Anda di halaman 1dari 39

REPUBLIK INDONESIA

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA

BALAI BESAR PELAKSANAAN JALAN NASIONAL XI


SATKER PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI KALIMANTAN TENGAH
PPK 08. TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KUALA KURUN

PENINGKATAN STRUKTUR JALAN RUAS TUMBANG TALAKEN - TUMBANG JUTUH (MYC)

JOB MIX DESIGN


( JMF )
AC - BC

NAMA PAKET : PENINGKATAN STRUKTUR JALAN RUAS TUMBANG TALAKEN - TUMBANG JUTUH (MYC)
KONTRAKTOR : PT ADHI KARYA (Persero), Tbk. DEPARTEMEN INFRASTRUKTUR II
NO & TGL KONTRAK : HK.02.03/SATKER-WIL.II/PPK-8/64, tanggal 6 APRIL 2017
NO & TGL ADD-01 : HK.02.03/SATKER-WIL.II/PPK-8/113a, tanggal 17 MEI 2017
NO & TGL ADD-02 : HK.02.03/SATKER-WIL.II/PPK-8/139, tanggal 2 JUNI 2017
NO & TGL ADD-03 : HK.02.03/SATKER-WIL.II/PPK-8/ADD-03/VII/2018/141, tanggal 30 JULI 2018
NILAI KONTRAK : Rp. 180.344.442.000,00
SUMBER DANA : APBN MURNI
WAKTU PELAKSANAAN : 957 HARI KALENDER
WAKTU PEMELIHARAAN : 365 HARI KALENDER
TAHUN ANGGARAN : 2016 - 2019

KONTRAKTOR PELAKSANA

PT. ADHI KARYA (PERSERO),Tbk


DEPARTEMEN INFRATRUKTUR II
Kantor Pusat
Jl. Raya Pasar Minggu Km.18 Jakarta 12510
Telp.(021)797 5312 Fax (021)797 5311
Divisi Konstruksi V Kalimantan
Jl. Milono No.16 Balikpapan 76121
Telp.(0542)736315 Fax (0542)735221

KONSULTAN SUPERVISI

PT. WIRANTA BUANA RAYA JO PT. WIRAGUNA TANI

Kantor Pusat
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112

KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

LEMBAR PENGESAHAN
JOB MIX DESIGN

AC - BC

Diajukan Oleh,
Kontraktor
PT. ADHI KARYA Persero (Tbk)

Budi Hariyanto, ST
Project Manager

Diperiksa Oleh,
Konsultan
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

Ir. Mindar Sinambela


Site Enggineer

Disetujui Oleh,
Pejabat Pembuat Komitmen
Tumbang Talaken - Tumbang Jutuh - Tewa - Kuala Kurun
Kordinator Lapangan

Nasib A. Sera, ST. MT


NIP : 19690731 200604 1 002
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112

KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

No Pengujian Metode
1 Analisa Saringan agg. Kasar dan halus SNI-03-1968-1990
2 Berat jenis dan penyerapan agg. halus SNI-1970-2008
3 Berat jenis dan penyerapan agg. kasar SNI-1969-2008
4 Berat jenis campuran aspal / GMM SNI-06-6893-2002
5 Marshall SNI-06-2489-1991
GRAFIK AC - BC
Kadar Asphal ( % ) 5,00 5,50 6,00 6,50 7,00 Kadar Asphal ( % ) 5,00 5,50 6,00 6,50 7,00
Density ( gr/cc ) 2,297 2,305 2,317 2,321 2,323 VMA ( % ) 16,31 16,43 16,46 16,76 17,13
VFB ( % ) 55,650 62,268 69,291 74,913 79,906 VIM ( % ) 7,2 6,2 5,1 4,2 3,4
Stability ( kg ) 920,244 932,016 945,751 894,736 957,524 Flow ( mm ) 2,53 2,70 3,00 2,90 3,17
M.Quotient ( kg/mm ) 363,3 345,2 315,3 308,5 302,4

DENSITY VMA
2,400 19,00
2,380 18,60
2,360 18,20
2,340 17,80
2,320 17,40
Gr/cc

2,300 17,00

%
2,280 16,60
2,260 16,20
2,240 15,80
2,220 15,40
2,200 15,00
4,5 5,0 5,5 6,0 6,5 7,0 4,5 5,0 5,5 6,0 6,5 7,0

