Anda di halaman 1dari 88

[J KEMENTERIAN PEKERJAAN UMUM DAN PERUMAKAN RAt<YAT

DIREKTORAT JENDERA L CIPTA KARYA


8ALAI PRASARANA PERMUKIMANWILAYAH JAWA 8ARAT

LAPORAN NOTA DESAIN


STRUKTUR BANGUNAN
TPST CICUKANG- KABUPATEN BANDUNG

Bandung, Agustus 2021


DAFTAR ISI
Hal
1. GENERAL l
1.L Scope of Work l
1.2. Work of Location l
1.3. Code & Standards l
1.4. Major Materials 2
1.5. Basic Design 2
1.6. Parameter Check 2
1.7. Load Type 3
1. Primary load 3
2. Unfactored load Combination 4
3. Factored load Combination 5

2. STRUCTURE LAYOUT 6
3. MOOEUNG OF STRUCTURES 7
4. LOADING 9
4.1 Dead load (0) 9
4 .1.1 Se�weight 9
4.1.2 Dead load from Roof 9
4.1.3 Dead load from Siding in Z·Dir (long direction) 10
4.1.4 Dead load from Siding in X·Dir (Short direction) u
4.2 Live load (l) 12
4.2.1 Roof Live load 12
4.3 Wind Load (Wx and Wz) 13
4.3 Seismic Load (Ex and Ez) 17
5. INPUT STRUCTUR ANALYS 22
6. OUTPUT STRUCTUR ANALYS 24
7. CHECKING PARAMETER 26
7.1. STEa RATIO 26
7.2. DISP1.ACEMEITT STEa COI.UMN 27
7.3. DEFLECTlON STEa BEAM 28
8. CONNECTING DESIGN 29
8.1. BASE PLATE 29
8.2. RAFTER 33
8.2.1. Hounch Rafter-Column 33
8.2.2. Hounch Rafter-Rafter 36
9. PEDESTAL COLUMN DESIGN 39
10. FONOATION DESIGN 46
10.1. LONGITUDINAL DIRECTION FONOATION 46
10.2. TRANVERSAl DIRECTION FONOATION 55
11. PURUN BEAM DESIGN 64

LAMP IRAN

ND Analisa Struktur WH-TPST CICUKANG O�


!.GENERAL
1.1. Scope of Work

Provek ini ber1okasi dl Kawasan Oxbow Sung.ai OaJkang Kabupaten Bandung, Jawa Barat
dengan luas lahan berkisar ±t,JO Ha, dimana pada lokasi ini direncanakan akan dibangun
Tempat Pengolahan Sampah Terpadu (TPST). Konsep utama dali TPST lni adalah sebuah
bangunan gudang dengan luas 1860.00 m2 (24x65 m+ 12x25 m).

1.2. Work or Location

1.3. Code & Standards


SNI 1726-2019, Tata cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan
Gedung dan Non Gedung
SNI 1727-2013, Beban Minimum Untuk Peranca.ngan Ba.ngunan Gedung dan Struktur
Lain
SN! 1729:2015, Spesifikasi untuk Bangunan Gedung Baja Struktural
SN! 7860:2015, Ketentuan Seismik untuk Struktur Bangunan Gedung Baja
SN! 7972:2013, Sambungan Terprakualifikasi untuk Rangka Momen Khusus dan
Menengah Baja pada Ap(ikasi Seismik.
SN! 2847:2013, Persyaratan Seton Slruktural untuk Bangunan Gedung
SNr 8640-2017 Persyaratan Perancangan Geoteknik
ASCI: 7· 16 (American Society d CivR Engineers), Minimum Design Loads and
Associated Criteria for Buildings and Other Structures
HB 212·2002 (Standards Australia), Design Wind Speeds tor the Asia-Pacific Region

NO Analisa Struktur WH-TPST CICUKANG 08-ok Pagel


1.4. Major Materials
1. Concrete
Concrete Grade for Structure, fc' 300 kg/cm2
Concrete grade for lean Concrete, fC 125 kg/cm2
Unit weight of concrete (gconc.) 2400 kg/m3

2. Reinforcing Steel Bar :


Yield strength of Deformed bar, ASTM A615 Gr.60, fy �kg/cm2
Yield strength of Plain bar BJTD40, A5TM A615 Gr.40, fy kg/cm2

3. Steel Structure
ASTM A· 36 Yield strength, fy �kg/cm2
Unit weight of steel (gs) kg/m3

4. Soff &Sand
Unit Weight or Compacted Soil (gs) �kg/m3
Unit Weight of Sand (g sand) kg/m3

5. Anchor Bolt and Nuts


Bolt ASTM A36 or Equivalent

1.5. Basic Design


In designing a structure, the folk>wing items shall be considered:
J. Cofumn support is considered as pinned connection ak>ng transverse direction and
pinned connectioo along the k>ngitudinal direction
2. For the design of steel load shall be used In checking member deflection and strength
of material.

1.6. Parameter Check


1. Steel Ratio Check from STAAD Pro < 1
2. Denections Oleck
- OiscpCacement Steel Column : HJ 200
• Deflection Steel Beam : l/ 360

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page2


1.7. load Type
Beban-beban yang diaplikasikan kepada struktur dikombinasikan untuk me.ncf.apatkan
respon struktur yang paring menentukan untuk digunakan dalam disain eiemeo-eiemen
struktur.
Pada perencanaan elemen struktur dengan metode ASO (allowable strength design)
kombinasi pembebanan yang dlmaksud adalah sebagai berikut :

No Load Tiiie Oesc-on Remaks


1 Load 1 0 Dead Load include se!fwe;,,ht
2 Load 2 l Live loads all movable load lncludina
3 Load 3 Lr Roof Live Loads
4 Load4 s Snow Load N/A
5 Load 5 R Rain Load NIA
6 Load 6 WX+ Wind Load X+ directioo
7 Load 7 WX· Wind load X· direction
8 Loads WZ+ Wind Load Z + direction
9 Load9 W2· Wind Load Z· direction
10 Load 10 EX+ Seismic load X+ direction
11 Load 11 EX· Seismic load X- direction
12 Load 12 EZ+ Seismic Load Z+ direction
13 Load l3 EZ· Seismic Load Z· direction

1. Primary load

No TiUe T"=
! Q Dead
2 .L bill
3 Lr Live
4 llYX± JtY.llllj
5 wx. Wind
6 WZ• Wind
7 Wk Wlru!
8 EX• Seismic
9 .EX: Scls:nls.
10 EZ• Seismic
11 ez- Selsn1lc

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page3


2. Unfactored Load Combination
LOAOCOM8 Load I Load I L04ff I Load
No.
""• F•clOtlFac.torlFaotorlFaa.o.r
J. i
.., ..
100 ,o
'
J.
l0•1L
1 1 t
:!. .'.!.

.. , .....
{OZ 10-,.1L,
' '
�!... r
....
J.

...
tD•O. 7:11..+O TOU-

...
,o ...o.owx.. J.

..,.
'
...
J.
1C,.O.GWX.
• r
10+0.GWZ+ J.
'
..£ �
,o, ..... z
...
.!
t0"0.0WZ.
• �
t0•0.1£.X>
. ..
J.

••• ..
..
;J. ,l
t0•0.7EX.

...u
1
J. JJ1.
10•0.1ez�

• ..,.
1
J.
'" \O<l0.7£2.

J. .s .l.
t1:. t0•0.7:sL...0.A-)WX+< ..0.7:PJ
o.•�
:!.'
0.75 U>

"' t0 ...0.70L+0-'3N�.7«..t
'
...,.
.t
... .!...
! >

..,, .,... •.... ' ........


...
1C,.0.70L+O.A-:w.tZ....,•O,nR.r J. 2
,,

.,... .l.. ...l
..
10+0.n!L...,.4,WZ...,.0..7!11.t J.

tD•O. 7:ll.+0.o.:2:)EX.._ J.
• .,... . ...
I ,

... ....
..
117 10 ...0.10L+0.020EX. J. I >

'
..
10•0.70L.-..O.ta:IEZ• .! .! .!.!!

. ..
e.sae

.
0.75

l0•0,70L�Ez.. J.
..:> J.1

'20 0.00,.0.GW»
..
J.
..,.
$.

.. ..
...
J.
t2I Q.C,0.0.C,W,C..
t
.. .. t
.....
O.C!0"'0.6WZ• J. £

.,. J. i

... •••:!. �
0.00,.0.0WZ.

.. !.

....
O.ClO*O.TEX•

,,. ..
J.
I
...
o.ao,.o.7EX,..

C>.00•0.7E.Z...
.. JJ1.
;J.
.. �
t;?T 0.00,.0.7EZ.--
.. .u
J.
.. t

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page4


3. Factored Load Combination

.....
LOAD COMB
Title
Load I Load I Load I Load
Factor1Faet«1Factor1Factor
..1,,-

..,1,
200

..
1.40

..:•\.
201 1.20t-1.6l +-0.51.r l 1. l
••
202 1.2D+L6Lr+0.5WX<t- l·•
203 L20+- l.6Lf-t.0.5WX. ,J.,. ..
a
204 L20+- l.6Lf-t.0.5WZ+- ,l,. ..lA .A
••
205 1.20,- L6lr�.5WZ· ,,1 ••.3. .1-
/·, A 1.

..,-,
206 1.2o+tEX++1l
• •
207 1.2o+tEX-•1L J. ll 1.

208 1.2D+1EZ.,.+1l
1
t
10 '
1.
l 1
200 1.20+-1EZ-+1L J. .11 1.
1.2 1 I

210 O.QD+IWX• 1 i
••
.-.
1
1 �
211 0.9o+-tWX.
.I 1·
212 0.90t-1WZ+- l
0.0
1
I t
213 0.90t-1WZ· l
••
z t
214 0.90+-IE.X.,.
.-.
I s' . I
.I
215 0.90+18'- J.
0.9
.2
1 I·
216 0.90+-lEZ<t- 1
••
JA
,. t
.-.
I

217 0.90t- lEZ-


I
1 t

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page5


2.STRUCTURELAYOUT

'

- .

x
-,
'
. •.

<,

- ,,
-
/ x
� * �· � ___..,_
� 0 � m � � � m

TOPVl�YV

lONGIT\lOINAL S!OE VIEY/

.!WC
TRANSVERSAi.. SIOE VIEW

TRANSVERSAL SIDE VtEW

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page6


3. MOOEUNG OF STRUCTURES

Perspektif 30

Plan View

Long Section

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page7


I .;;;:

Portal Frame Sis! Luar Oepan


IJ.JJJ
Portal frame Sisl Oalam

Portal Frame Slsl Luar Belakang

.....
Section Properties

-· ,.
'w
.. ..,.
FIOp J _..:eriill

'""·'! (cm') (cm� (l!ffl')


2
I-US0.'(1T!K7X11
�i2Xt9
02.S>O
171 9JCI
9$..XI)
13.6'::N
13�•:!
$9 Sc-J
SlUI.
J1S.tOS STEEL
a Rect 0.40x>:20 800.0IX �.1E+3 14-n:�� J.!,.2£+3 CONCRETE
4 H200XtOC6.,.� 2'!Ev ,,um 15tE .. ! '4.'478 ST"'..El.

e
Hl50X150C7Xt0 330!v
"" ow
�.S3E+3
182£.._J t1 001 SF..El.

- -
T.pe, 4-00.3:.1 1�+-2 l�,¢+,3 STEEi.
so is. ,o
'
6
t I a.
, - .
�1o0
9
10
Hl00:<1� SX5
*"'150X7� 17.o!<) '""""
4S:;.OO
1 21t•?
eee cec
$.SS<
.2....lU
·�., �·=
S•;:.il
SiEEl.

-
11 =·= , ...��3 4...,c.cc+�
IZ "4.,=,;, -�N l.la!C-:! IL �,�

-�-
v.iu

u A4-ol 0-4!-la-•S 2,02:E4 �"ZE--3 ;.m.1 $?ii+) CONCRETS


14 Rect O.lQ:iO 30 -mm 67.5e-3 67.££-:? 114£+3 CONCR�TE
R�I�. .:r.i:..e:: ,:-+.: a•. . uunl Rc.1:::

lo HI 1 I !
•• ....se
" Lt10X1Xj)C12 2936) 764.4� 1'95 1 Z! S'TEEI.

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page8


4. LOADING
4.1 Dead Load (0)
Dead loads are the Vleght at all materials permanently fastened or supported thereby.

4.1.1 Selfwel9ht
SelfWelght of structure will be calculated by computer it self, (STAAD PRO Program),
due to material in use (ccocrete/steel) with "Selfweight Y· l" command.

4.1.2 Dead load from Roof


a. Purlin Weight (Wpr)
Purlln size, Cl50x65x20x2,3 VI-:, - 5.6 Kg/m
TotaJ length of rafter, l= 12.20 m
Purtin spacing (max), s= 0.95 m
Number of purlin to be used, N = Lfs = 12.8
N= 13
Total weight of pu�in,
w.. (N•w,.)/l
w.. = ( 12.9*5.6 )/12.2 Wcr =I 5.92 iKg/m'

b. Roofing weight:
Dl due to roofing, Wr =I 5.00 iKg/m2

c. Sagrod weight:
assumed weight of sagrod = 5% of pur6n weight,
w� O.OS*Wcr
w� = 0.05 • 5.921 Wsr-1 0.296 lkg/m'

Total dead load of roof,


w_ Wrii + Wr + Ws,
w,.., = 5.921 + 5 + 0.29605 Wrod-1 11.217 iKg/m'

Dead Load assi nment to frames/aridline


length qd - Wroer•L
Frame Type
Im} rknfm)

1 & J4 2.5 28.04 UNI GY

2-13 5 56.09 UMGY

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page9


4.1.3 Dead load from Siding in Z-Dir (long direction)
a. Girt Weight (Wpr)

w.,=m6 .
Girt size, C150x65x20x2,3
kg/m
Total length ot- column, L= 5 m
Girt spacing (max), s= 0.9 m
Number of girt to be used, N = L{s = 5.6
N= 6
Total weight ol purtin,
W., (N'W.,)/l
w., = ( 5.6*5.6 )/5 w,, -..1 __6_27
. __.lkg/rn'
_

b. Siding weight:
DL due to sidingng, Ws =.__..:Saa
I 00=.__.l
. kgfm'

c. Sagrod weght:
assumed weight of sagrod = 5% of girt weight,
W" O.OS'*WDI'
Wv = 0.05 • 6.272 Wsr =.___
i o_.___
1 _.ikgfm'

3
Total dead load of siding-Z,
W"°"' W"' + Wr + Wsr
w,,..,, = 6.272 + 5 + 0.3136 w_,. =.__.;;;11;
I ;.;;;.;9;...._,i
5 kg/m'

·
Dead load assi nment to framP�/nridllne
lengtll qd- w...... *L
Frame Type
(ml (kn/ml

l&H 2.5 28.96 UNtGY

2-13 5 57.93 UNtGY

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 10


4.1.4 Dead Load from Siding in X-Dir (Short direction)
a. Girt Weight (Wpr)
Girt size, 050x65x20x3.2 w.,=m 6 .
kg/m
Total length ot- column, L= 6 m
Girt spacing (max), s = 0.9 m
Number of girt to be used, N=L{s= 6.7
N= 7
Total weight ol purtin,
W., (N'W.,)/l
w., = ( 6.7•5.6 )/6 w,, -,.__
i 6_25
.
__ _.lton/m.c

b. Siding weight:
DL due to sidingng, Ws =.__-"5"'
I .:aaoo�__.ltonfm'

c. Sagrod weght:
assumed weight of sagrod = 5% of girt weight,
W" O.OS'*WDI'
Wv = 0.05 • 6.253 Wsr =.___
i o_.___
1 _.itoofm'

3
Total dead load of siding-X,
W"°"' WfX + Wr + Wsr
w,,..,, = 6.253 + 5 + 0.31265 w_,. =I U.56565 !toofm'

Dead load assi nment to framP�/nridllne


Lengtll qd- w...... *L
Frame Type
(ml (kn/ml

A&G 2.00 23.13 UNtGY

B�F 4.00 46.26 UNtGY

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 11


4.2 Live load (l)
Live load shall mean the moving or movable external loads on building produced by people,
tools, etc. which are not permanently fixed.

4.2.1 Roof live load


Reference: - ASCE 7-16 Section 4.8 Reduction in Roof live Loads
- SN! 1727-2013 Section 4.8 Reduksi pada beban hidup atap

Minimum Roof live load t.. =.___


I o_9_6
. __.ikN/m'
Reduction In roof live load·
F = 0.12 x slope{%)
1 fo, I'< s 18.58 m·
R1 = 1.2 • 0.011*1'< for 18.58 ·m2 s I\ < 55.74 mJ
0.6 for I'< ;,, 55.74 m'
1 forFS4
R2 = 1.2 • O.OSF for't:Sf<l2
0.6 [orf.el2
t.,•R1•R2 {kN/m1)
Lr =
0.58 s Lr s 0.96 kN/m'l

Tnbutary area, At = 6.Smx24m


1560 m'
Roof slope 9.5 deg
16]3 %
f 2.0J
Rl 0.6
R2 1
Lr = lo*R1•R2 0.58 kN/m'
Use Lr 0.60 kN/m'
60 kg/rri'
Roof live load assionment to frames'"ridline
Length ad= Lr•L
Frame Type
Im\ rka/ml
1 & 14 2.50 150.00 UNJGY

2-13 5.00 300.00 UNIGY

..

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 12


4.3 Wind Load (Wx and Wz)
tnout Pat,
Building Widtll Perpendiallar to Wind Direction B 21.0 m
Building Length Parallel to Wind Direction L 65.0 m
Side wall Height (See Diagrams sketch) zl 5.0 m
Side wall Height (See Dlograms sketch) 5.0 m
Roof top height (See Diagrams sketch) h 7.0 m
Roof Angle (See Diagrams sketch) q 10
Type ot Roof (See Diagrams sketcll) Gable Hiae Roof I
wan Cblahl I

Diagram

fiEVAllCII
GABLE, HIP ROOF

t,GC,

zt

EL£VA1lOH
MONOSLOPE ROOF

PUN
MANSARD ROOF

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 13


Pn@ro&er WJod A§Cf Z-19 I $NI 03-JZ?Z-?917'
Design wind pressures for the MWFRS of buildings shall be determined by the
fonowing equation:
I p = qGC, - q(GCg)

Where:
p Wind Pressures Design, (N/m')
q qz for windward walls evaluated at height z above the ground,
qh for leeward walls, sidewalls, and roofs evaluated at height h, (N/m2)
Q, for positive internal pressure evaluation, qi may conservatively be evaluated at
height h(qi=qh), (N/m1)
G Gust-effect factor
c, external pressure coefficient
(GC,.) Internal pressure coefficient

Velocity pressure, qz, evaluated at height z above ground shall be calculated


by the following equation:

q, = 0.613 K.,K.K, V' OR q, = o. 613 K.,K.K,, v'


Where:
Q Velocity pressure, (N/m')
v basic wind speed, (m/s)
Kd wind directionality facto,
Kzt topographic Factor,
Kz/ Kh velocity pressure exposure coefficient.,

Basic Wind Speed CV), Following as per International Code HS 212-2002


Wind Speed Condition I SetviceabBity Condition I 32.0 im/s

Building Classification Category, ASCE7-16 TiJble J.5-1 SN/ OJ-1727-ZOJJ T•ble,.,1_..s_.1...__,


-
=I n
Wind Dlrectlonallty Factor Kd ASCe J.16 Table 76.6-1 SN! 03·17:V•Z0/3 T•bel 76.6·!
Structure Type Maln Wind Face Reslstln S em = 0.85 I
Exposure Categories, ASCE 7-16 Secuon 26.7.3 SN/ 03-1727-2013 Secffon 26.,7.....3..._ . ____,
lnformation Note : . I
= EJcsposur B
For /Joi/dings or other s/nJ<tvms with;; mwn ft)(){height fess V.,n or equal tu .JQ � (9./
m), Expcsum 8 shiJ/l apply 111>ere the ground surface roughness, "'defined by Surface
Roughness 4 pre11ails in the upw'ind directfpn for a distance greorer than 1,500 ft (457
m). For buildings or other structures with• mean rooff,e/ght greilter men JO it (9.1 m},
exposure 8 shall apply wflere Surface Roughness 8 prevails In the upwlro direction for a
d!staJ>ce g,ooter 1han 2,600 it (792 m) or ZO time« tne height of 1he bulk/Ing or
Sl/'ut:Jure, whichever IsgtaJt«.

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 14


Topographic Factor (Kzt), ASCE 7-16 Section 26.8.2 SN! 03·1727-2013 Section 26.8.2
Ifsite conditions ;md loco/Ions ofbuildings soa other stnJctures r,:::-i
do not meet a!I I/Je conditions spedlifff in Section 26.8.J, men Kzr = 1.0. = �

Gust-Effect Factor (G), ASCE 7·J6Sectfon 26.JJ.1 SN! 03·1727·2013 Section 26.9.1
I
The gus,-,,rrec, fOt:tor fora rigid "'1//ding permitted lt1 be take,, as 0.85 0.85

Internal Pressure Coefficient Ge I SN! 03·1727-2013 Tabet 27.3·1


Endosure CJass.ific.ation Endosed bulldin s 0.18

Velocity pressure exposure coefficient (Kz / Kh) and Velodty pressure (q), � 7·16
Table 26.10-1 SN! 03-1727-2013 5edlon 27.3·1
The attitude interval For the incident wind pressure distribution o.5o Im

PldrihUHPD or Wind f9oisi in !be Xt dlrertJgp

PirtdhuUoo er Wind fatEss in !be X- dicedion

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 15


PIS:rihuti90 pf Wind f9tr&S In tbtl Zt dla:GUoo

..,... u-..

