Anda di halaman 1dari 28

LAPORAN AKHIR

Paket Pekerjaan :
PELAKSANAAN PAKSI UPDATING DAERAH IRIGASI
KAB. JENEPONTO

KONTRAK
Nomor :
1124/KPTS/Au/X/2020

TAHUN ANGGARAN 2021

TENAGA PENDUKUNG E-PAKSI

D.I KAB.JENEPONTO
DAFTAR ISI

KATA PENGANTAR

BAB I PENDAHULUAN ..........................................................................1

1.1 Latar Belakang Kegiatan E-PAKSI…………..........................1

1.2 Maksud dan Tujuan .................................................................2

1.3 Dasar Hukum............................................................................2

1.4 Lokasi Pekerjaan ....................................................................4

1.5 Metedologi Pekerjaan...............................................................9

BAB II PROGRES KEMAJUAN PEKERJAAN......................................13

a. Tim Schedule/ Jadwal Pelaksanaan Kegiatan Rencana dan

Realiasisasi……………………………………………………..13

b. Progres Pekerjaan Persiapan…………………………………….16 .

c. Progres Pelaksanaan Kegiatan......................................................16

d. Tabel Laporan Kemajuan Progres Kegiatan...............................20

BAB III RENCANA KEGIATAN SELANJUTNYA.................................23

3.1. Kesimpulan .......................................................................23

3.2.Saran..................................................................................24
KATA PENGANTAR

Puji syukur kami panjatkan kehadirat Tuhan Yang Maha Esa yang telah melimpahkan

rahmat dan hidayah-Nya serta karunian-Nya sehingga kami dapat menyelesaikan kegiatan

Update E-Paksi 2021 D.I Jeneponto ” ini dengan baik walau berbagai tantangan yang kami

hadapi.

Laporan akhir Kegiatan Update E-Paksi 2021 D.I Jeneponto ini berisi tentang seluruh

kegiatan Update E-Paksi 2021 D.I Jeneponto yang terdiri dari 35 D.I dengan jumlah total Luasan

2720 Ha yang berdiri atas kewenangan Kabupaten Soppeng.

Terselesaikannya kegiatan ini tentu tidak lepas dari bantuan banyak pihak. Oleh karena

itu, kami mengucapkan terima kasih yang setulus-tulusnya kepada semua jajaran Dinas Pekerjaan

Umum dan Penata Ruang Kabupaten Jeneponto, yang telah membantu melaksanakan kegiatan ini

sebaagai wujud Pencapaian Program ketahanan Pangan dan Kebutuhan Air untuk negeri melalui

Program Irigasi berkelanjutan.

Serta tidak juga kami tuturkan banyak terimakasih kepada Konsultan Tenaga Ahli ,

Koordinator E-Paksi Kab. Jeneponto dan rekan rekan tim Tenaga Pendukung Update E-Paksi

2021 Dinas Pekerjaan Umum dan Penata Ruang Kabupaten Jeneponto.

Selain itu, kami berharap semoga kegiatan ini terus berkelanjutan dan bermanfaat bagi

semua pihak dan menjadi referensi keilmuan untuk melakukan Pencapaian Program ketahanan

Pangan dan Kebutuhan Air untuk negeri melalui Program Irigasi berkelanjutan

Koordinator
Tenaga Pendukung Update E-Paksi 2020

Akmal Anur,ST
BAB I PENDAHULUAN

I.1. Latar Belakang Kegiatan E-PAKSI

Pelaksanaaan E-PAKSI Merupakan kegiatan Penilaian Kerja Sistem Irigasi yang

dilakukan dengan berbasis Teknologi. Kegiatan E-PAKSI memiliki fungsi melakukan

Pengelolaan asset irigasi dan indeks kerja irigasi sebagai refresentatif untuk menghitung dan

mengukur nilai dari bangunan bangunan irigasi yang ada.

Salah satu D.I dari penggaplikasian E-PAKSI adalah Kab. Jeneponto yang terbagi dari 3

Kewenangan. Kewenangan Pusat, Kewenangan Provensi, dan Kewenangan Kabupaten.

Kegiatan E-PAKSI sendiri di lakukan untuk memudahkan inventarisasi aset aset yang ada

dalam Jaringan irigasi. Mulai dari Bendung dan bangunan pelengkapnya, Jaringan Irigasi

Primer, Sekunder , Tersier sampai ke Petak tersier. Aplikasi E-PAKSI juga mendukung

penilaian pengelolaan asset non Irigasi seperti Rumah POB, jalan inspeksi, Kantor , Perumahan

dan pertemuan, pengamanan sampah, dan jalan usaha tani.

Metodologi pelaksanaan kegiatan E-PAKSI di awali dengan penelusuran Update PAI

dan IKSI kemudian dilakukan web editing untuk merapikan kolerasi data data hasil survey

dilokasi.

Di Kabupaten Soppeng. khususnya di kewenangan Kabupaten D.I Jeneponto terdapat 35 D.I

yang menjadi daerah Survei kegiatan. Salah satu D.I yang Paling Luas fungsionalnya adalah

D.I Lajaroko 912 Ha, D.I Daoe 500 Ha, D.I Awo Banua 125 Ha dan paling kecil Daerah

irigasinya adalah Wae Pejje dengan luas fungsional 12 Ha. Survey ini dilakukan dimulai pada

tanggal 2 Oktober dan akan berakhir pada tanggal 31 Desember 2020


I.2. Maksud dan Tujuan

Adapun maksud dari kegiatan ini adalah dengan dilaksanakannya update PAI

dan IKSI secara terintegrasi dalam suatu DI, efektifitas dan efisiensi pelaksanaan

Operasi dan Pemeliharaan sistem irigasi dapat tercapai secara berkelanjutan.

Sedangkan tujuan dari kegiatan ini adalah sebagai berikut:

1. Mengetahui kondisi terkini (Updating) Pemuktahiran aset jaringan irigasi dan asset

pendukung pengolahan irigasi yang sudah dilakukan DI melalui kegiatan baseline.

2. Mengetahui Updating kinerja sistem irigasi utuh, irigasi utama, dan irigasi tersier

pada setiap DI.

3. Memudahkan dalam mengidentifikasi jenis dan tingat kerusakan di masing masing

bangunan berdasrkan koordinat masing masing bangunan.

4. Aplikasi EPAKSI juga memudahkan untuk mengidentifikasi potensial peningkatan

bangunan Irigasi untuk menunjang data produktivitas.

