No. Laporan:
0034/IMS/DP-MSI/I- 2018
CERTIFICATION BODY
BADAN SERTIFIKASI
www.multisertifikasi.co.id
Type of Audit :
CONFIDENTIAL
Head Office : Jenis Audit:
Kantor Pusat:
Jl. Letjend. Suprapto No. 55C, Ungaran AUDIT
INITIALREPORT
Kabupaten Semarang
Phone : +62 24 7651 0101
Telp : +62 24 7651 0101 LAPORAN
AWAL AUDIT
Email : marketing@multisertifikasi.co.id
RAHASIA
Ownership of this report and the information
contained within remain the property of MSI
Certification Body
Laporan ini beserta informasi yang terkandung di
dalamnya adalah hak milik Badan Sertifikasi MSI
Standard(s) to be Certified :
Standard untuk Disertifikasi:
ISO 9001:2015
Scope :
Ruang Lingkup:
This report is confidential and distribution is limited to the audit team, the company and the MSI office
Laporan ini bersifat rahasia dan pendistribusiannya terbatas pada tim audit, perusahaan, dan kantor MSI
Table of Contents
Daftar Isi
1 of 23
Company Information
Informasi Perusahaan
Company Name
PT. MARGO TRESNO KARYA
Nama Perusahaan
Address
Alamat
Jl. Bima I / 1-B, Semarang
2 of 23
Scope of Certification
Ruang Lingkup Sertifikasi
Para auditor memastikan bahwa mereka belum pernah melakukan konsultasi sistem manajemen apapun
kepada organisasi yang diaudit selama 2 tahun terakhir dan mereka tidak akan melakukan konsultasi
apapun selama periode sertifikasi dan 2 tahun setelahnya. Para auditor juga memastikan bahwa tidak ada
konflik kepentingan yang muncul selama proses sertifikasi.
3 of 23
1. GENERAL AUDIT REPORT
The findings in this report represent only a sample of the actual management system in place at the
company and do not exclude any further deviations that may still be present. The audit does not
absolve the company from continuing the internal audit regime, maintaining the system and further
looking for continuous improvement opportunities.
The management has been informed of the decision of the audit team during the closing meeting.
Temuan dalam laporan ini hanya mewakili sampel sistem manajemen sebenarnya yang berada di
perusahaan dan tidak terkecuali penyimpangan lebih lanjut yang mungkin masih terjadi. Audit tidak
membebaskan perusahaan dari kelanjutan rangkaian audit internal, perawatan sistem, dan pencarian
peluang peningkatan berkelanjutan.
Manajemen telah diinformasikan perihal keputusan tim audit selama rapat penutupan.
4 of 23
UU. No. 7, 2014 about the rules and
Legislation related to marketing
regulations of trade Y
licenses Y
UU No. 7 Tahun 2014 tentang aturan
Peraturan terkait lisensi pemasaran
dan peraturan perdagangan
UU. 18, 2012 about food safety and
food industries
Product Quality Standards salable SNI 01-2802-1995 Flour Product
Y
Baku Mutu Produk yang dapat Y UU No. 18 Tahun 2012 tentang
dijual keamanan makanan dan industri
makanan
SNI 01-2802-1995 Produk Tepung
Permen No. 261/PMK.03/2016, about
legislation taxation tax Y
Y Permen No. 261/PMK.03/2016 tentang
Peraturan perpajakan
pajak
PERMEN No. 77/M- DAG/10/2014
Legislation on Import Export Export Import Non Mineral Y
Y PERMEN No. 77/M- DAG/10/2014
Peraturan Ekspor Impor
tentang Ekspor Impor Non Mineral
PERMEN P.43/Menhut-II/2014 &Permen
LHK No. 68, 2016 use and control of
industrial waste
Environmental Legislation PERMEN P.43/Menhut-II/2014 &Permen Y
Y
Peraturan Lingkungan Hidup LHK No. 68, 2016 tentang
penggunaan dan pengendalian
limbah industry
4. AUDIT PERFORMANCE
KINERJA AUDIT
The practical implementation of the standard(s) was evaluated and compared with the management
system manual and supporting documents. The audit was conducted through discussions and
interviews with personnel at various locations and functions throughout the facility.