Di.strlbution of Wind Forces In the Z-dlrection

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 16


4.3 Seismic Load (Ex and Ez)

Parameter SeismicASCE 7-16 & S'NI 03·-1726-2019

location Project Soreang(B)


Latitude / Untang 107,558
Longitude / Buju r -6983
Height of Building 5.00 m
Types of building ublizatioo GudanQ-penyimpa.nan I

- -""""""*' .... "-Al,. ,_.....,,., ...i.eiJ, ..�"'· -tt �................,.


fl'.(>qt'- Re�AI· �ltt;t'• 1'9t.fl Q� lOdQll-l& a'O 111
,•.• ...,... - -··
IOI Q:iryc1q�t ?ueln.a-,u�tf-Ultt'. ilOl�.1010

tto:c• 8oXCUll'l'1 (.9.

pus!s.[m
fll6:IIII
ea,-u..t I t.ooo1.o:: ..w.. : 107,SSt n.Qree•
S..l..nt;lll)Q I t..llt�:udol,, -E,. 903 n.or•••

IQ.. c:. 0 .• ,;JS.) 'ii


� a o.s,:is, o
�It.Ii a 0. 01)0000
�11.1 • 0. 000000
•• .- t.6JSS<j,E, g

·-·�-° "
st • 0. 4$30�'1 q
n. • 11.0(10000 cbo�i.11,
... .. 1.1:c.s,,,
"14 �•i,n ,.� • 1. .l,i5)

-·"4= a,,. • 1. 1.sti•o? 9


o .• ,.,.,..
. ..,__
*'>1 • 9
.. IM\W.
�· • 0 • .,.,1,t> 9

--
ffi • O,'Jo-,,11«. 9
to • o. �11l7l'I ct,e11,,,
,o,,,s
S1' ·�
l'• • O, de•al
-.�-i3
---------------- V..tlu..t (QI
-o=- 0.000 0.1005
o.oso 0.4E1-?
0.100 O.S1lE
0.1..SO 0.1Ul.
0.1-s: 0.11.13
O.:lOO 0. "1l 3
O.J-SO 0.1713
0.?00 0.11i3
0.3SO U.17 l-J
0.400 U.771!
0.450 u. 7715
(1.500 u. ,,, :,
o.�!o o. ,.,, :,
o.too IJ, ,.,,:,
o.c.so u. '.11l)
O."lOO IJ, .,.,, :,
O,'t$0 v, 1'1\:1
0,1"G9 u.111:,
<1.100 U, 7:114
Q.o,o o.eee•
0,900 0,6$01
<l.�SO 0,61:i'9
l.000 O. S8Sl
l.OSO 0, SS?3
l.l.OG o. 5'319

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 17


Seismic Design catego,y Table 3 SNJ 03-1726-2019 I
Importance Factor, Taole 4 SNl 03-J 726-2()1!}, le I
Spectral response acceleration parameter s, 1.086 g
Spectral response acceleration parameter s, 0.483 0
Site Oassificatioo Soil Table S SNI 03-1726-2019 [ Medium Soil JI
Short-period site coeffi dent F, J.066
long-period site coeffi dent F, 1.817
Spectral response acceleration parameter at short periods S,.,=Fa•Ss 1.158 g
Design response acceleration parameter at a period of 1 s S..,=Fv'Sl 0.878 g
Spectral response acreleration parameter at short periods Sos= (2/3)'5,,s = o.n2 g
Design response acceleration parameter at a period of 1 s s,,, = (2/3J•s., = 0.585 g

Type Seismic force·Res.isting System I Rangka baja pem]l<ul momen khusus I


Response Modification Coeficient., Table J2 SN! 03-17.'26-2019) R = 8
OVerstrength Factor Table 12 SN/ 03-1726-2019) !lo = 3
Deflection Amplification Factor Taole 12 SN! 03·1726·2019) c, = 5.5

The fundamental period T 0.262 sec


The fundamental period of the buikiing (Optional From Soft! Tc 0.000 sec
Approximate fundamental period or the building T, = C. • h,,' 0.26'2 sec
Clj)per limit of Fundamental Period C.. • T, 0.367 sec

Type of Structure Taole 18 SN/ 03-1126·2019) I Rangka baja pemlkul momen I


Period coefficient Table 18 SNI 03-1126-2019) c, = 0.0.724
Structural height h. = 5 m
Coefficient x Taole 18 SN! 03-J 726-2019) x = 0.8
Upper limit Coefficient for calculated Period Cu = 1.1
Coefficient Respon Seismic Cs = Sos ' l,/ R = 0.096
Max Cs Csmu = (SDI • !,) I (T • R) = 0.279
- Min Cs (Condition 1) Csmml = 0.044 • S,,. • I, � 0,01 = 0.034
- Min Cs (Condition 2: Si z 0,6 g) Csm"" = 0.s•s1•Ic/R = 0.030
Result Coefficient Respon Seismic Cs = 0.096
Distribution exponent k = LOO
lfT S 0.5, k = I
If 0.5 < T < 2.5, k = interpolation I N 2
lfT � 2.5. k = 2

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 18


Variance Response Spectrum
The fundamental period T 0.262 sec
T, = 0.2 S,,JS.,. 0.151616 sec
T, = 5,,JS., 0.75808 sec
Design Acceleration Response Spectrum
lf, T<To. Sa= Sos • (0.4 + 0.6 T{To)
lf, T0:ST.ST, Sa= S.,.
lf, T > TJ Sa= S,,,/ T
Table Re.s.........ce
5 .......ctrum
T T Sa-
second second (g) Respons Spectrum
0 0 0.309
T. 0.152 o.m ··""'
HX>

c.rn ..?Oil

. "'""". .
....
Ts 0.758 0.000
Ts+0.10 0.858 0.682
Ts+0.20 0.958 0.611 O.lOIJ
Ts+0.30
Ts+0.40
l.058
1.158
0.553
0.505
......
Cl?OO-

......
Ts+0.50 1.258 0.465
Ts+0.60 l.358 0.431
Ts+0.70 l.458 0.401 •• T
Ts+0.80 1.558 0.376
Ts+0.90 l.658 0.353
Ts+l.00 J.758 0.333
Ts+l.10 l.858 0.315
Ts+ 1.20 l.958 0.299
Ts+l.30 2.058 0.284
Ts+l.40 2.158 0.271 rl��
S -·�s:/i 3) S,.,
Ts+l.50 2.258 0.259
-

Ts+l.60 2.358 0.248


Ts+l.70
Ts+l.80
Ts+l.90
Ts+2.00
2.458
2.558
2.658
2.758
0.238
0.229
0.220
0.212
0.4
'; II
l
Ts+2.10
Ts+2.20
2.858
2.958
0.205
0.198 1l0.2
0
_ Sh,
Ts+2.30 3.058 0.191 T,.=o,2T 7•s=rzr:
0

S,:as
Ts+2.40 3.158 0.185
Ts+2.50 3.258 0.180
Ts+2.60 3.358 0.174
Ts+2.70 3.458 0.169
Ts+2.80 3.558 0.164
Ts+2.90 3.658 0.160
4.00 4.000 0.146

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 19


PistribuUeo er kitmls ferses lo the Xt dlcsrtion

DistdbuttAA er kisnlr fea;cs In the x� diccstien

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 20


PistcJbutiPD 9 , seJsmi, E9tre:s in the z+ dired:ion

Oi#:cibYtfPD pf Se:iSmlr Fan;;ss In tbc z- dlcerUoo

NO Anallsa Struktur WH-TPSTCICUKANGOB-ok Page 21


5. INPUT STRUCTUR ANALYS
- lf,» 'TP8T OG CICUKANG �
,, -·�21 O•
a- rt. /,,N/1,L. 8tRIJKruR QCUl°"'..m- 28.Aut,2021 23.2S

Job tntormatlon
i!ngl,_ �twtcl<itd .........
=:__I 10 ,\ug,21
I I I
Pr�ID
,,,,.,, I I
s�w.. -ryp. I SJ>A(..1; F,V.,4;:
I
I M,mbe( O! N06ee
Ni;ni!>l':l'Ol�
I
'rt11�NCl!<t
U1 �&cllffl I =I
I °'-
I ;:I
: N,.....flllt Of RllWC Lf>M
�llllrdCmnb'flll:ll.l(l<ll.oLYJ C2•

�2,?t'(tf11:1'>'-:£1!1tl!)!,1- tf(lt!J,W:
I Al• I Tre ,YhrJe Strue::ure I
.,,.
hk:Il.,d,;d"' 11'11# !>!l!lllluf .>flt �.\'tl � JQ::,d,C.llll&l',
IJC N'....

••••
Pr,111111y EX•

-
ex-
, , _...,
�'1"11'1'llf'I'

""'' U•
ea-
"'
_. .,.
D
'""'!2
. . ...,,
a
•'
...
L

•• ..,,.
WX•

."""""'
..
"'"""
.•••.'.
\VZ•
wz.
cn,..i:,iroili,11•
Con,HNW,r,n
••
1D,1L.
C1111,t,,r,;,i1.11:n
tel".JJlr.,uon ,"'., ID41L.R
10-,0 IU.•o:rllil..R

-·· .'.",'
Co�Nllloo
'"
-cs
IO-OG'NX·
t0.0.6WX.

-�
COf'lll�Nl{lr.n t0-.0.6WZ•
Coir.U�oi• t£M)EiW2·
C:1111tbr..ll)M
""."'. ID•C)7'f)t•

·- =
Co,�"" 10.0.(l)l,
10--0 7EZ•

'"
..
CcilllblNll/cn

--M
Con,ti....nr.n
"' 10•Ck.1!L • Q..,1S'HX.-+0. 715l.R

.."'..
C111N.lrtll!OO 10..0 751,,0.45'lll(.•0.7a.R
comb�en ID•O 1�•0.•0'hl.••(I fet.H

,o-o.,�·o.�. .
t.tH>JOl •0.<l�'IIZ,...J.7ou:t
C:Omblt!lllllef\
CllmlliMl.iM
"' 10..0.15..•G,,52:SVv

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page22


.... u-. "'JPSfOB CICUKAHG

B�
-.. °'"10� �
r, .. ANAi.. 6'TRUKTVR CICUi°"...,.." �2021 23.''2'5

··-
Job Information Cont...
Typo
""
� ,.,. OAi0--0.ilWX.

--
� eee-cewe-
""""'"- ""
"'' eec-eewz-
=- ,,.
'" O.GIVO 7EX�

°"""""'"" ,,. 0.61>-0.7EX.


o.el),O 1r1,


,.,""
""
,,.
0.tSO,o,(1,11!:Z,

--
� 1 .'n-1.&L•O.SlA



""
,..
""
1,2l)o,t.OLR..0.&II)("
1.20<-1.tSLA•O.!VN)(.
1.20•1 fiLFi.;),&NZ•

""""'
12Dt<t.GLf\-<l,:.WZ.·

...
Cambri"""" 1.20.1tx.... ,t

�-

� '"' 1.:tl>*IEX.+-IL
1.20-IE2'Pt1L
c,,-
""'
:no
120+1EZ�iL
090-,1\VX•

'"""""""'
Qoot::tow,.,... ,,,
211 0110-1wx.
011�1\\'Z•

"°"""'-

.,.,.,,.._., '""'
0$0,..IWZ·
0.90•1EX-
2'S O.tlh1EX.
¢<,,1'\11� e-e o.oo,..,u..
"'
_
"""""""' 0.<,10-,IU:•

.... ·-· ...


Materials
,

.'""'
e
ll•N.tmm') �m')

V"C)
• sree. 205.000
.,.,.,
0000 T &JE•'3 ee e
'
l
Sl�!HUa�:SSlla.U
At.UMfNUM
191,\1�0
£8.946
'tJS:)l:c•:I
,:11�
rece
?)i; ,6

• (l()NCRF.TE 21,716
""' a.. e-a l(IE·B

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 23


... , ...... ,, ..--..
6. OUTPUT STRUCTUR ANALYS

...... "

Bmdina Momeot z

Shear Z and Y Direction


... -·
NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 24
--�--

....... _
Aliill foair

Pedestal Reaction

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 25


7. CHECKING PARAMETER
7.1. STEEL RATIO

..
--
••• ...••• ,.. - --4
·�"".....,. .··-.-. .,·.-... ,::f1�:
,,,,,.

...., .···.---.. .. ...., _....,"'


..oc;.-1,1 ill
m
,
1e1;..,;••lN
•••
....... ··-- ·..-. i:::.;-1-:
,m
,m ,w �,..;;.-r,
1
:"'
.... 1..,. .Ill"

....·- ...,... ·- ..... ..... ""


"'K- , ;u
AM--i• .,..

··-·-- .·..-... ··.·---.. :::�::.: �:: ;..c.--..J "'

·�... . ..
...c-u "'
�-·· ...:
-·.•.- .···.---. ....··-·.···..--.,,
;::_:j
;--·•.J-···'"..
.•.·...- ·...-...... .,....
--�--· l'q

... ..
-
;

·..-.... .·-..
• .,f .- tu
� ..,, ru
. ...... ....
......
ON
• ••
.......�··-' �
�-,-� ',n

=
....... .·..-... ...... ;:::-!
;, . ...
.....,.;. ••"'••
·- .·.·..-.-.... .,.·"".,.�-.
""6••-'

....'*....
''" •i..
••
...... -··. .....
......J
"'
.·.-. ""..,�. ., ....
.WC..•··� "'
, .....,,, ,..

...""·�....
.·...-....... .,.·....�
;

·�-··=�:· ,:......
'.t.•••
"'"
........·-
::l
... ... --
Ratio Steel Beam/Column Max= 0.95 < 1.00 (OX)

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 26


7 .2. DISPLACEMENT STEEL COLUMN
ill

'" ··,.,.�
-..·-..··....-_-- -·�·....·- ......
,w ......., ..........
...
.�·�
'"
"' - ,,::.,.
.·�...
'"'
............... '"<l �=·
... !!II.
•11.u1

2:+
,u

··--
... «''

......
ot•••

-···....---
+!),�-

."..
"'
'''"
1:on ...
·=
'""
·=
......... �=t
............ ...........
uoj

" '""
............
-....·- ..::l. .................
'" .....
·'"�
1:i,o• H�
,w
"=

·-·=-....·-
"'

"-. . .......,..
,u>
,:, •II.- .,.o,,-
.....
•••

- .-::l::1.. ..........
,. ·"l',t ....h

.........
---:-o.,

-·-
·IIMf

...
"'
. .. ...·- ...... �=:......
...............
•n•J •w
11>:111 ,,,,
"' .,,I

-...·-
11.,1.•1

... .... ..
•••
·-...-
-,i4Q-

-• .....
............
""' ••• '"'
·!!''" ::-
-
·•=
· --
,e-,i.

....::i....
t,r.1
...�.- ,,a
,e,.,:i,
......., c,n
.,

-.·-. ....
............ . ..
...-oo
........
·'!=�
�M

·-•••
·-:�-·
I.ti)

.............
.... �-::
UIJ :

._

..·- .........
-�·
Ho'tr_
.,w ...oo,
na
,.
··'"'...-.... ......
·.-.. ·-.·....-.. ........
111\::t
�'.io

.........
-::...
.........
--.. ··-- -
--{�
'" "" uio·

.·�....,,.,
• •• ..so•,
•••
···
ttlo

f''O_ ... �:i!-


Dlscplacement Steel Column 14.46 < Hf200 = 25.00 (OK)

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 27


7.3. DEFLECTION STEEL BEAM

_........, �-
·-·�· -·= -·::::1
......
::,
F "" """'
,� ,_ m � ...
1:ffl -----.·�
..
t•:io I
=
...Q•tti

.·..-.....
,� ,n,
"" ... '"'
·....- ... ... .. .""...
..Qf\t
-:,u
"" .-� '"'
"''
4.UI
;.,.

'"' .......,
,,;,
...
'!L '4''
... '"",....,... ""
-i1,, :Q

- .......,,,...
..."".......
"" "'
f
-
..- ,4$<1)11

"'' "'."'.. .'�"...


7q�\
, ,e:- A>..

"" ""
'.42$

'.,".... '·"�'
.JCI07t'
''"
··-�=..· -··�-· ·-
.q�l
ien
"" ::��I
,..,
··,n,-=
.!II� w, uo,

·=
...... .. - -...,
>Am l.l"
,_

....·�
=
,.:-,. ...
,u, !:!:+- m ,.- -u�,i '·"''
_:su
"'
i,n

,,,.. ,. ,.f,u, ,:,,,


""
.'"' '""
10)
"'"
....
"" "' •T1,e.
1$$1
'"' 1_w;+-:
"" ""' ......
AO:lttr-
,..,, '"..."'., '"' ��
.... ........,,,. .,..a..........0,,1,
!·!: lli!l
-;-,, JJl6
';,.
,.. ......
11;•816.
,.,, "'
Lt28' 1.V-J ·•f1&

,·""
-
;.,.

.""·.-.�-.
,iii
...... .o(,sa,'. A....

�-
,a, .,.iv
'"
·= '"'" ·=
'
""'
:l-&'1

..... ...'"
··=- ·-
= ,,,
2Q' ·lflllllt,

·= ·-
>Q> Hm
,m
,,
,... ·=
OMO

,�
· -
,a ...&$:µ ..f.11�
�·
·:fffl

.... ..... .. it:.._ .n�.


,.,..-
,a .),J;)
,·m- ,n,..
,-�
...'"'. ""�=· ."'.. .,.,;... ........,.. ..,,., "''....,,.,
,a )JOO ••
-:;,,-
. . .. ·r:·
,n"!9!""
..,,
2•>1 OQ
.-m_.
"'" "'
'"
,.... ·•�• .'...
.:-J1W1 . fl11
�$»:

··=,�,- ,.� ·� ·.·-.-.. �- ••••�·- ··.�,,.


.i•lt
1.,, !.�:
"" ,.,.�
2q,
� ."..',u
'"
_,,__ , .... .,
•J•
1
ua

�=
-#.,, I
4'�1

-»--
1.111111

A,q
...0:11

-
"''
:.1111
lri '"" .:om1 ... :l<Ol
....
.--;:- ,;, ,-4:'t

"=
............- '",., Hi
-ui,.

'"'
--rm.
fg1

..'"',,,
17,ff
»m· xw-
' ..
,i'i
,,.. �.-1
"" ··� "'...
.;Itffl

....�.
···"
�1->1,
.�,-
oenectlon Steel Beam 2.85 < l/360 = 11.28 (OK)

NO Analisa Struktur WH-TPST CICUKANG 08-ok Page 28


8. CONNECTING DESIGN
8.1. SASE PLATE

PERHITUNGAN TUMPUAN (BEARING)


BASE PLATE DAN ANGKUR

hl

0.9hl
a+- ;°l
@) @) @)
I
@) {§) @)
� -
11 11 I
11 11 I
11 II I
11 11 I
lsucdJ
1. DATA TUMPUAN

BEBANKOLOM DATA SEBAN KOLOM


Gays aksial akibat beban tetfaktor, Nv= 56484.00 N
Momen akibat beban terfaktor, M,= 5008300 Nmm
Gaya geser akibat beban terfaktor, Ou-= 44100.30 N
PlAT TUMPUAN fBASE PLATEI DATA PLAT TUMPUAN
Tegangan leleh baj.a. ly= 240 MPa
Tegangan bulk putus plat, ir- 370 MPa
Labar plat tumpuan, B= 430 mm
Panplng plat 1umpuan. l= �30 mm
Teba) nla1 tumouan, 1= 20 mm
KOLOM PEDESTRAI. DATA KOLOM SETON
Kua! tekan beton. i.·= 20 MPa
Lebar penampang kolom. I= 450 mm
Panu:anr1. cenamcenc kotom. J:
450 mm

.. ..
OIMENSI KOLOM BAJA DATA KOLOM BAJA
ProfiJbaja: HBEAM.350.JS0.12.19
Tingg1 total, 350 mm
Labar sayap, 350 mm
TebaJ badan.. i..= 12 mm
Tebal sayap, ,= 19 mm
ANGKURBAUT DATA AHGKUR BAUT
Janis angkut baut. Tinn: A-325
Tegangan tarik putus angkur baut, ,., = 825 MPa
Tegengan leleh angkuJ baut., fy = 400 MPa
Diameter angku.r baut, d= 22 mm
Jutnah angkur baut pad.a sisi tarik, "'= 3 l>h
Juml.ah angkur beut pada am tekan, a,= 3 bh
Jarak baut terhadap pusat pen.ampang kolom, r= 125 mm
Panjang angkur baut yang tartanam di baton. L,= 750 mm
2. EKSENTRISITAS BEBAN

r·l �I,
h, E.ksentrisita.s be,. .b...
an,... .,

IJPu
e=Mu/P•=1 88.67 Imm
h Lt6=. 71.67mm
f e e >L/6 (OK)

§§
2 1
h=h,-•= mm
e,=f+h/2= 281 mm
ec=f-hl2= -3t mm

Jumlah ang:kur baut t:otal.


•=ni•0c=I s
Pu+Pl
y
P,
L

3. TAHANAN TUMPU SETON

Gaya tarik pada engkur baut, P1 = P11° er,1 e,.= -6231 N


Gaya tekan total peda plat turq:iuan, P00=P11+P1= 50253 N
Pan.iang bidang tegangan tekan beton. Y=3'(L·h)/2= rrr.oo mm
Luas plat tumpuan baja. A1=B·L= 184900 mm'
Luas penampang kolom pede-s1ral, A,=l"J= 202500 mm'
Tegangan wmpu nominal. fen= 0.85 • fc'' ./ ( A1 I A1 ) = 17.791 MPa
fCJl=1.70'fc'= 34.000 MPa
Tegangan tumpu nominal bel'On yg diguna.kan, fat= 17.791 MPa
Faklor reduk&i kekua\an tekan bell)n, 0.65
Tegangan tumpu beton yg diijinkan, 11.564 MPa
Tegangan tumpu maksimum yang teljaOl pada beton.
'� = 2 • P� I ( V • B ) =L__
f ,_32_
. _1
_.jMPa

..
Syara'l yang harus di'penuhl :
•• fa,
1.321 I < I ,1.56• AMAN(OK)

. _J
4. KONTROL OIMENSI PLAT TUMPUAH

Labar minimum plat tumpuan yang Qpertukan,

Lebar plat yang digunakan,


Sys.rat yang herus d;perwhi :
s.... B
4g I < 430 AMA>I {OK)
Panjang bagian plat tumpuan_jeplt bebaa,
•=(l·0.95·.,,,12= 48.75 mm
fo.,-1-=( l-a/Y) fa,-=
0
0.957 MPa
Modulus penampang plastis ptet, Z= 114•9•t': 43000 mm1
Momen yang terjadi pad a pl.at akibat beban terfaktor,
� = 112 • 8 • fo.,1 • a2 - 1/3 - B - ( fQj - fcu1) • a: = 612792 Nmm
Faklof reduksi kekuatan lentur. Oti-= 0.90
Tahanan momen nominal plat, Mn= f� • Z-= 10320000 Nmm
Tahanan momen plat, .>t,·Mn-= ._ 9288000 ..., Nmm
Syarat yang harus dipenuhj :
M,.
a,2192 I < I 9288000 AMA>I {OK)

5. GAYATARIK PADAANGKUR BAUT

Gaya tarik pada angfwr baut, T111 = P,I n.-= ·2077 N

..
Tegangan tarik puMi anglcur baut, f.}"-= 825 MPa
Lu.as pensmpang angkur baut. A,,=n/4 ·d'= 380 mm'
Faktor teduk&i kekuatan tarik. 0.90
T11=0.75'Ai,
0

Tahanan ta.rik nominal angkur baut. fu0= 235207 N


Tahanan ta.rik angkur baut, i>I • T""= 211686 N
Syara1 yang harus di'penuhi :

.2077 I < I 211686 AMA>I {OK)

6. GAYA GESER PADAANGKUR BAUT

Gays geser pada angkur ba:ut. Vu1=Vuln= 7350 N


Tegengan tarik putus baut, fu°-= 825 MPa
Jumtah penampang g.eser. m= 1

..
Faldcw pengeruh ulfr pada bktang geser, r,-= 0.4
Luas p,mampang baut., A,,:n/4 ·d'= 380 mm'
Faklor reduk&ikekua\a.n geser, 0.75
Tahanan geser nominal, Vn = r1 • m ·Ao· fu°'-= 125444 N
Tahanan geser angkur baut, � • Vn-= 94083 N
Sys.rat yang herus dtpenuhi :
v,, +c. v;
7350 I < I 94083 AMAN(OK)
7. GAYA TUMPU PADAAHGKUR BAUT

Gaya tu:mpu pada angkur baut, Rut-= Vu,-= 7350 N


Diameter baut, d= 22 mm
Tebal plat tumpu, t= 20 mm
Teganga n tarik puMi plat, t,,C-= 370 MPa
Taha:nan tumpu nominal. Rn-=2.4'd•t•tv°"-= 390720 N
Tahanan tumpu, ... R,,= 293040 N
Syara1 yang harus dipenuhi :
R,,,
7350 I < I 293040 ... AMAN(OK)

8. KOMBINASI GESER DAN TARIK

Kons.tanta tegang.an untuk ba-ut mutu tlngg:i, f1 -= 807 MPa


fi-= 621 MPa
FaktOf pengaruh ulr pada b:idang geser. r1-= 1.9
Tegengan geser a.lcibal beban terfaktor, fw-=V11/(n'Aci)-= 19.34 MPa
Kuai geser angku.r baut, �·r,•m•f11b-= 247.50 MPa

Sys.mt yang harus dipenutu :


r.,.-=V11/(n•Al>) s +r'r1 •m•f,}'
I ,e.34
Gaya tarik a ldbat beban terfaktor,
I < I 247.50 ... Tu1-=
AMAN OK
-20n N
Taha:nan tarik angku.r baut, ,i,.·r.= �-,, ·A,=

