Oleh:
Hasanudin, S.T., M.T.
Ir. Hesty Anita Kurniawati, M.Sc.
Danu Utama, S.T., M.T.
DAFTAR ISI
DAFTAR ISI ................................................................................................................... ii
DAFTAR GAMBAR.......................................................................................................... iii
DAFTAR TABEL ............................................................................................................. iv
KATA PENGANTAR ......................................................................................................... v
Bab 1 PENDAHULUAN ....................................................................................................1
1.1 TUJUAN TUGAS DESAIN KAPAL I ...................................................................... 1
1.2 PRASYARAT TUGAS DESAIN KAPAL I ................................................................. 1
1.3 DOSEN PEMBIMBING TUGAS DESAIN KAPAL I ................................................... 1
1.4 PENILAIAN TUGAS DESAIN KAPAL I .................................................................. 2
1.5 BERKAS TUGAS DESAIN KAPAL I....................................................................... 2
Bab 2 PROSEDUR PELAKSANAAN TUGAS DESAIN KAPAL I ................................................3
Bab 3 METODOLOGI TUGAS DESAIN KAPAL I ..................................................................5
3.1 LANGKAH PENGERJAAN TUGAS DESAIN KAPAL I ................................................ 5
3.1.1 Tahap 1: Penentuan Ukuran Utama Kapal Awal............................................ 5
3.1.2 Tahap 2: Pemeriksaan Persyaratan Teknis, Regulasi, dan Payload ................. 5
3.1.3 Tahap 3: Pembuatan Rencana Garis (Lines Plan ) ........................................ 6
3.1.4 Tahap 4: Pembuatan Rencana Umum (General Arrangement) ....................... 6
3.2 JADWAL PENGERJAAN TUGAS DESAIN KAPAL I .................................................. 9
Bab 4 PEDOMAN PENULISAN LAPORAN TUGAS DESAIN KAPAL I ..................................... 10
4.1 FORMAT LAPORAN TUGAS DESAIN KAPAL I ......................................................10
4.2 ISI LAPORAN TUGAS DESAIN KAPAL I .............................................................. 12
4.2.1 Bagian Awal Laporan Tugas Desain Kapal I................................................. 12
4.2.2 Bagian Inti Laporan Tugas Desain Kapal I .................................................. 14
4.2.3 Bagian Akhir Tugas Desain Kapal I .............................................................14
Bab 5 PEDOMAN PEMBUATAN GAMBAR TUGAS DESAIN KAPAL I ..................................... 17
5.1 FORMAT UMUM ..............................................................................................17
5.2 FORMAT GAMBAR RENCANA GARIS..................................................................19
5.3 FORMAT GAMBAR RENCANA UMUM ................................................................. 19
DAFTAR PUSTAKA........................................................................................................ 20
LAMPIRAN
LAMPIRAN 1 FORM TD1-01 “EVALUASI TUGAS DESAIN KAPAL I”
LAMPIRAN 2 FORM TD1-02 “LEMBAR ASISTENSI TUGAS DESAIN KAPAL I”
LAMPIRAN 3 “LAPORAN TUGAS DESAIN KAPAL I”
LAMPIRAN 4 “GAMBAR RENCANA GARIS (LINES PLAN)”
LAMPIRAN 5 “GAMBAR RENCANA UMUM (GENERAL ARRANGEMENT)”
Halaman:
Fakultas Teknologi Kelautan, ITS
ii dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
DAFTAR GAMBAR
Gambar 2.1 Diagram Alir Prosedur Pelaksanaan Tugas Desain Kapal I di Departemen Teknik
Perkapalan................................................................................................. 4
Gambar 3.1 Diagram Alir Langkah Pengerjaan Tugas Desain Kapal I di Departemen Teknik
Perkapalan................................................................................................. 8
Halaman:
Fakultas Teknologi Kelautan, ITS
iii dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
DAFTAR TABEL
Tabel 3.1 Jadwal Pengerjaan Tugas Desain Kapal I di Departemen Teknik Perkapalan ........ 9
Tabel 5.1 Jenis Garis ....................................................................................................18
Halaman:
Fakultas Teknologi Kelautan, ITS
iv dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
KATA PENGANTAR
Mahasiswa Departemen Teknik Perkapalan FTK ITS wajib mengambil mata kuliah
Tugas Desain Kapal I (MN 141355) dengan bobot 4 SKS. Untuk memberikan pedoman
dalam pelaksanaan Tugas Desain Kapal I maka disusun “Pedoman Tugas Desain Kapal I”
agar kegiatan pengerjaan Tugas Desain Kapal I dapat dilaksanakan oleh mahasiswa sesuai
dengan aturan dan norma akademis yang berlaku.
Pedoman ini disusun dengan mengacu pada “Kurikulum Jurusan Teknik Perkapalan
Tahun 2014” serta dengan mempertimbangkan kondisi dan situasi akademis terkini di
Departemen Teknik Perkapalan FTK ITS.
Pedoman ini akan terus dievaluasi dan disempurnakan pada masa mendatang
dengan mempertimbangkan dinamika kegiatan akademis pada Departemen Teknik
Perkapalan FTK ITS.
