Mengetahui
PPK Operasi dan Pemeliharaan SDA I Balai
Besar Wilayah Sungai Bengawan Solo
KATA PENGANTAR................................................................................................................i
DAFTAR ISI............................................................................................................................iii
DAFTAR GAMBAR................................................................................................................ix
DAFTAR TABEL.....................................................................................................................x
BAB I - PENDAHULUAN ............................................................................................... I-1
I.1 Latar Belakang .......................................................................................... I-1
I.2 Maksud dan Tujuan .................................................................................. I-1
I.3 Data Pekerjaan .......................................................................................... I-2
I.4 Lingkup Pekerjaan .................................................................................... I-2
I.5 Sasaran Mutu ............................................................................................ I-3
I.6 Referensi ................................................................................................... I-3
I.7 Definisi Penilaian Kinerja Dan Penyusunan AKNOP .............................. I-4
I.7.1 Penilaian Kinerja........................................................................... I-4
I.7.2 Penyusunan AKNOP..................................................................... I-6
BAB II - TINJAUAN PUSTAKA ................................................................................... II-1
II.1 Umum ...................................................................................................... II-1
II.2 Tata Cara Penilaian Kinerja Bendungan.................................................. II-1
II.2.1 Pengisian Blangko Penilaian Kinerja......................................... II-32
II.3 Petunjuk Pengisian dan Penggunaan Formulir Perhitungan AKNOP ... II-
51 BAB III - GAMBARAN PEKERJAAN.........................................................................
III-1 III.1 Umum .....................................................................................................III-
1
III.2 Pelaksanaan Penilaian Kinerja..............................................................III-17
III.3 Hal-Hal yang Perlu Diperhatikan .........................................................III-18
III.4 Pengertian .............................................................................................III-18
III.5 Metode Penilaian Kinerja Bendungan ..................................................III-
21
BAB IV - INVENTARISASI DAN PENILAIAN KINERJA BENDUNGAN............. IV-1
IV.1 Umum .................................................................................................... IV-1
IV.2 Inventarisasi dan Penilaian Kinerja Bendungan Nawangan .................. IV-
2 IV.2.1 Data Teknis ................................................................................ IV-
2 IV.2.2 Data Inventarisasi.......................................................................
IV-3 IV.2.3 Penilaian Kinerja........................................................................
d. Menyajikannya dalam bentuk peta (mapping), membuat jadwal perencanaannya dan skala
kegiatan, maupun jenis pekerjaannya.
c. Operasional;
4. Penyusunan AKNOP
I.6 Referensi
Dalam kegiatan ini memakai beberapa referensi sebagai berikut :
1. Konsepsi Pengaturan Penyusunan Rancangan Pedoman Penilaian Kinerja Bendungan
Tahun 2015
2. Lampiran I-VII Surat Edaran Direktur Jenderal Sumber Daya Air Tentang Pedoman
Penilaian Kinerja Bendungan
3. Lampiran II Surat Edaran Direktur Jenderal Sumber Daya Air Tentang Petunjuk Pengisian
dan Penggunaan Formulir Perhitungan AKNOP Bendungan Tahun 2015
4. Formulir Perhitungan AKNOP Bendungan, yang dilkeluarkan oleh Direktorat Bina
Operasi dan Pemeliharaan. Tahun 2015
5. Daftar Harga Upah Dan Bahan Dpu. Kab. Wonogiri.Th.2017
6. Daftar Harga Upah Dan Bahan Dpu.Kab. Boyolali.Th.2017
7. Daftar Harga Upah Dan Bahan Dpu. Kab. Karanganyar.Th.2017
8. Daftar Harga Upah Dan Bahan Dpu. Kab. Klaten.Th.2017
9. Daftar Harga Upah Dan Bahan Dpu.Kab. Sragen.Th.2017
10. Daftar Harga Upah Dan Bahan Dpu.Prov. Jawa timur.Th.2017
11. Data base Bendungan Wilayah Sungai Bengawan Solo Tahun 2014
Sasaran dan jangkauan pengaturan yang hendak dicapai dalam pedoman penilaian kinerja
bendungan adalah untuk pedoman bagi para pengelola bendungan, para pelaksana di lapangan
serta para operator bendungan, unit monitoring bendungan, serta para pengambil kebijakan
terkait dengan pengelolaan dan OP bendungan. Gambaran jangkauan pengaturan dalam
pengelolaan dan OP bendungan dapat digambarkan pada bagan berikut, yang menunjukkan
secara jelas posisi lingkup kegiatan penilaian dan evaluasi kinerja bendungan dalam lingkup
kegiatan operasi dan pemeliharaan (OP). Dengan demikian lingkup pengaturan penilaian kinerja
bendungan terkait langsung dengan dukungan terhadap efektivitas kelancaran penyelenggaraan
OP bendungan sebagai salah satu aspek dari kegiatan pengelolaan bendungan. Gambaran posisi
kegiatan penilaian kinerja bendungan dalam lingkup pengaturan kegiatan operasi dan
pemeliharaan bendungan, adalah sebagaimana bagan berikut :
Gambaran diagram diatas, menunjukkan jangkauan pengaturan untuk kegiatan penilaian kinerja
bendungan dalam proses kegiatan penyelenggaraan operasi dan pemeliharaan (OP) bendungan
dan merupakan salah satu komponen kegiatan dan satu simpul penting dalam lingkup
penyelenggaraan kegiatan pengelolaan bendungan (sebagaimana ditunjukkan dalam amanat
Permen PU no 27/2015).
II.1 Umum
Penilaian kinerja bendungan, menuntun kepada ketepatan penentuan prioritas penyusunan
anggaran penanganan OP bendungan berdasarkan skala prioritas terkait dengan kondisi dan
tingkat kerusakan bendungan. Aspek penilaian kinerja suatu bendungan merupakan kegiatan
yang sangat penting dalam menjaga keberlangsungan fungsi dan manfaat sebuah bangunan.
Berdasarkan dengan Paket Pekerjaan Penilaian Kinerja Dan Penyusunan AKNOP Bendungan
Bengawan Solo, Maka diperlukan penjelasan mengenai Tata cara Penilaian Kinerja dan
Penyusunan AKNOP
Kriteria
Sub Eleman
No Komponen Baik Cukup Kurang Buruk
Komponen Penilaian (80 s.d 100) (70 s.d <80) (55 s.d <70) (<55)
1 Tubuh a Puncak 1) Lapis 80 s.d 100% 70 s.d <80% mampu 55 s.d <70% mampu ≤ 55 % mampu melindungi
Bendungan Perkera- mampu melindungi puncak melindungi puncak tubuh puncak tubuh bendungan
san melindungi tubuh bendungan bendungan
puncak tubuh
bendungan
Retakan Terdapat retakan Terdapat retakan Terdapat retakan
permukaan rambut pada bagian memanjang atau memanjang atau melintang
< 1 mm Permukaan, 1 mm melintang pada bagian pada bagian permukaan >3
s.d <2 mm permukaan sebesar <3 mm dan kedalaman
mm dan kedalaman >1 m
<1 m
2) Bahu Lebar dan kondisi Lebar dan kondisi Lebar dan kondisi bahu Lebar dan kondisi bahu
jalan bahu jalan 80 s.d bahu jalan 70 s.d jalan 55 s.d <70% jalan <55%
100% <80%
3) Parapet kondisi 80 s.d kondisi 70 s.d <80% kondisi 55 s.d <70% dan kondisi <55% dan berfungsi
100% dan dan berfungsi cukup berfungsi atau tidak berfungsi sama
berfungsi dengan dengan baik sekali
baik
4) Saluran kondisi 80 s.d kondisi 70 s.d <80% kondisi 55 s.d <70% dan kondisi <55% dan berfungsi
drainase 100% dan dan berfungsi cukup berfungsi atau tidak berfungsi sama
berfungsi dengan dengan baik sekali
baik
5) Guard kondisi 80 s.d kondisi 70 s.d <80% kondisi 55 s.d <70% dan kondisi <55% dan berfungsi
rail 100% dan dan berfungsi cukup berfungsi atau tidak berfungsi sama
berfungsi dengan dengan baik sekali
baik
6) Patok kondisi 80 s.d kondisi 70 s.d <80% kondisi 55 s.d <70% dan kondisi <55% dan berfungsi
HM/BM 100% dan dan berfungsi cukup berfungsi atau tidak berfungsi sama
berfungsi dengan dengan baik sekali
baik
2) Plat kondisi 80 s.d 100% kondisi 70 s.d <80% kondisi 55 s.d <70% kondisi <55% dan berfungsi
jembata dan berfungsi dan berfungsi dan cukup berfungsi atau tidak berfungsi sama
n dengan baik dengan baik sekali
3) Gelagar kondisi 80 s.d 100% kondisi 70 s.d <80% kondisi 55 s.d <70% kondisi <55% dan berfungsi
dan berfungsi dan berfungsi dan cukup berfungsi atau tidak berfungsi sama
dengan baik dengan baik sekali
4) Hand kondisi 80 s.d 100% kondisi 70 s.d <80% kondisi 55 s.d <70% kondisi <55% dan berfungsi
rail dan berfungsi dan berfungsi dan cukup berfungsi atau tidak berfungsi sama
dengan baik dengan baik sekali
5) Kolom/ kondisi 80 s.d 100% kondisi 70 s.d <80% kondisi 55 s.d <70% kondisi <55% dan berfungsi
tiang dan berfungsi dan berfungsi dan cukup berfungsi atau tidak berfungsi sama
dengan baik dengan baik sekali
Kriteria
Sub Eleman
No Komponen Baik Cukup Kurang Buruk
Komponen Penilaian (80 s.d 100) (70 s.d <80) (55 s.d <70) (<55)
5 Bendungan b Lereng 1) Lapis kondisi 80 s.d kondisi 70 s.d kondisi 55 s.d kondisi <55% dan
Pelana Hulu Pelindung 100% dan <80% dan <70% dan cukup berfungsi atau tidak
(lanjutan) berfungsi dengan berfungsi dengan berfungsi berfungsi sama sekali
baik baik
2) Jalan kondisi 80 s.d kondisi 70 s.d kondisi 55 s.d kondisi <55% dan
Inspeksi 100% dan <80% dan <70% dan cukup berfungsi atau tidak
berfungsi dengan berfungsi dengan berfungsi berfungsi sama sekali
baik baik
3) Saluran kondisi 80 s.d kondisi 70 s.d kondisi 55 s.d kondisi <55% dan
Drainase 100% dan <80% dan <70% dan cukup berfungsi atau tidak
berfungsi dengan berfungsi dengan berfungsi berfungsi sama sekali
baik baik
4) Tumbuh- Pembersihan Pembersihan Pembersihan Pembersihan dilakukan
an dilakukan 4 kali dilakukan 3 kali dilakukan 2 kali 1 kali dalam 1 tahun
atau lebih dalam 1 dalam 1 tahun dalam 1 tahun
tahun
c Lereng 1) Lapis kondisi 80 s.d kondisi 70 s.d kondisi 55 s.d kondisi <55% dan
Hilir Pelindung 100% dan <80% dan <70% dan cukup berfungsi atau tidak
berfungsi dengan berfungsi dengan berfungsi berfungsi sama sekali
baik baik
Kriteria
Sub Eleman
No Komponen Baik Cukup Kurang Buruk
Komponen Penilaian (80 s.d 100) (70 s.d <80) (55 s.d <70) (<55)
6 Pelimpah a Lantai 1) Beton kondisi 80 s.d kondisi 70 s.d kondisi 55 s.d kondisi <55% dan
darurat Hulu 100% dan <80% dan <70% dan cukup berfungsi atau tidak
berfungsi dengan berfungsi dengan berfungsi berfungsi sama sekali
baik baik
b Mercu 1) Beton Terkikis <10% Terkikis 10 s.d Terkikis 20 s.d Terkikis >30%
Spillway <20% <30%
kondisi 80 s.d kondisi 70 s.d kondisi 55 s.d kondisi <55% dan
100% dan <80% dan <70% dan cukup berfungsi atau tidak
berfungsi dengan berfungsi dengan berfungsi berfungsi sama sekali
baik baik (perlu penanganan
khusus)
c Saluran 1) Lantai kondisi 80 s.d kondisi 70 s.d kondisi 55 s.d kondisi <55% dan
Luncur beton 100% dan <80% dan <70% dan cukup berfungsi atau tidak
berfungsi dengan berfungsi dengan berfungsi berfungsi sama sekali
baik baik (perlu penanganan
khusus)
Kriteria
Sub Eleman
No Komponen Baik Cukup Kurang Buruk
Komponen Penilaian (80 s.d 100) (70 s.d <80) (55 s.d <70) (<55)
1 Pedoman a Manual 1) Keterse- Pengesahan Ada Pengesahan Ada Belum disahkan Belum disahkan
OP OP diaan dan tersedia di dan tersedia di namun tersedia di namun tidak tersedia
Kantor UPB dan salah satu kantor salah satu kantor di kantor UPB dan
kantor lapangan UPB atau kantor UPB atau kantor kantor lapangan (0%)
(100%) lapangan (75%) lapangan (55%)
2) Kesesuai- Ketidaksesuaian ketidaksesuaian ketidaksesuaian
ketidaksesuaian
an terhadap operasi terhadap operasi terhadap operasi 30
terhadap operasi >40%
<20% 20 s.d <30 % s.d ≤40 %
3) Pelaksa- 80 s.d 100% 70 s.d <80% sesuai 55 s.d <70% sesuai
<55% sesuai prosedur
naan sesuai prosedur prosedur prosedur
b Pola 1) Keterse- Pengesahan Ada Pengesahan Ada Belum disahkan Belum disahkan
Operasi diaan dan tersedia di dan tersedia di namun tersedia di namun tidak tersedia
Waduk Kantor UPB dan salah satu kantor salah satu kantor di kantor UPB dan
kantor lapangan UPB atau kantor UPB atau kantor kantor lapangan (0%)
(100%) lapangan (75%) lapangan (55%)
2) Updating 1 kali dalam 1 1 kali antara 1 s.d 1 kali antara 3 s.d 5 1 kali di atas 5 tahun
tahun (100%) 3 tahun (75%) tahun (60%) (40%)
3) Sosialisasi Dilakukan Dilakukan antara Dilakukan diatas 2 Dilakukan diatas 4
sebelum pola 0 s.d 2 minggu s.d 4 minggu setelah minggu setelah pola
operasi yang baru setelah pola pola operasi operasi berjalan (40%)
dijalankan (100%) operasi berjalan berjalan (60%)
(75%)
4) Pelaksa- 80 s.d 100% sesuai 70 s.d <80% sesuai 55 s.d <70% sesuai <55% sesuai pola operasi
naan pola operasi waduk pola operasi waduk pola operasi waduk waduk
c Standar 1) Keterse- Pengesahan Ada dan Pengesahan Ada dan Belum disahkan Belum disahkan namun
Operasi- diaan tersedia di Kantor tersedia di salah satu namun tersedia di tidak tersedia di kantor
onal dan UPB dan kantor kantor UPB atau salah satu kantor UPB UPB dan kantor lapangan
Prosedur lapangan (100%) kantor lapangan atau kantor lapangan (0%)
(SOP) (75%) (55%)
Kriteria
Sub Eleman
No Komponen Baik Cukup Kurang Buruk
Komponen Penilaian (80 s.d 100) (70 s.d <80) (55 s.d <70) (<55)
1 Hasil a Elevasi 1) Kecukup- ≥90% Terpenuhi 75 s.d <90% 60 s.d <75% <60% Terpenuhi
Pengamat- Muka Air an jumlah Terpenuhi Terpenuhi
an
Instrumen-
tasi
2) Kondisi <10% tidak 10 s.d <20% tidak 20 s.d <30% tidak >30% tidak berfungsi
alat berfungsi berfungsi berfungsi
3) Hasil <15% dari elv 15 s.d <20% dari 20 s.d <25% dari elv >25% dari elv normal
Pengamat- normal kearah elv normal kearah normal kearah batas kearah batas kritis dan
an batas kritis dan batas kritis dan kritis dan <75% <100% diatas elv
<25% diatas elv <50% diatas elv diatas elv normal normal
normal normal
hasil pengamatan hasil pengamatan 80 hasil pengamatan 70 hasil pengamatan <70%
≥90% dalam 1 tahun s.d <90% dalam 1 s.d <80% dalam 1 dalam 1 tahun
tahun tahun
4) Pelaporan Laporan dan hasil Laporan dan hasil Laporan dan hasil Laporan dan hasil analisa
analisa terpenuhi 80 analisa terpenuhi 70 analisa terpenuhi 55 terpenuhi <55 %
s.d 100% s.d <80% s.d <70%
b Air Tanah 1) Kecukup- 90 s.d 100% 75 s.d <90% 60 s.d <75% <60% Terpenuhi
an jumlah Terpenuhi Terpenuhi Terpenuhi
2) Kondisi alat <10% tidak 10 s.d <20% tidak 20 s.d <30% tidak >30% tidak berfungsi
berfungsi berfungsi berfungsi
3) Hasil syarat keamanan syarat keamanan syarat keamanan syarat keamanan
Pengamat- terpenuhi 80 s.d terpenuhi 70 s.d terpenuhi 55 s.d <70% terpenuhi <55 %
an 100% <80%
4) Pelaporan Laporan dan hasil Laporan dan hasil Laporan dan hasil Laporan dan hasil analisa
analisa terpenuhi 80 analisa terpenuhi 70 analisa terpenuhi 55 terpenuhi <55 %
s.d 100 % s.d <80% s.d <70%
c Tekanan 1) Kecukup- 90 s.d 100% 75 s.d <90% 60 s.d <75% <60% Terpenuhi
Air Pori an jumlah Terpenuhi Terpenuhi Terpenuhi
Kriteria
Eleman
No Komponen Sub Komponen Kurang (55 s.d
Penilaian Baik (80 s.d 100) Cukup (70 s.d <80) Buruk (<55)
<70)
1 Unit a Struktur 1) legalitas ada, disahkan (100%) - - belum disahkan (50%)
Pengelola Organisasi
Bendungan
2) Kelengkapa 80 s.d 100% jumlah 70 s.d <80% jumlah 55 s.d <70% jumlah <55% jumlah personil
n personil terpenuhi personil terpenuhi personil terpenuhi terpenuhi
b Kompetensi 1) Kepala UPB 80 s.d 100% sesuai 70 s.d <80% sesuai 55 s.d <70% sesuai <55% sesuai yang
yang disyaratkan yang disyaratkan yang disyaratkan disyaratkan
2) Kepala Seksi 80 s.d 100% sesuai 70 s.d <80% sesuai 55 s.d <70% sesuai <55% sesuai yang
yang disyaratkan yang disyaratkan yang disyaratkan disyaratkan
3) Staff 80 s.d 100% sesuai 70 s.d <80% sesuai 55 s.d <70% sesuai <55% sesuai yang
yang disyaratkan yang disyaratkan yang disyaratkan disyaratkan
4) petugas 80 s.d 100% sesuai 70 s.d <80% sesuai 55 s.d <70% sesuai <55% sesuai yang
yang disyaratkan yang disyaratkan yang disyaratkan disyaratkan
c Kinerja UPB 1) Pelaporan 80 s.d 100% 70 s.d <80% 55 s.d <70% <55% kewajiban
kewajiban pelaporan kewajiban pelaporan kewajiban pelaporan pelaporan terpenuhi
terpenuhi terpenuhi terpenuhi
2) staff tercapainya kinerja tercapainya kinerja tercapainya kinerja tercapainya kinerja
80 s.d 100% 70 s.d <80% 55 s.d <70% <55%
d Pembiayaan 1) Kecukupan 80 s.d 100% AKNOP 70 s.d <80% AKNOP 55 s.d <70% AKNOP <55% AKNOP
e Rencana 1) Ketersediaa Ada (100%) - - tidak (50%)
Strategis n
2) Pelaksanaan 80 s.d 100% 70 s.d <80% 55 s.d <70% <55% dilaksanakan
dilaksanakan dilaksanakan dilaksanakan
2 Dokumen a Dokumen 1) Kelengkapa 80 s.d 100% lengkap 70 s.d <80% lengkap 55 s.d <70% lengkap <55% lengkap
OP Perencanaan n Isi
2) Lokasi 100% apabila Terdapat 75% : Minimal terdapat 60% : Minimal 0% : Tidak ada sama
Penyimpana di Balai Bendungan, di 2 s.d 3 lokasi (Balai terdapat di 1 Lokasi sekali
n Kantor Pemilik Bendungan, Kantor Bendungan
Bendungan/ Kantor Pemilik Bendungan/
UPB, dan Lokasi Kantor UPB, dan Lokasi
Bendungan Bendungan)
3. Nilai komponen total merupakan nilai masing-masing komponen yang merupakan jumlah
dari perkalian nilai sub komponen dengan bobotnya. Penjabaran nilai komponen total
menggunakan rumus berikut.
1 Pedoman OP 20%
REKOMENDASI
2 Inspeksi 30%
REKOMENDASI
2 Dokumen OP 30%
REKOMENDASI
Selain itu, formulir ini juga terdiri atas delapan (8) halaman yang secara singkat disajikan
dalam tabel berikut ini.
No
Worksheet Jenis Uraian
1 Home Form Pilihan Terdiri atas pilihan halaman yang akan dibuka meliputi:
Data Teknis Bendungan, Komponen OP Bendungan, Harga
Dasar, dan AKNOP Bendungan
2 Data Teknis Form Isian Form Isian
Form ini diisi sesuai dengan data teknis bendungan
3 Asumsi Form isian Formulir isian untuk menghitung koefisien upah dan bahan
dalam perhitungan Harga Satuan Pekerjaan (HSP) OP
bendungan.
4 Harga Dasar Form Isian Kolom no 1 adalah nomor urut
Kolom no 2 adalah Upah/Bahan
Kolom no 4 diisi dengan standar harga upah dan bahan yang
dikeluarkan oleh kabupaten setempat (Letak bendungan
berada)
5 AHSP Form Informasi Berisi mengenai Analisis Harga Satuan pada masing-masing
jenis kegiatan OP Bendungan. Informasi yang terdapat pada
halaman ini adalah koefisien masing-masing upah dan bahan
untuk setiap jenis kegiatan OP Bendungan.
III.1 Umum
Pada tahap awal pekerjaan, penyedia jasa melakuan survey pendahuluan dan inventarisasi
lokasi yang diarahkan oleh Direksi pekerjaan. Tujuan dari survey pendahuluan adalah untuk
melihat kondisi awal daerah studi dan memperkirakan kendala – kendala yang mungkin
terjadi selama studi. Survey ini dilakukan terutama untuk orientasi terhadap medan yang akan
di survey sehingga dapat memperkirakan kebutuhan ideal peralatan dan surveyor.
Penilaian Kinerja dan Penyusunan AKNOP Bendungan Bengawan Solo, yang merupakan
asset BBWS Bengawan Solo yang terdiri dari :
Selain data primer hasil survey, dilakukan kajian awal juga dengan menggunakan literatur
perencanaan/ as built drawing sebagai pembanding. Dari semua Bendungan yang menjadi
tanggung jawab BBWS Bengawan Solo yang di survey ada beberapa bendungan mengalami
kerusakan dan penurunan fungsi, kinerja dan keandalannya yang antara lain disebabkan oleh
faktor internal dan eksternal. Efektifitas kinerja bendungan yang semakin menurun
diakibatkan permasalahan pendangkalan waduk akibat tingginya laju sedimentasi, penurunan
debit inflow, serta penurunan kondisi fisik bendungan itu sendiri.
III.4 Pengertian
1) Bangunan Pengambilan (Intake) adalah segala fasilitas yang digunakan untuk
mengatur penyaluran air lewat bendungan dalam rangka pengoperasian bendungan,
pengendalian banjir atau pengosongan waduk dan befungsi untuk menghentikan
pasokan air sebagai pembangkit tenaga listrik, air baku, air irigasi, dll.
Mulai
Gambar III-33 Contoh Kerusakan Pada Pintu Air dan Bangunan pendukung Bendungan
Gambar III-34 Contoh Kerusakan Pada Pagar dan Bangunan pendukung Bendungan
Gambar III-36 Contoh Tumbuhan Liar dan Sedimantasi Pada Saluran Pendukung Bendungan
Gambar III-37 Contoh Retakan/Longsoran Pada Tanggul dan kerusakan Pada Bangunan Pendukung
IV.1 Umum
Penilaian kinerja bendungan dilakukan pada semua komponen bendungan yang berpengaruh
terhadap kinerja bendungan, tidak terbatas pada komponen fisik tetapi juga kondisi non fisik.
Ruang lingkup Penilaian kinerja bendungan meliputi:
1.) Inventarisasi komponen-komponen detail prasarana bendungan beserta waduknya, termasuk
struktur, kelengkapan peralatan operasi dan instrumentasi bendungan yang harus dilakukan,
2.) Inventarisasi komponen – komponen pendukung dalam kegiatan operasi waduk dan OP
bendungan.
3.) Inventarisasi fasilitas pendukung yang diperlukan dalam mendukung pelaksanaan kegiatan
pengelolaan bendungan, operasi dan pemeliharaan, serta pemeriksaan dan pemantauan
kondisi bendungan.
4.) Identifikasi faktor-faktor yang memberikan pengaruh terhadap kinerja bendungan.
5.) Analisis penilaian kinerja bendungan.
6.) Penetapan prioritas penanganan dan pembiayaan OP bendungan berdasarkan kinerja.
Penilaian kinerja bendungan bertujuan untuk :
1) Mengetahui/mengukur tingkat pelayanan suatu bendungan secara umum.
2) Mengetahui kondisi bendungan saat dilakukan penilaian terhadap bendungan tersebut.
3) Mengetahui dan mengukur adanya kerusakan minor maupun mayor pada setiap komponen
bendungan.
4) Mengetahui dan mengukur efektivitas operasi bendungan pada saat dilakukan penilaian.
5) Mengenali problem-problem yang mengancam keamanan bendungan.
6) Mempercepat respon yang efektif untuk mencegah terjadinya keruntuhan bendungan.
7) Mempersiapkan upaya-upaya untuk memperkecil risiko jatuhnya korban jiwa dan mengurangi
kerusakan harta benda, bila terjadi keruntuhan bendungan.
Inventarisasi dan Penilaian Kinerja Bendungan berdasarkan survei lapangan dapat dilihat pada tabel di
bawah ini :
1. Data Umum
a. Nama Bendungan : Nawangan
b. Alamat Bendungan : Desa Nawangan, Kec. Giriwoyo, Kab. Wonogiri, Jawa Tengah
c. Koordinat Intake x : 08º02’613”
y : 110º54’096”
2. Riwayat Paket Pekerjaan : - Inspeksi besar di tahun 2016
- Rencana Tindak Darurat di tahun 2015
3. Data Inventarisasi
a. Lantai Outlet Bangunan penguras sudah retak dan rusak
b. Ada retakan di dinding bangunan penguras
c. Lantai Hilir saluran pengeluaran/Outlet sudah rusak/ hancur
d. V-Notch di dekat bangunan pengeluaran tidak berfungsi karna ada bocoran lewat bawah
e. Dinding dan lantai bangunan V-Notch sudah retak dan sudah hampir jebol
f. Sedimentasi di waduk sudah cukup tinggi
g. Penjaga mengajukan untuk pemasangan bronjong pada sungai suplesi, untuk
mengurangi sedimentasi
h. Ada kerusakan pada Stoplog pintu intake, yang mengakibatkan kebocoran
i. Ada penurunan di bagian lereng hilir di sebelah kiri tangga inspeksi ke outlet
j. Saluran terjunan spillway ada yang bocor, tetapi belum diketahui dari mana
asal kebocoran tersebut
k. Penjaga Mengajukan Pemasangan Bronjong di atas dinding saluran spillway
l. Ada kerusakan pintu penguras pada bangunan check dam, dan sedimetasi cukup tinggi +
2m
m. Belum ada rumah jaga
n. Penjaga menanyakan batas wilayah Bendungan/Waduk itu dimana...?
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 250 m x 4m = 1.000 m2
Lapis Perkerasan 33% Ada 98% 33%
Total Kerusakan : 20 m2
Luas : (250 m x 0,5m) x 2 = 250
Bahu 11% Ada 80% 9% m2
Total Kerusakan : 50 m2
Luas : (250 m x 0,15m x
Parapet 11% Ada 55% 6% 0,15m) x 2 = 11,25 m3
Total Kerusakan : 5 m3
Luas : (0,5 m x 0,25m x 0,25m)
Puncak 40% Guard rail 40% Ada 85% 34% 37% x 170 = 5,32 m3
Total Kerusakan : 0,798 m2
Luas : (0,20 m x 0,20 m x 0,80
Patok HM/BM 13% Ada 80% 11% m) x 16 bh = 0,512 m3
Total Kerusakan : 0,1024 m3
Portal Masuk 9% Tidak Ada 0% 0%
Peralatan
Penggerak
Hidromekanika 38% 100% Ada 75% 75% 28%
Manual
l
Pipa pesat 70% Ada 75% 53% Luas : 2,5 m x 1,6 m x 116m =
Tunnel/
60% 44% 464 m2
Terowongan
Total Kerusakan : 116 m2
Sambungan 30% Ada 70% 21%
Luas : 28 m x 3 m= 84 m2
Dinding 33% Ada 65% 22%
Total Kerusakan : 29,5 m2
Luas : (4 m x 2 m) + (10 m x
Bangunan
20% Lantai 33% Ada 50% 17% 11% 5,5 m) = 63 m2
Bangunan Pelindung
3 20% Total Kerusakan : 31,5 m2
Pengeluaran Luas : 0,6 m x 3 m= 1,8 m2
Tangga inspeksi 33% Ada 55% 18%
Total Kerusakan : 0,8 m2
Luas : 1,5 m x 1,5 m x 12 m =
Dinding beton 50% Ada 65% 33% 27 m2
Total Kerusakan : 9,5 m2
Gallery 20% 10% Luas : 0,5 m x 7 m= 3,5 m2
Tangga inspeksi 25% Ada 70% 18%
Total Kerusakan : 1 m2
Luas : 20 m x 5 m= 100 m2
Lantai hulu 13% Lapis Beton 100% Ada 88% 88% 12%
Total Kerusakan : 22 m2
Luas : 20 m x 3 m= 60 m2
Mercu Spillway 27% Lapis Beton 100% Ada 81% 81% 22%
Total Kerusakan : 11 m2
Luas : 20 m x 20 m= 400 m2
Lantai beton 70% Ada 65% 46%
Saluran Total Kerusakan : 140 m2
13% 9%
Luncur Jumlah : 40 bh x 2 = 80 bh
Lubang Drain 30% Ada 72% 22%
Total Kerusakan : 22bh
Luas : 40 m x 3 m= 120 m2
Dinding beton 70% Ada 60% 42%
Total Kerusakan : 48 m2
Dinding/ Sayap 13% 8%
Luas : 16 m x 2 m= 32 m2
Sambungan beton 30% Ada 70% 21%
Total Kerusakan : 9,6 m2
Luas : 15 m x 7 m= 105 m2
Kolam Olak 35% Ada 55% 19%
Total Kerusakan : 47 m2
Peredam Luas : 3 m x 7 m= 21 m2
Bangunan 27% Kolam Terjunan 35% Ada 58% 20% 15%
4 15% Energi Total Kerusakan : 8,9 m2
Pelimpah
Luas : 3 m x 2m= 6 m2
Kolam Loncat 30% Ada 61% 18%
Total Kerusakan : 2,3 m2
Luas : (4 m x 5 m) x 2 bh = 40
Abutmen 19% Ada 92% 17% m2
Total Kerusakan : 3,2 m2
Luas : (4 m x 8,7 m) = 34,8 m2
Plat jembatan 19% Ada 96% 18%
Total Kerusakan : 1,4 m2
Luas : (0,5 x 8,7 m) x 2 = 8,7
Jembatan 7% Gelagar 25% Ada 95% 24% 6% m2
Total Kerusakan :0,435 m2
Luas : (9 m x 1m) x 2 = 18 m2
Hand rail 13% Ada 95% 12%
Total Kerusakan :0,9 m2
Luas : (4 m x 5 m) x 2 bh = 40
Kolom/tiang 25% Ada 90% 23% m2
Total Kerusakan : 4 m2
Tumpuan
50% Saluran Drainase 30% Tidak ada 0% 0% 23%
Kanan
Pelimpah
6 5% 0% 0% 0% 0% Tidak ada
darurat
Lereng sebelah kiri terdapat
penurunan muka tanah dan
7 Bukit Tumpuan 5% 5% 6% 40% 2% belum adanya saluran
drainase dan pagar
pelindung
REKOMENDASI
a. Pada Puncak bendungan perlu dibangun portal masuk, pagar pelindung dan lampu penerangan (10 Titik)
Pada Bangunan pengambilan perlu adanya penggantian pintu intake (2,5 x 1,6 m) dan stoplog karena kondisinya
b.
sudah rusak
Pada bangunan pengeluaran perlu adanya perbaikan pada lantai, dindingnya dan galeri karena kondisi lantai sudah
c.
pecah, dinding sudah retak dan tangga rusak
Pada bangunan pelimpah perlu perbaikan pada saluran luncur, dinding/sayap dan peredam energi karena
d.
kondisinya sudah berlobang dan retak
Pada bukit tumpuan perlu adanya pengecekan dan perbaikan pada lereng sebelah kiri karena terjadi penurunan
e.
muka tanah dan perlu juga pembangunan saluran drainase dan pagar pelindung
Butuh perbaikan pintu sebanyak 4 unit pada bangunan Cek Dam dan pengerukan sedimen yang sudah sangat
g.
tinggi
Ketersediaa
40% Ada 75% 30%
n
Buku RTD 35% 18%
1 kali/ 5
Updating 30% 75% 23%
tahun
Kurangnya
4 Rencana Tindak Darurat (RTD) 20% 38% 8% kesiapsiagaan dan
sistem komunikasi
REKOMENDASI
a. Perlu dilakukan penyesuaian Standar Operasional dan Prosedur (SOP) agar pelaksanaanya sesuai kondisi terkini
b. Perlu dilakukan uji operasi secara berkala sehingga dapat menjadi acuan dalam pelaksanaan operasi
c. Perlu dilakukan sosialisasi dan simulasi kesiapsiagaan terhadap rencana tindak darurat
e. Perlu adanya pengadaan sistem komunikasi untuk mendukung Rencana Tindak Darurat (RTD)
Kecukupan
20% Ada 100% 20% Jumlah = 12 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 29 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 1 buah
jumlah
Di Tubuh
35% Ada 60% 21% Jalan Desa (mobil/motor)
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 65% 23% 31% Pemancingan
Masyarakat Sekitar Waduk
5 10% Di tepi
Sekitar Waduk
waduk/green 30% Ada 60% 18% Perhutanan
belt
Hubungan
Pelibatan
dengan 50% 100% Tidak Ada 0% 0% 0%
Masyarakat
Masyarakat
1 2 3 4 5=3x4 6
REKOMENDASI
a. Perlunya dilakukan pengamatan patok geser secara rutin (Alat Untuk Pengamatannya Belum Ada)
Perlu adanya penggantian alat ukur V notch dan perbaikan bangunannya karena kondisi v notch dan
b.
bangunannya dalam keadaan rusak
c. Perlu dilakukan pengukuran kualitas air pada 3 titik pemantauan sehingga dapat diketahui kualitas airnya
Perlu dilakukan pengerukan sedimentasi pada waduk karena pada saat kemarau terlihat banyak sedimen pada
d.
sisi hulu spillway
Perlu adanya kesepakatan antara UPB dan perhutani khususnya dalam penebangan pohon hasil hutan terkait
e.
dengan sedimen yang masuk ke dalam waduk
Bobot Indeks
Bobot Bobot Sub Elemen
No Komponen Sub Komponen Eleme Ada/Tidak Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian
n Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Struktur Legalitas 60% Ada 100% 60%
20% 20%
Organisasi Kelengkapan 40% Ada 100% 40%
Kepala UPB 40% Ada 100% 40%
Unit Kompetensi 20% Kepala Seksi 30% Ada 100% 30% 20%
Staff 30% Ada 100% 30%
1 Pengelola 40%
Kinerja UPB 20% Pelaporan 100% Ada 85% 85% 17%
Bendungan
Pembiayaan 20% Kecukupan 100% Ada 85% 85% 17%
Ketersediaa
Rencana n 50% Ada 100% 50%
20% 19%
Strategis Pelaksanaan 50% Ada 85% 43%
Kecukupan
Petugas 50% Ada 100% 50%
25% Jumlah 23%
Operasi Kompetensi 50% Ada 85% 43%
Kecukupan
Petugas 50% Tidak ada 0% 0%
25% Jumlah 0%
Pemantauan Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
Petugas 50% Ada 60% 30%
25% Jumlah 18%
Pemeliharaan Kompetensi 50% Ada 85% 43%
Kecukupan
Petugas 50% Tidak ada 0% 0%
25% Jumlah 0%
Keamanan Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Gedung/kantor 20% 0%
Kondisi
50% Tidak ada 0% 0%
Gedung
Kecukupan
50% Ada 60% 38% 15%
Peralatan Jumlah
20%
Operasi Kondisi
50% Ada 60% 35%
peralatan
Kecukupan
50% Ada 85% 33%
Peralatan Jumlah
Sarana dan 20% 13%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 85% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
REKOMENDASI
1. Data Umum
a. Nama Bendungan : Ngancar
b. Alamat Bendungan : Desa Selopuro, Kec Batuwarno, Kab. Wonogiri, Jawa Tengah
c. Koordinat Intake x: 07º59’419”
y: 110º58’742”
2. Riwayat Penanganan : -
3. Data Inventarisasi
a. Rumah jaga Belum ada listrik.
b. Perlu Pengecatan di Bangunan Pendukung bendungan (kream, biru, dan kuning) ± 2 galon.
c. Perlu Lampu penerangan (Solar Cell).
d. Butuh Peilschaal di bangunan spillway, Peilschaal di intake rusak (bagian luar).
e. Ada retakan dan pecahan di dekat jembatan spillway
f. Apabila Limpasan air 35 – 40 cm, jembatan spillway ikut terkena limpasan
g. Usulan dari penjaga untuk pengadaan barang berikut :
- Kunci untuk rumah jaga sudah rusak (minta diganti)
- Lantai untuk rumah jaga minta di ganti keramik.