1.3 Dasar Hukum

Adapun dasar pelaksanaan paket Updating PAKSI (Pengelolaan Aset dan Kinerja Sistem

Irigasi) mengacu pada beberapa referensi hukum sebagai berikut:

1. Undang-Undang No. 17 Tahun 2019 tentang Sumber Daya Air;

2. Undang-Undang No. 23 Tahun 2014 tentang Pemerintahan Daerah;

3. Perpres No. 16 tahun 2018 tentang pengadaan barang/jasa pemerintah;

4. Permen PU No. 603/PRT/M/2005 mengenai Pedoman Umum Sistem Pengendalian

Manajemen Penyelenggaraan Pembangunan Prasarana;

5. Permen PUPR No. 12/PRT/M/2015 tentang Eksploitasi dan Pemeliharaan Jaringan

Irigasi;

6. Permen PUPR No. 14/PRT/M/2015 tentang Kriteria dan Penetapan Status Daerah irigasi

7. Permen PUPR No. 20/PRT/M/2016 tentang Organisasi dan Tata Kerja Unit Pelaksana

Teknis Kementerian Pekerjaan Umum dan Perumahan Rakyat;


8. Permen PUPR No. 23/PRT/M/2015 tentang Pengelolaan Aset Irigasi;

9. Permen PUPR No. 30/PRT/M/2015 tentang Pengembangan dan Pengelolaan Sistem

Irigasi;

10. Permen PUPR No 31/PRT/M/2015 tentang Perubahan Ketiga Peraturan Menteri

Pekerjaan Umum No. 07/PRT/M/2011 tentang Standar dan Pedoman Pengadaan

Pekerjaan Konstruksi dan Jasa Konsultansi

11. Surat Menteri Koordinator Bidang Perekonomian Nomor: S-44/M.EKON/02/2016

tanggal 26 Februari 2016 tentang Pendataan dan Pengembangan Sistem Irigasi;

12. PMK No. 94/PMK.02/2017 tentang Petunjuk Penyusunan dan Penelaahan Rencana Kerja

dan Anggaran Kementerian/Lembaga dan Pengesahan Daftar Isian Pelaksanaan

Anggaran;

13. Kepmen. PUPR. No. 897/KPTS/M/2017 tentang Besaran Remunerasi Minimal Tenaga

Kerja;

14. Juklak dan Juknis Paksi oleh Direktur Bina OP Direktorat Jenderal Sumber Daya Air

Tahun 2019 dan

15. Dinas Pekerjaan Umum dan Penata Ruang Kabupaten Jeneponto Tahun Anggaran 2021.
I.4 Lokasi Pekerjaan

Kegiatan untuk updating E-Paksi ini berlokasi di kabupaten Soppeng untuk 35 D.I
Kewenangan Kabupaten. Berikut Profil Daerah Irigasi Kabupaten Jeneponto :

Profil Daerah Irigasi Kabupaten Jeneponto :

1. Nama D.I : Awo Banua (73120013)


Luas Fungsional D.I : 111 Ha
Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 7 Saluran / 8 Bangunan / 8 Non fisik / 8 Non jaringan

Titik Koordinat : 119.8816968, -4.3311813 / 119.8816948, -4.3311934


119.8845599,-4.3307927 / 199.97425470501184, - 4.361447137072727

2. Nama D.I : Barang (73120015)


Luas Fungsional D.I : 60 Ha
Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 3 Saluran / 4 Bangunan / 9 Non fisik / 2 Non jaringan Titik
Koordinat : 119.8815889, -4.331264 / 119.8815396, -4.3312998 /
119.99134374597955, -4.404867606114204

3. Nama D.I : Cubbue (73120026) Luas Fungsional D.I : 81 Ha


Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 4 Saluran / 5 Bangunan / 9 Non fisik / 4 Non jaringan Titik
Koordinat : 119.9600039, -4.3976319 / 119.96178209781648, -
4.396515267931063 / 119.96227294206619, -
4.395174431344518 / 119.96227294206619, -
4.395174431344518 / 119.96227294206619, -
4.395174431344518

4. Nama D.I : Cilekke (73120021) Luas Fungsional D.I : 30 Ha


Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 2 Saluran / 3 Bangunan / 9 Non fisik / 1 Non jaringan Titik
Koordinat : 119.8962875, -4.4282869 / 119.8962875, -4.4282869 /
119.9001979082823, -4.427856258249972
5. Nama D.I : Cinebbeng (73120024) Luas Fungsional D.I : 80 Ha
Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 2 Saluran / 3 Bangunan / 9 Non fisik / 1 Non jaringan Titik
Koordinat : 199,9000785, -4.428599

6. Nama D.I : Ampalang (73120009) Luas Fungsional D.I : 60 Ha


Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 3 Saluran / 8 Bangunan / 9 Non fisik / 2 Non jaringan Titik
Koordinat : 119.9017517, -4.428935 / 119.90167807791822, -
4.429324196254347 / 119.90154577517609, -4.429473557945264

7. Nama D.I : Daoe (73120027)


Luas Fungsional D.I : 60 Ha Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 14 Saluran / 30 Bangunan / 9 Non fisik / 5 Non jaringan Titik
Koordinat : 119.86453, -4.2741083 / 119.86453, -4.2741083 / 119.8754167, -
4.2623167 / 119.8737494, -4.2664785

8. Nama D.I : Lajaroko (73120048)


Luas Fungsional D.I : 912 Ha
Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 30 Saluran / 44 Bangunan / 9 Non Fisik / 22 Non Jaringan
Titik Koordinat : 119.8796427, -4.1378879 / 119.8647294, -4.1470655 / 119.8801035,
-4.1413897

9. Nama D.I : Cempae (73120019)


Luas Fungsional D.I : 106 Ha
Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 14 Saluran / 15 Bangunan / 9 Non Fisik / 7 Non Jaringan
Titik Kordinat : 119.8982347, -4.2012787 / 119.9070984, -4.195334 / 119.907795,
-4.1975933 /

10. Nama D.I : Labuleng (73120044)


Luas Fungsional : 78 Ha
Kewenangan D.I : Kabupaten
Jumlah Aset (PAI) : 3 Saluran / 6 Bangunan / 8 Non Fisik / 3 Non Jaringan
Titik Kordinat : 119.8616724, -4.3468716 / 119.8596653, -4.3455914 /119.8616724,
-4.3468716 / 119.8614046, -4.3461622

11. Nama D.I : Labuleng Utara (73120123)


Luas Fungsional : 180 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 14 Saluran / 28 Bangunan / 9 Non Fisik / 7 Non Jaringan
Titik Kordinat : 119.8838419, -4.2091176 / 119.8916879, -4.2065283 / 119.8813867,
-4.2100967 / 119.8827935, -4.2085058 / 119.8828192, -4.2085045 /
119.8782433, -4.2120683 / 119.8847555, -4.2088996 / 119.888654,
-4.2082472 / 119.885062, -4.2076543 / 119.8851453, -4.2073106 /
119.895221, -4.2074066

12. Nama D.I : Tobangko (73120088)


Luas Fungsional : 87 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 5 Saluran / 7 Bangunan / 9 Non Fisik / 3 Non Jaringan
Titik Kordinat : 119.8986439, -4.3256544 / 119.9130153, -4.3147381 / 119.8974798,
-4.3270141

13. Nama D.I : Batu Sianre (73120016)


Luas Fungsional : 123 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 9 Saluran / 16 Bangunan / 9 Non Fisik / 7 Non Jaringan
Titik Kordinat : 119.9567545, -4.5259735 / 119.9617498, -4.5241714 / 119.9617682,
-4.524141

14. Nama D.I : Cimpolong (73120022)


Luas Fungsional : 30 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 4 Saluran / 5 Bangunan / 9 Non Fisik / 2 Non Jaringan
Titik Kordinat : 119.9246237, -4.469423 / 119.9252204, -4.4681655
15. Nama D.I : Sanuale (73120081)
Luas Fungsional : 20 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 2 Saluran / 4 Bangunan / 9 Non Fisik / 1 Non Jaringan
Titik Kordinat : 119.9422932, -4.5011382 / 119.9437337, -4.500367 / 119.9453721,
-4.5001684