Halaman:
Fakultas Teknologi Kelautan, ITS
v dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Bab 1
PENDAHULUAN
1.1 TUJUAN TUGAS DESAIN KAPAL I
Tugas Desain Kapal I (TD 1) yang berada di bawah Rumpun Mata Kuliah (RMK)
Desain Kapal dilaksanakan dengan tujuan umum agar mahasiswa mampu memahami proses
mendesain kapal sesuai dengan persyaratan teknis dan peraturan yang berlaku baik
nasional maupun internasional.
Halaman:
Fakultas Teknologi Kelautan, ITS
1 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Apabila mahasiswa mengulang mata kuliah Tugas Desain Kapal I maka berlaku
ketentuan sebagai berikut:
1. Mengulang 1 (satu) kali maka Dosen Pembimbing tetap; dan
2. Mengulang 2 (dua) kali maka akan mendapat Dosen Pembimbing baru.
Mahasiswa dinyatakan lulus mata kuliah Tugas Desain Kapal I apabila nilai total
minimal 51 dan memenuhi persyaratan minimal kehadiran sesuai dengan yang tertulis pada
Bab 2 nomor 2 dan 4.
Halaman:
Fakultas Teknologi Kelautan, ITS
2 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Bab 2
PROSEDUR PELAKSANAAN TUGAS DESAIN KAPAL I
Secara umum prosedur pelaksanaan TD 1 di Departemen Teknik Perkapalan adalah
sebagai berikut:
1. Pada minggu ke-1 Kepala Studio Gambar melakukan pembagian kelompok mahasiswa
dan Dosen Pembimbing dengan persetujuan dari Kepala Program Studi Sarjana serta
memberikan data tentang jenis kapal dan payload.
2. Mulai minggu ke-1 Koordinator Kelas dan Tim Dosen memberikan materi di kelas sesuai
dengan Rencana Pembelajaran Semester (RPS) sebanyak 8 (delapan) kali pertemuan
dan wajib dihadiri oleh semua mahasiswa yang mengambil mata kuliah tersebut, di
mana minimal kehadiran mahasiswa adalah 6 (enam) kali dalam satu semester. Apabila
kehadiran mahasiswa kurang maka dinyatakan tidak lulus mata kuliah Tugas Desain
Kapal I. Materi TD 1 adalah sesuai dengan Bab 3.
3. Pada minggu ke-2 mahasiswa mulai asistensi ke Dosen Pembimbing yang telah
ditetapkan dengan membawa:
a. Form TD1-01 “Evaluasi Tugas Desain Kapal I”; dan
b. Form TD1-02 “Lembar Asistensi Tugas Desain Kapal I”.
Dosen Pembimbing memberikan data tambahan tentang muatan, kecepatan dinas (Vs),
rute pelayaran, dan klasifikasi.
4. Mahasiswa wajib melakukan asistensi kemajuan pengerjaan TD 1 kepada Dosen
Pembimbing dengan sistem tutorial secara teratur minimal 10 (sepuluh) kali dalam 1
(satu) semester. Apabila jumlah asistensi mahasiswa kurang maka dinyatakan tidak lulus
mata kuliah Tugas Desain Kapal I. Bagi mahasiswa yang mengulang jumlah asistensi
diserahkan kepada Dosen Pembimbing masing-masing.
5. Setiap asistensi mahasiswa wajib membawa Form TD1-02 “Lembar Asistensi Tugas
Desain Kapal I” dan Dosen Pembimbing wajib memberi paraf pada formulir tersebut.
Mahasiswa dan Dosen Pembimbing wajib menandatangani Form TU-03 “Daftar Hadir
Asistensi”.
6. Pada minggu ke-17 Dosen Pembimbing melakukan evaluasi terhadap semua mahasiswa
bimbingannya dengan mengisi Form TD1-01 “Evaluasi Tugas Desain Kapal I”, dengan
bobot nilai sesuai dengan Bab 1.4. Koordinator Kelas melakukan evaluasi terhadap
Halaman:
Fakultas Teknologi Kelautan, ITS
3 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Gambar 2.1 Diagram Alir Prosedur Pelaksanaan Tugas Desain Kapal I di Departemen Teknik
Perkapalan
Halaman:
Fakultas Teknologi Kelautan, ITS
4 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Bab 3
METODOLOGI TUGAS DESAIN KAPAL I
Pengerjaan TD 1 di Departemen Teknik Perkapalan adalah sesuai dengan metodologi
seperti yang tertulis pada bab ini.
Halaman:
Fakultas Teknologi Kelautan, ITS
5 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
3. Melakukan perhitungan berat dan titik berat DWT. Komponen DWT meliputi payload,
consumables, berat crew, dan berat barang bawaan.
4. Melakukan pemeriksaan terhadap volume ruang muat dengan batas antara 1-5%
terhadap payload. Volume ruang muat dihitung dengan terlebih dahulu membuat
sketsa ruangan-ruangan utama kapal (ceruk depan, ruang muat, kamar mesin, dan
ceruk belakang). Jika perhitungan volume ruang muat memenuhi, maka selanjutnya
dilakukan perhitungan displacement kapal, serta berat dan titik berat kapal, namun
jika tidak memenuhi maka dilakukan perubahan ukuran utama kapal.