Kadar Aspal % Kadar Aspal %

VFB VIM
8,0
100,0 7,5
95,0 7,0
90,0 6,5
85,0 6,0
5,5
80,0 5,0
75,0 4,5
70,0 4,0
%
%

3,5
65,0 3,0
60,0 2,5
55,0 2,0
50,0 1,5
1,0
45,0 0,5
40,0 0,0
4,5 5,0 5,5 6,0 6,5 7,0 4,5 5,0 5,5 6,0 6,5 7,0
Kadar Aspal % Kadar Aspal %

STABILITY FLOW
1200 4,50
4,00
1100
3,50
3,00
1000
2,50
kg

mm

900 2,00
1,50
800 1,00
0,50
700 0,00
4,5 5,0 5,5 6,0 6,5 7,0 4,5 5,0 5,5 6,0 6,5 7,0
Kadar Aspal % Kadar Aspal %

M.QUOTIENT
400,0 DENSITY

VFB
350,0 STABILITY

M. QUOTIENT
kg/mm

300,0
VMA

VIM
250,0
FLOW

200,0
4,5 5,0 5,5 6,0 6,5 7,0 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0
4,5 5,0 5,5 6,0 6,5 7,0 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0
Kadar Aspal % Kadar Aspal %

Optimum Kadar Aspal = 6,00 %


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Jalan Ruas Tb.Talaken - Tb. Jutuh (MYC) Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 29 Juli 2018

BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)

A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 512,2 1190,7 681,5 1193,7 2,325 1030,1 1030,1 2,50
2 523,0 1190,0 670,0 1193,0 2,275 883,0 847,6 2,70
3 518,9 1188,2 672,3 1191,2 2,290 883,0 883,0 2,40
Ave 5,00 2,476 2,230 2,297 7,2 16,3 55,6 920,2 2,53 363,3 5,748 7,155

1 518,3 1192,7 675,6 1193,9 2,301 883,0 883,0 2,80


2 513,5 1188,0 676,3 1189,8 2,314 883,0 883,0 2,60
3 514,4 1184,0 671,8 1186,2 2,302 1030,1 1030,1 2,70
Ave 5,50 2,458 2,250 2,305 6,2 16,4 62,3 932,0 2,70 345,2 5,748 8,077

1 519,5 1190,8 672,8 1192,3 2,292 883,0 883,0 3,00


2 514,5 1191,3 677,9 1192,4 2,315 883,0 883,0 3,00
3 505,8 1185,1 680,3 1186,1 2,343 1030,1 1071,3 3,00
Ave 6,00 2,440 2,270 2,317 5,1 16,5 69,3 945,8 3,00 315,3 5,748 9,010

BJ Bulk (Gsb) : 2,607 APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
GMM = AASHTO T 209 - 74 : 2,412 PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(...........................................................) Lab.Techinician Lab.Technician


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Jalan Ruas Tb.Talaken - Tb. Jutuh (MYC) Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 29 Juli 2018

BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)

A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 510,2 1180,0 670,8 1181,0 2,313 883,0 883,0 2,90
2 513,4 1187,8 675,6 1189,0 2,314 883,0 883,0 3,00
3 504,3 1178,4 675,3 1179,6 2,337 883,0 918,3 2,80
Ave 6,50 2,423 2,289 2,321 4,2 16,8 74,9 894,7 2,90 308,5 5,748 9,953

1 508,9 1182,2 675,0 1183,9 2,323 883,0 918,3 3,20


2 503,0 1180,0 678,7 1181,7 2,346 1030,1 1071,3 3,10
3 512,5 1178,7 667,3 1179,8 2,300 883,0 883,0 3,20
Ave 7,00 2,406 2,301 2,323 3,4 17,1 79,9 957,5 3,17 302,4 5,748 10,906

BJ Bulk (Gsb) : 2,607 APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
GMM = AASHTO T 209 - 74 : 2,412 PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(...........................................................) Lab.Techinician Lab.Technician


