NAMA PAKET : PENINGKATAN STRUKTUR JALAN RUAS TUMBANG TALAKEN - TUMBANG JUTUH (MYC)
KONTRAKTOR : PT ADHI KARYA (Persero), Tbk. DEPARTEMEN INFRASTRUKTUR II
NO & TGL KONTRAK : HK.02.03/SATKER-WIL.II/PPK-8/64, tanggal 6 APRIL 2017
NO & TGL ADD-01 : HK.02.03/SATKER-WIL.II/PPK-8/113a, tanggal 17 MEI 2017
NO & TGL ADD-02 : HK.02.03/SATKER-WIL.II/PPK-8/139, tanggal 2 JUNI 2017
NO & TGL ADD-03 : HK.02.03/SATKER-WIL.II/PPK-8/ADD-03/VII/2018/141, tanggal 30 JULI 2018
NILAI KONTRAK : Rp. 180.344.442.000,00
SUMBER DANA : APBN MURNI
WAKTU PELAKSANAAN : 957 HARI KALENDER
WAKTU PEMELIHARAAN : 365 HARI KALENDER
TAHUN ANGGARAN : 2016 - 2019
KONTRAKTOR PELAKSANA
KONSULTAN SUPERVISI
Kantor Pusat
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
LEMBAR PENGESAHAN
JOB MIX DESIGN
AC - BC
Diajukan Oleh,
Kontraktor
PT. ADHI KARYA Persero (Tbk)
Budi Hariyanto, ST
Project Manager
Diperiksa Oleh,
Konsultan
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
Disetujui Oleh,
Pejabat Pembuat Komitmen
Tumbang Talaken - Tumbang Jutuh - Tewa - Kuala Kurun
Kordinator Lapangan
KONTRAKTOR KONSULTAN
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
No Pengujian Metode
1 Analisa Saringan agg. Kasar dan halus SNI-03-1968-1990
2 Berat jenis dan penyerapan agg. halus SNI-1970-2008
3 Berat jenis dan penyerapan agg. kasar SNI-1969-2008
4 Berat jenis campuran aspal / GMM SNI-06-6893-2002
5 Marshall SNI-06-2489-1991
GRAFIK AC - BC
Kadar Asphal ( % ) 5,00 5,50 6,00 6,50 7,00 Kadar Asphal ( % ) 5,00 5,50 6,00 6,50 7,00
Density ( gr/cc ) 2,297 2,305 2,317 2,321 2,323 VMA ( % ) 16,31 16,43 16,46 16,76 17,13
VFB ( % ) 55,650 62,268 69,291 74,913 79,906 VIM ( % ) 7,2 6,2 5,1 4,2 3,4
Stability ( kg ) 920,244 932,016 945,751 894,736 957,524 Flow ( mm ) 2,53 2,70 3,00 2,90 3,17
M.Quotient ( kg/mm ) 363,3 345,2 315,3 308,5 302,4
DENSITY VMA
2,400 19,00
2,380 18,60
2,360 18,20
2,340 17,80
2,320 17,40
Gr/cc
2,300 17,00
%
2,280 16,60
2,260 16,20
2,240 15,80
2,220 15,40
2,200 15,00
4,5 5,0 5,5 6,0 6,5 7,0 4,5 5,0 5,5 6,0 6,5 7,0
VFB VIM
8,0
100,0 7,5
95,0 7,0
90,0 6,5
85,0 6,0
5,5
80,0 5,0
75,0 4,5
70,0 4,0
%
%
3,5
65,0 3,0
60,0 2,5
55,0 2,0
50,0 1,5
1,0
45,0 0,5
40,0 0,0
4,5 5,0 5,5 6,0 6,5 7,0 4,5 5,0 5,5 6,0 6,5 7,0
Kadar Aspal % Kadar Aspal %
STABILITY FLOW
1200 4,50
4,00
1100
3,50
3,00
1000
2,50
kg
mm
900 2,00
1,50
800 1,00
0,50
700 0,00
4,5 5,0 5,5 6,0 6,5 7,0 4,5 5,0 5,5 6,0 6,5 7,0
Kadar Aspal % Kadar Aspal %
M.QUOTIENT
400,0 DENSITY
VFB
350,0 STABILITY
M. QUOTIENT
kg/mm
300,0
VMA
VIM
250,0
FLOW
200,0
4,5 5,0 5,5 6,0 6,5 7,0 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0
4,5 5,0 5,5 6,0 6,5 7,0 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0
Kadar Aspal % Kadar Aspal %