5. Melakukan pemeriksaan terhadap hukum Archimedes. Jika displacement dikurangi
dengan DWT dan LWT memenuhi pada batas margin antara +(2-10%) maka
selanjutnya dilakukan perhitungan freeboard. Jika tidak memenuhi maka dilakukan
perubahan ukuran utama kapal.
6. Perhitungan freeboard harus memenuhi International Convention on Load Lines,
1966 (ICLL 1966). Jika tidak memenuhi, maka dilakukan perubahan ukuran utama
kapal. Jika memenuhi selanjutnya dilakukan perhitungan stabilitas kapal.
7. Perhitungan stabilitas harus memenuhi 2008 Intact Stability Code (2008 IS Code).
Jika tidak memenuhi, maka dilakukan perubahan ukuran utama kapal. Jika
memenuhi maka didapatkan ukuran utama kapal akhir sebagai dasar dalam
pembuatan Lines Plan.
Halaman:
Fakultas Teknologi Kelautan, ITS
7 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Gambar 3.1 Diagram Alir Langkah Pengerjaan Tugas Desain Kapal I di Departemen Teknik
Perkapalan
Halaman:
Fakultas Teknologi Kelautan, ITS
8 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Tabel 3.1 Jadwal Pengerjaan Tugas Desain Kapal I di Departemen Teknik Perkapalan
MINGGU KE-
MATERI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Owner’s requirements
Ukuran utama awal kapal awal
Kapal pembanding
Regresi
Persyaratan teknis
Hambatan kapal
Daya mesin induk
Daya mesin bantu
Jumlah crew
Perhitungan berat dan titik berat kapal
Pemeriksaan displacement
Perhitungan freeboard
Pemeriksaan freeboard
Perhitungan stabilitas
Pemeriksaan stabilitas
Rencana Garis (Lines Plan )
Body Plan
Bentuk haluan
Bentuk buritan
Sheer Plan
Half-Breadth Plan
Offset Tables
Rencana Umum ( General Arrangement )
Outline
Penentuan jarak gading
Penentuan sekat
Pembagian ruangan-ruangan utama
Desain ruang akomodasi
Peralatan dan perlengkapan kapal
Laporan
Halaman:
Fakultas Teknologi Kelautan, ITS
9 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Bab 4
PEDOMAN PENULISAN LAPORAN TUGAS DESAIN KAPAL I
Pedoman penulisan Laporan TD 1 berisi hal-hal yang mengatur tata cara penulisan
laporan yang harus diikuti oleh mahasiswa dalam menyusun Laporan TD 1. Contoh format
penulisan Laporan TD 1 dapat dilihat pada Lampiran 3 “Laporan Tugas Desain Kapal I”.
Halaman:
Fakultas Teknologi Kelautan, ITS
10 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Halaman:
Fakultas Teknologi Kelautan, ITS
11 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
8. Pembuatan tabel
Tabel diberi nomor dan nama yang diletakkan di atas tabel di tengah halaman
(centred);
Nomor tabel terdiri atas dua angka yang dipisahkan oleh sebuah titik, angka
pertama ditulis dengan angka Romawi yang menunjukkan nomor bab tempat
tabel tersebut dimuat, sedangkan angka kedua ditulis dengan angka Arab yang
menunjukkan nomor urut tabel dalam bab, misalnya Tabel V.2;
Nama tabel ditulis dengan huruf kecil di mana setiap kata dimulai dengan huruf
kapital, kecuali kata sambung;
Pada data sekunder yang berbentuk tabel dan berasal dan satu sumber
dicantumkan nama penulis dan tahun nomor urut pustaka pada Daftar Pustaka
atau di bawah nama tabel; dan
Tabel yang memuat data yang dikutip dan beberapa sumber, tiap kumpulan data
dari satu sumber diberi cetak atas (superscript), dan cetak atas tersebut
dijelaskan pada catatan kaki (footnote) di bawah tabel. Sumber tersebut dapat
pula dituliskan pada satu kolom khusus pada tabel, di mana dalam hal ini tidak
diperlukan cetak atas.
Nama penulis ditulis secara lengkap tanpa disingkat. Halaman Sampul ditulis dalam
Bahasa Indonesia dengan menggunakan huruf yang sama dengan bagian halaman yang
lain (bukan huruf timbul dan/atau berwarna).
Halaman:
Fakultas Teknologi Kelautan, ITS
12 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Nomor bab ditulis dengan angka Romawi tanpa diakhiri dengan titik. Sedangkan nomor
sub-bab, angka pertama ditulis dengan angka Romawi yang menunjukkan nomor bab
dan angka berikutnya ditulis dengan angka Arab yang menunjukkan nomor urut sub-bab
tanpa diakhiri dengan titik, misalnya II.2. Judul BAB ditulis seluruhnya dengan huruf
kapital, sedangkan judul sub-bab dan anak sub-bab ditulis dengan huruf kecil kecuali
huruf pertama yang ditulis dengan huruf kapital.