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SIEVE ANALYSIS
LOCATION : PT.ADHI KARYA (Perero) Tbk.
MATERIAL : HOT BIN I DATE TEST : 25 Juli 2018
WT SAMPLE I : 2901 gr WT SAMPLE II : 2732 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 0 0,0 100,0 0 0,0 100,0 100,0
3/8" 0 0,0 100,0 0 0,0 100,0 100,0
#4 321 11,1 88,9 451 16,5 83,5 86,2
#8 821 28,3 71,7 969 35,5 64,5 68,1
# 10
# 16 1202 41,4 58,6 1549 56,7 43,3 50,9
# 30 1591 54,8 45,2 1911 69,9 30,1 37,6
# 40
# 50 2276 78,5 21,5 2100 76,9 23,1 22,3
# 100 2599 89,6 10,4 2364 86,5 13,5 11,9
# 200 2730 94,1 5,9 2595 95,0 5,0 5,5

US Standard Sieve opened in Number US Standard Sieve opened in Inch


# 200

# 100

11/2"
# 50

# 40
# 30

# 16

# 10

3/8"
1/2"

3/4"
#8

#4

1"

2"

3"
100,0

90,0

80,0
Grading Test Result
70,0

60,0
% Passing

50,0

40,0

30,0

20,0

10,0

0,0
0,01 0,10 1,00 10,00 100,00
mm

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.
(................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SIEVE ANALYSIS
LOCATION : Quary PT.ADHI KARYA (Perero) Tbk.
MATERIAL : HOT BIN II DATE TEST : 25 Juli 2018
WT SAMPLE I : 2985 gr WT SAMPLE II : 3001 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 0 0,0 100,0 0 0,0 100,0 100,0
3/8" 536 18,0 82,0 507 16,9 83,1 82,6
#4 1516 50,8 49,2 1707 56,9 43,1 46,2
#8 2196 73,6 26,4 2315 77,1 22,9 24,6
# 10
# 16 2336 78,3 21,7 2485 82,8 17,2 19,5
# 30 2650 88,8 11,2 2686 89,5 10,5 10,9
# 40
# 50 2654 88,9 11,1 2687 89,5 10,5 10,8
# 100 2699 90,4 9,6 2709 90,3 9,7 9,7
# 200 2802 93,9 6,1 2742 91,4 8,6 7,4

US Standard Sieve opened in Number US Standard Sieve opened in Inch


# 200

# 100

11/2"
# 50

# 40
# 30

# 16

# 10

3/8"
1/2"

3/4"
#8

#4

1"

2"

3"
100,0

90,0

80,0

70,0
Grading Test Result
60,0
% Passing

50,0

40,0

30,0

20,0

10,0

0,0
0,01 0,10 1,00 10,00 100,00
mm

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.
(................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SIEVE ANALYSIS
LOCATION : Quary PT.ADHI KARYA (Perero) Tbk.
MATERIAL : HOT BIN III DATE TEST : 25 Juli 2018
WT SAMPLE I : 3147 gr WT SAMPLE II : 2881 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 1457 46,3 53,7 1301 45,2 54,8 54,3
3/8" 2878 91,5 8,5 2628 91,2 8,8 8,7
#4 2898 92,1 7,9 2648 91,9 8,1 8,0
#8 2981 94,7 5,3 2699 93,7 6,3 5,8
# 10
# 16 2991 95,0 5,0 2719 94,4 5,6 5,3
# 30 3012 95,7 4,3 2870 99,6 0,4 2,3
# 40
# 50 3113 98,9 1,1 2871 99,7 0,3 0,7
# 100 3114 99,0 1,0 2872 99,7 0,3 0,7
# 200 3115 99,0 1,0 2873 99,7 0,3 0,6

US Standard Sieve opened in Number US Standard Sieve opened in Inch


# 200

# 100

11/2"
# 50

# 40
# 30

# 16

# 10

3/8"
1/2"

3/4"
#8

#4

1"

2"