. . ,, ....
230075 N
Syare:l yang harus dipenuh.i :
T,, s
Kua! tarik ang kur baut.
.2on I < I 230075 ...
; -= 0.75 •,'ii.-=
AMAN'OK'
618.75 MPa
Batas tegangan kombinasi, f,·r2'fut= rre.ae MPa
,, = 621.00 MPa
Syara'l yang harus di'penuhl :
r, s
...
f1·r::•f11¥
618.75 < I rro.ae AMAN (OK)
Syarat yang harus dlpenuhi:
,, s r,
618.75 I < I 621.00 ... AMAN(OK)

9. KONTROL PANJANG ANGKUR BAUT

Panjang angkur tanam yang digunakan. L,=m0 5


mm
Kuat tekan beton, �·= 20
Tegangan leleh baj.a, r, = 400
Diameter angkur baut. d= 22
Panjang angkur tanam minimum yang diperlukan,
t....,=t,/( 4 ·<I,')• d=�__
! •9_2 _,!mm
_
Syaral yang harus dipenuh.i :
S L,
492 I < I.:;_-5-0-
7 �
AMAN(OK)
8.2. RAFTER
&? 1 HPYDGb Bafttt:Csalumo

PERHITUNGAN SAMBUNGAN RAFTER • COLUMN

1. DATA SAMBUNGAN
Gaya geser akibat beban terfakior, 1 -�0--�-�-00--ll�mm
1-��--,.:�-:+�

:
,
Momen akibat beban ter(aktor,

1.1. SAUT
Jenis baut yang digune:lcan. Ti!'.18 baut: A-325
Tegangan terik putus baut., c- 825 MPa
Diameter baut d= 10 mm
Jarak antara baut.. •= 85 mm
Jumlah baut datam satu baris,, n,= 2 bh
Jumlah baris ba:ut, n,= 7 bar\$
Faktor reduksi ke.kuatan tarik baut, +,= 0.75
Faktor reduksi ke.kuatan ge:ser baut, o,= 0.75

1.2. PLAT SAMSUNG


Tegan,gan leleh plat,. f,= 240 MPa
Tegangan tarik putus plat, f,,l= 370 MPa
lebar- plat sambung.. b= 175 mm
Tebal JMa1 sambung. t= 15 mm
2. LETAK GARIS NETRAL

e ·- ·- sn • r_,r::c;
0

a
- - a
h
@
-- a h
x

@
a

@
. ·�. 0··

a/2 �h-xf.
b b' 0

Jumlah baul 1otal.


rmggi plat sa.mbung,
n = n•• n,
h-=-n,.·a=
=r--'595---11bmhm


'-......;=--'

=t__
Lebar plat sambung.ekivaJen sebagai pengganti baut tarik.
3-=- n. · (rt/ 4 • 02) / a 6._fi7_31_
b' = 0.75 • b =.._.,_
_.lmm
. 3:1 :.1:a2. 5=.._._

mm
Lebar efektif plat .sambung begian tekan.
Mis.al garis netraf iertet.ak pada jarak x dari sisi at.as plea sambung.
Momen &ia.tls h.aasan tethadap garis netral.
t/2 • b' • (h-x}' =- 112.3 • x�
(b' -�)12 ·x'- b' • h • x + 112 • b' • h'=o
(b' ·3)12 • ... b'' h • H 112 • b· • h'=o f ncrsamean kuadrat dalam x
A, = (b' • li)/2 = 62
8,=-b'"h = -78094
c.= 1/2' b' 0
h" = 23232891
Dx=B:i"-4"A.'C._ = 309985.512
x =(-81- ,10.J/( 2 · A:.} = 485.54 mm
3. TEGANGAN YANG TERJAOI PAOA BAUT
Pers.amaan hubungan tegangan. GJ = (h-x)I x ' a1 pen;. (I)
a,= ()It-a 12 }/x • a, pers. (2)
Persamaan momen :
t/2. (h-•}. b' 0
0-J '213. { h ·X) T 112. e ' a· Gt. 2/3. x= M11
t/2 • (h-•} • b' • {h-x}/x • 01 • 2/3 • ( h· x) • 112 • x • 6° a,·
213 • x= Mv
makadiperoleh: o1=3'M11/({h-x)1/x'b'+-x2'8 J pers. (3)

Tegangan pada maslng--masing baris baut dihitung sebagai betilwl.


Tegan,gan tarik pada s.isi alas plat sambung,
Dari pers.. (3}: a1 = 3 • M,,/ ff h • x )1 /x • b" • x' '6 I =.__"-
i 5;2 .9'
;.. -'__.!MPa
1

Tegangan tekan pada stSi bawah plat sambung,


Dari pars. (1): i __s_._4_
o3 = ( h • x )Ix· o• =.. 8
_,fMPa

Tegangan terik pade baut baris 1eratas,


Oanpers. (2J: o, = ( x- a/2 )/x • o, =i..__23_64._ _,IMPa

=r__s2_s_.........1MPa
Teg.angan tarik putus pada baut dan plat:
Tegangan tank putus bau:t. r.}
Tegangan tarik putus pial, r,}" =._ 370 MPa
4.GAYATARJKPADABAUT
Gaya larik yang terjadi pada. baul baris teratas, T11-=-a1·a·6= 13408 N
Gaya tank yang ditahan satu baut.. Tut=Tufn,= 6704 N
luas penampang bavt, Ac=a/4 ·d7= 284 mm1

Tah.anan lank nominal &Siu baut T11=0J5°At,.0f1)1= 175433 N


Tallanan tank 681u baut. ._.T11= 131575 N
Syarat yang harus dipenuh1 :

-----T""':.:, � +i T11
O

0104 I < I 131575 -+ AMAN{OK)

5. GAYA GESER PAOA BAUT


Gaya geser yang ditahan oleh satu ba-ut, v,,=V11/n= 750 N
Koodrsi sambu.ngan baut geser tungg.al, malt.a n.ilai m= 1
Faktor peogaruh ulir pada bidang geser, r,= 0.4
Luas penampang baut, Ao-=&/4"d2
= 284 mm'
Tehan.an geser nominal baut, Vn= r1 • m • Ao* f,,'ll= 93564 N
Teh.anan geser baut, +i • Vn = 70173 N
Syarat yang harus dlpenuhi:

1so I < I 10113 -+ AMAN{OK)

8. GAYA lUMPU PAOABAUT


Gaya tumpu yang ditahan satu baut,. R.1=V11= 750 N
Diameter baut, d= 19 mm
Tebal p!a1 sambung. t= 15 mm
Tegangan tarik putus pial, r,l= 370 MPa
Tahanan tumpu nominal, R,.=2.4*d•t•rllP: 253080 N
Tahanan tumpu, ti"Rn-= 189810 N
Syarat yang harus dfpenuhi :

rse I < I 189810 _, AMAN{OK)

7, KOMBINASI GESERDAN TARIK


Konstanla tegangan (f1) u:ntu:k baut mutu trlggl, ,, = 807 MPa
Konstanla tegangan (IV untu:k baut mutu tinggl, f2 = 621 MPa
Faktor peogaruh ullr pada bidang geser. r2-= 1.9
Teg;angan geser yang lerjadi. f.,..-=Vu/(n"Ao)-= 2.65 MPa
Tal'\al\So geser baul, +i:"r,·m·r.,'ll= 247.50 MPa
Syarat yang harus dipenuhl :
f11"-=V11/(n•Ao) s ch. r1 • m • f,/
I 2.65 I < I 247.50 -+ AMAN{OKJ

T,,=1
1:
Gaya tank yang lejad� 6704
Tahanan tank baut, +,·T,= ... ,,.A,= 171606
Syarat yang harus dfpenuhi :
s �·T"
6704 I < I 171606 _, AMAN{OK)

Tegangan tank, �= o.1s · r,."= 618.75 MPa


Nllai tegangan kombinasi, r1-r2°f..,..= 801.97 MPa

..
Syarat yang harus dlpenuhi:
s ft·r,•r'"
61a.1s I < I 801.97 AMAN{OK)
Syarat yang harus dfpenuhi :
s ,,
618.75 I < I 621.00 .... AMAN{OK)
&? ? HPYDGb Bafttr·Baftec

PERHITUNGAN SAMBUNGAN RAFTER • RAFTER

1. DATA SAMBUNGAN

Gaya geser akibat beban tarl'aidot.


t+omen ekibat beban terfalnor.
l----�-': .:-1 1--J.; �;1 ;;:� =o--ll�mm

;.
1.1. BAUT

Jenise baut yang digu-nakan. Ti.... baut: A-325


Teg.angan tarik putus baul r,,"= 825 MPs
Diameter baut d= 19 mm
Jarak antara .baut. •= 85 mm
..
Jumlah baut dafam satu baris, nJ = 7 bh
Jumlah baris bout, n,= 2 beris
Faktor reduksi kekuatan taM bavl., 0.75
Faktor reduksi kekuatan geser baut, 0,: 0.75

1.2. PLAT SAMBUNG

Tegangan leleh �L r, = 240 MPa


Tegangan terik putus plat, f,.," = 370 MPa
Lebar plat sambung. b= 175 mm
Tebal plal sambung. t= 15 mm
2. LETAK GARIS NETRAL

e ·- ·- sn • r_,r::c;
0

a
- - a
h
@
-- a h
x

@
a

. ·�.
�h-xl
,,--JW,..._,c-i • ..
0·· •.
@ a/2
b b' 0

Jumlah baul 1otal.


rmggi plat sa.mbung,
n = n•• n,
h-=-n,.·a=
=r--'595---11bmhm


'-......;=--'

=t__
Lebar plat sambung.ekivaJen sebagai pengganti baut tarik.
3-=- n. · (rt/ 4 • 02) / a
Lebar efektif plat .sambung begian tekan.
2_3_35
b' = 0.75 • b =.._.,_
.
_
_,lmm
. 3:1 :.1:a2. 5=.._._

mm
Mis.al garis netraf iertet.ak pada jarak x dari sisi at.as plea sambung.
Momen &ia.tls h.aasan tethadap garis netral.
t/2 • b' • (h-x}' =- 112.3 • x�
(b' -�)12 ·x'. b' • h • x + 112 • b' • h'=o
(b' ·3)12 • ... b'' h • H 112 • b· • h'=o f ncrsamean kuadrat dalam x
A, = (b' • li)/2 = 54
8,=-b'"h = -78094
c.= 1/2' b' 0
h" = 23232891
Dx=B:i"-4"A.'C._ = 1084949293
x =(-81- ,10.J/( 2 · A:.} = 418.49 mm
3. TEGANGAN YANG TERJAOI PAOA BAUT
Pers.amaan hubungan tegangan. GJ = (h-x)I x ' a1 pen;. (I)
a,= ()It-a 12 }/x • a, pers. (2)
Persamaan momen :
t/2. (h-•}. b' 0
0-J '213. { h ·X) T 112. e ' a· Gt. 2/3. x= M11
t/2 • (h-•} • b' • {h-x}/x • 01 • 2/3 • ( h· x) • 112 • x • 6° a,·
213 • x= Mv
makadiperoleh: o1=3'M11/({h-x)1/x'b'+-x2'8 J pers. (3)
Tegangan pada maslng--masing baris baut dihitung sebagai betilwl.
Tegangan tarik pada sisi Blas plat sambung,,
Dari pers.. (3}: cr,=3'M.,ll(h·xJ'rx·b·+x'•6 J=! 3.66 !MPa
Tegangan tekan pada stSi bawah plat sambung,
Dari pars. (1): OJ= ( h • x) Ix· a, =I 1.54 !MPa
Tegangan terik pade baut baris teratas.
Dari pers.. (2) : o,=(x-a/2)tx•o,=I 3.29 !MPa
Tegangan terik putus pada baut dan plat:

r.' =1
Tegangan tarik putus baut., 825 IMP•
Tegangan tank putus plat. r,/= 370 MPa
4.GAYATARJKPADABAUT
Gaya larik yang terjadi pada. baul baris teratas, T11-=-a1·a·6= 6523 N
Gaya tank yang ditahan satu baut.. Tut=Tufn,= 932 N
luas penampang bavt, Ac=a/4 ·d7= 284 mm1

Tah.anan lank nominal &Siu baut T11=0J5°At,.0f1)1= 175433 N


Tallanan tank 681u baut. ._.T11= 131575 N
Syarat yang harus dipenuh1 :

-----T""':.:, � +i T11
O

932 I < I 131575 -+ AMAN{OK)

5. GAYA GESER PAOA BAUT


Gaya geser yang ditahan oleh satu ba-ut, v,,=V11/n= 1518 N
Koodrsi sambu.ngan baut geser tungg.al, malt.a n.ilai m= I
Faktor peogaruh ulir pada bidang geser, r,= 0.4
Luas penampang baut, Ao-=&/4"d2
= 284 mm'
Tehan.an geser nominal baut, Vn= r1 • m • Ao* f,,'l = 93564 N
Teh.anan geser baut, +i • Vn = 70173 N
Syarat yang harus dlpenuhi:

1518 I < I 10113 -+ AMAN{OK)

8. GAYA lUMPU PAOABAUT


Gaya tumpu yang ditahan satu baut,. R.1=V11= 1518 N
Diameter baut, d= 19 mm
Tebal p!a1 sambung. t= 15 mm
Tegangan tarik putus pial, r,l= 370 MPa
Tahanan tumpu nominal, R,.=2.4*d•t•rllP: 253080 N
Tahanan tumpu, ti"Rn-= 189810 N
Syarat yang harus dfpenuhi :

1518 I < I 18oa10 _, AMAN{OK)

7, KOMBINASI GESERDAN TARIK


Konstanla tegangan (f1) u:ntu:k baut mutu trlggl, ,, = 807 MPa
Konstanla tegangan (IV untu:k baut mutu tinggl, f2: 621 MPa
Faktor peogaruh ullr pada bidang geser. r2-= 1.9
Teg;angan geser yang lerjadi. f.,..-=Vu/(n"Ao)-= 5.36 MPa
Tal'\al\So geser baul, +i:"r,·m·r.,'l = 247.50 MPa
Syarat yang harus dipenuhl :
f11"-=V11/(n•Ao) s ch. r1 • m • f,/
I s.36 I < I 247.50 -+ AMAN{OKJ

T,,=1
1:
Gaya tank yang lejad� 932
Tahanan tank baut, +,·T,= ... ,,.A,= 171606
Syarat yang harus dfpenuhi :
s �·T"
932 I < I 171606 _, AMAN{OK)

Tegangan tank, �= o.1s · r,.'l = 618.75 MPa


Nllai tegangan kombinasi, r1-r2°f..,..= 796.82 MPa

..
Syarat yang harus dlpenuhi:
s ft·r,•r'"
618.75 I < I 796.B2 AMAN{OK)
Syarat yang harus dfpenuhi :
s ,,
618.75 I < I 621.00 .... AMAN{OK)
9. PEDESTAL COLUMN DESIGN

ANALISIS KEKUATAN KOLOM PEDESTAL


DENGAN DIAGRAM INTERAKSI

A DATABEBAN
Paajang te-bar Tebal 8""'1 Beban
(ml (ml lml (kNtm31 (kNI
Berat sendiri kolom pedestal 1.50 0.45 0.45 24 7.29
Beban Seodiri V1 = 7.29

Pu1 = 1.2" V1 = 8.75 kN


Pu2 = Nu11111x= 56.48 kN
Pu= Pu, -+-Pm= 65.23 kN
Mv=-0- • 4(p=- 5.01 kNm

B. DATA KOLOM
Kuat tekan beton. lo'= 0.83 'K/10 = 20.75 MPa ,j1.Pn
Tegangan leleh ba)a, r., =- 390 MPa h
Bernt be-ton bertulang, 24 kN/mJ
s,
Lebar koJom, 450 mm
Tinggl kolom, 450 mm
Tebal brutto selimut beton, 50 mm I strain
Jumlah tulangan,
Diameter tulangan,
n=
D=
B
16
buah
mm
•I

I -r
F,

··1
• I •
I
I b

J
C. PERHITUNGAN DIAGRAM INTERAKSI steel torce

I; =12.E+05!MPa
• .1 •
Modulus elastls ba)a.
F,
ll, = 0.85 untuk 1; � 30 MPa
1 eonerere for'oe- -r-
ll, = 0.85 • 0.008 [I.'. 30) untuk fc' > 30 MPa 3�
�51,
Faktor distribusi tegangan,
Luas lulangan toial, A, = n • n/ 4 •
ll, =
02 =
0.85
1608 mm' �
1 •. d1

kiJ
Jarak antara tulangan, x=(h-2'd,)12= 175 mm
Raslo tulangan, p =A,/ A,, = 0.79%
Fal<tor reduksi kekuatan,
•= 0.65 unruk P0 > 0.1 • re.. b • h Untuk: 0 s Pns 0.1•fii_••b•h
+= 080 unruk P0=0 � = 0.65 + 0.15 • ( p� • P, )I PM
No Luas maslng-maslng tulangan Jarak tutangan thd. sls! beton Pada kondisi tekan aksial sentris (M00-= 0) :
1 A., = 3/8 • A, = 603 mm• de-= 2"'x + d,-= 400 mm P,0 = 0.60"[ 0.85"fc' "b'h + A,"(I, -0.85"fc')]"10·'
2 A,,=2/8"A,= 402 mm· d2-=x+d.= 225 mm � P�=�kN
3 A,,=3/8"A,= 603 mm· dl -= d,-= 50 mm o.t ·r,"b·h·1o·'=�kN
Pada kondisi balance :
c = c,, = 600 I (600 + r,) • d, =i 242.42 jmm
A,= 1608 mm·

Pada kondisi garis netral terfetak pada jarak c dari sisi beton tekan terluar:
Regangan pada masing.masing baja tulangan : ""= 0.003 • ( c - d, ) I c
Tegangan pada masing-masing baja tulangan:
Untuk I t,, I < t, I Es maka : f,1 -= i:-.• �
Untuk maka : f,1 -=J £,i I / G/ t.,
Jumlah interval Jarak grs netral =I 125 I � �c-= 3.6000
URAIAN PERHITUNGAN PER SAMAAN UNIT
Gaya1jllya internal pada masing.mosing baja tulangan: F.. =A.· r., • 10·., kN
Resultan gaya internal baja tulangan: C"-=(£F_.)"1U- kN
Momen akibat gaya internal masi.ng.masing baja rulangan: M• = F.(h/2 • d,) kNmm
Momen total akibal gaya Internal baja tulangan: M,-= £ M,. kNmm
Tinggi blok tegaogan tekan beton, a-=13.·c mm
Gaya inlemal pada beton tekan: c,-= 0.85 • r,· • b • a • 1o•s kN
Momen akibat gaya Internal tekan beton: M.,=C,"(h-a)/2 kNmm
Gaya aksial oominaJ: pl\-= c,-+ c, kN
Momen oominal : M0 = (M, + M,)"10·• kNm
Gaya aksial renoana : P11-=i>,·Pn kN
Momen rencana : M..=+·M, kNm
--
.,..
.-
= = �
=t f ""'! '--'
"'" ;,-- I"- G"'.
....
- - - - • •
2'00
��� ::E •
l
==
� ,_ ,
-r-e
--:i= - __ 1=-
_,_
-, +
""'° -i- -i- -;- -,,- -i- -j- ct
� ==!= -"'F- - • •
2100
-, -, --
I
�:
-:r t ---,=- -=r=- �
CF-
� c=:-
2000
± --c-j-," ..E . ± --.- • • •
.... �FE
1000
1= ---r
�-
- ,_:,=_
��
---'-

--� b _J

-
,_ >--= � t-
.... :::±::• =!= -·
- 1-'-l-
17"0
= = baa = �- b= 450 mm
+
;;: =c

1'00
_L _J_
..c..]:: :::t
. - ,, h= 450
8 016
mm

!& -'
�·=
.
1'00
21 MPa

+ ++
f :

1300
390 MPa
- :::l'\
Pu'
-e- -!- -i- -"'
1100
':F=: -� � "-- � � - � Mu

±- - ± -!- -!- _,_ �-


1100

-
lkNl llcNml

p: a
- � -:r .,...,
1000
-er- 6523 5.01
= T =
T=
,_ T ::;!=' I-=
I= c; i=
900
_ I__ ,...;,:::: --
F- ':J7
= =r
f- -eel
000
-, -, t t
r= � ""'.,. =r= -

-- -
100
::±: ;.,-
,, -
�:
'
000
- =- ='=

=+ -:+
000
=!=
ecc
>OO + +++ <C' _,_ + _,_ -=;
_,_ + _,_
,oo ���
.±: - -
=I
,_ =I=- -j:: =I=-
-,,,,-
--""!'.,;_-

-· = =I=- .c±- =I=- �


--.-
-=- -=- �

--
1-J-- =t
"'
= •• ••=- - -
100


• T- =•-=+- -"1= � - l=;c-

a • • • • • • ro • • 100 •• - - �
4-Mn (kl'On)

GRAFIK ANAUSIS KOLOM OENGAN DIAGRAM INTERAKSI


0. TULANGAN GESER

�·
Gaya geser ultimi1 rencana, 3.34 kN
Faktor reduksi kekuatan geser, 0.60
Tegangan leleh tulangan geser, t,. = 240 MPa
b= 450 mm
h= 450 mm
d,= 50 mm
d=h·d'= 400 mm
Kuat g:eser beton, V,=(�fc')/6 • b•d • 10->= 136.66 kN
Tahanan geser beton, �. v, = 81.99 kN
> v.
Hanya pertu tul.geser mln

Tahanan geser sengkang, r· v, = v, -r • v, :c=JkN


Kuat geser sengka.ng. V,-�kN
Dlgunakan sengkang berpenampang: 0 10
Luas tulangan geser sengkang, A,=n,•p/4·p' = 0.00 mm'
Jarak sengkang yang dipe<lukan : s =A,· r, ·di< v, • 10') = 0.00 mm
Jarak sengkang makslmum, Sm111(=d/2= 0.00 mm
Jarak sertgkang ma.ksimum, Sm1x = 250.00 mm
Dlambll Jarak sengkang : s= 150 mm
Digunakan sengkang, I 0 10 - 150
.
. .. •
....
a
0
" "

......,. ....... ·� ....


,N ,N
..fPII
'" "'
KOHOISI TEKAM U.&tAl. SENTRIS

0.000011 ClDOtO,. 0.002711 u:i.,:i: ll7.Vl


,,.,,,.
390000 011,e.,o 131,004 23,�2
.,..,..,
<l.lO..»I .,21� 11 0.00 4 tlG1...., 2901i.32 429.7:r, ,,,.. ..
.......,.
40fJJa.UI
J.JJ0.43

3330.4.l
o.oa

.....
"·°'
0.l)!I 2H!.O.OII

2H!.O.OII .....
,,,.... ......, ... ....,
.. ,,•.ioo
.......
O.OOfGJ 0.00:.'69 J 11.000 1,0.001 0.00 .t ti 07.� 417.ll!f l3t:uo 33,0"' o.a.,
,,..,..,
390.000 01.310 43.l..JM -1'700.17 29107.26 21&CI 00 3191
.,....,
401.tlOO

....... ..........
....a.. u.....,
o.oo,�
0.00101
0.00:.'69

0.00:.'69 .....,,,
107�

l:!1.t3CI
390.000

390.000
G.l.141

1'-2-'"" 12"!1.1::,0 .,....,


430..lCle .1uae.os
471..330 -0013.:,,0
0.00

0.00
.t ti 07.�

.t ti 07.�
29107.7'1

3010U7
414..«13

411..!17 .....ee 02107..33


33,0"'
3330 4.J
01.81

°'·"'
o.a.,
o.a.,
21&CI 00

21&CI 00 .....
07.1(1

........., ..,.,.
0.00100 0.00209 100.&24 319.tOt 390.000 00.0'!IO IZG.310 2:».242 42"1.2'6 -10021.IM 0.00 .C1107.4l lO:M0.79 4oa..,1 )242..29 01201.:JO ll330.4J 97.0I o.o, 2100.00 Ol.01
471.000 0.0010II 0.00209 90.o.:115- ll0.90t 390.000 ,0.'22 127A.OO 2:».242 "21.llO .t02231U 0.00 .C1107.4l 30943,C,2 4�..., 3210.01 71001.C)O ll330.4J 102.o.!
......,,
o.o, 2100.00

,,_..
00.71

....,.. ...... ..
..ll13.400 a.oote.7 000:101> 8:3.t\..� l\<f,029 390.000 ,0 11<4 170.000 :r»242 "17..9:17 �l!U9.$l 0,00 •1107.4.3 l'l.347.!IO 3l'33..72 70020.40 '3330.4,) 107.37 aree.ee CS.9.-ro
...., ,
..OIUIOO

........
4(12.000
a.oote.o
Q.0(110,:,

0.00104 ...
000:101>

000:101>
,..
09.......