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Jalan Ruas Tb.Talaken - Tb. Jutuh (MYC) Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 29 Juli 2018
BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)
A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 512,2 1190,7 681,5 1193,7 2,325 1030,1 1030,1 2,50
2 523,0 1190,0 670,0 1193,0 2,275 883,0 847,6 2,70
3 518,9 1188,2 672,3 1191,2 2,290 883,0 883,0 2,40
Ave 5,00 2,476 2,230 2,297 7,2 16,3 55,6 920,2 2,53 363,3 5,748 7,155
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Jalan Ruas Tb.Talaken - Tb. Jutuh (MYC) Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 29 Juli 2018
BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)
A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 510,2 1180,0 670,8 1181,0 2,313 883,0 883,0 2,90
2 513,4 1187,8 675,6 1189,0 2,314 883,0 883,0 3,00
3 504,3 1178,4 675,3 1179,6 2,337 883,0 918,3 2,80
Ave 6,50 2,423 2,289 2,321 4,2 16,8 74,9 894,7 2,90 308,5 5,748 9,953
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
SIEVE ANALYSIS
LOCATION : PT.ADHI KARYA (Perero) Tbk.
MATERIAL : HOT BIN I DATE TEST : 25 Juli 2018
WT SAMPLE I : 2901 gr WT SAMPLE II : 2732 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 0 0,0 100,0 0 0,0 100,0 100,0
3/8" 0 0,0 100,0 0 0,0 100,0 100,0
#4 321 11,1 88,9 451 16,5 83,5 86,2
#8 821 28,3 71,7 969 35,5 64,5 68,1
# 10
# 16 1202 41,4 58,6 1549 56,7 43,3 50,9
# 30 1591 54,8 45,2 1911 69,9 30,1 37,6
# 40
# 50 2276 78,5 21,5 2100 76,9 23,1 22,3
# 100 2599 89,6 10,4 2364 86,5 13,5 11,9
# 200 2730 94,1 5,9 2595 95,0 5,0 5,5
# 100
11/2"
# 50
# 40
# 30
# 16
# 10
3/8"
1/2"
3/4"
#8
#4
1"
2"
3"
100,0
90,0
80,0
Grading Test Result
70,0
60,0
% Passing
50,0
40,0
30,0
20,0
10,0
0,0
0,01 0,10 1,00 10,00 100,00
mm
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
SIEVE ANALYSIS
LOCATION : Quary PT.ADHI KARYA (Perero) Tbk.
MATERIAL : HOT BIN II DATE TEST : 25 Juli 2018
WT SAMPLE I : 2985 gr WT SAMPLE II : 3001 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 0 0,0 100,0 0 0,0 100,0 100,0
3/8" 536 18,0 82,0 507 16,9 83,1 82,6
#4 1516 50,8 49,2 1707 56,9 43,1 46,2
#8 2196 73,6 26,4 2315 77,1 22,9 24,6
# 10
# 16 2336 78,3 21,7 2485 82,8 17,2 19,5
# 30 2650 88,8 11,2 2686 89,5 10,5 10,9
# 40
# 50 2654 88,9 11,1 2687 89,5 10,5 10,8
# 100 2699 90,4 9,6 2709 90,3 9,7 9,7
# 200 2802 93,9 6,1 2742 91,4 8,6 7,4
# 100
11/2"
# 50
# 40
# 30
# 16
# 10
3/8"
1/2"
3/4"
#8
#4
1"
2"
3"
100,0
90,0
80,0
70,0
Grading Test Result
60,0
% Passing
50,0
40,0
30,0
20,0
10,0
0,0
0,01 0,10 1,00 10,00 100,00
mm
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
SIEVE ANALYSIS
LOCATION : Quary PT.ADHI KARYA (Perero) Tbk.