16. Nama D.I : Waepejje (73120021)


Luas Fungsional : 15 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 3 Saluran / 4 Bangunan / 9 Non Fisik / 2 Non Jaringan
Titik Kordinat : 119.9768169, -4.4860425 / 119.9770233, -4.4861367 / 119.9766196,
-4.4866621

17. Nama D.I : Allaringe (73120006)


Luas Fungsional : 45 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 7 Saluran / 19 Bangunan / 9 Non Fisik / 4 Non Jaringan
Titik Kordinat : 119.8816232, -4.4790948 / 119.88234, -4.4800444 / 119.888939,
-4.4809353 / 119.8739263, -4.4792375 / 119.86801, -4.4787017

18. Nama D.I : Ajuarae (73120003)


Luas Fungsional : 20 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 1 Saluran / 2 Bangunan / 8 Non Fisik / 2 Non Jaringan
Titik Kordinat : 119.8242948, -4.5110164

19. Nama D.I : Cinurung (73120025)


Luas Fungsional : 30 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 3 Saluran / 4 Bangunan / 9 Non Fisik / 2 Non Jaringan
Titik Kordinat : 119.9169575, -4.4698728 / 119.9176386, -4.4697998 / 119.9211323,
-4.4679182

20. Nama D.I : Ilampe (73120031)


Luas Fungsional : 50 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 2 Saluran / 3 Bangunan / 9 Non Fisik / 1 Non Jaringan
Titik Kordinat : 119.9317883, -4.4968818 / 119.930964, -4.497066 / 119.9312495,
-4.495408
21. Nama D.I : Lompoe (73120062)
Luas Fungsional : 50 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 4 Saluran / 3 Bangunan / 9 Non Fisik / 1 Non Jaringan
Titik Kordinat : -4.500799, 119.938486 / -4.500482, 119.942276 / -4.50026,
119.942247 / -4.499932, 119.942306 / -4.499734, 119.942126

22. Nama D.I : Lapince (73120055)


Luas Fungsional : 50 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 5 Saluran / 6 Bangunan / 9 Non Fisik / 4 Non Jaringan
Titik Kordinat : 119.966693, -4.519629 / 119.9667227, -4.5197636 / 119.967822,
-4.520736 / 119.9646099, -4.5220057

23. Nama D.I : Lamaloang (73120050)


Luas Fungsional : 40 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 1 Saluran / 3 Bangunan / 9 Non Fisik / 1 Non Jaringan
Titik Kordinat : 120.0341316, -4.4948924 / 120.0358862, -4.4929254 / 120.0289768,
-4.4931672

24. Nama D.I : Alau Bolae (73120004)


Luas Fungsional : 61 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 4 Saluran / 7 Bangunan / 9 Non Fisik / 2 Non Jaringan
Titik Kordinat : -4.404129, 119.970157 / -4.405367, 119.971709 / -4.402261,
119.972282 / -4.403243, 119.971252 / -4.403243, 119.971252 /-
4.402566, 119.972029 / -4.4006, 119.973407

25. Nama D.I : Appalaringe (73120010)


Luas Fungsional : 30 Ha
Kewenangan : Kabupaten
Jumlah Aset (PAI) : 8 Saluran / 17 Bangunan / 9 Non Fisik / 4 Non Jaringan
Titik Kordinat : -4.35405, 119.968418 / -4.35006, 119.96999 / -4.355467, 119.967463 /
1.5 Metodelogi Pekerjaan

Pelaksanaan E-Paksi pada D.I Kewenangan Kabupaten Soppeng. Dilaksanakan dengan


tahapan dan item kegiatan sebagaimana di uraikan sebagai berikut.

1. Kegiatan Persiapan/ Pendahuluan


Kegiatan persiapan ini meliputi Update E-PAKSI 2020 D.I Kabupaten Soppeng antara
lain:

a. Administrasi Pelaksanaan Kegiatan

b. Mobilisasi personil

c. Peralatan, persiapan pekerjaan lapangan dan pengumpulan data.

2. Data Awal / Baseline


Tim Kerja updating PAKSI mengumpulkan data sekunder dan primer, terlebih dahulu
dilakukan pengumpulan data awal yang akan digunakan dalam kegiatan updating
PAKSI.
a. Baseline PAKSI di daerah irigasi yang ditinjau
b. Data PAI dan IKSI daerah irigasi yang ditinjau tahun sebelumnya
c. Skema jaringan dan bangunan eksisting
d. Peta situasi daerah irigasi yang ditinjau

3. Pengumpulan Data Sekunder

a. Peta Daerah Irigasi yang akan di Update IKSI, yang memuat Petak-petak tersier,
letak terase saluran, bangunan irigasi, kampong dan bangunan penting lainnya.

b. Skema Jaringan Irigasi dan Skema bangunan Daerah Irigasi yang akan di
Update IKSI

c. Data Luas layanan per petak tersier

d. Data Aset Non Fisik

e. Data Non Jaringan

4. Pengumpulan Data Primer


Data Primer yang dibutuhkan untuk melaksanakan Analisa data PAKSI/IKSI
antara lain :

a. Data hasil Penelusuran JAringan

b. Data hasil Penilaian IKSI Jaringan Irigasi,Non Jaringan,Aset Non Fisik pada
system irigas
5. Metodelogi Pelaksaaan E-PAKSI

1. Instalasi Aplikasi E-Paksi


Download Aplikakasi ‘’EPAKSI” di Playstore

2. Otoritas Akses Surveyor


Login menggunakan Username dan Password
yang ada sesuai D.I yang akan di survey
3. Kalibrasi dan Sinkronisasi data
Sebelum masuk ke Kalibrasi,
jangan lupa aktifkan GPS
kemudian Masuk ke menu
pengaturan untuk melakukan
singkronisasi, lalu klik Singkronisasi Sekarang ,
Aplikasi E-PAKSI siap digunakan.

4. Metodelogi PAI dan IKSI


Untuk melakukan survey PAI ,
Pilih menu PAI/Aset Jaringan Irigasi
Untuk melakukan Survey IKSI,
Pilih menu IKSI/ Penilaian System Kinerja irigasi
5. Survey PAI dan IKSI
a. Survey PAI
Dalam melakukan Survey PAI , posisi harus berada Di
koordinat asset bangunan , lalu klik Salah satu
bangunan atau saluran yang akan di Updating

b. Survey PAI
sama halnya dengan IKSI. Survey hanya dapat
dilakukan dengan posisi Mapping Aplikasi pada
bangunan yang akan di IKSI. Metodenya sama klik
salah satu bangunan yang akan di IKSI
BAB II

PROGRES KEMAJUAN PEKERJAAN


Time Schedule/ Jadwal Pelaksanaan Kegiatan Bulan Oktober 2020
Update E-Paksi D.I Soppeng 2020
Bobot OKTOBER NOVEMBER DESEMBER
N0 PELAKSANAAN PEKERJAAN (IKSI) Luas Areal (Ha) Volum
(%)
e M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
A PEKERJAAN PERSIAPAN 5%
1 Persiapan Lapangan - 1 1,00% 0,20% 0,20% 0,20% 0,20% 0,20%
0,20%
2 Inventarisasi Data Awal ( Baseline) - 1 1,00% 1,00%

