Anda di halaman 1dari 128

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik

Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Daftar Isi
BAB 1

PENDAHULUAN.................................................................................1-1

BAB 2

METODOLOGI PENYELIDIKAN TANAH....................................2-2


2.1
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6

BAB 3

LINGKUP PEKERJAAN ..............................................................................2-2


METODOLOGI PENYELIDIKAN TANAH LAPANGAN ..................................2-2
Pemboran ...............................................................................................2-2
Pengambilan Contoh Tanah Tidak Terganggu......................................2-3
SPT (Standard Penetration Test) ...........................................................2-4
DCPT (Dutch Cone Penetration Test)/Sondir .......................................2-4
METODOLOGI PENYELIDIKAN TANAH LABORATORIUM ..........................2-4
Specific Gravity......................................................................................2-5
Water Content / Moisture Content .........................................................2-5
Analisis Saringan dan Hidrometer.........................................................2-5
Atterbergs Limit ....................................................................................2-6
Triaxial-UU............................................................................................2-6
Consolidation Test .................................................................................2-6
ANALISIS GEOTEKNIK ...................................................................3-1

3.1
3.2
3.3
3.3.1
3.3.2
3.4
3.4.1
3.4.2
3.4.3
3.4.4
BAB 4

KLASIFIKASI TANAH.............................................................................3-1
PROFIL LAPISAN TANAH .........................................................................3-2
PARAMETER TANAH ................................................................................3-9
Hasil Uji Laboratorium..........................................................................3-9
Korelasi Parameter Tanah...................................................................3-10
ANALISIS PENURUNAN 1-D KONSOLIDASI TERZAGHI ...........................3-11
Immediate atau Elastic Settlement (Si) ................................................3-11
Consolidation Settlement (Sc) ..............................................................3-11
Time Rate Consolidation......................................................................3-12
Hasil Analisis Penurunan Konsolidasi ................................................3-13
ANALISIS DAYA DUKUNG PONDASI TIANG ............................4-1

4.1
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.2
4.3
4.4

KAPASITAS DAYA DUKUNG PONDASI TIANG ..........................................4-1


Kapasitas Daya Dukung Aksial Tiang Tunggal.....................................4-2
Tahanan Geser Selimut Tiang................................................................4-2
Tahanan Ujung Tiang ............................................................................4-3
Kapasitas Tarik Tiang............................................................................4-4
Kapasitas Lateral Tiang Tunggal ..........................................................4-4
PENENTUAN PARAMETER ........................................................................4-6
KAPASITAS DAYA DUKUNG IJIN TIANG ..................................................4-7
HASIL ANALISIS DAYA DUKUNG PONDASI TIANG ..................................4-8

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BAB 5

KESIMPULAN.....................................................................................5-1

LAMPIRAN A: Boring Log


LAMPIRAN B: CPT Log
LAMPIRAN C: Hasil Uji Laboratorium
LAMPIRAN D: Perhitungan Daya Dukung Pondasi Tiang