Ol!l.189'
01.19)
ltZM<I

310A30.
390.000

390.000
Ol.771

:11.391
40.910
12' 721

124 029
:r»242

:r»242
;?».242
.. ,._,:,.:,

411 MU

400 ICO
-NO!ll.l»

-Oe93..4.)

�70.ac'.I
0,00

0,00
0.00
•1107.4.3

•1107.4.3
.C1107.43
3'1701'.M

1;,11a90,
,ii�
'399.33
'l,�.27
.J.'J)..21
3,09,43

31•�10 044-94 33
'3330.4,)

'3330.4,)
112.00
110.IST ...,
0.6,
llGO.Gel

llGO.Gel 70.1)3

O.OOCMl l00.17t 390.000 12.J.9:?3 3\:?0.CC 0001070 .J.3)6,4.J 121.Zl 210C.00 Til.>S
4:le.000

4:1:....oo
,..,,.eoo
0.00039

o.oocoo
o.ClOI.O'
0.0010.l

0.001�
0.001�1
000:.'07

000:.-01
o 002G1
77 f24

72.99 t
Ml.1'02
300.042

lC)."7
301,i<l:I
390.000

390.000
390.000
40.020

4•.027
l?l.OCQ

IZ?.000
121110
1».242

23'.242
2".242
40& TOO

401 337
391.0!:ol
�141.0C.

-1704...12
-7201,�
0.00

0.00
0.00
.C1107.43

.C1107.43
.C1107.43
33C'20..39

33402.71
3390U7
.J90 1,

.30109

� Ol
3090.o!l7

307220

3G4a.OO
92604.91

90030 12

100030.2.2
.3·336,4.J

.J.3)6,4.J

33.llS.43
12,:r,.09

130 10
,,. ....
0.6,

0.6,
O.o,
210C.00

210C.00
21GCI.Cla
.....,.,.,
C.1.70

.4141l.200 O.OOIU2 0.0014$ 0 002G7 �20 280.19, 390.000 1:.'0. ,:13 2».242 .3&4..310 �U.07 0.00 .C1107.43 3-13:!,6.,30 :JM.IJ7 30'?)..71 104303.l-il 33.llS.43 13"0.7.! O.o, 21GCI.Cla 90.17
o.G,
444 COO O.OOOXI 0...00t4a 0.00206 OO.Hl9 2&0.il,O 390 000 119.112 Z),.242 380.1t9 -83n39 0.00 .f11Gr.43 J.Co:Jt•CM 37791 �.•:1 10411'1.2!1 3.336.it.l 142.91 2100.00
"·"'
4,41.000

4)7400 ....... ........ .......


O.OOO'JC O...OOtA'T 0.00206 oo..nl2

IU.303
283.070
,....,..
390 000

390000 ,._ ... 117 142 Z),.242 ltn.3,0 -!Mtt> 43


0.00

0.00
.f11Gr.43

.f11Gr.43
3:1179. 19

,.,,,...
a.:r,,,'2.oo
37400

371 79
"97a.t4

�:I0.00
11fT90.00

1 l$3fl.0:!
3.336.it.l

3.JJ.t.20
147.07
t,1 i,
o.G,
·�,
2100.00

lt07.23 .....
9-'.00

....... ....
··��
4-)1000 0.0002' 0.001.U 0.0020, 40.:t!IO 2Nl.1'97 3'0.000 :u119'3 110.132 23:1.24:;! 379..!173 -4$3-4 TO 0.00 .. I Hl7.Q .l�7l :n20.,o 11 ne:20.92 .llOCi.14 1:1,, 1:1 o.o:i 214ll.99 U>0.0)

,.,,
4l0.200
.,.....
...
O.DOtQ 0.0020, 42.120 2e6.t91 3'0.000
......
za..... 11:u,� 23:1.24:;! 37.!1733 -4440 00 0.00 .. I Hl7.Q ,l,0!1,01 :nouo 122374 01 .l.211).01 1�10 o.o:i 21!10.71 1.0).41

....,.
·�
0.00019 O.DOJ..:! 0.0020, 37 •ll.2 2l!J;� 390000 11•.020 23,.242 371.c29 .SS.CS tl 0.00 4 tlG1.4'.'I 172111,)0 3(12.01 2077 99 1:!�"3 70 l..2'9.C1 162,!11 2112..JC 10,.93
.,., 3,,�,
........
.;u.c3 n

..
0.00010 O.DOJ4" 0.0020, 2!!0.o.!I) 390000 f'3.070 112.937 23,.242 301.0� 0.00 4 tlG1.4'.'I l772l.71 20!l1.70 1:!90001'4 3221 OiO 16070 20&4.Cll 100.41

,.,,, "'
....... ........,...,... .......
,,.....
419.400 0.0001.t 0.00139 0.00204 27 7:.C 270.t t2 390000 t0741 I 11,030, 23,.242 30).019 0.00 4 tlG1.4'.'I 3:1£>A!I 20,-:9.42 1322.1!9.UT 3193.3.1 170.al 207!1.00 lt0.04
_.,�oo .,..,.., ,.,, ,.,..,
....... ..
0.00130 210� 390.000 13.nl� I 10.710 .:,>,IQG.6' 0.00 .t ti G7.� 3071)1).76 2lW». t , 1 »ua.os 3.104.0l t7k.2l o.a., :,0071, Ul.?J

......
412.200

.......
O.OOf,0 t't.1�
,......
,.....,
390.000 f0.712 109.074 .,..,.., ,.,.,,.
.,..,..,
-1074." 0.00 .t ti G7.� ,.,,,,....
,..,._ ..,.,,
l.:iG.37 ;!.70CU,.1 1l00l.7...J)5 3.130.37 ,,,.., o.a., "''° .. u:r,.oo

......
..
100.-114 0.00 .t ti G7.� ;!l'�,o 1410�.31 o.a., :,(120.09

..
0.00000 O.OOtl:I 0.00:.!03 l2..020 390.000 7..017 "l.274 -1333.03 l.10'7aJ IOU7 01.09
400..000

401.400
0.00t33

O.OOtU
0.0021$1

......
1.401 390.000 107.2:U �42

�42
""·""" ,.
,...... ,.,,_,.,
..
.701 91 0.00

0.00
.C1107.4l

.C1107.4l
40lOM2

40940.)l
ll....2' 21.n...21 1'4«.o n llOta.21 IOA.O:i
, .,,
o.o,

......,,
o.o,
2001..C.9 120.IC

.......
0.00001 0.0021$1 26.).677 390.000 L:Z02 100.031 3,4.2.030 ll•1.1, 2707.110 1•7317.70 ll0:50.a2 180,2.64 122. .le

........ 200.on 1-,01u.:u


. .....
197..«IO .0.0000:, 0.00130 000::02 -3.3.10 390.000 .2.002 IOC 007 2'»242 0,00 •1107.4.3 41-,i1.10 '3�13 2003,,10 '3021.7.t 191.0l 1911-1: 13 1:2,.oc
,..., ,.,.,,,. ,.,.,. ,,..,..,,.
, .......,, 0.1)0129

0.00tl7
000::02

000::02
.0.020
-1�439' 2'4.370.
390.000

390.000 �.710
!Ol.OIU

102.291
2'»242

2'»242 32a 02"4


,.. .....
931.00

10:r.a.10
0,00

0,00
•1107.4.3

•1107.4.3 4269l0t
'l.»07

'llZ.01
2M9tft

20».12
,_,�

1-'0ol'901
,..._.,
,.,,...,
l!M.82

,., .,
19' 1' ..., 194:t 30

19:ICI.OO
120.ro

1:20.00

.....,,,
0.001� 00020, 0.00 .C1107.43 .J'26.9, 0.6,

........
:Ml?.000 .Q,00010 ..;!0.t.,15, lft:110) 390.000 -t2 l:J7 100Jll919 23'.242 :MZJ.0-2 4-):?$<490 :!Ot0.0,1 1-'0020.79 1'934.82 1007.10 130.0C

343.AOO ..0,00013 0.0012' 00020, 2<17.tl07 390.000 .1,:1.010


...,..
99.0tU 23'.242 319_:,.. 2742.tO 0.00 .C1107.43 4-)909.CU .J.�S..09 2,00..:i, 10Ci0Cld.2:) 20A.42 0.6,
.... ,.
IOM.77 132.07
,�.O,

...,.,
o.o,
.......
379«!00 .000010 0.0012' 0 00201 -31.!tUt 244,15,,0 390.000 -rs.zee 2».242 31•...J.l3 '300.00 0.00 .C1107.C.3 ·�3 l.22.0l 2:I0:2...26 102921.l-9 l!a70'..o9 ::!!>7.40
.,,,,,.

·� ·
+000019 �1,14ll 9Cl,97 I 2».242 309..)10 4000.01 0.00 .C1107.C.3 2037.97 1"'2ao.21 �7.29 ::it0.4.J o.o,

... ........
370-200 0.00121 0 00200 390.000 4'17'!.:211 31977 10,0..7;1 UC.7fl
,...,,,,,
17'2.000
.,..
.Q.000(12

,...... ........
0.00119
o.oom
000200
0.00::-09
-'4.122
�.407
217.001
X.:. 140
390.000
390000
.:lG.01-'
,.30 ,1<)4

.,.,.
9,1 1"°
2".242
Z),.242 .... ...
,.,..,,,
40)7,..,
..,..,.
0.00
0.00
.C1107.C.3
.C 1t!Sr.4l
4'°'24.00-
40400.22"
310 71
31.10,
2$13.08
:!4�9.4-0
107a14 72
109'7{4.00
lh1J7.(19

"""·"
213..»
'lt0.20
o.o, 1031.Gl
UU:2.40
ue.oo
1.fO.O"l

0.0011!1 0002::19 �.41.t llOJM> 3'0000 -lJ.210 23:1.242: :599'1 19 0.00 .. IIG7.4l 47l04..CS1 .311>.!19 24(m. 1 t 171(19037 2100:nt 2t9.0Q o.o:i 17&J.22 l-42.3:1
3Gt.«IO ..(I.QOOXI Q.00113 0 002:09 -63..3:IO 220 G0a. 390.000 --31:1.212 91.220 :r»242 :mo.2:16 0007.00 0.00 41107.oll 41&>4.49 '307.33 J4-40.03 173072,32 71.29.0!I "221.73 o..o, 17Tl.91 lA4.11

�2.233

..
"°---200 ..O.tlOOl.:I 0.00112 000200 .JO Gl7 223.110. 390.000 09 7� :r» 242 2Cl2.729 7390.1'9 0.00 41107.oll 40,01).22- '304.AT J411l.:r,4 17,0lS..tkl 2<1:119 V "224.ol(I o..o, 17� e,;3 lA!l.00
3,),IICOO ..OJXI03CI 0.00110 000200 .JOOt9 719.209 390.000 -AC330 00,101 :r»242 211..000 CU00.02 0.00 41107.oll 48270.:20 <JOI.AS 13:92.20 111732.47 2009.34 "22"7,0l o..o, 173:1.07 l-47.0C
�t.000 .O,OOCMl O.D010tl 000:.:!IT -63.701 210;.lM .JII0.000 �.023 00.011 23'.242 VI 330 ll041�7 0..00 .C110"f.43 ,0009,_QO 2'9&.» 23CST.91 11�,1.01 2038.30 ,,., o.o:r, 11,,� .,,z1
�1.AOO .O,OOCM!I O.DOUXI 000:.:!IT .1!(1.040 211..J.119 .JII0.000 -..'M 7'!17 o:i.ooe 2.n242 ,o:r,_4,-i sooa_,1 0..00 .C110"f.43 �TOO..M �.29 2343.00 101290...3.!I 2.00$.13 n..i.o, o.o:r, 1as,.94 IIKl.03
�3.GOO .o,CJOCM., o.001CM ooo� .eo.ooo 207.330. .JIIO.ooo ..:,::1101 03.3n 23'.242 �.4,-i 103� 11 0..00 .C110"f.43 :U'-20..:14 2'!1� 2'319..'39 102'll0a.32 2071).0:1 '23-4,49 o.o:r, 101<1.2:1 1�2.42
lA0-200 .000001 0.00102 oooioo .100.4CT 20().11, 390.ooo -63.010 01.701 2".242 2e.3..ll7 lt13a.07 0.00 41107.43 "2l00.,)0 ,�17 �11 ICl4l)(l0.90 "40,43 aae.ee o.o, 105040 133.81!1
3,30.c,oo .o 00007 0.00099 o oo2!i, .1 t, on1 ,w.s» 390.ooo -40, 100 79.990 2".242 2'17.070 I 1929..')J: 0.00 41107.43 ,3000..70 t\00..11 2210..IJ2 100011l2.2$ ,1S1T.Q9 ,,,.,. 0.0:1 10JCUJJ 1.:):t.47
333,000 .o.oooeo 0...00001 o.oo:is, .120.121 l!MM!l 390000 -12.011 70.2$1 2:),.242 2VJATT 12742,90 0.00 -411G1.43 $3910.At 2'(110, �3 10'1lUS..lO 2-411-7 21 �41�"4 o.G, 1010.0:1 1)0.9,11

.l�AOO .Q,OOCIO' 0...0000, O.OO:m4 .1:o..oe1 190.1� 390000 -nMO 7t1409 2:),.242 29,t 144 1�7A..4l 0.00 -411G1.43 :W741CO 279 99 n.22.20 100'901.99 24:.0.3' �4.l.Oof o.G, 10'Ml.o, HJ0.71
n:>.ooo -c.cceee 0...00001 o.oo:m4 .130 0.t0 100.033 390 ooo --42.•.2� 7of.040 2:),.242 D1-'<i1 14424 2, 0.00 -411G1.43 °""91.00. Vtl.91 2197.90 190:200.30 24�.ol.J �4!119 o.G, 1'70.63 l�.TC

.......
3:22.200 .0.00012 0.00091 0.00�3 .144.075 IIU.000 390.000 --473el9 72.TllT 23:1.24::! l:20..G40 1"293..00 0.00 .tt1G7.Q :5C40GA9 27141 2173.07 191424 42 """ 31 o.o, 1�.30 UU.13

310.GOO .o.ooon O.DOOIXI 0.00�3 ·1"3.290 110.n, 390.000 �4(10 70.oa.:J 23:1.24:;! Z13..otl0 111-101.:,1 0.00 .Cl1G7.Q Sll-'Cl.84 2TIUlt 2t4US 1�il te 23G:J.Gf o.o, 1»:1.90
lUU)OO O.DOOCIO 0.002!12 ,IQ.I.� 171..419 300000 .$7.1.\:19 00,930 23:1.242 200.!l19 0.00 41lG1.4ll �O! U110 212110 193049.ISCI l.l31.CJ1 o.M 1:n!l,o,

..
..O,OOC!Dl 17090.20 Hn.1.1.

lH.400 ..O,OOOD:1 O.IJOOCO 0.002!12 -1707'13 100.llT-4 300000 -HU.912 OCl.!M3 23:1.242 t9!1.:H4 10020.0l 0.00 41 lGr.4ll 09111-T40. 164.tl!I 2100..0 I 194000.M 2300,03 '""·tu 104.99
, .,,
2',") � 0.6:1
307.bXI ..o,oooeo o.oooc1 0.002:11 -1n.n1 101MM 300000 .1oc,-409 O,C.9G4 23:1.242 191 TJO Hl971." 0.00 41lG1.4ll 00-13!UIO lOJ,C3 2010..:.: 19�.AT ll!I0.211 :tM n o.M 147A.37
"304.200 .O..OOCl!'M o.ooon1 o.0020t .100.s» 1::16211 390.ooo .u1mo a2.0l7 23$.242 10,&..000 t9134a.:50 0.00 .t 1107.4;:r, CU II !L.01 �1 io!l:!.24 190428.94, lllo.3:2 o.o., 140;) 01 1(17.4(1

"JCO.GOO .0..000!9a o.ooon o.oo:z:,o .1ao.403 1:io.&10- 390.ooo .us.e:1• CICl.000 23$.242 110.;!40 �2.9' 0.00 .&1107.4;:r, Cito.» ��t 2021�!10 191200.Ce �:20 o.o., 1.t:u..n 1CO.OC
2'!17.000 ..O.OOICM 0.0007l 0.00249 -200.()(11 ..OA!I:) 390.000 .1�011 00.491 �42 10l!l.122 2t9Col.49 0.00 .C1107.4l Gl13t92 2�� 2003.GO 1979'1.92 2171.0'!I o.o, 1.4tl.7l 149.ot!
2'!13.400

l::�9.<100
l!OG.200
..0.00109

..O.OOJ!o&
..OJXl\19
0.00070

0.00067
Q.OOOtU
0.00249

0.00240
000240
-2U'.890

-220.t:17
-230.074
llS.077

1>4�1<11
120.302
390.000

390.000
390.000
.131.,1.92

.137.alt
.1.43.80�
00.240

03.9:KI
01.09:3
�42

�42
2'» 242
H)l'J.990

101.071
142.911
2:IOll.11

240e.l.72
�OH\3 32
0.00

0.00
0.00
.C1107.4l

.C1107.4l
41107.oll
GAtTO._,..

G:l�S.10
00�70
2'49..J9

240.:ll
243.27
1979..�0

19!1:t.09
1930.00
1�1.4.C

190090.03
1911CS77..!)1
21lS.:ie

2100.00
2073.73
......
.;?r,-,.93
o.o,
o.o,
o..o,
1390.09

1369.'ll
1347 91
11'0.71
11'1.0J
,n,o,
l!02.000 ..OJXl12' Q.00061 0002-47 ,24Q.2'"7 122'.2Sl 390.000 .100.3,.t(I 4111.177 :r»242 tiMOTl .:!6310.'9' 0.00 41107.oll 1)7470..37 2'1>.l1 1906..,2 199904.07 ZOC0-09 .21>1."4 o..o, 1l2G.,30 11'3.0,

:-19.000 ..OJXli:JO Q.ooooel 000240 -2f!0�1, 110 129 390.000 .1,0&:1(1 40.090 :r» 242 124..803 "274G7.00 0.00 41107.oll OOC,\30,.00, 2'37 1:, 1Cld2.2.) 200310 )2 1007.21 .200.9' o..o, 1304 0'3 174.CO:
27:S.AOO .0,001:,0 O.DOOCI, 000240 -271.400 1.0'J.004 .JII0.000 ·163,741 .&4.1� 23'.242 110.007 200!).l.01 0..00 .C110"f.43 09022.� �.09 10:17.94 200074.2,4 1913.00 27,1,40 o.o:r, 1202.o,; rrs.re
211.000 ..0,00142 0..00002 00024!) -2M.002 ICtl.311 .JII0.000 .17.1.701 41 � 23'.242 100,003 16073.01 0..00 .C110"f.43 11040'4 231.03 1033.CC 2007!)7.G!I 193$.74 211.00 o.o:r, 1200.01 fTO.�
�oo .000147 o.� 0002« -211M.c." So0.044 390.000 .1n.o:r,2 ,C,00,3 2».242 SCl..233 lt1:-.i 1l 0.00 41107.•3 72'91.:lO ,-2197 1009.)7 20Ql'SCIT,t.C HIOO,a2 213,10 0.0:1 1 :?ac.G, 171.0,

iZG4GOO ·0001!)4 O.� 0002•l -307.029 oa.no 390.ooo .10:1 ,so ee. 100 2».242 CIC! 100 lUl.'9..27 0.00 41107.•3 11,1&.10 214,40 0.0:1 12.JO..JO 110..41
l!G'l.000 .Q.00100 O.OOCM! 0002•l .S19� &2.T-!19 390.000 .192 742 33.VG 2».242 7:1.700 337129.07 0.00 41107.43 7'°67.30 "1.c, 11oo..GO 20Ql')02.77 1030.0CI 210.70 o.o, 1191 TT 179 2ol
;n 400 .o.ootoo 0...00030 0.00241 .s32.40t �.02,1 390 000 �.000 '30.l:10 2:),.242 ee I 13 3'007,4l 0.00 41161.43 nu:.4(10 are 19 1730.,01 2007�9.1 I 1001,G:2 :,n,oo o.G, 1111,o:r, 100.0,

:,1.coo .o.oot73 o...ooOGt 0.00241 ..>40..62'0 GO.OD, 390 000 �An l1.l79 2:),.242 04 •144 96443..47 o.oo 41161.43 nooo.ao :1:1on 1112.2l 20000113 1100.37 :uu, O.G!I 11-40..14 III0.0-1
.,,,..,
2:Kl.200 �0..00100 0.00000 0.002>1,o .:,�.233 00.432 390.000 -210.004 Z.C.3&1 23:1.24:;! <ll.o:19 37&t9.70 0.00 41167.4!1 711()1)113 212.07 10ll7.11-1 200280.0:1 1730.Tll
....., o.o, 112!1.Ql 101.00
.240.000 �o..ootGT

�0.001�
o.oooari o.oo23!J ..tT.1.236 :i.z eee 390.000 -27!1.1]1 2.1 l'l-l 23:1.24:;! 31�..0, 38')97.07 0.00 4 I 1 Cl7.Q 00'!!0:UO 209.Gt
�:t
1003.GO 199e02.22 105't O":I

..... o.o, 111>1.00 1G2..3A

..
.243.000 0.00022 o.oono -3CIT.r.,-i -44 4.44 390.000 -23:1.0ZCI 11.on 23:1.2-12 1.9.207 "40919.0"! 0.00 4 I 1 Cl7.Q i,2007 .20 lo.».30 1990:l-l..lll IO!IO.O., o.o, 1010.1, 16'l.07
239.400 ..0,00201 0.00010 0.00237 -390.000 JG 000 300 000 ..2J.:l.2,U t.t 013 23:1.242 14,!113 At1(17.4l 0.00 41 lGr.4,ll ll2l34..<lll- l03.4!1 1013..07 19000G.Ol Hl29.05 21'1 ,c.a 0.6:1 1�!123 111291
230..000 0..00014 0.00230 .;)II0.000 27 �) 300 000 I 1.0, I 23:1.242 11,001 At1(17.4l o.oo 41 lGr.4,ll ll2l34..<lll- lOOAl l.lMCl.79 1911:'J00.40 HIOI 04 ,.. 0.6:1 1CMt..:0 11120)
,...,,
..0,00203 ..23,!1.2,U

.232..200 ..0,00211 0..00009 0.00230 .;)II0.000 10.00, 300 000 ..23,!1.2,U 7 41U 23:1.242 7.401 At1CT.4l o.oo 41 lGr.4,ll ll2l34..<lll- 191.37 l�O 191012.:ICI HIT3.!ICI 0.6:1 Ul2.l.O!I 111213
l2UOO

l:2:l.000
.O..�

..Q..00233
0.0000,

0.00000
0.002341

0.00233
-390.000

-390.000
9.4i9

0.000
390.000

390.000
-23!1.2-t2

-23!1.2-t2
3.000

0.000
23$.242

23$.242
l..000

0.000
.tUOT.4.l

.tUOT.4.l
o.oo
0.00
.t 1107.4;:r,

.t 1107.4;:r,
0-2334..CO

0-2334..CO
l�..3t

191.2:,
11M221

10t7�!13
1971Col.31

19t\301 0.,
1�0..01

10119:I
279.!IO
270.72
o.o.,
o.o., ......
10GC.91 101.1$1

101.17
U-J..400 ..OJXl.24.2 .0.0000:, 0 00232 -350,000 -9,7M 390.000 ,23".2.t2 -l.923 2'» 242 ..J..823 .Cl lG7...3 0.00 41107.43 02334.00 100.-19 1-491.04 19'0�01 1"°971 "277.llG o..o,
""°·" ICIO.Ol
:11..«IO ..(IJXl2:)1 .0.00010 000231 -350.000 .t9.03!1- 390.000 ·?3".2•2 -7970 :r»242 .7.910 .4tlG7.43 0.00 .t11D7.oll 0233<1.00 1oi.13 1-409.30 194091.� 1"61.30 "270.83 ......,, 849.80 100.00
2 l4.200 ..OJJI02CO .0.0001!1 0 00230 -350.000 ,30,2!12 390.000 -?3".2•2 -12.1CIO :r» 242 -12.100 -4t 167.43 0.00

0.00
.t11D7.oll

.t11D7.oll
0233<1.00

0233<1.00
102.07

,not
1-44,.07 183:)00 !IO 1,32.9C "27.:1.82

"274,0C: ..., ......