3"
100,0

90,0

80,0

70,0
Grading Test Result
60,0
% Passing

50,0

40,0

30,0

20,0

10,0

0,0
0,01 0,10 1,00 10,00 100,00
mm

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.
(................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SIEVE ANALYSIS
LOCATION : Quary PT.ADHI KARYA (Perero) Tbk.
MATERIAL : Fine Filler DATE TEST : 25 Juli 2018
WT SAMPLE I : 687 gr WT SAMPLE II : 661 gr
SIEVE I II
SIZE CUMMULATIVE CUMMULATIVE RATE SPEC.
NO WT RETAIN % RETAIN % PASSING WT RETAIN % RETAIN % PASSING
3"
2"
1 1/2"
1" 0 0,0 100,0 0 0,0 100,0 100,0
3/4" 0 0,0 100,0 0 0,0 100,0 100,0
1/2" 0 0,0 100,0 0 0,0 100,0 100,0
3/8" 0 0,0 100,0 0 0,0 100,0 100,0
#4 0 0,0 100,0 0 0,0 100,0 100,0
#8 0 0,0 100,0 0 0,0 100,0 100,0
# 10
# 16 0 0,0 100,0 0 0,0 100,0 100,0
# 30 1 0,1 99,9 1 0,2 99,8 99,9
# 40
# 50 1 0,1 99,9 1 0,2 99,8 99,9
# 100 1 0,1 99,9 1 0,2 99,8 99,9
# 200 685 99,7 0,3 651 98,5 1,5 0,9

US Standard Sieve opened in Number US Standard Sieve opened in Inch


# 200

# 100

11/2"
# 50

# 40
# 30

# 16

# 10

3/8"
1/2"

3/4"
#8

#4

1"

2"

3"
100,0

90,0

80,0

70,0

60,0
% Passing

50,0

40,0

30,0

20,0
Grading Test Result

10,0

0,0
0,01 0,10 1,00 10,00 100,00
mm

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.
(................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

AGGREGATE COMBINED GRADING HOT BIN


AC - BC
PT. ADHI KARYA ( Persero ) Tbk.

1" 3/4" 1/2" 3/8" #4 #8 #16 # 30 # 50 # 100 # 200


HOT BIN I 100,0 100,0 100,0 100,0 86,2 68,1 50,9 37,6 22,3 11,9 5,5
44,00
% 44,0 44,0 44,0 44,0 37,9 30,0 22,4 16,5 9,8 5,3 2,4
HOT BIN II 100,0 100,0 100,0 82,6 46,2 24,6 19,5 10,9 10,8 9,7 7,4
33,00
% 33,0 33,0 33,0 27,2 15,2 8,1 6,4 3,6 3,6 3,2 2,4
HOT BIN III 100,0 100,0 54,3 8,7 8,0 5,8 5,3 2,3 0,7 0,7 0,6
22,00
% 22,0 22,0 11,9 1,9 1,8 1,3 1,2 0,5 0,2 0,1 0,1
FILLER 100,0 100,0 100,0 100,0 100,0 100,0 100,0 99,9 99,9 99,8 1,5
1,00
% 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 0,0

COMBINED GRADING 100,0 100,0 88,9 73,2 54,9 39,4 30,0 20,6 13,5 8,6 5,0
100,0 90,0 82,0 64,0 49,0 38,0 28,0 20,0 13,0 8,0
SPESIFICATION 100,0
90,0 75,0 66,0 44,0 30,0 18,0 12,0 7,0 5,0 4,0

US Standard Sieve opened in US Standard Sieve opened in Inch


# 200

# 100

# 10

3/4"
# 50

# 40
# 30

# 16

3/8"
1/2"
#8

#4

100,0

90,0
Combined Grading Test Result
80,0

70,0

60,0
Spesification Limit
% Passing

50,0

40,0

30,0

20,0

10,0

0,0
0,01 0,10 1,00 10,00 100,00
mm

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.
(................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SPECIFIC GRAVITY MAXIMUM OF MIX

PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL :
MATERIAL TO BE USED FOR : AC - BC DATE : 15 Maret 2018

A B Average
Wt. of Pycnometer + Sample
A gr 2.281,00 2.414,00

Wt. of Pycnometer
B gr 1.095,00 1.086,00

Wt.of Sample A-B


C gr 1.186,00 1.328,00

Wt. of Pycnometer + Water


D gr 2.818,20 2.814,70

Wt. of Pycnometer + Water + Sample C+D


E gr 3.512,30 3.592,20

Volume Sample (D + C) - E
F gr / cc 491,90 550,50

Specific Gravity C/F


G gr / cc 2,411 2,412

GMM = 2,412 gr/cc

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

BERAT JENIS DAN PENYERAPAN

PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : CA 10 - 20 mm (Quary PT. ADHI KARYA (Persero) Tbk.)
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018