- Agar diadakan Meja, kursi, pompa air dan perbaikan kamar mandi di rumah jaga
- Butuh penggantian/ perbaikan Papan larangan (peringatan) sebanyak 3 buah.
- Butuh Pengadaan Pelampung petugas untuk membersihkan sampah.
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Ada
ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Lapis Luas : 181m x 3,5 = 633,5 m2
42% Ada 85% 35%
Perkerasan Total Kerusakan : 95 m2
Peralatan Penggerak
38% 100% Ada 75% 75% 28%
Hidromekanikal Manual
Bangunan Luas = 5 m x 15 m = 75 m2
20% Lantai 33% Ada 70% 23% 14%
Pelindung Total kerusakan : 22,5 m2
Luas = 5 m x 0,6 m x 2 = 6 m2
Tangga inspeksi 33% Ada 70% 23%
Total kerusakan : 1,8 m2
Luas = 7 m x 1 m x 2 m = 14
Hand rail 17% Ada 85% 14%
m2 Total kerusakan : 2,1
m2
Saluran
Tumpuan Kiri 50% 30% Tidak ada 0% 0% 23%
Drainase
Pagar
20% Tidak ada 0% 0%
Pelindung
Bukit
5 5%
Tumpuan Lereng 50% Ada 90% 45%
Tumpuan Saluran
50% 30% Tidak ada 0% 0% 23%
Kanan Drainase
Pagar
20% Tidak ada 0% 0%
Pelindung
1 2 3 4 5 = 4/90% 6 7=5x6 8
Sedimentasi Tinggi
Bangunan
3 20% 20% 22% 74% 16% Disaluran
Pengeluaran
Pengeluaran
Bangunan
4 15% 15% 17% 83% 14%
Pelimpah
b. Perlu Perbaikan Pada Pintu Intake (1,5 x 1,5) Karena sudah ada bocoran
Bobot Indeks
Bobot Sub Bobot Sub Elemen Ada/Tidak
No Komponen Eleme Kondisi yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Ada
n Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
1 2 3 4 5=3x4 6
1 Pedoman OP 20% 70% 14% Belum ada pola operasi waduk dan SOP
Layanan
3 30% 75% 23% Baru melayani Irigasi
Bendungan
REKOMENDASI
c. Perlu dilakukan penyesuaian Standar Operasional dan Prosedur (SOP) agar pelaksaaannhya sesuai kondisi terkini
d. Perlu dilakukan uji operasi secara berkala sehingga dapat menjadi acuan dalam pelaksanaan operasi
e. Perlu dilakukan sosialisasi dan simulasi kesiapsiagaan terhadap rencana tindak darurat
g. Perlu adanya pengadaan sistem komunikasi untuk mendukung Rencana Tindak Darurat (RTD)
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Kecukupan
20% 90% 18% Jumlah = 4 buah
jumlah
Kecukupan
20% 100% 20% Jumlah = 14 buah
jumlah
Hasil Pengamatan
1 30% Pelaporan 10% 80% 8%
Instrumentasi
Kecukupan
20% 100% 20% Jumlah = 2 buah
jumlah
Kecukupan
40% 80% 32% Jumlah = 4 buah
jumlah
Pelaporan 0% 70% 0%
Kecukupan
20% 0% 0%
jumlah
Pelaporan 10% 0% 0%
Kondisi grenbelt
60% Kondisi vegetasi 100% Masih Bagus 80% 80% 48%
dan sempadan
Kondisi Sempadan
4 10%
dan Greenbelt
Di Tubuh
35% Ada 80% 28%
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 70% 25% 38%
Sekitar Waduk Di tepi
30% Ada 80% 24%
Masyarakat Sekitar waduk/greenbelt
5 10%
Waduk
Hubungan
Pelibatan
dengan 50% 100% Tidak Ada 0% 0% 0%
Masyarakat
masyarakat
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 75% 23%
Instrumentasi
Kondisi Sempadan
4 10% 48% 5% Masih bagus
dan Greenbelt
Masyarakat Sekitar
5 10% 38% 4%
Waduk
Jumlah 60% Kinerja Kurang
REKOMENDASI
b. Inspeksi rutin tetap selalu dilakukan dan inspeksi berkala biasa juga harus dilakukan
d. Perlu dilakukan pengukuran kualitas air pada 3 titik pemantauan sehingga dapat diketahui kualitas airnya
Kecukupan
Petugas 50% 90% 45%
25% Jumlah Ada 22%
Operasi Kompetensi 50% 85% 43%
Kecukupan
Petugas 50% Tidak ada 0% 0%
25% Jumlah 0%
Pemantauan Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
Petugas 50% 75% 38%
25% Jumlah Ada 20%
Pemeliharaan Kompetensi 50% 85% 43%
Kecukupan
Petugas 50% Tidak ada 0% 0%
25% Jumlah 0%
Keamanan Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% 85% 43%
Jumlah
Gedung/kantor 20% Ada 16%
Kondisi
50% 70% 35%
Gedung
Kecukupan
50% 70% 35%
Peralatan Jumlah
20% Ada 14%
Operasi Kondisi
50% 70% 35%
peralatan
Kecukupan
50% 70% 35%
Peralatan Jumlah
20% Ada 14%
Sarana dan Pemeliharaan Kondisi
4 20% 50% 70% 35%
Prasarana peralatan
Kecukupan
50% 0% 0%
Peralatan Jumlah
20% Tidak ada 0%
Pemantauan Kondisi
50% 0% 0%
peralatan
Kecukupan
50% 0% 0%
Jumlah
Kendaraan 20% Tidak ada 0%
Kondisi
50% 0% 0%
kendaraan
Unit Pengelola
1 40% 92% 37%
Bendungan (UPB)
Sarana dan
4 20% 44% 9% Belum ada peralatan pemantauan
Prasarana
REKOMENDASI
Inventarisasi Bendungan
1. Data Umum
a. Nama Bendungan : Song Putri
b. Alamat Bendungan : Desa Sindukarto, Kec. Eromoko, Kab. Wonogiri - Jawa Tengah
c. Koordinat Intake x: 07º59’425”
y: 110º49’824”
2. Riwayat Penanganan : - Inspeksi besar di tahun 2016
- Rencana Tindak Darurat di tahun 2015
3. Data Inventarisasi
a. Dinding / lining tubuh bendung batunya tidak tersusun.
b. Banyaknya Tumbuhan Rumput di lereng hulu dan hilir
c. Butuh Pengecatan Pada Intake dan Bangunan Pendukung Lainnya
d. Ada kebocoran pintu air ± 25 l/dt
e. Ada bocoran di saluran bilas dari kolam olak (outlet)
f. Pengerukan saluran sedimentasi di saluran pembilas
g. Perlu perbaikan di stang pintu intake ada beberapa baut yang hilang
h. Penjaga minta di buatkan bak penampung untuk air baku warga dari keluaran v-notch
i. Dinding saluran bilas ada yang bolong dan retak
j. Saluran drainase kiri perlu di perbaiki dan di rabat bagian kiri & kanan ± 150 m
k. Perlu dinaikan pasangan batu pada dinding saluran pembilas
l. Belum ada tangga inspeksi di tanggul hilir kiri & kanan (60 & 75 m)
m. Jumlah Piezometer ada 11 buah
- Ada piezometer lama no. 1 di dasar pipa terdapat lumpur (± sudah 4 tahun) setinggi ±
45 cm (naik turun)
- Ada 7 peizometer tidak terdeteksi air (sejak 2016)
n. Belum ada Portal mobil di puncak bendungan
o. Belum ada Penerangan lampu dipuncak bendungan
p. Pintu penguras perlu pagar besi dan scren pengaman
q. Peilschaal ada 5 unit, Patok geser ada 24 kondisi baik, Bm ada 5 buah, Cp ada 4 buah
r. Belum ada batas wilayah pengolahan bendungan/ waduk
s. Perlu dilakukan Leveling di kaki lereng hilir (Kondisi tanah bergelombang)
t. Lereng hilir (rip-rap) sudah berantakan & nama waduk “song putri” di lereng hilir sudah jelek
u. Papan peringatan belum ada
v. Tambahan talud di bagian hilir saluran spillway
w. Perlu Tambahan drainase di daerah tebing kanan waduk sepanjang ± 50 m
x. Perlu Pembuatan drainase di hulu bendungan untuk suplesi yang berbatasan dengan
tanah warga, panjangnya ± 125 m, lebar 80 cm
Luas : 2 m x 12 m = 24
Dinding 25% Ada 84% 21%
m2 Total Kerusakan : 3,84
m2
Luas : 3 m x 3 m = 9 m2
Lantai 25% Ada 90% 23%
Menara Intake 23% 20% Total Kerusakan : 0,9 m2
Luas : 3 m x 3 m = 9 m2
Atap Pelindung 25% Ada 85% 21%
Total Kerusakan : 1,4 m2
Luas : 12 m x 1 m = 12
Tangga inspeksi 25% Ada 80% 20%
m2 Total Kerusakan : 2,4
Bangunan m2
2 20%
Pengambilan
Luas : (2 m x 2 m) x 2 bh = 8 m2
Stoplog 67% Ada 55% 37%
Total Kerusakan : 2,4 m2
Peralatan
46% Penggerak Manual 100% Ada 75% 75% 35%
Hidromekanikal
Luas : 3 m x 90 m = 270 m2
Bangunan Dinding 33% Ada 88% 29%
3 20% Total Kerusakan : 32,4 m2
Pengeluaran
Bangunan Luas : 6 m x 40 m = 240 m2
25% Lantai 33% Ada 62% 21% 18%
Pelindung Total Kerusakan : 91 m2
Luas : 0,3 m x 2 m = 0,6
Tangga inspeksi 33% Ada 71% 24%
m2 Total Kerusakan : 0,17
m2
84%
a. Perlu perbaikan di stang pintu intake ada beberapa baut yang hilang
b. Perlu Perbaikan Lantai Hilir di bangunan pelimpah karena ada pasangan yang jebol
e. Perlu perapihan pada Dinding/lining tubuh bendungan karena batunya sudah tidak tersusun rapih
f. Perlu penambahan alat pemeliharaan karena Banyaknya tumbuhan rumput di lereng hulu dan hilir
g. Perlu perbaikan pada Dinding saluran bilas karena ada yang bolong dan retak
h. Saluran drainase di bukit tumpuan kiri perlu di perbaiki dan di rabat bagian kiri & kanan ± 150 m
k Perlu dibuatkan tangga inspeksi di tanggul hilir kiri atau kanan (60 & 70 m)
Bobot Indeks
Bobot Sub Bobot Sub Elemen
No Komponen Eleme Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Komponen Penilaian
n Ada
1 2 3 4 5 6 7 8 9 10=7x9 11
Ketersediaa
30% Ada 75% 23%
n
Ketersediaa
20% Ada 75% 15%
n
1 Pedoman OP 20% Pola Operasi Updating 20% Ada 75% 15%
35% 26%
Waduk
Sosialisasi 20% Ada 75% 15%
Pelaksanaan 40% Ada 70% 28%
Standar Ketersediaa
30% Ada 75% 23%
n
Operasional
30% Updating 20% Ada 60% 12% 22%
dan Prosedur
(SOP) Pelaksanaan 50% Ada 75% 38%
Pelaksanaan
Operasi 70% Ada 75% 53%
40% operasi 29%
Normal Uji Operasi 30% Ada 70% 21%
Pelaksanaan
Operasi Operasi 70% Ada 75% 53%
2 30% 30% Operasi 22%
Waduk Darurat Uji Operasi 30% Ada 70% 21%
Kecukupan
Operator 50% Ada 80% 40%
30% jumlah 23%
Bendungan Kompetensi 50% Ada 75% 38%
Ketersediaa
40% Ada 75% 30%
n
Lokasi
Buku RTD 35% Penyimpana 30% Ada 70% 21% 25%
n
1 kali/ 5
Updating 30% 70% 21%
tahun
Rencana
Tindak Sosialisasi 40% Ada 60% 24%
4 20%
Darurat Kesiapsiagaa
(RTD) 35% Simulasi 30% Ada 65% 20% 15%
n
Petugas
30% Tidak ada 0% 0%
Darurat
Alat
50% Tidak ada 0% 0%
Sistem Komunikasi
30% 0%
komunikasi Early
50% Tidak ada 0% 0%
Warning
Operasi
2 30% 75% 22%
Bendungan
Layanan
3 30% 77% 23% Baru melayani untuk Irigasi
Bendungan
a. Agar Rutin Melakukan Sosialisasi Mengenai Pola Operasi waduk dan Mengupdate SOP Penjaga Bendungan/Waduk
c. Agar menyiapkan petugas darurat dan Alat komunikasi dalam keadaan darurat
Kecukupan
20% 100% 20% Jumlah = 11 buah
jumlah
Kecukupan
20% 70% 14% Jumlah = 1 buah
jumlah
Kecukupan
20% 100% 20% Jumlah = 24 buah
jumlah
Ada
Kondisi alat 30% 100% 30%
Deformasi
Eksternal (Patok 23% 12%
Hasil
Geser) 10% Tidak ada 0% 0% Belum Ada alat ukurnya
Pengamatan
Kecukupan
20% 100% 20% Jumlah = 2 buah
jumlah
Pengukuran
50% Ada 50% 25%
Sedimentasi Sedimen Dilakukan 1 kali diatas 5
40% 20%
Waduk Upaya tahun
50% Ada 50% 25%
Pencegahan
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 80% 80% 48%
dan sempadan
Kondisi
4 Sempadan dan 10% Masih bagus
Greenbelt
Upaya konservasi 40% Upaya konservasi 100% Tidak ada 0% 0% 0%
Di Tubuh
35% 50% 18%
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 70% 25% 32%
Masyarakat Sekitar Waduk
5 10% Di tepi
Sekitar Waduk 30% 70% 21%
waduk/greenbelt
Nilai Kinerja
Sistem
Bobot Nilai
No Komponen Keamanan Keterangan
Komponen Komponen
dan
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 74% 22% Piezometer sudah rusak 7 titik
Instrumentasi
Perlu dibuatkan legalitas batas wilayah operasi waduk karena Belum ada batas wilayah pengolahan
d.
bendungan/waduk
f. Perlu dilakukan pengukuran kualitas air pada 3 titik pemantauan sehingga dapat diketahui kualitas airnya
Rencana
Ketersediaan 50% Ada 100% 50%
Strategis 20% 19%
Pelaksanaan 50% Ada 85% 43%
1 2 3 4 5= 3 x 4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
Sarana dan
4 20% 44% 9% Belum ada kendaraan
Prasarana
REKOMENDASI
b. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Plumbon
b. Alamat Bendungan : Desa Puloharjo, Kec. Eromoko, Kab. Wonogiri, Jawa Tengah
c. Koordinat Intake x: 07º58’379”
y: 110º50’073”
2. Riwayat Penanganan :
3. Data Inventarisasi
a. Ada retakan dan kerusakan di beberapa bagian tangga inspeksi
b. Ada retakan dan kerusakan di saluran pengeluaran
c. Pagar curah hujan sudah rusak
d. Banyak tumbuhan rumput dan sampah di lereng hulu tanggul
e. Sedimentasi di hulu mercu spillway tinggi
f. Ada banyak tumbuhan rumput di saluran spillway
g. Banyak tumbuhan rumput pada saluran drainase dikaki lereng hilir
h. Dinding kolam pengeluaran ada retakan
Peralatan Penggerak
38% 100% Ada 80% 80% 30%
Hidromekanikal Manual
Luas : 8 m x 6 m x 4 m = 192
Dinding 25% Ada 75% 19%
m² Total kerusakan = 48 m²
Bangunan
3 20% Luas : 8 m x 6 m = 48
Pengeluaran Lantai 25% Ada 70% 18%
m² Total kerusakan = 14,4
Bangunan m²
25% 18%
Pelindung Luas : 0,30 m x 4 m = 1,2
Tangga inspeksi 25% Ada 70% 18%
m² Total kerusakan = 0,36
m²
Luas : (2 m x 1 m x 0,30 m) + (2 m x 2
Atap Pelindung 25% Ada 70% 18% m
x 0,30) = 1,8 m²
Total kerusakan = 0,54 m²
Peredam Energi 29% Kolam Terjunan 35% Ada 70% 25% 20%
Bukit Saluran
5 5% Tumpuan Kiri 100% 30% Tidak ada 0% 0% 38%
Tumpuan Drainase
Nilai
Bobot Bobot Nilai Kinerja
No Komponen Bobot Baru Keterangan
Komponen Indikator Komponen Fisik
Bendungan
1 2 3 4 5 = 4 /90% 6 7=4x5 8
a. Perlu di lakukan perbaikan di beberapa bagian tangga inspeksi karena ada retakan dan kerusakan
b. Perlu dibuatkan Portal masuk, Lampu penerangan (10 titik) dan pagar pengaman di puncak tanggul
Perbaikan Rumah pintu frame yang sudah rusak dan juga ada bocoran di
c.
pintu 2 (butuh perbaikan)
d. Perlu di lakukan perbaikan di saluran pengeluaran yang ada Retakan dan kerusakan
perlu di lakukan perbaikan di dinding kolam pengeluaran
e.
karena terdapat retakan
f. Perlu di lakukan pembabatan yang ada banyak tumbuhan rumput di saluran spillway
g. Disarankan untuk membersihkan bagian di lereng hulu tanggul karena banyak tumbuhan rumput dan sampah
Disarankan Untuk membersihkan pada bagian saluran drainase dikaki lereng hilir karena banyak tumbuhan
h. rumput
Bobot Indeks
Bobot Sub Bobot Sub Elemen
No Komponen Eleme Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Komponen Penilaian
n Ada
1 2 3 4 5 6 7 8 9 10 =7 x 9 11
Ketersediaa
30% 75% 23%
n
Ketersediaa
20% 75% 15%
n
1 Pedoman OP 20% Pola Operasi Updating 20% 70% 14%
35% Ada 25%
Waduk
Sosialisasi 20% 70% 14%
Pelaksanaan
Operasi 70% Ada 75% 53%
40% operasi 29%
Normal Uji Operasi 30% Ada 70% 21%
Pelaksanaan
Operasi Operasi 70% Ada 78% 55%
2 30% 30% Operasi 23%
Waduk Darurat Uji Operasi 30% Ada 70% 21%
Kecukupan
Operator 50% Ada 80% 40%
30% jumlah 23%
Bendungan Kompetensi 50% Ada 75% 38%
Ketersediaa
40% Tidak Ada 0% 0%
n
Lokasi
Buku RTD 35% Penyimpana 30% Tidak Ada 0% 0% 0%
n
Updating 30% Tidak Ada 0% 0%
Rencana
Tindak Sosialisasi 40% Tidak ada 0% 0%
4 20%
Darurat Simulasi 30% Tidak ada 0% 0%
Kesiapsiagaan 35% 0%
(RTD) Petugas
30% Tidak ada 0% 0%
Darurat
Alat
50% Tidak ada 0% 0%
Sistem Komunikasi
30% 0%
komunikasi Early
50% Tidak ada 0% 0%
Warning
b. Agar menyiapkan updating Standar Operasional dan Prosedur (SOP) Penjaga Bendungan
Di Bendungan Plumbon belum dilakukan Kegiatan Rencana Tindak Darurat (RTD) Rekomendasi
c.
Konsultan untuk segera melakukan kegiatan tersebut
7 berfungsi 2 tidak
Kondisi alat 30% Ada 78% 23%
berfungsi
Tekanan Air Pori
23% 19%
(Piezometer) Hasil
40% Ada 84% 34%
Pengamatan
Kecukupan
20% Ada 95% 19% Jumlah = 26 buah
jumlah
Kecukupan
20% Tidak ada 0% 0%
jumlah
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 80% 80% 48% Masih Bagus
dan sempadan
Kondisi Sempadan
4 10%
dan Greenbelt
1 2 3 4 5=3x4 6
Hasil
V-Notch tidak berfungsi semua, Curah hujan belum
1 Pengamatan 30% 48% 14%
ada
Instrumentasi
Kondisi
4 Sempadan dan 10% 48% 5% Belum ada Upaya Konservasi
Greenbelt
REKOMENDASI
a. Perlu perbaikan pada bangunan V-Notch ada 3 bangunan tidak berfungsi semua
e. Perlu di lakukan pengerukan sedimen di waduk dan hulu mercu spillway yang sudah cukup tinggi
Perlu dilakukan pengukuran sedimen secara rutin (1 kali pertahun) sehingga dapat diketahui tinggi sedimen yang
f.
ada dalam waduk
g. Perlu dilakukan pengukuran kualitas air pada 3 titik pemantauan sehingga dapat diketahui kualitas airnya
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37% Cukup
Bendungan (UPB)
REKOMENDASI
c. Agar selalu menyiapkan suku cadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Parang Joho
b. Alamat Bendungan : Desa Demesan/Gedong, Kec. Eromoko, Kab. Wonogiri, Jawa Tengah
c. Koordinat Intake x: 07º57’053”
y: 110º49’085”
5. Riwayat Penanganan : - Inspeksi besar di tahun 2016
- Sedang Ada Perbaikan Tangga Inspeksi di dekat spillway dan Saluran
drainase mulai tanggal 17 maret 2017
6. Data Inventarisasi :
a. V-Notch sudah berkarat.
b. Bangunan tangga inspeksi sudah berlubang dan retak – retak.
c. Saluran Drainase di kaki lereng hilir ada retakan sepanjang ± 50 m.
d. Rumah – rumah peizometer sudah rusak dan retak.
e. Peilschaal di tampungan saluran pengeluaran sudah berkarat dan salah tempat
f. Pintu penguras sudah berat (yang kiri)
g. Ada Pendangkalan di waduk (perlu pengerukan sedimentasi)
h. Ada tambahan piezometer 4 Buah (stand pipe) tahun 2016
i. Patok geser ada 21 buah
j. Pernah ada Inspeksi besar tahun 2016
- Tambahan bm 9 Buah
- Tambahan cp
- Tambahan piezometer 4 buah
k. Paving blok di puncak tanggul ada penurunan (bergelombang) sepanjang 315 m
l. Butuh Peralatan pemantauan
- Jas hujan
- Pelampung
Luas : 3 m x 4 m x 10 m = 120 m²
Dinding 25% Ada 80% 20%
Total kerusakan = 24 m²
Bangunan
2 20% Luas : 3 m x 4 m = 12 m²
Pengambilan Lantai 25% Ada 83% 21%
Total kerusakan = 2,04 m²
Menara Intake 19% 15% Luas : 4 m x 5 m x 0,30 m = 6 m²
Atap Pelindung 25% Ada 86% 22%
Total kerusakan = 0,84 m²
Luas : 0,30 m x 8 m= 2,4 m²
Tangga inspeksi 25% Ada 79% 20%
Total kerusakan = 0,5 m²
Luas : 47 m x 3 m = 141 m²
Mercu Spillway 29% Lapis Beton 100% Ada 95% 95% 27%
Total kerusakan = 7,05 m²
Luas : 20 m x 25 m = 500 m²
Kolam Olak 35% Ada 78% 27%
Total kerusakan = 110 m²
Luas : 20 m x 20 m = 400 m²
Peredam Energi 29% Kolam Terjunan 35% Ada 81% 28% 22% Total kerusakan = 76 m²
Luas : 35 m x 20 m = 700 m²
Kolam Loncat 30% Ada 76% 23%
Total kerusakan = 168 m²
Tumpuan Kiri 50% Saluran Drainase 30% Ada 75% 23% 38%
Bukit
7 5%
Tumpuan
Lereng 50% Ada 80% 40%
1 2 3 4 5 6=4x5 7
Bangunan
2 20% 22% 66% 15% Pintu Intake ada bocoran
Pengambilan
Bangunan
3 20% 22% 77% 17% Pintu penguras sudah berat
Pengeluaran
Bangunan
4 15% 17% 85% 14% Lantai Hulu Mercu Banyak Sedimen
Pelimpah
Bendungan
5 5% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
REKOMENDASI
Perlu Bangunan pelengkap di tubuh Bendungan Seperti Guard rail/Pagar Pelindung dan Lampu Penerangan (10
a.
Titik)
b. Butuh renovasi pada paving blok di puncak tanggul karena ada penurunan (bergelombang)
Perlu dilakukan perbaikan pada bangunan tangga inspeksi di tanggul hilir karena sudah berlubang dan retak-
c.
retak
d. Perlu perbaikan pada pintu Intake karena pada saat pintu ditutup rapat air masih tetap keluar
e. Perlu dilakukan penggantian gelagar jembatan hantar intake karena sudah mulai rapuh
f. Di perlukan perbaikan pada pintu penguras karena sudah berat (bagian kiri)
g. Butuh Pengerukan sedimen di waduk dan Lantai Hulu Mercu spiilway karena sudah banyak Sedimen
Bobot Indeks
Bobot Sub Bobot Sub Elemen
No Komponen Eleme Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Komponen Penilaian
n Ada
10=7x
1 2 3 4 5 6 7 8 9 9 11
Ketersediaa
30% Tidak ada 0% 0%
n
1 2 3 4 5=3x4 6
REKOMENDASI
b. Agar menyiapkan updating Standar Operasional dan Prosedur (SOP) Penjaga Bendungan
c. Agar melakukan sosialisasi dan simulasi secara rutin untuk kesiapsiagaan darurat
Elevasi Muka Kondisi alat 30% Ada 50% 15% Butuh di Kalibrasi Ulang
Air
13% 9%
(AWLR/Peilsch Hasil
aal) 40% Ada 85% 34%
Pengamatan
Kecukupan
20% Ada 90% 18% Jumlah = 14 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 28 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 3 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 36 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 2 buah
jumlah
Kondisi
grenbelt dan 60% Kondisi vegetasi 100% Ada 75% 75% 45%
sempadan
Kondisi Sempadan
4 10%
dan Greenbelt
Upaya
40% Upaya konservasi 100% Tidak Ada 0% 0% 0%
konservasi
Di Tubuh
35% Ada 60% 21%
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 65% 23% 32%
Sekitar Waduk Di tepi
Masyarakat Sekitar 30% Ada 65% 20%
5 10% waduk/greenbelt
Waduk
Hubungan
dengan
Pelibatan
masyarakat 50% 100% Tidak Ada 0% 0% 0%
Masyarakat
Nilai Kinerja
Sistem
Bobot Nilai
No Komponen Keamanan Keterangan
Komponen Komponen dan
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan Peilschaal Butuh dikalibrasi ulang,
1 30% 65% 20%
Instrumentasi Piezometer Hidrolik Tidak berfungsi Semua
c. Di butuhkan perbaikan pada bagian rumah-rumah piezometer yang sudah rusak dan retak
Disarankan Untuk Melakukan Pengukuran Kualitas Air Waduk (2 kali pertahun di 3 titik) dan Pengukuran
f.
Sedimen Secara Rutin (1 Kali Pertahun)
Di perlukan untuk melakukan pengerukan di dalam waduk karena sudah mengalami pendangkalan (sedimentasi)
g.
terutama di sisi hulu spillway
Rencana
20% Ketersediaan 50% Ada 80% 40%
Strategis 17%
Pelaksanaan 50% Ada 85% 43%
Kecukupan
Petugas 50% Ada 90% 45%
25% Jumlah 22%
Operasi
Kompetensi 50% Ada 85% 43%
Kecukupan
Petugas 50% Tidak ada 0% 0%
25% Jumlah 0%
Pemantauan Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
Petugas 50% Ada 70% 35%
25% Jumlah 19%
Pemeliharaan Kompetensi 50% Ada 80% 40%
Kecukupan
Petugas 50% Tidak ada 0% 0%
25% Jumlah 0%
Keamanan Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 85% 43%
Jumlah
Gedung/kantor 20% 16%
Kondisi
50% Ada 75% 38%
Gedung
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
20% 11%
Operasi Kondisi
50% Ada 50% 25%
peralatan
Kecukupan
50% Ada 60% 30%
Peralatan Jumlah
Sarana dan 20% 12%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 91% 36%
Bendungan (UPB)
REKOMENDASI
c. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Kedunguling
b. Alamat Bendungan : Desa Demangan, Kel. Ngunggahan, Kec. Eromoko, Kab. Wonogiri
c. Koordinat Intake x: 07º56’395”
y: 110º50’922”
2. Riwayat Penanganan :
3. Data Inventarisasi
a. Tanggul Hilir sebelah kanan intake turun (± 500 cm), sepanjang ± 100 m
b. Ada retakan di kaki tanggul hilir (dekat outlet).
c. Ada Kebocoran di kolam outlet dekat pintu.
d. Ada rembesan di dekat outlet.
e. Terjadi Longsoran dan retakan pada tanggul bagian hulu dari intake – rumah jaga (± 300 m).
f. Perlu di pasang tralis/pagar di intake pembantu sebelah utara.
g. Peilschaal tidak sesuai (rusak).
h. Papan nama di area bendungan belum ada.
i. Bronjong dibagian spillway terjadi penurunan
j. Penjaga mengusulkan untuk pengadaan barang berikut :
- Fasilitas di rumah jaga (pompa air, meja, kursi, dsb).
- Mesin potong rumput dan lampu penerangan.