Urutan Lampiran harus diberi nomor berupa angka 1, 2, 3, dan seterusnya, yang diikuti
dengan judul Lampiran yang ditulis dengan huruf kecil kecuali huruf pertama yang ditulis
dengan huruf kapital.
Tulisan DAFTAR PUSTAKA sebagai judul dari halaman ini diketik seluruhnya dengan
huruf besar cetak tebal (bold) di tengah halaman (centred).
Halaman:
Fakultas Teknologi Kelautan, ITS
14 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Semua sumber pustaka yang tercantum harus dirujuk dalam penulisan TD 1, dan semua
pustaka yang diacu secara langsung harus dicantumkan dalam Daftar Pustaka.
Cara penulisan Daftar Pustaka dan penyebutan acuan (citation) mengikuti style APA,
dengan format yang akan diuraikan berikut ini.
Halaman:
Fakultas Teknologi Kelautan, ITS
15 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
i. Acuan
(Clarke, D. and Kurniawati, H.A., 2000).
(Linde, 2004).
2. LAMPIRAN
Lampiran memuat keterangan tambahan yang dianggap bukan merupakan Bagian Inti
Laporan TD 1. Lampiran dapat berupa gambar, tabel, grafik, dan sebagainya. Apabila
terdapat lebih dari satu Lampiran maka setiap Lampiran harus diberi nomor yang berupa
angka 1, 2, 3, atau huruf kapital abjad Latin A, B, C, dan seterusnya. Lampiran didahului
oleh satu halaman yang hanya memuat kata LAMPIRAN sebagai judul dari halaman
yang diketik seluruhnya dengan huruf besar cetak tebal (bold) di tengah halaman
(centred), tanpa nomor halaman.
Halaman:
Fakultas Teknologi Kelautan, ITS
16 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Bab 5
PEDOMAN PEMBUATAN GAMBAR TUGAS DESAIN KAPAL I
Pedoman pembuatan gambar TD 1 berisi hal-hal yang mengatur format pembuatan
dan pencetakan gambar yang harus diikuti oleh mahasiswa. Dalam TD 1 terdapat 2 (dua)
gambar yang harus dicetak yaitu gambar Rencana Garis dan gambar Rencana Umum.
Contoh gambar Rencana Garis dan gambar Rencana Umum dapat dilihat pada Lampiran 4
dan Lampiran 5 secara berurutan.
Halaman:
Fakultas Teknologi Kelautan, ITS
17 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
6. Kepala gambar
Kepala gambar berada di sebelah kanan bawah dengan ukuran kotak 180 x 90
mm
Dilengkapi dengan lambang ITS, nama dan ukuran kapal, judul gambar, nama
desainer, nama pemeriksa, skala, tanda tangan desainer dan pemeriksa, tanggal,
keterangan, ukuran kertas, dan tulisan DEPARTEMENT OF NAVAL
ARCHITECTURE, FACULTY OF MARINE TECHNOLOGY, INSTITUT TEKNOLOGI
SEPULUH NOPEMBER
7. Ukuran utama kapal (ship particulars)
Dituliskan di atas kepala gambar
Data yang harus dicantumkan yaitu:
o Ship type
o Length overall (Loa)
Halaman:
Fakultas Teknologi Kelautan, ITS
18 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Halaman:
Fakultas Teknologi Kelautan, ITS
19 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
DAFTAR PUSTAKA
Harvald, S.S. (1983). Resistance and Propulsion of Ships. New York: John Wiley and Sons.
IMO, 2008 IS Code (International Code on Intact Stability, 2008).
IMO, COLREGs 1972 (Convention on the International Regulations for Preventing Collisions
at Sea, 1972, as amended).
IMO, ICLL 1966/1988 (International Convention on Load Lines, 1966, as amended by the
Protocol of 1988).
IMO, SOLAS 1974 (International Convention for the Safety of Life at Sea, 1974, as
amended).
IMO, Tonnage Convention 1969 (International Convention on Tonnage Measurement of
Ships, 1969).
ILO Conventions, International Labour Organization Conventions.
Rawson, K.J. and Tupper, E.C. (2001). Basic Ship Theory (5th ed., Vol. 1). Oxford:
Butterworth-Heinemann.
Taggart, R. (1980). Ship Design and Construction. Society of Naval Architect & Marine
Engineers.
van Dokkum, K. (2005). Ship Knowledge. Enkhuizen, The Netherlands: Dokmar.
Watson, D. (1998). Practical Ship Design (Vol. 1). (R. Bhattacharyya, Ed.) Oxford: Elsevier.
Halaman:
Fakultas Teknologi Kelautan, ITS
20 dari 20
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Lampiran 1
FORM TD1-01
“EVALUASI TUGAS DESAIN KAPAL I”
Nama : ……………………………………………………..
NRP : ……………………………………………………..
Semester : Gasal/Genap (coret yang tidak sesuai)
Tahun Ajaran : 20…/20…
Dosen Pembimbing : ……………………………………………………..