831:39

812.70
1"79.3'

no.cu
0..00 -411D'f,,c;J 0233400 17�9, 1JM•9 181�:M..•7 11m.:,1 21-3.09 0.6!1 rn.eo
�3.AOO ·0,00:?90 .0..00032 000220 -3!!0.000 0..00 -411D'f,,c;J 0233400 112.09 1372.21 180120.0, l�OM 21'2,'*<I 0.6!1 .ani.20 rn.10
199.000 .0,00301 .o..ooo:;e ooo:n, -3!!0.ooo .7:,.070 390.ooo .n,,2-,12 -30 431 1.n242 -30 ,11 ,1101.4.J 0..00 -411D'f,,c;J 0233400 10,,.Cll 13.t7.fJ2 100Cl.23.30 1317.A') 211 HI 0.6!1 O:S0,31 rre.ee

··��··
1-90.200 -000312 .0.()00,M 000224 -390.000 �.073 390.000 ·"23!1.�2 .;5!J,<l10 2".242 ...):)-410 -41167,43 0.00 •11D7.•3 Cl233A.OO 106..77 1323.03 ICl7A.4� t::PD0.22 ;!G.9.7CI o.o, 03-1.>t 110.30
19UIOO -000�3 .0..00000 00022:! -390.000 -100.93::1 390.000 ·"23!1.�2 -"0.000 2».242 ..4Ul.!SCIO -41167,43 0.00 •11D7.•3 Cl233A.OO 103 71 ln!J.30 IMelM,OC 12'6.70 �.S:l o.o, 010.1;, ll'A-'1

·� ·
109000 .0.00007 0.00221 -390 000 -1 t•.200 390 000 -23!1.242 -4.).5'7 Z),.2<l2 --'U.9'7 •110:,,43 0.00 411Gr.43 0233.1.00 100.0:i 1UD.OO 1�<1.C!i.HI 1229.10 .....ec 173..C:>

..
.Q,0033!1 190,9:!

tOMOO .Q,00�7 .0..00064" 0.00219 -390 000 .1�.1,, 390 000 -23!1.242 -!11.0J.t Z),.2<l2 �I !IJ.4 .£11G7,43 0.00 411Gr.43 0233.1.00 101.-'!t 12»11 1amca.1• ttoo.2.- ..a.,.20 779... 172.�
HIJGOO .Q,OOJC'.,O .0.00071 0.00217 -390000 ·14:2$4 390000 -23!1.242 -�.333 Z),.2<l2 417.333 •110:,,43 0.00 411Gr.43 0233.1.00 10,1_,3 122G...f,9 1Dl1!M.OO 1109.1!1 ,'f)l.�l , .., 171,29

"""·"' ...
17UOCI .Q.00373 .O.DOOTII 0..00210 -390.000 -t!17.071l 390.000 -23-:l,2'2 -03.300 23:1.24::! ..GJ..30!) .C\167 43 0.00 .ct1G7.Q D::t33AM Hit.Ar 1:muo 17944a..1:i 1130 G3 20170 o.o:i 740.2" 170.1.D

...
17-4.lSOCI .Q.00307 .0.00001 0..00214 -390.000 -111.1:le 390.000 -23-:l,2'2 -09.lWO 23:1.24::! ..o9.D40 .C\167 43 0.00 .ct1G7.Q D::t33AM 1..0..,1 1m.S11 1noa10 1100.:n 2'-9.911 o.o:i 170.71 100.97

,,u..
,...."' ...
111.000 ..o,C!O'CQ .o..oooe, 0.00212 -380.ooo .11,e.1174 300 ooo ..23,!1.2.l2 .70, 1!rJ. 23!1.2-42 :10 1112 _., 101 ,13 0.00 -41lG1.4ll ll2l34..00. t•:J.3� I 17�la.09 1017 4.l 70033 107.7..1.

"""· ....
.,......
t07.o&OO ..O,OOA 11 .Q..00103 0.00210 -380.000 -200.,t:Q. 300 000 ..23,!1.2,U .Ol.OUI 23!1.2-42 --Cll.019 .4t 107 ,13 0.00 -41lG1.4ll ll2l34..00. 1"2..29 I la.J,I 173754.29 IOA0.32 �.11 HIG.<le
t03&XI ..O,OOC33 .Q..0041� O.OOlOCl -380.000 -22.t 1711 300 000 ..23,!1.2,U -80, 140 23!1.2-42 -90 l-40 .4t 107 ,13 0.00 -41lG1.4ll ll2l34..00. 13".23 1 ,oa.o:i 17rTil(l.l)7 10�.oo HY.1.13

HICt.200 .0..�.9 .0.00f21 O.OOXIG -390.000 -242.G!Jl' 390.000 -2l!l.2.t2 .et,:,'J,l 23$.242 --97-'6-I .41107.43 0.00 ,4 ti 07.� 112334..00 1311.17 1000..70 1090,G0.13 SD.3.17 2,l.a2 o.o, 105.7.)

1:,0.000 .O..OOCCG -0.00131 0.00204 -390.000 -202.009 390.000 -2l!l.2.t2 ·10:S.304 23$.242 .10,.3G,I .41107.43 0.00 ,4 ti 07.� 112334..00 133.U IQ»..40 1�7 ,:u.09 2.i,n o.o, 010.21 1�.32
1:13.000 .0.0Ch11W .0.00141 0.00202 ..l90.00G -202.3'3 390.000 .J':».2"112 -113.041 �·2 .111.:t,11 4lt07,4l 0.00 .C11D7.4l 023:lAOO tlO,o:) 1032..19 10:r,12,t.C.9 910.Cl:I 247.4(1 o.o, !197. 12 lG0.0)

t-49.AOO .0.00003 .0.001a2 0.00201) ..l90.00G -303.014 390.000 .J':».2"112 -12:2.091 �42 .12:2.0,1 4lt07,4l 0.00 .C11D7.4l 023:lAOO 120.99 1007_90 10:111-1.,0 CC0.01 24.:1.1.! o.o, !170.7(1 1�9.lJ
t-4�00
t•2.200
.0.00"23
..OJJIO:W.C
.0.00101
.0.0011:1
0.00197
000t9!1-
..l90.00G
-350.000
-3�.$26
-349.307
390.000
30$030
.J':».2"112
,?3".2.12
-131.ot\l
.J,IQ.'46
�·2
23f0!17
.t)l.003
.t,11.07A
4lt07,4l
.4tlG7.•3
0.00

0.00
.C11D7.4l

•1064.99
023:lAOO

02232.-4,
t23.9l
120.07
�l.02

&!l!Lll
1003G3.96

1!11072.10
0:12.0,

0102'1
242.'ro
240 10 ......,,
o.o, ,,...10

'31.CIT
107.7"
ll!0.07
130.600

tl:iOOO
..OJJIO:IOO

..OJJI0""'9
.0.00t07

.0.00200
0 00t92

000109
-350.000

-350.000
-374 CC'D-

-390,000-
30"3,000

377.770
,?3".2.12

,?3".2.12
-1!1.'.l."'30

-1.00.020
231.3�

2'27.070
.tOol....
"90

.10...201
-4t IG7.•3

-4tlG7.•3
0.00

0.00
CCW.D0.00
30CITT.20
01003.99
OIOU,7-t
117.0t
11.cJ!l-
9.»,0,l

810..70
l!l:!300.01

1!12000.!W
100.1,

740.0CI
�30.80
�33.71 ..., .........,...
!I07 49 IIM.03:
101 &i
t3t •oo

t2T.GOO
.0,00013

.(l,O(le39
.0..0021,

.o..oones
000100

000103
-3!!0.000

-3!!0.000
-300,000-

-300,000-
al I

31>:I.�
CIC!" .n,,2-42

.n,,2-42
-1!111.020

-1!111.020
2:k 18a

2:2!1.319
·1G1'.Cl73

.,11 7:.,
.f,1107.4.J

-41107.4.J
0..00
o..oo
:38234.02
ao:i:io.10
00402.�
79r.n.1c. ...,......,
111.09 eee,..r
!!02.10
1>C99:lll.70

1>C71G1.6D
710.00

000.4.3
'230.3!1

""'·"' .,,
0.6!1

0.6!1 .U0.10
1..19.TJ

147•...,
0.00 101«!0.0:! !17932..t:i 4!!0.10 09901 ,• Hl2.4e l.C7,0!I co.ee 109,7A

KONOISJTEKAN AJ($1A.L KE.OIL; PP :(1.1 • re- • D • i, 213.12 0.00


213.12 200.00

KOHO!Sl BM.AMOE
0.00 0.00
211-t,01 O.o.:I 101,.33 111-l. ID
10. FONDATION DESIGN
10.1. LONGITUDINAL DIRECTION FONDATION

PERHITUNGAN PONDASI TIANG PANCANG

A. DATA TANAH
DATA HASIL PENGUJIAN SON DIR 80
Kedalaman q, R, to
No Jenls Tanah
.z, (m) z, (m) (ka/cm2l (%) 40
1 0.00 0.20 Medium Silty Clay 9.00 5.00
2 0.20 0.40 Medium Silty Clay 11.00 3.27
3 0.40 0.60 Medium Silty Clay 12.00 3.00
4 0.60 0.80 Medium Silty Clay 13.00 2.77
5 0.80 1.00 Medium Silty Clay 12.00 3.00
6 1.00 1.20 Medium Silty Clay 13.00 2.77
7 1.20 1.40 Medium Silty Clay 8.00 4.50
8 1.40 1.60 Medium Silty Clay 9.00 5.00
9 1.60 1.80 Medium Silty Clay 10.00 3.60
10 1.80 2.00 Medium Silty Clay 10.00 3.60
11 2.00 2.20 Medium Silty Clay 8.00 4.50
12 2.20 2.40 Medium Silty Clay 9.00 4.00
13 2.40 2.60 Medium Silty Clay I0.00 3.60
14 2.60 2.80 Medium Silty Clay 9.00 4.00
15 2.80 3.00 Medium Silty Clay 9.00 4.00
16 3.00 3.20 Medium Silty Clay 9.00 4.00
17 3.20 3.40 Medium Silty Clay 12.00 3.00
18 3.40 3.60 Medium Silty Clay 12.00 3.75
19 3.60 3.80 Sand 18.00 1.50
20 3.110 4.00 Sand 19.00 1.89
21 4.00 420 Sand 16.00 2.25
22 4.20 4.40 Sand 16.00 1.69
23 4.40 4.60 Medium Sandy Clay 11.00 3.27
24 4.60 4.80 Medium sarv1u Clav 10.00 2.70
25 4.80 5.00 Medium Sa""" Clav 10.00 2.70
26 5.00 5.20 Medium Sa""" Clav 11.00 2.45
27 5.20 5.40 Medium Sa""" Clav 10.00 2.70
28 5.40 5.60 Medium Sandy Clay 10.00 2.70 12.47
29 5.60 5.80 Medium Sandv Clav 12.00 3.00
30 5.80 6.00 Medium Sand• Clav 12.00 3.00
31 6.00 620 Medium Sand• Clav 13.00 2.77
32 6.20 6.40 Medium Sandv Clav 13.00 2.77
33 6.40 6.60 Medium Sandy Clay 10.00 3.60
34 6.60 6.80 Medium Sand• Clav 9.00 3.00
35 6.80 7.00 Medium Sandy Clay 9.00 3.00
36 7.00 720 Medium Snrvtv ClMI 10.00 2.70
37 7.20 7.40 Medium sarv1u Clav 11.00 2.45
38 7.40 7.60 Medium Sandy Clay 12.00 2.25
39 7.60 7.80 Medium Sa""" Clav 9.00 4.00
40 7.80 8.00 Medium Sandy Clay 10.00 3.60
41 8.00 8.20 Medium Sandy Clay 12.00 3.75
42 820 8.40 Medium Sa""" Clav 14.00 3.21
43 8.40 8.60 Sliff Clav Sand 18.00 3.00
44 8.60 8.80 Sliff Clay Sand 21.00 2.57
45 8.80 9.00 Stiff Clay Sand 23.00 2.74
B. DATA BAHAN

Jeois tiang pancang · Belon bertulang tampang SQUAR


Diameter tiang pancang, B=H= 0.30 m
Panjang tiang pancang, L= 5.60 m
Kuat tekan beton tiang pancang, fo'= 40 MPa
Berat beton bertulang, We.= 24 kNfm'

C. TAHANAN AKSIAL TIANG PANCANG


1. BERDASARKAN KEKUATAN BAHAN
Luas penampang tiang pancang, A= a' =1-_o_0_9_--1m'
.
Berat tiang pancang, W• = A" l • w, =l-_2_._
1 _ 1 _
0 -lkN
Kual tekan beton tlang pancang, fc" = 40000 kPa
Kapasitas dukung nominal Uang pancang,
P• = 0.30 • f," A - 1.2 • W • =l-_1__56 _-lkN

0
Faktor reduksl kekuatan, � =1--0cc.6c.
. cO_-I
Tahanan aksial tiang pancang. � • P0 = 639.29 kN

2. BERDASARKAN HAStl UJI SONDIR (BAGEMANNJ


a. Tahanan uJung
Tahanan ujung nominal dihitung dengan rumus :
ru = faktor reduksi ntlai tahanan ujung nominal tiang,
Ai, = luas ujung bawah tiang (m').
q0 = tahanan penetrasi kerucut statis yang merupakan nilai rata-rata dihitung dari 8.0 di
ates dasar tiang sampai 4.0 di bawah dasar tiang (kN/m2),
�.,___B_=
1 __=r--
i .-
0 0
3 --,lm
Diameter tiang pancang,
H

Luas tampang tiang pancang. A= 67 =. 0.09m'


Tahanan penetrasi kerucut statis rata-rata dari 8.0 di atas dasar s.d, 4.0 di bawah dasar
lkglcm' =ookN/m'
tiang pancang. Qo =I
0.00 - Ck
Faktor Keamana FK 1 = 3.00
Tahanan ujung nominal tlang pancang: P0 =(A.· <lo} I FK1 = 0.00 kN
b. Tahanan gesek
Tahanan gesek nominal menurut Skempton dihitung dg rumus: P,=l: [A,"T,J
Ar= Luas pem,ukaan segmen dinding tiang (cm2). A.,=4"D"L,
T, = tahanan gesek kerucut statis rata-rata (kg/cm).
KedaJaman L, A,, T, P,
No
z, (m) z, (m) (cm) (cm') (kg/cm) (kg)
1 0.00 0.20 20.0 2400 9.00 21600
2 0.20 0.40 20.0 2400 7.20 17280
3 0.40 0.60 20.0 2400 7.20 17280
4 0.60 0.80 20.0 2400 7.20 17280
5 0.80 1.00 20.0 2400 7.20 17280
6 1.00 1.20 20.0 2400 7.20 17280
7 1.20 1.40 20.0 2400 7.20 17280
8 1.40 1.60 20.0 2400 9.00 21600
9 1.60 1.80 20.0 2400 7.20 17280
10 1.80 2.00 20.0 2400 7.20 17280
11 2.00 220 20.0 2400 7.20 17280
12 2.20 2.40 20.0 2400 7.20 17280
13 2.40 2.60 20.0 2400 7.20 17280
14 2.60 2.80 20.0 2400 7.20 17280
15 2.80 3.00 20.0 2400 7.20 17280
16 3.00 320 20.0 2400 7.20 17280
17 3.20 3.40 20.0 2400 7.20 17280
18 3.40 3.60 20.0 2400 9.00 21600
19 3.60 3.80 20.0 2400 5.40 12960
20 3.80 4.00 20.0 2400 7.20 17280
21 4.00 420 20.0 2400 7.20 17280
22 4.20 4.40 20.0 2400 5.40 12960
23 4.40 4.60 20.0 2400 7.20 17280
24 4.60 4.80 20.0 2400 5.40 12960
25 4.80 5.00 20.0 2400 5.40 12960
26 5.00 520 20.0 2400 5.40 12960
27 5.20 5.40 20.0 2400 5.40 12960
28 5.40 5.60 20.0 2400 5.40 12960

P,=I: [A,'T,l= 466560 Kg


FK2= 5.00
93312 Kg
Ps = 93.31 kN

c. Tahanan aksial Uang pancang


Tahanan axial tiang pancang, P. = P. + P. -I 93.31 !kN

5. REKAP TAHANAN AKSIAL TIANG PANCANG

No Uralan Tahanan Aksial Tiang Pancang <I>' Pn


1 Berdasarkan kekuatan bahan 639.29
3 Berdasarkan hasil uli sondlr IBagemannl 93.31
Daya dukung aksial terkecil, Pn = 93.31 kN
pn =
' 93.00
DiambO tahanan aksial tiang pancang, kN
0. TAHANAN LATERAL TIANG PANCANG
BEROASARKAN OEFLEKSI TIANG MAKSIMUM (BROMS)
Tahanan lateral tiang (H) kategori tiang panJang, dapat.dihitung dengan persamaan:
H =v;: ki, ' DI [ 2 • P • ( e ' P + 1 ) J
dengan. Jl = [ kh • 0 I ( 4 ' E0 ' 10 ) ]°25
D = Diameter tlang pancang (m). I B=H= 0.30 m
L = panjang tiang pancang (m). L= 5.60 m
k. = modulus subgrade horisontal (kN/m3), k,,= 38000 kN/m'
E =
0 modulus elastis tiang (kN/m'). E,, = 4700 • .Jt; • 10'= 29725410 kN/m2
10 = momen inersia penampang (m.. ), = 1112 ·a'= 0.000675 m'
e = Jarak beban lateral terhadap muka tanah (m), e= 0.00 m
Yo= deffeksi liang maksimum (rn). Yo-= 0.028 m
P = koefisien defleksi fiang, (I = [ k,, • BI ( 4 • Ee ·1,)]0.2:1= 0.61390802 m
P• L =!
3.44 !> 2.� maka termasuk tiang panjang (OK)
Tahanan lateral nominal fiang pancang,
H = Yo· k,, • BI [ 2 • Jl ' ( e • Jl + 1
) I= 259.97
1-----1
kN
Faktor reduksl kekuatan, �= 1-------1
0.60
Tahanan lateral tiang pancang, � H
• 0
= 155.98 kN

3. REKAP TAHANAN LATERAL TIANG

No Uralan Tahanan Lateral Tlang Pancang 4>. H.


1 Berda:sarkan defleksJ tiang maksimum (Broms) 155.98
Tahanan lateral Uang terkecil, 4>'H.- 155.98 kN

' 4,'H.=
DiambU tahanan lateral Uang pancang, 1�$.00 kN
PERHITUNGAN KEKUATAN FONDASI

KODE FONOASI : F2

DATA BAHAN PILECAP


Kuat tekan beton, t:c = 20 MPa
Kuat leleh ba)a tulangan defonn ( 0 > 12 mm ), f, - 390 MPa
Kuat leleh baja tulangan polos ( 0 s 12 mm ), f;, = 240 MPa
Berat belon bertulang, wc = 24 kN/m3

DATA DIMENSI FONDASI


Lebar kolom arah x, bx= 0.45 m
Lebar kolom. arah y. b, = 0.45 m
Jarak Uang pancang tepi ferhadap sisi luar beton, a= 0.38 m
Tebal pilecap, h= 0.60 m
Tebal tanah di alas oilecao, z= 0.90 m
Berat volume tanah di alas pOecap, Ws- 16.00 kNlm'
Posisi kolom {dalam = 40, tepi-= 301 sudut = 20) a.= 30

I- bx---;
- -
-r
P, z
i
__ __
x,
[.,
x, I ( 'M.- �

�. •--.!i__Jt, XI a_.