ii

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Daftar Gambar

GAMBAR 1-1

LOKASI TITIK PENYELIDIKAN TANAH ......................................................1-1

GAMBAR 2-1

ROTARY DRILLING MACHINE ...................................................................2-3

GAMBAR 2-2

TABUNG SHELBY .....................................................................................2-3

GAMBAR 2-3

SPLIT SPOON SAMPLER ..........................................................................2-4

GAMBAR 3-1

PROFIL LAPISAN TANAH POTONGAN A-A DI LOKASI KOLAM RENANG


TANJUNG REDEP ....................................................................................3-3

GAMBAR 3-2

PROFIL LAPISAN TANAH POTONGAN B-B DI LOKASI KOLAM RENANG


TANJUNG REDEP ....................................................................................3-4

GAMBAR 3-3

PROFIL LAPISAN TANAH POTONGAN C-C DI LOKASI KOLAM RENANG


TANJUNG REDEP ....................................................................................3-5

GAMBAR 3-4

PROFIL LAPISAN TANAH POTONGAN D-D DI LOKASI KOLAM RENANG


TANJUNG REDEP ....................................................................................3-6

GAMBAR 3-5

PROFIL LAPISAN TANAH POTONGAN E-E DI LOKASI KOLAM RENANG


TANJUNG REDEP ....................................................................................3-7

GAMBAR 3-6

PROFIL LAPISAN TANAH POTONGAN F-F DI LOKASI KOLAM RENANG


TANJUNG REDEP ....................................................................................3-8

GAMBAR 3-7

GRAFIK C VS KEDALAMAN .......................................................................3-9

GAMBAR 3-8

GRAFIK

GAMBAR 3-9

GRAFIK CC VS KEDALAMAN ..................................................................3-10

GAMBAR 3-10

KORELASI ANTARA NILAI N-SPT DENGAN KUAT GESER UNDRAINED


(TERZAGHI & PECK, 1967) ..................................................................3-10

GAMBAR 3-11

KORELASI ANTARA NILAI N-SPT DENGAN SUDUT GESER DALAM


(TERZAGHI)...........................................................................................3-11

GAMBAR 3-12

GRAFIK

GAMBAR 3-13

GRAFIK TIME RATE CONSOLIDATION ....................................................3-14

VS KEDALAMAN ......................................................................3-9

PENURUNAN KONSOLIDASI UNTUK BEBERAPA VARIASI TINGGI


TIMBUNAN .............................................................................................3-14

iii

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

GAMBAR 4-1

RUANG LINGKUP PERHITUNGAN PONDASI ............................................4-1

GAMBAR 4-2

DAYA DUKUNG AKSIAL PONDASI TIANG ................................................4-2

GAMBAR 4-3

FAKTOR ADHESI API METHOD 2 (1986) ...............................................4-3

GAMBAR 4-4

KURVA P-Y UNTUK TIANG DENGAN BEBAN LATERAL ............................4-4

GAMBAR 4-5

PENENTUAN BENTUK KURVA P-Y LEMPUNG LUNAK HINGGA KAKU


(MATLOCK) .............................................................................................4-5

GAMBAR 4-6

PENENTUAN KEDALAMAN KRITIS TIANG DENGAN BEBAN LATERAL PADA


TANAH NON-KOHESIF (REESE, COX, DAN COOP).................................4-6

GAMBAR 4-7

PENENTUAN KURVA P-Y PASIR (REESE, COX, DAN COOP) .................4-6

GAMBAR 4-8

MINIMAL TEBAL DATA TANAH DI BAWAH DASAR PONDASI UNTUK


PERHITUNGAN KAPASITAS DAYA DUKUNG UJUNG................................4-7

iv

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Daftar Tabel

TABEL 3-1

KLASIFIKASI TANAH LEMPUNG BERDASARKAN N-SPT ......................... 3-1

TABEL 3-2

KLASIFIKASI TANAH PASIR BERDASARKAN N-SPT............................... 3-1

TABEL 3-3

PARAMETER UNTUK PERHITUNGAN PENURUNAN DAN WAKTU KONSOLIDASI ..


................................................................................................. 3-13

TABEL 4-1

KOREKSI NILAI N-SPT ...................................................................... 4-7

TABEL 4-2

RANGKUMAN HASIL PERHITUNGAN KAPASITAS PONDASI TIANG .............. 4-9

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 1 PENDAHULUAN
Sehubungan dengan detail desain kolam renang di Tanjung Redeb Berau, Kalimantan Timur,
PT. Byma Arsihas telah melakukan penyelidikan tanah untuk mendapatkan data keadaan tanah
untuk selanjutnya data tersebut digunakan untuk keperluan analisis geoteknik di lokasi kolam
renang tersebut. Penyelidikan tanah yang dilakukan berupa pemboran sebanyak 5 titik, uji
sondir sebanyak 12 titik, dan pengujian laboratorium. Penyelidikan tanah tersebut dilakukan
mulai tanggal 29 Januari 2007 hingga tanggal 11 Februari 2007. Adapun lokasi penyelidikan
tanah tersebut dapat dilihat pada Gambar 1-1.

BH-1
S-06

S-01

S-02
BH-04
S-03
S-09

BH-02
S-07

S-05

BH-03
BH-05
S-04

S-08

Gambar 1-1 Lokasi Titik Penyelidikan Tanah

1-1

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 2 METODOLOGI PENYELIDIKAN


TANAH
2.1

LINGKUP PEKERJAAN

Lingkup pekerjaan penyelidikan tanah ini meliputi penyelidikan lapangan dan pengujian
laboratorium yang terdiri dari:
1. Penyelidikan lapangan yang dilakukan meliputi:
a. 3 (tiga) titik pemboran mesin hingga kedalaman 40 m
b. 2 (dua) titik pemboran mesin hingga kedalaman 30 m
c. 12 (dua belas) titik penyondiran dengan alat sondir kapasitas 2-ton
d. Standard Penetration Test
e. Pengambilan undisturbed soil samples
2. Pengujian laboratorium yang dilakukan meliputi:
a. Uji index properties
b. Analisis butiran tanah
c. Triaxial UU Test
d. Consolidation Test
2.2