3 Inventarisasi Sekunder - 1 1,00% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
0,11% 0,11% 0,11% 0,11%
4 Inventarisasi Primer - 1 1,00% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
0,11% 0,11% 0,11% 0,11%
5 Pelaporan - 1 1,00% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10%

B PELAKSANAAN PEKERJAAN (IKSI) 95,00%


1 Nama D.I Ajuare 20,00 1 0,70% 0,70%

2 Nama D.I Alau Bolae 61,00 1 2,13% 2,13%

3 Nama D.I Allaringe 45,00 1 1,57% 1,57%

4 Nama D.I Ampalang 60,00 1 2,10% 2,10%


2,10%
5 Nama D.I Appalaringe 30,00 1 1,05% 1,05%

6 Nama D.I Awo Banua 125,00 1 4,37% 4,37%


4,37%
7 Nama D.I Barang 60,00 1 2,10% 2,10%
2,10%
8 Nama D.I Batu Sianre 75,00 1 2,62% 2,62%

9 Nama D.I Cempae 102,00 1 3,56% 3,56%

10 Nama D.I Cilekkke 30,00 1 1,05% 1,05%


1,05%
11 Nama D.I Cimpolong 20,00 1 0,70% 0,70%

12 Nama D.I Cinebbeng 80,00 1 2,79% 2,79%


2,79%
13 Nama D.I Cinurung 20,00 1 0,70% 0,70%

14 Nama D.I Cubbue 90,00 1 3,14% 3,14%


3,14%
15 Nama D.I Daoe 500,00 1 17,46% 17,46%
5,00%
16 Nama D.I Ilampe 50,00 1 1,75% 1,75%

17 Nama D.I Labuleng 78,00 1 2,72% 2,72%

18 Nama D.I Lajaroko 912,00 1 31,85% 31,85%

19 Nama D.I lamaloang 40,00 1 1,40% 1,40%

20 Nama D.I Lapince 50,00 1 1,75%


1,75%
21 Nama D.I Lompoe 50,00 1 1,75% 1,75%

22 Nama D.I Sanuale 20,00 1 0,70% 0,70%

23 Nama D.I Tobangko 87,00 1 3,04% 3,04%

24 Nama D.I Waepejje 15,00 1 0,52% 0,52%

25 Nama D.I Labuleng Utara 100,00 1 3,49% 3,49%

Progres Rencana Kegiatan 34,33% 0,52% 0,32% 0,32% 32,38% 18,23% 8,38% 0,32% 5,10% 0,10%
100,00%
Progres Rencana Kegiatan Bulanan 35,49% 94,80% 100,00%
2720,00 100,00%
Progres Realisasi Kegiatan 0,22% 20,96% 0,22% 0,22% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
21,63%
Progres Realisasi Kegiatan Bulanan 21,63% 0,00% 0,00%

Progres Rencana Soppeng, 31 Oktober 2020


Progres Realisasi
Disetujui: Diperiksa: Dibuat Oleh:
Pejabat Pembuat Komitmen Tenaga Ahli SDA Kordinator Up Date E-Paksi
OP SDA I SATKER O&P Update E-Paksi 2020 D.I Soppeng

Irwansyah Renreng, ST., MT Ir. Burhanuddin Akib,ST.,MT. Akmal Aanur,ST


NIP: 19720520 200911 1 001 NRP : C20021988092018001
Time Schedule/ Jadwal Pelaksanaan Kegiatan Bulan November 2020
Update E-Paksi D.I Soppeng 2020
OKTOBER NOVEMBER DESEMBER
N0 PELAKSANAAN PEKERJAAN (IKSI) Luas Areal (Ha) Volume Bobot (%)
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
A PEKERJAAN PERSIAPAN 5%
1 Persiapan Lapangan - 1 1,00% 0,20% 0,20% 0,20% 0,20% 0,20%
0,20% 0,20% 0,20% 0,20% 0,20%
2 Inventarisasi Data Awal ( Baseline) - 1 1,00% 1,00%
1,00%
3 Inventarisasi Sekunder - 1 1,00% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
4 Inventarisasi Primer - 1 1,00% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
5 Pelaporan - 1 1,00% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10%
1,00%
B PELAKSANAAN PEKERJAAN (IKSI) 95,00%
1 Nama D.I Ajuare 20,00 1 0,70% 0,70%
0,70%
2 Nama D.I Alau Bolae 61,00 1 2,13% 2,13%
2,13%
3 Nama D.I Allaringe 45,00 1 1,57% 1,57%
1,57%
4 Nama D.I Ampalang 60,00 1 2,10% 2,10%
2,10%
5 Nama D.I Appalaringe 30,00 1 1,05% 1,05%
1,05%
6 Nama D.I Awo Banua 125,00 1 4,37% 4,37%
4,37%
7 Nama D.I Barang 60,00 1 2,10% 2,10%
2,10%
8 Nama D.I Batu Sianre 75,00 1 2,62% 2,62%
2,62%
9 Nama D.I Cempae 102,00 1 3,56% 3,56%
3,56%
10 Nama D.I Cilekkke 30,00 1 1,05% 1,05%
1,05%
11 Nama D.I Cimpolong 20,00 1 0,70% 0,70%
0,70%
12 Nama D.I Cinebbeng 80,00 1 2,79% 2,79%
2,79%
13 Nama D.I Cinurung 20,00 1 0,70% 0,70%
0,70%
14 Nama D.I Cubbue 90,00 1 3,14% 3,14%
3,14%
15 Nama D.I Daoe 500,00 1 17,46% 17,46%
5,00% 12,46%
16 Nama D.I Ilampe 50,00 1 1,75% 1,75%
1,75%
17 Nama D.I Labuleng 78,00 1 2,72% 2,72%
2,72%
18 Nama D.I Lajaroko 912,00 1 31,85% 31,85%
31,85%
19 Nama D.I lamaloang 40,00 1 1,40% 1,40%
1,40%
20 Nama D.I Lapince 50,00 1 1,75%
1,75% 1,75%
21 Nama D.I Lompoe 50,00 1 1,75% 1,75%
1,75%
22 Nama D.I Sanuale 20,00 1 0,70% 0,70%
0,70%
23 Nama D.I Tobangko 87,00 1 3,04% 3,04%
3,04%
24 Nama D.I Waepejje 15,00 1 0,52% 0,52%
0,52%
25 Nama D.I Labuleng Utara 100,00 1 3,49% 3,49%
3,49%
Progres Rencana Kegiatan 34,33% 0,52% 0,32% 0,32% 32,38% 18,23% 8,38% 0,32% 5,10% 0,10%
100,00%
Progres Rencana Kegiatan Bulanan 35,49% 94,80% 100,00%
2720,00 100,00%
Progres Realisasi Kegiatan 0,22% 20,96% 0,22% 0,22% 45,74% 13,24% 13,17% 0,22% 5,00% 1,00%
100,00%
Progres Realisasi Kegiatan Bulanan 21,63% 94,00% 100,00%

Progres Rencana Soppeng, 30 November 2020


Progres Realisasi

Disetujui: Diperiksa: Dibuat Oleh:


Pejabat Pembuat Komitmen Tenaga Ahli SDA Kordinator Up Date E-Paksi
OP SDA I SATKER O&P Update E-Paksi 2020 D.I Soppeng