Mulai Selesai
Tanda Tangan Tanda Tangan
Tanggal Tanggal
Dosen Pembimbing Dosen Pembimbing
Data Kapal:
Jenis : ………………………………………………………………
Muatan : ………………………………………………………………
Payload : ………………………………………………………………
Kecepatan Dinas (Vs) : ………………………………………………………………
Rute Pelayaran : ………………………………………………………………
Klasifikasi : ………………………………………………………………
…………………………………………………… …………………………..…………………..
NIP NIP
Halaman:
Fakultas Teknologi Kelautan, ITS
1 dari 1
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Lampiran 2
FORM TD1-02
“LEMBAR ASISTENSI TUGAS DESAIN KAPAL I”
Nama : ……………………………………………………..
NRP : ……………………………………………………..
Semester : Gasal/Genap (coret yang tidak sesuai)
Tahun Ajaran : 20…/20…
Dosen Pembimbing : ……………………………………………………..
*)
NO. TANGGAL MATERI PARAF
1
Halaman:
Fakultas Teknologi Kelautan, ITS
1 dari 2
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id http://www.na.its.ac.id
Nama : ……………………………………………………..
NRP : ……………………………………………………..
Semester : Gasal/Genap (coret yang tidak sesuai)
Tahun Ajaran : 20…/20…
Dosen Pembimbing : ……………………………………………………..
*)
NO. TANGGAL MATERI PARAF
10
11
12
13
14
15
16
Surabaya, .................................
Dosen Pembimbing
…………………………..………
NIP
Catatan:
1. *) Paraf Dosen Pembimbing.
2. Formulir ini wajib dibawa pada saat asistensi.
3. Dosen Pembimbing wajib memberi paraf setiap selesai asistensi.
4. Asistensi dilaksanakan minimal 10 (sepuluh) kali dalam 1 (satu) semester
5. Formulir ini wajib dilampirkan di Laporan Tugas Desain Kapal I.
Halaman:
Fakultas Teknologi Kelautan, ITS
2 dari 2
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Lampiran 3
“LAPORAN TUGAS DESAIN KAPAL I”
Danu Utama
NRP 4108100065
Dosen Pembimbing
Ir. Wasis Dwi Aryawan, M.Sc., Ph.D.
[Trebuchet MS Bold 14 pt]
i
KATA PENGANTAR
Surabaya, .……………….
Penulis
ii
DAFTAR ISI
iii
IV.11.1 Perhitungan Stabilitas ........................................................................... 7
IV.11.2 Pemeriksaan Stabilitas .......................................................................... 7
BAB V DESAIN RENCANA GARIS.................................................................................... 8
V.1 Desain Bentuk Body Plan .................................................................................... 8
V.2 Desain Bentuk Haluan ......................................................................................... 8
V.3 Desain Bentuk Buritan ......................................................................................... 8
V.4 Desain Sheer Plan................................................................................................ 8
V.5 Desain Half-Breadth Plan .................................................................................... 8
BAB VI DESAIN RENCANA UMUM ................................................................................. 9
VI.1 Penentuan Jumlah Sekat dan Kompartemen ......................................................... 9
VI.2 Desain Layout Ruangan ....................................................................................... 9
VI.3 Desain Layout Kamar Mesin ................................................................................ 9
VI.4 Peralatan Tambat ................................................................................................. 9
VI.5 Lampu-lampu Navigasi ........................................................................................ 9
VI.6 Peralatan Keselamatan ......................................................................................... 9
BAB VII PENUTUP ............................................................................................................ 10
DAFTAR PUSTAKA .......................................................................................................... 11
LAMPIRAN
LAMPIRAN 1 Form TD1-02 “Lembar Asistensi Tugas Desain Kapal I”
LAMPIRAN 2 Detail Perhitungan dan Pemeriksaan Teknis dan Regulasi
LAMPIRAN 3 Gambar Rencana Garis Format A3
LAMPIRAN 4 Gambar Rencana Umum Format A3
iv
DAFTAR GAMBAR
Gambar II.1 Diagram Alir Langkah Pengerjaan Tugas Desain Kapal I ................................... 2
v
DAFTAR TABEL
vi
DAFTAR SIMBOL
vii
BAB I
PENDAHULUAN
I.2 Tujuan
(Uraian tentang tujuan TD 1.)
1
BAB II
METODOLOGI
II.1 Umum
(Penjelasan umum tentang metodologi yang digunakan, yaitu Point-Based Design.)
II.5 Asumsi-Asumsi
(Tuliskan asumsi-asumsi yang digunakan.)
2
BAB III
PENENTUAN UKURAN UTAMA AWAL
Tipe kapal :
Jenis muatan :
Kuantitas muatan : (pilih salah satu, payload atau DWT)
Kecepatan dinas :
Rute :
Bunkering Port :
Klasifikasi :
Bm (moulded breadth)
H (height)
T (draught)
Vs (service speed)
3
Tabel III.1 Kapal Pembanding
No. Nama kapal DWT Panjang (Lpp) Lebar (B) Tinggi (H) Sarat (T)
1
2
….
….