METODOLOGI PENYELIDIKAN TANAH LAPANGAN

Penyelidikan tanah yang dilakukan sesuai dengan American Standard for Testing Material
(ASTM). Penyelidikan tanah ditujukan untuk memahami struktur tanah dan sifat mekanika
tanah di wilayah proyek. Lingkup pekerjaan penyelidikan tanah yang dilakukan meliputi:

2.2.1

Pemboran

Pemboran inti sebanyak 5 titik bor. Sebanyak 3 titik dilakukan hingga mencapai kedalaman
pemboran sedalam 40 m dan 2 titik dilakukan hingga kedalaman 30 m. Selama pengeboran,
dilakukan pengamatan secara visual terhadap perlapisan tanah. Pada kedalaman tertentu
dilakukan pengambilan contoh tanah (disturbed sample dan undisturbed sample) dan Standard
Penetration Test (SPT).
Prosedur pelaksanaan dan peralatan pemboran dalam mengacu pada ASTM D 1452-80,
Standard Practice for Soil Investigation and Sampling by Auger Borings, ASTM D 420 - 93,
Standard Guide for Investigating and Sampling Soil and Rock, ASTM D 2488 - 93,
Standard Practice for Description and Identification of Soils (Visual-Manual Procedure) dan
ASTM D 2113 83, Standard Practice for Diamond Core Drilling for Site Investigation.
Data hasil pemboran dalam disajikan dalam field logs (Bore - Logs) yang didalamnya tercakup:
identifikasi proyek, nomor boring, lokasi, orientasi, tanggal mulai pemboran, tanggal akhir
pemboran, dan nama operator, elevasi koordinat bagian atas bore hole, klasifikasi/deskripsi
tanah (kekerasan, warna, derajat pelapukan, dan identifikasi lainnya yang masih berhubungan),
deskripsi litologi, kondisi air tanah, pengambilan contoh tanah, in situ test di bore hole, dst.

2-2

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Gambar 2-1 Rotary drilling machine

2.2.2

Pengambilan Contoh Tanah Tidak Terganggu

Undisturbed samples yang dilaksanakan adalah sebanyak 20 tabung untuk keperluan uji
laboratorium. Pelaksanaan pengambilan contoh tanah tidak terganggu mengacu pada ASTM
D 1587-94 Standard Practice for Thin-Walled Tube Geotechnical Sampling of Soils.
Contoh tanah undisturbed diambil dari kedalaman tertentu dengan menggunakan Shelby tube
sampler (thin walled tube sampler). Kemudian contoh tanah dilindungi dari goncangan,
getaran dan perubahan kadar air, yang bertujuan untuk menjaga struktur tanah dan komposisi
fisiknya tetap seperti kondisi aslinya, sampai contoh tersebut dikeluarkan untuk kemudian diuji
di laboratorium. Kedalaman bagian atas contoh dan panjang sampler dicatat di boring log.

Gambar 2-2 Tabung shelby


2-3

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

2.2.3

SPT (Standard Penetration Test)

SPT (Standard Penetration Test) yang dilakukan adalah sebanyak 110 test dengan interval
kedalaman lebih kurang setiap 1.5 m. Prosedur pelaksanaan dan peralatan Standard
Penetration Test mengacu pada ASTM D 1586 84, "Standard Method for Penetration Test
and Split Barrel Sampling of Soils". Hammer yang digunakan seberat 140 lbs (63 kg) dengan
tinggi jatuh 30 (76.2 cm). Jumlah total tumbukan yang dibutuhkan untuk penetrasi tanah 3
15 cm dicatat. Nilai SPT, dinyatakan dengan nilai N, didapat dari jumlah tumbukan yang
diperlukan untuk penetrasi 2 15 cm terakhir.

Gambar 2-3 Split spoon sampler

2.2.4

DCPT (Dutch Cone Penetration Test)/Sondir

Prosedur pelaksanaan Dutch Cone Penetration Test (DCPT) dilakukan berdasarkan standar
ASTM D 3441-86, Method for Deep Quasi-Static, Cone and Friction Cone Penetration Tests
of Soil. Nilai tahanan ujung konus, qc, dan friksi lokal atau friksi selimut, fs, diukur untuk
setiap interval 20 cm.
2.3

METODOLOGI PENYELIDIKAN TANAH LABORATORIUM

Uji laboratorium yang dilaksanakan adalah:


5
5
5
5

Index properties
Grainsize analysis
Triaxial UU
Consolidation

Metoda pelaksanaan uji laboratorium mengikuti standar-standar berikut ini:

