PERENCANAAN
05 PERKERASAN
JALAN RAYA
HAERUL PURNAMA

PERENCANAAN TEBAL PERKERASAN LENTUR


Metode Analisis Komponen SNI 1732-1989-F

1
08/05/2021

BEBAN LALU-LINTAS
3

2
08/05/2021

01. BEBAN SUMBU KENDARAAN


5

01. BEBAN SUMBU KENDARAAN


6

3
08/05/2021

01. BEBAN SUMBU KENDARAAN


7

02. DAYA DUKUNG TANAH


8

4
08/05/2021

03. FAKTOR REGIONAL


9

04. INDEKS PERMUKAAN


10

5
08/05/2021

04. INDEKS PERMUKAAN


11

05. RUMUS DASAR METODE Metode Analisis Komponen SNI


1732-1989-F

12

6
08/05/2021

13

14

7
08/05/2021

15

16

8
08/05/2021

17

18

9
08/05/2021

19

20

10
08/05/2021

21

CONTOH SOAL

22

11
08/05/2021

a. Data lalulintas

No Jenis Kendaraan Jumlah persentase

kendaraan ringan 2 ton (1+1) 9684 76%


bus 8 ton (3+5) 324 3%
truk 2 as 10 ton (4+6) 1969 15%
truk 3 as 20 ton (6+14) 628 5%
truk 5 as 30 ton (6+12+12) 134 1%
12738.4 100%
perkembangan lalu-lintas (i) = 2 % mengikuti perkembangan geometrik
umur rencana = 10 tahun

23

24

12
08/05/2021

25

26

13
08/05/2021

27

28

14
08/05/2021

5. Menghitung Lintas Ekivalen Rencana ( LER )

LER = LET x FP

FP = UR
10

10
LER = 247.9609 x
10
= 247.9609

29

1. Mencari harga CBR yang mewakili :

segmen 1
CBR CBR JUMLAH YANG SAMA PERSENTASEYANG SAMA
No Chainage ( KM )
( DCP ) SORTED AT AU LEBIH BESAR AT AU LEBIH BESAR

1 20 + 000 4.05 4.05 6 100.0


2 20 + 200 10.48 4.8 5 83.3
3 20 + 400 9.02 5.53 4 66.7
4 20 + 600 10.51 9.02 3 50.0
5 20 + 800 5.53 10.48 2 33.3
6 21 + 000 4.8 10.51 1 16.7
44.39

30

15
08/05/2021

1. Mencari harga CBR yang mewakili :

segmen 1
CBR CBR JUMLAH YANG SAMA PERSENTASEYANG SAMA
No Chainage ( KM )
( DCP ) SORTED AT AU LEBIH BESAR AT AU LEBIH BESAR

1 20 + 000 4.05 4.05 6 100.0


2 20 + 200 10.48 4.8 5 83.3
3 20 + 400 9.02 5.53 4 66.7
4 20 + 600 10.51 9.02 3 50.0
5 20 + 800 5.53 10.48 2 33.3
6 21 + 000 4.8 10.51 1 16.7
44.39

31

1. Mencari harga CBR yang mewakili :

segmen 1
CBR CBR JUMLAH YANG SAMA PERSENT ASEYANG SAMA
No Chainage ( KM )
( DCP ) SORTED AT AU LEBIH BESAR AT AU LEBIH BESAR

1 20 + 000 4.05 4.05 6 100.0


2 20 + 200 10.48 4.8 5 83.3
3 20 + 400 9.02 5.53 4 66.7
4 20 + 600 10.51 9.02 3 50.0
5 20 + 800 5.53 10.48 2 33.3
6 21 + 000 4.8 10.51 1 16.7
44.39

secara analitis
CBR segmen = 7.3983333 - ( 10.51 - 4.05 ) / 2.67
= 4.98

2. Mencari nilai Daya Dukung Tanah dasar

Nilai Daya Dukung Tanah Dasar ( DDT ) anatis


DDT = 4.3 Log CBR + 1.7
= 4.3 Log 4.98 + 1.7
= 4.698

32

16
08/05/2021

04. INDEKS PERMUKAAN


33

03. FAKTOR REGIONAL


34

17
08/05/2021

DDT = 4.698
LER = 247.96
FR = 2.5

ITP = 8.67

35

36

18
08/05/2021

DIKETAHUI :
D1 min = 7.5 cm ; a1 = 0.4
D2 min = 15 cm ; a2 = 0.13
D3 min = ? cm ; a3 = 0.12

ITP = a1.D1 + a2.D2 + a3.D3


8.67 = (0.4*7.5) + (0.13*15) + (D3*0.12)
D3 * 0.12 = 8.67 - 3 - 1.95
D3 = 31 cm
7.5 cm

15 cm
31 cm
31 cm

37

19