30
4
BAB IV
PERHITUNGAN DAN PEMERIKSAAN
TEKNIS DAN REGULASI
5
IV.6 Perhitungan Berat dan Titik Berat LWT
(Jelaskan dan hitung berat dan titik berat berdasarkan rumus-rumus pendekatan yang ada pada literatur.
Perhitungan LWT meliputi baja kapal, peralatan dan perlengkapan, serta permesinan.)
IV.10 Freeboard
(Uraikan mengenai perhitungan dan pemeriksaan freeboard.)
6
IV.10.2 Pemeriksaan Freeboard
(Periksalah ukuran freeboard yang telah didapatkan dengan cara membandingkan selisih H – T dengan
freeboard standar sesuai regulasi ICLL 1966.)
IV.11 Stabilitas
(Uraikan secara umum mengenai stabilitas kapal.)
7
BAB V
DESAIN RENCANA GARIS
Proses pembuatan Lines Plan dilakukan dengan menggunakan software desain hull
form, misalnya Maxsurf. Desain Lines Plan menggunakan parent ship (basis design).
bagian haluan, midship, sampai buritan yang terdiri dari garis-garis buttock line, station, dan waterline.)
8
BAB VI
DESAIN RENCANA UMUM
9
BAB VII
PENUTUP
(Buatlah ringkasan dari pekerjaan yang telah dilakukan dalam bentuk poin-poin.)
10
DAFTAR PUSTAKA
(Semua sumber pustaka yang tercantum harus dirujuk dalam penulisan TD 1, dan semua pustaka yang diacu
secara langsung harus dicantumkan dalam Daftar Pustaka.)
11
LAMPIRAN
Nama : ……………………………………………………..
NRP : ……………………………………………………..
Semester : Gasal/Genap (coret yang tidak sesuai)
Tahun Ajaran : 20…/20…
Dosen Pembimbing : ……………………………………………………..
*)
NO. TANGGAL MATERI PARAF
1
Halaman:
Fakultas Teknologi Kelautan, ITS
1 dari 2
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id http://www.na.its.ac.id
Nama : ……………………………………………………..
NRP : ……………………………………………………..
Semester : Gasal/Genap (coret yang tidak sesuai)
Tahun Ajaran : 20…/20…
Dosen Pembimbing : ……………………………………………………..
*)
NO. TANGGAL MATERI PARAF
10
11
12
13
14
15
16
Surabaya, .................................
Dosen Pembimbing
…………………………..………
NIP
Catatan:
1. *) Paraf Dosen Pembimbing.
2. Formulir ini wajib dibawa pada saat asistensi.
3. Dosen Pembimbing wajib memberi paraf setiap selesai asistensi.
4. Asistensi dilaksanakan minimal 10 (sepuluh) kali dalam 1 (satu) semester
5. Formulir ini wajib dilampirkan di Laporan Tugas Desain Kapal I.
Halaman:
Fakultas Teknologi Kelautan, ITS
2 dari 2
LAMPIRAN 2
DETAIL PERHITUNGAN DAN PEMERIKSAAN
TEKNIS DAN REGULASI
LAMPIRAN 3
GAMBAR RENCANA GARIS (LINES PLAN)
FORMAT A3
LAMPIRAN 4
GAMBAR RENCANA UMUM (GENERAL ARRANGEMENT)
FORMAT A3
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Lampiran 4
“GAMBAR RENCANA GARIS (LINES PLAN)”
ST 2.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST 2.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST 3 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST 3 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST 3.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX WL 9.00 m WL 9.00 m ST 3.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST 4 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX FP ST 4 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
.5
WL 8.00 m WL 8.00 m
19
ST 5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX TR ST 5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
AN
ST
SO
19
ST 6 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX M ST 6 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST
ST 7 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX WL 7.00 m AP WL 7.00 m ST 7 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
.5
18
ST
0.5 S
ST
ST 8 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX EN ST 8 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
E
ST 9 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
WL 6.00 m ST LIN T
LIN
WL 6.00 m
ST 9 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST 1 T
EN
18
1.5 E
S
ST
ST 10 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST 10 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
.5
WL 5.00 m WL 5.00 m
S T 17
ST 11 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST ST ST 11 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
2.5 2
ST 12 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST 12 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
WL 4.00 m WL 4.00 m
ST 17
ST 13 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST ST 13 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
3
.5
ST 16
ST 14 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST 14 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