2-4

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

2.3.1

Specific Gravity

Specific gravity dari tanah, Gs, didefinisikan sebagai perbandingan massa volume partikel
tanah di udara dengan massa volume yang sebanding dengan gas free distilled water di udara
pada suhu kamar (umumnya 68 F {20 C}). Specific gravity ditentukan berdasarkan jumlah
dari pycnometer yang sudah dikalibrasi, dimana massa dan suhu dari contoh tanah deaerasi/air distilasi diukur.
Test dilakukan berdasarkan ASTM D 854-92, Standard Test Method for Specific Gravity of
Soils. Metoda ini digunakan pada contoh tanah dengan komposisi ukuran partikel lebih kecil
daripada saringan No. 4 (4.75 mm). Untuk partikel dengan ukuran lebih besar dari saringan
tersebut, prosedur pelaksanaan mengacu pada Test Method Specific Gravity and Absorption
of Coarse Aggregate (ASTM C 127-88). Specific gravity dari tanah diperlukan untuk
menentukan hubungan antara berat dan volume tanah, dan digunakan untuk perhitungan test
laboratorium lainnya.

2.3.2

Water Content / Moisture Content

Moisture content, w, didefinisikan sebagai perbandingan antara berat air di dalam contoh
tanah dengan berat partikel solid. Contoh basah mula-mula ditimbang, kemudian dikeringkan
di dalam oven pada suhu 230 F (110 C) hingga mencapai berat konstan. Berat contoh
setelah dikeringkan adalah berat partikel solid. Perubahan berat yang terjadi selama proses
pengeringan setara dengan berat air. Untuk tanah organik, terkadang disarankan untuk
menurunkan suhu pengeringan hingga mencapai 140 F (60 C).
Test dilakukan mengacu pada ASTM D 2216-92, Test Method for Laboratory Determination
of Water (Moisture) Content of Soil and Rock. Moisture content diperlukan untuk
menentukan properties tanah dan dapat dikorelasikan dengan parameter-parameter lainnya.

2.3.3

Analisis Saringan dan Hidrometer

Test ini dilakukan dalam dua tahapan, yaitu: analisis saringan untuk tanah berbutir kasar (pasir,
kerikil), dan analisis hidrometer untuk tanah berbutir halus (lempung, lanau). Tanah yang
mengandung butiran kasar dan butiran halus di uji secara berurutan. Material dengan ukuran
lebih kecil dari saringan No. 200 (0.075 mm atau lebih kecil) dianalisis dengan menggunakan
hidrometer.
Analisis saringan memberikan pengukuran secara langsung terhadap distribusi ukuran partikel
tanah dengan cara melewatkan contoh pada sejumlah wire screens, dari ukuran yang terbesar
hingga terkecil. Jumlah material yang tertahan di tiap-tiap saringan kemudian ditimbang.
Prosedur pelaksanaan pengujian ini mengacu pada ASTM C 136-95a, Method for Sieve
Analysis of Fine and Coarse Aggregates.
Pelaksanaan uji hidrometer mengacu pada Hukum Stokes. Diameter partikel tanah
didefinisikan sebagai diameter bola yang memiliki unit massa dan kecepatan jatuh yang sama
dengan partikel tanah. Jadi distribusi ukuran partikel didapatkan dengan menggunakan sebuah
hydrometer untuk mengukur perubahan specific gravity, suspensi tanah-air seperti partikel
tanah mengendap.
Hasil analisis dicatat dalam combined grain size distribution plot sebagai persentase contoh
yang lebih kecil beratnya versus log diameter partikel. Data ini diperlukan di dalam klasifikasi
tanah. Kurva tersebut juga dapat menunjukkan parameter-parameter lainnya, seperti diameter
2-5

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

efektif (D10) dan koefisien uniformity (Cu). Test dilakukan berdasarkan ASTM D 422-63
Method for Particle Size Analysis of Soils, dan ASTM D 1140 92 Test Method for
Amount of Material in Soils Finer than the No.200 (75-m) Sieve.

2.3.4

Atterbergs Limit

Liquid limit dilakukan dengan cara meletakkan pasta tanah dalam mangkuk kuningan
kemudian digores tepat ditengahnya dengan alat penggores standar. Dengan menjalankan alat
pemutar, mangkuk kemudian dinaikturunkan dari ketinggian 0.4 inci (10 mm) dengan
kecepatan 2 drop/detik. Liquid limit dinyatakan sebagai moisture content dari tanah yang
dibutuhkan untuk menutup goresan yang berjarak 0.5 inci (13 mm) sepanjang dasar contoh
tanah dalam mangkuk sesudah 25 pukulan. Pengujian dilakukan menurut ASTM D 4318.
Plastic limit ditentukan dengan mengetahui secara pasti moisture content terkecil, dimana
material dapat digulung hingga diameter 0.125 inches (3.2 mm) tanpa mengalami keretakan.
Pengujian dilakukan sesuai dengan ASTM D 4318-95, Test Method for Liquid Limit, Plastic
Limit and Plasticity Index of Soils.
Shrinkage limit (SL) didefinisikan sebagai water content maksimum dimana pengurangan
water content tidak akan menurunkan volume dari massa tanah. Pengujian dilakukan dengan
mengacu pada ASTM D 427-93, Test Method for Shrinkage Factors of Soils.
Nilai-nilai ini digunakan didalam klasifikasi tanah dan dapat dikorelasikan dengan parameterparameter lainnya.