MATERIAL : HOT BIN III DATE TEST : 25 Juli 2018
WT SAMPLE I : 3147 gr WT SAMPLE II : 2881 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 1457 46,3 53,7 1301 45,2 54,8 54,3
3/8" 2878 91,5 8,5 2628 91,2 8,8 8,7
#4 2898 92,1 7,9 2648 91,9 8,1 8,0
#8 2981 94,7 5,3 2699 93,7 6,3 5,8
# 10
# 16 2991 95,0 5,0 2719 94,4 5,6 5,3
# 30 3012 95,7 4,3 2870 99,6 0,4 2,3
# 40
# 50 3113 98,9 1,1 2871 99,7 0,3 0,7
# 100 3114 99,0 1,0 2872 99,7 0,3 0,7
# 200 3115 99,0 1,0 2873 99,7 0,3 0,6
# 100
11/2"
# 50
# 40
# 30
# 16
# 10
3/8"
1/2"
3/4"
#8
#4
1"
2"
3"
100,0
90,0
80,0
70,0
Grading Test Result
60,0
% Passing
50,0
40,0
30,0
20,0
10,0
0,0
0,01 0,10 1,00 10,00 100,00
mm
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
SIEVE ANALYSIS
LOCATION : Quary PT.ADHI KARYA (Perero) Tbk.
MATERIAL : Fine Filler DATE TEST : 25 Juli 2018
WT SAMPLE I : 687 gr WT SAMPLE II : 661 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 0 0,0 100,0 0 0,0 100,0 100,0
3/8" 0 0,0 100,0 0 0,0 100,0 100,0
#4 0 0,0 100,0 0 0,0 100,0 100,0
#8 0 0,0 100,0 0 0,0 100,0 100,0
# 10
# 16 0 0,0 100,0 0 0,0 100,0 100,0
# 30 1 0,1 99,9 1 0,2 99,8 99,9
# 40
# 50 1 0,1 99,9 1 0,2 99,8 99,9
# 100 1 0,1 99,9 1 0,2 99,8 99,9
# 200 685 99,7 0,3 651 98,5 1,5 0,9
# 100
11/2"
# 50
# 40
# 30
# 16
# 10
3/8"
1/2"
3/4"
#8
#4
1"
2"
3"
100,0
90,0
80,0
70,0
60,0
% Passing
50,0
40,0
30,0
20,0
Grading Test Result
10,0
0,0
0,01 0,10 1,00 10,00 100,00
mm
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
COMBINED GRADING 100,0 100,0 88,9 73,2 54,9 39,4 30,0 20,6 13,5 8,6 5,0
100,0 90,0 82,0 64,0 49,0 38,0 28,0 20,0 13,0 8,0
SPESIFICATION 100,0
90,0 75,0 66,0 44,0 30,0 18,0 12,0 7,0 5,0 4,0
# 100
# 10
3/4"
# 50
# 40
# 30
# 16
3/8"
1/2"
#8
#4
100,0
90,0
Combined Grading Test Result
80,0
70,0
60,0
Spesification Limit
% Passing
50,0
40,0
30,0
20,0
10,0
0,0
0,01 0,10 1,00 10,00 100,00
mm
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL :
MATERIAL TO BE USED FOR : AC - BC DATE : 15 Maret 2018
A B Average
Wt. of Pycnometer + Sample
A gr 2.281,00 2.414,00
Wt. of Pycnometer
B gr 1.095,00 1.086,00
Volume Sample (D + C) - E
F gr / cc 491,90 550,50
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : CA 10 - 20 mm (Quary PT. ADHI KARYA (Persero) Tbk.)
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : MA 5 - 10 mm (Quary PT. ADHI KARYA (Persero) Tbk.)
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : Abu Batu Quary PT. ADHI KARYA (Persero) Tbk.
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : Pasir Quary PT. ADHI KARYA (Persero) Tbk.