Luas : 5 m x 6 m x 4 = 120 m²
Dinding 25% Ada 83% 21%
Total kerusakan = 20,4 m²
Bangunan Luas : 5 m x 3 m = 15 m²
2 20% Lantai 25% Ada 85% 21%
Pengambilan Total kerusakan = 2,25 m²
Menara Intake 19% 15% Luas : 5 m x 0,35 m x 4 = 7 m²
Atap Pelindung 25% Ada 82% 21%
Total kerusakan = 1,05 m²
Luas : 0,30 m x 4 m= 1,2 m²
Tangga inspeksi 25% Ada 80% 20% Total kerusakan = 0,24 m²
Luas : 1 m x 1,5 m = 1,5 m²
Stoplog 67% Ada 75% 50%
Total kerusakan = 0,45 m²
Pintu Intake 25% 13%
Trashrack 33% Tidak Ada 0% 0%
Luas : 15 m x 5 m x 4 = 300 m²
Dinding 25% Ada 0% 0%
Bangunan Total kerusakan = 36 m²
3 20%
Pengeluaran
Bangunan Luas : 15 m x 5 m = 75
25% Lantai 25% Ada 0% 0% 0%
Pelindung m² Total kerusakan = 10,5
m²
Luas : 10 m x 6,5 m = 65 m²
Kolam Olak 35% Ada 65% 23%
Total kerusakan = 22,75 m²
Luas : 10 m x 5 m = 50 m²
Peredam Energi 21% Kolam Terjunan 35% Ada 60% 21% 13%
Total kerusakan = 20 m²
Luas : 10 m x 3,5 m = 35 m²
Kolam Loncat 30% Ada 67% 20%
Total kerusakan = 11,55 m²
Bangunan
4 15% Luas : (1,5 m x 2,5 m) x 2 = 7,5 m²
Pelimpah Pintu Spilway 50% Ada 82% 41%
Total kerusakan = 1,35 m²
Pintu Spillway 21% Alat Angkat 25% Ada 75% 19% 13%
Luas : (3 m x 2,5 m) x 2 = 15 m²
Abutmen 15% Ada 92% 14%
Total kerusakan = 1,2 m²
Luas : 37 m x 2,5 m = 92,5 m²
Plat jembatan 15% Ada 88% 13%
Total kerusakan = 7,2 m²
1 2 3 4 5 = 4/90% 6 7=5x6 8
Tubuh Bendungan
1 Tubuh Bendungan 30% 30% 35% 40% 14% Mengalami Retakan dan
Penurunan
Bangunan
2 20% 20% 24% 70% 16%
Pengambilan
REKOMENDASI
a. Perlu dilakukan perbaikan di kaki tanggul hilir (dekat outlet) karena ada retakan
b. Perlu di lakukan perbaikan di kolam outlet dekat pintu karena ada kebocoran
Perlu dilakukan rehab pada Tanggul hilir sebelah kanan intake karna terjadi penurunan (± 500 cm) sepanjang ± 100
c.
m
Perlu dilakukan perbaikan karena terjadi longsoran dan retakan pada tanggul bagian hulu dari intake-rumah jaga (±
d.
300 m)
f. Perlu melakukan perbaikan pada bronjong dibangunan spillway karena terjadi penurunan
Indek
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11
Ketersediaan 30% Ada 85% 26%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 85% 34% 81%
Waduk
Kepuasan komplain 3-4
20% 75% 15%
User kali /thn
Lokasi
Buku RTD 35% 30% Ada 75% 23% 27%
Penyimpanan
1 kali/ 5
Updating 30% 70% 21%
tahun
Rencana Sosialisasi 40% Ada 50% 20%
Tindak
4 20%
Darurat Kesiapsiagaan 35% Simulasi 30% Ada 50% 15% 0%
(RTD)
Petugas
30% Tidak ada 0% 0%
Darurat
Alat
50% Tidak ada 0% 0%
Sistem Komunikasi
30% 0%
komunikasi
Early Warning 50% Tidak ada 0% 0%
1 2 3 4 5=3x4 6
Layanan
3 30% 81% 24% Baru melayani untuk Irigasi
Bendungan
REKOMENDASI
d. Agar menyiapkan updating Standar Operasional dan Prosedur (SOP) Penjaga Bendungan
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Foto Ketrangan
Komponen Komponen Penilaian Elemen Ada
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11 12 13
Kecukupan
20% Ada 75% 15% Jumlah = 2 buah
jumlah
Kecukupan
20% Ada 20% 4% Jumlah = 1 buah
jumlah
Inspeksi berkala
25% Pelaporan, 30% Ada 70% 21% 17%
biasa
Tindak lanjut 30% Ada 65% 20%
2 Inspeksi 30%
Pelaksanaan: 40% Tidak ada 0% 0%
Pemeriksaan Luar
25% Pelaporan, 30% Ada 70% 21% 18%
Biasa
Tindak lanjut 30% Ada 70% 21%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 75% 75% 45% Masih Bagus
dan sempadan
Kondisi Sempadan
4 10%
dan Greenbelt
Di Tubuh
35% Ada 70% 25%
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 50% 18% 29%
Masyarakat Sekitar Waduk Di tepi
5 10% 30% Ada 50% 15%
Sekitar Waduk waduk/greenbelt
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keterangan
Komponen Komponen Keamanan dan
Lingkungan
1 2 3 4 5=3x4 6
Masyarakat Sekitar
5 10% 29% 3% Ada Peternakan ayam di dekat waduk
Waduk
REKOMENDASI
a. Di sarankan Untuk mengganti/mengkalibrasi peilschaal karena sudah tidak sesuai (rusak)
b Di perlukan penambahan Piezometer untuk lebih optimal mengetahui tekanan air pori di dalam tanggul
d. Perlu dilakukan pengukuran kualitas air pada 3 titik pemantauan sehingga dapat diketahui kualitas airnya
e. Perlu juga melakukan pengukuran sedimentasi di dalam waduk setiap 1 tahun 1 kali
Kecukupan
50% Ada 85% 43%
Jumlah
Gedung/kantor 20% 17%
Kondisi
50% Ada 85% 43%
Gedung
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
20% 11%
Operasi Kondisi
50% Ada 50% 25%
peralatan
Kecukupan
50% Ada 50% 25%
Peralatan Jumlah
Sarana dan 20% 10%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 50% 25%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3z4 6
Unit Pengelola
1 40% 90% 36%
Bendungan (UPB)
REKOMENDASI
a. Agar dokumen OP di sediakan di kantor/rumah jaga penjaga bendungan / waduk
b. Perlu pengadaan barang untuk rumah jaga (pompa air, meja, kursi, dsb)
d Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
Inventarisasi Bendungan
1. Data Umum
a. Nama Bendungan : Krisak
b. Alamat Bendungan : Desa Singodutan dan Desa Pare, Kec. Selogiri, Kab. Wonogiri, Jateng
c. Koordinat Intake x: 07º48’042”
y: 110º53’922”
2. Riwayat Penanganan
3. Data Inventarisasi
a. Kondisi Piezometer rusak sebanyak 28 buah, jumlah semuanya ada 34 buah + 2 buah
yang baru.
b. Pintu intake rusak / bocor 1 buah, jumlah semunya ada 2 buah.
c. Gorong – gorong intake mengelupas & banyak sedimen batu.
d. Perlu pengadaan Lampu penerangan (± 5 titik).
e. Kolam olak banyak sedimen dan ada sebagian yang belum di cor.
f. Penjaga Minta di buatkan pintu pagar untuk rumah jaga.
g. Belum ada jalan inspeksi di lereng hilir.
h. Pengadaan Pagar di bangunan spillway (besi).
i. Pintu gerbang di bangunan pembagi rusak (besi).
Peralatan
38% Penggerak Manual 100% Ada 70% 70% 26%
Hidromekanikal
Luas : 5 m x 5 m x 4 = 100 m²
Dinding 25% Ada 80% 20%
Bangunan Total kerusakan = 20 m²
3 20%
Pengeluaran Luas : 5 m x 5 m = 25 m²
Lantai 25% Ada 80% 20%
Bangunan Total kerusakan = 5 m²
25% 19% Luas : 0,30 m x 4 m= 1,2 m²
Pelindung Tangga inspeksi 25% Ada 70% 18% Total kerusakan = 0,36 m²
Luas : 4 m x 2 m x 0,35 m = 2,8 m²
Atap Pelindung 25% Ada 80% 20% Total kerusakan = 0,56 m²
Luas : 2 m x 66 m = 132m²
Dinding beton 70% Ada 85% 60%
Total kerusakan = 19,8 m²
Dinding/ Sayap 13% 11%
Sambungan beton 30% Ada 82% 25%
Luas : 10 m x 8 m x 2 = 160 m²
Bangunan Kolam Olak 35% Ada 78% 27%
4 15% Total kerusakan = 35,2 m²
Pelimpah
Peredam Energi 27% Kolam Terjunan 35% Ada 81% 28% 21%
Luas : (0,50 m x 3 m) x 2 = 3
Abutmen 25% Ada 84% 21%
m² Total kerusakan = 0,48
m²
Luas : 8 m x 3 m = 24 m²
Plat jembatan 25% Ada 86% 22%
Jembatan 7% 6% Total kerusakan = 3,36 m²
Luas : 8 m x 1 x 2 = 16
Hand rail 17% Ada 85% 14%
m Total kerusakan = 2,4
m
Bangunan
2 20% 20% 22% 66% 15% Pintu Intake Sudah Rusak
Pengambilan
Gorong-gorong Saluran
Bangunan
3 20% 20% 22% 75% 17% Pengeluaran Mengelupas dan
Pengeluaran
Banyak Sedimen Batu
Lantai Kolam Olak belum ada
Bangunan
4 15% 15% 17% 84% 14% perkerasan (sudah banyak
Pelimpah
sedimen)
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
a. Di perlukan Pembuatan Tangga inspeksi di lereng hilir dan Portal Masuk di puncak bendungan
d. Di butuhkan perbaikan pada gorong-gorong intake yang mengelupas & banyak sedimen batu
g. Perlu pengerukan sedimen pada kolam olak dan ada sebagian lantainya belum di lakukan perkerasan
h. Perlu dilakukan perbaikan pada pintu gerbang di bangunan pembagi yang sudah rusak
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 70% 21%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 22%
Waduk Darurat
Uji Operasi 30% Ada 60% 18%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 75% 30% 77%
Waduk
Kepuasan komplain 3-4
20% 75% 15%
User kali /thn
Ketersediaa
40% Tidak ada 0% 0%
n
Lokasi
Buku RTD 35% Penyimpana 30% Tidak ada 0% 0% 0%
n
Operasi
2 30% 76% 23%
Bendungan
Layanan
3 30% 77% 23% Baru melayani untuk Irigasi
Bendungan
Rencana
4 Tindak 20% 0% 0% Belum ada RTD
Darurat (RTD)
REKOMENDASI
Agar melakukan sosialisasi dan simulasi untuk kesiapsiagaan darurat dan menyiapkan sistem komunikasi
c.
darurat
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Kecukupan
20% Ada 90% 18% Jumlah = 4 Buah
jumlah
Kecukupan
20% Ada 80% 16% Jumlah = 6 Buah
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 36 buah stand pipe
jumlah
Kecukupan
Hasil Pengamatan 20% Ada 70% 14% Jumlah = 1 buah
1 30% jumlah
Instrumentasi
Kondisi alat 30% Ada 85% 26%
Rembesan (V-
19% 15%
Notch) Hasil
40% Ada 85% 34%
Pengamatan
Kecukupan
20% Ada 100% 20% Jumlah = 29 buah
jumlah
Kecukupan
20% Tidak ada 0% 0%
jumlah
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 75% 75% 45% Masih Bagus
dan sempadan
Kondisi Sempadan
4 10%
dan Greenbelt
Di Tubuh
35% Ada 50% 18%
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 60% 21% 28%
Masyarakat Sekitar Sekitar Waduk Di tepi
5 10% 30% Ada 60% 18%
Waduk waduk/greenbelt
Nilai Kinerja
Sistem
Bobot Nilai
No Komponen Keamanan Keterangan
Komponen Komponen dan
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan Kerusakan pada alat Piezometer dan belum ada
1 30% 50% 15%
Instrumentasi curah hujan
3 Kondisi Waduk 20% 45% 9% Belum dilakukan pengukuran kualitas air waduk
Kondisi
4 Sempadan dan 10% 45% 5% Kurangnya Upaya Konservasi
Greenbelt
Masyarakat Dipuncak Bendungan Bisa dilewati kendaraan
5 10% 28% 3%
Sekitar Waduk motor dan belum ada kerja sama dengan warga
Jumlah 53% Kinerja Buruk
REKOMENDASI
Perlu dilakukan perbaikan/ penggantian alat instrument piezometer yang rusak sebanyak 28 buah (Standpipe) dan 6
a.
Buah Elektrik
Perlu dilakukan pengukuran kualitas air waduk (1 tahun 2 kali) pada 3 titik pemantauan sehingga dapat diketahui
c.
kualitas airnya
Perlu juga dilakukan pengukuran sedimen secara rutin (1 kali pertahun) untuk mengetahui tinggi sedimentasi di
d.
waduk
f. Perlu dibuatkan portal masuk di puncak bendungan karena sering dilewati kendaraan bermotor
1 2 3 4 5 6 7 8 9 10=7x9 11
Rencana
20% Ketersediaan 50% Ada 90% 45%
Strategis
18%
Pelaksanaan 50% Ada 85% 43%
Kecukupan
50% Ada 85% 43%
Jumlah
Petugas Operasi 25% 21%
Kompetensi 50% Ada 85% 43%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 60% 30%
Petugas Jumlah
25% 18%
Pemeliharaan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 85% 43%
Jumlah
Gedung/kantor 20% 17%
Kondisi
50% Ada 80% 40%
Gedung
Kecukupan
50% Ada 50% 25%
Peralatan Jumlah
20% 10%
Operasi Kondisi
50% Ada 50% 25%
peralatan
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
Sarana dan 20% 11%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 50% 25%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 92% 37%
Bendungan (UPB)
REKOMENDASI
Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan yang sudah
c.
rusak
1. Data Umum
a. Nama Bendungan : Jombor
b. Alamat Bendungan : Desa Krakitan, Kec. Bayat, Kab. Klaten, Jawa Tengah
c. Koordinat Intake x: 07º45’492”
y: 110º38’087”
2. Riwayat Penanganan :
- Pada Tahun 2013 ada Pekerjaan pasangan batu pada tanggul hulu,
ada pengerukan, penyelesaian talud sekeliling waduk dan rehab
spillway
- Peninggian talud sepanjang 150 m (tahun 2015)
- Sedang ada pekerjaan lining di hilir saluran induk (bulan
mei tahun 2017)
3. Data Inventarisasi
a. Pagar curah hujan rusak / hilang.
b. Sedimentasi di waduk tinggi.
c. Eceng gondok menutupi / tumbuh di sebagian besar waduk.
d. Banyak Kerambah ikan ditengah-tengah waduk.
e. Lining disaluran outlet utama banyak yang retak dan berlobang.
f. Di rumah jaga butuh Listrik, kamar mandi, sumur, dan butuh Lampu penerangan (2 tiang
listrik, 3 titik lampu) di daerah intake
g. Saluran pembuangan dari warga yang masuk saluran diperlukan scren pengaman
h. Butuh penambahan tanggul (Talud) di saluran utama dekat intake
i. Butuh Peilschaal di bangunan spillway
j. Butuh peninggian Talud, karna sudah terendam 30 cm di bawah air sepanjang 300
m sebelah kanan intake
k. Perlu dipasang lining di saluran inlet, sepanjang 50 m, dengan lebar 1 m dan
Scren pengaman untuk menahan sampah masuk ke waduk.
l. Terjadi kerusakan di bagian pen stang pintu
m. Belum adanya Papan larangan di waduk
n. Dinding luar spillway ada retakan
o. Talud bagian barat kurang tinggi sepanjang 3 km, dibutuhkan
penambahan/peninggian talud
Indeks
Bobot Sub Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Lapis
Perkerasan 30% Tidak Ada 0% 0%
Bahu 10% Tidak Ada 0% 0%
Parapet 10% Tidak Ada 0% 0%
Saluran
drainase 10% Tidak Ada 0% 0%
Guard rail 8% Tidak Ada 0% 0%
Puncak 40% 3% Luas : (0,80 m x 0,20 m x
Patok HM/BM 8% Ada 95% 8% 0,20 m) x 2 bh = 0,064
m³
Total kerusakan = 0,003 m³
Portal Masuk 8% Tidak Ada 0% 0%
Pagar Pelindung 8% Tidak Ada 0% 0%
Penerangan 8% Tidak Ada 0% 0%
Luas : 8 m x 5 m x 4 = 160 m²
Dinding 25% Ada 85% 21%
Total kerusakan = 24 m²
Luas : 6 m x 4 m = 24
Lantai 25% Ada 80% 20%
m² Total kerusakan = 4,8
Menara Intake 23% 18% m²
Luas : 6 m x 4,25 m = 25,5
Atap Pelindung 25% Ada 80% 20%
m² Total kerusakan = 5,1
m²
Luas : 12 m x 1 m x 1,5 m =
Pipa pesat 70% Ada 81% 57%
Tunnel/ 18
75% 61% m³
Terowongan
Sambungan 30% Ada 80% 24%
Bangunan
3 20% Luas : 200 m x 2 m = 400 m²
Pengeluaran Dinding 25% Ada 80% 20%
Total kerusakan = 80 m²
Bangunan Luas : 100 m x 6 m = 600 m²
25% Lantai 25% Ada 78% 20% 15%
Pelindung Total kerusakan = 132 m²
Luas : 2 m x 1,5 m = 3 m²
Tangga inspeksi 25% Ada 75% 19%
Total kerusakan = 0,75 m²
Lantai hulu 13% Lapis Beton 100% Ada 85% 85% 11%
Mercu Spillway 27% Lapis Beton 100% Ada 80% 80% 21%
Luas : 16 m x 2 m = 32m²
Dinding beton 70% Ada 84% 59%
Dinding/ Total kerusakan = 5,12 m²
13% 11%
Sayap Sambungan
30% Ada 80% 24%
beton
Luas : (5 m x 4 m) x 2 = 40
Abutmen 19% Ada 87% 16%
m² Total kerusakan = 5,2
m²
Luas : 8 m x 5 m = 40 m²
Plat jembatan 19% Ada 86% 16%
Total kerusakan = 5,6 m²
Jembatan 7% 6% Luas : (8 m x 1,5 m) x 2= 24
Gelagar 25% Ada 86% 22% m²
Total kerusakan = 3,4 m²
Luas : (8 m x 0,50 m x 0,50 m)
Hand rail 13% Ada 85% 11% x 2= 4 m³
Total kerusakan = 0,6 m³
Luas : (5 m x 4 m) x 3 = 60 m²
Kolom/tiang 25% Ada 85% 21%
Total kerusakan = 9 m²
Saluran
Tumpuan Kiri 50% 30% Tidak ada 0% 0% 0%
Drainase
Tumpuan Saluran
50% 30% Tidak ada 0% 0% 0%
Kanan Drainase
1 2 3 4 5 = 4/90% 6 7=5x6 8
Tubuh
1 30% 30% 35% 43% 15%
Bendungan
Bangunan
2 20% 20% 24% 70% 16% Pintu intake rusak ringan
Pengambilan
Saluran Pengeluaran
Bangunan
3 20% 20% 24% 75% 18% Banyak retakan dan
Pengeluaran
berlubang
Bangunan
4 15% 15% 18% 81% 14%
Pelimpah
REKOMENDASI
a. Diperlukan perbaikan lining di saluran outlet utama karna banyak retak dan berlobang
h. Perlu peninggian talud di bagian barat sepanjang 3 km karena sudah hampir rata dengan jalan
i. Perlu penambahan talud di sebelah kanan intake karna sudah terendam 30 cm di bawah air sepanjang 300 m
1 2 3 4 5=3x4 6
Tidak ada pola operasi waduk dan manual
1 Pedoman OP 20% 21% 4%
OP
Operasi
2 30% 73% 22%
Bendungan
Layanan Baru melayani untuk Irigasi dan fasilitas
3 30% 75% 22%
Bendungan umum
Rencana Tindak
4 20% 0% 0% Belum ada RTD
Darurat (RTD)
REKOMENDASI
a. Agar Segera Menyiapkan Kegiatan Manual OP dan Pola Operasi Waduk Di Waduk Jombor
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7x9 11 12 13
Kecukupan
20% Ada 70% 14% Jumlah = 2 buah
jumlah
Inspeksi rutin 25% Pelaporan, 30% Ada 70% 21% 18% Cukup
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 75% 75% 45%
dan sempadan
Kondisi Sempadan
4 10%
dan Greenbelt
Di Tubuh
35% Ada 55% 19% Akses jalan warga
Bendungan
Aktivitas
Masyarakat Sekitar 50% Di Waduk 35% Ada 30% 11% 21% Keramba ikan warga
Masyarakat Sekitar Waduk
5 10% Di tepi
Waduk 30% Ada 40% 12% Akses jalan warga
waduk/greenbelt
Kondisi
4 Sempadan dan 10% 45% 5% Kurangnya Upaya Konservasi
Greenbelt
c. Di perlukan pembersihan eceng gondok yang menutupi/ tumbuh di sebagian besar waduk
e. Disarankan untuk menertibkan kerambah ikan milik warga yang ada di tengah-tengah waduk
Unit
Staff 30% Ada 100% 30%
1 Pengelola 40%
Bendungan
Kinerja UPB 20% Pelaporan 100% Ada 85% 85% 17%
Kecukupan
50% Ada 85% 43%
Petugas Jumlah
25% 21%
Operasi
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 60% 30%
Petugas Jumlah
25% 17%
Pemeliharaan
Kompetensi 50% Ada 75% 38%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 80% 40%
Jumlah
Gedung/kantor 20% 16%
Kondisi
50% Ada 75% 38%
Gedung
Kecukupan
50% Ada 50% 25%
Peralatan Jumlah
20% 10%
Operasi Kondisi
50% Ada 50% 25%
peralatan
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
Sarana dan 20% 11%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 50% 25%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
Unit Pengelola
1 40% 88% 35%
Bendungan (UPB)
c. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Delingan
b. Alamat Bendungan : Desa Delingan, Kec.Karangayar, Kab. Karanganyar, JawaTengah
c. Koordinat Intake x: 07º36’771”
y: 110º59’440”
2. Riwayat Penanganan : - Sedang diakukan pekerjan pasangan batu di dinding kanan &
kiri termasuk lantai di spillway
-Sedang ada pekerjaan pasangan batu untuk menahan erosi pada
saluran pengeluaran
-Sedang ada pekerjaan pembuatan saluran drainase di daerah hulu
3. Data Inventarisasi
a. Tingginya sedimentasi di pengeluaran saluran induk.
b. Banyak tumbuhan rumput pada saluran pengeluaran.
c. Kerusakan pada lantai pengeluaran saluran induk.
d. Banyak retakan pada dinding saluran.
e. Perlu tambahan peilschaal 3 buah untuk saluran pelimpah, saluran irigasi, dan di gardu
pandang.
f. Butuh penambahan papan larangan
g. Pada rumah jaga perlu dilakukan perbaikan dan pengadaan sebagai berikut :
- Perbaikan atap
- Pengadaan grandel pintu 6 buah
- Pengadaan Meja, Kursi, kasur, ATK, Cangkul, Sabit, Arit, Garpu, dan Pelampung
- Penambahan OP BBM
h. Patok geser ada 27 buah tetapi belum pernah di ukur (kondisinya Bagus)
i. Peizometer ada 37 buah, elektrik 8 bh (Rusak semua sejak pertama kali dipasang
thn 2002), Standpipe rusak 19 buah ( sudah rusak sejak penjaga masuk tahun 2012)
j. Patok BM ada 10 buah (dalam keadaan Baik)
k. Akses jalan puncak tanggul banyak yang bergelomang
l. Tanggul bagian hilir terdapat beberapa titik yang mengalami kelongsoran
m. Curah hujan ada 2 buah, 1 buah sudah rusak
n. Diperlukan penerangan di puncak bendungan sebanyak ± 5 titik
o. Lampu penerangan di rumah pintu spillway sudah putus sebanyak 4 buah
Luas : 6 m x 15 m x 4 = 360
Dinding 25% Ada 87% 22%
m² Total kerusakan = 46,8
m²
Bangunan Luas : 6 m x 5 m = 30 m²
2 20% Lantai 25% Ada 86% 22%
Pengambilan Total kerusakan = 4,2 m²
Menara
19% 16%
Intake
Luas : 6 m x 7 m = 42 m²
Atap Pelindung 25% Ada 88% 22%
Total kerusakan = 5,04 m²
Luas : 0,30 m x 10 m= 3
Tangga inspeksi 25% Ada 79% 20%
m² Total kerusakan = 0,63
m²
Luas : 1 m x 1,5 m = 1,5 m²
Stoplog 67% Ada 76% 51%
Total kerusakan = 0,36 m²
Pintu Intake 25% 13%
Trashrack 33% Ada 0% 0%
Peralatan
Hidromekani 38% Penggerak Manual 100% Ada 75% 75% 28%
kal
Bangunan
3 20%
Pengeluaran
Luas : 28 m x 3 m = 84
Dinding 33% Ada 75% 25%
m² Total kerusakan = 21
m²
Bangunan Luas : 8 m x 6 m = 48
25% Lantai 33% Ada 75% 25% 18%
Pelindung m² Total kerusakan = 12
m²
Luas : (14 m x 2 m) x 2 = 56 m²
Lantai beton 70% Ada 85% 60%
Total kerusakan = 8,4 m²
Saluran
10% 9%
Luncur
Lubang Drain 30% Ada 85% 26%
Luas : 32 m x 2 m = 64 m²
Dinding beton 70% Ada 84% 59%
Dinding/ Total kerusakan = 10,24 m²
10% 8%
Sayap
Sambungan beton 30% Ada 80% 24%
Peredam
20% Kolam Terjunan 35% Ada 85% 30% 16%
Energi
Bangunan
4 15% Luas : 2,70 m x 1,20 m = 3,24 m²
Pelimpah Pintu Spilway 50% Ada 85% 43%
Total kerusakan = 0,49 m²
Pintu
20% Alat Angkat 25% Ada 85% 21% 17%
Spillway
Luas : (2 m x 3 m) x 4 = 24 m²
Abutmen 19% Ada 85% 16%
Total kerusakan = 3,6 m²
Luas : 56 m x 2 m = 112 m²
Plat jembatan 19% Ada 87% 16%
Total kerusakan = 14,56 m²
Luas : (24 m x 0,50 m) x 4 = 48 m²
Jembatan 5% Gelagar 25% Ada 85% 21% 4% Total kerusakan = 7,2 m²
Luas : 56 m x 1 x 2 = 112
Hand rail 13% Ada 90% 11%
m Total kerusakan = 11,2
m
Luas : (7 m x 0,75 m) x 9 = 47,25 m²
Kolom/tiang 25% Ada 90% 23%
Total kerusakan = 4,73 m²
1 2 3 4 5 = 4/90% 6 7=5x6 8
Belum Ada Guard rail dan
Tubuh
1 30% 30% 35% 80% 28% Lampu Penerangan Di
Bendungan
Puncak Tanggul
Bangunan Jembatan Hantar Sudah
2 20% 20% 24% 72% 17%
Pengambilan Ada Yang Rusak
Saluran Pengeluaran
Bangunan
3 20% 20% 24% 78% 18% Sudah Banyak Sedimen
Pengeluaran dan ditumbuhi Rumput
Bangunan
4 15% 15% 18% 85% 15%
Pelimpah
Bendungan Tidak ada bendungan
5 5% 0% 0% 0% 0%
Pelana Pelana
Pelimpah Tidak ada bangunan
6 5% 0% 0% 0% 0%
darurat pelimpah darurat
Bukit
7 5% 0% 0% 0% 0% Tidak ada Bukit Tumpuan
Tumpuan
REKOMENDASI
Disarankan Untuk melengkapi bangunan pendukung bendungan yang belum ada seperti : Saluran drainase,
a.
Guard rail, dan Lampu Penerangan (20 Titik) di puncak
Disarankan untuk memeriksa lebih lanjut di bagian puncak tanggul dan lereng hilir yang mengalami penurunan
b.
sedikit
Di perlukan perbaikan paving blok untuk akses jalan di puncak tanggul karena banyak yang sudah
c.
bergelombang
Diperlukan pemeliharaan pada jembatan hantar, seperti : penambahan lapisan aspal pada jembatan dan
d.
pengecatan
Diperlukan pemeliharaan pada menara intake dan pintu intake seperti : Pemeliharaan stoplog, trasrack dan
e.
pengecatan
Perlu dilakukan pengerukan di saluran pengeluaran karena sedimen sudah cukup tinggi dan sudah di tumbuhi
f.
rumput
g. Perlu dilakukan perbaikan pada lantai saluran pengeluaran karena sudah terkikis air
h. Di perlukan untuk memperbaiki dinding saluran Pengeluaran yang terdapat banyak retakan
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 75% 53%
Operasi Operasi
Operasi 30% 22%
2 30% Darurat
Waduk Uji Operasi 30% Ada 70% 21%
Kecukupan
50% Ada 85% 43%
Operator jumlah
30% 25%
Bendungan
Kompetensi 50% Ada 80% 40%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 80% 32% 81%
Waduk
komplain 3-
Kepuasan User 20% 75% 15%
4 kali /thn
REKOMENDASI
b. Agar menyiapkan petugas darurat dan sistem komunikasi untuk keadaan darurat
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11 12 13
Kecukupan
20% Ada 95% 19% Jumlah = 5 Buah
jumlah
Kecukupan
20% Ada 80% 16% Jumlah = 6 Buah
jumlah
Kecukupan
20% Ada 90% 18% Jumlah = 29 buah
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 2 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 2 buah
jumlah
Hidroklimatologi 13% 9%
Hasil Pengamatan 40% Ada 80% 32%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 75% 75% 45% Masih Bagus
dan sempadan
Kondisi
4 Sempadan dan 10%
Greenbelt
Nilai Kinerja
Bobot Nilai
No Komponen Sistem Keamanan Keterangan
Komponen Komponen dan Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 61% 18% Piezometer Sudah ada yang rusak
Instrumentasi
Kondisi Sempadan
4 10% 45% 5% Kurangnya Upaya Konservasi
dan Greenbelt
Masyarakat Sekitar
5 10% 68% 7%
Waduk
Jumlah 67% Kinerja Kurang
REKOMENDASI
a. Perlu penambahan peilschaal 3 buah untuk saluran pelimpah, saluran irigasi, dan gardu pandang
b. Perlu perbaikan Piezometer karena sudah banyak yang rusak (6 buah Elektrik, 19 Buah Stand Pipe)
e. Perlu dilakukan pengerukan karena tingginya sedimentasi di saluran induk dan hulu spillway
f. Perlu juga dilakukan pengukuran kualitas air waduk ( 2 Kali Pertahun 3 titik Pemantauan )
Indek
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah
Komponen Komponen Penilaian Elemen Ada
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11
Kecukupan
50% Ada 100% 50%
Jumlah
Petugas Operasi 25% 23%
Kompetensi 50% Ada 85% 43%
Kecukupan
25% 50% Tidak ada 0% 0%
Petugas Jumlah
0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
25% 50% Tidak ada 0% 0%
Petugas Jumlah
0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Dokumen
30% Kelengkapan 60% Ada 75% 45%
Perencanaan
Lokasi 23%
40% Ada 75% 30%
Penyimpanan
Dokumen
30% Kelengkapan 60% Ada 75% 45%
Pelaksanaan
3 Dokumen OP 20% 22%
Lokasi
40% Ada 70% 28%
Penyimpanan
Kecukupan
50% Ada 80% 40%
Jumlah
Gedung/kantor 20% 15%
Kondisi
50% Ada 70% 35%
Gedung
Kecukupan
50% Ada 48% 24%
Peralatan Jumlah
20% 10%
Operasi Kondisi
50% Ada 50% 25%
peralatan
Kecukupan
50% Ada 50% 25%
Peralatan Jumlah
Sarana dan 20% 10%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 47% 24%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
REKOMENDASI
c. Perlu pengadaan perlengkapan untuk rumah jaga (Grandel, meja, kursi, kasur, ATK, dsb)
f. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Lalung
b. Alamat Bendungan : Desa Lalung, Kec. Karanganyar, Kab. Karanganyar, Jawa Tengah
c. Koordinat Intake x: 07º36’771”
y: 110º56’158”
2. Riwayat Penanganan : - Sedang ada pekerjaan pembuatan pagar rumah jaga dan saluran
drainase
- Akan ada pekerjaan untuk perbaikan tanggul bagian hilir
yang longsor
- Ada Perbaikan piezometer pada bulan juni tahun 2016
3. Data Inventarisasi
a. Terjadi kelongsoran pada Tanggul hilir disebelah kiri dan kanan Intake & bangunan
pengeluaran.
b. Banyak tumbuhan rumput liar di puncak tanggul.
c. Kurangnya papan peringatan di atas tanggul
d. V-Notch tertutup tanah longsoran 1 buah
e. Peizometer ada 27 buah (baru dilakukan perbaikan tahun 2016 lalu)
f. Patok geser ada 72 buah ( 1 buah terkena longsoran)
g. Peilschaal ada 6 buah (baik)
h. Patok BM ada 8 buah (baik)
i. Pada tanggal 29 november 2016 mulai terjadi retakan ditanggul hilir sebelah kiri dan
kanan intake
j. Di dalam waduk sedimentasi tinggi, terlihat dari banyaknya petani yang menanam padi
di dalam waduk
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Bangunan Luas : 6 m x 4 m = 24 m²
2 20% Lantai 25% Ada 85% 21%
Pengambilan Menara Intake 19% 15% Total kerusakan = 3,6 m²
Bangunan Tunnel/
3 20% 100% 65%
Pengeluaran Terowongan
1 2 3 4 5 = 4/75% 6 7=5x6 8
REKOMENDASI
a. Perlu di lakukan rehab pada tanggul hilir di sebelah kiri dan kanan intake karena terjadi longsoran
b. Perlu di lakukan pembabatan di puncak tanggul karena banyak tumbuhan rumput liar
c. Perlu di lakukan perbaikan di tanggul hilir sebelah kiri dan kanan intake karena terjadi retakan
d. Perlu di lakukan perbaikan pada lapis perkerasan (Paving blok) di puncak bendungan karena sudah bergelombang
Perlu lampu penerangan (8 titik)di puncak tanggul dan penambahan papan peringatan, karena saat ini yang ada
g.