2.3.5

Triaxial-UU

Tujuan test ini adalah untuk memperoleh parameter kekuatan tanah dalam kondisi undrained.
Pada uji ini contoh yang diuji tidak diperkenankan untuk mengalami konsolidasi akibat
tekanan confining dan selama geser berlangsung tidak diperkenankan adanya aliran
(undrained). Dibutuhkan minimal tiga buah pengujian dengan tekanan confining yang
berbeda-beda untuk mendapatkan parameter tegangan total. Jika selama pengujian tekanan air
pori diukur, maka parameter tegangan efektif juga dapat diukur. Pengujian dilakukan menurut
ASTM D 2850-95, Test Method for Unconsolidated, Undrained Compressive Strength of
Cohesive Soils in Triaxial Compression.

2.3.6

Consolidation Test

Test ini bertujuan untuk memperoleh nilai koefisien konsolidasi Cc dan Cv yang selanjutnya
dipergunakan untuk memprediksi lamanya konsolidasi dan besarnya settlement. Metode yang
digunakan dalam pengujian konsolidasi adalah pengujian konsolidasi satu dimensi. Pada uji ini
spesimen diletakkan pada konsolidometer (oedometer) diantara dua batu pori sehingga
memungkinkan terjadinya drainase. Berbagai prosedur pembebanan dapat digunakan selama
pengujian. Pengujian dengan peningkatan pembebanan adalah yang paling umum digunakan.
Pada prosedur ini, spesimen diberikan beban yang semakin bertambah. Biasanya beban awal
yang digunakan besarnya 1/16 tsf (5 kPa) dan ditambah menjadi dua kalinya hingga mencapai
16 tsf (1600 kPa). Setelah pemberian beban, perubahan tingga sampel dimonitor umumnya
selama 24 jam. Untuk mengevaluasi parameter rekompresi, siklus pembebanan unload/reload
dapat dilakukan selama pembebanan. Agar diperoleh hasil pengamatan parameter rekompresi
yang lebih baik untuk lempung terkonsolidasi berlebih (over consolidated clay), siklus
2-6

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

unload/reload dilakukan setelah tekanan pra konsolidasi terdefinisikan. Setelah beban


maksimum tercapai, beban dikurangi secara bertahap. Pengujian dilakukan menurut ASTM D
2435-90, Test Method for One Dimensional Consolidation Properties of Soils.
Data dari uji konsolidasi biasanya ditampilkan dalam grafik e-log p dengan plot angka pori (e)
sebagai fungsi dari logaritma tekanan (p) atau dalam grafik -log p dimana adalah regangan
dalam %. Parameter-parameter yang diperlukan untuk perhitungan penurunan dapat diperoleh
dari kurva ini adalah: indeks kompresi (Cc), indeks rekompresi (Cr), tekanan pra konsolidasi
(Po atau Pc) dan angka pori awal (eo).

2-7

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 3 ANALISIS GEOTEKNIK


3.1

KLASIFIKASI TANAH

Dengan menggunakan nilai N-SPT dapat ditentukan konsistensi dari lapisan tanah lempung
dan pasir seperti yang terlihat pada Tabel 3-1. Sedangkan untuk menentukan besarnya sudut
geser dalam berdasarkan nilai N-SPT pada tanah pasir dapat digunakan Tabel 3-2.
Tabel 3-1 Klasifikasi Tanah Lempung Berdasarkan N-SPT

(After Bowles, 1988)


Consistency

Very stiff
Hard

OCR

increasing

Medium
Stiff

Young
clay

Soft

Aged/
cemented

NC

Very soft

N70

Remarks

0-2

Squishes between fingers when squeezed

3-5

Very easily deformed by squeezing

6-9
10-16

Hard to deform by hand squeezing

17-30

Very hard to deform by hand

> 30

Nearly impossible to deform by hand

Tabel 3-2 Klasifikasi Tanah Pasir Berdasarkan N-SPT

(After Bowles, 1988)


