002 Mendefinisikan Proyek Scope Pekerjaan
002 Mendefinisikan Proyek Scope Pekerjaan
Sifat Proyek
Unik , proyek satu dengan lainnya tidak pernah sama.
Dinamis, dalam penggunaan sumberdaya & multi disiplin
keilmuan
Sasaran Proyek & Triangle Constraints
Dalam proses mencapai tujuan, proyek dibatasi oleh target
biaya, jadual, serta mutu yang telah ditetapkan. Ketiga hal tsb
sering disebut triple (Triangle) constraint.
Biay
a
Waktu
Good Customer
Relationship
Mutu
Scope Statement
Project Objective
To construct a high-quality home within 5 months at
cost not to exceed $150.000
Deliverables
A 2200 sq.ft, 2 Bath, 3 bedroom, finished home
A finished garage, insulated and sheetrocked
Kitchen applicance to include range, oven, microwave
& dishwaher
High efficiency gas furnance with programmable
thermostat
Milestones
Permit approved 5 march
Foundation poured 14 march
Dry in, framing, sheeting, plumbing, M/E inspection
passed - 25 may
Technical Requirements
Home must meet local building codes.
All windows and door must pass NFRC Class 40 energy
ratings
Exterior wall insulation must meet an R Factor of 21
Ceiling insulation must meet an R factor at 38
Floor insulation must meet an R factor at 25
Garage will accomodation two large-size cars
Structure must pass seismic stability code.
Limits & Exclutions
The home will be build to the specifications and design of
the original blueprint provided by customer.
Owner responsible for landscaping.
Air conditioner is not included but prewiring is included.
Contractor responsible for subcontractor work.
Customer Review
John and Joan smith
1.Work Preparation
2. Structure
Activity
Activity
Volume
Volume
4. Finishing
2.2.1.Foundation
2.2.1.1. Pile
3. Mech / Elect.
2.2.1.2. Pilecap
Resources
Resources
Requirement
Requirement
2.2.1.3. Sloof
ActivityDuration
Duration
Activity
Estimates
Estimates
Department
Department
Responsibled
Responsibled
WORK PACKAGE
Go to : View >
Insert Column Then
select WBS, To Insert
or Show WBS Code
2. Memasukkan Aktivitas
To start building a
project, enter the title
of the major steps to
reach your goal. You
should input each title
as you expect them to
occur.
After you enter the
major tasks in your
project, you can now
add details by adding
subordinate
tasks,
also known as subtasks
"Show"
on
the
Formatting toolbar
easily determines the
level of detail you
want to view in a
project.
Milestones
are
tasks that usually
have
zero
duration.
It
simply marks a
noteworthy point
in your project.
Select General
Option to show
Password Dialog
Box
Go to the
Next Lesson