Irwansyah Renreng, ST., MT Ir. Burhanuddin Akib,ST.,MT. Akmal Aanur,ST


NIP: 19720520 200911 1 001 NRP : C20021988092018001
Time Schedule/ Jadwal Pelaksanaan Kegiatan
Update E-Paksi D.I Soppeng 2020
OKTOBER NOVEMBER DESEMBER
N0 PELAKSANAAN PEKERJAAN (IKSI) Luas Areal (Ha) Volume Bobot (%)
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
A PEKERJAAN PERSIAPAN 5%
1 Persiapan Lapangan - 1 1,00% 0,20% 0,20% 0,20% 0,20% 0,20%
0,20% 0,20% 0,20% 0,20% 0,20%
2 Inventarisasi Data Awal ( Baseline) - 1 1,00% 1,00%
1,00%
3 Inventarisasi Sekunder - 1 1,00% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
4 Inventarisasi Primer - 1 1,00% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11% 0,11%
5 Pelaporan - 1 1,00% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10% 0,10%
1,00%
B PELAKSANAAN PEKERJAAN (IKSI) 95,00%
1 Nama D.I Ajuare 20,00 1 0,70% 0,70%
0,70%
2 Nama D.I Alau Bolae 61,00 1 2,13% 2,13%
2,13%
3 Nama D.I Allaringe 45,00 1 1,57% 1,57%
1,57%
4 Nama D.I Ampalang 60,00 1 2,10% 2,10%
2,10%
5 Nama D.I Appalaringe 30,00 1 1,05% 1,05%
1,05%
6 Nama D.I Awo Banua 125,00 1 4,37% 4,37%
4,37%
7 Nama D.I Barang 60,00 1 2,10% 2,10%
2,10%
8 Nama D.I Batu Sianre 75,00 1 2,62% 2,62%
2,62%
9 Nama D.I Cempae 102,00 1 3,56% 3,56%
3,56%
10 Nama D.I Cilekkke 30,00 1 1,05% 1,05%
1,05%
11 Nama D.I Cimpolong 20,00 1 0,70% 0,70%
0,70%
12 Nama D.I Cinebbeng 80,00 1 2,79% 2,79%
2,79%
13 Nama D.I Cinurung 20,00 1 0,70% 0,70%
0,70%
14 Nama D.I Cubbue 90,00 1 3,14% 3,14%
3,14%
15 Nama D.I Daoe 500,00 1 17,46% 17,46%
5,00% 12,46%
16 Nama D.I Ilampe 50,00 1 1,75% 1,75%
1,75%
17 Nama D.I Labuleng 78,00 1 2,72% 2,72%
2,72%
18 Nama D.I Lajaroko 912,00 1 31,85% 31,85%
31,85%
19 Nama D.I lamaloang 40,00 1 1,40% 1,40%
1,40%
20 Nama D.I Lapince 50,00 1 1,75%
1,75% 1,75%
21 Nama D.I Lompoe 50,00 1 1,75% 1,75%
1,75%
22 Nama D.I Sanuale 20,00 1 0,70% 0,70%
0,70%
23 Nama D.I Tobangko 87,00 1 3,04% 3,04%
3,04%
24 Nama D.I Waepejje 15,00 1 0,52% 0,52%
0,52%
25 Nama D.I Labuleng Utara 100,00 1 3,49% 3,49%
3,49%
Progres Rencana Kegiatan 34,33% 0,52% 0,32% 0,32% 32,38% 18,23% 8,38% 0,32% 5,10% 0,10%
100,00%
Progres Rencana Kegiatan Bulanan 35,49% 94,80% 100,00%
2720,00 100,00%
Progres Realisasi Kegiatan 0,22% 20,96% 0,22% 0,22% 45,74% 13,24% 13,17% 0,22% 5,00% 1,00%
100,00%
Progres Realisasi Kegiatan Bulanan 21,63% 94,00% 100,00%

Progres Rencana Soppeng, 31 Desember 2020


Progres Realisasi
Disetujui: Diperiksa: Dibuat Oleh:
Pejabat Pembuat Komitmen Tenaga Ahli SDA Kordinator Up Date E-Paksi
OP SDA I SATKER O&P Update E-Paksi 2020 D.I Soppeng

Irwansyah Renreng, ST., MT Ir. Burhanuddin Akib,ST.,MT. Akmal Aanur,ST


NIP: 19720520 200911 1 001 NRP : C20021988092018001

A. PROGRES KEMAJUAN PEKERJAAN LAPANGAN


Kemajuan pekerjaaan yang telah dicapai sampai saat ini antara lain
seperti diuraikan pada pembahasan di bawah ini.

a. Pekerjaan Persiapan

Total kemajuan pelaksanaan Bulan yang lalu sebesar 3,58% ,


Bulan sebesar 5 % (progres kemajuan pelaksanaan pekerjaan
terlampir).

b. Pelaksanaan Kegiatan (IKSI)

1. Progres Kemajuan Pekerjaan D.I Ampalang

Total kemajuan pelaksanaan Bulan yang lalu sebesar 2% ,


Bulasebesar 2% (progres kemajuan pelaksanaan pekerjaan terlampir).

2. Progres Kemajuan Pekerjaan D.I Awo Banua


Total kemajuan pelaksanaan Bulan yang lalu sebesar 5% , Bulan sebesar 5%
(progres kemajuan pelaksanaan pekerjaan terlampir).

3. Progres Kemajuan Pekerjaan D.I Barang


Total kemajuan pelaksanaan Bulan yang lalu sebesar 2% , Bulan sebesar 2%
(progres kemajuan pelaksanaan pekerjaan terlampir).

4. Progres Kemajuan Pekerjaan D.I Cilekke


Total kemajuan pelaksanaan Bulan yang lalu sebesar 1% , Bulan sebesar 1%
(progres kemajuan pelaksanaan pekerjaan terlampir).

5. Progres Kemajuan Pekerjaan D.I Cinebbeng


Total kemajuan pelaksanaan Bulan yang lalu sebesar 3% , Bulan sebesar 3%
(progres kemajuan pelaksanaan pekerjaan terlampir).

6. Progres Kemajuan Pekerjaan D.I Cubbue


Total kemajuan pelaksanaan Bulan yang lalu sebesar 3% , Bulan sebesar 3%
(progres kemajuan pelaksanaan pekerjaan terlampir).

7. Progres Kemajuan Pekerjaan D.I Doae


Total kemajuan pelaksanaan Bulan yang lalu sebesar 12,46% , Bulan sebesar 12,46%
(progres kemajuan pelaksanaan pekerjaan terlampir).
8. Progres Kemajuan Pekerjaan D.I Lajaroko
Progres Kemajuan Pekerjaan D.I Lajaroko Total kemajuan pelaksanaan Bulan yang
lalu sebesar 31,85%, Bulan ini sebesar 31,85% (progres kemajuan pelaksanaan
pekerjaan terlampir).

9. Progres Kemajuan Pekerjaan D.I Ajuarae


Progres Kemajuan Pekerjaan D.I Ajuarae Total kemajuan pelaksanaan Bulan yang
lalu sebesar 0,70%, Bulan ini sebesar 0,70% (progres kemajuan pelaksanaan
pekerjaan terlampir).