( FA ) Fine Aggreate < # 4


A B Average
A Mass of SSD Sample in Air gr 500 500
B Mass of Oven Dry Sample in Air gr W1
C Mass of Picnometre Filled with Water gr W2
Mass of Picnometre with Sample and Water to
D gr W3
Calibration Mark
W1
E Bulk Specific Gravity
(W2+500-W3)
500
F SSD Basis Specific Gravity
(W2+500-W3)
W1
G Apparent Specific Gravity
(W2+W1-W3)
(500-W1)
H Absorption x100
W1

(CA) Coarse Aggregate > # 4


A B Average
A Mass of Oven Dry Sample in Air gr W1 1000 1000
B Mass of SSD Sample in Air gr W2 1007,9 1008,7
C Mass of SSD Sample in Water gr W3 623 615
W1
D Bulk Specific Gravity 2,598 2,540 2,569
W2 - W3
W2
E SSD Basic Specific Gravity 2,619 2,562 2,590
W2 - W3
W1
F Apparent Specific Gravity 2,653 2,597 2,625
W1 - W3
W2 - W1
G Absorption x100 0,790 0,870 0,830
W1

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(....................................................) Lab.Techinician Lab.Technician


(....................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SPECIFIC GRAVITY AND ABSORPTION TEST

PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : MA 5 - 10 mm (Quary PT. ADHI KARYA (Persero) Tbk.)
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018

( FA ) Fine Aggreate < # 4


A B Average
A Mass of SSD Sample in Air gr 500 500
B Mass of Oven Dry Sample in Air gr W1
C Mass of Picnometre Filled with Water gr W2
Mass of Picnometre with Sample and Water to
D gr W3
Calibration Mark
W1
E Bulk Specific Gravity
(W2+500-W3)
500
F SSD Basis Specific Gravity
(W2+500-W3)
W1
G Apparent Specific Gravity
(W2+W1-W3)
(500-W1)
H Absorption x100
W1

(CA) Coarse Aggregate > # 4


A B Average
A Mass of Oven Dry Sample in Air gr W1 1000 1000
B Mass of SSD Sample in Air gr W2 1011,4 1019,5
C Mass of SSD Sample in Water gr W3 629 635
W1
D Bulk Specific Gravity 2,615 2,601 2,608
W2 - W3
W2
E SSD Basic Specific Gravity 2,645 2,651 2,648
W2 - W3
W1
F Apparent Specific Gravity 2,695 2,740 2,718
W1 - W3
W2 - W1
G Absorption x100 1,140 1,950 1,545
W1

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(....................................................) Lab.Techinician Lab.Technician


(....................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SPECIFIC GRAVITY AND ABSORPTION TEST

PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : Abu Batu Quary PT. ADHI KARYA (Persero) Tbk.
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018

( FA ) Fine Aggreate < # 4


A B Average
A Mass of SSD Sample in Air gr 500 500
B Mass of Oven Dry Sample in Air gr W1 494,1 493,9
C Mass of Picnometre Filled with Water gr W2 775,1 770,1
Mass of Picnometre with Sample and Water to
D gr W3 1081,5 1082,4
Calibration Mark
W1
E Bulk Specific Gravity 2,552 2,631 2,592
(W2+500-W3)
500
F SSD Basis Specific Gravity 2,583 2,664 2,623
(W2+500-W3)
W1
G Apparent Specific Gravity 2,632 2,720 2,676
(W2+W1-W3)
(500-W1)
H Absorption x100 1,194 1,235 1,215
W1

(CA) Coarse Aggregate > # 4


A B Average
A Mass of Oven Dry Sample in Air gr W1
B Mass of SSD Sample in Air gr W2
C Mass of SSD Sample in Water gr W3
W1
D Bulk Specific Gravity
W2 - W3
W2
E SSD Basic Specific Gravity
W2 - W3
W1
F Apparent Specific Gravity
W1 - W3
W2 - W1
G Absorption x100
W1

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(....................................................) Lab.Techinician Lab.Technician


