 1 4
SKALA 1 : 100
SATKER PELAKSANAAN JALAN NASIONAL PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM POT. MELINTANG JEMBATAN Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO SKALA 1 : 100
LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal SKALA 1 : 2000
PROVINSI GORONTALO Site Engineer General Superintendent
6.0
ARAH MARISA ARAH PALU
AS JEMBATAN + 31.586
PASANGAN BATU
MAB + 29.729
MAN + 28.229
DAS + 28.129
7.5
LANTAI PLAT
AS JEMBATAN + 31.586
TANGGUL + 31.603
TANGGUL + 31.326
CL
CL CL
ARAH KE MOLINGKAPOTO 1200 2000 2000 2000
ARAH KE TOLINGGULA
MAB
0055
0055
MAN
CL
POND. SUMURAN
Ø = 3000
L = 4000
n = 2 BH
005
0004
0004
2.0% 2.0%
057
002
1 1
2 2
SKALA 1:100 SKALA 1:50
3 3
4 4 CATATAN :
1. PERLU MELAKUKAN PENYELIDIKAN TANAH DENGAN
5 5 ALAT BOR MESIN SEBELUM PELAKSANAAN PISIK.
2. SEMUA UKURAN DALAM MILIMETER KECUALI
6 6
500 1000 1500 2000 2500 3000 500 1000 1500 2000 2500 3000 ELEVASI DALAM METER.
052
005
- MUTU BETON SIKLOP K.175
- MUTU TULANGAN POLOS U-24
0002
- MUTU TULANGAN ULIR U-32
- Ø < 12 MM POLOS
- D > 12 MM ULIR
0005
0053
L EJ
0007
00011
00011
NAT AB CM
0053
SCUPPERS
0005
0002
005
4800
SKALA 1:100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
15000
002
002
Ø10-250(B7')
004
004
2Ø10(B8') Ø10-250(B7')
2Ø10(B8')
0501
0501
60
Ø10(B9) Ø10(B9)
001
001
B6 B5 B6 B5
085
Ø10-250 Ø10-250
055
B7 B7
2D25(B3) 2D25(B3)
3D25(B2) 3D25(B2)
053
053
7D25(B1) 7D25(B1)
450 450
600 600
900 900
1500
1500
1500
B5' B5'
057
Ø10-250(B7') Ø10-250(B7')
2Ø10(B8') 2Ø10(B8')
055
2D25(B3)
0501
SKALA 1:50
052
058
Ø10-70 7D25(B1)
055
B7
c 2D25(B3)
a a a c 3D25(B2)
d d
7D25(B1)
b a
a
a a
b b 450
d c b c
b b
b
c d
d b
b
a
a
a
SKALA 1:20 SKALA 1:20
300
3D19(D1)
42Ø10-200(D2)
005
3D19(D1)
SKALA 1:20
CATATAN :
1. STANDAR KONSTRUKSI JEMBATAN MENGACU KEPADA
STANDAR TYPE BALOK T SPAN 15.00 M
2. KELAS MUATAN BM-100
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
JEMBATAN POPAYATO
PENULANGAN LANTAI DAN
SATKER PELAKSANAAN JALAN NASIONAL
LOKASI DETAIL TIANG SANDARAN
PROVINSI GORONTALO KABUPATEN POHUWATO Zenny Mashudi, ST
Maryam Yunus, ST Ir.Iskandar Faisal
General Superintendent
PROVINSI GORONTALO Site Engineer
100 CL 100
100 100
100 100
1000 3500 3500 1000 1000 100 100 100
100
001
PIPA Ø 3"
005
PLAT BAJA t=25 PIPA Ø 3"
100
002
TROTOAR TROTOAR
0521
PLAT BAJA T=25
D13-100
081
057
KERB BETON D13-200
02
2.0% 2.0%
ANGKER 4Ø22-200
002
D1
0521
3D19
051
002
05
Ø12-200
051
2.0%
001
KERB BETON
K.250
052
05
CL
058
001
003
006
053
009
D2 D1
42Ø10-200 3D19
450
PIPA AIR Ø4"
002- 31 D
002- 31 D
D13-100
D13-100
SKALA 1:10
0084
3D19
Ø10-200
005
Ø12-200
3D19
300
Ø12-200
D2 D1
42Ø10-200 3D19
SKALA 1:10
SKALA 1:20
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
A6 22 300 A8
0521
A7 22 150 A9
2.0%
A8 13 200
2.0% A6 A7
A9 13 200/300 A11
A10 A11a
D16-200(A14) C C PLAT INJAK C C A10 19 150
052
D16-150(A15) BRG BRG BRG
BRG 200X1700X7000/2
D13-200/300(A12) A11/A11a 16/19 200
1000 300
052
BRG A12
200 A12 13 200/300 A13
D13-200(A13)
500
A13 13 200 A18
0031
D16-150(A17)
002 002
D13-200
D16-150(A16) D19-150(A10) (A18) A14 16 200
A15
D13-200 1200 1200 1200 600
A15 16 150
A19
(A19)
A16 16 150 A14
A16
D13-200(A8) A17 16 150
005
A17
A18 13 200
A19 13 200
0573
D16-200(A11)
005
D19-200(A11a)
3 1
C
0074
D13-200(A8) D13-200(A8)
0055
1200 1200 1200 1200 1200 1200 1200
0002
D13-200/300(A9) 1000
2 2
C BRG C BRG C BRG C BRG C BRG C BRG C BRG C BRG
0002
D22-150(A7) D22-150(A7) C
D13-300/200(A2)
0004
D22-300(A6) D16-200(A3)
D22-150(A4) 3D13-300/200(A5)
3D13-200/300(A5)
0002
D22-150(A4)
D16-200(A3)
059
D16-200(A3)
PELAT INJAK
004
Ø13-200/300(A2)
008
500 1500 1500 500
D22-100(A1)
2000 7000 2000