Description
Dr
SPT N70
Fine
Medium
Coarse

Very Loose
0

Loose

0.15

Medium
0.35

Dense
0.65

Very dense
0.85

1-2
2-3
3-6

3-6
4-7
5-9

7-15
8-20
10-25

16-30
21-40
26-45

?
> 40
> 45

Fine
Medium
Coarse

26-28
27-28
28-30

28-30
30-32
30-34

30-34
32-36
33-40

33-38
36-42
40-50

< 50

wet (kN/m3)

11-16

14-18

17-20

17-22

20-23

3-1

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

3.2

PROFIL LAPISAN TANAH

Lapisan tanah di lokasi kolam renang secara umum terbagi atas tanah lempung lanauan dengan
konsistensi sangat lunak (very soft), sedang hingga keras (medium stiff hard) dan batuan
lempung (claystone) pada kedalaman tanah keras. Selain itu, dijumpai batubara (coal) dan
tanah organik (peat) di beberapa lokasi. Simplifikasi lapisan tanah yang dijumpai di lokasi
kolam renang ini dapat dilihat pada Gambar 3-1 - Gambar 3-6.

3-2

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BH-1
S-06

A
S-01

S-02
BH-04
S-03
S-09

BH-02
S-07

S-05

BH-03
BH-05
S-04
25.00m

S-06

15.00m

S-01

BH-01

qc (kg/cm2 )

qc (kg/cm2 )

2
1
1
2
1

SILTY CLAY, very soft


N=1-2

1
1
1
1
1
1
3

qc>150

8 SILTY CLAY, med. stiff to very stiff


N=8-21

21

qc>150

73
100
100
100
100
100
100
100
100
100
100

CLAYSTONE
N>100

KETERANGAN :

SILTY CLAY,
very soft

SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard

COAL

PEAT

CLAYSTONE

Gambar 3-1 Profil lapisan tanah potongan A-A di lokasi Kolam Renang Tanjung Redep

3-3

S-08

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BH-1
S-06

S-01

S-02

B BH-04
S-03
S-09

BH-02
S-07

S-05

BH-03
BH-05
S-04

30.00m

BH-04

28.00m

S-05

BH-02

qc (kg/cm2 )

SILTY CLAY, very soft


N=1-2

1
8

2
25

SILTY CLAY, stiff to very stiff


N=8-45

45

26

50

qc>150

14

55

86
SILTY CLAY, hard
N>45

50
50

90
50
82

50

82

19
SILTY CLAY, very stiff
N=19-26

20

52

100
100

COAL
N=40-100

???
???

26

40

68
PEAT
N<1

???

40

100

100

100
100

100

100

100
100

CLAYSTONE
N>100

100

KETERANGAN :

SILTY CLAY,
very soft

SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard

COAL

PEAT

CLAYSTONE

Gambar 3-2 Profil lapisan tanah potongan B-B di lokasi Kolam Renang Tanjung Redep

3-4

S-08

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BH-1
S-06

S-01

S-02
BH-04
S-03

BH-02

S-09
S-07

S-05

BH-03
BH-05
S-04

U
25.00m

S-09

25.00m

S-07

qc (kg/cm2 )

33.00m

BH-03

qc (kg/cm2)

BH-05

SILTY CLAY, very soft


N=1-2

qc>150

???

qc>150

2
1

5
12
100
100
100

SILTY CLAY, medium stiff to stiff


N=4-12

4
5
5
7

100
100
100
100

100
100
100
100
100
100

CLAYSTONE
N>100

100

KETERANGAN :

SILTY CLAY,
very soft

SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard

COAL

PEAT

CLAYSTONE

Gambar 3-3 Profil lapisan tanah potongan C-C di lokasi Kolam Renang Tanjung Redep

3-5

S-08

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BH-1

S-01

S-06
S-02
BH-04

S-03

S-09

BH-02
S-07

S-05

BH-03
BH-05

D
S-04

30.00m

S-06

30.00m

BH-04

qc (kg/cm2)

S-07

qc (kg/cm2)

1
1
SILTY CLAY, very soft
N=1-2

1
1
1
1
1

SILTY CLAY, med. stiff to very stiff


N=8-25

8
25

qc>150

45
50

SILTY CLAY, hard


N>45

55

qc>150

50

???

50
50
SILTY CLAY, very stiff
N=19-20

19

???

20
40
100

???

???

COAL
N=40-100

???

100
100
100

???