DATA BEBAN FONDASI


Gaya aksial kolom akibat beban terfaktor, Pu11= 119.86 kN
Momen arah x akibat beban terfaktor. M.,= 0.00 kNm
Momen arah y akibal beban terfaktor. Ml.IV= 0.00 kNm
Gaya lateral arah x aklbal beban terfaktor, Hui(= 45.83 kN
Gaya lateral arah y akibat beban lertaktor. H,,,= 6.95 kN
Tahanan aksiaJ tiang pancang. �. P. = 93.00 kN
Tahanan lateral tlang pancang, +· Hn = 155.00 kN
DATA SUSUNAN TIANG PANCANG
Susunan tiang pancang arah x : Susunan tiang pancang arah y:

No. Jumlah x n · x2 No. Jumlah y n•/


n fml <m'l n {ml <m'I
1 1 0.38 0.14 1 1 0.00 0.00
2 1 -0.38 0.14

n= 2 r. i1 = 0.28 n= 1 r. v2 = 0.00
Lebar pilecap arah x, Lx = 1.50 m
Lebar pilecap arah y, L. - 0.75 m

1. GAYAAKSIAL PADA TIANG PANCANG

Berat tanah di atas pilecap, Ws=L.·Ly•z•ws=1-----1


1620 kN
Berat pilecap, W=L'L'h'w=y
16.20 kN
O X C t-----1
TotaJ gaya aksial terfaktor. Pu = Puk + 1.2' W. + 1.2' W0 -1------1
158.74 kN
Lengan maksimum Uang pancang arah x thd. pusat, x,.... = 1-----1
0.38 m
Lengan minimum tiang pancang arah x thd. pusat, x....=.___
-0.38 __, m
Gaya aksial maksimum dan minlmum pada tiang pancang,
Pumax = Pu/n + M ••"x..axlr.i1=�kN
Punm = P.ln + M...·x,..,tr.i1 =�kN
Syarat : Pwrun S 9 ' Pn
79.37 I < I 93.00 � AMAN (OK)

2. GAYA LATERAL PADA TIANG PANCANG

Gaya lateral arah x pada tiang, hux = Huxl n - 22.92 kN


Gaya lateral arah y pada tlang, huy = Huyl n = 3.48 kN
Gaya lateral kombinasi dua arah, h..,,.,. = � ( hu,2 + h./) = 23.18 kN
Syarat: h"""" s i >' Hn
23.18
I < I 155.00 � AMAN (OK)
3. llNJAUAN TERHAOAP GESER

I bx I
-�-

� -
I x, a
'
Lx
Jarak pusat tulangan terhadap slsi luar beton, d'= 0.075 m
Tebal erektif pllecap, d=h-d'= 0.525 m
Jarak bid. kritis terhadap sisi luar, c, = ( L, - b, - d ) I 2 - 0.263 m
Berat beton. W, = c, •Ly' h 'We= 2.835 kN
Berat tanah, W2 = c,' Ly' z ' w. = 2.835 kN
Gaya geser arah x, Vu,= Pwnax· W, · W2- 73.7000 kN
Lebar bidang geser untuk tinjauan a rah x, b = Ly = 750 mm
Tebal erektif pllecap. d= 525 mm
Rasio sisi panjang 1hd. sisi pendek kolom, l30 = b, I by - 1.0000
Kuat geser pllecap arah x, dlamb!I nllal terkecil darl V0 yang diperoleh darl pers.sbb.:
v.=[1+2/Pel'"fc"b'd ,s·10-3= 880.452 kN
V =[et.'d/b+2]'-ifc''b'd /12'10-3-
0
3375.065 kN
V0= 1 /3' ..Jfc'' b'd '10-3= 586.968 kN
OiambO, kuat geser pilecap, ve = 586.968 kN
Faktor reduksl kekuatan geser, 0.75
Kuat geser pllecap, 440.226 kN
Syarat yang harus cfipenuhi,
,!)• Ve v;
1 440.226 1 1 73.100 AMAN (OK)
4. PEMBESIAN PILECAP

-T c'
I

"/K ---+ r
I

I
I

w:-
I

�i
"<,
, h
l

l�
I •

J.
I
l
� x, +a.
,.. L,-- .
Jarak tepl kolom terhadap sisl luar piJecap, c,=(L,-b,)/2= 0.525 m
Jarak Uang thd. sisi kolorn, el(=c.-a= 0.150 m
Berat beton. w,=c.·t.,·h·w,= 5.670 kN
Berat tanah, w2 = ex· Ly" z ·w,= 5.670 kN
Momen yang terjadi pada pilecap.
Mu.:=2"Pi.m.u ·e,- vv, ·c.t2-w2·c..12= 20.834 kNm
Lebar pilecap yang ditlnjau, b =L, = 750 mm
Tebal pilecap, h= 600 mm
Jarak pusat tu1angan lhd. sisl luar beton, d'= 75 mm
Tebal elektif plat, d=h-d'= 525 mm
Kuat tekan beton, 1;= 20 MPa
Kuat leleh ba)a tulangan, fr= 390 MPa
Modulus elastis baja, E, = 2.00E+05 MPa
Faktor disttibusi teg. beton. ll, = 0.85
P• = a,• 0.85 • (,,'/ I, • 600 I ( 600 + I, J = 0.02245532
Faktor reduksl kekualan lentur, += 0.80
R,,,., = 0. 75 • Po· I, • (1-WO. 75· Po• 1, I ( 0.85 • r; )I= 5.299
M,,=Mwi+= 26.043 kNm
Rn= Mn• 10• I ( b • d') = 0.12598
< R,,,., (OK)
Rasio tulangan yang diperlukan,
p = 0.85 • 1; 11, • [ 1 - "(1 - 2 • R,, I ( 0.85 • 1; ) J J = 0.0003
Rasia tuJangan minimum, Pll'ISI = 0.0025
Rasio tulangan yang digunakan, --+ p= 0.0025
Luas tulangan yang diperfukan, A,=p"b"d= 984.38 mm'
Diameter tulangan yang dlgunakan, I D 16 mm
Jarak tulangan yang dlperlukan, s=n/4·D�·btA,-= 153 mm
Jarak tulangan maksimum, Sw.u.ir: -= 200 mm
Jarak tulangan yang digunakan, --+ s= 153 mm
Digunakan tutangan, I D 16 . 150
Luas tulangan terpakai, A,=n/4"02"b/s = 1005.31 mm•
Tulangan bagi diambil 50% tulangan pokok. A,u = 50°/o • A, -= 502.65 mm�
Jarak tulangan bagi yang diperlukan, s=ii/4·02 �b/�n-= 300 mm
Jarak tulangan maksimum, Smoir:-= 150 mm
Jarak tulangan yang dlgunakan, --+ s= 150 mm
Digunakan tutangan, I D 16 . 150
Luas tulangan terpakai, A,=d4"02"b/s = 1005.31 mm'

3. TULANGAN SUSUT

Raslo tulangan susut mlnimum. Psmwi = 0.0014


Luas tulangan susul, A,=p-"b"d= 551 mm'
Diameter tulangan yang dlgunakan, I D 13 mm
Jarak tulangan susut. s=;;/4•0'•b/A,= 181 mm
Jarak tulangan susut maksimum, Sm.ox -= 150 mm
Jarak tulangan susut arah x yang digu nakan, --+ s= 150 mm
Digunakan tutangan su.sut arah x, I D 13 . 150
10.2. TRANVERSAL DIRECTION FONDATION

PERHITUNGAN PONDASI TIANG PANCANG

A. DATA TANAH
DATA HASIL PENGUJIAN SON DIR 80
Kedalaman q, R, to
No Jenls Tanah
.z, (m) z, (m) (ka/cm2l (%) 40
1 0.00 0.20 Medium Silty Clay 9.00 5.00
2 0.20 0.40 Medium Silty Clay 11.00 3.27
3 0.40 0.60 Medium Silty Clay 12.00 3.00
4 0.60 0.80 Medium Silty Clay 13.00 2.77
5 0.80 1.00 Medium Silty Clay 12.00 3.00
6 1.00 1.20 Medium Silty Clay 13.00 2.77
7 1.20 1.40 Medium Silty Clay 8.00 4.50
8 1.40 1.60 Medium Silty Clay 9.00 5.00
9 1.60 1.80 Medium Silty Clay 10.00 3.60
10 1.80 2.00 Medium Silty Clay 10.00 3.60
11 2.00 2.20 Medium Silty Clay 8.00 4.50
12 2.20 2.40 Medium Silty Clay 9.00 4.00
13 2.40 2.60 Medium Silty Clay I0.00 3.60
14 2.60 2.80 Medium Silty Clay 9.00 4.00
15 2.80 3.00 Medium Silty Clay 9.00 4.00
16 3.00 3.20 Medium Silty Clay 9.00 4.00
17 3.20 3.40 Medium Silty Clay 12.00 3.00
18 3.40 3.60 Medium Silty Clay 12.00 3.75
19 3.60 3.80 Sand 18.00 1.50
20 3.110 4.00 Sand 19.00 1.89
21 4.00 420 Sand 16.00 2.25
22 4.20 4.40 Sand 16.00 1.69
23 4.40 4.60 Medium Sandy Clay 11.00 3.27
24 4.60 4.80 Medium sarv1u Clav 10.00 2.70
25 4.80 5.00 Medium Sa""" Clav 10.00 2.70
26 5.00 5.20 Medium Sa""" Clav 11.00 2.45
27 5.20 5.40 Medium Sa""" Clav 10.00 2.70
28 5.40 5.60 Medium Sandy Clay 10.00 2.70 12.47
29 5.60 5.80 Medium Sandv Clav 12.00 3.00
30 5.80 6.00 Medium Sand• Clav 12.00 3.00
31 6.00 620 Medium Sand• Clav 13.00 2.77
32 6.20 6.40 Medium Sandv Clav 13.00 2.77
33 6.40 6.60 Medium Sandy Clay 10.00 3.60
34 6.60 6.80 Medium Sand• Clav 9.00 3.00
35 6.80 7.00 Medium Sandy Clay 9.00 3.00
36 7.00 720 Medium Snrvtv ClMI 10.00 2.70
37 7.20 7.40 Medium sarv1u Clav 11.00 2.45
38 7.40 7.60 Medium Sandy Clay 12.00 2.25
39 7.60 7.80 Medium Sa""" Clav 9.00 4.00
40 7.80 e.oo Medium Sandy Clay 10.00 3.60
41 8.00 8.20 Medium Sandy Clay 12.00 3.75
42 820 8.40 Medium Sa""" Clav 14.00 3.21
43 8.40 a.60 Sliff Clav Sand 18.00 3.00
44 8.60 a.80 Sliff Clay Sand 21.00 2.57
45 8.80 9.00 Stiff Clay Sand 23.00 2.74
B. DATA BAHAN

Jeois tiang pancang · Belon bertulang tampang SQUAR


Diameter tiang pancang, B=H= 0.30 m
Panjang tiang pancang, L= 5.60 m
Kuat tekan beton tiang pancang, fo'= 40 MPa
Berat beton bertulang, We.= 24 kNfm'

C. TAHANAN AKSIAL TIANG PANCANG


1. BERDASARKAN KEKUATAN BAHAN
Luas penampang tiang pancang, A= a' =1-_o_0_9_--1m'
.
Berat tiang pancang, W• = A" l • w, =l-_2_._
1 _ 1 _
0 -lkN
Kual tekan beton tlang pancang, fc" = 40000 kPa
Kapasitas dukung nominal Uang pancang,
P• = 0.30 • f," A - 1.2 • W • =l-_1__56 _-lkN

0
Faktor reduksl kekuatan, � =1--0cc.6c.
. cO_-I
Tahanan aksial tiang pancang. � • P0 = 639.29 kN

2. BERDASARKAN HAStl UJI SONDIR (BAGEMANNJ


a. Tahanan uJung
Tahanan ujung nominal dihitung dengan rumus :
ru = faktor reduksi ntlai tahanan ujung nominal tiang,
Ai, = luas ujung bawah tiang (m').
q0 = tahanan penetrasi kerucut statis yang merupakan nilai rata-rata dihitung dari 8.0 di
ates dasar tiang sampai 4.0 di bawah dasar tiang (kN/m2),
�.,___B_=
1 __=r--
i .-
0 0
3 --,lm
Diameter tiang pancang,
H

Luas tampang tiang pancang. A= 67 =. 0.09m'


Tahanan penetrasi kerucut statis rata-rata dari 8.0 di atas dasar s.d, 4.0 di bawah dasar
lkglcm' =ookN/m'
tiang pancang. Qo =I
0.00 - Ck
Faktor Keamana FK 1 = 3.00
Tahanan ujung nominal tlang pancang: P0 =(A.· <lo} I FK1 = 0.00 kN
b. Tahanan gesek
Tahanan gesek nominal menurut Skempton dihitung dg rumus: P,=l: [A,"T,J
Ar= Luas pem,ukaan segmen dinding tiang (cm2). A.,=4"D"L,
T, = tahanan gesek kerucut statis rata-rata (kg/cm).
KedaJaman L, A,, T, P,
No
z, (m) z, (m) (cm) (cm') (kg/cm) (kg)
1 0.00 0.20 20.0 2400 9.00 21600
2 0.20 0.40 20.0 2400 7.20 17280
3 0.40 0.60 20.0 2400 7.20 17280
4 0.60 0.80 20.0 2400 7.20 17280
5 0.80 1.00 20.0 2400 7.20 17280
6 1.00 1.20 20.0 2400 7.20 17280
7 1.20 1.40 20.0 2400 7.20 17280
8 1.40 1.60 20.0 2400 9.00 21600
9 1.60 1.80 20.0 2400 7.20 17280
10 1.80 2.00 20.0 2400 7.20 17280
11 2.00 220 20.0 2400 7.20 17280
12 2.20 2.40 20.0 2400 7.20 17280
13 2.40 2.60 20.0 2400 7.20 17280
14 2.60 2.80 20.0 2400 7.20 17280
15 2.80 3.00 20.0 2400 7.20 17280
16 3.00 320 20.0 2400 7.20 17280
17 3.20 3.40 20.0 2400 7.20 17280
18 3.40 3.60 20.0 2400 9.00 21600
19 3.60 3.80 20.0 2400 5.40 12960
20 3.80 4.00 20.0 2400 7.20 17280
21 4.00 420 20.0 2400 7.20 17280
22 4.20 4.40 20.0 2400 5.40 12960
23 4.40 4.60 20.0 2400 7.20 17280
24 4.60 4.80 20.0 2400 5.40 12960
25 4.80 5.00 20.0 2400 5.40 12960
26 5.00 520 20.0 2400 5.40 12960
27 5.20 5.40 20.0 2400 5.40 12960
28 5.40 5.60 20.0 2400 5.40 12960

P,=I: [A,'T,l= 466560 Kg


FK2= 5.00
93312 Kg
Ps = 93.31 kN

c. Tahanan aksial Uang pancang


Tahanan axial tiang pancang, P. = P. + P. -I 93.31 !kN

5. REKAP TAHANAN AKSIAL TIANG PANCANG

No Uralan Tahanan Aksial Tiang Pancang <I>' Pn


1 Berdasarkan kekuatan bahan 639.29
3 Berdasarkan hasil uli sondlr IBagemannl 93.31
Daya dukung aksial terkecil, Pn = 93.31 kN
pn =
' 93.00
DiambO tahanan aksial tiang pancang, kN
0. TAHANAN LATERAL TIANG PANCANG
BEROASARKAN OEFLEKSI TIANG MAKSIMUM (BROMS)
Tahanan lateral tiang (H) kategori tiang panJang, dapat.dihitung dengan persamaan:
H =v;: ki, ' DI [ 2 • P • ( e ' P + 1 ) J
dengan. Jl = [ kh • 0 I ( 4 ' E0 ' 10 ) ]°25
D = Diameter tlang pancang (m). I B=H= 0.30 m
L = panjang tiang pancang (m). L= 5.60 m
k. = modulus subgrade horisontal (kN/m3), k,,= 38000 kN/m'
E =
0 modulus elastis tiang (kN/m'). E,, = 4700 • .Jt; • 10'= 29725410 kN/m2
10 = momen inersia penampang (m.. ), = 1112 ·a'= 0.000675 m'
e = Jarak beban lateral terhadap muka tanah (m), e= 0.00 m
Yo= deffeksi liang maksimum (rn). Yo-= 0.028 m
P = koefisien defleksi fiang, (I = [ k,, • BI ( 4 • Ee ·1,)]0.2:1= 0.61390802 m
P• L =!
3.44 !> 2.� maka termasuk tiang panjang (OK)
Tahanan lateral nominal fiang pancang,
H = Yo· k,, • BI [ 2 • Jl ' ( e • Jl + 1
) I= 259.97
1-----1
kN
Faktor reduksl kekuatan, �= 1-------1
0.60
Tahanan lateral tiang pancang, � H
• 0
= 155.98 kN

3. REKAP TAHANAN LATERAL TIANG

No Uralan Tahanan Lateral Tlang Pancang 4>. H.


1 Berda:sarkan defleksJ tiang maksimum (Broms) 155.98
Tahanan lateral Uang terkecil, 4>'H.- 155.98 kN

' 4,'H.=
DiambU tahanan lateral Uang pancang, 1�$.00 kN
PERHITUNGAN KEKUATAN FONDASI

KODE FONOASI : F1

DATA BAHAN PILECAP


Kuat tekan beton, t:c = 20 MPa
Kuat leleh ba)a tulangan defonn ( 0 > 12 mm ), f, - 390 MPa
Kuat leleh baja tulangan polos ( 0 s 12 mm ), f;, = 240 MPa
Berat belon bertulang, wc = 24 kN/m3

DATA DIMENSI FONDASI


Lebar kolom arah x, bx= 0.30 m
Lebar kolom. arah y. b, = 0.30 m
Jarak Uang pancang tepi ferhadap sisi luar beton, a= 0.38 m
Tebal pilecap, h= 0.60 m
Tebal tanah di alas oilecao, z= 0.90 m
Berat volume tanah di alas pOecap, Ws- 16.00 kNlm'
Posisi kolom {dalam = 40, tepi-= 301 sudut = 20) a.= 30

I- bx---;
- -
-r
P, z
i
__ __
x,
[.,
x, I ( 'M.- �

�. •--.!i__Jt, XI a_.

DATA BEBAN FONDASI


Gaya aksial kolom akibat beban terfaktor, Pu11= 42.54 kN
Momen arah x akibat beban terfaktor. M.,= 0.00 kNm
Momen arah y akibal beban terfaktor. Ml.IV= 0.00 kNm
Gaya lateral arah x aklbal beban terfaktor, Hui(= 2.50 kN
Gaya lateral arah y akibat beban lertaktor. H,,,= 0.25 kN
Tahanan aksiaJ tiang pancang. �. P. = 93.00 kN
Tahanan lateral tlang pancang, +· Hn = 155.00 kN
DATA SUSUNAN TIANG PANCANG
Susunan tiang pancang arah x : Susunan tiang pancang arah y:

No. Jumlah x n · x2 No. Jumlah y n•/


n fml <m'l n {ml <m'I
1 1 0.00 0.00 1 1 0.00 0.00

n= 1 r. i1 = 0.00 n= 1 r. v2 = 0.00
Lebar pilecap arah x, Lx = 0.75 m
Lebar pilecap arah y, L. - 0.75 m

1. GAYAAKSIAL PADA TIANG PANCANG

Berat tanah di atas pilecap, Ws=L.·Ly•z•ws=1-----1


8.10 kN
Berat pilecap, W=L'L'h'w=y
8.10 kN
O X C t-----1
TotaJ gaya aksial terfaktor. Pu = Puk + 1.2' W. + 1.2' W0 -1------1
61.98 kN
Lengan maksimum Uang pancang arah x thd. pusat, x,.... = 1-----1
0.00 m
Lengan minimum tiang pancang arah x thd. pusat, x....=.___
0.00 __, m
Gaya aksial maksimum dan minlmum pada tiang pancang,
Pumax = Pu/n + M ••"x..axlr.i1=�kN
Punm = P.ln + M...·x,..,tr.i1 =�kN
Syarat : Pwrun S 9 ' Pn
61.98 I < I 93.00 � AMAN (OK)

2. GAYA LATERAL PADA TIANG PANCANG

Gaya lateral arah x pada tiang, hux = Huxl n - 2.50 kN


Gaya lateral arah y pada tlang, huy = Huyl n = 0.25 kN
Gaya lateral kombinasi dua arah, h..,,.,. = � ( hu,2 + h./) = 2.51 kN
Syarat: h"""" s i >' Hn
2.51
I < I 155.00 � AMAN (OK)
3. llNJAUAN TERHAOAP GESER

I bx I
-�-

� -
I x, a
'
Lx
Jarak pusat tulangan terhadap slsi luar beton, d'= 0.075 m
Tebal erektif pllecap, d=h-d'= 0.525 m
Jarak bid. kritis terhadap sisi luar, c, = ( L, - b, - d ) I 2 - -0.038 m
Berat beton. W, = c, •Ly' h 'We= -0.405 kN
Berat tanah, W2 = c,' Ly' z • w. = -0.405 kN
Gaya geser arah x, Vu,= Pwna,-W, -W2- 62.7900 kN
Lebar bidang geser untuk tinjauan a rah x, b = Ly = 750 mm
Tebal erektif pllecap. d= 525 mm
Rasio sisi panjang 1h<i sisi pendek kolom, l30 = b, I by - 1.0000
Kuat geser pllecap arah x, dlamb!I nllal terkecil darl V0 yang diperoleh darl pers.sbb.:
v.=[1+2/Pel'"fc"b'd ,s·10-3= 880.452 kN
V =[et.'d/b+2]'-ifc''b'd /12'10-3-
0
3375.065 kN
V0= 1 /3' ..Jfc'' b'd '10-3= 586.968 kN
OiambO, kuat geser pilecap, ve = 586.968 kN
Faktor reduksl kekuatan geser, 0.75
Kuat geser pllecap, 440.226 kN
Syarat yang harus cfipenuhi,
,!)• Ve v;
1 440.226 1 1 62.790 AMAN (OK)
4. PEMBESIAN PILECAP

-T c'
I

"/K ---+ r
I

I
I

w:-
I

�i
"<,
, h
l

l�
I •

J.
I
l
� x, +a.
,.. L,-- .
Jarak tepl kolom terhadap sisl luar piJecap, c,=(L,-b,)/2= 0.225 m
Jarak Uang thd. sisi kolorn, el(=c.-a= -0.150 m
Berat beton. w,=c.·t.,·h·w,= 2.430 kN
Berat tanah, w2 = ex· Ly" z ·w,= 2.430 kN
Momen yang terjadi pada pilecap.
Mu.:=2"Pi.m.u ·e,- vv, ·c.t2-w2·c..12= -19.141 kNm
Lebar pilecap yang ditlnjau, b =L, = 750 mm
Tebal pilecap, h= 600 mm
Jarak pusat tu1angan lhd. sisl luar beton, d'= 75 mm
Tebal elektif plat, d=h-d'= 525 mm
Kuat tekan beton, 1;= 20 MPa
Kuat leleh ba)a tulangan, fr= 390 MPa
Modulus elastis baja, E, = 2.00E+05 MPa
Faktor disttibusi teg. beton. ll, = 0.85
P• = a,• 0.85 • (,,'/ I, • 600 I ( 600 + I, J = 0.02245532
Faktor reduksl kekualan lentur, += 0.80
R,,,., = 0. 75 • Po· I, • (1-WO. 75· Po• 1, I ( 0.85 • r; )I= 5.299
M,,=Mwi+= -23.926 kNm
Rn= Mn• 10• I ( b • d') = -0.11574
< R,,,., (OK)
Rasio tulangan yang diperlukan,
p = 0.85 • 1; 11, • [ 1 - "(1 - 2 • R,, I ( 0.85 • 1; ) J J = -0.0003
Rasia tuJangan minimum, Pll'ISI = 0.0025
Rasio tulangan yang digunakan, --+ p= 0.0025
Luas tulangan yang diperfukan, A,=p"b"d= 984.38 mm'
Diameter tulangan yang dlgunakan, I D 16 mm
Jarak tulangan yang dlperlukan, s=n/4·D�·btA,-= 153 mm
Jarak tulangan maksimum, Sw.u.ir: -= 200 mm
Jarak tulangan yang digunakan, --+ s= 153 mm
Digunakan tutangan, I D 16 . 150
Luas tulangan terpakai, A,=n/4"02"b/s = 1005.31 mm•
Tulangan bagi diambil 50% tulangan pokok. A,u = 50°/o • A, -= 502.65 mm�
Jarak tulangan bagi yang diperlukan, s=ii/4·02 �b/�n-= 300 mm
Jarak tulangan maksimum, Smoir:-= 150 mm
Jarak tulangan yang dlgunakan, --+ s= 150 mm
Digunakan tutangan, I D 16 . 150
Luas tulangan terpakai, A,=d4"02"b/s = 1005.31 mm'

3. TULANGAN SUSUT

Raslo tulangan susut mlnimum. Psmwi = 0.0014


Luas tulangan susul, A,=p-"b"d= 551 mm'
Diameter tulangan yang dlgunakan, I D 13 mm
Jarak tulangan susut. s=;;/4•0'•b/A,= 181 mm
Jarak tulangan susut maksimum, Sm.ox -= 150 mm
Jarak tulangan susut arah x yang digu nakan, --+ s= 150 mm
Digunakan tutangan su.sut arah x, I D 13 . 150
11. PURLIN BEAM DESIGN

PERHITUNGAN GORDING DAN SAGROD

AOATABAHAN
Tegangan leleh bafa (yield stress). fy = 240 MPa
Tegangan larik putus (ultimate-Stress), Iv= 370 MPa
Tegangan sisa (r&Sidual stt-e.ss ), f, = 70 MPa
Moduius eJastik baja (modulus of elasticity), E= 2<10000 MPa
Angka PoiS&On (POO'son's ratio), u= 0.3