Penerapan praktis standard telah dievaluasi dan dibandingkan dengan manual dan dokumen
pendukung sistem manajemen. Audit dilakukan melalui diskusi dan wawancara dengan personil di
berbagai lokasi dan fungsi di seluruh lokasi.
The audit covered relevant processes, areas of the organization in order to obtain an overall picture of
the degree of management system implementation. Although performed to reasonable depth, not
every detail of the complete management system could be checked.
Audit mencakup proses yang bersangkutan, wilayah organisasi untuk memperoleh gambaran lengkap
atas tingkat penerapan sistem manajemen. Meskipun dilakukan hingga kedalaman yang wajar, tidak
tiap detail dari sistem manajemen yang lengkap dapat diperiksa.
5 of 23
Hasil audit sebelumnya atas sistem ini telah ditinjau, terutama untuk memastikan bahwa perbaikan
dan tindakan perbaikan yang sesuai telah diterapkan untuk menangani ketidaksesuaian yang
teridentifikasi.
No. of nonconformities from previous audit
Major Minor
0 0
Jumlah ketidaksesuaian dari audit sebelumnya Besar Kecil
No. of nonconformities closed
Major Minor
0 0
Jumlah ketidaksesuaian yang ditutup Besar Kecil
No. of nonconformities re-raised
Major Minor
0 0
Jumlah ketidaksesuaian yang diangkat kembali Besar Kecil
the management system has not adequately addressed nonconformity identified during previous
audit activities and the specific issue has been re-defined in the nonconformity section of this report.
sistem manajemen tidak cukup menangani ketidaksesuaian yang teridentifikasi selama kegiatan
audit sebelumnya, dan masalah yang bersifat khusus telah didefinisikan ulang pada bagian
ketidaksesuaian dari laporan ini.
Catatan:
Perubahan yang mempengaruhi keabsahan sertifikasi wajib diverifikasi selama audit atau, bila perlu, dalam suatu audit
perpanjangan / verifikasi tambahan. Beberapa contoh perubahan tersebut telah dijelaskan dalam rapat penutupan dan
kontrak sertifikasi.
6 of 23
7. SUMMARY AND FORMAL REVIEW THE ORGANIZATION MANAGEMENT
SYSTEM:
RINGKASAN DAN TINJAUAN FORMAL SISTEM MANAJEMEN ORGANISASI:
Effectiveness of the management system:
Efektivitas sistem manajemen:
Indicate which processes in the management system are important contributor to the organization’s system
effectiveness;
Tentukan proses mana dalam sistem manajemen yang merupakan kontributor penting terhadap efektivitas sistem
organisasi;
Internal audit
Audit internal
Corrective action including root cause identification and removal
Tindakan perbaikan termasuk identifikasi dan penyelesaian akar masalah
Preventive action
Tindakan pencegahan
Use of performance data and objectives to drive continuous improvement (such as customer report cards-
customer evaluations, on-time delivery, waste generated, raw materials/energy used, safety incidents, near
miss accidents, etc.)
Penggunaan data dan tujuan kinerja untuk menerapkan peningkatan berkelanjutan (seperti kartu laporan
pelanggan, evaluasi pelanggan, pengiriman tepat waktu, limbah yang dihasilkan, bahan baku/energi yang
digunakan, insiden keselamatan, kecelakaan yang tidak menyebabkan kerugian, dll)
Management review activity
Kegiatan peninjauan manajemen
Detailed audit findings, samples taken, audit trails followed etc. are included in the attached auditor
notes (Audit Trail)conduct and coverage of the audit is defined in the audit plan and the attendance
list.
Detail temuan audit, sampel yang diambil, jejak audit yang diikuti, dan lain-lain tertera dalam catatan
auditor (Jejak Audit) yang dilampirkan. Pelaksanaan dan cakupan audit dijelaskan dalam rencana
audit dan daftar kehadiran.
7 of 23
8. AUDIT SUMMARY (ISO 9001:2015)
RINGKASAN AUDIT (ISO 9001:2015)
The quality management system has been documented, implemented and maintained
accordance with ISO 9001:2015as well as statutory and regulatory requirements. Top
management having high commitment to meet with customer requirement in order to increase
the customer satisfaction.
