Maj<simum panjar›g ' rner ›oapai:.@U m mamamsnienoaoarPom


fabi4 kasi
r%kanperna%ahe ačao
’’”” ’’’’ k’an kat’d ” ’”
c›erat wa
HuDč›ngan"der›gan struiktuir Mudah, karer›a har›ya rnernotc›r›g k4emer\ukan v•aktu lebiln larna
bet6n d ermag a pipa cie an alat potong” las, č›’mČk mer›ghar curkan Deton aan
serta pe elasan dgn besietn mernotor›g Desi Deton
untuk
$itr¢Jktur
K ap asitas Daya Dukur›g Tetaas
Tiar+g oapatoipawangdanbatasdava
d ukur›g kiir+gs a rnelebi lvi batas
d aya dukur›g rer›cana
xeananan€aem Terbatas
Dapat rnenahan gaya igritspntal
Keahaoan erhaoapkam Tid ak pe u
žena
(Dycatho<di c brat iann smem)
Mahal
ZLJkup

Per\u waklui letiii larr›a

ii ayzz Ko mslruiksi
Piling Barge Biasa

a.tanpa sambungan 6 - 8 fang per han 2 - 3 tiang per hari


b. dengan sambungan £ - 3 fang per fufi 1 -2 tiang per hari

Due to our Piling Barge KffY was designed different with ordinary piling
barge, the system is Self Elevating Piling Rig (SEPR) all operated by
hydraulic system and the positioning by using DGPS (Digital Global
Positioring System), operation of driving work will faster then ordinary
pilirg barge.
Besides, if the joint of pile can rot avoidable, we can do easily, joint of
pile will be carried out on the boom (rig) in horizontal position before
driving work.
Pease refer to the attached "SPECIFCATE›N OF PLING BARGE KfTY-If'

Sehubungan dengan penggunaan Piling Barge KITY II yang mempunyai desain yang berbeda
dari pada alat pancang diatas barge biasa, Kitty II mempunyai sistem pengoperasian yang
disebut dengan SeI1 Elevating Piling Rig (SEPR) yang mana seluruh pengoperasian
menggunakan sistem hidrolik dengan perletakan/penewuan titik pancang dengan
menggunakan DGPS (Digital Global Positioning System), sehingga proses pemancangan akan
lebih cepat daripada penggunaan alat pancang biasa.
Disamping itu penyambungan tiang dapat dilakukan dengan mudah diatas alat pancang.
PILING BARGE PILING BARGE
DESKRIPSI KITTY II BIASA

a. tanpa sambungan 6 - 8 tiang /hari 2 - 3 tiang/hari


b. dengan sa bunga 3 - 4 tiang/hari 1 - 2 tiang/hari

Sistem Pengoperasian Piling Barge Kitty II Self Elevating


Piling Rig)
- Sistem Hidrolik
- Penet an Titik Pancang dengan menggunakan DGPS
The Piling Barge KITTY II was designed different with the ordinary piling barge, the
system operated is by SEPR (Self Elevating Piling Rig), with ally operated by
hydraulic system and the positioning system by using DGPS (Digital Global
Positioning system) that operation of driving work will faster than the ordinary piling
bar e (only <30 minutes for setting position) and driving pile could be
executed or›
day

Descnption Piling Barge Kitty II Ordinary Piling Barge


Maximum Length o1 Pipe a5.00 m + water depth 20.00 m + water depth

Maximum Diameter o1 Pipe 1.20 m < 1.00 m


Angle o1Leader Boom 20° up to a0° Longitudinal a
Only Longitudinal direclion
(Piling Rig position 1or FId
raked pile) 20° Transversal direction
Capacity o1 pile driving L-a5 m a 5 piles/day without joint 1 2 piles/day with joint

Length pipe > 24 Lm No need joint Need joint

Loading capacity 40.00 ton exclude hammer < 40.00 exclude hammer
SEPR (Self Elevating Piling Rig), all
Operation System operated ay hydraulic system
NA
DGPS (Digital Global Positioning
Positioning System System)
NA

Piling deviation tolerance With DGPS maximum 10 mm Without DGPS 50 mm


Water depth minimum 5.00 m > 5.00 mm
Maneuver of Pile Leader Angle to Longitudinal Direction

40 °

SIDE VIEW
3.0
Maneuver of Pile Leader Angle to Transversal Direction

FRONT VIEW
Pengiriman tiang dgn diapungkan dan ii tiang ke ladder alat pancang
dibar

Proses Kalendering Proses Cutting OF


Tiang
SEQUENCING PEMANCANGAN
Proses Pernancangan
1.Pasang Bracket penyangga bekisting
2. P asang Bekist‹np f alas beton (H- dan M
s .I
beam,
Pasan bekist‹ng — pembesian dan itu pike
ca!
4. Setting pre-cast concrete kepala tiar
5. Sett‹np pre-cast balok bentuk U di
6. Sett‹ng pre-cast slab t=12 cm ee
7. Pem esian slab beton dan
»e•
P\Ir il taü any*di\Iun kan
Wa u Pe ele ía = 4 bula

Pile head Reinforce bar


Pre cast concrete Pile head
Pen ecoran Pile head
Plate Formwork

Bracket

Pi a Pancang
jangka an 30 m
e. Trailer pegangkut pre-
cast c

reklamas unakan
Peralatan yang digunakan
a. trawler Crane 80 ton
Wal‹tu Penyelesaian = z 3 bulan b. W elder Engine
c. Truk trailer penga gkut pre-cast slab
d. Concrete Pump deg an jangkauan 30 m
e. Pre-cast slab ditabrikasi di Pabrik

a re
k
PENGECORAN SLAB TAHAP II

DEREK PETI KEMAS, DLL)


CONCRETE IN SITU (B EAM)

PR ECAST BEAM (AS F OR M)

GONGPETE IN-SITU OF SLAB

PPECAST SLAE

DETAIL 24
PELINDUNG TIANG PANCANG
Tiang pancang yang terletak diantara struI‹tur beton dermaga dengan permukaan
Untuk hal tersebut bagian tiang
CONCRETE CAPPING

Ada 3 (tiga) metode untuk


pelindung pipa tiang pancang, yaitu

a. Pelindun mortar bet

Sketsa "SPLASH PRO"