Menentukan Serviceability
MR = 15000
Digunakan :
Surface (LASTON) :
a1
MS
SN Trial
Lapisan Pers. 1 Pers. 2 Pers. 3 Pers. 4
Surface -0.3364 3.9269090081 -0.01606472154 3.832374
Base -0.3364 4.3463525519 -0.02621292478 3.423843
SubBase -0.3364 6.2602353091 -0.14119586538 1.618532
Subgrade
Sub-grade CBR
Tanah dasar 10%
O 1993 Untuk Hasil Tass MAT
7% GF=((1+i)^(UR)-1))/i
20
0.5
100%
DL W18' GF 18ESAL
d a x b x 365 e c x d x W18' x e
1 1450.890127 40.995492 29739.97753084
1 176469.80489 40.995492 3617233.265675
1 4764.2562572 40.995492 97656.51540436
1 949044.8425 40.995492 19453280.27669
1 32527.983981 40.995492 666750.3587627
1 51036.421537 40.995492 1046131.61361
Total 18ESAL 24,910,792.01
LOG(10)18ESAL 7.396387535609
80
0.4
-0.841
Digunakan :
Surface (LASTON) :
= 0.44
= 1000 kg
3,00 -6,70
6,71 - 7,49
7,50 - 9,99
> 10,00
Total Sebelah
So ∆PSI SN Trial
kanan
0.4 2 1.76 7.41 OK
0.4 2 2.06 7.41 OK
0.4 2 3.90 7.40 OK
- - - -
7.72
1.001410295748
0.998488749365
OK 0.999353665929
OK
OK
a CBR MR
MR
15000
14
LOG(10)18ESAL LOG(10)18ESAL Keterangan
SN
(acuan) (hasil trial) (≥ acuan)
7.40 7.41 Sesuai 1.76
7.40 7.41 Sesuai 2.06
7.40 7.40 Sesuai 3.90
7.40 - - -
SN
< 3,00
3,00 - 6,70
6,71 - 7,49
7,50 - 9,99
> 10,00
Tebal Minimum
SN Bahan
(Cm)
< 3,00 15 Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Kapur
20 Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Kapur
3,00 - 7,49
10 LASTON ATAS
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Kapur,
20
7,49 - 9,99 Pndasi Macadam
15 LASTON ATAS
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Kapur,
10,00 - 12,24 20
Pndasi Macadam, Lapen, Laston Atas
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Kapur,
> 12,25 25
Pndasi Macadam, Lapen, Laston Atas
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Kapur,
> 12,25 25
Pndasi Macadam, Lapen, Laston Atas
2,76
= 20 Cm
Digunakan :
Surface (LASTON) : a1 =
Base (Batu Pecah Kelas
SubBase (Sirtu Kelas B)
SubGrade : CBR = 10 %
nah Dengan Kapur
nah Dengan Kapur
1,21 = 8 Cm
= 15 Cm
akan :
e (LASTON) : a1 = 0.4
Batu Pecah Kelas B) : a2 = 0.13, CBR = 80%, Mr = 120000
se (Sirtu Kelas B) : a3 = 0.12, CBR = 50%, Mr = 75000
ade : CBR = 10 %, Mr = 1500
= 8 Cm
= 15 Cm