B. DATA PROFIL BAJA Up Channel:IC-UP.150.50.20.2.3


I\= 150 mm
t b= 50 mm
I
a •= 20 mm
t I L != 2.3 mm
A= 632 mm2
I,= mm'
h, h 2100000
c ly= 220000 mm'

tl
S,:= 28000 mm1
Sy= 6330 mm'
rx= 58 mm
L b
� ry-= 19 mm
c= 15.4
Beratprofil, w= 4.96 kg/m

Faktor redu.ksi kekualan untuk lentur, 0.90


Faktor reduksi k.ekua1an untuk geser, 0.75
Oiamete,c sagrod. 12 mm
Jarak tmi:ring) anaara gorcfing, 950 mm
Panjang gordlng ijarak antara rafter), 5000 mm
Jarak antar-a sagrod (jsrak dukungan lafeml gocdmg), 2500 mm
Sudut. miring atap, 9.5

C. SECTION PROPERTY
G = Elj2 • (1+ u) I= 76923.07692 MPa
h=h,-t= 147.70 mm
J =2 • 113 • b • � + 113 • (h,· 2· w �· 213· (a-!)•�= 1138.83 mm'
l,,=�·h'l4= 1.200E+o9 mm•
= it/S,
X1
0
>/{E G J
0 0 0
A/2j= 8348.50
•·Ls.,
MPa
x,= (G'J)J1·1.111= 0.00223 mm"IN'
z.. = 1 14 • h1 • t2 T a • l • ( h1 • a ) + t • ( b - 2 • t) • { h. - l ) -= 2160t mm'
Z., = t\'l""(c. t/2) T 2·a·r(b-c-t/2) +t • (c- t)2+ t • (b-t-c'I = 10788 mm'

G =- modulus geE.er-. z. =· modulus penampang plasfis lhd. sb. x.,


J =- Konsta11ta puntir tof'Sl, Zy =- modulus penampang ptastis thd. sb. v,
I_.=- kont.ta.nta pufu 1e.ng:lrung. X1 -= koefisien momen tekuk torsi lateral,
h =- tinggi bersih baden. X1 -= koefisi&n mome:n tekuk torsi tateral.,
1. BESAN PAOA GORDING
1.1. BEBAN MATI (DEAD LOAD)

No Mat.en.at Be,at Sa1uan


Leber a
rm, INhnl
1 Betal sandiri ..-:..... 49.6 i'llm 49.6
2 A.l<>nbaialsn:ondeckl 70 Nim: 1.0 66.5
Total beban matl, a...= 116.1 Nim

1.2. BEBAN HIDUP (LIVE LOAD)

Beban h.idup akibat beban air hufan dipethltungkan setara dengan beban genangan ait
.satebal I inc = 25 mm. � = 0.025 • 10 = 0.25 kNlm'
1-----1
Jarak antara gording. s=,__=�-
0.95 .. m
Behan air h.ujan., - .•• 10'= 238
1-_.;=--1
Nim
Beban h.idup merata akibat air hujan, 238 Nim
Ou. '1------1
Be-ban hidop lerpusat aJdbat beban pekMja, 1000
PLl.-=�----� N

2. BEBAN TERFAKTOR

Beban merata, 011 = 1.2 "Ooc.. + t.6 •Ou..= 519:32 Nim


Beban terpusat. P11-=-16"Pu.-= 1600.00 N
Sudut miring atap, a= 0.17 rad
Be ban merata tertiadap sumbu x, 0111'=011 'cosu "104-= 0.5122 N/mm
Beban merat.a terhadap sumbu y, Or.y-= Ou• sinu "104-= 0.0857 N/mm
Beboo t.erpusat terhadap sumbtJ x, P�=Pu'cosu= 1578.06 N
Beboo t.erpusat terhadap sumbtJ )'. Pu,= Pv"s1no.= 264.08 N

3. MOMEN DAN GAYA GESER AKIBAT BEBAN TERFAKTOR

Panjang benlang gording terhadap su-mbu x.


Panjang benlang gording terhadap su-mbu y,
Moman akibat beban terfaktot terhadap st.mbu x,
t, = L, ·�----!
5000
t..,=L,=._ 2500 1::
..,
t.\a: =- 1/tO • 0111 • L,.2 <t 118 • Piil!'" lx = 2266780 Nm
1-----1
Momen pada 114 bentang. MA= 1700085 Nm
1-------1
fl.4omen di te.ngah be.ntang, 2266780
Ms -=1-===--1 Nm
Momen pacla 3/4 bent.ang. Me'----4
1700085 Nm
fl.4omen alooat bebao terfak1ot terhadap sumbu y,
Miff-= 1110 ' o.i,. • L,2 + 1./8 • Puy ' r, _=='--'!Nmm
=._ i 136094

Gaya g13ser akibat beban ierfa.klor terhadap sombu x,


Pia-=�------'
' 4139
Vi,,.-= Oil![• la+ !N
Gaya geser akibat beban terfa:Jdor terhadap sumbu y.
478 !N
4. MOMEN NOMINAL PENGARUH LOCAL BUCKLING
Pengaruh tekuk lokal (local buclding) pada s.ayap:
Kelangsingan penampang sayap. ,.=bit =I 21.7l9
Ba-las ketangsingan maksirnum untuk pe.nampang compact.
'-o= 1101 -1r., =I 10.973
Balas kelangsingan maksimum unhik penampang non-compact,
J�-=370/.J(r� -fr>= 28.378
Momen plasbs lerhadap sum.bu x. Mi:.-= r1 • z)( = 5184290 Nmm
Momen plas6s terhadap sumbu y, M,,=�·z,= 2589101 Nmm
Momen batas teku.k teshadap sumbu a.
s,
M =S, r,-�)= Nmm
0 0(
4760000
Momen balas tekuk terh.adap MJmbu y. I.I,,= P,· �) = 1076100 Nmm
Momen nominal penampang untuk :
a. Penampang compact, 1 s ",,
... M11-= M.i
b. Penampang non-compact.
.. 1.p< ).��
M11-(Mo -M.-) • (A- >.o) f{i,,-l.o)

..
c. Penampang langsing,

> I� dan ). < ),

Betdasarkan Mai kelangsinga.n sayap, maka termasuk penam:pang non-compact


Momen ncmioaf penampeng terhadap sumbu x dihitung sebagal berikul :
compact Mn=Mo-= . Nmm
non�: M,= M,· (M,,·M,) "( 1 • 1..,)1 (),· >,J= -4921839 Nmm
Jang.sing: Mn-= Mr· ( i""J }. )2-= . Nmm
Moman nominal te-rhadap sumbu x penampang : non-compact M,,=._ 4921839 _. Nmm
Moman nominal penampang terhad� sumbu y dlhitung sebagai berikut:
compact: Mn=Mo=1---·---1Nmm
non-oompact: M,, = M,, • (M,,· M,) •().·I�) I (I,·._)= 1653210 Nmm
langsing: Mn=.._\.,(},../i.)"= - Nmm
Momen ncmioal tethadap sumbu y peoampang ; non-compJJc.r � = 1653210 Nmm

5. MOMEN NOMINAL PENGARUH LATERAL BUCKUNG


Momen ncmioal komponen struktur dengat1 pengaruh tekuk late,aJ, unluk:
a Bentang pendek . l S- lo
,.. �-=M0=f1'Z,.

l
b. Ben\ang sedang: Los. L s t....
.. M,,= c, • [M,+( M,· M, )" ( l,·l )f( l,· L,)J sM,
c. Bentang panjang: l > Lr
--+ Mr,-=Cb. nfL·,11e. t,·G·J+(�- E/L)2•t, • 1.1 SM,

1�;.
Panjang bentang maks.imwn balok yang mampu menahan momen pta$tis,
Lo= 1.76"r,· �( E/11 �5
Tegengan leleh dikurangi tegangan 1oisa, ft.-= fr - f,
)=1=�====��===�
170
Panjang benlang minimum balok yang tahanannya ditentu.kan oleh momen kritis tekuk
torsilateml, l,-= t1 X1 /(L • .J( 1 + .J ( 1 .,. X1 • fL:) J =._ i 2754 !mm
_.
Koefisien momen tekuk tors.i la!erai,
C�-= 12.5 • Muc I ( 2.s·rvt111 -<t 3�M,. � 4'Me...,. 3"Mc) = 1.14
Momen plas6s terhadap sumbu Jt. M,:.=r.,·z)(-= 5184290 Nmm
Momen plastis terhadap sumbu y, M,,= �. Z,= 2589101 Nmm
Momen balas tekuk terh.adap MJmbu x, M.=S,"(f,·t)= 4760000 Nmm
Moman batas tekuk terhadap sum buy. M,,=S,(11·0= 1076100 Nmm
Pan)ang bentang l.ettiadap sumbu y {jerak dukungan lateta.1). L-=L,= 2500 mm
L > lo dan l < L,
..... Termasuk kategori: benranq sedanq
Momen nominal 1&.rh.adap MJmbu x dihiung sebagai berikut:
Mm=M,.=f,·Z,=�Nmm
M,.=C,.'[M0•("',.·M..).(l.,·L)/(l.,·l,,)J = 5476690 Nmm
Mn,=C0"1i./L .J(E*l-,·G·J.,.(1t E/L)2*1,"lwJ= -
0 0

Nmm
Moman nominal thd. se. x untuk: bentang sedang Mr_.= 5476690 Nmm
Mm > rM��=-���,
Momen ncmioal tethadap sumbu x yang digunaka.n. M.-.-.: -=-I 5184290 f Nmm
Momen ncmioal tethadap sumbu y dihilung &ebagal beokut:
M,,=M,,=�·z,= • Nmm
1-----1
M,,=c,·1M.,•(M.,·M,,).(l.,·L)/(l.,·l,,)J= 1463897 Nmm
M,,=C,'a/l .... [E·1,·G·J•(o•E/L)'·�·1,,J= • Nmm
Moman nomlnal th,cL sb. y untuk: be-ntang sedang M,.v-=- 1463897 Nmm
M.,, < M,.
""""4_638_9_7
1 .....,!Nmm
Momen nominal ie-.rhadap sumbu x yang digunakan, M,, =,. !

6. TAHANAN MOMEN LEHTUR


Momen nominal ie-.rhadap sumbu x :
Be-rd.asarkan pengaruh foe.al buckling, Mr.. -=- 4921839 Nmm
Mr.. =
""'
Betdasarkrui pengaruh lateral b�lding. 5184290 Nmm
fl.4omen nominal terhadap sumbu x (terkecil) yg menentukan, 4921839 Nmm
:
Tahanan momen lentu1 terhadap su-mbu x, -+ ..... M,,.: 4429655 Nmm
Momen ncmioal tethadap sumbu y;
Befdasarkan penga-ru h local buckling , M,.,.= 1653210 Nmm
Berd.asarkan pengaruh lateral buckling. ........ 1463897 Nmm
Moman nomlnal teriiadap sumbu y (terkecil) yg menenlukan. M,.,= 1463897 Nmm
Tahanan momen lentur tethadap sumbu y, -+ � "M'l'=- 1317507 Nmm
Momen akibel beban teriak1or terhedap sumbu x, M,.• 2266780 Nmm
Moman akibat beban terfaktor terhadap st.mbu y, 136094 Nmm
M,,, I ( t,, M,. ) : 0.5117
M,,/( ·�. M,.,.): 0.1033
Syaral )'!! harus dfpenuhi : Mm I ( +,, M,. ) • M.,, I ( fb • M,,, ) < 1.0
M�/( ... •MM)+ M,,I( 'i,, • M.,)•! 0.6150 I < 1.0 AMAN (OK)

7. TAHANAN GESER

Ke-tebalan plat bad.an tanpa peng:aku ha:rus memenuru syarat.


hit� 6.311•,/(Elf,)
--64-2. 2-""'"I < I 183.60 I -+ etat ha<taa mwra,rbi ,vanu fQtU
Gaye Qfier ekibet beban lerfaktor tefhadap sumbu x. VJ#.= 4139 N
luas penampang baden. A,.=,·h,: 345 mm2
Tahanan gaya geser nominal thd.sb. x. V,.= 0.60 ·tv. �: 49680 N
Tehanan gays geser terhadap sumbu x, -+ 91 • v,. = 37260 N
Gaya geser akfbat beban ier1a.k1or terhadap sumbu y, Vvt= 478 N
luas penampang sayap. A,=2·b·1 = 230 mm'
Tahanan gaya geser nominal thd.sb. y, V"f= 0.60 • r., • A,.= 33120 N
Tahanan gaya geser terhadap sumbu x, -+ .,. v,.: 24840 N
V�/(+,·v�)· 0.1111
v.,,1(+,·v,.)• 0.0193
Sy.vat yang harus dipenuhi :

JC th• V,.) ... Vu,, I ( +, • VIit') � 1.0
V�/(+,·VmJ•V.,l(O,•v,..)=! 0.1300 I < 1.0 AMAN (OK)
8. KONTROL INTERAKSI GESER DAN LENTIJR

Sayarat yang harus dipenuhi untuk interakasi geser dru, len1ur :


M,,I {+.,' M,,) • 0.62s· V,1( <I,· V,) ·1.375

M,,l{�·M,)= M,. I { +., • M� ) • M,,, I { .. • M,, J =l-_o_. 6_1,_50_-I


V,i{+,·V,)= VUl.l(+.'V,_).,.V�/{ti"V"'>= 0.1303
�---�M;i/( 0-, • M11 }+0.625°V1i1/(� V�} =
0
0.6965
1-.::;0 6965=
;:. _.I < ! 1.375 ! ... AMAN {OK)

9. TAHANAN TARIK SAGROD

Be ban merata terfaktor pada gording, aur.:1----,---1


0.0857 N/mm
Behan terposat terlaktor pads gotding, Pi.--r.: 264.08 Nim
Pan)ang sagrod {;arak anlara gon:ling), Ly= L:r =,_--'2"500=--'m
Gaye tarik pada sagrod aJdbal beban terfaktor,
Tu= O.q"L.,-1-Pw.: 478 N
Tegengan leleh baia. r.,-= 240 MPa
Tegangan tarik. pub.ls, Iv = 370 MPa
Diameter s.agrod, d= 12 mm
luas penampang brurto sagtod. ,.. •• 14·.f= 113.10 mm'
Lu.as penampang_ efektif sagrod. A,,= 0.90 ' A,, • 101.79 mm'

Tahanan tarik sag.rod berda.sarkan luas penampa119 brutlo.

Tahanan tarik .sagrod berdasarkan lua.s- penampang e.feklif.


t • T11 = 0.75 • Ae • fu =-1-_;;2.;;2c.
8 4;.;6c...-1N
Tahanan tarik .sag.rod (1e1keca) yang digunakan. t>'Tn..: ._ 24429 ... N
Syarat yg h.arus dipenuhi : T, s
478 I < I 24429 ... AMAN{OK)
LAMPIRAN·1
PERHITUNGAN KEKUATAN TIANG PANCANG
A. DATA TANAH
DATA HASIL PENGUJIAN SONOIR 80
Kedalaman Clo R, lo
No Jenis TaMh
z, (m) z2(m) 11<a1cm2\ (%) 40
1 0.00 020 lemounn 9.00 5.00
2 0.20 0.40 lempung 11.00 3.27
3 0.40 0.60 lemouno 12.00 3.00
4 0.60 0.80 lernuoadat 13.00 2.77
5 0.80 1.00 lemn, oasir 12.00 3.00
6 1.00 1.20 lemouno 13.00 2.77
7 1.20 1.40 lempung 8.00 4.oo
8 1.40 1.60 lemo. oadat 9.00 5.00
9 1.60 1.80 lemo. oasir 10.00 3.60
10 1.80 2.00 lemouna 10.00 3.60
11 2.00 220 lemauna 8.00 4.50
12 2.20 2.40 lemo.oadat 9.00 4.00
13 2.40 2.60 lemp. pasir 10.00 3.60
14 2.60 2.80 lemounn 9.00 4 00
15 2.80 3.00 lemouno 9.00 4.00 1u,
16 3.00 3.20 lemo.oadat 9.00 4.00
17 3.20 3.40 l.emp. pasir 12.00 3.00
18 3.40 3.60 iemo. paslr 12.00 3.75
19 3.60 3.80 l.emouno 18.00 1.50
20 3.80 4.00 lemouno 19.00 1.89
21 4.00 4.20 lernp.padat 16.00 2.25
22 420 4.40 lemo. oaslr 16.00 1.69
23 4.40 4.60 lemauna 11.00 3.27
24 4.60 4.80 lemauna 10.00 2.70
25 4.80 5.00 lemo. oadat 10.00 2.70
26 5.00 5.20 lemp. pasir 11.00 2.45
27 520 5.40 lemo. oasir 10.00 2.70
28 5.40 5.60 lempung 10.00 2.70
29 5.60 5.80 lemp.padal 12.00 3.00
30 5.80 6.00 iemo. pasir 12.00 3.00
31 6.00 6.20 lemouno 13.00 2.77
32 6.20 6.40 lemouno 13.00 2.77
33 6.40 6.60 lemo. oadat 10.00 3.60
34 6.60 6.80 lemp. paslr 9.00 3.00
35 6.80 7.00 iemo. oasfr 9.00 3.00
36 7.00 720 lemauna 10.00 2.70
37 7.20 7.40 lempung 11.00 2A5
38 7.40 7.60 lemo.oadat 12.00 2.25
39 7.60 7.80 lemo, oasir 9.00 4.00
40 7.80 8.00 lemo. oasfr 10.00 3.60
41 8.00 820 lemouno 12.00 3.75
42 8.20 8.40 lempung 14.00 3.21
43 8.40 8.60 lemo. oadal 18.00 3.00
44 8.60 8.80 l.emo. oasir 21.00 2.57
45 8.80 9.00 lemo. oasir 23.00 2.74
B. DATA BAHAN

Jeois tiang pancang · Belon bertulang tampang SQUAR


Diameter tiang pancang, B=H= 0.30 m
Panjang tiang pancang, L= 3.00 m
Kuat tekan beton tiang pancang, fo'= 40 MPa
Berat beton bertulang, We.= 24 kNfm'

C. TAHANAN AKSIAL TIANG PANCANG


1. BEROASARKAN KEKUATAN BAHAN
Luas penampang tiang pancang, A= a' =1-_o_0_9_--1m'
.
Berat tiang pancang, W• = A • l • w, =1-_6_.4_8_--lkN
Kual tekan beton tlang pancang, fc" = 40000 kPa
Kapasitas dukung nominal Uang pancang,
P0 = 0.30 • t; •A· 1.2 • w. =l-_1__12_--lkN

0
Faktor reduksl kekuatan, � =1--0c.6c.
c. cO_-I
Tahanan aksial tiang pancang. � • P0 = 643.33 kN

2. BERDASARKAN HAStl UJI SONDIR (BAGEMANNJ


a. Tahanan uJung
Tahanan ujung nominal dihitung dengan rumus :
ru = faktor reduksi ntlai tahanan ujung nominal tiang,
Ai, = luas ujung bawah tiang (m').
q0 = tahanan penetrasi kerucut statis yang merupakan nilai rata-rata dihitung dari 8.0 di
ates dasar tiang sampai 4.0 di bawah dasar tiang (kN/m2),
�.,___B_=
1 __=r--
i .-
0 0
3 --,lm
Diameter tiang pancang,
H

Luas tampang tiang pancang. A= 67 =. 0.09m'


Tahanan penetrasi kerucut statis rata-rata dari 8.0 di atas dasar s.d. 4.0 di bawah dasar
lkglcm' =ookN/m'
tiang pancang. Qo =I
0.00 - Ck
Faktor Keamana FK 1 = 3.00
Tahanan ujung nominal tlang pancang: P0 =(Ao· <lo} I FK1 = 0.00 kN
b. Tahanan gesek
Tahanan gesek nominal menurut Skempton dihitung dg rumus: P,=l: [A,"T,J
Ar= Luas pem,ukaan segmen dinding tiang (cm2). A.,=4"D"L,
T, = tahanan gesek kerucut statis rata-rata (kg/cm).
KedaJaman L, A,, T, P,
No
z, (m) z, (m) (cm) (cm') (kg/cm) (kg)
1 0.00 0.20 20.0 2400 9.00 21600
2 0.20 0.40 20.0 2400 7.20 17280
3 0.40 0.60 20.0 2400 7.20 17280
4 0.60 0.80 20.0 2400 7.20 17280
5 0.80 1.00 20.0 2400 7.20 17280
6 1.00 1.20 20.0 2400 7.20 17280
7 1.20 1.40 20.0 2400 7.20 17280
8 1.40 1.60 20.0 2400 9.00 21600
9 1.60 1.80 20.0 2400 7.20 17280
10 1.80 2.00 20.0 2400 7.20 17280
11 2.00 220 20.0 2400 7.20 17280
12 2.20 2.40 20.0 2400 7.20 17280
13 2.40 2.60 20.0 2400 7.20 17280
14 2.60 2.80 20.0 2400 7.20 17280
15 2.80 3.00 20.0 2400 7.20 17280
16
17
18
19
20
21
22
23
24
25
26
27
28
29
P,=I: [A,'T,l= 267840 Kg
FK2= 5.00
53568 Kg
Ps = 53.57 kN

c. Tahanan aksial Uang pancang


Tahanan axial tiang pancang, P. = P. + P. -I 53.57 !kN

5. REKAP TAHANAN AKSIAL TIANG PANCANG

No Uralan Tahanan Aksial Tiang Pancang <I>' Pn


1 Berdasarkan kekuatan bahan 643.33
3 Berdasarkan hasil uli sondlr IBagemannl 53.57
Daya dukung aksial terkecil, Pn = 53.57 kN
pn =
' 53.00
DiambO tahanan aksial tiang pancang, kN
D. TAHANAN LATERAL TIANG PANCANG
1. BERDASARKAN DEFLEKSI TIANG MAKSIMUM (BROMS)
Tahanan lateral tiang (H) kategori tiang panJang, dapat.dihitung dengan persamaan:
H =v;: ki, ' DI [ 2 • P • ( e ' P + 1 ) J
dengan. Jl = [ kh • 0 I ( 4 ' E0 • 10 ) ]°25
D = Diameter tlang pancang (m). I B=H= 0.30 m
L = panjang tiang pancang (m), L= 3.00 m
k. = modulus subgrade horisontal (kN/m3), k,,= 38000 kN/m'
E0 = modulus elastis tiang (kN/m'). E.., = 4700 • .Jt; • 10'= 29725410 kN/m2
10 = momen inersia penampang (m.. ), = 1112 • e' = 0.000675 m'
e = Jarak beban lateral terhadap muka tanah (m), e= 0.00 m
Yo= deffeksi liang maksimum (rn). Yo-= 0.015 m
P = koefisien defleksi fiang, (I = [ k,, • BI ( 4 • Ee ·1,)]0.2:1= 0.61390802 m
P • L =! 1.84 !< 2.� maka temasuk tlang pendek
Tahanan lateral nominal fiang pancang,
H = Yo· k,, • BI [ 2 • Jl • ( e • Jl + 1 ) J = 139.27 kN
Faktor reduksl kekuatan, �= 1-------1
0.60
Tahanan lateral tiang pancang, � H ,__
• 0
= 83.56 kN .....,

3. REKAP TAHANAN LATERAL TIANG

No Uraian Tahanan Lateral Tiang Pancang cl>• H.