Sistem manajemen mutu telah didokumentasikan, diterapkan, dan dirawat sesuai dengan ISO
9001:2015serta persyaratan hukum dan peraturan. Manajemen puncak sangat berkomitmen
untuk memenuhi persyaratan pelanggan demi meningkatkan kepuasan pelanggan.
Evidence :
Quality Manual was set : MM-YTN-01 rev 00
Bukti:
Panduan Mutu telah dipersiapkan: MM-YTN-01 rev 00
No Negative Finding
Temuan Negatif Tidak Ditemukan
8 of 23
MR Activity (Internal audit, management review, corrective and preventive action)
Kegiatan MR (Audit internal, peninjauan manajemen, tindakan perbaikan dan
pencegahan)
9 of 23
Check Internal Audit Procedure : SOP-YTN/MR-02 rev 00, Internal audit already performed as
planned on 7-9 January 2017 by internal auditors team who appointed by Top Management.
There are of audit covered all of the function and level within organizations. As the result of
internal audit already corrected properly. Corrective actions in order to prevent re-occurrence of
the problems have been determined and will be verified in the next audit.
Periksa Prosedur Audit Internal: SOP-YTN/MR-02 rev 00, Audit internal telah dilakukan sesuai
rencana pada 7-9 Januari 2017 oleh tim auditor internal yang ditunjuk oleh Manajemen Puncak.
Audit mencakup seluruh fungsi dan tingkatan dalam organisasi. Hasilnya, audit internal telah
melakukan perbaikan secara layak. Tindakan perbaikan untuk mencegah terulangnya masalah
telah ditentukan dan akan diverifikasi pada audit selanjutnya.
Evidence :
Bukti:
- Internal Audit Plan (Form-YTN/MR-02/01 rev 00)
Rencana Audit Internal (Form-YTN/MR-02/01 rev 00)
- Auditor Team (Form-YTN/MR-02/03 rev 00)
Mr. Hariyadi, Lead Auditor : Certificate of Internal Auditor Training No. 7838-
PROXIS/2/2016
Tim Auditor (Form-YTN/MR-02/03 rev 00)
Mr. Hariyadi, Pemimpin Auditor : Sertifikat Pelatihan Auditor Internal No. 7838-
PROXIS/2/2016
- Check List Audit (Form-YTN/MR-02/02 rev 00)
Daftar Pemeriksaan Audit (Form-YTN/MR-02/02 rev 00)
- Audit Result (Form-YTN/MR-02/05 rev 00), 3 minor 2 Obs, seen on the corrective action
was closed
Hasil Audit (Form-YTN/MR-02/05 rev 00), 3 kecil 2 pengamatan, terlihat bahwa tindakan
perbaikan ditutup
Check Management Review Procedure : SOP-YTN/MR-03, rev 00 Top management already
reviewed the effectiveness of its quality management system implementation on 21 January
2017 with the inputs of review included the internal/external audit results, customer feedback,
performance of projects, achievement of quality objectives, corrective and preventive action
status, and follow up action of the prior management review. The results of review already
documented as required by procedure included corrective/preventive action plan, date for
implementation, needed resources and PIC.
Periksa Prosedur Peninjauan Manajemen: SOP-YTN/MR-03, rev 00 Manajemen puncak telah
meninjau efektivitas penerapan sistem manajemen mutunya pada 21Januari 2017 dengan input
peninjauan yang mencakup hasil audit internal/eksternal, umpan balik pelanggan, kinerja proyek,
pencapaian tujuan mutu, status tindakan perbaikan dan pencegahan, dan langkah lanjutan dari
peninjauan manajemen sebelumnya. Hasil peninjauan telah didokumentasikan seperti yang
diwajibkan oleh prosedur termasuk rencana tindakan perbaikan/pencegahan, tanggal
penerapan, sumber daya yang diperlukan, dan penanggungjawab.