WL 3.00 m WL 3.00 m
ST
ST 15 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX 3.5 ST 15 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
16
ST 16 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX WL 2.00 m ST WL 2.00 m ST 16 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST
4
ST 16.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX WL 1.50 m ST WL 1.50 m ST 16.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
14 15
5
ST S T
ST 17 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX WL 1.00 m ST WL 1.00 m ST 17 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
6
ST 17.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX WL 0.50 m WL 0.50 m ST 17.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST 18 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX BASE LINE BASE LINE ST 18 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
BL 9.50 m
BL 9.00 m
BL 8.50 m
BL 8.00 m
BL 7.00 m
BL 6.00 m
BL 5.00 m
BL 4.00 m
BL 3.00 m
BL 2.00 m
BL 1.00 m
BL 1.00 m
BL 2.00 m
BL 3.00 m
BL 4.00 m
BL 5.00 m
BL 6.00 m
BL 7.00 m
BL 8.00 m
BL 8.50 m
BL 9.00 m
BL 9.50 m
ST 7 ST 13
ST 18.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST 18.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST 8-ST 12 ST 8-ST 12
ST 19 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
℄ ST 19 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
ST 19.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX ST 19.5 X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
FP X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX FP X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX X.XXX
BULKWARK
FORECASTLE DECK CENTER LINE
POOP DECK SIDE LINE FORECASTLE DECK SIDE LINE
UPPER DECK CENTER LINE
UPPER DECK SIDE LINE
SHEER PLAN UPPER DECK CENTER LINE
UPPER DECK SIDE LINE
UPPER DECK CENTER LINE
7546
6476
WL 9.00 m WL 9.00 m
E
SID
3800
WL 8.00 m F WL 8.00 m
O
AT
FL
0m
m
m
m
m
m
m
BL BL BL BL BL BL BL m m 0 m
0 0 0
0
m
1.0
BL
0
9 .5
0
WL 7.00 m 5.00 7.00 8.0 5.0 WL 7.00 m
2.0
6 .0 8.5 9 .0 9 .5 6 .0 4.0
3 .0
9.0
8 .5
8.0
4.00 0m 0m 0m 0
m 0m 0m 7.0
m m FLA
BL BL BL BL
BL
BL
BL
BL
BL
BL
TO
FS BL
IDE
WL 6.00 m WL 6.00 m
9800
WL 5.00 m WL 5.00 m
WL 4.00 m WL 4.00 m
KNUC
WL 3.00 m KLE WL 3.00 m
L INE
FLAT OF SIDE
WL 2.00 m WL 2.00 m
WL 1.50 m BL WL 1.50 m
BL 2.00
2093
1.0 m
WL 1.00 m 0m WL 1.00 m
BL 3.00
WL 0.50 m m WL 0.50 m
BASE LINE BASE LINE
BL 1.00 m
FP
AP ST 0.5 ST 1 ST 1.5 ST 2 ST 2.5 ST 3 ST 3.5 ST 4 ST 5 ST 6 ST 7 ST 8 ST 9 ST 11 ST 12 ST 13 ST 14 ST 15 ST 16 ST 17 ST 18 ST 19 FP
BL 2.00 m
BL 3.00 m
POOP DECK SIDE LINE BOAT DECK SIDE LINE WL 7.00 m BULWARK
UPPER DECK SIDE LINE WL 6.00 m FORECASLE DECK SIDE LINE
WL 5.00 m UPPER DECK SIDE LINE
WL 4.00 m WL 9.00 m
WL 9.00 m
HALF-BREADTH PLAN WL 3.00 m
WL 2.00 m
WL 8.00 m
BL 9.50 m BL 9.50 m
BL 9.00 m BL 9.00 m
BL 8.50 m BL 8.50 m
BL 8.00 m FLAT OF BOTTOM BL 8.00 m
BL 7.00 m BL 7.00 m
0m
8.0 WL
WL m
WL
1.00
1.50
m
WL
.00 0.50 m
BL 6.00 m L7 m m m m BL 6.00 m
W .00 0m 0 m
.00 0m m m
L6 .0 4.0 .00 .5 .00 .50
W L5 L L3 L2 L1 L1 L0
W W W W W W W
BL 5.00 m BL 5.00 m
BL 4.00 m BL 4.00 m
BL 3.00 m E BL 3.00 m
KLE LIN
KNUC
BL 2.00 m BL 2.00 m
BL 1.00 m BL 1.00 m
℄ ℄
AP ST 0.5 ST 1 ST 1.5 ST 2 ST 2.5 ST 3 ST 3.5 ST 4 ST 5 ST 6 ST 7 ST 8 ST 9 ST 11 ST 12 ST 13 ST 14 ST 15 ST 16 ST 17 ST 18 ST 19 FP
PRINCIPAL DIMENSIONS
SHIP TYPE PRODUCT OIL TANKER
LENGTH OVERALL (Loa) 108.00 m
SENT LINE LENGTH BETWEEN PERPENDICULARS (Lpp) 102.00 m
BREADTH (B) 19.20 m
HEIGHT (H) 9.30 m
DRAUGHT (T) 6.00 m
SERVICE SPEED (Vs) 12.00 knots
COMPLEMENTS 26 Persons
MAIN ENGINE POWER 3000 HP
DEPARTEMENT OF NAVAL ARCHITECTURE
FACULTY OF MARINE TECHNOLOGY
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
MT SUMBADRA 6500 DWT
LINES PLAN
SCALE 1 : 100 SIGNATURE DATE REMARKS
DRAWN Danu Utama DD-MM-YY 4108100065
APPROVED Ir. Wasis Dwi Aryawan, M.Sc., Ph.D. DD-MM-YY A0
DEPARTEMEN TEKNIK PERKAPALAN
Kampus ITS Sukolilo, Surabaya 60111
Telp: 031 594 7254, Fax: 031 596 4182, Email: kapal@its.ac.id
http://www.na.its.ac.id
Lampiran 5
“GAMBAR RENCANA UMUM (GENERAL ARRANGEMENT)”
WBT
CHAIN
L OCKER
LO
FRES H WATER S ETTLING
(P& S) TANK
WBT 2 52 m 3
S LOP TANK
FUEL OIL (MDO) TANK (P&S)
(P& S)
W.B.T CARGO OIL TANK CARGO OIL TANK W.B.T
3 92 m 3 2 58 m
3
No. 5
No. 1 FORE PEAK
No. 4 No. 3 No. 2 DEEP
E SCA PE TRUNK
COF FE
E MERGENCY
T ABLE
C.E.
