1 STRUKTUR ORGANISASI PROJECT ADHESIVE

2 JOB DESCRIPTION PROJECT ADHESIVE

3 DESAIN TEMPAT DAN ALUR PROSES

4 DESAIN PLANT

5 TIME LINE

6 PART LIST EQUIPMENT DAN BUDGETING


MANUFACTURE ASSEMBLY MARKETING PRO
MARSHANDI PURCHASING PROJECT
SONY RAHMAT
HENDRA
MAULIDIA (ADM

TEKNIK 1
M. YUNUS
- DWI PRAST
- BAGOES
- DIAN
- AGUS
- YUSROL

TEKNIK 2
ROBI
- TATOK
- RIFAI
- YUDI
- KARIM
- M ZACKY
STRUKTUR ORGANISASI ADHESIVE PROJECT

PT TOYA INDO MANUNGGAL

KOORDINATOR PROJECT
HERI

WAKIL KOORDINATOR PROJECT


FIKRI

MARKETING PROJECT LABORATORY DAN QC GA PROJECT


RAHMAT DANUAR MUHAIMIN
HENDRA ISMAIL
MAULIDIA (ADMIN) - DESTIA (ADMIN)
- USTMAN (OPERATOR)
- YAZID (OPERATOR)
OR PROJECT

GA PROJECT ACCOUNTING AND FINANCE


MUHAIMIN GUDANG DONY
ZAINURI
NG AND FINANCE
DONY
JOB DESCRIPTION PROJECT ADHESIVE

No DIVISION JOB DESCRIPTION


MANUFACTURE - Monitoring dan Controlling Manufacture Assemblly All Proses dan
ASSEMBLY Support
MARSHANDI

TEKNIK 1 - Modifikasi Reaktor, Modifikasi Buffer Storage, Reaktor Equipment dan


M. YUNUS Pipa, Electrical Proses dan FIlling
- DWI PRAST
- BAGOES
- DIAN
- AGUS
- YUSROL
1

TEKNIK 2 - Mezanine, Penutup Dinding Gudang, Office, Electrical Support dan Lampu
ROBI
- TATOK
- RIFAI
- YUDI
- KARIM
- M ZACKY

PURCHASING - Bertanggung Jawab terhadap pengadaan Barang untuk project dan


PROJECT supporting material.
SONY - Bertanggung Jawab terhadap pengadaan Raw Material dan Komponen
MR. 1 (ADMIN) packaging untuk trial. -
Menyeleksi suplier yang akan berhubungan perusahaan dan berkomunikasi
resmi dengan suplier tersebut. - Mengurus
2 penganggaran, penetapan biaya, dan penghematan biaya setelah dilakukan
review. - Mengelola
service level agreement antara suplier dan perusahaan

MARKETING PROJECT - Perencanaan Produk yang mencakup, Mengenal produk yang akan di
RAHMAT pasarkan, Mengamati keadaan pasar (minat konsumen), Menetapkan
HENDRA harga yang di sesuaikan dengan lokasi (kisaran harga). - Perencanaan
MR. 2 (ADMIN) Promosi yang mencakup, mengenalkan produk (promosi dengan media
tertentu). - Perencanaan
pemberian bonus/diskon (dibatasi Waktu) - Perencanaan
proses distribusi mencakup, Sarana yang digunakan (kendaraan dll),
3 Waktu/Timing proses distribusi, Perhitungan cost Produksi, Kemasan yang
di butuhkan konsumen. - Pelayanan konsumen
mencakup merencanakan proses edukasi, Menampung keluhan pelanggan.
LABORATORY DAN - Memastikan RM sesuai standart (standart sudah ready), Untuk prepare
QC saat trial -
DANUAR Memastikan komponen sesuai dengan standart konsumen. -
ISMAIL Membuat dan memastikan langkah-langkah trial proses agar sesuai dengan
- DESTIA (ADMIN) standart dari produk dengan kualitas bagus. -
- USTMAN Memastikan penyimpanan RM dan komponen sesuai dengan standart dan
(OPERATOR) aman. -
- YAZID (OPERATOR) Membuat dan memastikan langkah-langkah trial filling dan distribusi agar
sesuai dengan standart dan aman terhadap produk. - Merencanakan
tempat penyimpanan produk yang sesuai saat trial