10 of 23
Evidence :
Bukti:
- Management Review Program (Form-YTN/MR-03/01 rev 00)
Program Peninjauan Manajemen (Form-YTN/MR-03/01 rev 00)
- MOM (Form-YTN/MR-03/03 rev 00)
Berita Acara Rapat (Form-YTN/MR-03/03 rev 00)
- List of Participant of Management Review Program (Form-YTN/MR-03/08 rev 00)
Daftar Peserta Program Peninjauan Manajemen (Form-YTN/MR-03/08 rev 00)
No finding
Tidak ada temuan
HRD & GA
Check
Periksa
1. Recruitment Procedure (SOP-YTN/HRD-01 rev 00)
Prosedur Perekrutan (SOP-YTN/HRD-01 rev 00)
2. Training Procedure (SOP-YTN/HRD-02 rev 00)
Prosedur Pelatihan (SOP-YTN/HRD-02 rev 00)
3. Job Disc and Evaluation Personnel
Deskripsi Pekerjaan dan Personil Evaluasi
The job activities cover recruitments, staffing (job placement), regular training, on-the-job-
training, etc. The regular report prepared is to monitor personnel activities (i.e. attendance
record, performance achieved). The staff appraisal is conducted by annual basis. This is also
responsible for the up-grading competencies of internal staff, while the end-result (promotion,
demotion, and training) is subject to be decided by Manager. This unit is also responsible the
maintenance of working environment, such as computer, building renovation, security, Etc.
Kegiatan kerja mencakup perekrutan, penerimaan staf (penempatan kerja), pelatihan berkala,
pelatihan sambil bekerja, dll. Laporan berkala yang dipersiapkan bertujuan memantau kegiatan
(yaitu catatan kehadiran, kinerja yang diraih). Penilaian staf dilakukan secara tahunan. HRD/GA
juga bertanggungjawab meningkatkan kompetensi staf internal, sedangkan hasil akhir (promosi,
demosi, dan pelatihan) diputuskan oleh Manajer. Unit ini juga bertanggungjawab atas perawatan
lingkungan pekerjaan seperti komputer, renovasi gedung, keamanan, dll.
11 of 23
Evidence :
Bukti:
- Roles of company (DOK-YTN/ITR-3015)
Peranan perusahaan (DOK-YTN/ITR-3015)
- Employee Evaluation (Form -YTN/HRD-01/03 rev 00)
Evaluasi Karyawan (Form -YTN/HRD-01/03 rev 00)
- Training Program and Realization (SOP-YTN/HRD-01/03 rev 00), 100% implemented
Program Pelatihan dan Realisasi (SOP-YTN/HRD-01/03 rev 00), 100% diterapkan
No finding
Tidak ada temuan
12 of 23
Evidence :
Bukti:
- SPK No 022-6738/PT. Anugrah Abadi /2015
SPK No 022-6738/PT. Anugrah Abadi /2015
- Evaluation of Customer Satisfaction (SOP-YTN/MKT-03/3 rev 00), No Complaint
Evaluasi Kepuasan Pelanggan (SOP-YTN/MKT-03/3 rev 00), Tidak Ada Keluhan
No finding
Tidak ada temuan
Production/Project
Produksi/Proyek
The production is responsible for the overall performance and control of product realization
according to customer requirements/specification (such as project quality Plan and compliance to
contract agreement). There are several stages that shall be completed by Manager prior to
execute of construction project, such as reviewing and studying carefully all customer
requirements/specifications as stipulated within document contract, preparing the availability of
materials, equipment, vehicles and human resources, all necessary legal/license documents
relating to product requirements, etc.
Produksi bertanggungjawab atas keseluruhan pelaksanaan dan pengendalian realisasi produk
berdasarkan persyaratan/spesifikasi pelanggan (seperti Rencana mutu proyek dan kepatuhan
terhadap perjanjian kontrak). Terdapat beberapa tahap yang harus diselesaikan oleh Manajer
sebelum melaksanakan proyek konstruksi, seperti meninjau dan mempelajari dengan saksama
seluruh persyaratan/spesifikasi pelanggan seperti yang tercantum dalam dokumen kontrak,
mempersiapkan ketersediaan bahan, perlengkapan, kendaraan dan sumber daya manusia,
seluruh dokumen lisensi/hukum yang diperlukan terkait persyaratan produk, dll.
No finding
Tidak ada temuan
Purchasing
Pembelian
The production is responsible for the overall performance and control of Purchasing realization
according to Plan & Department/Unit requirements/specification (such as Production/project
quality Plan and compliance to contract agreement). There are several stages that shall be
completed by Manager prior to execute of production process and activities support, such as
purchase order form, specification of goods, supplier, approval by finance manager or director,
reviewing and studying carefully all customer requirements/specifications as stipulated within
document contract, preparing the availability of materials, equipment, vehicles and human
resources, all necessary legal/license documents relating to product requirements, etc.