G ENERATOR
B OOK
CASE
4 th ENG 1 st E NG. DAY ROOM
ROOM S TORE 3 rd ENG DN P ILOT
R
ROOM
R D R
RADIO
S TATION
A NTE NNA
DN FOREMAN UP DN DN DN
DN
E L. STR. B ATTERY
G YMNA SIUM ROOM
FUNNEL P RAY ROOM FUNNEL
CL E NGINE CASING ROOM
CL CL O FFICE
CL CL CL CL RM MC
CL CL CL
10 15 20 25 30 35 10 15 20 25 30 35 15 20 25 30 35 20 25 30 35 135 140 145 150
VL.
DECK
S TORE HATCH ROPES
UP UP UP DN
E LE CTRICIAN
CHART
ROOM
A NTE NNA
D D R R D
W
R
HOSPITAL 3 rd O FF B OATS WAIN DN
RADIO OPE RATOR 1 st O FF.
CASE
B OOK
CAPT.
COF FE
DAY ROOM
T ABLE
D
DN
UP n)
To
N E (1 CA PT.
2 nd OFF RA B ED ROOM
TC
AR
.P LIFE BOAT
SP
SIDELIGHT
112.5 Deg
POOP DECK AN
CR )
E Ton
E
MAIN DECK
DG .5
LU (0
S
OIL C OAMING
C/G S TORE
DN UP CARGO
L AUNDRY DRY
OTH No.5 P UP MANIFOLD TR AY UP
O ILER O ILER O ILER UP
ROOM ROOM
P UMP MAN
WASHMAN CARGO OIL TANK
A PT (WBT)
753 m TCH TCH TCH TCH TCH TCH No.2 P TCH C/G S TORE
TCH
COOK
CO 2 ROOM
L CKR. UP UP CARGO OIL TANK TCH
No.1 P
No.3 P
P ROV. HATCH
DN UP
3
UP UP 841 m CARGO
UP
OIL TANK
CREW MESS ROOM CARGO OIL TANK
OTH OTH OTH OTH OTH 737 m TCH
C.L.
E . T. RF
CARGO
UP
No.4 P 871 m
P ROV.
E . T. CONTROL LOBBY S TORE S HELTER
DN
DN
ROOM WORKSHOP
DN
CARGO OIL TANK 3
GALLEY FIRE
LAV & 871 m
CL E NGINE CASING
DN
S TATION
CL E NGINE CASING
S HOWER
B OATS WAIN STORE
CL
0 5 10 15 20 25 30 35 40 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155
COOL BOX COOL BOX
FOR MEAT FOR
UP UP S HIP OFFICE UP
DN
VEGETABLE UP OTH OTH
No.4 S OTH OTH OTH C.L.
TCH
E NGINE FOA M TK CARGO OIL TANK
I SM CODE RA CK RF S TORE
JUMP LO CKER
& PUMP ROOM
No.3 S
871 m No.1 S
O FFICER MESS ROOM UP UP CARGO OIL TANK UP No.2 S TCH
UP
A IR COND.
TCH TCH TCH TCH TCH TCH TCH
CARGO OIL TANKTCH CARGO OIL TANK
S P. A CCESS ROOM
UP UP
871 m
HA TCH FITTER L CKR.
841 m 737 m
BOYS No.5 S P AINT
OTH S TORE
A PT (WBT)
E LECT.
S AILOR
S AILOR Q . MASTER Q . MASTER
CARGO OIL TANK UP
Q . MASTER
S TORE CARGO
DN UP
753 m UP UP
C/G S TORE MANIFOLD TR AY
S
LU
D
(0 GE
.5 C
To RA
n) N
E
TWEEN DECK at 6.3 m DOUBLE BOTTOM
FO DAY
TANK FUEL OIL (MDO) TANK FUEL OIL (MDO) TANK
FRES H WATER 3 .0 m FLOOR SEA 1 96 m 3
CHEST
HSD DAY
TANK FRES H WATER
HYD. OIL TANK 1 26 m 3
No.2 P
1 .7 m FLOOR
SEA
No.4 P No.3 P
W.B.T CHEST No.5 P WATER BALLAST TANK WATER BALLAST TANK WATER BALLAST TANK
UP
WATER BALLAST TANK
3
HSD C.L.
39 m
3
No.1 P