GA PROJECT - Mengelola pengadaan barang dan jasa selama project, trial dan running
MUHAIMIN well. -
Mengelola sarana dan prasarana selama project, trial dan running well.
-
Membuat prioritas anggaran yang berhubungan dengan fasilitas karyawan.
-
Membuat dan merencanakan semua administrasi yang berhubungan
dengan karyawan. - Koordinasi
dengan pihak di luar perusahaan yang berhubungan dengan Dinas
ketenagakerjaan. - Menjaga
kualitas SDM (sisi kesehatan, jam kerja dan beban kerja)

GUDANG - Menyiapkan material, equipment, tool selama project dan trial. -


ZAINURI Menjaga, Mendata dan merencanakan penyimpanan Raw Material untuk
MR. 1 (ADMIN) persiapan trial. -
Menjaga, Mendata dan merencanakan penyimpanan komponen packaging
untuk persiapan trial.
IVE

KETERANGAN

- Sampling untuk mengenalkan produk,


koordinasi dengan pihak QC -
Kenderaan Operasional dan kelengkapan
identitas perusahaan.
FINISHED GOOD DAN KOMPONEN
BUFFER

4X6
T.3

REAKTOR

TIMBANGAN

TEMPAT RAW MATERIAL


ED GOOD DAN KOMPONEN OFFICE DAN LAB

6x3
SOLVENT IN
PHE power agitator
VAPOUR OUT dan inverter
PANEL
RAW MATERIAL VENTING
SOLID

MODIFIKASI
BLADE
2" SS 304 BUFFER
SCH 10 REAKTOR 5 m3
3 m3

SOLVENT
MEMBRAN PANEL
2" SS 304 FILLING
TIMBANGAN POMPA
TRANSFER SCH 10 POMPA
FILLING
TI

NOVEMBER
No KETERANGAN
11 12 13 14 15 16 17 18 19 20 21 22 23
1 Man Power Clear GA
2 Sarana dan Prasarana Project GA
3 Equipment dan Material Project PUR/GUD
4 Administratif Prosedure All GA DAN TEAM GA DAN TEAM
5 Modifikasi Reaktor TEKNIK 1
6 Modifikasi Buffer Storage TEKNIK 1
7 Equipment dan Pipa Reaktor
8 Mezanine Proses dan Dinding
9 Office dan Lab TEKNIK 2
10 Electrical Proses
11 Electrical Office dan Lampu
12 Equipment Laboratory
13 ATK dan Equipment Administrasi PURCHASING
14 RAW Material Untuk Trial
Persiapan Laboratory Proses Prosedure dan
15 Formula Lem untuk Trial LAB

Laboratory and QC Trained, Proses Support


16
Marketting
17 RAW Material Trial Test
18 Packaging Untuk Trial
19 Packaging Prepare dan Test
Prepare alokasi Tempat Penyimpanan Raw
20 GUDANG
Material

21 Prepare alokasi Tempat Penyimpanan


Packaging Komponen
22 All Prosedure Gudang RM dan FG

23 Market Survey Final dan Packaging need MARKETTING

24 Market Survey Final dan Distributor MARKETTING


Accounting, Finance Administration and ACCOUNTING AND
25
System Report FINANCE
26 Final Komitment Konsumen
27 Final Komitment Supplier
Final Persiapan TRIAL (All Equipment
28 Comissioning Test)
TIME LINE ADHESIVE PROJECT