100
100

CLAYSTONE
N>100

100

KETERANGAN :

SILTY CLAY,
very soft

SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard

COAL

PEAT

CLAYSTONE

Gambar 3-4 Profil lapisan tanah potongan D-D di lokasi Kolam Renang Tanjung Redep

3-6

S-08

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

S-06

BH-1

S-01

S-02
BH-04
S-03
BH-02
S-09

S-05

S-07
BH-03

BH-05

S-04

25.00m

25.00m

S-02

BH-01
2

25.00m

BH-02

qc (kg/cm2)

2
1

1
1

SILTY CLAY, very soft


N=1-2

2
1

SILTY CLAY, medium stiff to very stiff

12 N=5-26

100

26

100

14

qc>150

100

86

100

90

100

50

21

100

82

73
100

100

82

SILTY CLAY, hard


N>45

100

52
26

100

68

100

PEAT
N<1

100

CLAYSTONE
N>100

1
40

100
100

100
100

100

100

100

100

100

KETERANGAN :

SILTY CLAY,
very soft

SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard

COAL

PEAT

qc (kg/cm2)

S-08

qc (kg/cm2)

25.00m

S-04

BH-03

CLAY

20.00m

S-08

CLAYSTONE

Gambar 3-5 Profil lapisan tanah potongan E-E di lokasi Kolam Renang Tanjung Redep

3-7

qc>150

qc>150

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

F
BH-1
S-06

S-01

S-02
BH-04
S-03
S-09

BH-02
S-05

S-07
BH-03

BH-05

U
64.00m

S-01

20.00m

S-05

qc (kg/cm2 )

BH-05

qc (kg/cm2 )
CH, SILTY CLAY, very soft

2
1
2

SILTY CLAY, very soft


N=1-2

1
1
1
2
5
4

SILTY CLAY, medium stiff


N=4-7

qc>150

5
5
7
100

qc>150

100
100
100
100

CLAYSTONE
N>100

100
100

KETERANGAN :

SILTY CLAY,
very soft

SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard

COAL

PEAT

CLAYSTONE

Gambar 3-6 Profil lapisan tanah potongan F-F di lokasi Kolam Renang Tanjung Redep

3-8

S-08

S-04

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

3.3

3.3.1

PARAMETER TANAH

Hasil Uji Laboratorium

Grafik parameter-parameter tanah hasil uji laboratorium ditunjukkan pada Gambar 3-7 Gambar 3-9.
UU, c (kN/m2)
0.00

0.05

0.10

0.15

0.20

0
BH-01

BH-02

BH-03

BH-04

BH-05

Kedalaman (m)

8
10
12
14
16
18
20

Gambar 3-7 Grafik c vs kedalaman


UU, (deg)
0

Kedalaman (m)

0
2

BH-01

BH-02

BH-03

BH-04

BH-05

8
10
12
14
16
18
20

Gambar 3-8 Grafik vs kedalaman


3-9

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Cc
0

0.2

0.4

0.6

0.8

0
2

Kedalaman (m)

4
6
8
10
12
BH-01

BH-02

16

BH-03

BH-04

18

BH-05

14

20

Gambar 3-9 Grafik Cc vs kedalaman

3.3.2

Korelasi Parameter Tanah

Undrained shear strength - kN/m

Parameter tanah ditentukan berdasarkan hasil penyelidikan tanah. Pada kondisi dimana tidak
terdapat hasil pengujian tanah atau properti tanah sulit diukur secara langsung, parameter
tanah ditentukan berdasarkan engineering judgment maupun korelasi terhadap properti tanah.
Korelasi properti tanah disajikan dalam Gambar 3-10 dan Gambar 3-11.

Soil groups refer to


Unified system

CH

Sowers

CL

SC-ML

Terzaghi and Peck

SPT N-value - blows/300 mm

Gambar 3-10 Korelasi Antara Nilai N-SPT Dengan Kuat Geser Undrained
(Terzaghi & Peck, 1967)

3-10

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Gambar 3-11 Korelasi Antara Nilai N-SPT Dengan Sudut Geser Dalam (Terzaghi)

3.4

ANALISIS PENURUNAN 1-D KONSOLIDASI TERZAGHI

Settlement dari suatu lapisan tanah yang dibebani dapat dibedakan menjadi 2 (dua) jenis, yaitu :
immediate/elastic settlement dan consolidation settlement.
3.4.1

Immediate atau Elastic Settlement (Si)

Elastic settlement dari tanah terjadi sewaktu atau setelah masa konstruksi suatu struktur.
Persamaan untuk mengevaluasi besarnya elastic settlement rata-rata dari pondasi fleksibel di tanah
lempung jenuh (saturated clay) menurut Janbu, Bjerrum, dan Kjaernsli adalah sebagai berikut:
Si