(....................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

SPECIFIC GRAVITY AND ABSORPTION TEST

PACKAGE : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
KIND OF MATERIAL : Pasir Quary PT. ADHI KARYA (Persero) Tbk.
MATERIAL TO BE USED FOR : AC - BC DATE : 23 Juli 2018

( FA ) Fine Aggreate < # 4


A B Average
A Mass of SSD Sample in Air gr 500 500
B Mass of Oven Dry Sample in Air gr W1 497,1 499,5
C Mass of Picnometre Filled with Water gr W2 662,2 663,7
Mass of Picnometre with Sample and Water to
D gr W3 974,1 975,2
Calibration Mark
W1
E Bulk Specific Gravity 2,643 2,650 2,646
(W2+500-W3)
500
F SSD Basis Specific Gravity 2,658 2,653 2,655
(W2+500-W3)
W1
G Apparent Specific Gravity 2,684 2,657 2,671
(W2+W1-W3)
(500-W1)
H Absorption x100 0,583 0,100 0,342
W1

(CA) Coarse Aggregate > # 4


A B Average
A Mass of Oven Dry Sample in Air gr W1
B Mass of SSD Sample in Air gr W2
C Mass of SSD Sample in Water gr W3
W1
D Bulk Specific Gravity
W2 - W3
W2
E SSD Basic Specific Gravity
W2 - W3
W1
F Apparent Specific Gravity
W1 - W3
W2 - W1
G Absorption x100
W1

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(....................................................) Lab.Techinician Lab.Technician


(....................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SNVT PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

BULK SPGR OF TOTAL AGGREGATE AND


VOID MINERAL IN AGGREGATE

Package : Peningkatan Struktur Ruas Jalan Ruas Tumbang Talaken - Tumbang Jutuh (MYC)
Type of Mix : AC - BC
Proportion Specific Gravity
Type of Aggregate ( O D B ) ( S S D ) ( App. ) ( Absorp. ) Remarks
% gr / cc gr / cc gr / cc %
CA ( 3/4" ) 10,00 2,569 2,590 2,625 0,830
MA ( 3/8" ) 40,00 2,608 2,648 2,718 1,545
Abu Batu 37,00 2,592 2,623 2,676 1,215
Pasir 12,00 2,646 2,655 2,671 0,342
Filler 1,00 3,150

Bulk Spesific Gravity of Total Aggregate :

100
=
10,00 40,00 37,00 12,00 1,00
+ + + +
2,569 2,608 2,592 2,646 3,150

100 = 2,607
3,89 + 15,34 + 14,28 + 4,53 + 0,32

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(....................................................) Lab.Techinician Lab.Technician


(....................................................) Lab.Techinician Lab.Technician
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Ruas Jalan Tb.Talaken - Tb. Jutuh Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 28 Agustus 2018

BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)

A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 513,7 1189,4 677,8 1191,5 2,315 883,0 883,0 3,00
2 507,0 1190,2 686,4 1193,4 2,348 956,5 994,8 3,10
3 511,3 1185,6 677,1 1188,4 2,319 883,0 883,0 3,00
4 524,6 1191,2 669,6 1194,2 2,271 1030,1 988,9 3,00
5 513,6 1189,5 678,0 1191,6 2,316 941,8 941,8 3,00
6 509,6 1188,2 681,4 1191,0 2,332 897,7 897,7 3,20
7 513,5 1189,1 679,1 1192,6 2,316 883,0 883,0 3,00
8 513,8 1183,5 673,1 1186,9 2,303 883,0 883,0 3,10
9 510,6 1188,4 680,7 1191,3 2,327 956,5 956,5 3,00
10 509,1 1179,3 672,2 1181,3 2,317 986,0 986,0 3,20
11 512,8 1186,2 675,9 1188,7 2,313 927,1 927,1 3,10
12 514,0 1190,2 679,2 1193,2 2,316 883,0 883,0 3,10

Ave 6,30 2,430 2,270 2,316 4,7 16,8 72,1 925,6 3,1 301,8 5,748 9,575

BJ Bulk (Gsb) : 2,607 APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
GMM = AASHTO T 209 - 74 : 2,412 PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(...........................................................) Lab.Techinician Lab.Technician