MBER DESEMBER
24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

GA DAN TEAM GA DAN TEAM GA DAN TEAM GA DAN TEAM


TEKNIK 1
TEKNIK 1
TEKNIK 1 TEKNIK 1
TEKNIK 2 TEKNIK 2
TEKNIK 2
TEKNIK 1
TEKNIK 2 TEKNIK 2
PURCHASING PURCHASING
PURCHASING
PURCHASING PURCHASING

LAB LAB LAB

LAB
PURCHASING PURCHASING
LAB
GUDANG

GUDANG GUDANG

GUDANG & TEAM


MARKETTING MARKETTING

MARKETTING MARKETTING MARKETTING


ACCOUNTING AND ACCOUNTING AND ACCOUNTING AND ACCOUNTING AND
FINANCE FINANCE FINANCE FINANCE
MARKETTING
PURCHASING
DESEMBER
18 19 20 21 22 23 24 25 26 27 28 29 30 31

GA DAN TEAM GA DAN TEAM

TEKNIK 1 TEKNIK 1

LAB LAB
PURCHASING
LAB LAB

GUDANG & TEAM GUDANG & TEAM

ACCOUNTING AND ACCOUNTING AND


FINANCE FINANCE
MARKETTING MARKETTING
PURCHASING PURCHASING

ALL Division
EQUIPMENT DAN LIST PROJECT ADHESIVE

NO PART LIST JUMLAH SATUAN KETERANGAN


I MODIFIKASI REAKTOR
1 Potong Pipa Steam 1 Set
2 Modifikasi Baling-baling 2 Set
Buat Nozle untuk Solvent inlet 2" SS 304
3 1 Set
end Flange 10K
Buat Nozle untuk PHE Outlet 2" SS 304
4 1 Set
end Flange 10K
Buat Nozle untuk Venting 2" SS 304 end
5 1 Set
Flange 10K
6 Lamp Nozle 4" SS 304 1 Set
7 Polishing dan Finishing 1 Lot
II MODIFIKASI BUFFER STORAGE
1 Ganti tutup tanki dan Manhole 1 Lot
Buat Nozle untuk Produk inlet 2" SS 304
2 1 Set
end Flange 10K
Buat Nozle untuk PHE Outlet 2" SS 304
3 end Flange 10K 1 Set

Buat Nozle untuk Venting 2" SS 304 end


4 1 Set
Flange 10K
5 Polishing dan Finishing 1 Lot
III REAKTOR EQUIPMENT DAN PIPA
1 Pompa Membran untuk Solvent 1 Unit Ready
Pompa Transfer Gear Type, 5KW,
2 1 Unit
5m3/Hour Exproof Type
3 Air Drum Pump 1 Unit

4 Inverter 5.5KW untuk Motor Agitator 1 Unit

5 PHE untuk Vapour Solvent 1 Unit Second


6 AC PHE untuk PHE Cooling 2PK 1 Unit
7 Pipa 2" CS SCH 40 5 Btg Solvent dan Product
8 Selang Chemical 2" 1 m
9 Fitting Container/IBC (Custom) 1 Set
10 Ball Valve 2" Screw Type 10K 2 Pc In/Out Membran Pump
11 Ball Valve 2" Screw Type 10K 2 Pc In/Out Drum Pump
12 Ball Valve 2" Flange Type 10K CS 2 Pc In/Out Transfer Pump
13 Ball Valve 1" Flange Type 10K CS 3 Pc Venting, PHE Vapour