masih kurang
h. Perlu dilakukan pengerukan saluran drainase di lereng hilir karena lantainya sudah tertutup sedimen
i. Perlu pembabatan rumput pada tanggul hulu dan hilir karena sudah banyak rumput
liar
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Ketersediaa
n 30% Tidak ada 0% 0%
Pelaksanaan
70% Ada 75% 53%
operasi
Operasi Normal 40% 29%
Uji Operasi 30% Ada 70% 21%
Pelaksanaan
70% Ada 75% 53%
Operasi Operasi Operasi
2 30% 30% 22%
Waduk Darurat
Uji Operasi 30% Ada 70% 21%
Kecukupan
50% Ada 75% 38%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Ketersediaa
40% Ada 85% 34%
n
Lokasi
Buku RTD 35% 30% Ada 75% 23% 27%
Penyimpana
Updating 30% Ada 65% 20%
1 2 3 4 5=3x4 6
Operasi
2 30% 74% 22%
Bendungan
Layanan
3 30% 77% 23% Baru melayani untuk Irigasi
Bendungan
Rencana Tindak Kurangya penilaian di sub komponen
4 20% 42% 8%
Darurat (RTD) Kesiapsiagaan dan sistem komunikasi
Jumlah 58% Kinerja Kurang
REKOMENDASI
c. Agar melakukan sosialisasi 2 tahun 1 kali dan simulasi 3 tahun 1 kali untuk kesiapsiagaan darurat
d. Agar menyiapkan petugas darurat dan sistem komunikasi untuk keadaan darurat
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7x9 11 12 13
Kecukupan
20% 100% 20% Jumlah = 6 buah
jumlah
Kecukupan
20% 90% 18% Jumlah = 72 buah Stand pipe
jumlah
Kecukupan
20% 90% 18% Jumlah = 2 buah
jumlah
Kecukupan
20% 100% 20% Jumlah = 72 buah
jumlah
Kecukupan
20% 0% 0%
jumlah
Pelaporan 10% 0% 0%
Pengukuran
50% Tidak Ada 0% 0%
Sedimentasi Sedimen
40% 0%
Waduk Upaya
50% Tidak Ada 0% 0%
Pencegahan
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 70% 70% 42%
dan sempadan
Kondisi
4 Sempadan 10%
dan Greenbelt
Upaya
40% Upaya konservasi 100% Ada 0% 0% 0%
konservasi
Di Tubuh
35% Ada 50% 18% Dilewati Kendaraan Bermotor
Bendungan
Masyarakat Aktivitas
5 Sekitar 10% Masyarakat 100% Di Waduk 35% Ada 55% 19% 53% Ada Sawah di Waduk
Waduk Sekitar Waduk Di tepi
30% Ada 55% 17% Ada Sawah Di tepi Waduk
waduk/greenbelt
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keamanan dan
Keterangan
Komponen Komponen
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan Ada kerusakan pada alat Piezometer dan V-
1 30% 44% 13%
Instrumentasi notch
a. Perlu di lakukan perbaikan v-notch yang rusak karena tertutup tanah longsoran dan sudah tidak keluar air
d. Melakukan Pengukuran Kualitas Air Waduk ( 2 kali Pertahun sebanyak 3 titik pemantauan )
Kecukupan
25% 50% Ada 85% 43%
Petugas Operasi Jumlah 21%
Kompetensi 50% Ada 80% 40%
Kecukupan
Petugas 25% 50% Tidak ada 0% 0%
Jumlah 0%
Pemantauan Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
Petugas 25% 50% Ada 60% 30%
Jumlah 17%
Pemeliharaan Kompetensi 50% Ada 75% 38%
Kecukupan
Petugas 25% 50% Tidak ada 0% 0%
Jumlah 0%
Keamanan Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 80% 40%
Jumlah
Gedung/kantor 20% 16%
Kondisi
50% Ada 80% 40%
Gedung
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 13%
Operasi Kondisi
50% Ada 65% 33%
peralatan
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
Sarana dan 20% 14%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 70% 35%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
REKOMENDASI
b. Disarankan untuk menambah petugas pemantauan dan petugas keamanan minimal 1orang
d. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Cengklik
b. Alamat Bendungan : Desa Cengklik dan Desa Ngargorejo, Kec. Nemplak, Kab. Boyolali,
c. Koordinat Intake x: 07º31’021”
y: 110º43’969”
2. Riwayat Penanganan :
3. Data Inventarisasi
a. Ada rembesan di intake yang mengakibatkan rumah pintu tergenang.
b. Banyaknya tumbuhan air (eceng gondok) di sebagian waduk.
c. Rip – rap di tubuh bendungan pelana sudah berantakan
d. Banyaknya sampah warga di bendungan pelana / rip – rap.
e. Banyak tumbuhan rumput di saluran pelimpah.
f. Dipuncak tanggul bisa dilewati kendaraan bermotor dan pedagang yang berjualan
g. Belum ada Lampu Penerangan
Indeks
Bobot Sub Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Lapis Luas : 1.693 m x 3 m = 5.079 m²
33% Ada 85% 28%
Perkerasan Total kerusakan = 761 m²
Luas : (1.693 m x 0,25 m) x 2 = 846,5 m²
Bahu 11% Ada 80% 9%
Total kerusakan = 169 m²
Parapet 11% Tidak Ada 0% 0%
Luas : 14 m x 1,5 m = 21 m²
Jalan Inspeksi 20% Ada 81% 16%
Total kerusakan = 4 m²
Lereng Hilir 30% 24%
Saluran Luas : 1.693 m x 1 m x 0,8 m = 1354,4 m³
20% Ada 76% 15%
Drainase Total kerusakan = 325,1 m³
Peralatan Penggerak
Hidromekani 38% 100% Ada 70% 70% 26%
Manual
kal
1 2 3 4 5 = 4/95% 6 7=5x6 8
Tidak Ada Portal Masuk
di Puncak, Tidak ada
1 Tubuh Bendungan 30% 30% 33% 72% 24%
Penerangan dan Pagar
Pelindung
Bangunan
3 20% 20% 22% 72% 16%
Pengeluaran
REKOMENDASI
a. Di Puncak Tanggul perlu dibuatkan Portal Masuk dan Lampu Penerangan ( 15 Titik)
e. Di sarankan untuk memperbaiki rip-rap di tubuh bendungan pelana yang sudah berantakan
Pelaksanaan
70% 75% 53%
operasi
Operasi Normal 40% Ada 29%
Uji Operasi 30% 70% 21%
Pelaksanaan
70% 75% 53%
Operasi Operasi Operasi
2 30% 30% Ada 22%
Waduk Darurat
Uji Operasi 30% 70% 21%
Kecukupan
50% 75% 38%
Operator jumlah
30% Ada 22%
Bendungan
Kompetensi 50% 70% 35%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 75% 30% 77%
Waduk
Kepuasan komplain 3-4
20% 75% 15%
User kali /thn
Ketersediaan 40% 0% 0%
Lokasi
Buku RTD 35% 30% Belum Ada 0% 0% 0%
Penyimpanan
Updating 30% 0% 0%
Operasi
2 30% 73% 22%
Bendungan
Layanan
3 30% 77% 23% Baru melayani Irigasi
Bendungan
Rencana Tindak
4 20% 0% 0% Belum ada RTD
Darurat (RTD)
REKOMENDASI
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Kecukupan
20% Ada 100% 20% Jumlah = 7 buah
jumlah
Kecukupan
20% Ada 85% 17% Jumlah = 14 buah
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 33 buah
jumlah
Kecukupan
20% Tidak ada 0% 0%
jumlah
Hidroklimatologi 15% 0%
Hasil Pengamatan 40% Tidak ada 0% 0%
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keamanan dan
Keterangan
Komponen Komponen
Lingkungan
1 2 3 4 5=3x4 6
Kondisi Sempadan
4 10% 45% 5% Belum ada Upaya Konservasi
dan Greenbelt
REKOMENDASI
d. Perlu dilakukan pembersihan tumbuhan air (Eceng Gondok) yang banyak tumbuh di permukaan air waduk
e. Agar melakukan pengukuran kualitas air waduk dan upaya untuk pencegahan tercemarnya air waduk
f. Agar segera menertibkan kerambah dan warung yang berada di waduk dan sekitar tanggul
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
REKOMENDASI
c. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Botok
b. Alamat Bendungan : Desa Mojodoyong, Kec. Kedawung, Kab. Sragen, Jawa Tengah
c. Koordinat Intake x: 07º31’551”
y: 111º02’626”
Indeks
Bobot Sub Bobot Sub Bobot Ada/Tidak
No Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7x9 11 12 13
Luas : 744 m x 3 m = 2.232 m²
Lapis Perkerasan 33% Ada 85% 28%
Total kerusakan = 334,8 m²
Luas : 10 m x 1,5 m = 15 m²
Jalan Inspeksi 20% Ada 77% 15%
Total kerusakan = 3,75 m²
Lereng Hilir 30% 23%
Luas : 744 m x 0,30 m x 0,40 m =
Saluran Drainase 20% Ada 75% 15% 178,6 m³ Total kerusakan =
44,64 m³
Pembesihan dilakukan lebih dari 4
Tumbuhan 20% Ada 70% 14%
kali dalam satu tahun
Jembatan Luas : 6 m x 3 m = 18 m²
19% Plat jembatan 38% Ada 80% 30%
Hantar Total kerusakan = 3,6 m²
Luas : (7 m x 4 m) x 4 = 112 m²
Dinding 25% Ada 81% 20%
Total kerusakan = 21,28 m²
Bangunan
2 20% Luas : 4 m x 4 m = 16 m²
Pengambilan Lantai 25% Ada 80% 20%
Total kerusakan = 3,2 m²
Menara
19% 15%
Intake Luas : 6 m x 6 m x 0,15 m = 5,4 m³
Atap Pelindung 25% Ada 79% 20%
Total kerusakan = 1,13 m³
Luas : (6 m x 2) x 2 m = 24 m²
Dinding beton 70% Ada 85% 60%
Dinding/ Total kerusakan = 3,6 m²
13% 11%
Sayap
Sambungan beton 30% Ada 80% 24%
Luas : 5 m x 4 m = 20 m²
Kolam Olak 35% Ada 82% 29%
Total kerusakan = 3,6 m²
1 2 3 4 5 = 4/90% 6 7=5x6 8
Bangunan
4 15% 15% 18% 84% 15%
Pelimpah
Bukit
7 5% 0% 0% 0% 0% Tidak ada Bukit tumpuan
Tumpuan
REKOMENDASI
a. Perlu pemasangan portal dan lampu penerangan (15 titik) di puncak tanggul
c. Di perlukan untuk memperbaiki rip – rap lereng hilir bagian bawah karena berantakan & ada yang hilang
d. Perlu dilakukan perbaikan patok pengaman di atas tanggul karena sudah banyak yang roboh
e Perlu di lakukan perbaikan jembatan hantar untuk inspeksi ke intake yang sudah mengalami retakan.
f. Perlu di lakukan perbaikan pada dinding bangunan pengeluaran karena sudah banyak yang retak dan berlubang
i. Perlu di lakukan perbaikan saluran drainase di bawah lereng hilir karena banyak terjadi kerusakan dan berlubang
Karena disekitar waduk dijadikan warga setempat sebagai tempat pariwisata jadi ada banyak sampah di sekitar
k.
waduk disarankan untuk membuat Bak Sampah
Ketersediaan 30% 0% 0%
Manual OP
35% Kesesuaian 20% Tidak ada 0% 0% 0%
Pelaksanaan 50% 0% 0%
Ketersediaan 20% 0% 0%
Pelaksanaan 40% 0% 0%
Pelaksanaan
2 Operasi 70% Ada 70% 49%
30% Operasi 30% Operasi 21%
Waduk Darurat
Uji Operasi 30% Ada 70% 21%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Nilai Komponen Total 74%
Kepuasan
User komplain 3-4
20% kali /thn 75% 15%
Nilai Komponen Total
79%
Lokasi
Buku RTD 35% 30% Tidak ada 0% 0% 0%
Penyimpanan
Rencana
Sosialisasi 40% Tidak ada 0% 0%
4 Tindak
Darurat 20%
(RTD) Kesiapsiagaan 35% Simulasi 30% Tidak ada 0% 0% 0%
Petugas
Darurat 30% Tidak ada 0% 0%
Alat
Sistem Komunikasi 50% Tidak ada 0% 0%
30%
komunikasi
Early Warning 50% Tidak ada 0% 0%
1 2 3 4 5=3x4 6
Rencana Tindak
4 20% 0% 0% Belum Ada RTD
Darurat (RTD)
REKOMENDASI
b. Agar selalu rutin melakukan kegiatan Operasi waduk, baik itu operasi Normal dan Operasi darurat
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Kecukupan
20% Ada 75% 15% Jumlah = 3 buah (Kurang 1 Buah)
jumlah
Kecukupan
20% Ada 85% 17% Jumlah = 17 buah
jumlah
Kecukupan
20% Ada 90% 18% Jumlah = 4 buah
jumlah
Kecukupan
20% Ada 90% 18% Jumlah = 14 buah,
jumlah
Kecukupan
20% Tidak ada 0% 0%
jumlah
Pengukuran
50% Tidak ada 0% 0%
Sedimentasi Sedimen
40% 0% Belum ada
Waduk Upaya
50% Tidak ada 0% 0%
Pencegahan
Hubungan
Pelibatan
dengan 50% 100% Tidak ada 0% 0% 0%
Masyarakat
masyarakat
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keterangan
Komponen Komponen Keamanan dan
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan (Peilschaal rusak 1 buah, kurang 1 buah),
1 30% 53% 16%
Instrumentasi Piezomater rusak 8 buah
2 Inspeksi 30% 51% 15% Belum ada Inspeksi besar
belum dilakukan pengukuran kualitas air
3 Kondisi Waduk 20% 19% 4%
waduk dan pengukuran sedimen secara rutin
Kondisi Sempadan
4 10% 45% 5% belum ada upaya konservasi
dan Greenbelt
Masyarakat Sekitar Dipuncak tanggul bisa dilewati kendaraan
5 10% 29% 3%
Waduk bermotor
Jumlah 42% Kinerja Kurang
REKOMENDASI
c. Di perlukan perbaikan pada v-notch yang kondisi bangunannya bagus tetapi tidak keluar air sebanyak 4 buah
e. Disarankan Untuk segera melakukan kegiatan Inspeksi Besar di Bendungan Botok ini
f. Disarankan Untuk melakukan pengukuran kualitas air waduk (2 kali pertahun di 3 titik pemantauan)
h. Di perlukan pengerukan di waduk karena sedimentasi sudah tinggi dan air keruh
Kecukupan
25% 50% Ada 100% 50%
Petugas Jumlah
23%
Operasi
Kompetensi 50% Ada 85% 43%
Petugas Kecukupan
25% 50% Tidak ada 0% 0%
Pemantauan Jumlah
0%
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Petugas Kecukupan
25% 50% Ada 80% 40%
Pemeliharaan Jumlah
19%
Kompetensi 50% Ada 70% 35%
Petugas Kecukupan
25% 50% Tidak ada 0% 0%
Keamanan Jumlah
0%
Kompetensi 50% Tidak ada 0% 0%
Dokumen
30% Kelengkapan 60% Ada 75% 45%
Perencanaan
23%
Lokasi
40% Ada 75% 30%
Penyimpanan
Dokumen
30% Kelengkapan 60% Ada 75% 45%
Pelaksanaan
3 Dokumen OP 20% 23%
Lokasi
40% Ada 75% 30%
Penyimpanan
Dokumen OP
40% Kelengkapan 60% Ada 75% 45%
Bendungan
30%
Lokasi
40% Ada 75% 30%
Penyimpanan
Kecukupan
50% 80% 40%
Jumlah
Gedung/kantor 20% Ada 12%
Kondisi
50% 40% 20%
Gedung
Kecukupan
50% 65% 33%
Peralatan Jumlah
20% Ada 13%
Operasi Kondisi
50% 60% 30%
peralatan
Kecukupan
50% 75% 38%
Peralatan Jumlah
Sarana dan 20% Ada 15%
4 20% Pemeliharaan Kondisi
Prasarana 50% 70% 35%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
REKOMENDASI
b. Perlu di lakukan renovasi pada rumah jaga karena kondisinya sudah tidak layak
d. Perlu pengadaan peralatan operasi, pemeliharaan, dan pemantauan (Garpu, Senter, Jas Hujan, dan Pelampung)
1. Data Umum
a. Nama Bendungan : Brambang
b. Alamat Bendungan : Desa Brambang, Kec. Kedawung, Kab. Sragen, Jawa Tengah
c. Koordinasi Intake x: 07º29’232”
y: 111º01’835”
3. Data Inventarisasi
a. Kebocoran/rembesan tanggul sebelah barat (apabila muka air tinggi)
b. Pintu intake dibagian stoplog ada kebocoran
c. Ada rembesan didekat saluran suplesi
d. Belum adanya pos jaga waduk
e. Belum ada kejelasan perbatasan tanah waduk dengan tanah warga
f. Butuh sosialisasi ke warga karena ada bangunan ternak babi dekat waduk
yang membuang limbah ke waduk
g. Saluran drainase ada yang rusak sepanjang ± 50 m
h. Terdapat kerusakan pada pintu saluran inlet ( tidak bisa di operasikan / berat)
i. Belum adanya curah hujan di waduk brambang
j. Secara visual kondisi bendungan brambang dalam keadaan baik, selain kerusakan yang
telah ditulis di atas, hanya perlu pengecatan di beberapa bangunan pendukung
bendungan (Intake)
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 294,10 m x 0,80 m = 235,3 m²
Lapis Perkerasan 47% Ada 80% 38%
Total kerusakan = 47,1 m²
Luas : 294,10 m x 0,20 m = 58,82 m²
Bahu 16% Ada 85% 13%
Total kerusakan = 8,82 m²
Luas : (0,80 x 0,20) x 2 bh = 0,32 m³
Puncak 40% Patok HM/BM 13% Ada 80% 10% 29% Total kerusakan = 0,064 m³
Luas : 132 m x 1 x 2 = 264 m
Pagar Pelindung 13% Ada 86% 11%
Total kerusakan = 36,96 m
Luas : 6 m x 1,5 m = 9 m²
Jalan Inspeksi 20% Ada 84% 17%
Total kerusakan = 1,44 m²
Lereng Hilir 30% 25%
Luas : 132 m x 0,25 m x 0,30 m = 9,9 m³
Saluran Drainase 20% Ada 77% 15%
Total kerusakan = 2,3 m³
Luas : 3 m x 2 m = 6 m²
Lantai 25% Ada 80% 20%
Total kerusakan = 1,2 m²
Menara Intake 23% 13% Luas : 5 m x 4,5 m x 0,30 m = 6,8 m³
Atap Pelindung 25% Ada 70% 18%
Total kerusakan = 2,04 m³
Luas : 16 m x 3 m = 48 m²
Dinding 33% Ada 75% 25%
Total kerusakan = 12 m²
1 2 3 4 5 = 4/75% 6 7 = 5x6 8
Tubuh Belum ada lampu
1 30% 30% 43% 81% 35%
Bendungan penerangan
Bangunan Pintu intake ada
2 20% 20% 29% 55% 16%
Pengambilan bocoran
Bangunan
3 20% 20% 29% 72% 20%
Pengeluaran
Bangunan
4 15% 0% 0% 0% 0%
Pelimpah
REKOMENDASI
b. Di perlukan perbaikan pada tanggul sebelah barat yang terdapat rembesan (apa bila muka air tinggi)
f. Di perlukan perbaikan pada pintu inlet karena terdapat kerusakan (tidak bisa di operasikan)
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11
Ketersediaan 30% 0% 0%
Kesesuaian 20% 0% 0%
Manual OP 35% Belum Ada 0%
Pelaksanaan 50% 0% 0%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 80% 32% 80%
Waduk
Kepuasan komplain 3-
20% 80% 16%
User 4 kali /thn
Lokasi
Buku RTD 35% 30% Tidak ada 0% 0% 0%
Penyimpanan
REKOMENDASI
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Keterangan
Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12
Kecukupan
20% 80% 16% Jumlah = 3 buah
jumlah
Elevasi Muka Air Kondisi alat 30% 40% 12% Rusak 3 buah (Sudah Kabur)
(AWLR/Peilschaa 50% Ada 34%
Hasil
l) 40% 80% 32%
Pengamatan
Inspeksi berkala
33% Pelaporan, 30% Ada 60% 18% 21%
2 Inspeksi 30% biasa
Tindak lanjut 30% Ada 60% 18%
Kondisi grenbelt
Kondisi 60% Kondisi vegetasi 100% Ada 90% 90% 54%
dan sempadan
4 Sempadan dan 10% Masih Bagus
Greenbelt Upaya konservasi 40% Upaya konservasi 100% Tidak ada 0% 0% 0%
Di Tubuh
35% Ada 80% 28%
Bendungan
Aktivitas ada pemeliharaan ikan di dalam
Masyarakat 50% Di Waduk 35% Ada 70% 25% 33% waduk
Sekitar Waduk Di tepi Ada peternakan hewan di dekat
Masyarakat 30% Ada 45% 14%
5 10% waduk/greenbelt waduk
Sekitar Waduk
Hubungan
Pelibatan
dengan 50% 100% Tidak ada 0% 0% 0%
Masyarakat
masyarakat
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 34% 10% Hanya Ada Peilschaal
Instrumentasi
Kondisi Sempadan
4 10% 54% 5%
dan Greenbelt
Ada pemeliharaan ikan di dalam waduk
Masyarakat Sekitar
5 10% 33% 3% dan Ada peternakan hewan di dekat
Waduk
waduk
Jumlah 100% 47% Kinerja Kurang
REKOMENDASI
c. Disarankan Untuk segera melakukan kegiatan Inspeksi Besar di Bendungan Brambang ini
e. Agar melakukan pengukuran kualitas air waduk dan upaya untuk pencegahan tercemarnya air waduk
Diperlukan sosialisai ke warga karna ada bangunan ternak babi dekat waduk yang membuang limbahnya
f.
kedalam waduk
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
REKOMENDASI
1. Data Umum
a. Nama Bendungan : Gembong
b. Alamat Bendungan : Desa Gembong, Kec. Karangmalang, Kab. Sragen, Jawa Tengah
c. Koordinat Intake x: 07º28’363”
y: 110º59’799”
3. Data Inventarisasi
a. Saluran drainase sepanjang ± 100 meter butuh penambahan setinggi 50 cm
b. Butuh peninggian talud di saluran pengeluaran sepanjang 150 m dengan ketinggian 50 –
70 cm
c. Belum adanya listrik di rumah jaga
d. Belum adanya curah hujan
e. Sedimentasi di waduk sudah cukup tinggi
f. Saluran suplesi yang jebol butuh perbaikan & timbunan tanggul
g. Pintu limpasan dari suplesi butuh perbaikan
h. Talud di tanggul hilir bagian timur butuh peninggian sepanjang ± 110 m
i. Atap pintu intake (dak/cor beton) bergelombang
j. Tangga inspeksi ke saluran outlet ada retakan dan pecahan
k. Sedimentasi tinggi di saluran pengeluaran.
l. Selain kerusakan diatas, Secara visual kondisi bendungan Gembong dalam keadaan
baik, hanya perlu pembersihan rumput di beberapa bangunan pendukung bendungan.
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Luas : 110 m x 2 m = 220
Lapis Perkerasan 33% Ada 85% 28%
m² Total kerusakan = 33
m²
Luas : 110 m x 1 m = 110
Bahu 11% Ada 83% 9%
m² Total kerusakan = 18,7
m²
Luas : 110 m x 0,15 m x 0,15 m = 2,5
Parapet 11% Ada 80% 9%
m³ Total kerusakan = 0,5 m³
Luas : (0,5 x 1) x 20 bh = 10
Guard rail 9% Ada 90% 8%
Puncak 40% 25% m³ Total kerusakan = 1 m³
Luas : 3 m x 2 m = 6 m²
Lantai 25% Ada 80% 20%
Total kerusakan = 1,2 m²
Menara Intake 23% 14%
Luas : 6 m x 4 m x 0,20 m = 4,8
Atap Pelindung 25% Ada 81% 20%
m³ Total kerusakan = 0,91 m³
Bangunan
2 20% Tangga inspeksi 25% Tidak Ada 0% 0%
Pengambilan
Peralatan
46% Penggerak Manual 100% Ada 75% 75% 35%
Hidromekanikal
Luas : 10 m x 3 m = 30
Dinding 33% Ada 79% 26%
m² Total kerusakan = 6,3
m²
Bangunan Bangunan
3 20% 100% 52% Luas : 5 m x 3 m = 15 m²
Pengeluaran Pelindung Lantai 33% Ada 77% 26%
Total kerusakan = 3,5 m²
REKOMENDASI
a. Perlu dilakukan penambahan saluran drainase sepanjang ± 100 m dengan tinggi 0,5 m
e. Perlu Perbaikan Tangga Inspeksi Ke saluran Outlet Karena sudah ada yang pecah
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Ketersediaan 30% 0% 0%
Pelaksanaan 50% 0% 0%
Ketersediaan 20% 0% 0%
Updating 20% 0% 0%
Pola Operasi
1 Pedoman OP 20% 35% Belum Ada 0%
Waduk Sosialisasi 20% 0% 0%
Pelaksanaan 40% 0% 0%
Operasi
2 30% 75% 22%
Bendungan
Layanan
3 30% 79% 24% Baru melayani untuk Irigasi
Bendungan
Rencana Tindak
4 20% 0% 0% Belum ada RTD
Darurat (RTD)
REKOMENDASI
Bobot Indeks
Sub Komponen Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Komponen Kondisi yg Nila Jumlah Keterangan
Komponen Penilaian Elemen Ada
Ada i
1 2 3 4
5 6 7 9 10=7x9 11 12
Kecukupan
8 80% 16% Jumlah = 2 buah
jumlah
0%
Hidroklimatologi 50% 0%
Hasil
40% Tidak ada 0% 0%
Pengamatan
Inspeksi rutin
33% Pelaporan, 30% Ada 70% 21% 24%
2 Inspeksi berkala
Inspeksi 30% 33% Pelaporan, 30% Ada 65% 20% 23%
biasa
Pelaksanaan: 40% 0% 0%
0%
Kondisi grenbelt
4
Kondisi Sempadan dan sempadan 60% Kondisi vegetasi 100% Ada 75% 75% 45%
dan Greenbelt 10
Masih Bagus
% Upaya konservasi
40% Upaya konservasi 100% Tidak ada 0% 0% 0%
Di Tubuh
35% Ada 65% 23%
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 65% 23% 33%
Masyarakat Sekitar Sekitar Waduk Di tepi
5
Waduk 10% 30% Ada 65% 20%
waduk/greenbelt
Hubungan dengan
masyarakat Pelibatan
50 100 Tidak ada 0% 0% 0%
Masyarakat
% %
Hasil Pengamatan
1 30% 36% 11% Hanya ada peilschaal
Instrumentasi
REKOMENDASI
c. Disarankan Untuk segera melakukan kegiatan Inspeksi Besar di Bendungan Gembong ini
f. Agar melakukan pengukuran kualitas air waduk dan upaya untuk pencegahan tercemarnya air waduk
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11
Rencana
20% Ketersediaan 50% Ada 90% 45%
Strategis
18%
Pelaksanaan 50% Ada 85% 43%
Kecukupan
50% Ada 90% 45%
Petugas Jumlah
25% 21%
Operasi
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 80% 40%
Petugas Jumlah
25% 20%
Pemeliharaan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% 80% 40%
Jumlah
Gedung/kantor 20% Ada 12%
Kondisi
50% 35% 18%
Gedung
Kecukupan
50% 55% 28%
Peralatan Jumlah
20% Ada 11%
Operasi Kondisi
50% 50% 25%
peralatan
Kecukupan
50% 55% 28%
Peralatan Jumlah
Sarana dan 20% Ada 11%
4 20% Pemeliharaan Kondisi
Prasarana 50% 55% 28%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
Tidak ada Petugas Pemantauan dan petugas
2 Petugas OP 20% 41% 8%
Keamanan
REKOMENDASI
c. Perlu Pengadaan Cangkul, Sabit, Garpu sampah, Sepatu Bot dan peralatan mesin rumput
Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan yang sudah
d.
rusak
1. Data Umum
a. Nama Bendungan : Gebyar
b. Alamat Bendugan : Desa Sambirejo, Kec. Sambirejo, Kab. Sragen, Jawa Tengah
c. Koordinat Intake x: 07º30’203”
y: 111º07’742”
2. Riwayat Penanganan :
- Sedang ada pembangunan talud, perbaikan jalan, dan pengecoran
tangga inspeksi menuju outlet (Tahun 2017)
3. Data Inventarisasi
a. Jembatan hantar ke intake plat betonya putus-putus (tidak menyatu)
b. Setir untuk pintu intake sudah lepas
c. Tingginya sedimentasi di dalam waduk
d. Tangga inspeksi ke bangunan pengeluaran sudak mulai rusak dan berumput
e. Ada 1 pintu intake yang tidak berfungsi (jumlah pintu intake ada 2 buah)
f. Perlu dibuatkan spillway baru, karna spillway yang sudah ada sekarang tidak berfungsi
g. Piezometer ada 22 buah, 6 buah terdapat lumpur
h. V-notch ada 4 buah, 3 buah tidak keluar air (cuma 1 yang baik)
i. Kondisi saluran pengeluaran/outlet sudah ada retakan dan lubang pada dinding
dan sayapnya sepanjang ± 50 m
j. Kondisi saluran pengeluaran/outlet banyak sedimentasi & rumput (tidak terawat)
k. Di perlukan pengerukan sedimentasi di waduk dan saluran outlet
l. Banyak tumbuhan rumput di tanggul hulu dan tanggul hilir (tidak terawat)
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 490 m x 3 m = 1470 m²
Lapis Perkerasan 33% Ada 78% 26%
Total kerusakan = 323,4 m²
Luas : (490 m x 0,25 m) x 2 = 245 m²
Bahu 11% Ada 75% 8%
Total kerusakan = 61,25 m²
Luas : 490 m x 0,15 m x 0,15 m = 11,03 m
Parapet 11% Ada 73% 8%
³ Total kerusakan = 2,98 m³
Luas : (0,50 m x 0,8 m) x 490 m = 196 m³
Guard rail 9% Ada 75% 7%
Puncak 40% 23% Total kerusakan = 49 m³
Luas : (0,80 x 0,80) x 1 bh = 0,64 m³
Patok HM/BM 9% Ada 85% 8%
Total kerusakan = 0,096 m³
Portal Masuk 9% Tidak Ada 0% 0%
Pagar Pelindung 9% Tidak Ada 0% 0%
Penerangan 9% Tidak Ada 0% 0%
Tumbuhan 20% Ada 65% 13% Banyak Tumbuhan Rumput di Lereng Hilir
Luas : 8 m x 1,5 m = 12
Plat jembatan 25% Ada 75% 19%
m² Total kerusakan = 3
Jembatan 19% 15% m²
Hantar
Luas : (2,7 m x 0,20 m) x 8 = 4,32
Gelagar 33% Ada 80% 27%
m² Total kerusakan = 0,86 m²
Luas : 8 m x 1 x 2 = 16
Hand rail 17% Ada 85% 14%
m Total kerusakan = 2,4
m
Bangunan
2 20% Luas : 5,5 m x 3 m = 16,5
Pengambilan Lantai 25% Ada 85% 21%
m² Total kerusakan = 2,48
m²
Menara Intake 19% 15%
Luas : 6,5 m x 4 m x 0,15 m = 3,9
Atap Pelindung 25% Ada 80% 20%
m³ Total kerusakan = 0,78 m³
Peralatan
38% Penggerak Manual 100% Ada 65% 65% 24%
Hidromekanikal
Bangunan
3 20%
Pengeluaran
Luas : 22 m x 3 m = 66 m²
Dinding 33% Ada 78% 26%
Total kerusakan = 14,52 m²
Bangunan Luas : 10 m x 3 m = 30
25% Lantai 33% Ada 75% 25% 19%
Pelindung m² Total kerusakan = 7,5
m²
Luas : (4 m x 1 m) x 2bh = 8
Tangga inspeksi 33% Tidak ada 70% 23%
m² Total kerusakan = 2,4 m²
Bukit
5 5%
Tumpuan
Lereng 50% Ada 90% 45%
1 2 3 4 5 = 4/90% 6 7=5x6 8
Bangunan
2 20% 20% 22% 65% 14% Pintu intake rusak 1 buah
Pengambilan
Dinding dan sayap saluran
Bangunan
3 20% 20% 22% 80% 18% pengeluaran sudah berlubang dan
Pengeluaran
ada retakan
Bangunan Bangunan spillway sudah tidak
4 15% 15% 17% 56% 9%
Pelimpah berfungsi
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
Pelimpah Tidak ada bangunan pelimpah
6 5% 0% 0% 0% 0%
darurat darurat
Bukit
7 5% 5% 6% 70% 4% Tidak ada pagar pelindung
Tumpuan
Jumlah 100% 90% 100% 68% Kinerja Cukup
REKOMENDASI
a. Di perlukan pembabatan rumput di puncak, tanggul hulu dan tanggul hilir karena sudah terlihat cukup tebal
Pada puncak bendungan perlu ditambahkan pagar pelindung, portal masuk dan lampu penerangan sebanyak 10
b.
titik
Pintu Intake ada 2 Buah (1 m x 1,5 m) tetapi 1 pintu butuh perbaikan/ penggantian karena sudah tidak
c.
berfungsi
Di perlukan penambahan atau rehab pada jembatan hantar menuju intake karena plat betonnya putus-putus
d.