10. Progres Kemajuan Pekerjaan D.I Allaeringe


Progres Kemajuan Pekerjaan D.I Allaringe Total kemajuan pelaksanaan Bulan yang
lalu sebesar 1,57%, Bulan ini sebesar 1,57% (progres kemajuan pelaksanaan
pekerjaan terlampir).

11. Progres Kemajuan Pekerjaan D.I Batusianre


Progres Kemajuan Pekerjaan D.I Batusianre Total kemajuan pelaksanaan Bulan yang
lalu sebesar 2,62%, Bulan ini sebesar 2,62% (progres kemajuan pelaksanaan
pekerjaan terlampir).

12. Progres Kemajuan Pekerjaan D.I Cempae


Progres Kemajuan Pekerjaan D.I Cempae Total kemajuan pelaksanaan Bulan yang
lalu sebesar 3,56,%, Bulan ini sebesar 3,56% (progres kemajuan pelaksanaan
pekerjaan terlampir).

13. Progres Kemajuan Pekerjaan D.I Cimpolong


Progres Kemajuan Pekerjaan D.I Cimpolong Total kemajuan pelaksanaan Bulan
yang lalu sebesar 0,70%, Bulan ini sebesar 0,70% (progres kemajuan pelaksanaan
pekerjaan terlampir).

14. Progres Kemajuan Pekerjaan D.I Cinurung


Progres Kemajuan Pekerjaan D.I Cinurung Total kemajuan pelaksanaan Bulan yang
lalu sebesar 0,70%, Bulan ini sebesar 0,70% (progres kemajuan pelaksanaan
pekerjaan terlampir).

15. Progres Kemajuan Pekerjaan D.I Ilampe


Progres Kemajuan Pekerjaan D.I Ilampe Total kemajuan pelaksanaan Bulan yang
lalu sebesar 1,75%, Bulan ini sebesar 1,75% (progres kemajuan pelaksanaan
pekerjaan terlampir).

16. Progres Kemajuan Pekerjaan D.I Labuleng


Progres Kemajuan Pekerjaan D.I Labuleng Total kemajuan pelaksanaan Bulan yang
lalu sebesar 2,72%, Bulan ini sebesar 2,72% (progres kemajuan pelaksanaan
pekerjaan terlampir).

17. Progres Kemajuan Pekerjaan D.I Lapince


Progres Kemajuan Pekerjaan D.I Lapince Total kemajuan pelaksanaan Bulan yang
lalu sebesar 1,75%, Bulan ini sebesar 1,75 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

18. Progres Kemajuan Pekerjaan D.I Lompoe


Progres Kemajuan Pekerjaan D.I Lompoe Total kemajuan pelaksanaan Bulan yang
lalu sebesar 1,75%, Bulan ini sebesar 1,75 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

19. Progres Kemajuan Pekerjaan D.I Sanuale


Progres Kemajuan Pekerjaan D.I Sanuale Total kemajuan pelaksanaan Bulan yang
lalu sebesar 0,70%, Bulan ini sebesar 0,70 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

20. Progres Kemajuan Pekerjaan D.I Tobangko


Progres Kemajuan Pekerjaan D.I Tobangko Total kemajuan pelaksanaan Bulan yang
lalu sebesar 3,04%, Bulan ini sebesar 3,04 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

21. Progres Kemajuan Pekerjaan D.I Waepejje


Progres Kemajuan Pekerjaan D.I Waepejje Total kemajuan pelaksanaan Bulan yang
lalu sebesar 0,52%, Bulan ini sebesar 0,52 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

22. Progres Kemajuan Pekerjaan D.I Labuleng Utara


Progres Kemajuan Pekerjaan D.I Labuleng Utara Total kemajuan pelaksanaan Bulan
yang lalu sebesar 3,49 %, Bulan ini sebesar 3,49 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

23. Progres Kemajuan Pekerjaan D.I Alau Bolae


Progres Kemajuan Pekerjaan D.I Labuleng Utara Total kemajuan pelaksanaan Bulan
yang lalu sebesar 3,49 %, Bulan ini sebesar 3,49 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

24. Progres Kemajuan Pekerjaan D.I Appaliringeng


Progres Kemajuan Pekerjaan D.I Labuleng Utara Total kemajuan pelaksanaan Bulan
yang lalu sebesar 3,49 %, Bulan ini sebesar 3,49 % (progres kemajuan pelaksanaan
pekerjaan terlampir).

25. Progres Kemajuan P ekerjaan D.I Lamalloang

Progres Kemajuan Pekerjaan D.I Labuleng Utara Total kemajuan pelaksanaan Bulan
yang lalu sebesar 3,49 %, Bulan ini sebesar 3,49 % (progres kemajuan pelaksanaan
pekerjaan terlampir).
LAPORAN KEMAJUAN PELAKSANAAN E-PAKSI BULAN OKTOBER 2020 (BULAN I)

Bobot Kemajuan Pekerjaan


Yang Lalu Saat Ini Sampai dengan
N0 PELAKSANAAN PEKERJAAN (IKSI) Volume
(%) Bobot Bobot Bobot
Volume Volume Volume
(%) (%) (%)
A PEKERJAAN PERSIAPAN
Persiapan Lapangan 1,00 1,00% 0,00 0,00% 0,33 0,20% 0,33 0,20%
Inventarisasi Data Awal ( Baseline) 1,00 1,00% 0,00 0,00% 0,00 0,00% 0,00 0,00%
Inventarisasi Sekunder 1,00 1,00% 0,00 0,00% 0,33 0,44% 0,33 0,44%
Inventarisasi Primer 1,00 1,00% 0,00 0,00% 0,33 0,44% 0,33 0,44%
Pelaporan 1,00 1,00% 0,00 0,00% 0,00 0,00% 0,00 0,00%
Sub Total A 5,00% 1,09% 1,09%
B PELAKSANAAN PEKERJAAN (IKSI)
1 Nama D.I Ajuare 1,00 0,70% 0,000 0,00% 0,000 0,00% 0,000 0,00%
2 Nama D.I Alau Bone 1,00 2,13% 0,000 0,00% 0,000 0,00% 0,000 0,00%
3 Nama D.I Allaringe 1,00 1,57% 0,000 0,00% 0,000 0,00% 0,000 0,00%
4 Nama D.I Ampalang 1,00 2,10% 0,000 0,00% 1,000 2,10% 1,000 2,10%
5 Nama D.I Appalaringe 1,00 1,05% 0,000 0,00% 0,000 0,00% 0,000 0,00%
6 Nama D.I Awo Banua 1,00 4,37% 0,000 0,00% 1,000 4,37% 1,000 4,37%
7 Nama D.I Barang 1,00 2,10% 0,000 0,00% 1,000 2,10% 1,000 2,10%
8 Nama D.I Batu Sianre 1,00 2,62% 0,000 0,00% 0,000 0,00% 0,000 0,00%
9 Nama D.I Cempae 1,00 3,56% 0,000 0,00% 0,000 0,00% 0,000 0,00%
10 Nama D.I Cilekkke 1,00 1,05% 0,000 0,00% 1,000 1,05% 1,000 1,05%
11 Nama D.I Cimpolong 1,00 0,70% 0,000 0,00% 0,000 0,00% 0,000 0,00%
12 Nama D.I Cinebbeng 1,00 2,79% 0,000 0,00% 1,000 2,79% 1,000 2,79%
13 Nama D.I Cinurung 1,00 0,70% 0,000 0,00% 0,000 0,00% 0,000 0,00%
14 Nama D.I Cubbue 1,00 3,14% 0,000 0,00% 1,000 3,14% 1,000 3,14%
15 Nama D.I Daoe 1,00 17,46% 0,000 0,00% 0,368 5,00% 0,368 5,00%
16 Nama D.I Ilampe 1,00 1,75% 0,000 0,00% 0,000 0,00% 0,000 0,00%
17 Nama D.I Labuleng 1,00 2,72% 0,000 0,00% 0,000 0,00% 0,000 0,00%
18 Nama D.I Lajaroko 1,00 31,85% 0,000 0,00% 0,000 0,00% 0,000 0,00%
19 Nama D.I lamaloang 1,00 1,40% 0,000 0,00% 0,000 0,00% 0,000 0,00%
20 Nama D.I Lapince 1,00 1,75% 0,000 0,00% 0,000 0,00% 0,000 0,00%
21 Nama D.I Lompoe 1,00 1,75% 0,000 0,00% 0,000 0,00% 0,000 0,00%
22 Nama D.I Sanuale 1,00 0,70% 0,000 0,00% 0,000 0,00% 0,000 0,00%
23 Nama D.I Tobangko 1,00 3,04% 0,000 0,00% 0,000 0,00% 0,000 0,00%
24 Nama D.I Waepejje 1,00 0,52% 0,000 0,00% 0,000 0,00% 0,000 0,00%
25 Nama D.I Labuleng Utara 1,00 3,49% 0,000 0,00% 0,000 0,00% 0,000 0,00%
Sub Total A 95% 0,00% 20,54% 20,54%
Total Progres Realisasi ( A+B) 0,00% 21,63% 21,63%