14 Check Valve Swing Type 1" CS Screw 2 Pc Venting, PHE Vapour

15 Y Strainer CS 4" 10K 1 Pc Outlet Reaktor

16 Ball Valve 1 1/2" Flange Type 10K CS 1 Pc Sample

17 Check Valve Swing Type 2" CS Screw 2 Pc Solvent dan Produk

18 Flexible Joint 2" 30cm 2 Pc In/Out Pompa Produk


19 Pressure Gauge 0-10Bar 4" Bottom Type 2 Pc Solvent dan Produk

20 Ball Valve 1/2" Screw Type CS 2 Pc Pressure Gauge


21 Pipa 1" Galvaniz Med A 1 Lot Kompressor
22 Timbangan 2 Ton Avery 1 Unit
23 Hand Pallet 3 Ton 3 Unit
24 N2 PGS For Blanketing 1 Lot
IV BUFFER STORAGE EQUIPMENT DAN PIPA
Pompa Filling Gear Type 3KW,
1 1 Unit Filling Produk
1m3/Hour Exproof Type
2 Ball Valve 2" Flange Type 10K CS 1 Pc Outlet Buffer Storage
3 3 Way Valve 1" Model L 1 Pc Filling Produk
V ELECTRIKAL PART LIST
1 Main Panel (80cm x 25cm x 100cm) 1 Pc
2 MCB 125A 3Phase 1 Pc
3 MCB 20A 3Phase 2 Pc
4 MCB 16A 3Phase 5 Pc
5 MCB 20A 1Phase 3 Pc
6 MCB 10A 1Phase 5 Pc
7 MCB 2A 1Phase 1 Pc
8 Emergency Stop Ex 2 Pc
9 Kontaktor Motor Transfer 5KW 1 Pc
10 Thermis Motor Agitator 1 Pc
11 Thermis Motor Transfer 1 Pc
12 Thermis Motor Filling 1 Pc

13 Box Panel Filling (25cm x 25cm x 50cm) 1 Pc

14 Timer Analog 1 Pc
15 Timer Digital 1 Pc
16 Switch Manual 1 Pc
17 Lampu Indikator 2 Pc
18 Selenoid Valve 220Volt 1 Pc
19 Relay MY2N 220Volt 1 Pc
20 Kabel NYY 5x4mm2 1 Lot
21 Kabel NYY 5x2.5mm2 1 Lot
22 Pipa Konduit dan Flexible 1 Lot

23 Lampu Penerangan IP 65 dan Exproof 1 Lot

24 Arrester System 1 Lot


VI MEZANINE DAN TANGGA DAN OFFICE
1 H Beam 150mm 6 Btg
2 UNO 100mm 4 Btg
3 Siku 5cm 7 Btg
4 Plat Bordes 3mm 7 Lbr
5 Pipa 1 1/2" Galvaniz reling Med A 4 Btg
6 Pipa 1" Galvaniz reling Med A 2 Btg
7 Office Ukuran 3x6 + AC 2 Unit 1 Lot
VI LABORATORY
1 Viscometer 1 Lot
2 Thermometer 1 Lot
3 Ball and Ring 1 Lot
4 PH Meter 1 Lot
5 TDS Meter 1 Lot
6 Stirer 1 Lot
7 Timbangan Analytic 1 Lot
8 Lemari Pendingin 1 Lot
9 Oven 1 Lot
10 Alat Test Aplikasi 1 Lot
VII ATK
1 Komputer PC, Laptop dan Printer 4 Unit
2 Meja dan Kursi 1 Lot
3 Safety dan Seragam 1 Lot
4 Lemari Tool 1 Unit
3 Lemari Lab 1 Lot
4 Administrasi Tool 1 Lot
VIII OPERASIONAL 2 MONTH PROJECT
1 Labour Dan Manajerial Project 25 People Rp. 239.000.000,00/Month
2 Akomodasi (Makan dan kendaraan) 1 Lot Rp.55.000.000,00/Month

TOTAL
E

HARGA

Rp75,000,000.00

Rp55,000,000.00

Ready

Rp75,000,000.00

Rp50,000,000.00

Rp10,000,000.00

Rp30,000,000.00
Rp7,500,000.00

Rp85,000,000.00
Rp30,000,000.00
Rp12,000,000.00
Rp15,000,000.00

Rp50,000,000.00

Sudah Include Reaktor

Rp75,000,000.00

Rp25,000,000.00

Rp15,000,000.00

Rp200,000,000.00
Rp125,000,000.00

Rp85,000,000.00

Rp478,000,000.00
Rp110,000,000.00

Rp1,607,500,000.00