1 Berdasarkan defleksi tlang maksimum (Broms) 83.56
Tahanan lateral tiang terkecil, cl>• H. = 83.56 kN
OiambU fahanan lateral tiang pancang, 7 cl>• H.- 83.00 kN
PERHITUNGAN KEKUATAN FONDASI

KOOE FONOASI : F2

DATA BAHAN PILECAP


Kuat tekan beton, f.c - 20 MPa
Kual leleh baja tulangan deform { 0 > 12 mm ), f. = 390 MPa
Kuat leleh baja tulangan polos ( 0 s 12 mm), f, = 240 MPa
Bernt beton bertuJang, We - 24 kN/ms

DATA DIMENSI FONOASI


Lebar kolom arah x, t>.= 0.45 m
Lebar kolom arah y, b, - 0.45 m
Jarak tlana oancana teoi terhadao sisl luar beton a= 0.38 m
Tebal pilecap, h= 0.60 m
Tebal tanah di atas pilecan. z= 0.90 m
w= kNfm'
Berat volume tanah di atas pilecap,
• 16.00
Posisl kolom (dalam = 40. lepi = 30, sudut = 20) Us= 30

!- bx. .,
·1-
I•p,

a X2 X, a
( M,-

I
.
-.?I,- X2 iL X1 +�-·
DATA BEBAN FONDASI
Gaya aksial kolom al<ibal beban tertaktor, Pu1t-= 119.86 kN
Momen arah x ak.ibal beban terfaktor. Mm= 0.00 kNm
Momen arah y aklbat beban terfaktor. Muy-= 0.00 kNm
Gaya lateral arah x akibat beban tertaxtor, Hu,= 45.83 kN
Gaya lateral arah y al<ibal beban terfaktor. H ., = 6.95 kN
Tahanan aksiaJ tiang pancang. �. P. = 53.00 kN
Tahanan lateral tiang pancang, l,"Hn= 83.00 kN
DATA SUSUNAN TIANG PANCANG
Susunan tiang pancang arah x : Susunan tiang pancang arah y:

No. Jumlah x n · x2 No. Jumlah y n•/


n fml <m'l n {ml <m'I
1 1 0.38 0.14 1 1 0.00 0.00
2 1 -0.38 0.14

n= 2 r. i1 = 0.28 n= 1 r. v2 = 0.00
Lebar pilecap arah x, Lx = 1.50 m
Lebar pilecap arah y, L. - 0.75 m

1. GAYAAKSIAL PADA TIANG PANCANG

Berat tanah di atas pilecap, Ws=L.·Ly•z•ws=1-----1


1620 kN
Berat pilecap, W=L'L'h'w=y
16.20 kN
O X C t-----1
TotaJ gaya aksial terfaktor. Pu = Puk + 1.2' W. + 1.2' W0 -1------1
158.74 kN
Lengan maksimum Uang pancang arah x thd. pusat, x,.... = 1-----1
0.38 m
Lengan minimum tiang pancang arah x thd. pusat, x....=.___
-0.38 __, m
Gaya aksial maksimum dan minlmum pada tiang pancang,
Pumax = Pu/n + M ••"x..axlr.i1=�kN
Punm = P.ln + M...·x,..,tr.i1 =�kN
Syarat : Pwrun S 9 ' Pn
79.37 I > I 53.00 � FAILURE (NG)

2. GAYA LATERAL PADA TIANG PANCANG

Gaya lateral arah x pada tiang, hux = Huxl n - 22.92 kN


Gaya lateral arah y pada tlang, huy = Huyl n = 3.48 kN
Gaya lateral kombinasi dua arah, h..,,.,. = � ( hu,2 + h./) = 23.18 kN
Syarat: h"""" s i >' Hn
23.18
I < I 83.00 � AMAN (OK)
3. llNJAUAN TERHAOAP GESER

I bx I
-�-

� -
I x, a
'
Lx
Jarak pusat tulangan terhadap slsi luar beton, d'= 0.075 m
Tebal erektif pllecap, d=h-d'= 0.525 m
Jarak bid. kritis terhadap sisi luar, c, = ( L, - b, - d ) I 2 - 0.263 m
Berat beton. W, = c, •Ly' h 'We= 2.835 kN
Berat tanah, W2 = c,' Ly' z ' w. = 2.835 kN
Gaya geser arah x, Vu,= Pwnax· W, · W2- 73.7000 kN
Lebar bidang geser untuk tinjauan a rah x, b = Ly = 750 mm
Tebal erektif pllecap. d= 525 mm
Rasio sisi panjang 1hd. sisi pendek kolom, l30 = b, I by - 1.0000
Kuat geser pllecap arah x, dlamb!I nllal terkecil darl V0 yang diperoleh darl pers.sbb.:
v.=[1+2/Pel'"fc"b'd ,s·10-3= 880.452 kN
V =[et.'d/b+2]'-ifc''b'd /12'10-3-
0
3375.065 kN
V0= 1 /3' ..Jfc'' b'd '10-3= 586.968 kN
OiambO, kuat geser pilecap, ve = 586.968 kN
Faktor reduksl kekuatan geser, 0.75
Kuat geser pllecap, 440.226 kN
Syarat yang harus cfipenuhi,
,!)• Ve v;
1 440.226 1 1 73.100 AMAN (OK)
6. PEMBESIAN PILECAP

-T c'
I

"/K ---+ r
I

I
I

w:-
I

�i
"<,
, h
l

l�
I •

J.
I
l
� x, +a.
,.. L,-- .
Jarak tepl kolom terhadap sisl luar piJecap, c,=(L,-b,)/2= 0.525 m
Jarak Uang thd. sisi kolorn, el(=c.-a= 0.150 m
Berat beton. w,=c,-L,"h"w,= 5.670 kN
Berat tanah, w2 = ex· Ly" z ·w,= 5.670 kN
Momen yang terjadi pada pilecap.
Mu.:=2"Pi.m.u ·e,- vv, ·c.t2-w2·c..12= 20.834 kNm
Lebar pilecap yang ditlnjau, b =L, = 750 mm
Tebal pilecap, h= 600 mm
Jarak pusat tu1angan lhd. sisl luar beton, d'= 75 mm
Tebal elektif plat, d=h-d'= 525 mm
Kuat tekan beton, 1;= 20 MPa
Kuat leleh ba)a tulangan, fr= 390 MPa
Modulus elastis baja, E, = 2.00E+05 MPa
Faktor disttibusi teg. beton. ll, = 0.85
P• = a,• 0.85 • (,,'/ I, • 600 I ( 600 + I, J = 0.02245532
Faktor reduksl kekuatan lenlur, += 0.80
R,,,., = 0. 75 • Po· I, • (1-WO. 75· Po• 1, I ( 0.85 • r; )I= 5.299
M,,=Mwi+= 26.043 kNm
Rn= Mn• 10• I ( b • d') = 0.12598
< R,,,., (OK)
Rasio tulangan yang diperlukan,
p = 0.85 • 1; 11, • [ 1 - "(1 - 2 • R,, I ( 0.85 • 1; ) J J = 0.0003
Rasia tuJangan minimum, Pll'ISI = 0.0025
Rasio tulangan yang digunakan, --+ p= 0.0025
Luas tulangan yang diperfukan, A,=p"b"d= 984.38 mm'
Diameter tulangan yang dlgunakan, I D 16 mm
Jarak tulangan yang dlperlukan, s=n/4·D�·btA,-= 153 mm
Jarak tulangan maksimum, Sw.u.ir: -= 200 mm
Jarak tulangan yang digunakan, --+ s= 153 mm
Digunakan tutangan, I D 16 . 150
Luas tulangan terpakai, A,=n/4"02"b/s = 1005.31 mm•
Tulangan bagi diambil 50% tulangan pokok. A,u = 50°/o • A, -= 502.65 mm�
Jarak tulangan bagi yang diperlukan, s=ii/4·02 �b/�n-= 300 mm
Jarak tulangan maksimum, Smoir:-= 150 mm
Jarak tulangan yang dlgunakan, --+ s= 150 mm
Digunakan tutangan, I D 16 . 150
Luas tulangan terpakai, A,=d4"02"b/s = 1005.31 mm'

3. TULANGAN SUSUT

Raslo tulangan susut mlnimum. Psmwi = 0.0014


Luas tulangan susul, A,=p-"b"d= 551 mm'
Diameter tulangan yang dlgunakan, I D 13 mm
Jarak tulangan susut. s=;;/4•0'•b/A,= 181 mm
Jarak tulangan susut maksimum, Sm.ox -= 150 mm
Jarak tulangan susut arah x yang digu nakan, --+ s= 150 mm
Digunakan tutangan su.sut arah x, I D 13 . 150
LAMPIRAN-2
PERHITUNGAN FONDASI FOOTPLAT

.... rI
.----'-. . . '---, ! !'
··�--�
!----------i...L-'-

A DATA FONDASI FOOT PLAT


DATATANAH
Kedalaman fondasl. o,= 3.00 m
Berat volume tanah. y= 15.10 kNlm'
Suctut gesek dalam. di= 6.20 •
Kohesi, c= 16.00 kPa
Tahanan konus rata-rata (hasH pengujian sondir). <lo= 11.35 kg/cm.e

DIMENSI FONDASI
lebar fondasi arah x, Bl(= 1.50 m
Lebar fondasi arah y, B = 1.50 m
Tebal fondasi
'
h= 0.30 m
Lebar kolom arah x, br = 0.30 m
lebar kotom arah y, b = 0.30 m
Posisi kolom (dalam = 40. Jepi = 30. sudut = 20) '
0., = 40
BAHAN KONSTRUKSI
Kuat tekan beton. fe' = 20.0 MPa
Kuat leleh baja tulangan, [ = 390 MPa
Berat beton bertulang, Ye.'= 24 kNlm'
BEBAN RENCANA FONDASI
Gaya aksial akibat beban terfaktor, P11= 119.86 kN
Momen arah x akibat beban terfaktor, M..ul(= 0.000 kNm
Momen arah y akibat be.ban terfaktor, M,,, = 0.000 kNm
B. KAPASITAS OUKUNG TANAH
1. MENURUT MEYERHOF (19�6)
Kapasttas dukung tanah menurul Meyerhol (1956) :
q. = <le 133 • [ ( B + 0.3) I BJ' • K• ( clalam kg/cm')
dengan. Ko = 1 + 0.33 • O, I B harus s 1.33

q, = tahanan konus rata-rata hasil sondir pada dasar fondasi ( kg/cm


2)

B = lebar fondasi (m) B =a,= 1.50 m


D, = Kedalaman rondasl (m) D,= 3.00 m
K• = 1 + 0.33 • D, I B - 1.66 > 1.33
diambil. Ko= 1.33
Tahanan konus rata-rata hasil sondlr pada dasar fondasi. Qc: = 11.35 kg/cm2

q. = <le I 33 • [ ( B + 0.3 ) I B ]2 • Ko = 0.659 kg/cm.e


Kapasilas dukung fjin tanah, 65.89 kN/m.._

2. KAPASITAS OUKUNG TANAH YANG OIPAKAI


Kapasitas dukung tanah tanah menurut Meyerhof: q.=�kNlm'
Kapasitas dukung tanah yang dipakal : q.=�kNlm'

C. KONTROL TEGANGAN TANAH

luas dasar foot plat. A=sx·a,.= 2..2500 m'


Tahanan momen arah x, W.,,= 1/6 • B, • B,' = 0.5625 m'
Tahanan momen amh y, w y = 1/6 • B:,, · B.,' = 0.5625 m'
Tinggi tanah di atas foot plat. z=-01-h= 2.70 m
Tekanan akibat beral foot plat dan tanah. q = h • Ye.+ z . y = 47.970 kNlm'

Eksentrisitas pad.a fondasi :


e,.=Mux/Pu=�m < B,.16 =i 02500 Im (OK)
e., = M,,.I Pu =�m < B,16 = 02500 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi:
q-,= P.. IA+Mu.lW,+Mu,,w,+q=I 101.241 lkN/m2
q,,,.. > q. -t CHECK I (NG)
Tegangan tanah minimum yang teJjadi pada dasar fondasi :
q"*"= Pu/A - Mu,IW,.- Mu�JW,+q=I 101.241 lkN/m2
Q,m > 0 tak terjadl teg.tarlk (OK)
D. GAYA GESER PADA FOOT PLAT
1. TINJAUAN GESER ARAH X

I.
·'

q ••
..- d
a,

I /'1DI
I

h

b�·l• l
q•• � a, .
. B, .
B, ...L

Jarak pusat tulangan terhadap sisl Juar beton, d'= 0.05 m


Tebal efeklff fool plat, d=h-d'= 0.250 m
Jarak bid. kritis terhadap sisl luar foot plat. a,=(B,-b,-d)/2= 0.475 m
Tegangan tanah pada bidang kritis geser arah x,
Q..: = qnm + (B. - alt} I B:, :. (Qnsa11 - Qmn) = 101.241 kNim'
Gaya geser arah x, v� = [q,+ ( q=, .q, )/ 2-q 1 ·a,· e, = 37.956 kN
lebar bidang geser untuk tinjauan arah x, b= B, = 1500 mm
Tebal efektff Iootplat, d= 250 mm
Rasio sisi panjang thd. sisl pendek kolom, Pc.=b.lb,.= 1.0000
Kuat geser foot plat arah x. diambil nilai terkecil dari Vr, yang diperoleh dari pers.sbb.:
V0 = ( 1 + 21 �.I• .J fo'' b' d / 6 • 10·' = 838.525 kN
V0 = (a,· d I b + 2 J • � f.' • b • d I 12 • 10.., = 1211.203 kN
v 0
=113·,r1,"b'd ·10..,= 559.017 kN
DiambU, kuat geser foot plat. -+ 559.017 kN
Faktor reduksi kekuatan geser, � = 0.75
Kuat geser foot plat. +•Ve= 419.263 kN
Syarat yang harus dipenuhi,
� • V0 2: VIS/I,
�4--
1 .9 �-36 -c.l
> ,...;;�7-
3 -
. 5-s
9 �
-+ AMAN (OK)
2
2. TINJAUAN GESER ARAH Y

1-b'-:
a, I

I av
i----�BJC '

Jarak pusat tulangan terhadap sisi luar beton, er= 0.085 m


Tebal efektif fool plat, d=h-d'= 0.215 m
Jarak bid. kritis terhadap sisi luar foot plat, a,,= ( B,- b, - d) / 2 = 0.493 m
Tegangan tanah pada bidang krttis geser arah y,
q, = Qm• + (B, • a,) I B, ' (q,,,., - Qm.l = 101.241 kNim'
Gaya geserarahy, V.,,= [q, + (q= -q, )12-q 1 ·a,· B, = 39.354 kN
Lebar bidang geser untuk tinjauan arah y, b = Bx = 1500 mm
Tebal efektif foolplal. d= 215 mm
Rasio sisi panjang thd. sisi pendek kolom, �' = b,, I by= 1.0000
Kuat geserfoot plat arah y, diambll nUal terkecll darl Ve yang diperoleh darl pers.sbb.;
v. = [ 1 + 21 �. I . .J f," b • d I 6 • 10., = 721.132 kN
V, =Ia,, • d I b + 2 I • ,/ f.' • b • d / 12 • 10·' = 929.459 kN
V, = 1 / 3 • .J lo'· b • d • 10.., = 480.755 kN
DiambD, kual geser fool plat, ..... 480.755 kN
Faktor reduksi kekuatan geser, 0.75
Kuat geser foot plat, 360.566 kN
Syaral yang harus dlpenuhl,
9• Ve � Vu::,.
360.566 I ·I� .::;3_9-
3-54
. �
-+ AMAN (OK)
3. TINJAUAN GESER DUA ARAH {PONS)

b,

r= 1
P.

-�=====l�-tJ q.p
1
B,

Jarak pusat tulangan terhadap sisl luar beton, d'= 0.085 m


Tebal efeklif foof ptat, d=h·d·= 0.22 m
lebar bidang geser pons arah x, Cx=b,:+2•d= 0.515 m
Lebar bidang geser pons arah y. c,=b,+2"d= 0.515 m
Gaya geser pons yang letjadi,
V.,. = ( B,. B,- c,.. c,) • [( q_.., + q..., )/2 -q) = 105.731 kN
Luas bictang geser pons, A, = 2 • ( c, + c,) • d = 0.443 m'
lebar bidang geser pons, b0 = 2 • ( c, + c,) = 2.060 m
Rasio sisi panjang thd. siSI pendek kolom. �' = b;_/ by= 1.0000
Tegangan geser pons, diambil nllai terkecil dari fP yang dlperoleh dari pers sbb - ·-
!0=(1+2/ll,J'-'f,'/6= 2.23.6 MPa
1 = [ C:.. • d I e, + 2 J • "f,' / 12 =
0 2.301 MPa
r. = 1 / 3 • '1 f,' = 1.491 MPa
f = 1.491
Tegangan geser pons yang disyaratkan, • MPa
Faktor reduksi kekuatan geser pons, += 0.75
Kuat geser pons, � · v•• =�·A, • r. • 10' = 495.18 kN
Syarat: +·v..., � v.,,,

+. v...,I I P,
495.177 > 10S.731 -+ AMAN {OK)

495.177
I >
I 119.860 -+ AMAN {OK)
3. TINJAUAN GESER DUA ARAH {PONS)

b,

r= 1
P.

-�=====l�-tJ q.p
1
B,

Jarak pusat tulangan terhadap sisl luar beton, d'= 0.085 m


Tebal efeklif foof ptat, d=h·d·= 0.22 m
lebar bidang geser pons arah x, Cx=b,:+2•d= 0.515 m
Lebar bidang geser pons arah y. c,=b,+2"d= 0.515 m
Gaya geser pons yang letjadi,
V.,. = ( B,. B,- c,.. c,) • [( q_.., + q..., )/2 -q) = 105.731 kN
Luas bictang geser pons, A, = 2 • ( c, + c,) • d = 0.443 m'
lebar bidang geser pons, b0 = 2 • ( c, + c,) = 2.060 m
Rasio sisi panjang thd. siSI pendek kolom. �' = b;_/ by= 1.0000
Tegangan geser pons, diambil nllai terkecil dari fP yang dlperoleh dari pers sbb - ·-
!0=(1+2/ll,J'-'f,'/6= 2.23.6 MPa
1 = [ C:.. • d I e, + 2 J • "f,' / 12 =
0 2.301 MPa
r. = 1 / 3 • '1 f,' = 1.491 MPa
f = 1.491
Tegangan geser pons yang disyaratkan, • MPa
Faktor reduksi kekuatan geser pons, += 0.75
Kuat geser pons, � · v•• =�·A, • r. • 10' = 495.18 kN
Syarat: +·v..., � v.,,,

+. v...,I I P,
495.177 > 10S.731 -+ AMAN {OK)

495.177
I >
I 119.860 -+ AMAN {OK)
E. PEMBESIAN FOOTPLAT
1. TULANGAN LENTUR ARAH X

B, I- •• i
Jarak tepi kolom terhadap sisl luar foot plat, a, = ( B,. e, ) I 2 =! 0.600 jm
Tegangan tanah pada tepi kolom,
q, = Qm• + (Bx· a,) IS. • (q�, · Qmnl =j 101.241 jkNlm'

Momen yang terjadi pada plat fondasi akibat tegangan tanah,


Mu,:= 1f2 • a-..2 • I Qx + 213 • ( Qm11.--q,: )-q J •By= 14.3ll3 kNm
Lebar plat fondasl yar19 ditinjau, b = a, = 1500 mm
Tebal plat fondasl, h= 300 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 50 mm
Tebal efektif plat, d=h-d'= 250 mm
Kuat tekan beton. ,; = 20 MPa
Kuat leleh baja tulangan, r, = 390 MPa
Modulus elastiS baja. E,= 2.00E+05 MPa
Faktor dislribusi leg. belon. �1 = 0.85
P• = p, o.85 • 1;1 r, • 600 1 < soo + r, > = 0.0224553
Faktor reduksi kekuatan lentur. 9 = 0.80
� = 0.75 • P. • r, · (1-W0.75• P. • f,I ( 0.85 • r;) J = 5.299
M. = M�"I• = 17.979 kNm
Rn= M0 • 10• 1 ( b • d2) =
...
0.19178
R. < � (OK)
Rasla tulangan yang dlpe�ukan,
p = 0.85 • fc' I r, • [ 1 • 4 (1 - 2 • R0 I ( 0.85 • f;J} I = 0.0005
Rasia tulangan minimum, Pnm = 0.0025
Rasia tulangan yang digunakan1 � p= 0.0025
Luas tulangan yang diper1ukan. A,=p·b"d= 937.50 mm'
Diameter tulangan yang digunakan, I D 13 mm
Jarak tulangan yang dlperlukan, s=n/4•D.. b/A,= 212 mm
Jarak tulangan maksimum, Stl"IIIX: 150 mm
Jarak tulangan yang dlgunakan, � s= 150 mm
Digunakan tulangan, I D 13 .
150
Luas tulangan terpakai, A,-•14"D.. bls = 1327.32 mm'
2. TULANGAN LENTUR ARAH Y

I
_b,-1
-- a, .
I

. I,
I
I
Bx

-r
I
I
q ....._L

------� .l;

B,
I
Bx

Jarak tepi kolom terhadap sisi luar foot plat, a, = ( By - e, ) I 2 =I 0.600 jm


Tegangan tanah pada tepi kolom,

Momen yang terjadi pada plat fondasi akibat tegangan tanah,


M..,= 1/2 - a/·
I q,+ 2f3 • (qm,. -q, )-q) • B, = 14.383 kNm
Lebar plat fondasi yang ditinjau, b=Bx= 1500 mm
Tebal plat londasl, h= 300 mm
Jarak pusat tulangan tnd, sisi luar beton. d' = 85 mm
Tebal elektif ptat, d=h-d'= 215 mm
Kuat tekan beton. fe' - 20 MPa
Kuat leleh baja tulangan, f, - 390 MPa
Modutus elastis baja, E,= 2.00E+05 MPa
Faktor dislribusi leg. belon. �. = 0.85
�. • o.85 • 1;H, • 600, < 600 + 1, 1 =
P. = 0.0224553
Faktor reduksi kekuatan lentur. += 0.80
Rm.,= 0.75 •Po· I,· [1-l',"0.75" P• • r, I ( 0.85 • 1 J = 0·)
5.299
M0= M...,J+ - 17.979 kNm
R =M0 0• 10• 1 ( b • d2) = 0.25930
R,, < R,,,.._ (OK)
Rasla tulangan yang dlpe�ukan,
p = 0.85 • le' I I, • [ 1 - .J (1 - 2 • R0 I ( 0.85 • F;J}] = 0.0007
Rasia tulangan minimum, Pmkl = 0.0025
Rasia tulangan yang digunakan1 -+ p= 0.0025
Luas tulangan yang diper1ukan. A.,=p"b"d= 806.25 mm'
Diameter tulangan yang digunakan, I D 13 mm
Jarak tulangan yang diperlukan, s=n/4"0.. b/A.,= 247 mm
Jarak tulangan maksimum, S111,11)( = 150 mm
Jarak tulangan yang dlgunakan, -+ s= 150 mm
Digunakan tulangan, I D 13 .
150
Luas tulangan terpakai, A.,=n/4"D'"bfs = 1327.32 mm'
3. TULANGAN SUSUT

Rasio tulangan sosut minimum. ,_= 0.0014


luas tulangan susut arah x, A.x = rsm ·d·ax=
11
525.000 mm'
luas tulangan susut arah y, As.,= r,m�·d·By-= 451.500 mm'
Diameter tutangan yang digunakan, I D 13 mm

Jarak tulangan susut arah x. s.. =p/4•tE.2·BvlA,.= 379 mm


Jarak tulangan susutmaksimum arah x, S.1;.l!'lllx = 200 mm
Jarak tulangan susut arah x yang digunakan, s = 200 mm
Jarak tulangan susutarah y, s,= p/4' A:'· B,I A,.,-
' 441 mm
Jarak tulangan susut maksimum arah y, S,,max-= 150 mm
Jarak tulangan susut arah y yang digun akan. s,,= 150 mm
Digunakan tulangan susut arah x, I D 13 . 200
Digunakan tulangan susut arah Y� I D 13 . 150

Anda mungkin juga menyukai