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
Package : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
Type of Mix : AC - BC
Proportion Specific Gravity
Type of Aggregate ( O D B ) ( S S D ) ( App. ) ( Absorp. ) Remarks
% gr / cc gr / cc gr / cc %
CA ( 3/4" ) 10,00 2,569 2,590 2,625 0,830
MA ( 3/8" ) 40,00 2,608 2,648 2,718 1,545
Abu Batu 37,00 2,592 2,623 2,676 1,215
Pasir 12,00 2,646 2,655 2,671 0,342
Filler 1,00 3,150
100
=
10,00 40,00 37,00 12,00 1,00
+ + + +
2,569 2,608 2,592 2,646 3,150
100 = 2,607
3,89 + 15,34 + 14,28 + 4,53 + 0,32
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Ruas Jalan Tb.Talaken - Tb. Jutuh Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 28 Agustus 2018
BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)
A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 513,7 1189,4 677,8 1191,5 2,315 883,0 883,0 3,00
2 507,0 1190,2 686,4 1193,4 2,348 956,5 994,8 3,10
3 511,3 1185,6 677,1 1188,4 2,319 883,0 883,0 3,00
4 524,6 1191,2 669,6 1194,2 2,271 1030,1 988,9 3,00
5 513,6 1189,5 678,0 1191,6 2,316 941,8 941,8 3,00
6 509,6 1188,2 681,4 1191,0 2,332 897,7 897,7 3,20
7 513,5 1189,1 679,1 1192,6 2,316 883,0 883,0 3,00
8 513,8 1183,5 673,1 1186,9 2,303 883,0 883,0 3,10
9 510,6 1188,4 680,7 1191,3 2,327 956,5 956,5 3,00
10 509,1 1179,3 672,2 1181,3 2,317 986,0 986,0 3,20
11 512,8 1186,2 675,9 1188,7 2,313 927,1 927,1 3,10
12 514,0 1190,2 679,2 1193,2 2,316 883,0 883,0 3,10
Ave 6,30 2,430 2,270 2,316 4,7 16,8 72,1 925,6 3,1 301,8 5,748 9,575
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Ruas Jalan Tb.Talaken - Tb. Jutuh Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 28 Agustus 2018
BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)
A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 511,7 1191,4 681,7 1193,4 2,328 883,0 883,0 3,20
2 509,2 1184,5 677,8 1187,0 2,326 956,5 956,5 3,10
3 516,5 1189,4 675,9 1192,4 2,303 956,5 956,5 3,10
Ave 6,00 2,440 2,230 2,319 5,0 16,4 69,7 932,0 3,13 297,5 5,748 9,010
1 17+710 KN 6,80 1.101,30 601,10 1.103,30 502,20 2,193 2,319 94,56% 98%
6,80
6,77 6,70
6,70
6,77 6,70
6,40
6,47 6,50
6,50
6,53 6,50
6,00
6,03 6,00
6,10
6,07 6,00
APPROVED BY : CHECKED BY : TESTED BY :
CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.
KONTRAKTOR KONSULTAN
PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani
2 12 2 Sta.17+715 2 12 2
Lokasi Lokasi
2 14 2 Sta.17+730 2 14 2
Lokasi Lokasi
2 16 2 Sta.17+750 2 16 2
NOMOR 1 2 3
UKURAN KERTAS CM 25 X 25 25 X 25 25 X 25
LUAS KERTAS M2 0,0625 0,0625 0,0625
(...........................................) Lab.Technician
Lab.Techinician
PENINGKATAN STRUKTUR RUAS JALAN TUMBANG TALAKEN - TUMBANG JUTUH (MYC)
DOKUMENTASI PEKERJAAN
DESKRIPSI
LOKASI
TANGGAL KEGIATAN
25 Juli 2018
DESKRIPSI
LOKASI
TANGGAL KEGIATAN
29 Juli 2018
DESKRIPSI
UJI MARSHALL AC - BC
LOKASI
DOKUMENTASI PEKERJAAN
DESKRIPSI
CORE DRILL AC - BC
LOKASI
Sta. 17+710
TANGGAL KEGIATAN
28 Agustus 2018
DESKRIPSI
CORE DRILL AC - BC
LOKASI
Sta. 17+720
TANGGAL KEGIATAN
28 Agustus 2018
DESKRIPSI
CORE DRILL AC - BC
LOKASI
Sta. 17+740
TANGGAL KEGIATAN
28 Agustus 2018