13 of 23
Produksi bertanggungjawab atas keseluruhan pelaksanaan dan pengendalian realisasi
Pembelian berdasarkan persyaratan/spesifikasi Rencana & Departemen/Unit (seperti Rencana
mutu proyek/Produksi dan kepatuhan terhadap perjanjian kontrak). Terdapat beberapa tahap
yang harus diselesaikan oleh Manajer sebelum melaksanakan proses produksi dan kegiatan
pendukung, seperti formulir pesanan pembelian, spesifikasi barang, penyuplai, persetujuan dari
manajer keuangan atau direktur, meninjau dan mempelajari dengan saksama seluruh
persyaratan/spesifikasi pelanggan seperti yang tercantum dalam dokumen kontrak,
mempersiapkan ketersediaan bahan, perlengkapan, kendaraan dan sumber daya manusia,
seluruh dokumen lisensi/hukum yang diperlukan terkait persyaratan produk, dll.
No finding
Tidak ada temuan
Maintenance
Perawatan
In general maintenance program implementation goes well, in accordance with planning in
charge of management, Risk Register has been set and in the value of the degree of risk, as well
as the visible implementation of risk reduction action is determined.
Visible part measurement quality objectives have been set and looks evaluations over the past
three months priceless nice
The main engine maintenance, support and calibrated machine that has been done properly in
accordance with a program that is in charge
14 of 23
Secara umum, penerapan program perawatan berjalan dengan lancar sesuai dengan
perencanaan manajemen. Daftar Risiko telah diatur dan berada dalam nilai tingkat risiko. Selain
itu, penerapan nyata tindakan pengurangan risiko telah ditentukan.
Sasaran mutu pengukuran bagian yang terlihat telah diatur dan mengacu pada evaluasi tiga
bulan sebelumnya yang dinilai sangat bagus
Perawatan mesin utama, dukungan, dan mesin yang dikalibrasi telah dilakukan dengan layak
sesuai dengan program utama
No finding
No finding
Tidak ada temuan
15 of 23
Audit Summary Matrix (QMS ISO 9001:2015)
Matriks Ringkasan Audit (QMS ISO 9001:2015)
QC/QA
PerawatanMaintenance
PembelianPurchasing
Kegiatan Manajemen Top Mgt & MR
Produksi Production
Dept. SDMHRD
Activities
Total Total
Baku Mutu/Jaminan
ISO 9001:2015 Requirement
Persyaratan ISO 9001:2015
Mutu
Puncak & MR
Auditor:
Auditor:
Context of organization
Understanding the organization and its
4
context
4.1
Konteks organisasi
Memahami organisasi dan konteksnya
Customer Focus
5.1.2
Fokus Pelanggan
Policy
5.2 Developing the quality policy
5.2.1 Kebijakan
Mengembangkan kebijakan mutu
Communicating the quality policy
5.2.2
Mengomunikasikan kebijakan mutu
Planning
6 Actions to addressed risks and opportunities
6.1 Merencanakan tindakan untuk menangani
risiko dan peluang
Quality objectives and planning to achieve
6.2 them
Sasaran mutu dan rencana pencapaian
Planning of changes
6.3
Perencanaan perubahan
16 of 23
Support
Resources
7
General
7.1
Dukungan
7.1.1
Sumber Daya
Umum
People
7.1.2
Orang
Infrastructure
7.1.3
Infrastruktur
Organizational knowledge
7.1.6
Pengetahuan organisasi
Competence
7.2
Kompetensi
Awareness
7.3
Kesadaran
Communication
7.4
Komunikasi
Documented information
7.5 General
7.5.1 Informasi yang didokumentasikan
Umum
17 of 23
Design and development of products and
services
8.3 General
8.3.1 Rancangan dan pengembangan produk
dan layanan
Umum
Design and development planning
8.3.2 Rancangan dan pengembangan
perencanaan
Design and development inputs
8.3.3
Rancangan dan pengembangan input
Preservation
8.5.4
Perawatan
Post-delivery activities
8.5.5
Kegiatan pasca-pengiriman
Control of changes
8.5.6
Pengendalian perubahan
18 of 23
Performance evaluation
Monitoring, measurement, analysis and
