PRODUCTION
Production 1st Floor Area
Production 2nd Floor Area
Anis, Budi & Material Preparation Area
1 Production Boiler Room & yard
Team Stair & Emergency Stair
Table Lifter
ABCG inside building area,
ABCG outside building area
FILLING
Rest Room
Filling Area.
Endan (L) &
2 Cooling Tower Area,
Filling Team
Waste Grease (outside area)
Drum Empty (outside area)
1st Floor Mesh Cleaning
DECANTING
Employee Toilet,
Decanting Room,
David (L) & Packaging Storage Area
3
Decanting Team Decanting WIP Area,
Waiting Inspection Area.
Non Conforming Product Area.
PPIC
Shipping Area,
Good Product Storage Area
Raw Material Storage Area
Satria (L) & PPIC
4 Base Oil Pump Facility
Team
Base Oil Tank & Floor Area.
Base Oil Land (behind Tank).
Base Oil Loading Street
Forklift Parking Area
LABORATORY
Arifah (L)
5 Laboratory Area
Tatok
Sample Storage Place
Total Number of "G" x 100% So, the score = (3/4) x 100% = 75%
(%) Score :
Total Number of check item.
Record of Safety Patrol Date ____________ Assessor Name: ________________________
OFFICE ROOM
Frans (L)
1
Sendy Office Room
Medical Room
PUBLIC AREA
(INSIDE BUILDING )
PUBLIC AREA
(OUTSIDE BUILDING )
Score Criteria: G : Good Implementation Example : Result of patrol on any location. L = Leader
NG : Not Good Implementation Material =G, Worker = G, Machine = G, Environment = NG
Total Number of "G" x 100% So, the score = (3/4) x 100% = 75%
(%) Score :
Total Number of check item.
REPORT INSPECTION SAFETY PATROL
AREA : ....
DATE : ....
NOTE :
CHEKED Mengetahui,
.................................. ....................................