(tidak menyatu)
Pada Saluran pengeluaran di perlukan perbaikan pada dinding dan sayapnya sepanjang 50 m karena terdapat
e.
lubang dan retakan
f. Kondisi Saluran pengeluaran/ Outlet sudah banyak sedimen dan berumput tebal (tidak terawat)
Perlu perbaikan atau dibuatkan baru saluran bangunan spillway, karena bangunan yang lama sudah tidak
g.
berfungsi
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
REKOMENDASI
a. Disarankan Operator Bendungan agar lebih aktif dalam memelihara Bendungan dan Waduknya
Indeks
Bobot Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Sub Komponen Kondisi yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Kecukupan
20% Ada 75% 15% Jumlah = 1 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 22 Buah
jumlah
Kecukupan
20% Ada 90% 18% Jumlah = 4 buah
jumlah
Kecukupan
20% Ada 65% 13% Jumlah = 4 Buah
jumlah
Kecukupan
20% Ada 85% 17% Jumlah = 1 unit
jumlah
Inspeksi Besar 33% Pelaporan, 30% Tidak ada 0% 0% 0% Belum ada Isnpeksi besar
Tindak lanjut 30% Tidak ada 0% 0%
Pengukuran
50% Tidak Ada 0% 0%
Sedimentasi Sedimen
40% 0% Belum Ada
Waduk Upaya
50% Tidak Ada 0% 0%
Pencegahan
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 90% 90% 54%
dan sempadan
Kondisi
4 Sempadan dan 10% Masih Bagus
Greenbelt
Upaya
Upaya konservasi 40% 100% Tidak Ada 0% 0% 0%
konservasi
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keterangan
Komponen Komponen Keamanan dan
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan Piezometer rusak 6 buah, Belum ada curah
1 30% 67% 20%
Instrumentasi hujan
Kondisi Sempadan
4 10% 54% 5% Belum ada upaya konservasi
dan Greenbelt
REKOMENDASI
b. Di perlukan perbaikan pada piezometer karena terdapat lumpur sebanyak 6 buah (total 22 buah)
c. Di perlukan perbaikan pada v-notch karena tidak berfungsi sebanyak 3 buah (total 4 buah)
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
Tidak ada Petugas Pemantauan dan petugas
2 Petugas OP 20% 37% 7%
Keamanan
REKOMENDASI
b. Disarankan petugas pemeliharaan Bendungan agar lebih aktif dalam memelihara Bendungan dan Waduknya
d. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Blimbing
b. Alamat Bendungan : Desa Blimbing, Kec. Sambirejo, Kab. Sragen, Jawa Tengah
c. Koordinat Intake x: 07º28’417”
y: 111º04’906”
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11 12 13
Luas : 433 m x 3 m = 1299 m²
Lapis Perkerasan 41% Ada 84% 34%
Total kerusakan = 207,84 m²
Luas : 433 m x 0,30 m = 130 m²
Bahu 14% Ada 81% 11%
Total kerusakan = 24,7 m²
Tubuh Luas : (3 m x 1 m) 3 = 9 m²
1 30% Lereng Hulu 30% Jalan Inspeksi 25% Ada 79% 20% 25%
Bendungan Total kerusakan = 1,9 m²
Luas :6 m x 2 m = 12 m²
Dinding 25% Ada 95% 24%
Total kerusakan = 0,6 m²
Luas : 3 m x 2 m = 6 m²
Lantai 25% Ada 85% 21%
Total kerusakan = 0,9 m²
Menara Intake 23% 15%
Luas : 4 m x 3 m x 0,25 m = 3 m³
Atap Pelindung 25% Ada 81% 20%
Total kerusakan = 0,6 m³
Bangunan
2 20% Luas : (0,80 m x 1,5 m) x 2 = 2,4 m²
Pengambilan Stoplog 67% Ada 80% 53%
Total kerusakan = 0,48 m²
Peralatan
46% Penggerak Manual 100% Ada 90% 90% 42%
Hidromekanikal
1 2 3 4 5 = 4/75% 6 7=5x6 8
Tidak ada pagar
Tubuh
2 30% 30% 43% 63% 27% pelindung, penerangan,
Bendungan
dan parapet
Dinding pengeluaran
Bangunan
3 20% 20% 29% 80% 23% air di bawah menara
Pengambilan
intake retak-retak
Dinding dan lantai
Bangunan
4 20% 20% 29% 78% 22% saluran pengeluaran
Pengeluaran
retak dan berlubang
Bangunan
5 15% 0% 0% 0% 0% Tidak ada spillway
Pelimpah
Bendungan Tidak ada bendungan
6 5% 0% 0% 0% 0%
Pelana Pelana
REKOMENDASI
a. Pada saat kemarau ada retakan sedikit pada tanggul, jadi diperlukan penyelidikan lebih lanjut
Diperlukan perbaikan pada saluran pengeluaran karena kondisi pada dinding ada retakan ± 2 m, dan lantainya
c.
ada yang berlubang lubang sepanjang ± 30 m
d. Perlu perbaikan di bangunan intake ( dinding pengeluaran air di bawah menara intake )
e. Perlu perbaikan di tanggul hulu bagian timur karena ada penurunan dan sudah rusak sepanjang ± 79
g. Perlu perbaikan tangga di saluran outlet karena sudah retak dan pecah
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Ketersediaan 30% 0% 0%
Pelaksanaan 50% 0% 0%
Ketersediaan 20% 0% 0%
Updating 20% 0% 0%
Pola Operasi
35% Tidak ada 0%
1 Pedoman OP 20% Waduk
Sosialisasi 20% 0% 0%
Pelaksanaan 40% 0% 0%
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 24%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 80% 32% 77%
Waduk
Kepuasan komplain 3-4
20% 75% 15%
User kali /thn
1 Pedoman OP 20% 22% 4% Belum ada Manual op dan Pola Operasi Waduk
Operasi
2 30% 78% 23%
Bendungan
Layanan
3 30% 77% 23% Baru melayani untuk Irigasi
Bendungan
Rencana Tindak
4 20% 0% 0% Belum ada RTD
Darurat (RTD)
Jumlah 51% Kinerja Buruk
REKOMENDASI
a. Agar menyiapkan Kegiatan manual OP dan Pola Operasi Waduk pada Waduk Blimbing
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12
Jumlah = 1 buah (kurang 1
Kecukupan jumlah 20% Ada 50% 10%
bh)
Inspeksi berkala
33% Pelaporan, 30% Ada 65% 20% 23%
2 Inspeksi 30% biasa
Pengukuran
50% tidak ada 0% 0%
Kualitas Air
Kualitas Air Waduk 30% 0% Belum Ada
Upaya Pencegahan 50% tidak ada 0% 0%
Pengukuran
50% Ada 55% 28%
Sedimentasi Sedimen
30% 17% Tidak rutin
Waduk
Upaya Pencegahan 50% Ada 55% 28%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 85% 85% 51%
dan sempadan
Kondisi
4 Sempadan dan 10% Masih Bagus
Greenbelt
Di Tubuh
35% Ada 80% 28%
Bendungan
Aktivitas
Masyarakat Sekitar 50% Di Waduk 35% Ada 75% 26% 38%
Masyarakat Waduk Di tepi
5 10% 30% Ada 70% 21%
Sekitar Waduk waduk/greenbelt
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 37% 11% Hanya Ada peilschal
Instrumentasi
Kondisi Sempadan
4 10% 51% 5% Belum ada upaya konservasi
dan Greenbelt
Masyarakat Sekitar
5 10% 38% 4%
Waduk
Jumlah 100% 43% Kinerja Buruk
REKOMENDASI
b. Agar melakukan pengukuran kualitas air waduk dan upaya untuk pencegahan tercemarnya air waduk
Rencana
20% Ketersediaan 50% Ada 90% 45%
Strategis
18%
Pelaksanaan 50% Ada 85% 43%
Kecukupan
25% 50% Ada 90% 45%
Jumlah
Petugas Operasi 21%
Kompetensi 50% Ada 80% 40%
Petugas Kecukupan
25% 50% Tidak ada 0% 0%
Pemantauan Jumlah
0%
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Petugas Kecukupan
25% 50% Ada 85% 43%
Pemeliharaan Jumlah
22%
Kompetensi 50% Ada 90% 45%
Petugas Kecukupan
25% 50% Tidak ada 0% 0%
Keamanan Jumlah
0%
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 80% 40%
Jumlah
Gedung/kantor 20% 16%
Kondisi
50% Ada 75% 38%
Gedung
Kecukupan
50% Ada 70% 35%
Peralatan Jumlah
20% 14%
Operasi Kondisi
50% Ada 65% 33%
peralatan
Kecukupan
50% Ada 70% 35%
Peralatan Jumlah
Sarana dan 20% 14%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 65% 33%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
e. Agar selalu menyiapkan suku cadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Kembangan
b. Alamat bendungan : Desa Kembangan, Kec.Karang malang, Kab. Sragen, Provinsi Jawa
tengah
c. koordinat intake X : 07°28’152’’
Y : 111°04’090’’
2.Riwayat Penanganan :
3.Data Inventarisasi
a. Rip – rap tanggul hulu bagian timur dan selatan sudah berantakan & banyak rumput
b. Cable strange / seling untuk mengangkat pintu bantu putus
c. Rip – rap di tanggul hilir ada yang berantakan (bagian utara)
d. Butuh talud di saluran pengeluaran (dinding kiri)
e. Piezometer ada 35 buah (Yang baru 11 buah) ± 10 buah yang rusak dari tahun 2012
f. Patok geser ada 24 buah, yang baru ada 15 buah (tahun 2016)
g. Butuh Pengecatan pintu intake, rumah intake, dan patok pembatas
h. Ada kebocoran di saluran kaki tanggul hilir (utara)
i. Pintu penguras lumpur sudah rusak/tidak berfungsi
j. Belum ada rumah jaga, dan perlengkapannya
k. Butuh Penerangan di puncak tanggul
l. Butuh peralatan untuk pemeliharaan seperti : sepatu, cangkul, sabit, garpu, dsg.
m. Belum ada Curah hujan
n. Sedimentasi tinggi di bangunan v-notch, inlet & saluran pengeluaran
o. Paving block di puncak tanggul sudah bergelombang
p. Rip – rap di bagian atas tanggul hulu utara & barat butuh perapihan / pasang talud
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 =7 x 9 11 12 13
Tubuh
1 30%
Bendungan
Luas : 1.590 m x 10 m = 15.900 m²
Lapis Pelindung 67% Ada 78% 52%
Total kerusakan = 3498 m²
Luas : 12 m x 1,5 m = 18
Jalan Inspeksi 20% Ada 80% 16%
m² Total kerusakan = 3,6
Lereng Hilir 30% 24% m²
Luas : 3 m x 3 m x 3 m = 27
Dinding 25% Ada 84% 21%
m³ Total kerusakan = 4,32
m³
Luas : 3 m x 3 m = 9 m²
Lantai 25% Ada 87% 22%
Menara Intake 23% 14% Total kerusakan = 1,17 m²
Peralatan
46% Penggerak Manual 100% Ada 65% 65% 30%
Hidromekanikal
Bangunan Luas : 30 m x 2 m = 60 m²
3 20% Dinding 33% Ada 75% 25%
Pengeluaran Total kerusakan = 15 m²
Bangunan
3 20% 20% 29% 82% 23% Pintu penguras rusak
Pengeluaran
Bangunan
4 15% 0% 0% 0% 0% Tidak ada spillway
Pelimpah
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
Pelimpah Tidak ada bangunan pelimpah
6 5% 0% 0% 0% 0%
darurat darurat
Bukit
7 5% 0% 0% 0% 0% Tidak Ada Bukit Tumpuan
Tumpuan
REKOMENDASI
Di perlukan perbaikan Rip-rap di tanggul hulu bagian timur dan selatan karena sudah berantakan & banyak
a.
rumput
b. Di perlukan perbaikan Rip - rap di tanggul hillir karena ada yang berantakan ( bagian Utara )
c. Di perlukan perbaikan pada Cable strangge / seling untuk mengangkat pintu bantu yg putus
e. Di perlukan perbaikan saluran drainase di kaki tanggul hilir ( utara ) karena ada kebocoran
f. Di perlukan perbaikan pada pintu penguras lumpur yang sudah rusak / tidak berfungsi
g. Perlu dilakukan perbaikan paving block di puncak tanggul yang sudah bergelombang
h. Perlu dilakukan perapihan rip - rap di bagian atas tanggul hulu utara & barat / pasang talud
i. Perlu dilakukan pengecatan pintu intake, rumah intake, dan patok pembatas
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11
Pelaksanaan
70% Ada 75% 53%
Operasi operasi
40% 29%
Normal
Uji Operasi 30% Ada 65% 20%
Pelaksanaan
70% Ada 75% 53%
Operasi Operasi Operasi
2 30% 30% 22%
Waduk Darurat
Uji Operasi 30% Ada 65% 20%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 70% 28% 73%
Waduk
Kepuasan komplain 3-4
20% 75% 15%
User kali /thn
Lokasi
Buku RTD 35% 30% tidak ada 0% 0% 0%
Penyimpanan
Rencana Tindak
4 20% 0% 0% Belum ada RTD
Darurat (RTD)
Jumlah 60% Kinerja Kurang
REKOMENDASI
b. Perlu dilakukan penyesuaian Standar Operasional dan Prosedur (SOP) agar pelaksanaanya sesuai kondisi terkini
c. Perlu dilakukan uji operasi secara berkala sehingga dapat menjadi acuan dalam pelaksanaan operasi
Indeks
Bobot Bobot Sub Bobot Ada / Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10=7 x 9 11 12 13
Kecukupan
20% Ada 90% 18% Jumlah = 4 buah
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 35 buah
jumlah
Kecukupan
Hasil Pengamatan 20% Ada 50% 10% Jumlah = 1 buah (Rusak)
1 30% jumlah
Instrumentasi
Kondisi alat tertutup
Kondisi alat 30% Ada 0% 0%
Rembesan (V- sedimen
23% 9%
Notch)
Hasil Pengamatan 40% Ada 60% 24%
Kecukupan
20% Ada 100% 20% Jumlah = 24 buah
jumlah
Kecukupan
20% Tidak ada 0% 0%
jumlah
Pengukuran
50% Ada 55% 28%
Sedimentasi Sedimen
40% 22% 1 kali dalam 5 tahun
Waduk Upaya
50% Ada 55% 28%
Pencegahan
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keamanan dan
Keterangan
Komponen Komponen
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan Piezometer dan V-notch ada yang sudah rusak,
1 30% 52% 16%
Instrumentasi tidak ada curah hujan
c. Disarankan untuk pemasangan alat curah hujan minimal 1 unit dan petugas pemantaunya
Agar melakukan pengukuran kualitas air waduk dan upaya untuk pencegahan tercemarnya air waduk secara rutin(2
e.
kali pertahun di 3 titik pemantauan)
f. Agar melakukan pengukuran sedimentasi waduk dan upaya untuk pencegahannya secara rutin ( 1kali pertahun)
Rencana
20% Ketersediaan 50% Ada 100% 50%
Strategis
19%
Pelaksanaan 50% Ada 85% 43%
Kecukupan
50% Ada 90% 45%
Petugas Jumlah
25% 21%
Operasi
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 65% 33%
Petugas Jumlah
25% 18%
Pemeliharaan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Dokumen
30% Kelengkapan 60% Ada 75% 45%
Perencanaan
23%
Lokasi
40% Ada 75% 30%
Penyimpanan
Dokumen
30% Kelengkapan 60% Ada 75% 45%
Pelaksanaan
3 Dokumen OP 20% 23%
Lokasi
40% Ada 75% 30%
Penyimpanan
Kecukupan
50% Ada 80% 40%
Jumlah
Gedung/kantor 20% 16%
Kondisi
50% Ada 80% 40%
Gedung
Kecukupan
50% Ada 50% 25%
Peralatan Jumlah
20% 12%
Operasi Kondisi
50% Ada 65% 33%
peralatan
Kecukupan
50% Ada 50% 25%
Peralatan Jumlah
Sarana dan 20% 11%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
d. Agar selalu menyiapkan suku cadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Ketro
b. Alamat bendungan : Desa Ketro, Kec.Tanon, Kab.Sragen, Provinsi Jawa Tengah
c. Koordinat intake X: 07°22’806’’
Y: 110°54’243’’
2. Riwayat Penanganan : - Pengaspalan tanggul, Perbaikan Rip-rap dan perbaikan Peizometer
3. Data Inventarisasi
a. Peilschaal rusak 4 bh ( tidak ada yang baik )
b. Pintu penguras tidak bisa diangkat karna tertumpuk sedimen
c. Pintu intake sebelah kanan rusak ( bocor / tidak rapat )
d. Pintu / pagar tralis pelindung rumah intake sudah rusak
e. Tingginya Sedimentasi di dekat tanggul hulu
f. Peilschaal digital sudah tidak berfungsi
g. Papan peringatan sudah rusak (butuh penggantian/perbaikan)
h. Perlunya Lampu penerangan ± 6 titik, Untuk Pengecekan pada malam hari
i. Peizometer masih berfungsi sebanyak 15 buah.
j. Air Bersumber dari Tadah hujan, kali ketro sdh tdk berfungsi.
Indeks
Bobot Bobot Sub Bobot
No Komponen Sub Komponen Elemen Penilaian Keterangan Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 1.200 m x 4 m = 4.800 m²
Lapis Perkerasan 33% Ada 85% 28%
Total kerusakan = 720 m²
Luas : (1.200 m x 0,25 m) x 2 =
Bahu 11% Ada 78% 9% 600 m²
Total kerusakan = 132 m²
Luas : 1.200 m x 0,15 m x 0,15 m
Parapet 11% Ada 82% 9% = 27 m ³
Total kerusakan = 4,86 m³
Luas : (0,50x0,25x0,25) x 482
Guard rail 9% Ada 84% 7% = 15,06 m³
Puncak 40% 24%
Total kerusakan = 2,41 m³
Luas : 12 m x 1,5 m = 18 m²
Lereng Hulu 30% Jalan Inspeksi 25% Ada 76% 19% 25% Total kerusakan = 4,32 m²
Luas : 7 m x 4 m x 8 m = 224 m³
Dinding 25% Ada 75% 19%
Total kerusakan = 56 m³
Luas : 7 m x 4 m = 28 m²
Bangunan Lantai 25% Ada 80% 20%
Total kerusakan = 5,6 m²
2 20%
Pengambilan Menara Intake 19% 14% Luas : 2 m x 3 m x 0,15 m = 0,9
Atap Pelindung 25% Ada 77% 19% m³ Total
kerusakan = 0,21 m³
Luas : 0,30 m x 6 m = 1,8 m²
Tangga inspeksi 25% Ada 73% 18%
Total kerusakan = 0,49 m²
Peralatan
38% Penggerak Manual 100% Ada 65% 65% 24%
Hidromekanikal
Luas : 56 m x 2 m = 112 m²
Dinding 25% Ada 80% 20%
Total kerusakan = 22,4 m²
Bangunan Luas : 10 m x 12 m = 120 m²
3 20% Lantai 25% Ada 75% 19%
Pengeluaran Total kerusakan = 30 m²
Bangunan
25% Tangga inspeksi 25% Tidak Ada 0% 0% 15%
Pelindung
Luas : (4 m x 2 m x 0,15 m) x 2 =
Atap Pelindung 25% Ada 83% 21% 2,4 m³
Total kerusakan = 0,41 m³
Luas : 8 m x 3 m = 24 m²
Plat jembatan 25% Ada 95% 24%
Total kerusakan = 1,2 m²
Jembatan 7% 6%
Gelagar 33% Ada 100% 33%
1 2 3 4 5 = 4/90% 6 7=5x6 8
REKOMENDASI
a. Di perlukan pengerukan sedimen di Pintu penguras karena tidak bisa di angkat karna tertumpuk sedimen
b. Di perlukan rehab di pintu intake (1 m x 1,5 m)sebelah kanan rusak ( bocor/ tidak rapat )
c. Di perlukan perbaikan pada pintu / pagar tralis pelindung rumah intake yang sudah rusak
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 24%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 70% 28% 73%
Waduk
Kepuasan komplain 3-4
20% 75% 15%
User kali /thn
Lokasi
Buku RTD 35% 30% Tidak ada 0% 0% 0%
Penyimpanan
1 2 3 4 5=3x4 6
Operasi
2 30% 78% 23%
Bendungan
Layanan
3 30% 73% 22% Baru melayani untuk Irigasi
Bendungan
Rencana Tindak
4 20% 0% 0% Belum Ada RTD
Darurat (RTD)
Jumlah 61% Kinerja Kurang
REKOMENDASI
b. Disarankan Operator Bendungan agar lebih aktif dalam memelihara Bendungan dan Waduknya
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10= 7 x 9 11 12 13
Kecukupan
20% Ada 90% 18% Jumlah = 4 buah
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 15 buah
jumlah
Kecukupan
20% Ada 90% 18% Jumlah = 3 buah
jumlah
Kecukupan
20% Ada 65% 13% Jumlah = 3 buah
jumlah
Kecukupan
20% Tidak ada 0% 0%
jumlah
Inspeksi berkala
25% Pelaporan, 30% Ada 70% 21% 18%
biasa
2 Inspeksi 30%
Pelaksanaan: 40% Tidak ada 0% 0%
Pemeriksaan Luar
25% Pelaporan, 30% Ada 70% 21% 18%
Biasa
Pengukuran
50% Ada 55% 28%
Sedimentasi Sedimen
40% 22% 1 kali dalam 5 tahun
Waduk Upaya
50% Ada 55% 28%
Pencegahan
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 80% 80% 48%
Kondisi Sempadan dan sempadan
4 10%
dan Greenbelt
Upaya konservasi 40% Upaya konservasi 100% tidak ada 0% 0% 0%
Di Tubuh
35% Ada 50% 18% Akses jalan warga (motor)
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 55% 19% 28% Pemancingan
Sekitar Waduk
Masyarakat Di tepi
5 10% 30% Ada 65% 20%
Sekitar Waduk waduk/greenbelt
Hubungan dengan
masyarakat
Pelibatan
50% 100% tidak ada 0% 0% 0%
Masyarakat
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keterangan
Komponen Komponen Keamanan dan
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 52% 15% V-notch rusak semua, curah hujan tidak ada
Instrumentasi
Kondisi Sempadan
4 10% 48% 5% Belum ada upaya konservasi
dan Greenbelt
REKOMENDASI
a. Perlu dilakukan perbaikan pada V-Notch Sebanyak 3 buah karena tidak berfungsi
c. Di sarankan untuk melakukan perbaikan pada peilschaal digital yag sudah tidak berfungsi
Perlu dilakukan pengukuran kualitas air waduk (2 kali pertahun di 3 titik pemantauan) dan pengukuran sedimen(1
e
kali pertahun) secara rutin
f. Perlu dilakukan pengerukan di dekat tanggul hulu karena sedimentasi sudah tinggi
Unit
1 Pengelola 40% Staff 30% Ada 100% 30%
Bendungan
Kinerja UPB 20% Pelaporan 100% Ada 85% 85% 17%
Rencana
20% Ketersediaan 50% Ada 100% 50%
Strategis
19%
Pelaksanaan 50% Ada 85% 43%
Kecukupan
25% 50% Ada 85% 43%
Petugas Jumlah
21%
Operasi
Kompetensi 50% Ada 85% 43%
Kecukupan
25% 50% Tidak ada 0% 0%
Petugas Jumlah
0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
25% 50% Ada 65% 33%
Petugas Jumlah
17%
Pemeliharaan
Kompetensi 50% Ada 70% 35%
Kecukupan
25% 50% Tidak ada 0% 0%
Petugas Jumlah
0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 90% 45%
Jumlah
Gedung/kantor 20% 18%
Kondisi
50% Ada 90% 45%
Gedung
Kecukupan
50% Ada 70% 35%
Peralatan Jumlah
20% 14%
Operasi Kondisi
50% Ada 65% 33%
peralatan
Kecukupan
50% Ada 60% 30%
Peralatan Jumlah
20% 12%
Sarana dan Pemeliharaan Kondisi
4 20% 50% Ada 55% 28%
Prasarana peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
Tidak ada Petugas Pemantauan dan petugas
2 Petugas OP 20% 38% 8%
Keamanan
3 Dokumen OP 20% 75% 15% Dokumen belum disediakan di lokasi
Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharan yang sudah
b.
rusak
1. Data Umum
a. NamaBendungan : Telaga pasir
b. Alamat bendungan : Desa sarangan, Kec.plaosan, Kab.Magetan, Jawa timur
c. Koordinat intake X: 07°40’782’’
Y: 111°13’155’’
3. Data Inventarisasi
a. Area selatan – barat tanggul/dinding hulu telaga banyak yang berlubang dan retak
b. Di lereng/dinding hulu telaga banyak tumbuhan liar yang sulit untuk dibersihkan
c. Peilschaal rusak 1 buah dan butuh penambahan 1 buah
d. Di atas saluran outlet sudah ada bangunan (warung dan rumah warga)
e. Butuh pelampung dan alat keamanan lainnya untuk pembabatan/ pembersihan tumbuhan
liar di lereng hulu
f. Butuh alat dan perlengkapan pemeliharaan Seperti :
- Sepatu bot (5 Buah)
- Jas Hujan
- Sabit, Golok, Garpu dan perlengkapan lainnya
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 2.250 m x 4 m = 9000 m²
Lapis Perkerasan 33% Ada 85% 28%
Total kerusakan = 1350 m²
Luas : (3 m x 2 m) x 2 = 12 m²
Lantai 25% Ada 75% 19%
Total kerusakan = 3 m²
Menara Intake 23% 12%
Luas : 4 m x 3 m x 0,15 m = 1,8 m³
Atap Pelindung 25% Ada 70% 18%
Total kerusakan = 0,5 m³
Luas : (0,30 m x 10 m) x 2 = 6 m²
Tangga inspeksi 25% Ada 68% 17%
Total kerusakan = 1,92 m²
Bangunan
2 20%
Pengambilan Luas : (1 m x 1,5 m) x 2 = 3 m²
Stoplog 67% Ada 75% 50%
Total kerusakan = 0,75 m²
Pintu Intake 31% 23%
Luas : (1 m x 5 m) x 2 = 10 m²
Trashrack 33% Ada 75% 25%
Total kerusakan = 1,5 m²
Peralatan
46% Penggerak Manual 100% Ada 85% 85% 39%
Hidromekanikal
Bangunan
3 20% Dinding 33% Ada 75% 25%
Pengeluaran
Bangunan
25% Lantai 33% Ada 70% 23% 12%
Pelindung
1 2 3 4 5 = 4/90% 6 7=5x6 8
Tubuh
1 30% 30% 35% 77% 27%
Bendungan
Bangunan
2 20% 20% 24% 75% 18% Tangga inspeksi berkarat
Pengambilan
Bangunan
3 20% 20% 24% 67% 16% Tidak ada tangga inspeksi
Pengeluaran
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
REKOMENDASI
a. Di perlukan perbaikan pada area selatan – barat tanggul/dinding hulu telaga banyak yang berlubang dan retak
Di sarankan untuk melakukan pembabatan di lereng/dinding hulu telaga yang banyak tumbuhan liar yang sulit untuk
b.
dibersihkan
c. Disarankan untuk menertibkan bangunan di atas saluran outlet (warung dan rumah warga)
Indeks
Bobot Sub Bobot Sub Bobot
No Komponen Elemen Penilaian Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 24%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Layanan
3 30% Irigasi 100% Kualitas Air 40% Ada 85% 34% 87%
Waduk
Lokasi
Buku RTD 35% 30% Ada 75% 23% 26%
Penyimpanan
1 2 3 4 5=3x4 6
Belum ada Manual OP dan Pola Operasi
1 Pedoman OP 20% 22% 4%
Waduk
Layanan
3 30% 87% 26% Baru melayani untuk Irigasi
Bendungan
REKOMENDASI
a. Agar Menyiapkan Kegiatan Manual OP dan Pola Operasi Waduk di Bendungan Telaga Pasir
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11 12 13
Kecukupan
20% Ada 50% 10% Jumlah = 1 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 4 buah
jumlah
Kecukupan
20% Tidak ada 0% 0%
jumlah
Hidroklimatologi 20% 0%
Hasil Pengamatan 40% Tidak ada 0% 0%
Pengukuran
50% Tidak Ada 0% 0%
Sedimen
Sedimentasi Waduk 40% 0%
Upaya
50% Tidak Ada 0% 0%
Pencegahan
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 85% 85% 51%
Kondisi Sempadan dan sempadan
4 10% Masih Bagus
dan Greenbelt
Upaya konservasi 40% Upaya konservasi 100% Tidak Ada 0% 0% 0%
Di Tubuh
35% Ada 50% 18%
Bendungan
Aktivitas
Pariwisata (Mobil dan motor
Masyarakat Sekitar 50% Di Waduk 35% Ada 50% 18% 25%
bisa lewat)
Waduk
Di tepi
30% Ada 50% 15%
waduk/greenbelt
Masyarakat Sekitar
5 10%
Waduk
Kondisi Sempadan
4 10% 51% 5% Kurangnya Upaya Konservasi
dan Greenbelt
REKOMENDASI
Agar melakukan pengukuran kualitas air waduk(2 kali pertahun di 3 titik pemantauan) dan upaya untuk
e.
pencegahan tercemarnya air waduk
f. Disarankan juga melakukan pengukuran sedimen di waduk (1 kali pertahun) secara rutin
Kecukupan
50% Cukup 80% 40%
Jumlah
Petugas Operasi 25% 19%
Kompetensi 50% Cukup 75% 38%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 65% 33%
Petugas Jumlah
25% 17%
Pemeliharaan
Kompetensi 50% Ada 70% 35%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 90% 45%
Jumlah
Gedung/kantor 20% 17%
Kondisi Gedung 50% Ada 75% 38%
Kecukupan
50% Ada 60% 30%
Jumlah
Peralatan Operasi 20% 12%
Kondisi
50% Ada 55% 28%
peralatan
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
Sarana dan 20% 13%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
REKOMENDASI
Di sarankan untuk pengadaan pelampung dan alat keamanan lainnya untuk pembabatan/ pembersihan
b.
tumbuhan liar di lereng hulu
Di perlukan alat dan perlengkapan pemeliharaan, Sepatu bot (5 Buah), Jas Hujan, Sabit, Golok, Garpu dan
c.
perlengkapan lainnya
1. Data Umum
a. Nama Bendungan : Gonggang
b. Alamat bendungan : Desa poncol dan Desa Janggan, Kec.poncol, Kab.magetan,Jawa timur
c. Koordinat intake X: 07°43’647’’
Y: 111°15’190’’
3. Data Inventarisasi
a. Pintu intake sudah rusak, ada 3 pintu :
- Pintu untuk irigasi (24 Ø pulp )
- Pintu untuk PDAM (8 Ø pulp)
- Pintu untuk pembilas / penguras (6 Ø pulp)
b. Pintu pulp dirumah katup (2 buah) 60 Ø ada kebocoran disambungan las
c. Ada erosi diatas tangga spillway
d. Dinding rumah instrument ada retakan
e. Saluran pengeluaran butuh penambahan talud/pasangan batu
f. Jumlah Peizometer ada 23 buah ( 5 buah stand pipe, 18 buah Pneumatic)
g. Patok geser ada 21 buah, tetapi tinggal 16 buah
h. Jumlah Peilschaal ada 2 buah (kondisi baik)
Indeks
Bobot Bobot Sub Bobot Ada/Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 241 m x 3 m = 723 m²
Lapis Perkerasan 37% Ada 95% 35%
Total kerusakan = 36,15 m²
Luas : (241 m x 0,30 m) x 2 = 144,6 m²
Bahu 12% Ada 88% 11%
Total kerusakan = 17,352 m²
Luas : (241 m x 0,15 m x 0,15 m) x 2 =
Parapet 12% Ada 83% 10% 10,85 m ³
Total kerusakan = 1,84 m³
Puncak 40% 36% Luas : (0,8 m x 0,2 x 0,2) x 5 = 0,16 m
Patok HM/BM 10% Ada 90% 9%
Total kerusakan = 0,02 m
Lantai hulu 13% Lapis Beton 100% Ada 85% 85% 11%
Peredam Energi 27% Kolam Terjunan 35% Ada 85% 30% 22%
Luas : 45 m x 1 m = 45
Plat jembatan 19% Ada 98% 18%
m² Total kerusakan = 0,9
m²
Jembatan 7% 7%
Gelagar 25% Ada 100% 25%
Tumpuan Kiri 50% Saluran Drainase 30% Ada 75% 23% 31%
Tumpuan Kanan 50% Saluran Drainase 30% Ada 85% 26% 33%
1 2 3 4 5 = 4/90% 6 7=5x6 8
Tubuh
1 30% 30% 33% 84% 28%
Bendungan
Bangunan
2 20% 20% 22% 72% 16%
Pengambilan
Pintu pengeluaran untuk
Bangunan
3 20% 20% 22% 63% 14% irigasi, PDAM dan Penguras
Pengeluaran
sudah rusak
Bangunan
4 15% 15% 17% 88% 15%
Pelimpah
Bendungan Tidak ada bendungan
5 5% 0% 0% 0% 0%
Pelana Pelana
Pelimpah Tidak ada bangunan
6 5% 0% 0% 0% 0%
darurat pelimpah darurat
Bukit
7 5% 5% 6% 64% 4% Belum ada pagar pelindung
Tumpuan
Jumlah 100% 90% 100% 76% Kinerja Cukup
REKOMENDASI
Di perlukan perbaikan pada pintu intake sudah rusak, ada 3 pintu, Pintu untuk irigasi (24Ø pulp ), Pintu untuk
a.