evaluation
9
General
9.1
Evaluasi kinerja
9.1.1
Pemantauan, pengukuran, analisis dan
evaluasi
Umum
Customer satisfaction
9.1.2
Kepuasan pelanggan
Internal audit
9.2
Audit internal
Management review
9.3 General
9.3.1 Peninjauan manajemen
Umum
Improvement
10 General
10.1 Peningkatan
Umum
Continual improvement
10.3
Peningkatan berkelanjutan
ELEMENT ADDRESSED, NO CORRECTIVE ACTION
RAISED
Major Minor Observation
ELEMEN YANG DITANGANI, TIDAK ADA TINDAKAN Besar Kecil Pengamatan
PERBAIKAN YANG DIUSULKAN
0 0 2
ELEMENT ADDRESSED, NUMBER OF
NUMBER CORRECTIVE ACTIONS RAISED
JUMLAH ELEMEN YANG DITANGANI, JUMLAH TINDAKAN
PERBAIKAN YANG DIUSULKAN
19 of 23
9.AUDIT OUTCOME
HASIL AUDIT
The significant audit results are grouped in two (2) categories:
Hasil audit yang signifikan dikelompokkan dalam dua (2) kategori:
Non-conformity (NC), mandatory to be verified before issue or continuance of certification can be
recommended;
Ketidaksesuaian (NC), wajib diverifikasi sebelum penerbitan atau kelanjutan sertifikasi dapat
direkomendasikan;
Major Nonconformity: The absence or total breakdown of a system to meet a requirement. (e.g. a
failure to achieve legal or statutory requirements, etc.). Solution: Corrective actions have to be done
within 90 days and re- audit (on-site or off-site).
Ketidaksesuaian Besar: Ketiadaan atau kegagalan total suatu sistem untuk memenuhi persyaratan
(misalnya, gagal memenuhi persyaratan hukum atau peraturan, dll). Solusi: Tindakan perbaikan telah
dilakukan dalam 90 hari dan diadakan audit ulang (di lokasi maupun luar lokasi).
Minor Nonconformity: Any failure of the audited system to satisfy a written requirement that is not
considered to be a major nonconformity.
Solution: root cause analysis and definition of corrective actions within 90 days and verification of
documents (off-site).
Ketidaksesuaian Kecil: Kegagalan apapun dari sistem yang diaudit untuk memenuhi suatu persyaratan
tertulis yang tidak dianggap sebagai suatu ketidaksesuaian besar.
Solusi: analisis akar masalah dan definisi tindakan perbaikan dalam 90 hari serta verifikasi dokumen (luar
lokasi).
Observation : Any potential condition that may become NC on next audit and the auditor wants to verify
it in the next audit and does not require immediate action (one work instruction not updated, qualification
matrix incomplete, etc.). Solution: Auditor has to get the acceptance signature from the customer and
verify in the next audit.
Pengamatan: Kondisi potensial apapun yang dapat menjadi NC pada audit berikutnya dan auditor ingin
memverifikasinya pada audit berikutnya serta tidak membutuhkan tindakan segera (satu instruksi kerja
tidak diperbarui, matriks kualifikasi tidak lengkap, dll). Solusi: Auditor harus menerima tanda tangan
penerimaan dari pelanggan dan memverifikasinya pada audit berikutnya.
AUDIT FINDING
TEMUAN AUDIT
NO OBSERVATION AREAS
NO AREA PENGAMATAN
01 Opportunities for improvement opportunities to add captions competency training as a complement to
the annual training plan
Peluang peningkatan menjadi tambahan catatan pelatihan kompetensi sebagai pelengkap rencana
20 of 23
pelatihan tahunan
Opportunities for improvement opportunities to make a planning documentation and the
achievement of sales to the local market (East Java) focus on PLN (JAWA-BALI)
02
Peluang peningkatan untuk melakukan dokumentasi perencanaan dan pencapaian penjualan ke
pasar lokal (Jawa Timur), fokus pada PLN (JAWA-BALI)
NON-CONFORMITY SITUATION
SITUASI KETIDAKSESUAIAN
MAJOR/
NC NO. CLAUSE STD/SCHEME DESCRIPTION MİNOR
NO. NC PASAL STD/SKEMA DESKRIPSI BESAR/
KECIL
None
Tidak
ada
21 of 23