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

MARSHALL TEST
AASHTO T 245 - 90 / SNI 06 - 2489 - 1991
Paket : Peningkatan Struktur Ruas Jalan Tb.Talaken - Tb. Jutuh Peoyek : Tumbang Talaken - Kalimantan Tengah
Trial Mix seri Type Camporan Panas : AC - BC Aspal Pen : 60 / 70 Lokasi : AMP Tajah Antang
BJ Aspal ( T ) : 1,04 Absorbsi Asp.Terhadap Agg. : 0,937
BJ Effective Total Agg.(Gse) : 2,670 Kalibrasi Proving Ring : 14,72 kg Tanggal : 28 Agustus 2018

BERAT GRAM 3% - 5% min. 14% min. 65% 2-4 min. 250 kg/mm
% ASP. BJ MAKS STABILITAS MARSHALL (min.800 LUAS LAPIS
NO. TERHADAP CAMPURAN VOLUME BERAT RONGGA DLM RONGGA kg ) MARSH
BERAT RONGGA DLM PELELEHA PERMUKAA KETEBALA
SPESIMEN SPESIMEN DI UDARA DALAM AIR SSD ISI CAMPURAN TERISI ASP QUOTIENT
CAMPURAN AGGREGAT (VMA) N (Flow) N AGG N BITUMEN
(TEORITIK) (VIM) (VFB) Kg KOREKSI (MQ)

A B C D E F G H I J K L M N O P
100 D B - G G (100-A) I-H L 1000( A-R )
100 x 100 - x 100
100-A A F - E F - E B Gsb I M O.T ( 100-A )
+
Gse T
1 511,7 1191,4 681,7 1193,4 2,328 883,0 883,0 3,20
2 509,2 1184,5 677,8 1187,0 2,326 956,5 956,5 3,10
3 516,5 1189,4 675,9 1192,4 2,303 956,5 956,5 3,10
Ave 6,00 2,440 2,230 2,319 5,0 16,4 69,7 932,0 3,13 297,5 5,748 9,010

BJ Bulk (Gsb) : 2,607 APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
GMM = AASHTO T 209 - 74 : 2,412 PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(...........................................................) Lab.Techinician Lab.Technician


HASIL PEMERIKSAAN KEPADATAN LAPANGAN ( CORE DRILL)
PAKET : PENINGKATAN STRUKTUR RUAS JALAN TB. TALAKEN - TB. JUTUH( MYC )
KONTRAKTOR : PT ADHI KARYA ( Persero ) Tbk.
JENIS MATERIAL : AC - BC
TANGGAL : 28 Agustus 2018
LOKASI TEBAL LEBAR BERAT DI BERAT BERAT KEPADATA
NO TGL PRODUKSI KR/CL/KN VOLUME BD.LAP BD.LAB SPEC (%) KETERANGAN
(STA) (CM) (M) UDARA DLM AIR SSD N (%)

1 17+710 KN 6,80 1.101,30 601,10 1.103,30 502,20 2,193 2,319 94,56% 98%

6,80

6,77 6,70

2 CL 6,90 1.119,20 603,30 1.121,50 518,20 2,160 93,13% 98%

6,70

6,77 6,70

3 17+720 KN 6,50 1.045,30 579,30 1.048,30 469,00 2,229 96,11% 98%

6,40

6,47 6,50

4 CL 6,60 1.144,30 631,20 1.146,40 515,20 2,221 95,77% 98%

6,50

6,53 6,50

5 17+740 KN 6,10 1.101,10 623,10 1.103,70 480,60 2,291 98,79% 98%

6,00

6,03 6,00

6 CL 6,10 1.021,10 574,90 1.024,10 449,20 2,273 98,02% 98%

6,10

6,07 6,00
APPROVED BY : CHECKED BY : TESTED BY :
CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(..................................................) Lab.Techinician Lab.Technician


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI BANJARMASIN
SATKER PELAKSANAAN JALAN NASIONAL WIL.II PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 8 TUMBANG TALAKEN - TUMBANG JUTUH - TEWAH - KURUN
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112

KONTRAKTOR KONSULTAN

PT. Adhi Karya (Persero) Tbk. PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani

LINTASAN PEMADATAN ASPAL


AC - BC
Lokasi Lokasi
Sta.17+700 TANDEM PTR TANDEM TANDEM PTR TANDEM

2 12 2 Sta.17+715 2 12 2

TEBAL AWAL 7,50 cm TEBAL AWAL 7,50 cm

TEBAL AKHIR 6,77 cm TEBAL AKHIR 6,77 cm

BJ LAB 2,319 BJ LAB 2,319

BJ LAP. 2,193 BJ LAP. 2,160

STABILITY 94,56 STABILITY 93,13

Lokasi Lokasi

Sta.17+715 TANDEM PTR TANDEM TANDEM PTR TANDEM

2 14 2 Sta.17+730 2 14 2

TEBAL AWAL 7,50 cm TEBAL AWAL 7,50 cm

TEBAL AKHIR 6,47 cm TEBAL AKHIR 6,53 cm

BJ LAB 2,319 BJ LAB 2,319

BJ LAP. 2,229 BJ LAP. 2,221

STABILITY 96,11 STABILITY 95,77

Lokasi Lokasi

Sta.17+730 TANDEM PTR TANDEM TANDEM PTR TANDEM

2 16 2 Sta.17+750 2 16 2

TEBAL AWAL 7,50 cm TEBAL AWAL 7,50 cm

TEBAL AKHIR 6,03 cm TEBAL AKHIR 6,07 cm

BJ LAB 2,319 BJ LAB 2,319

BJ LAP. 2,291 BJ LAP. 2,273

STABILITY 98,79 STABILITY 98,02


>Lintasan yang dipakai untuk mencapai stability optimum 2-16-2 dengan rotasi Tandem-PTR-Tandem
PAPER TEST
TACK COAT

Paket : Peningkatan Struktur Ruas Jalan Tb.Talaken - Tb.Jutuh (MYC)


Penyedia Jasa : PT. ADHI KARYA (Persero) Tbk.
Konsultan : PT. Wiranta Bhuana Raya JO PT.Wiraguna Tani
Jenis Campuran : AC - BC
Lokasi : Sta.17+700 - 17+750 (KN)
Hari/Tanggal : 26-Aug-18

NOMOR 1 2 3

BERAT KERTAS GRM 10,2 10,0 10,2

UKURAN KERTAS CM 25 X 25 25 X 25 25 X 25
LUAS KERTAS M2 0,0625 0,0625 0,0625

BERAT KERTAS + TACK COAT GRM 36,2 37,7 34,3

BERAT TACK COAT GRM 26,0 27,7 24,1

RATA-RATA GRM 25,9

BERAT TACK COAT / M2 414,9 GRM = 0,41 KG


BERAT JENIS TACK COAT 1,14
VOL.TACK COAT TERPASANG LT/M2 0,36

APPROVED BY : CHECKED BY : TESTED BY :


CONSULTANT SUPERVISI CONTRACTOR
PT. Wiranta Bhuana Raya JO PT. Wiraguna Tani PT.ADHI KARYA (Persero) Tbk.

(...........................................) Lab.Technician
Lab.Techinician
PENINGKATAN STRUKTUR RUAS JALAN TUMBANG TALAKEN - TUMBANG JUTUH (MYC)

DOKUMENTASI PEKERJAAN

DESKRIPSI

GRADASI MATERIAL HOT BIN


AC - BC

LOKASI

Laborat ADHI (Talaken)

TANGGAL KEGIATAN
25 Juli 2018

DESKRIPSI

UJI BERAT JENIS AC - BC

LOKASI

Laborat ADHI (Talaken)

TANGGAL KEGIATAN
29 Juli 2018

DESKRIPSI

UJI MARSHALL AC - BC

LOKASI

Laborat ADHI (Talaken)


TANGGAL KEGIATAN
29 Juli 2018
PENINGKATAN STRUKTUR RUAS JALAN TUMBANG TALAKEN - TUMBANG JUTUH (MYC)

DOKUMENTASI PEKERJAAN

DESKRIPSI

CORE DRILL AC - BC

LOKASI

Sta. 17+710

TANGGAL KEGIATAN
28 Agustus 2018

DESKRIPSI

CORE DRILL AC - BC

LOKASI

Sta. 17+720

TANGGAL KEGIATAN
28 Agustus 2018

DESKRIPSI

CORE DRILL AC - BC

LOKASI

Sta. 17+740
TANGGAL KEGIATAN
28 Agustus 2018

Anda mungkin juga menyukai