PDAM (8 Ø pulp), Pintu untuk pembilas / penguras (6Ø pulp)
b. Perlu dilakukan perbaikan di pintu pulp dirumah katup (2buah) 60Ø yang ada kebocoran disambungan las
e. Pengecekan dan perbaikan erosi diatas tangga spillway dan diatas rumah katup Butterfly
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 24%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Layanan
3 30% Irigasi 100% Kualitas Air 40% tercapai 70% 28% 73%
Waduk
Kepuasan komplain 3-
20% 75% 15%
User 4 kali /thn
Lokasi
Buku RTD 35% 30% Tidak ada 0% 0% 0%
Penyimpanan
b. Disarankan Juga Untuk segera Menyiapkan Kegiatan Rencana Tindak Darurat di Bendungan Gonggang
c. Agar menyiapkan juga petugas darurat dan komunikasi dalam keadaan darurat
Indeks
Bobot Sub Bobot Sub Elemen Bobot Ada/Tidak
No Komponen Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Komponen Penilaian Elemen Ada Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Kecukupan
20% Ada 100% 20% Jumlah = 2 buah
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 6 buah
jumlah
Air Tanah Kondisi alat 30% Ada 83% 25% Kondisi alat rusak 1
(Observation 10% 8%
Hasil
Well) 40% Ada 75% 30%
Pengamatan
Kecukupan
20% Ada 90% 18% Jumlah = 5 buah stand pipe
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 18 buah
jumlah
Tekanan Air Kondisi alat 30% Ada 67% 20% Rusak 6 Buah
Pori
15% 12%
(Piezometer Hasil
40% Ada 80% 32%
Pneumatic) Pengamatan
Kecukupan
20% Ada 95% 19% Jumlah = 21 buah
jumlah
Deformasi Kondisi alat 30% Ada 76% 23% Kondisi alat rusak 5
Eksternal 15% 6%
Hasil
(Patok Geser) 40% Tidak ada 0% 0%
Pengamatan
Kecukupan
jumlah 20% Ada 85% 17% Jumlah = 2 buah
Deformasi
Kondisi alat 30% Ada 90% 27%
Eksternal
10% Hasil 8%
(Multilayer 40% Ada 70% 28%
Settlement) Pengamatan
Pelaporan 10% Ada 70% 7%
Kecukupan
20% Ada 0% 0%
jumlah
Hubungan
Pelibatan
dengan 50% 100% Tidak Ada 0% 0% 0%
Masyarakat
masyarakat
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keamanan dan
Keterangan
Komponen Komponen
Lingkungan
1 2 3 4 5=3x4 6
REKOMENDASI
Agar melakukan pengukuran kualitas air Waduk ( 2 kali pertahun di 3 titik pemantauan) dan upaya untuk
c.
pencegahan tercemarnya air waduk secara rutin
Agar melakukan pengukuran sedimen ( 1 kali pertahun) dan upaya untuk pencegahan tercemarnya air waduk
d.
secara rutin
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Kecukupan
Petugas 50% Ada 90% 45%
25% Jumlah 22%
Operasi
Kompetensi 50% Ada 85% 43%
Kecukupan
Petugas 50% Tidak ada 0% 0%
Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 65% 33%
Petugas Jumlah
25% 18%
Pemeliharaan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 80% 40%
Jumlah
Gedung/kantor 20% 16%
Kondisi
50% Ada 80% 40%
Gedung
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 13%
Operasi Kondisi
50% Ada 60% 30%
peralatan
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
Sarana dan 20% 12%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
Tidak ada Petugas Pemantauan dan petugas
2 Petugas OP 20% 40% 8%
Keamanan
REKOMENDASI
b. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Dawuhan
b. Alamat bendungan : Desa Sidomulyo dan Desa Plumpungrejo, Kec.Wonosari,
Kab.Madiun, Jawa timur
c. Koordinat intake X: 07°35’712’’
Y: 111°37’709’’
2. Riwayat Penanganan :
3. Data Inventarisasi
a. Ada retakan dan Kebocoran pada dinding outlet
b. Pintu outlet sudah rusak dan bocor (sejak tahun 2016)
c. Belum ada lampu penerangan di bangunan intake & jalan inspeksi
d. Disaluran spillway ada kebocoran & rembesan
e. Dibagian hulu tubuh bendungan banyak tumbuhan rumput
f. Kondisi Air waduk keruh/berwarna orange
g. Peizometer ada 6 titik tetapi sudah tidak berfungsi semua
h. Butuh Perbaikan peilschaal yang diluar
i. Jumlah V-Notch ada 2 buah
j. Patok geser ada 10 buah
k. Curah hujan ada 2 unit
l. Peilschaal ada 2 buah ( 1 buah sudah rusak)
Keterangan penjaga :
- Kunci pintu intake dipegang oleh orang PU Perairan
Indeks
Bobot Bobot Sub Elemen Bobot Ada /
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Tidak ada Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Tubuh
1 30%
Bendungan Luas : 860 m x 5 m = 4.300 m2
Lapis Pelindung 40% Ada 78% 31%
Total kerusakan = 946 m2
Luas : 2 m x 1.5 m= 3 m2
Abutmen 15% Ada 87% 13%
Total kerusakan = 0.39 m2
Luas : 16 m x 1.5 m= 24 m2
Plat jembatan 15% Ada 80% 12%
Total kerusakan = 4.8 m2
Luas : 30 x 1.5 m = 45 m2
Jembatan Hantar 19% Gelagar 20% Ada 75% 15% 12% Total kerusakan = 11.25 m2
Luas : 18 m x 1m = 18 m2
Kolom/tiang 20% Ada 85% 17%
Total kerusakan = 2.7 m2
Luas : 0.3 x 10 m= 3 m2
Tangga inspeksi 25% Ada 68% 17%
Total kerusakan = 0.96 m2
Peralatan Penggerak
38% 100% Ada 85% 85% 32%
Hidromekanikal Manual
Bangunan
3 20%
Pengeluaran
Luas : 50 m x 5 m= 250 m2
Dinding 25% ada 87% 22%
Total kerusakan = 32.5 m2
Luas : 5 m x 3 m = 15 m2
Kolam Olak 35% Ada 65% 23%
Total kerusakan = 5.25 m2
Luas : 5 m x 10 m = 50
Peredam Energi 29% Kolam Terjunan 35% Ada 62% 22% 17%
m2 Total kerusakan = 19
m2
Luas : 10 m x 25 m = 250
Kolam Loncat 30% Ada 45% 14%
m2 Total kerusakan = 137.5
m2
Nilai Kinerja
Bobot Bobot Bobot Nilai
No Komponen Fisik Keterangan
Komponen Indikator Baru Komponen Bendungan
1 2 3 4 5 = 4/90% 6 7=5x6 8
REKOMENDASI
a. Perlu Perbaikan di dinding saluran pengeluaran karena ada retakan dan Kebocoran
b. Diperlukan Perbaikan /penggantian Pintu outlet karena sudah rusak dan bocor (sejak tahun 2016)
c. Butuh perbaikan di saluran pengeluaran pelimpah karena ada kebocoran & rembesan pada lantai dan dinding
d. Belum ada lampu penerangan di bangunan intake & jalan inspeksi ( 15 titik)
e. Butuh pemeliharaan Dibagian hulu tubuh bendungan karena banyak tumbuhan rumput
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Ketersediaan 30% 0% 0%
Pelaksanaan 50% 0% 0%
Ketersediaan 20% 0% 0%
Updating 20% 0% 0%
Pola Operasi
35% Tidak ada 0%
1 Pedoman OP 20% Waduk Sosialisasi 20% 0% 0%
Pelaksanaan 40% 0% 0%
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 24%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Lokasi
Buku RTD 35% 30% Ada 75% 23% 26%
Penyimpanan
Operasi
2 30% 78% 23%
Bendungan
Layanan
3 30% 73% 22% Baru melayani untuk Irigasi
Bendungan
a. Agar melakukan sosialisasi dan simulasi untuk kesiapsiagaan darurat secara rutin
b. Agar menyiapkan petugas darurat dan Sistem komunikasi dalam keadaan darurat
Indeks
Bobot Bobot Sub Elemen Bobot Ada / Tidak
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Kecukupan
20% Ada 80% 16% Jumlah = 2 buah
jumlah
Kecukupan
20% Ada 75% 15% jumlah = 6 buah
jumlah
Kecukupan
20% Ada 95% 19% Jumlah = 2 buah
jumlah
Pada saat kemarau tidak
Hasil Pengamatan Kondisi alat 30% Ada 70% 21%
1 30% Rembesan (V- keluar air
Instrumentasi 23% 18%
Notch) Hasil
40% Ada 80% 32%
Pengamatan
Kecukupan
20% Ada 80% 16% Jumlah = 10 buah
jumlah
Kecukupan
20% Ada 100% 20% Jumlah = 2 unit
jumlah
Kondisi alat 30% Ada 85% 26%
Hidroklimatologi 15% Hasil 13%
40% Ada 80% 32%
Pengamatan
Pelaporan 10% Ada 80% 8%
Pengukuran
50% tidak ada 0% 0%
Sedimentasi Sedimen
40% 0%
Waduk Upaya
50% tidak ada 0% 0%
Pencegahan
Kondisi grenbelt
60% Kondisi vegetasi 100% ada 85% 85% 51%
dan sempadan
Kondisi Sempadan
4 10% Masih Bagus
dan Greenbelt
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keamanan dan
Keterangan
Komponen Komponen
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 66% 20% Instrument sudah ada yang Rusak
Instrumentasi
REKOMENDASI
c. Perlu pengecekan Bangunan V-Notch yang tidak keluar Air pada saat kemarau (2 unit)
d. Disarankan untuk pengukuran kualitas air waduk (2 kali pertahun di 3 titik pemantauan)
Kecukupan
50% Ada 90% 45%
Jumlah
Petugas Operasi 25% 22%
Kompetensi 50% Ada 85% 43%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 60% 30%
Petugas Jumlah
25% 18%
Pemeliharaan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 70% 35%
Jumlah
Gedung/kantor 20% 12%
Kondisi
50% ada 50% 25%
Gedung
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
20% 11%
Operasi Kondisi
50% Ada 50% 25%
peralatan
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
Sarana dan 20% 11%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 55% 28%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
b. Diharapkan Petugas Operasi dan Pemeliharaan lebih Aktif Lagi dalam Menjaga Bendungan dan Waduknya
Agar selalu menyiapkan suku cadang dan segera memperbaiki/mengganti peralatan operasi dan pemeliharaan
d.
yang rusak
A. UMUM
1 No Registrasi Bendungan :
2 Nama Bendungan : Bendungan saradan
3 Alamat Bendungan : Ds. Saradan kec.saradan kab.madiun
4 Pemilik :
5 Pengelola :
6 Konstruksi : 1942
- Mulai :
- Selesai :
7 curah hujan tahunan :
8 luas daerah aliran :
B. DATA WADUK
1 Nama Sungai Utama : lemah bang, ulo, kali mati
2 Luas Daerah Tangkapan Air :
3 Elevasi Muka Air :
- Elevasi Muka Air Banjir (FWL) : 117,90 m
- Elevasi Muka Air Normal ( NWL ) : 117,50 m
- Elevasi Muka Air Minimum ( LWL ) : 113,00 m
4 Luas Genangan Air Waduk :
- Pada Muka Air Banjir : 103 ha
- Pada Muka Air Normal : 80 ha
- Pada Muka Air Minimum : 73 ha
5 Kapasitas Tampung Waduk :
- Pada Muka Air Banjir : 2,40 jt m3
- Pada Muka Air Normal : 2,34 jt m3
- Pada Muka Air Minimum : 0,06 jt m3
6 Kapasitas Tampung Effektif : 2,28 jt m3
7 Kapasitas Tampung Mati ( Dead Storage ) :
C. DATA BENDUNGAN
1 Tipe bendungan : urungan tanah
2 Volume Tubuh Bendungan :
3 Elevasi Puncak : +118,50 m
4 Lebar Puncak : 3-6 m
5 Panjang Puncak : 800 m
6 Tinggi Bendungan : 9m
D. DATA SPILLWAY
1 Tipe : pelimpah tanpa pintu
2 elevasi Mercu : 117,50 m
3 Panjang mercu : 10,70 m
4 Kapasitas Spillway :
E. INSTRUMENTASI
1 Peizometer : 9 buah stand pipe
2 Peilschaal : 1 buah
3 Patok Geser : 9 buah
4 Pos curah hujan : 1 unit
F. Bangunan Intake dan Pengeluaran
1 Tipe Intake :
2 Kapasitas Maksimal intake :
3 Tipe Outlet :
4 Kapasitas Outlet :
G. Manfaat
1 Irigasi (ha) :
2 Air Baku (liter/detik) :
3 Listrik/PLTA (MW) :
4 Manfaat Lain :
1. Data Umum
a. NamaBendungan : Saradan
b. Alamat bendungan : Desa saradan, Kec.Saradan, Kab.Madiun, Jawa timur
c. Koordinat intake X : 07°33’112’’
Y : 111°44’873’’
2. Riwayat Penanganan : - Sedang ada pekerjaan rehab rumah jaga, Perbaikan bronjong (tanggul
bagian barat), Pembuatan patok pengaman di puncak tanggul,
Perbaikan sayap spillway (hulu), Penambahan papan larangan, dan
Rehab saluran outlet (TA. 2017)
3. Data Inventarisasi
a. Rusak pada lining / dinding kanan outlet ± 6 meter (sudah diperbaiki)
b. Ada kemiringan pada dinding kiri outlet ± 10 m (sudah diperbaiki)
c. Ada kerusakan pada pintu intake (seal & baut sudah keropos), stangdrat
bengkok(tidak lurus), ada baut yang putus
d. Ada rembesan pada dinding / sayap di bangunan pengeluaran (bawah intake)
e. Jalan di puncak tanggul bergelombang dan dipenuhi tumbuhan rumput
f. Lampu penerangan belum ada
g. Jumlah Piezometer ada 9 titik (ada kemiringan 3 titik no. 5A, 4A, 4B)
h. Rumah piezometer sudah ada yang rusak (2 buah)
i. Patok geser ada 9 titik (3 titik sudah miring)
j. Peilschaal ada 2 buah (bukan dari papan, hanya dibuat dari cat)
k. Tangga untuk melihat peilschaal sudah keropos
l. Sedimentasi di waduk sudah cukup tinggi (Butuh pengerukan)
m. Kekurangan alat pemantauan & pemeliharaan
n. Papan nama “waduk saradan” minta di rehab
Indeks
Bobot Bobot Sub Bobot Ada /
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Tidak ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 30 m x 1.5 m = 45
Jalan Inspeksi 20% Ada 80% 16%
m2 Total kerusakan = 9
Lereng Hilir 30% 20%
m2
Luas : (2 m x 2 m) x 4 = 16
Dinding 25% ada 83% 21%
m2 Total kerusakan = 2,72
m2
Luas : 2 m x 3 m= 6 m2
Lantai 25% Ada 87% 22%
Menara Intake 23% 19% Total kerusakan = 0,78 m2
Luas : 4 m x 4 m = 16 m2
Atap Pelindung 25% Ada 94% 24%
Total kerusakan = 0,96 m2
Bangunan
2 20%
Pengambilan
Luas : 1.50 x 5 m= 7,5
Stoplog 67% Ada 60% 40%
m2 Total kerusakan = 3
m2
Pintu Intake 31% 12%
Luas : (7 m x 15 m) + (2 m x 40 m)
Dinding 50% Ada 77% 39% = 185 m2
Total kerusakan = 42,5 m2
Bangunan
3 20% Bangunan Pelindung 100% 76%
Pengeluaran
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Luas : 5 m x 10 m = 50
Lantai hulu 13% Lapis Beton 100% Ada 85% 85% 11%
m2 Total kerusakan = 7,5
m2
Luas : 10 m x 0.30 m = 3
Mercu Spillway 27% Lapis Beton 100% Ada 92% 92% 25%
m2 Total kerusakan = 0.24
m2
Luas : 3 m x 8 m = 24 m2
Lantai beton 70% Ada 98% 69%
Total kerusakan = 0,48 m2
Saluran Luncur 13% 12%
Luas : (7 m x 2 m) x 2 = 28
Dinding beton 70% Ada 98% 69%
m2 Total kerusakan = 0,5
Dinding/ Sayap 13% 13% m2
Luas : (4 m x 1.5 m) x 2 = 12 m2
Abutmen 25% Ada 96% 24%
Total kerusakan = 0.48 m2
Luas : 11 m x 1 = 11 m
Hand rail 17% Ada 80% 13%
Total kerusakan = 2.2 m2
Luas : 4 m x 1,5 m = 6 m2
Kolom/tiang 33% Ada 95% 32%
Total kerusakan = 0,33 m2
REKOMENDASI
a. Ada kerusakan pada lining / dinding kanan outlet ± 6 meter (sudah diperbaiki)
c. Perlu perbaikan pintu intake (seal & baut sudah keropos), stangdrat bengkok(tidak lurus), ada baut yang putus
d. Perlu perbaikan rembesan pada dinding / sayap di bangunan pengeluaran (bawah intake)
e. Perlu Perbaikan Jalan di puncak tanggul karena sudah bergelombang dan dipenuhi tumbuhan rumput
g. Perlu dilakukan perbaikan pada pintu intake (1m x 1,5m) yang bocor
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 24%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Lokasi
Buku RTD 35% 30% Tidak ada 0% 0% 0%
Penyimpanan
1 2 3 4 5=3x4 6
Rencana Tindak
4 20% 0% 0% Belum Ada RTD
Darurat (RTD)
REKOMENDASI
a. Agar Menyiapkan Kegiatan Manual OP dan Pola Operasi Waduk di Bendungan Saradan
Indeks
Bobot Bobot Sub Bobot Ada / Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Kondisi alat 30% ada 67% 20% Ada Yang Sudah Miring 3 titik
Tekanan Air Pori
23% 18%
(Piezometer)
Hasil Pengamatan 40% ada 80% 32%
Pengukuran
50% ada 55% 28%
Sedimen
Sedimentasi Waduk 40% 22% 1 kali dalam 5 tahun
Upaya Pencegahan 50% ada 55% 28%
Kondisi grenbelt
Kondisi 60% Kondisi vegetasi 100% ada 85% 85% 51%
dan sempadan
4 Sempadan dan 10% Masih Bagus
Greenbelt Upaya konservasi 40% Upaya konservasi 100% tidak ada 0% 0% 0%
Di Tubuh
35% ada 85% 30%
Bendungan
Aktivitas
Masyarakat Sekitar 50% Di Waduk 35% ada 75% 26% 39%
Waduk
Di tepi
30% ada 70% 21%
Masyarakat waduk/greenbelt
5 10%
Sekitar Waduk
1 2 3 4 5=3x4 6
Kondisi Sempadan
4 10% 51% 5% Belum Ada Upaya Konservasi
dan Greenbelt
Masyarakat Sekitar
5 10% 39% 4%
Waduk
Jumlah 51% Kinerja Kurang
REKOMENDASI
b. Perlu Pengadaan Peilschaal karena yang ada saat ini hanya ditulis dari cat tembok
c. Disarankan untuk pengadaan curah hujan minimal 1 unit dan petugas pemantaunya
e. Disarankan untuk pengadaan curah hujan minimal 1 unit dan petugas pemantaunya
f. Disarankan untuk pengukuran kualitas air waduk (2 kali pertahun di 3 titik pemantauan)
Indeks
Bobot Bobot Sub Elemen Bobot Ada / Tidak
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Kecukupan
50% Ada 90% 45%
Jumlah
Petugas Operasi 25% 21%
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 70% 35%
Petugas Jumlah
25% 19%
Pemeliharaan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% ada 85% 43%
Jumlah
Gedung/kantor 20% 17%
Kondisi
50% ada 80% 40%
Gedung
Kecukupan
50% Ada 60% 30%
Peralatan Jumlah
20% 12%
Operasi Kondisi
50% Ada 55% 28%
peralatan
Kecukupan
50% Ada 60% 30%
Peralatan Jumlah
Sarana dan 20% 12%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 92% 37%
Bendungan (UPB)
REKOMENDASI
Agar selalu menyiapkan sukucadang dan segera memperbaiki/ Mengganti peralatan operasi dan pemeliharaan
c.
yang rusak
e. Disarankan untuk pengadaan alat pemantauan seperti, pelampung, sepatu, perahu dan perlengkapannya
1. Data Umum
a. Nama Bendungan : Kedung Brubus
b. Alamat bendungan : Desa bulu, Kec.pilang, Kab.madiun, Jawa timur
c. Koordinat intake X: 07°27’065’’
Y: 111°42’104’’
2. Riwayat Penanganan : - Tahun 2016 akhir ada pekerjaan aspal, parapet, dan pengecatan
- Tahun 2015 akhir ada pekerjaan sonding
3. Data Inventarisasi
a. Sedimentasi di bagian hulu (timur) sudah tinggi (Perlu pengerukan)
b. Piezometer Pneumatic tidak berfungsi sebanyak 16 buah (selang – selangnya sudah bocor)
sejak tahun 2013
c. Di hilir kolam olak spillway ada kikisan beton
d. Sedimentasi tinggi di saluran outlet
e. peilschaal pelimpah sudah rusak/putus (butuh penggantian dan penambahan di outlet 1
buah)
f. Piezometer ada 5 buah (1 buah rusak, dept. meter tidak bisa masuk) sejak tahun 2012
g. Patok geser ada 19 buah, patok bm ada 4 buah
h. Jalan inspeksi saluran spillway-kantor jaga sepanjang 460 m sudah mulai rusak
i. Daun jendela rumah jaga sudah rusak dan lampunya sudah putus
j. Akses penerangan menuju waduk tiangnya sudah patah
k. Paving block di area kantor jaga sudah pecah & bergelombang
l. Aki genset rusak sebanyak 2 buah
m. Butuh alat pemeliharaan seperti : Mesin rumput, cangkul, sabit, garpu, sepatu, senter,
jas hujan, pelampung dsg.
n. Butuh Pelumas/stamplate untuk seling crane
o. Perlu di buat cek dam di kali gedangan dan kedung jaran (untuk mengurangi sedimentasi)
Indeks
Bobot Sub Bobot Sub Elemen Bobot Ada /
No Komponen Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Komponen Penilaian Elemen Tidak ada
Ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Lapis Luas : 146 m x 8 m = 1.168 m2
37% Ada 96% 35%
Perkerasan Total kerusakan = 46,7 m2
Luas : (146 m x 0.30 m) x 2 = 87.6 m2
Bahu 12% Ada 92% 11%
Total kerusakan = 7 m2
Luas : (146 m x 0.50 m) x 2 = 146 m2
Parapet 12% Ada 84% 10%
Total kerusakan = 23,4 m2
Luas : 0.30 m x 0.30 m x 0.30m =
Patok HM/BM 10% Ada 96% 9% 0.027 m3
Puncak 40% 36% Total kerusakan = 0.002 m3
Luas : (2 m x 0.3 m x 0,3 m) x 4 = 0,72
Portal Masuk 10% Ada 92% 9%
m3 Total kerusakan = 0,05 m3
Luas : (146 m x 1m) x 2 = 292 m2
Pagar Pelindung 10% Ada 88% 9%
Total kerusakan= 35 m2
Luas : 2 m x 7 m = 14 m2
Abutmen 25% Ada 98% 25%
Total kerusakan = 0,28 m2
Luas : 14 m x 1,5 m= 21 m2
Plat jembatan 25% Ada 95% 24%
Jembatan Total kerusakan = 1 m2
15% 14% Luas : (14 m x 0,4 ) x 2 = 11.2 m2
Hantar Gelagar 33% Ada 98% 33%
Total kerusakan = 0,3 m2
Luas : (7 m x 1) x 2 = 14 m2
Hand rail 17% Ada 92% 15%
Total kerusakan = 1,1 m2
Luas : 5 m x 5 m= 25
Lantai 20% Ada 92% 18%
m2 Total kerusakan = 2
Menara Intake 15% 10% m2
Luas : (4 m x 4 m) x 4 = 64 m2
Atap Pelindung 20% Ada 90% 18%
Bangunan Total kerusakan = 4.8m2
2 20%
Pengambilan
Luas : 0.8 x 30 m= 24 m2
Tangga inspeksi 20% Ada 76% 15%
Total kerusakan = 5,7 m2
Luas : (1 x 5 m) x 2 = 5 m2
Stoplog 67% ada 75% 50%
Total kerusakan = 2,5 m2
Pintu Intake 20% 15%
Luas : 3 x 5 m= 15 m2
Trashrack 33% Ada 82% 27%
Total kerusakan = 2,7 m2
Peralatan Panel otomatis 50% Ada 85% 35%
Hidromekanika 30% Penggerak 21%
l Manual 50% Ada 85% 35%
Tunnel/
75% 64%
Terowongan
Bangunan
3 20%
Pengeluaran
Luas : (2m x 50 m) x 2 = 200
Dinding 50% Ada 78% 39%
m2 Total kerusakan = 44
m2
Bangunan
25% 19%
Pelindung
Luas : (3m x 50 m) = 150 m2
Total kerusakan = 40,5m2
Lantai 50% Ada 73% 37%
(Di saluran Pengeluaran Sudah
Banyak Sedimen)
Luas : 45 m x 20 m = 9000 m2
Lantai hulu 13% Lapis Beton 100% Ada 92% 92% 12%
Total kerusakan = 720 m2
Luas : 1,2 m x 35 m = 42 m2
Mercu Spillway 27% Lapis Beton 100% Ada 87% 87% 23%
Total kerusakan = 5,46m2
Luas : 35 m x 20 m = 700 m2
Lantai beton 70% Ada 85% 60%
Total kerusakan = 105 m2
Saluran
13% 11%
Luncur
Lubang Drain 30% Ada 80% 24%
Bangunan
4 15% Luas : 60 m x 3 m = 180 m2
Pelimpah Kolam Olak 35% Ada 60% 21%
Total kerusakan = 72 m2
Luas : 40 m x 20 m = 800 m2
Kolam Loncat 30% Ada 70% 21%
Total kerusakan = 240 m2
Luas : 4 m x 1 m x 8 m = 14,4 m3
Kolom/tiang 20% Ada 91% 18%
Total kerusakan =1,3 m2
1 2 3 4 5 = 4 / 90% 6 7 8
Tubuh
1 30% 30% 33% 75% 25%
Bendungan
REKOMENDASI
b. Butuh Perbaikan Di hilir kolam olak spillway Karena ada kikisan beton
e. Perlu Perbaikan lampu penerangan menuju waduk karena tiangnya sudah ada yang patah
Disarankan membuat cek dam di kali gedangan dan kedung jaran, untuk upaya pencegahan/mengurangi
g.
sedimentasi di waduk
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 70% 21%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 23%
Waduk Darurat
Uji Operasi 30% Ada 70% 21%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 70% 35%
Layanan
3 30% Irigasi 100% Kualitas Air 40% Tercapai 70% 28% 75%
Waduk
Kepuasan Komlen 3-4 kali
20% 75% 15%
User pertahun
Lokasi
Buku RTD 35% 30% Ada 75% 23% 28%
Penyimpanan
1 2 3 4 5=3x4 6
Layanan
3 30% 75% 23% Baru melayani untuk Irigasi
Bendungan
Rencana Tindak Kurangya penilaian di sub komponen
4 20% 45% 9%
Darurat (RTD) Kesiapsiagaan dan sistem komunikasi
Jumlah 71% Kinerja Cukup
REKOMENDASI
Indeks
Bobot Bobot Sub Elemen Bobot Ada /
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen Tidak ada
Ada
10 = 7 x
1 2 3 4 5 6 7 8 9 9 11 12 13
Kecukupan
20% Ada 75% 15% Jumlah = 2 buah
jumlah
Kondisi alat 30% Ada 50% 15% Kondisi alat sudah putus 1 buah
Elevasi Muka Air
11% 8%
(AWLR/Peilschaal) Hasil
40% Ada 80% 32%
Pengamatan
Kecukupan
20% Ada 90% 18% Jumlah = 1 buah
jumlah
Kecukupan
20% Ada 70% 14% jumlah = 5 buah stand pipe
jumlah
Kondisi alat 30% Ada 80% 24% Kondisi Standpipe rusak 1 buah
Tekanan Air Pori
17% 13%
(Piezometer) Hasil
40% Ada 80% 32%
Pengamatan
Kecukupan
Hasil Pengamatan 20% Ada 90% 18% jumlah = 16 buah pneumatic
1 30% jumlah
Instrumentasi
Tekanan Air Pori Kondisi alat 30% Ada 0% 0% Pneumatic Rusak 16 buah
(Piezometer 17% 10%
Hasil
Pneumatic) 40% Ada 80% 32%
Pengamatan
Kecukupan
20% Ada 70% 14% jumlah = 1 buah
jumlah
Kecukupan
20% Ada 90% 18% jumlah = 19 buah
jumlah
Kecukupan
20% Ada 90% 18% jumlah = 1 buah
jumlah
Pengukuran
50% tidak ada 0% 0%
Sedimentasi Sedimen
40% 0%
Waduk Upaya
50% tidak ada 0% 0%
Pencegahan
Di Tubuh
35% Ada 65% 23% Bisa dilewati motor
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 45% 16% 29% Tempat Pemancingan warga
Sekitar Waduk
Masyarakat Di tepi
5 10% 30% Ada 65% 20% Tempat Pemancingan warga
Sekitar Waduk waduk/greenbelt
Nilai Kinerja
Bobot Nilai
No Komponen Sistem Keamanan Keterangan
Komponen Komponen dan Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan Peilschaal rusak 1 bh dan kurang 1 bh,
1 30% 69% 21%
Instrumentasi Piezometer Pneumatic sudah tidak berfungsi
b. Peilschaal pelimpah sudah rusak/putus (butuh penggantian 1 buah dan penambahan di outlet 1 buah)
Butuh Pengecekan lebih lanjut pada alat Piezometer standpipe karena dept. meter tidak bisa masuk (1 unit) sejak
c.
tahun 2012
d. Disarankan untuk pengukuran kualitas air waduk (2 kali pertahun di 3 titik pemantauan)
Disarankan membuat cek dam di kali gedangan dan kedung jaran, untuk upaya pencegahan/mengurangi
g.
sedimentasi di waduk
Kecukupan
Jumlah 50% Ada 90% 45%
Petugas Operasi 25% 22%
Kompetensi 50% Ada 85% 43%
Kecukupan
Jumlah 50% Tidak ada 0% 0%
Petugas
25% 0%
Pemantauan Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
Jumlah 50% Ada 65% 33%
Petugas
25% 18%
Pemeliharaan Kompetensi 50% Ada 75% 38%
Kecukupan
Petugas Jumlah 50% Tidak ada 0% 0%
25% 0%
Keamanan Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 85% 43%
Jumlah
Gedung/kantor 20% 15%
Kondisi
50% Ada 60% 30%
Gedung
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 14%
Operasi Kondisi
50% Ada 70% 35%
peralatan
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 13%
Sarana dan Pemeliharaan Kondisi
4 20% 50% Ada 65% 33%
Prasarana peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 92% 37%
Bendungan (UPB)
Tidak ada Petugas Pemantauan dan petugas
2 Petugas OP 20% 39% 8%
Keamanan
3 Dokumen OP 20% 75% 15% Dokumen belum disediakan di lokasi
REKOMENDASI
b. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan,
c. Butuh pengadaan alat pemeliharaan seperti : Mesin rumput, cangkul, sabit, garpu, sepatu, senter, jas hujan, pelampung dsg
e. Perbaikan Daun jendela rumah jaga sudah rusak dan lampunya sudah putus
f. Perbaikan Paving block di area kantor jaga karena sudah pecah & bergelombang
1. Data Umum
a. NamaBendungan : Notopuro
b. Alamat bendungan : Desa duren, Kec.pilang Kenceng, Kab.madiun, Jawa timur
c. Koordinat intake X: 07°29’045’’
Y: 111°41’527’’
2. RiwayatPenanganan : - Sedang ada pekerjaan rehab rumah jaga
- Bulan maret tahun 2017 telah ada pasangan bronjong sepanjang 20
m dan saluran drainase
3. Data Inventarisasi
a. Paving block di puncak bendungan sedikit amblas dan bergelombang
b. Saluran drainase di kaki lereng hilir ada kerusakan, lantai banyak sedimen, dinding
ada retakan dan jebol sepanjang + 300 meter
c. Sedimentasi tinggi di saluran outlet
d. Rumah jaga sudah rusak (sekarang dalam perbaikan)
e. Rip – rap di lereng hilir sudah berantakan
f. Ada longsor di tanggul hilir bagian selatan, perlu pemasangan bronjong tambahan 26 m
g. Sedimentasi tinggi di depan pintu intake
h. Tanggul hulu bagian selatan – timur ada kerusakan/penurunan (± 25 m)
i. Sedimentasi tinggi di kaki lereng hulu bagian selatan – timur
j. Piezometer ada 8 buah, rusak 3 buah (dept, meter tidak ada)
k. Perlu alat pemeliharaan seperti : mesin rumput, cangkul, sabit, sepatu, garpu, jas hujan dsg.