Soppeng, 31 Oktober 2020


Diperiksa: Di Buat Oleh
Tenaga Ahli SDA Koordinator Update E-Paksi
Update E-Paksi 2020 D.I Kab. Soppeng

Ir. Burhanuddin Akib,ST.,MT. Akmal Anur,ST


NRP : C20021988092018001
LAPORAN KEMAJUAN PELAKSANAAN E-PAKSI BULAN NOVEMBER 2020 (BULAN II)

Bobot Kemajuan Pekerjaan


Yang Lalu Saat Ini Sampai dengan
N0 PELAKSANAAN KEGIATAN (IKSI) Volume
(%) Volum Bobot Volum Bobot Bobot
Volume
e (%) e (%) (%)
A PEKERJAAN PERSIAPAN
Persiapan Lapangan 1,00 1,00% 0,33 0,20% 0,33 0,60% 0,66 0,80%
Inventarisasi Data Awal ( Baseline) 1,00 1,00% 0,00 0,00% 1,00 1,00% 1,00 1,00%
Inventarisasi Sekunder 1,00 1,00% 0,33 0,44% 0,33 0,44% 0,66 0,89%
Inventarisasi Primer 1,00 1,00% 0,33 0,44% 0,33 0,44% 0,66 0,89%
Pelaporan 1,00 1,00% 0,00 0,00% 0,00 0,00% 0,00 0,00%
Sub Total A 5,00% 1,09% 2,49% 3,58%
B PELAKSANAAN PEKERJAAN (IKSI)
1 Nama D.I Ajuare 1,00 0,70% 0,000 0,00% 1,000 0,70% 1,000 0,70%
2 Nama D.I Alau Bone 1,00 2,13% 0,000 0,00% 0,000 0,00% 0,000 0,00%
3 Nama D.I Allaringe 1,00 1,57% 0,000 0,00% 1,000 1,57% 1,000 1,57%
4 Nama D.I Ampalang 1,00 2,10% 1,000 2,10% 0,000 0,00% 1,000 2,10%
5 Nama D.I Appalaringe 1,00 1,05% 0,000 0,00% 0,000 0,00% 0,000 0,00%
6 Nama D.I Awo Banua 1,00 4,37% 1,000 4,37% 0,000 0,00% 1,000 4,37%
7 Nama D.I Barang 1,00 2,10% 1,000 2,10% 0,000 0,00% 1,000 2,10%
8 Nama D.I Batu Sianre 1,00 2,62% 0,000 0,00% 1,000 2,62% 1,000 2,62%
9 Nama D.I Cempae 1,00 3,56% 0,000 0,00% 1,000 3,56% 1,000 3,56%
10 Nama D.I Cilekkke 1,00 1,05% 1,000 1,05% 0,000 0,00% 1,000 1,05%
11 Nama D.I Cimpolong 1,00 0,70% 0,000 0,00% 1,000 0,70% 1,000 0,70%
12 Nama D.I Cinebbeng 1,00 2,79% 1,000 2,79% 0,000 0,00% 1,000 2,79%
13 Nama D.I Cinurung 1,00 0,70% 0,000 0,00% 1,000 0,70% 1,000 0,70%
14 Nama D.I Cubbue 1,00 3,14% 1,000 3,14% 0,000 0,00% 1,000 3,14%
15 Nama D.I Daoe 1,00 17,46% 0,368 5,00% 0,632 12,46% 1,000 17,46%
16 Nama D.I Ilampe 1,00 1,75% 0,000 0,00% 1,000 1,75% 1,000 1,75%
17 Nama D.I Labuleng 1,00 2,72% 0,000 0,00% 1,000 2,72% 1,000 2,72%
18 Nama D.I Lajaroko 1,00 31,85% 0,000 0,00% 1,000 31,85% 1,000 31,85%
19 Nama D.I lamaloang 1,00 1,40% 0,000 0,00% 0,000 0,00% 0,000 0,00%
20 Nama D.I Lapince 1,00 1,75% 0,000 0,00% 1,000 1,75% 1,000 1,75%
21 Nama D.I Lompoe 1,00 1,75% 0,000 0,00% 1,000 1,75% 1,000 1,75%
22 Nama D.I Sanuale 1,00 0,70% 0,000 0,00% 1,000 0,70% 1,000 0,70%
23 Nama D.I Tobangko 1,00 3,04% 0,000 0,00% 1,000 3,04% 1,000 3,04%
24 Nama D.I Waepejje 1,00 0,52% 0,000 0,00% 1,000 0,52% 1,000 0,52%
25 Nama D.I Labuleng Utara 1,00 3,49% 0,000 0,00% 1,000 3,49% 1,000 3,49%
Sub Total A 95% 20,54% 69,88% 90,42%
Total Progres Realisasi ( A+B) 21,63% 72,37% 94,00%

Soppeng, 30 November 2020


Diperiksa oleh Di Buat Oleh
Tenaga Ahli SDA Tenaga Pendukung E-Paksi
Update Epaksi 2020

Ir. Burhanuddin Akib,ST.,MT Akmal Anur, ST


NRP : C20021988092018001
LAPORAN KEMAJUAN PELAKSANAAN E-PAKSI BULAN DESEMBER 2020 (BULAN III)