1
11000
001
D16-200(A3a) D16-200(A3) LANTAI KERJA
D22-100(A1) 350 600 300
LANTAI KERJA
D16-200(A3a)
27D 22
C
D13-200 SKALA 1:50
D13-100 BRG
(A18)
058
D13-100
0004
002
D13-200 D13-200
054
(A19)
0001
C ABUTMENT
001
BETON K. 250 LANTAI KERJA
0001
0001
D13-150 (B1) D13-150 (B1)
0002
0004
0002
D13-200 (B4) D13-200 (B4)
BETON K. 250
0001
0001
BETON K. 250
004
200 100 100 200 200 100 100 200
11000
D13-200 (B4)
D13-200 (B3)
SKALA 1:25
SKALA 1:25
D13-150 (B1)
005
27 D 22 (B5) D13-150 (B2)
TYPE B2 B1 B3 B4 B5
0003
BENTUK
TULANGAN
005
750 3000 3500 3000 750
11000
SKALA 1:50
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh
ASBUILD DRAWING PPK - 06 Konsultan Supervisi Kontraktor Pelaksana
KEGIATAN (Marisa - Lemito - Molosipat )
PENINGKATAN JEMBATAN MARISA - LEMITO Koordinator Lapangan PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
100
TYPE A B C D E F
0521
C ABUTMENT BENTUK
500 2.0% TULANGAN
2.0%
6-D16(E) 6-D16(E)
C C C C
052
BRG BRG PLAT INJAK BRG BRG
200X1700X7000/2
052
CL BRG 750 300
0031
1200 1200 1200 600
C
005
NF.D16-150(C)
FF.D16-150(B)
1200 1200 1200 1200 1200 1200 1200
0002
1000
0573
C C C C C C C C
005
BRG BRG BRG BRG BRG BRG BRG BRG
NF.D16-150(C) C
0004
FF.D16-150(F)
0074
D16-150(B)
0002
0055
NF.D16-150(A)
D16-200(C)
FF.D16-150(B) D16-150(B)
PELAT INJAK
0002
500 1500 1500 500
004
3-D16(D)
008
SKALA 1:50
001
LANTAI KERJA
K. 125
LANTAI KERJA
003
D16-150(F)
0004
D16-150(A)
D16-150(B)
D16-150(B)
D16-150(C)
500 3000 500
750 3000 1750
SKALA 1:25
380
305
R=5
00
ANGKER Ø25 ANGKER Ø25
60
30 30
02
02
03
03
5
52 52 52 52 52 52
52 52 52 52 52 52
03
03 52
03 52
30 30
02
02
230
250
40 240 40
50 130 50
320 350
330 230
400 450
430
37,5 37,5
50 50 230 50 50 37,5 37,5
230
05
04
05
05
04
Ø 30
Ø 30
03
Ø 30
032
031
081
60
052
053
054
042
004
081
05
05
430
380
04
05
04
400
450
300 50 100
80
35 35
50 150 50 50 50 50 50
LAP. ASPAL
05
57
05 001
002
003
35 35
80
50 150 50 50 50 50 50
SKALA 1:10
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
SHOP DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
m 54
asi r a Me K
m 03
ul a P e K
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
SHOP DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DET TIMBUNAN DAN 9 10
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PAS BATU OPRIT Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 30
0.40 0.40
9.00
04. 0
RENCANA TIMBUNAN OPRIT
SKALA 1 : 30
I II III IV
52. 1
IV
05. 1
00. 2
52. 2
III
II
I 16 9.56 12.00 7.44
45
RENCANA PAS. BATU OPRIT ARAH MARISA
SKALA 1 : 30
05. 1
00. 2 0.46
52. 2
0.58 Pot IV - IV
SKALA 1 : 30
0.71
1.13 Pot III - III
Pot II - II SKALA 1 : 30
Pot I - I SKALA 1 : 30
SKALA 1 : 30
Mengetahui Diperiksa / Disetujui Oleh Dibuat Oleh Nama Gambar : Lembar
PPK - 06 Konsultan Supervisi Kontraktor Pelaksana Nomor Jumlah
REPUBLIK INDONESIA KEGIATAN
SHOP DRAWING (Marisa - Lemito - Molosipat ) PT. Astakona - Limas Konsultan PT. Tiaka Saka Pratama
Koordinator Lapangan
DET TIMBUNAN DAN 10 10
PENINGKATAN JEMBATAN MARISA - LEMITO
KEMENTERIAN PEKERJAAN UMUM SATKER PELAKSANAAN JALAN NASIONAL PAS BATU OPRIT Tanggal
JEMBATAN POPAYATO OKT 2013
PROVINSI GORONTALO LOKASI
DIREKTORAT JENDERAL BINA MARGA KABUPATEN POHUWATO Zenny Mashudi, ST Skala :
Maryam Yunus, ST Ir.Iskandar Faisal
PROVINSI GORONTALO Site Engineer General Superintendent SKALA 1 : 30
0.40 0.40
9.00
04. 0
RENCANA TIMBUNAN OPRIT
SKALA 1 : 30
I II III IV
00. 1
IV
05. 1
00. 2
52. 2
III
II
I 10.00 8.00 8.00 4.00
30.00
RENCANA PAS. BATU OPRIT ARAH PALU
SKALA 1 : 30
05. 1
00. 2 0.42
52. 2
0.58 Pot IV - IV
SKALA 1 : 30
0.71
1.13 Pot III - III
Pot II - II SKALA 1 : 30
Pot I - I SKALA 1 : 30
SKALA 1 : 30