Indeks
Bobot Bobot Sub Bobot Ada /
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen Tidak
Ada
ada
1 2 3 4 5 6 7 8 9 10=7x9 11 12 13
Luas : 2.113 m x 3 m = 6.340,5 m2
Lapis Perkerasan 33% Ada 65% 22%
Total kerusakan = 2.219 m2
Luas : (500 m x 0.60 m) x 2 =
Bahu 11% Ada 65% 7% 600 m2 Total kerusakan = 198
m2
Luas : (500 m x 0.15 x 0,15 m) x 2 =
Parapet 11% Ada 54% 6% 22,5 m2
Total kerusakan = 10,3 m2
Puncak 40% 17%
Guard rail 9% Tidak Ada 0% 0%
Luas : (0.8 x 0.2 x 0.2) x 5 = 0,16
Patok HM/BM 9% Ada 87% 8% m3
Total kerusakan = 0.02 m3
Portal Masuk 9% Tidak Ada 0% 0%
Luas : (12 m x 2 m) = 24 m2
Dinding 25% Ada 92% 23%
Total kerusakan = 1,92 m2
Luas : 3 m x 3 m= 9 m2
Lantai 25% Ada 94% 24%
Total kerusakan = 0,54
m2
Menara Intake 23% 20%
Luas : 3 m x 4 = 12 m2
Atap Pelindung 25% Ada 90% 23%
Total kerusakan = 1,2 m2
Bangunan
2 20% Luas : 0.40 m x 5 m= 2
Pengambilan Tangga inspeksi 25% Ada 72% 18%
m2 Total kerusakan =
0.56 m2
Luas : 1,2 m x 5 m= 6
Stoplog 67% Ada 75% 50%
m2 Total kerusakan = 1,5
m2
Pintu Intake 31% 23%
Peralatan
46% Penggerak Manual 100% Ada 85% 85% 39%
Hidromekanikal
Bangunan
3 20%
Pengeluaran Luas : (8 m x 30 m) x 2 = 480
Dinding 33% Ada 84% 28%
m2 Total kerusakan = 76,8
m2
Bangunan
25% 19% Luas : 3 m x 30 m= 90
Pelindung Lantai 33% Ada 72% 24%
m2 Total kerusakan = 25
m2
Luas : 4 m x 1,5 m= 6
Tangga inspeksi 33% Ada 70% 23%
m2 Total kerusakan = 1,8
m2
Luas : 3 m x 2 m = 6 m2
Lantai hulu 13% Lapis Beton 100% Ada 62% 62% 8%
Total kerusakan = 2,3 m2
Luas : 3 m x 3 m = 9 m2
Lantai beton 70% Ada 87% 61%
Total kerusakan = 1,2 m2
Saluran Luncur 13% 11%
Lubang Drain 30% Ada 70% 21% Ditutupi rumput
Luas : 2 m x 3 m = 6 m2
Kolam Olak 35% Ada 62% 22%
Total kerusakan = 2,3 m2
Luas : 5 m x 3 m = 15 m2
Bangunan Peredam Energi 27% Kolam Terjunan 35% Ada 65% 23% 17%
4 15% Total kerusakan = 5.25 m2
Pelimpah
Luas : 10 m x 3 m = 30 m2
Kolam Loncat 30% Ada 68% 20%
Total kerusakan = 9,6 m2
Luas : (4 m x 0.60 m x 1.5 m) x 2
Abutmen 19% Ada 92% 17%
= 7,2 m3 Total kerusakan = 0,576
m2
Luas : 5 m x 1.5 m = 7.5 m2
Plat jembatan 19% Ada 78% 15%
Total kerusakan = 1,65 m2
1 2 3 4 5 = 4 / 90 % 6 7=5x6 8
Kurangnya bangunan
Tubuh pelengkap seperti (Guard
1 30% 30% 35% 53% 19%
Bendungan rail/Pagar Pelindung, Portal
Masuk , Penerangan)
Bangunan
2 20% 20% 24% 82% 19%
Pengambilan
Bukit
7 5% 0% 0% 0% 0% Tidak Ada Bukit Tumpuan
Tumpuan
Rekomendasi
a. Perlu Perbaikan Paving block di puncak bendungan karena sedikit amblas dan bergelombang
Perbaikan Saluran drainase di kaki lereng hilir karena ada kerusakan, lantai banyak sedimen, dinding ada
b.
retakan dan jebol sepanjang +300 meter
c. Ada longsor di tanggul hilir bagian selatan, perlu pemasangan bronjong tambahan 26 m
Perbaikan dan pembersihan Bangunan Spillway karena kondisi bangunan sudah Banyak retakan dan dinding
e.
beserta sayap saluran banyak pecahan
Indeks
Bobot Sub Bobot Sub Elemen Bobot Ada / Tidak
No Komponen Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 75% 53%
Operasi operasi
40% 29%
Normal
Uji Operasi 30% Ada 70% 21%
Pelaksanaan
70% Ada 75% 53%
Operasi Operasi Operasi
2 30% 30% 23%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 70% 35%
Layanan
3 30% Irigasi 100% Kualitas Air 40% Tercapai 75% 30% 77%
Waduk
Komplen 2-3
Kepuasan User 20% 75% 15%
pertahun
1 2 3 4 5=3x4 6
Layanan
3 30% 77% 23% Baru melayani untuk Irigasi
Bendungan
Rencana Tindak
4 20% 0% 0% Belum Ada RTD
Darurat (RTD)
Jumlah 62% Kinerja Kurang
REKOMENDASI
Kondisi alat 30% Ada 63% 19% Kondisi alat rusak 3 buah
Tekanan Air Pori
23% 17%
(Piezometer)
Hasil Pengamatan 40% Ada 75% 30%
Hasil Pengamatan
1 30% Kecukupan jumlah 20% Ada 90% 18% jumlah = 2 buah
Instrumentasi
Pengukuran
50% Tidak Ada 0% 0%
Sedimentasi Sedimen
40% 0%
Waduk
Upaya Pencegahan 50% Tidak Ada 0% 0%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 65% 65% 39%
Kondisi Sempadan dan sempadan
4 10%
dan Greenbelt
Upaya konservasi 40% Upaya konservasi 100% Tidak Ada 0% 0% 0%
Di Tubuh
35% Ada 50% 18% Jalan desa di lalui motor
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 55% 19% 28% Pemancingan
Masyarakat Sekitar Sekitar Waduk
5 10% Di tepi
Waduk 30% Ada 65% 20% sawah
waduk/greenbelt
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keamanan dan
Keterangan
Komponen Komponen
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 64% 19% Piezometer rusak 3 unit, V-notch rusak semua
Instrumentasi
Kurangnya Inspeksi Rutin dan Inspeksi
2 Inspeksi 30% 64% 19%
berkala biasa
Belum dilakukan pengukuran kualitas air
3 Kondisi Waduk 20% 19% 4%
waduk dan pengukuran sedimen secara rutin
Kondisi
4 Sempadan dan 10% 39% 4% Belum Ada Upaya Konservasi
Greenbelt
Masyarakat Akses jalan warga (sepeda motor), Ada
5 10% 28% 3%
Sekitar Waduk pemancingan
REKOMENDASI
a. Perlu Perbaikan Piezometer yang rusak 3 buah dan Pengadaan dept meter karena belum ada
b. Perlu perbaikan pada bangunan V-Notch karena sudah tidak berfungsi (2 buah)
c. Disarankan untuk pengukuran kualitas air waduk (2 kali pertahun di 3 titik pemantauan)
e. Perlu Pengerukan Sedimentasi di waduk karena sudah tinggi terutama di kaki lereng hulu bagian selatan – timur
f. Disarankan untuk menertibkan masyarakat yang beraktifitas di puncak tanggul, di waduk dan daerah tepi waduk
Indeks
Bobot Bobot Sub Elemen Bobot Ada / Tidak
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Unit
Staff 30% Ada 100% 30%
1 Pengelola 40%
Bendungan
Kinerja UPB 20% Pelaporan 100% Ada 85% 85% 17%
Kecukupan
50% Ada 80% 40%
Petugas Jumlah
25% 18%
Operasi
Kompetensi 50% Ada 65% 33%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 60% 30%
Petugas Jumlah
25% 16%
Pemeliharaan
Kompetensi 50% Ada 65% 33%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 90% 45%
Jumlah
Gedung/kantor 20% 19%
Kondisi Gedung 50% Ada 95% 48%
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
20% 11%
Operasi Kondisi
50% Ada 55% 28%
peralatan
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
Sarana dan 20% 12%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
REKOMENDASI
b. Agar Petugas Operasi Dan Pemeliharaan lebih aktif lagi memelihara Bendungan Dan Waduknya
c. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
e. Perlu alat pemeliharaan seperti : mesin rumput, cangkul, sabit, sepatu, garpu, jas hujan dsg.
1. Data Umum
a. NamaBendungan : Sangiran
b. Alamat bendungan : Desa Sumber Bening, Kec. Beringin, Kab.Ngawi, Jawa timur
c. Koordinat intake X: 07°24’971’’
Y: 111°36’621’’
3. Data Inventarisasi :
a. Dinding saluran outlet ada yang sudah berlubang
b. Sedimentasi tinggi dan banyak tumbuhan rumput di saluran pengeluaran
c. Jumlah Peizometer ada 4 titik (1 titik rusak)
d. Tutup pengaman peizometer rusak
e. Jumlah patok geser ada 7 buah
f. Jumlah V-Notch 1 buah
g. Perlu alat pemeliharaan seperti : mesin rumput, cangkul, sabit, sepatu, garpu, jas hujan dsg.
Tubuh
1 30%
Bendungan
Luas : 137.25 m x 10 m = 1.372.5
Lapis Pelindung 67% Ada 89% 59% m2
Total kerusakan = 151 m2
Luas : (2 m x 1.5 m) x 2 = 6 m2
Abutmen 19% Ada 85% 16%
Total kerusakan = 0.45 m2
Luas : 24 m x 1.5 m = 36 m2
Plat jembatan 19% Ada 95% 18%
Total kerusakan = 1,8 m2
Bangunan
3 20% Luas : (70 m x 3 m) x 2 = 420 m2
Pengeluaran Dinding 33% Ada 74% 25%
Total kerusakan = 109 m2
Luas : 5 m x 30 m = 150 m2
Lantai hulu 13% Lapis Beton 100% Ada 78% 78% 10%
Total kerusakan = 33 m2
Luas : 6 m x 30 m = 180 m2
Mercu Spillway 27% Lapis Beton 100% Ada 97% 97% 26%
Total kerusakan = 5,4 m2
Luas : 6 m x 2 m = 12 m2
Peredam Energi 27% Kolam Terjunan 35% Ada 78% 27% 21% Total kerusakan = 2,64 m2
Luas : 6 m x 5 m = 30 m2
Kolam Loncat 30% Ada 75% 23%
Total kerusakan = 7,5 m2
Luas : 2 m x 10 m = 20 m2
Plat jembatan 25% Ada 97% 24%
Total kerusakan = 0,6 m2
Jembatan 7% 7%
Gelagar 33% Ada 100% 33%
1 2 3 4 5 = 4 / 85% 6 7=5x6 8
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
Pelimpah Tidak ada bangunan pelimpah
6 5% 0% 0% 0% 0%
darurat darurat
Belum ada saluran drainase
7 Bukit Tumpuan 5% 5% 6% 40% 2%
dan pagar pelindung
REKOMENDASI
a. Disarankan Untuk membuat jalan/tangga Inspeksi di Tanggul Hilir Untuk Menuju Ke saluran Pengeluaran
b. Penggantian Pintu Intake Karena pintu airnya sudah berkarat dan kalau di buka ada bocoran pada Asnya
c. Perbaikan Mesin Crane karena sudah tidak bisa bergerak kekanan dan kekiri (Hanya bisa turun dan naik)
d. Butuh perbaikan Dinding dan lantai saluran pengeluaran karena ada bagian yang sudah berlubang dan pecah
e. Butuh pengerukan Sedimen di saluran pengeluaran karena sudah tinggi dan banyak tumbuhan rumput
Butuh pembersihan semak-semak yang sudah mulai tumbuh di beberapa daerah Bendungan (Lereng hulu-hilir,
f.
daerah hilir, dan saluran pengeluaran)
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 70% 21%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 24%
Waduk Darurat
Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 70% 35%
1 2 3 4 5=3x4 6
Rencana Tindak
4 20% 0% 0% Belum Ada RTD
Darurat (RTD)
REKOMENDASI
Indeks
Bobot Bobot Sub Bobot Ada / tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Hasil Pengamatan
1 30% Kecukupan jumlah 20% Ada 85% 17% Jumlah = 24 Buah
Instrumentasi
1 2 3 4 5=3x4 6
Peilschaal Sudah Buram, Piezometer stand
Hasil Pengamatan
1 30% 60% 18% pipe rusak 1 bh, piezometer elektrik rusak
Instrumentasi
semua
Kondisi Sempadan
4 10% 48% 5% Belum ada upaya konservasi
dan Greenbelt
Masyarakat Dipuncak bisa dilewati motor, ada
5 10% 33% 3%
Sekitar Waduk pemancingan
Jumlah 57% Kinerja Kurang
REKOMENDASI
a. Pelu penambahan Peilschaal sebanyak 2 buah dan penggantian yang sudah buram
b. Perbaikan Piezometer yang sudah rusak (1 buah stand pipe dan 24 elektrik)
e. Disarankan Untuk Mengukur kualitas Air Waduk (2 sampai 3 kali Pertahun sebanyak 3 titik Pemantauan)
f. Disarankan juga untuk mengukur sedimentasi waduk secara rutin ( 1 kali pertahun)
Rencana
20% Ketersediaan 50% Ada 90% 45%
Strategis
18%
Pelaksanaan 50% Ada 85% 43%
Kecukupan
50% Ada 80% 40%
Petugas Jumlah
25% 19%
Operasi
Kompetensi 50% Ada 70% 35%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 65% 33%
Petugas Jumlah
25% 18%
Pemeliharaan
Kompetensi 50% Ada 75% 38%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 85% 43%
Gedung/kanto Jumlah
20% 18%
r
Kondisi Gedung 50% Ada 90% 45%
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 13%
Operasi
Kondisi peralatan 50% Ada 60% 30%
Kecukupan
50% Ada 60% 30%
Peralatan Jumlah
Sarana dan 20% 12%
4 20% Pemeliharaan
Prasarana Kondisi peralatan 50% Ada 60% 30%
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan
Kondisi peralatan 50% Tidak ada 0% 0%
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 92% 37% Cukup
Bendungan (UPB)
REKOMENDASI
c. Agar selalu menyiapkan sukucadang dan segera memperbaiki/mengganti peralatan operasi dan pemeliharaan
d. Perlu alat pemeliharaan seperti : mesin rumput, cangkul, sabit, sepatu, garpu, jas hujan dsg.
e. Perbaikan Saluran Drainase di sekeliling Rumah jaga karena sudah banyak sedimen dan sudah ada yang rusak
Inventarisasi Bendungan
1. Data Umum
a. Nama Bendungan : Pondok
b. Alamat bendungan : Desa gandong, kec.Bringin, kab.Ngawi, Jawa timur
c. Koordinat intake X: 07°24’638’’
Y: 111°33’720’’
2. Riwayat Penanganan :
3. Data Inventarisasi
a. Sedimentasi tinggi di dekat bangunan intake
b. Penahan Tebing di sebelah kiri saluran spillway ada longsoran
c. Ada kebocoran di bagian sambungan klem pintu intake (3 titik)
d. Sedimentasi tinggi di saluran outlet (dibawah jembatan benam)
e. Butuh Penambahan rip-rap di lereng hulu dan hilir
f. Dept. meter tidak ada
g. Jumlah piezometer jenis stand pipe ada 6 unit (rusak/tersumbat 3 unit)
h. Alat ukur penurunan jenis multylayer settlement (rusak/ tersumbat)
i. V-Notch tidak bisa diamati karena tenggelam
j. Butuh pembersihan semak-semak yang sudah mulai tumbuh di beberapa daerah waduk
(Lereng hulu-hilir, daerah hilir, dsg.)
k. Lampu penerangan di puncak tanggul sudah ada yang rusak.
Pagar
10% Ada 98% 10%
Pelindung
Luas : 6 m x 4 m= 24 m2
Lantai 25% Ada 97% 24%
Total kerusakan = 0,72 m2
Menara Intake 15% 14%
Atap Luas : 7 m x 5 = 35 m2
25% Ada 86% 22%
Pelindung Total kerusakan = 4,9 m2
Panel
Peralatan otomatis 50% Ada 75% 38%
Hidromekanika 30% 23%
Penggerak
l 50% Ada 75% 38%
Manual
Katup kupu-
30% Ada 80% 24%
kupu
Katup 33% 27%
Bangunan Katup
3 20% 30% Ada 80% 24%
Pengeluaran Kerucut
Luas : 18 m x 20 m = 360 m2
Lantai hulu 13% Lapis Beton 100% Ada 88% 88% 12% Total kerusakan = 79 m2
(Banyak Sedimen)
Luas : 18 m x 5 m = 90 m2
Mercu Spillway 27% Lapis Beton 100% Ada 85% 85% 23%
Total kerusakan =13,5 m2
Bangunan
4 15% Luas : 14 m x 25 m = 350 m2
Pelimpah Kolam Olak 35% Ada 87% 30%
Total kerusakan = 45,5 m2
Luas : 18 m x 25 m = 450 m2
Kolam Loncat 30% Ada 70% 21%
Total kerusakan = 135 m2
Luas : 3 m x 20 m = 60 m2
Plat jembatan 25% Ada 77% 19%
Total kerusakan = 14 m2
Jembatan 7% 6%
Luas : (0,8 m x 20 m) x 2 = 32 m2
Hand rail 17% Ada 98% 16%
Total kerusakan = 0,64 m2
Saluran
Tumpuan Kiri 50% 30% Tidak ada 0% 0% 20%
Drainase
Pagar
20% Tidak ada 0% 0%
Bukit Pelindung
7 5%
Tumpuan
Lereng 50% Ada 80% 40%
Tumpuan Saluran
50% 30% Tidak ada 0% 0% 20%
Kanan Drainase
Pagar
20% Tidak ada 0% 0%
Pelindung
1 2 3 4 5 = 4 / 85% 6 7=5x7 8
Bangunan
2 20% 20% 22% 82% 18% Pintu Intake ada kebocoran
Pengambilan
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
Pelimpah Tidak ada bangunan
6 5% 0% 0% 0% 0%
darurat pelimpah darurat
REKOMENDASI
b. Perbaikan Penahan Tebing di sebelah kiri saluran spillway Karena ada longsoran
f. Perbaikan lampu penerangan di sekitar Bendungan karena ada yang sudah rusak
Butuh pembersihan semak-semak yang sudah mulai tumbuh di beberapa daerah waduk (Lereng hulu-hilir, daerah
g.
hilir, dsg.)
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Layanan
3 30% Irigasi 100% Kualitas Air 40% Tercapai 80% 32% 81%
Waduk
Komplain 3-4
Kepuasan User 20% 75% 15%
pertahun
1 2 3 4 5=3x4 6
Bobot Indeks
Bobot Sub Elemen Bobot Ada /
No Komponen Kompon Sub Komponen Kondisi Yg Nilai Jumlah Jumlah Keterangan
Komponen Penilaian Elemen tidak ada
en Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Kecukupan
20% Ada 85% 17% Jumlah = 2 buah
jumlah
Kecukupan
20% Ada 70% 14% Jumlah = 6 unit
jumlah
Kecukupan
20% Ada 75% 15% Jumlah 1 buah
jumlah
Kecukupan
20% Ada 90% 18% Jumlah = 6 buah
jumlah
Kecukupan
20% Ada 90% 18% Jumlah = 3 buah
jumlah
Kecukupan
20% Ada 85% 17% Jumlah = 1 buah
jumlah
Hidroklimatologi 11% 9%
Hasil
40% Ada 80% 32%
Pengamatan
Kondisi grenbelt
Kondisi 60% Kondisi vegetasi 100% Ada 85% 85% 51%
dan sempadan
4 Sempadan dan 10% Masih Bagus
Greenbelt Upaya konservasi 40% Upaya konservasi 100% tidak ada 0% 0% 0%
Di Tubuh
35% Ada 55% 19% Bisa Jalan Motor
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 60% 21% 30%
Sekitar Waduk
Masyarakat Di tepi
5 10% 30% Ada 65% 20%
Sekitar Waduk waduk/greenbelt
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keamanan dan Keterangan
Komponen Komponen
Lingkungan
1 2 3 4 5=3x4 6
Peilschaal hilang 1 buah, piezometer stand
Hasil Pengamatan
1 30% 42% 13% pipe rusak 3 bh, piezometer hidrolik rusak
Instrumentasi
semua, Multylayer sattlement rusak 3 bh
2 Inspeksi 30% 75% 23%
Kondisi Sempadan
4 10% 51% 5% Belum ada upaya konservasi
dan Greenbelt
a. Butuh perbaikan piezometer yang rusak/tersumbat (3 buah stand pipe dan 32 buah hidrolik)
e. Disarankan Untuk Mengukur kualitas Air Waduk (2 sampai 3 kali Pertahun sebanyak 3 titik Pemantauan)
f. Disarankan juga untuk mengukur sedimentasi waduk secara rutin ( 1 kali pertahun)
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Legalitas 60% Ada 100% 60%
Struktur
20% 20%
Organisasi
Kelengkapan 40% Ada 100% 40%
Kecukupan
25% 50% Ada 90% 45%
Petugas Jumlah
22%
Operasi
Kompetensi 50% Ada 85% 43%
Petugas Kecukupan
25% 50% Tidak ada 0% 0%
Pemantauan Jumlah
0%
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Petugas Kecukupan
25% 50% Ada 75% 38%
Pemeliharaan Jumlah
19%
Kompetensi 50% Ada 75% 38%
Petugas Kecukupan
25% 50% Tidak ada 0% 0%
Keamanan Jumlah
0%
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 90% 45%
Jumlah
Gedung/kantor 20% 18%
Kondisi Gedung 50% Ada 85% 43%
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 13%
Operasi Kondisi
50% Ada 60% 30%
peralatan
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
Sarana dan 20% 13%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
Unit Pengelola
1 40% 92% 37%
Bendungan (UPB)
Sarana dan
4 20% 43% 9% belum ada kendaraan
Prasarana
REKOMENDASI
c. Agar selalu menyiapkan sukucadang dan segera memperbaiki/mengganti peralatan operasi dan pemeliharaan
1. Data Umum
a. Nama Bendungan : Kedung bendo
b. Alamat bendungan : Desa Gunung sari, Kec.Padas, Kab.Ngawi, Jawa timur
c. Koordinat intake X: 07°23’206’’
Y: 111°32’616’’
2. Riwayat Penanganan :
3. Data Inventarisasi
a. Jalan masuk kebendungan ada yang rusak ± 5 km
b. Ada 2 bangunan V-notch yang tidak berfungsi
c. Peilschaal tidak sesuai kenyataan di lapangan (butuh di kalibrasi ulang)
d. Sedimentasi tinggi di waduk
e. Saluran drainase di kaki lereng hilir banyak yang berlubang (lepas plesteran)
f. Dinding dan lantai saluran pengeluaran ada yang sudah retak dan berlubang
g. Rip-rap di saluran drainase ada yang sudah berantakan/rusak
h. Ada kebocoran di pintu intake
Indeks
Bobot Bobot Sub Elemen Bobot Ada/tidak
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Penilaian Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Tubuh
1 30%
Bendungan
Lapis Luas : 325 m x 15 m = 4.875
67% Ada 85% 57%
Pelindung m2 Total kerusakan = 731
m2
Luas : 22 m x 1.5 m = 33
Jalan Inspeksi 20% Ada 93% 19%
m2 Total kerusakan = 2,3
Lereng Hilir 30% 27%
m2
Luas : (162,5 x 1,9 m) + ( 162,5 x
Saluran
20% Ada 84% 17% 1,3 m) = 520 m2
Drainase
Total kerusakan = 83,2 m2
Jembatan Luas : 3 m x 2 m= 6 m2
19% Plat jembatan 30% Ada 95% 29% 18%
Hantar Total kerusakan =0,3 m2
Luas : 5 m x 5 m= 25 m2
Lantai 25% Ada 94% 24%
Total kerusakan = 1,5 m2
Menara Intake 19% 16%
Luas : 6 m x 4 = 24 m2
Atap Pelindung 25% Ada 92% 23%
Bangunan Total kerusakan = 2 m2
2 20%
Pengambilan
Tangga
25% Ada 70% 18%
inspeksi
Peralatan Penggerak
38% 100% Ada 80% 80% 30%
Hidromekanikal Manual
Luas : ( 1,5 x 15 m) x 2 m = 45
Bangunan Dinding 33% Ada 68% 23%
3 20% m2 Total kerusakan = 14 m2
Pengeluaran
Luas : 20 m x 25 m = 500
Lantai hulu 13% Lapis Beton 100% Ada 79% 79% 11%
m2 Total kerusakan = 105
m2
Luas : 4 m x 20 m = 80
Mercu Spillway 27% Lapis Beton 100% Ada 91% 91% 24%
m2 Total kerusakan = 7
m2
Luas : 5 m x 21 m = 105
Kolam Olak 35% Ada 80% 28%
m2 Total kerusakan = 21
m2
Luas : 21 m x 2 m = 42
Plat jembatan 19% Ada 93% 17%
m2 Total kerusakan = 3
m2
Tumpuan Saluran
50% 30% Tidak ada 0% 0% 21%
Kanan Drainase
Bangunan
2 20% 20% 22% 74% 17% Ada Kebocoran di pintu Intake
Pengambilan
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
Pelimpah Tidak ada bangunan pelimpah
6 5% 0% 0% 0% 0%
darurat darurat
Tidak ada saluran drainase
7 Bukit Tumpuan 5% 5% 6% 43% 2%
dan pagar pelindung
Jumlah 100% 90% 100% 77% Kinerja Cukup
REKOMENDASI
c. Perbaikan saluran pengeluaran karena dinding dan lantainya sudah retak dan berlubang
d. Perbaikan Saluran drainase di kaki lereng hilir karena banyak yang berlubang (lepas plesteran)
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 =7 x 9 11
Ketersediaa
30% Ada 90% 27%
n
Ketersediaa
20% Ada 90% 18%
n
Ketersediaa
30% Ada 75% 23%
Standar n
Operasional
30% Updating 20% Ada 65% 13% 22%
dan Prosedur
(SOP)
Pelaksanaan 50% Ada 75% 38%
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 70% 21%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi
Operasi 30% 24%
2 30% Darurat
Waduk Uji Operasi 30% Ada 75% 23%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 75% 38%
Layanan
3 30% Irigasi 100% Kualitas Air 40% Tercapai 70% 28% 75%
Waduk
Kepuasan Komplen 3-4
20% 75% 15%
User pertahun
Ketersediaa
40% Ada 75% 30%
n
Lokasi
Buku RTD 35% Penyimpana 30% Ada 75% 23% 25%
n
Updating 30% Ada 65% 20%
Layanan
3 30% 75% 23% Baru melayani untuk Irigasi
Bendungan
REKOMENDASI
b. Agar menyiapkan petugas darurat dan Sistem komunikasi dalam keadaan darurat
Pengukuran
50% tidak ada 0% 0%
Kualitas Air Kualitas Air
30% 0% Belum Ada
Waduk
Upaya Pencegahan 50% tidak ada 0% 0%
Pengukuran
50% Ada 55% 28%
Sedimentasi Sedimen
40% 22%
Waduk
Upaya Pencegahan 50% Ada 55% 28%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 80% 80% 48%
Kondisi Sempadan dan sempadan
4 10%
dan Greenbelt
Upaya konservasi 40% Upaya konservasi 100% tidak ada 0% 0% 0%
Di Tubuh
35% Ada 55% 19% Bisa lewat motor
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 55% 19% 28% ada sawah dan pemancingan
Masyarakat Sekitar Waduk
5 10% Di tepi
Sekitar Waduk 30% Ada 60% 18%
waduk/greenbelt
1 2 3 4 5=3x4 6
Hasil Pengamatan Tidak ada curah hujan, Peilschaal butuh di
1 30% 34% 10%
Instrumentasi kalibrasi ulang
Kondisi Sempadan
4 10% 48% 5% Kurangnya Upaya Konservasi
dan Greenbelt
Masyarakat
5 10% 28% 3% Akses jalan warga (motor)
Sekitar Waduk
Jumlah 48% Kinerja Buruk
REKOMENDASI
a. Peilschaal Butuh di kalibrasi ulang karena sudah tidak sesuai dengan kenyataan dilapangan
c. Perbaikan Bangunan V- Notch yang rusak sebanyak 2 buah dan belum ada Peilschaal semua
d. Disarankan Untuk Mengukur kualitas Air Waduk (2 sampai 3 kali Pertahun sebanyak 3 titik Pemantauan)
e. Disarankan juga untuk mengukur sedimentasi waduk secara rutin ( 1 kali pertahun)
Indeks
Bobot Bobot Sub Elemen Bobot Ada/tidak
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 =7 x 9 11
Unit
Staff 30% Ada 100% 30%
1 Pengelola 40%
Bendungan
Kinerja UPB 20% Pelaporan 100% Ada 90% 90% 18%
Kecukupan
50% Ada 90% 45%
Petugas Jumlah
25% 21%
Operasi
Kompetensi 50% Ada 75% 38%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 90% 45%
Jumlah
Gedung/kantor 20% 17%
Kondisi
50% Ada 75% 38%
Gedung
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 13%
Operasi Kondisi
50% Ada 60% 30%
peralatan
Kecukupan
50% Ada 60% 30%
Peralatan Jumlah
Sarana dan 20% 12%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
Unit Pengelola
1 40% 93% 37%
Bendungan (UPB)
Tidak ada Petugas Pemantauan dan
2 Petugas OP 20% 41% 8%
petugas Keamanan
REKOMENDASI
d. Disarankan melakukan pengecatan pada rumah jaga dan bangunan pendukung lainnya
Agar selalu menyiapkan sukucadang dan segera memperbaiki/mengganti peralatan operasi dan pemeliharaan yang
e.
sudah rusak
1. Data Umum
a. Nama Bendungan : Pacal
b. Alamat bendungan : Desa tretes. Kec.temayang, Kab.bojonegoro, Jawa timur
c. Koordinat intake X: 07°21’751’’
Y: 111°52’246’’
2. Riwayat Penanganan
3. Data Inventarisasi
a. Pintu penguras di dalam intake rusak (bisa dibuka tapi tidak keluar air)
b. Box pintu intake berkarat / bocor
c. Tangga bagian bawah intake berkarat & putus
d. Sekat balok tidak berfungsi (jumlah 16-18 buah)
e. Dinding saluran induk jebol, yang kiri ± 20 meter dan yang kanan ± 4-5 meter
f. Spillway longsor & jebol sebelah kanan
g. Jumlah Peizometer ada 2 buah (rusak)
h. Peilschaal rusak (sudah 5 tahun)
i. Pintu penguras sedimen rusak / dicuri
j. Lampu jalan rusak (16 buah)
k. Sambungan dinding hulu tubuh bendungan butuh aspal (filler)
l. Jembatan inspeksi ke intake perlu perbaikan
m. Tangga inspeksi ke saluran outlet sudah berlumut
Indeks
Bobot Bobot Sub Bobot Ada /
No. Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen tidak ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 90 m x 5 m = 450
Lapis Perkerasan 48% Ada 98% 47%
m2 Total kerusakan = 9
m2
Tubuh
1 30%
Bendungan
Luas : 90 m x 35 m = 3.150
Lapis Pelindung 50% Ada 86% 43%
m2 Total kerusakan = 441 m
2
Luas : (25 m x 1 m) x 2 = 50
Hand rail 13% Ada 98% 12%
m2 Total kerusakan = 1 m2
Luas : 3 m x 45 m = 135
Lantai hulu 14% Lapis Beton 100% Ada 40% 40% 6%
m2 Total kerusakan = 81
m2
Luas : 5 m x 45 m = 225
Mercu Spillway 29% Lapis Beton 100% Ada 67% 67% 19%
m2 Total kerusakan = 74
m2
Luas : 6 m x 40 m = 240
Lantai beton 70% Ada 55% 39%
m2 Total kerusakan = 108
m2
Saluran Luncur 14% 8%
Luas : (7 m x 35 m) = 245 m2
Kolam Olak 35% Ada 60% 21%
Total kerusakan = 98 m2
REKOMENDASI
b. Perbaikan Lampu jalan di puncak Bendungan karena sudah rusak (16 buah)
c. Perbaikan Pintu penguras di dalam intake (1,75 m x 1,57 m) karena sudah rusak ,bisa dibuka tidak keluar air
e. Perbaikan Tangga bagian bawah intake karena sudah berkarat & putus
f. Penggantian Aki Genset 2 buah dan Perbaikan Genset Yang sudah tidak bisa mengisi Aki
j. Perbaikan Dinding saluran induk karena sudah jebol, yang kiri ± 20 meter dan yang kanan± 4-5 meter
m. Tangga inspeksi di lereng hulu yang menuju ke saluran outlet sudah berlumut dan bagian bawah sudah rusak
Indeks
Bobot Sub Bobot Sub Elemen Bobot
No Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 80% 56%
Operasi operasi
40% 31%
Normal
Uji Operasi 30% Ada 75% 23%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi
Operasi 30% 23%
2 30% Darurat
Waduk Uji Operasi 30% Ada 70% 21%
Kecukupan
50% Ada 90% 45%
Operator jumlah
30% 25%
Bendungan
Kompetensi 50% Ada 75% 38%
Operasi
2 30% 79% 24%
Bendungan
Layanan
3 30% 77% 23% Baru melayani untuk Irigasi
Bendungan
REKOMENDASI
b. Agar melakukan sosialisasi dan simulasi untuk kesiapsiagaan darurat secara rutin
Inspeksi berkala
25% Pelaporan, 30% Ada 75% 23% 18%
biasa
Tindak lanjut 30% Ada 70% 21%
Pemeriksaan Luar
25% Pelaporan, 30% Ada 70% 21% 18%
Biasa
Tindak lanjut 30% Ada 75% 23%
Pengukuran
50% Ada 55% 28%
Sedimentasi Sedimen
40% 22%
Waduk
Upaya Pencegahan 50% Ada 55% 28%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 80% 80% 48%
dan sempadan
Kondisi Sempadan
4 10% Masih Bagus
dan Greenbelt
Di Tubuh
35% Ada 65% 23%
Bendungan
Aktivitas
Di Waduk 35% Ada 70% 25%
Masyarakat Sekitar 50% 35%
Masyarakat Sekitar Waduk
5 10% Di tepi
Waduk 30% Ada 75% 23%
waduk/greenbelt
Nilai Kinerja
Bobot Nilai Sistem
No Komponen Keterangan
Komponen Komponen Keamanan dan
Lingkungan
1 2 3 4 5=3x4 6
Hasil Pengamatan
1 30% 37% 11% Kurangnya Peilschaal, Piezometer rusak 2 titik.