Bobot Kemajuan Pekerjaan


Yang Lalu Saat Ini Sampai dengan
N0 PELAKSANAAN PEKERJAAN (IKSI) Volume
(%) Bobot Bobot Bobot
Volume Volume Volume
(%) (%) (%)
A PEKERJAAN PERSIAPAN
Persiapan Lapangan 1,00 1,00% 0,66 0,80% 0,34 0,20% 1,00 1,00%
Inventarisasi Data Awal ( Baseline) 1,00 1,00% 1,00 1,00% 0,00 0,00% 1,00 1,00%
Inventarisasi Sekunder 1,00 1,00% 0,66 0,89% 0,34 0,11% 1,00 1,00%
Inventarisasi Primer 1,00 1,00% 0,66 0,89% 0,34 0,11% 1,00 1,00%
Pelaporan 1,00 1,00% 0,00 0,00% 1,00 1,00% 1,00 1,00%
Sub Total A 5,00% 3,58% 1,42% 5,00%
B PELAKSANAAN PEKERJAAN (IKSI)
1 Nama D.I Ajuare 1,00 0,70% 1,000 0,00% 0,000 0,70% 1,000 0,70%
2 Nama D.I Alau Bone 1,00 2,13% 0,000 0,00% 1,000 2,13% 1,000 2,13%
3 Nama D.I Allaringe 1,00 1,57% 1,000 0,00% 0,000 1,57% 1,000 1,57%
4 Nama D.I Ampalang 1,00 2,10% 1,000 2,10% 0,000 0,00% 1,000 2,10%
5 Nama D.I Appalaringe 1,00 1,05% 0,000 0,00% 1,000 1,05% 1,000 1,05%
6 Nama D.I Awo Banua 1,00 4,37% 1,000 4,37% 0,000 0,00% 1,000 4,37%
7 Nama D.I Barang 1,00 2,10% 1,000 2,10% 0,000 0,00% 1,000 2,10%
8 Nama D.I Batu Sianre 1,00 2,62% 1,000 0,00% 0,000 2,62% 1,000 2,62%
9 Nama D.I Cempae 1,00 3,56% 1,000 0,00% 0,000 3,56% 1,000 3,56%
10 Nama D.I Cilekkke 1,00 1,05% 1,000 1,05% 0,000 0,00% 1,000 1,05%
11 Nama D.I Cimpolong 1,00 0,70% 1,000 0,00% 0,000 0,70% 1,000 0,70%
12 Nama D.I Cinebbeng 1,00 2,79% 1,000 2,79% 0,000 0,00% 1,000 2,79%
13 Nama D.I Cinurung 1,00 0,70% 1,000 0,00% 0,000 0,70% 1,000 0,70%
14 Nama D.I Cubbue 1,00 3,14% 1,000 3,14% 0,000 0,00% 1,000 3,14%
15 Nama D.I Daoe 1,00 17,46% 1,000 5,00% 0,000 12,46% 1,000 17,46%
16 Nama D.I Ilampe 1,00 1,75% 1,000 0,00% 0,000 1,75% 1,000 1,75%
17 Nama D.I Labuleng 1,00 2,72% 1,000 0,00% 0,000 2,72% 1,000 2,72%
18 Nama D.I Lajaroko 1,00 31,85% 1,000 0,00% 0,000 31,85% 1,000 31,85%
19 Nama D.I lamaloang 1,00 1,40% 0,000 0,00% 1,000 1,40% 1,000 1,40%
20 Nama D.I Lapince 1,00 1,75% 1,000 0,00% 0,000 1,75% 1,000 1,75%
21 Nama D.I Lompoe 1,00 1,75% 1,000 0,00% 0,000 1,75% 1,000 1,75%
22 Nama D.I Sanuale 1,00 0,70% 1,000 0,00% 0,000 0,70% 1,000 0,70%
23 Nama D.I Tobangko 1,00 3,04% 1,000 0,00% 0,000 3,04% 1,000 3,04%
24 Nama D.I Waepejje 1,00 0,52% 1,000 0,00% 0,000 0,52% 1,000 0,52%
25 Nama D.I Labuleng Utara 1,00 3,49% 1,000 0,00% 0,000 3,49% 1,000 3,49%
Sub Total A 95% 20,54% 74,46% 95,00%
Total Progres Realisasi ( A+B) 24,12% 75,88% 100,00%

Soppeng, 30 November 2020


Diperiksa oleh Di Buat Oleh
Tenaga Ahli SDA Tenaga Pendukung E-Paksi
Update Epaksi 2020

Ir. Burhanuddin Akib,ST.,MT Akmal Anur, ST


NRP : C20021988092018001
BAB III

KESIMPULAN

3.1. Kesimpulan

E-PAKSI merupakan singkatan dari Elektronik Pengelolaan Aset Irigasi dan Kinerja Sistem

Irigasi. Aplikasi e-Paksi merupakan aplikasi survey berbasis android yang digunakan untuk

pengambilan data survey inventaris. aset jaringan irigasi, aset non jaringan irigasi dan kinerja

aset irigasi. Pengelolaan irigasi dilaksanakan secara menyeluruh sebagai satu kesatuan sistem

mulai dari bangunan utama, jaringan primer, jaringan sekunder sampai petak tersier, sehingga

diperlukan satu pengelola di dalam satu sistem irigasi. Pengelolaan irigasi diperlukan

seperangkat alat untuk membantu proses pengumpulan data, survei dan analisis data. Kegiatan

pengelolaan aset ini salah satunya di laksanakan pada D.I Kab. Soppeng dengan luasan sebesar

2.720 Ha yang merupakan kewenangan Kabupaten. Dalam program IPDMIP, kegiatan

pengelolaan aset secara garis besar terdapat dalam kegiatan penelusuran aset irigasi sedangkan

Penilaian Kinerja Sistem Irigasi (IKSI) terdapat dalam kegiatan kinerja sistem irigasi. Pada

proses pelaksanaan kegiatan di mulai pada bulan Oktober hingga bulan Desember yang awali

dengan bimbingan teknis yang kemudian di lanjutkan pekerjaan lapangan ke Daerah Irigasi

Soppeng dan di selingi dengan pengumpulan data-data baseline terkait lokasi pekerjaan dan di

akhiri dengan penyusunan laporan bulanan hingga akhir.


Adapun kendala pada proses pelaksanaan pekerjaan yaitu:

1. Aplikasi yang kurang responsive

2. Kurangnya Pengetahuan pada narasumber/PPA/P3A setempat terkait data-data yang

ada.

3. Medan survei yang lumayan ekstrim dan sulit dijangkau.

4. Realita lapangan dan gambaran skema yang tidak sesuai.

5. Kurang lengkapnya data baseline yang sempat menghambat jalannya pelaksanaan

pekerjaan lapangan.

3.2. Saran

1. Sebaiknya Aplikasi yang di gunakan segera dilakukan updating agar dapat mengurangi

kesalahan teknis yang terjadi akibat kurang responsif.

2. Perlunya data atau baseline yang akurat sebelum pelaksanaan lapangan agar tidak

menghambat proses pekerjaan.

3. Dibutuhkan formatur-formatur yang telah dipatenkan agar mempermudah pengumpulan

data-data non teknis dilapangan

4. Dibutuhkan pelatihan-pelatihan terhadap PPA, P3A, Kepala Ranting dan Perangkat

perangkat Irigasi lainnya.

5. Perlunya draft laporan atau konsep laporan yang jelas dan baku sejak awal agar

mempermudah dalam penyusunan laporan.