PAKU LAS
KELING
BAUT- MUR
Tujuan Instruksional Khusus
41
Aerospace Solid Rivet Installation
• Drilling holes with a #30 drill bit
• Use 1/8” rivets with a #30 (.1285”) drill bit
42
Aerospace Solid Rivet Installation
• Deburr the holes by rotating (by hand) a much larger drill bit in the
holes
• This removes any metal shavings caused by drilling
43
Aerospace Solid Rivet Installation
• Position the pieces together and secure using Clecos
•Clecos maintain proper alignment of the pieces while rivets are being
installed
44
Aerospace Solid Rivet Installation
• Place the rivet in the hole
• Make sure you are using the correct size, material, and type of rivet
45
Aerospace Solid Rivet Installation
• Align the rivet gun
on the rivet head
46
Aerospace Solid Rivet Installation
Solid rivets can be
installed using a
rivet squeezer
instead of a
pneumatic rivet gun
The squeezer is
hand operated
47
Aerospace Blind Rivets
48
Aerospace Rivets – Fuselage
Repair
• Exterior of a riveted
patch fuselage skin
patch
49
Aerospace Rivets – Fuselage Repair
• Interior of a riveted fuselage skin patch
•Because the
stringer on the
interior of the
fuselage prevents
the bucking a solid
rivet requires
50
Sub PokokBahasan:
Perhitungan kekuatan sambungan denganpembebanan langsung
Figure: 01
The rivet arrangement is zigzag and the details are given below:
Pitch = 25 cm in outer row and 15 cm in inner rows,
Rivet diameter = 33 mm
Calculate the efficiency of the joint when the allowable stresses are 75 MPa,
60 MPa and 125 MPa in tension, shear and crushing, respectively.
TUGAS 1 – 1 A
Tugas
dikumpul
Minggu
Depan