Instrumentasi
Kondisi Sempadan
4 10% 48% 5% Kurangnya Upaya Konservasi
dan Greenbelt
Masyarakat Sekitar
5 10% 35% 3%
Waduk
Jumlah 44% Kinerja Buruk
REKOMENDASI
a. Perbaikan Piezometer yang sudah rusak sebanyak 2 buah (Sudah Rusak Selama 6 Tahunan)
b. Penggantian Peilschaal di menara Intake karena sudah 5 tahun dan Butuh Pengadaan Peilschaal di 3 titik
e. Disarankan Untuk Mengukur kualitas Air Waduk (2 sampai 3 kali Pertahun sebanyak 3 titik Pemantauan)
f. Disarankan juga untuk mengukur sedimentasi waduk secara rutin ( 1 kali pertahun)
Kecukupan
50% Ada 90% 45%
Jumlah
Petugas Operasi 25% 22%
Kompetensi 50% Ada 85% 43%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 80% 40%
Petugas Jumlah
25% 20%
Pemeliharaan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Tidak ada 80% 40%
Jumlah
Gedung/kantor 20% 16%
Kondisi Gedung 50% Tidak ada 75% 38%
Kecukupan
50% Ada 60% 30%
Jumlah
Peralatan Operasi 20% 12%
Kondisi
50% Ada 60% 30%
peralatan
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
Sarana dan 20% 13%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 60% 30%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 92% 37%
Bendungan (UPB)
Sarana dan
4 20% 40% 8% Belum ada kendaraan
Prasarana
Agar selalu menyiapkan sukucadang dan segera memperbaiki/Mengganti peralatan operasi dan pemeliharaan
c.
yang sudah rusak
Inventarisasi Bendungan
1. Data Umum
a. NamaBendungan : Prijetan
b. Alamat bendungan : Desa blumbang, kec.babat, kab.lamongan, jawa timur
c. Koordinat intake X: 07°12’934’’
Y: 112°12’636’’
2. Riwayat Penanganan
3. Data Inventarisasi
a. Pintu intake Berjumlah 2 buah tetapi sudah rusak 1 pintu, 1 pintu masih normal
b. Sedimentasi tinggi di dekat tanggul hulu waduk dan hilir saluran spillway
c. Jembatan hantar ke intake lantai kayunya sudah mulai rusak dan rapuh
d. Ada rembesan pada dinding tanggul bagian hulu
e. Banyak tumbuhan rumput liar di tanggul hulu dan hilir
f. Jalan di puncak tanggul sudah bergelombang dan tergenang air
g. Belum ada portal di puncak tanggul
h. Ada retakan di abutment jembatan spillway
i. V-notch berjumlah 2 buah tetapi sudah tidak berfungsi semua
j. Akses jalan menuju spillway rusak (kebun warga)
k. Jalan utama menuju ke bendungan/waduk milik perhutani
l. Dalam Empat tahun terakhir limpasan 12 cm
m. Sumber air waduk berasal dari tadah hujan
n. Butuh pengecatan di bangunan pendukung bendungan (Cat kuning dan biru + upah)
o. Butuh pengadaan mesin potong rumput
p. Curah hujan sudah tidak berfungsi dengan baik
q. Belum ada Lampu penerangan di sekitar waduk ( ± 10 titik)
Indeks
Bobot Bobot Sub Bobot Ada / Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 35 m x 1 m = 35
Jalan Inspeksi 20% Ada 78% 16%
Lereng Hilir 30% 25% m2 Total kerusakan = 7,7
m2
Luas : 7 m x 3 m= 21 m2
Bangunan Lantai 25% Ada 78% 20%
2 20% Total kerusakan = 4,6 m2
Pengambilan
Menara Intake 19% 15%
Luas : 9 m x 4 m = 36
Atap Pelindung 25% Ada 85% 21%
m2 Total kerusakan = 5,4
m2
Luas : 0,5 x 22 m= 11
Tangga inspeksi 25% Ada 72% 18%
m2 Total kerusakan = 3
m2
Luas : (1.50 x 2.0 m) x 4 = 12
Stoplog 67% Ada 65% 43%
m2 Total kerusakan = 4,2
Pintu Intake 25% 11%
m2
Luas : 2 x 6 m = 12 m2
Trashrack 33% Tidak Ada 0% 0%
Total kerusakan = 2,7 m2
Peralatan
38% Penggerak Manual 100% Ada 75% 75% 28%
Hidromekanikal
89%
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
a. Perlu perbaikan Jalan di puncak tanggul Karena sudah bergelombang dan tergenang air
b. Perlu perbaikan Parapet karena sudah banyak yang hilang dan rusak tertutup tanah
d. Perlu pengecekan dan perbaikan dinding tanggul bagian hulu karena ada rembesan
e. Perlu perbaikan Jembatan hantar ke intake karena lantai kayunya sudah mulai rusak dan rapuh
f. Perlu perbaikan Pintu intake (1,50 m x 2 m) karena sudah rusak 1 pintu (1pintu masih normal)
j. Perlu dilakukan pembabatan tumbuhan rumput liar di tanggul hulu dan hilir
l. Butuh pengecatan di bangunan pendukung bendungan (Cat kuning dan biru + upah)
m. Perlu perbaikan pada dinding dan lantai bangunan pelindung di saluran pengeluaran yang retak
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 70% 49%
operasi
Operasi Normal 40% 27%
Uji Operasi 30% Ada 65% 20%
Pelaksanaan
70% Ada 70% 49%
Operasi Operasi
2 30% Operasi Darurat 30% 21%
Waduk Uji Operasi 30% Ada 65% 20%
Kecukupan
50% Ada 80% 40%
Operator jumlah
30% 23%
Bendungan
Kompetensi 50% Ada 70% 35%
Layanan
3 30% Irigasi 100% Kualitas Air 40% Tercapai 75% 30% 77%
Waduk
Kepuasan Komplen 3-4
20% 75% 15%
User pertahun
Lokasi
Buku RTD 35% 30% Tidak ada 0% 0% 0%
Penyimpanan
Rencana Tindak
4 20% 0% 0% Belum Ada RTD
Darurat (RTD)
Jumlah 49% Kinerja buruk
REKOMENDASI
Indeks
Bobot Bobot Sub Bobot Ada / Tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Hasil Pengamatan Kondisi alat 30% Ada 0% 0% Kondisi alat tidak berfungsi
1 30% Rembesan (V-
Instrumentasi 23% 4%
Notch)
Hasil Pengamatan 40% Tidak ada 0% 0%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 75% 75% 45%
dan sempadan
Kondisi Sempadan
4 10% Masih Bagus
dan Greenbelt
Di Tubuh
35% Ada 45% 16% Bisa lewat motor
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 55% 19% 27% Pemancingan
Masyarakat Sekitar Sekitar Waduk
5 10% Di tepi
Waduk 30% Ada 65% 20%
waduk/greenbelt
Hubungan
Pelibatan
dengan 50% 100% tidak ada 0% 0% 0%
Masyarakat
masyarakat
Nilai Kinerja
Sistem
Bobot Nilai
No Komponen Keamanan Keterangan
Komponen Komponen dan
Lingkungan
1 2 3 4 5=3x4 6
2 Inspeksi 30% 67% 20% Kurangnya Inspeksi rutin dan berkala biasa
b. Disarankan pemasangan alat curah hujan minimal 1 unit dan Petugas pemantaunya
c. Disarankan Untuk Mengukur kualitas Air Waduk (2 sampai 3 kali Pertahun sebanyak 3 titik Pemantauan)
d. Disarankan juga untuk mengukur sedimentasi waduk secara rutin ( 1 kali pertahun)
e. Pengerukan Sedimen yang sudah tinggi didekat tanggul hulu waduk dan hilir saluran spillway
Kecukupan
50% Ada 95% 48%
Petugas Jumlah
25% 23%
Operasi
Kompetensi 50% Ada 85% 43%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Pemantauan
Kompetensi 50% Tidak ada 0% 0%
2 Petugas OP 20% Kecukupan
50% Ada 60% 30%
Petugas Jumlah
25% 16%
Pemeliharaan
Kompetensi 50% Ada 70% 35%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 80% 40%
Jumlah
Gedung/kantor 20% 15%
Kondisi
50% Ada 70% 35%
Gedung
Kecukupan
50% Ada 55% 28%
Peralatan Jumlah
20% 11%
Operasi Kondisi
50% Ada 50% 25%
peralatan
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
Sarana dan 20% 13%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 65% 33%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
50% Tidak ada 0% 0%
kendaraan
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 92% 37%
Bendungan (UPB)
Tidak ada Petugas Pemantauan dan petugas
2 Petugas OP 20% 39% 8%
Keamanan
3 Dokumen OP 20% 75% 15% Dokumen belum disediakan di lokasi
Sarana dan
4 20% 39% 8% Belum Ada Kendaraan
Prasarana
REKOMENDASI
b. Agar Petugas Pemeliharaan lebih Aktif lagi dalam pemeliharaan Bendungan dan Waduknya
Agar selalu menyiapkan sukucadang dan segera memperbaiki/mengganti peralatan operasi dan pemeliharaan yang
c.
sudah rusak
1. Data Umum
a. Nama Bendungan : Gondang
b. Alamat bendunga : Desa Gondang lor, kec.Sugiho, kab.Lamongan, Jawa timur
c. Koordinat intake X: 07°12’081’’
Y: 112°15’859’’
2. Riwayat Penanganan : - Inspeksi besar tahun 2014
- Manual O & P tahun 2014
3. Data Inventarisasi
a. Petugas minta pintu intake diganti dengan yang elektrik.
b. Daun pintu air dibawah sudah tipis.
c. Tanggul hulu ada pergeseran sepanjang ± 70 m (jarak geser 40 cm).
d. Ada retakan memanjang di puncak tanggul (bagian tumpuan kiri)
e. Di tanggul hilir menuju ke saluran outlet belum ada tangga/ jalan inspeksi.
f. Sedimentasi tinggi (menyusut ± 3.000.000 m3) butuh di normalisasi.
g. Pagar pengaman di dekat monumen waduk sudah rusak.
h. Filler di bangunan spillway sudah mulai habis/ aus yang mengakibatkan kebocoran
i. Gorong – gorong intake tulangannya sudah keluar & berkarat.
j. Banyak warga yang membuang sampah di saluran spillway
k. Patok geser ada 6 titik, sudah hilang 1 titik (perlu dilakukan pengukuran)
l. Masih kurangnya Papan larangan di sekitar waduk
m. Butuh Penangkal petir di bangunan intake
n. Butuh Lampu penerangan (± 12 titik).
o. Butuh pengecatan di bangunan pendukung bendungan.
p. Rumah jaga dan kantor sudah rusak (dalam perbaikan)
q. Saluran drainase di kaki tanggul hilir longsor.(dalam perbaikan)
r. Piezometer stand pipe rusak 7 buah (jumlah 22 bh)
s. Piezometer hidraulik ada 20 buah (tidak berfungsi)
t. Peilschaal tidak standar.
u. Ada instrumentasi terbaru (vibrating ware) 6 lubang, 16 sensor tetapi sampai
dilakukan survey inventarisasi kemarin (bulan maret) belum ada blangkonya, jadi
belum bisa di operasikan
Indeks
Bobot Bobot Sub Bobot Ada/tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Luas : 7 m x 3 m = 21 m2
Portal Masuk 10% Ada 98% 10%
Total kerusakan = 0,42 m2
Tubuh
1 30%
Bendungan
Luas : 903 m x 20 m = 18.060 m2
Lapis Pelindung 67% Ada 85% 57%
Total kerusakan = 2.709 m2
Luas : 18 m x 1.5 m= 27 m2
Plat jembatan 19% Ada 96% 18%
Total kerusakan = 1 m2
Luas : (8 x 4 x 4 m)+(2 x 7 x 7 m) =
Dinding 25% Ada 95% 24% 226 m2
Bangunan Total kerusakan = 11 m2
2 20%
Pengambilan
Luas : 7 m x 7 m= 49 m2
Lantai 25% Ada 90% 23%
Total kerusakan = 8.82 m2
Menara Intake 19% 17%
Luas : 7 m x 7 m = 49 m2
Atap Pelindung 25% Ada 97% 24%
Total kerusakan = 4.9 m2
Peralatan
38% Penggerak Manual 100% Ada 85% 85% 32%
Hidromekanikal
Luas : 9 m x 50 m = 450 m2
Lantai hulu 13% Lapis Beton 100% Ada 81% 81% 11%
Total kerusakan = 85.5 m2
Luas : 7 m x 50 m = 350 m2
Mercu Spillway 27% Lapis Beton 100% Ada 94% 94% 25%
Total kerusakan = 21 m2
Luas : 14 m x 7 m = 98 m2
Kolam Olak 35% Ada 87% 30%
Bangunan Total kerusakan = 13 m2
4 15%
Pelimpah
Luas : 14 m x 5 m = 70 m2
Peredam Energi 27% Kolam Terjunan 35% Ada 72% 25% 20%
Total kerusakan = 19,5 m2
Luas : 14 m x 15 m = 210 m2
Kolam Loncat 30% Ada 64% 19%
Total kerusakan = 75,6 m2
Luas : 15 m x 4 m = 60 m2
Plat jembatan 25% Ada 98% 25%
Total kerusakan = 1,2 m2
Jembatan 7% 7%
Gelagar 33% Ada 100% 33%
Bangunan
2 20% 20% 24% 78% 18% Daun Pintu Intake Sudah Tipis
Pengambilan
Gorong-gorong pengeluaran
Bangunan
3 20% 20% 24% 67% 16% tulangannya sudah keluar dan
Pengeluaran berkarat
Bangunan Lantai Saluran Spillway ada
4 15% 15% 18% 87% 15%
Pelimpah yang sudah bocor
Bendungan
5 5% 0% 0% 0% 0% Tidak ada bendungan Pelana
Pelana
Pelimpah Tidak ada bangunan pelimpah
6 5% 0% 0% 0% 0%
darurat darurat
REKOMENDASI
a. Penggantian pintu intake manual yang sudah berat diganti dengan yang elektrik
c. Pemeriksaan dan perbaikan Tanggul hulu karena ada pergeseran sepanjang ± 70 m (jarak geser 40 cm)
d. Pemeriksaan dan Perbaikan puncak tanggul Karena ada retakan memanjang (bagian tanggul kiri)
Butuh pembangunan tangga inspeksi Di tanggul hilir menuju ke saluran outlet karena belum ada tangga/ jalan
e.
inspeksi
i. Pada puncak bendungan dan intake perlu ditambahkan lampu penerangan sebanyak 18 titik
j. Perbaikan Saluran drainase di kaki tanggul hilir karena telah terjadi longsoran (dalam perbaikan)
Butuh penambahan Filler di Sambungan lantai beton bangunan spillway karena sudah mulai habis/ aus yang
k.
mengakibatkan kebocoran
Indeks
Bobot Bobot Sub Elemen Bobot
No Komponen Sub Komponen Keterangan Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Pelaksanaan
70% Ada 80% 56%
operasi
Operasi Normal 40% 30%
Uji Operasi 30% Ada 65% 20%
Pelaksanaan
70% Ada 80% 56%
Operasi Operasi Operasi
2 30% 30% 23%
Waduk Darurat
Uji Operasi 30% Ada 65% 20%
Kecukupan
50% Ada 85% 43%
Operator jumlah
30% 25%
Bendungan
Kompetensi 50% Ada 80% 40%
Layanan
3 30% Irigasi 100% Kualitas Air 40% Tercapai 80% 32% 81%
Waduk
Komplen 3-
Kepuasan User 20% 75% 15%
4 pertahun
REKOMENDASI
Indeks
Bobot Bobot Sub Bobot Ada / tidak
No Komponen Sub Komponen Elemen Penilaian Kondisi Yg Nilai Jumlah Foto Keterangan
Komponen Komponen Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11 12 13
Hasil Pengamatan
1 30% Kecukupan jumlah 20% Ada 85% 17% Jumlah = 1 buah
Instrumentasi
Tekanan Air Pori Kondisi alat 30% Ada 0% 0% Belum bisa berfungsi
(Piezometer) Jenis 17% 3%
Vibrating wire Hasil Pengamatan 40% Tidak ada 0% 0%
Kondisi grenbelt
60% Kondisi vegetasi 100% Ada 75% 75% 45%
dan sempadan
Kondisi Sempadan
4 10% Masih Bagus
dan Greenbelt
Di Tubuh
35% Ada 80% 28%
Bendungan
Aktivitas
Masyarakat 50% Di Waduk 35% Ada 75% 26% 38%
Sekitar Waduk
Di tepi
Masyarakat Sekitar 30% Ada 75% 23%
5 10% waduk/greenbelt
Waduk
Kondisi Sempadan
4 10% 45% 5% Belum ada upaya konservasi
dan Greenbelt
REKOMENDASI
b. Disarankan Untuk mengecek Patok geser Karena Ada 1 (Satu) Patok Geser Bagian Hilir yang tidak ada pengikatnya
d. Disarankan Untuk Mengukur kualitas Air Waduk (2 sampai 3 kali Pertahun sebanyak 3 titik Pemantauan)
e. Disarankan juga untuk mengukur sedimentasi waduk secara rutin ( 1 kali pertahun)
Indeks
Bobot Bobot Sub Elemen Bobot Ada / tidak
No Komponen Sub Komponen Kondisi Yg Nilai Jumlah
Komponen Komponen Penilaian Elemen ada
Ada
1 2 3 4 5 6 7 8 9 10 = 7 x 9 11
Kecukupan
50% Ada 90% 45%
Jumlah
Petugas Operasi 25% 21%
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Ada 80% 40%
Petugas Jumlah
25% 20%
Pemantauan
Kompetensi 50% Ada 80% 40%
Kecukupan
50% Tidak ada 0% 0%
Petugas Jumlah
25% 0%
Keamanan
Kompetensi 50% Tidak ada 0% 0%
Kecukupan
50% Ada 90% 45%
Jumlah
Gedung/kantor 20% 18%
Kondisi Gedung 50% Ada 85% 43%
Kecukupan
50% Ada 65% 33%
Peralatan Jumlah
20% 13%
Operasi Kondisi
50% Ada 65% 33%
peralatan
Kecukupan
50% Ada 60% 30%
Peralatan Jumlah
Sarana dan 20% 13%
4 20% Pemeliharaan Kondisi
Prasarana 50% Ada 65% 33%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Peralatan Jumlah
20% 0%
Pemantauan Kondisi
50% Tidak ada 0% 0%
peralatan
Kecukupan
50% Tidak ada 0% 0%
Jumlah
Kendaraan 20% 0%
Kondisi
kendaraan 50% Tidak ada 0% 0%
1 2 3 4 5=3x4 6
Unit Pengelola
1 40% 92% 37% Cukup
Bendungan (UPB)
REKOMENDASI
c. Agar selalu menyiapkan sukucadang dan segera memperbaiki peralatan operasi dan pemeliharaan
V.1 Umum
AKNOP Bendungan disusun untuk memperoleh penganggaran/pembiayaan operasi
dan pemeliharaan bendungan yang tepat sasaran sesuai dengan kebutuhan nyata di
lapangan agar terjamin transparansi, efisiensi, efektifitas dan akuntabilitas dalam
perhitungan biaya operasi dan pemeliharaan bendungan.
Formulir perhitungan AKNOP Bendungan ini merupakan bagian dari Pedoman
Tatacara Perhitungan AKNOP bendungan. Formulir ini disusun untuk memudahkan
pengelola bendungan dalam menyusun AKNOP Bendungan.
Formulir Perhitungan AKNOP Bendungan ini dilengkapi dengan beberapa Sheet
(halaman). Secara umum pola pikir hubungan antar halaman dalam formulir ini
disajikan berikut ini.
− Bahan Bakar (Genset,Operasi pintu air, dll) 7.866 Liter 9.700 76.304.274
− Oli/Pelumas 90 Liter 40.500 3.638.457
− Spare Part
Sparepart Mesin babat rumput 1 buah 150.000 143.480
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 20.280.000
− Golongan IV 24 OH 220.000 5.280.000
− Golongan III 24 OH 215.000 5.160.000
− Golongan II 24 OH 210.000 5.040.000
− Golongan I 24 OH 200.000 4.800.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 1.720 Liter 9.700 16.680.848
− Oli/Pelumas 103 Liter 40.500 4.158.162
− Spare Part
Sparepart Mesin babat rumput 1 buah 150.000 186.780
Seal 1 buah 600.000 600.000
Radiator 1 buah 940.000 940.000
Filter Oli 1 buah 200.000 200.000
Filter Solar 1 buah 185.000 185.000
Filter Udara 1 buah 365.000 365.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 20.280.000
− Golongan IV 24 OH 220.000 5.280.000
− Golongan III 24 OH 215.000 5.160.000
− Golongan II 24 OH 210.000 5.040.000
− Golongan I 24 OH 200.000 4.800.000
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 1.697 Liter 9.700 16.461.143
− Oli/Pelumas 100 Liter 40.500 4.044.186
− Spare Part
Sparepart Mesin babat rumput 2 buah 150.000 285.140
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 1.971 Liter 9.700 19.122.289
− Oli/Pelumas 206 Liter 40.500 8.363.246
− Spare Part
Sparepart Mesin babat rumput 3 buah 150.000 449.096
Seal 2 buah 600.000 1.200.000
Radiator 2 buah 940.000 1.880.000
Filter Oli 2 buah 200.000 400.000
Filter Solar 2 buah 185.000 370.000
Filter Udara 2 buah 365.000 730.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 683 Liter 9.700 6.626.070
− Oli/Pelumas 100 Liter 40.500 4.068.900
− Spare Part
Sparepart Mesin babat rumput 1 buah 150.000 105.600
Seal 1 buah 350.000 350.000
Radiator 1 buah 400.000 400.000
Filter Oli 1 buah 400.000 400.000
Filter Solar 1 buah 450.000 450.000
Filter Udara 1 buah 1.000.000 1.000.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
KP
KEGIATAN / SUB KEGIATAN / JENIS PERHITUNGAN
SD/C /
NO
P KD
BELANJA / RINCIAN BELANJA VOL. SAT. HARGA SATUAN JUMLAH BIAYA /
DK
/
TP
1 2 3 4 5 6 7 8
− Bahan Bakar (Genset,Operasi pintu air, dll) 880 Liter 9.700 8.533.556
− Oli/Pelumas 139 Liter 40.500 5.638.229
− Spare Part
Sparepart Mesin babat rumput 1 buah 150.000 206.798
Seal 1 buah 600.000 600.000
Radiator 1 buah 940.000 940.000
Filter Oli 1 buah 200.000 200.000
Filter Solar 1 buah 185.000 185.000
Filter Udara 1 buah 365.000 365.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 500 Liter 9.700 4.845.150
− Oli/Pelumas 100 Liter 40.500 4.047.300
− Spare Part
Sparepart Mesin babat rumput 1 buah 150.000 81.600
Seal 1 buah 600.000 600.000
Radiator 1 buah 940.000 940.000
Filter Oli 1 buah 200.000 200.000
Filter Solar 1 buah 185.000 185.000
Filter Udara 1 buah 365.000 365.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 405 Liter 9.700 3.930.944
− Oli/Pelumas 48 Liter 40.500 1.934.191
− Spare Part
Sparepart Mesin babat rumput 0 buah 150.000 51.202
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
524119
Belanja Perjalanan Lainnya (DN)
SOLO - JAKARTA
–
Uang Harian Perjalanan Dinas (DKI Jakarta) 8 O 370.000
–
Biaya Penginapan Perjalanan Dinas Kelas Bintang Dua H 450.000
–
Biaya Taksi Perjalanan Dinas 8 150.000
–
Biaya Tiket Pesawat Jakarta - Solo (PP) OH 2.000.000
4
OH
4
OH
JOBSITE
− Golongan IV 18 OH
− Golongan III 18 OH
− Golongan II 18 OH
− Golongan I 18 OH
Biaya OP 2 Tahunan
– Penggantian Nitrogen
– PENGGANTIAN SEAL
Biaya OP 5 Tahunan
– Manual Operasi dan Pemeliharaan
– Rencana Tindak Darurat
– Inspeksi Besar
Biaya OP 20 Tahunan
– PENGERUKAN SE
– SPECIAL STUD
– PERBAIKAN
Lereng Hu
Lereng
− Bahan Bakar (Genset,Operasi pintu air, dll) 1.694 Liter 9.200 15.588.094
− Oli/Pelumas 27 Liter 20.000 549.410
− Spare Part
Sparepart Mesin babat rumput 5 buah 165.300 866.362
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 16.920.000
− Golongan IV 18 OH 250.000 4.500.000
− Golongan III 18 OH 240.000 4.320.000
− Golongan II 18 OH 230.000 4.140.000
− Golongan I 18 OH 220.000 3.960.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 971 Liter 9.200 8.929.060
− Oli/Pelumas 110 Liter 20.000 2.201.618
− Spare Part
Sparepart Mesin babat rumput 4 buah 165.300 599.091
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 16.920.000
− Golongan IV 18 OH 250.000 4.500.000
− Golongan III 18 OH 240.000 4.320.000
− Golongan II 18 OH 230.000 4.140.000
− Golongan I 18 OH 220.000 3.960.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 717 Liter 9.200,00 6.591.800,00
− Oli/Pelumas 91 Liter 20.000,00 1.812.782,22
− Spare Part
Sparepart Mesin babat rumput 2 buah 165.300,00 378.823,52
Seal - buah 600.000,00 -
Radiator - buah 940.000,00 -
Filter Oli - buah 200.000,00 -
Filter Solar - buah 185.000,00 -
Filter Udara - buah 365.000,00 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000,00 -
Kendaraan Roda 3 - Kali 400.000,00 -
Mobil/Pick Up - Kali 400.000,00 -
Dump Truck - Kali 450.000,00 -
Speed Boat - Kali 1.000.000,00 -
JOBSITE 16.920.000,00
− Golongan IV 18 OH 250.000,00 4.500.000,00
− Golongan III 18 OH 240.000,00 4.320.000,00
− Golongan II 18 OH 230.000,00 4.140.000,00
− Golongan I 18 OH 220.000,00 3.960.000,00
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
KP/
KEGIATAN / SUB KEGIATAN / JENIS PERHITUNGAN
SD/C KD
NO
P /
BELANJA / RINCIAN BELANJA VOL. SAT. HARGA SATUAN JUMLAH BIAYA DK
/
TP
1 2 3 4 5 6 7 8
− Bahan Bakar (Genset,Operasi pintu air, dll) 509 Liter 9.700 4.935.360
− Oli/Pelumas 49 Liter 35.800 1.745.369
− Spare Part
Sparepart Mesin babat rumput 2 buah 165.300 359.693
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 660 Liter 9.700 6.398.120
− Oli/Pelumas 91 Liter 35.800 3.266.710
− Spare Part
Sparepart Mesin babat rumput 2 buah 165.300 409.062
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 292 Liter 9.700 2.830.945
− Oli/Pelumas 44 Liter 35.800 1.581.326
− Spare Part
Sparepart Mesin babat rumput 1 buah 165.300 132.460
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 500.000 -
Dump Truck - Kali 459.216 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 103 Liter 9.700 1.002.495
− Oli/Pelumas 43 Liter 35.800 1.551.477
− Spare Part
Sparepart Mesin babat rumput 1 buah 165.300 91.113
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 15.210.000
− Golongan IV 18 OH 220.000 3.960.000
− Golongan III 18 OH 215.000 3.870.000
− Golongan II 18 OH 210.000 3.780.000
− Golongan I 18 OH 200.000 3.600.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 837 Liter 9.200 7.700.400
− Oli/Pelumas 91 Liter 20.000 1.815.733
− Spare Part
Sparepart Mesin babat rumput 2 buah 165.300 386.141
Seal - buah 600.000 -
Radiator - buah 940.000 -
Filter Oli - buah 200.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 365.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 400.000 -
Dump Truck - Kali 450.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 16.920.000
− Golongan IV 18 OH 250.000 4.500.000
− Golongan III 18 OH 240.000 4.320.000
− Golongan II 18 OH 230.000 4.140.000
− Golongan I 18 OH 220.000 3.960.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
KP/
KEGIATAN / SUB KEGIATAN / JENIS PERHITUNGAN
SD/C KD
NO
P /
BELANJA / RINCIAN BELANJA VOL. SAT. HARGA SATUAN JUMLAH BIAYA DK
/
TP
1 2 3 4 5 6 7 8
− Bahan Bakar (Genset,Operasi pintu air, dll) 9.018 Liter 9.200 82.965.664
− Oli/Pelumas 242 Liter 33.300 8.049.881
− Spare Part
Sparepart Mesin babat rumput 1 buah 138.000 196.160
Seal 8 buah 603.000 4.824.000
Radiator 8 buah 940.000 7.520.000
Filter Oli 8 buah 199.000 1.592.000
Filter Solar 8 buah 185.000 1.480.000
Filter Udara 8 buah 400.000 3.200.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 4.000.000 -
Dump Truck - Kali 4.500.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 15.304 Liter 9.200 140.800.940
− Oli/Pelumas 60 Liter 33.300 2.001.774
− Spare Part
Sparepart Mesin babat rumput 2 buah 138.000 323.472
Seal 3 buah 603.000 1.809.000
Radiator 3 buah 940.000 2.820.000
Filter Oli 3 buah 199.000 597.000
Filter Solar 3 buah 185.000 555.000
Filter Udara 3 buah 400.000 1.200.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 4.000.000 -
Dump Truck - Kali 4.500.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 12.350.000
− Golongan IV 13 OH 250.000 3.250.000
− Golongan III 13 OH 240.000 3.120.000
− Golongan II 13 OH 235.000 3.055.000
− Golongan I 13 OH 225.000 2.925.000
− Bahan Bakar (Genset,Operasi pintu air, dll) 735 Liter 9.200 6.762.066
− Oli/Pelumas 81 Liter 33.300 2.697.304
− Spare Part
Sparepart Mesin babat rumput 2 buah 138.000 331.205
Seal - buah 603.000 -
Radiator - buah 940.000 -
Filter Oli - buah 199.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 400.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 4.000.000 -
Dump Truck - Kali 4.500.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 12.350.000
− Golongan IV 13 OH 250.000 3.250.000
− Golongan III 13 OH 240.000 3.120.000
− Golongan II 13 OH 235.000 3.055.000
− Golongan I 13 OH 225.000 2.925.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
− PENGGANTIAN SEAL 1 Ls - -
KP/
KEGIATAN / SUB KEGIATAN / JENIS PERHITUNGAN
SD/C KD
NO
P /
BELANJA / RINCIAN BELANJA VOL. SAT. HARGA SATUAN JUMLAH BIAYA DK
/
TP
1 2 3 4 5 6 7 8
− Bahan Bakar (Genset,Operasi pintu air, dll) 1.280 Liter 9.200 11.771.860
− Oli/Pelumas 55 Liter 33.300 1.819.764
− Spare Part
Sparepart Mesin babat rumput 4 buah 138.000 544.309
Seal - buah 603.000 -
Radiator - buah 940.000 -
Filter Oli - buah 199.000 -
Filter Solar - buah 185.000 -
Filter Udara - buah 400.000 -
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 4.000.000 -
Dump Truck - Kali 4.500.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
− Bahan Bakar (Genset,Operasi pintu air, dll) 15.191 Liter 9.200 139.756.625
− Oli/Pelumas 59 Liter 33.300 1.981.195
− Spare Part
Sparepart Mesin babat rumput 1 buah 138.000 90.887
Seal 2 buah 603.000 1.206.000
Radiator 2 buah 940.000 1.880.000
Filter Oli 2 buah 199.000 398.000
Filter Solar 2 buah 185.000 370.000
Filter Udara 2 buah 400.000 800.000
− Perawatan Kendaraan
Sepeda Motor - Kali 350.000 -
Kendaraan Roda 3 - Kali 400.000 -
Mobil/Pick Up - Kali 4.000.000 -
Dump Truck - Kali 4.500.000 -
Speed Boat - Kali 1.000.000 -
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
− Penggantian Nitrogen - LS - -
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
JOBSITE 12.350.000
− Golongan IV 13 OH 250.000 3.250.000
− Golongan III 13 OH 240.000 3.120.000
− Golongan II 13 OH 235.000 3.055.000
− Golongan I 13 OH 225.000 2.925.000
Biaya OP 2 Tahunan -
− Penggantian Nitrogen - LS - -
− PENGGANTIAN SEAL 1 Ls - -
JOBSITE 22.800.000
− Golongan IV 24 OH 250.000 6.000.000
− Golongan III 24 OH 240.000 5.760.000
− Golongan II 24 OH 235.000 5.640.000
− Golongan I 24 OH 225.000 5.400.000
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
JOBSITE 12.350.000
− Golongan IV 13 OH 250.000 3.250.000
− Golongan III 13 OH 240.000 3.120.000
− Golongan II 13 OH 235.000 3.055.000
− Golongan I 13 OH 225.000 2.925.000
− PERBAIKAN HIDROMEKANIKAL -
Overhaul HM Intake - Unit - -
Overhaul HM Outlet - Unit - -
Overhaul Pintu Spillway - Unit - -
Overhaul Pintu Emergency Spillway - Unit - -
VI.1 KESIMPULAN
Dari hasil pembahasan bab – bab sebelumnya maka dapat ditarik kesimpulan Penilaian kinerja
bendungan yang dilakukan pada semua komponen bendungan yang berpengaruh terhadap
kinerja bendungan, tidak terbatas pada komponen fisik tetapi juga kondisi non fisik.
Berikut adalah hasil penilaian kinerja bendungan yang didapatkan :
Operasi dan
No Nama Bendungan Pemeliharaan Berkala Pemeliharaan
Pemeliharaan Rutin Jumlah
Khusus
(Tahunan) 2 Tahunan 5 Tahunan 20 Tahunan (Rp)
(Rp) (Rp) (Rp) (Rp) (Rp)
1 Bendungan Nawangan 616.941.000,00 2.500.000.000,00 2.518.029.090,00 116.000.000,00 5.750.970.090,00
BBWS BS. 2014. “Data base Bendungan Wilayah Sungai Bengawan Solo” Solo : BBWS BS.
Dirjen SDA. 2015. “Konsepsi Pengaturan Penyusunan Rancangan Pedoman Penilaian Kinerja
Bendungan” Jakarta : Dirjen SDA.
Dirjen SDA. 2015. “ Lampiran I-VII Surat Edaran Direktur Jenderal Sumber Daya Air Tentang
Pedoman Penilaian Kinerja Bendungan” Jakarta : Dirjen SDA.
Dirjen SDA. 2015. “ Lampiran II Surat Edaran Direktur Jenderal Sumber Daya Air Tentang
Petunjuk Pengisian dan Penggunaan Formulir Perhitungan AKNOP Bendungan” Jakarta :
Dirjen SDA.
Direktorat Bina Operasi. 2015. “Formulir Perhitungan AKNOP Bendungan“ Jakarta :
Direktorat Bina Operasi dan Pemeliharaan.
BBWS BS. 2016. “Data base Bendungan Wilayah Sungai Bengawan Solo” Solo : BBWS BS.
Dinas Pekerjaan Umum. 2017. “Daftar Harga Upah Dan Bahan” Wonogiri : DPU.
Dinas Pekerjaan Umum. 2017. “Daftar Harga Upah Dan Bahan” Boyolali : DPU.
Dinas Pekerjaan Umum. 2017. “Daftar Harga Upah Dan Bahan” Karanganyar :
DPU. Dinas Pekerjaan Umum. 2017. “Daftar Harga Upah Dan Bahan” Klaten :
DPU. Dinas Pekerjaan Umum. 2017. “Daftar Harga Upah Dan Bahan” Sragen :
DPU. Dinas Pekerjaan Umum. 2017. “Daftar Harga Upah Dan Bahan” Jawa timur :
DPU.