A1 A 2

qo B
Es

dimana,
qo

beban luar

Es

Youngs modulus

A1

koefisien modifikasi sebagai fungsi dari H/B

A2

koefisien modifikasi sebagai fungsi dari Df/B

Berdasarkan kondisi aktual di lapangan, elastic settlement pada lokasi kolam renang dapat
diantisipasi dengan penimbunan kembali lokasi tanah yang sebelumnya digali untuk kebutuhan
konstruksi, hingga mencapai kedalaman yang diinginkan (levelling).
3.4.2

Consolidation Settlement (Sc)

Consolidation settlement merupakan settlement yang bergantung pada waktu dan terjadi sebagai
hasil dari pengaliran air pori dari rongga yang berada pada tanah lempung jenuh (saturated
clayey soils). Pengaliran air pori dari rongga terjadi saat tanah lempung jenuh dikenai beban
tambahan. Persamaan settlement konsolidasi satu dimensi adalah sebagai berikut :

3-11

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Normally consolidated clays:


SC

Cc Hc
p + p av
log 0
1 + e0
pc

Over consolidated clays dengan po+pav<pc


Cs H c
p + p av
log 0
1 + e0
pc

SC

Over consolidated clays dengan po<pc<po+pav


SC

Cs H c
p
C Hc
p + p av
log c + c
log 0
1 + e0
p0
1 + e0
pc

dimana,
po
=
pav =
pc
=
eo
=
Cc =
Cs
=
Hc =

tekanan tanah efektif di lapisan lempung


pertambahan beban/tekanan rata-rata di lapisan lempung
tekanan pre-consolidation
initial void ratio di lapisan lempung
compression index
swelling index
tebal lapisan lempung

Total settlement (St) dari tanah adalah sebagai berikut:


St =
3.4.3

S i + Sc

Time Rate Consolidation

Konsolidasi adalah hasil disipasi dari excess tekanan air pori pada lapisan lempung. Disipasi
tekanan air pori, pada suatu waktu, meningkatkan tekanan efektif, yang kemudian
menyebabkan settlement. Untuk memperkirakan tingkat konsolidasi dari lapisan lempung
pada waktu (t) setelah dikenai beban, tingkat disipasi excess tekanan air pori harus diketahui
terlebih dahulu.
Besar konsolidasi rata-rata dari lapisan lempung adalah sebagai berikut:
U

St
S max

dimana,
= settlement lapisan lempung pada waktu (t) setelah dikenai beban
St
Smax = settlement konsolidasi maksimum pada lempung bila dikenai beban
Lamanya waktu (t) untuk mencapai tingkat konsolidasi yang diinginkan dapat diperkirakan
dengan menggunakan formula:
t

Tv H 2
Cv

dimana,
H
= drainage path maksimum
Cv = koefisien konsolidasi (hasil uji laboratorium)
3-12

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Tv

= faktor waktu non dimensional


2

U%

4 100
Penurunan konsolidasi dihitung berdasarkan teori konsolidasi satu dimensi dari Terzaghi:
=

Sc =

cc H
q + p
log 0
1 + e0
q0

dimana:

3.4.4

Sc

: penurunan konsolidasi

cc

: koefisien konsolidasi

: tebal tanah lempung

e0

: angka pori awal

q0

: tegangan efektif awal

: pertambahan tegangan akibat beban fondasi

Hasil Analisis Penurunan Konsolidasi

Berdasarkan data tanah di lokasi kolam renang, parameter yang digunakan untuk melakukan
analisis konsolidasi ditunjukkan pada Tabel 3-3 .
Tabel 3-3 Parameter untuk perhitungan penurunan dan waktu konsolidasi
Bor. No. Kedalaman (m)

Cc

Cv
(cm /detik)
2

BH-01

16.00 - 16.55

0.594

0.00050

BH-02

16.00 - 16.55

0.143

0.00115

BH-03

2.50 - 3.00

0.560

0.00080

BH-04

11.00 - 11.55

0.561

0.00040

BH-04

27.00 - 27.50

0.207

0.00040

BH-05

2.50 - 3.00

0.617

0.00120

BH-05

16.00 - 16.50

0.587

0.00140

Analisis penurunan dilakukan pada analisis penurunan konsolidasi saja, mengingat kebiasaan di
lapangan immediate settlement (penurunan elastis) akan diperbaiki langsung saat konstruksi
dengan melakukan leveling pada elevasi design.
Hasil analisis konsolidasi untuk kolam renang tanjung redeb ditunjukkan pada Gambar 3-12
dan Gambar 3-13.

3-13

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

90.0

80.0

Penurunan Konsolidasi (mm)

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0

0.5

1.5

2.5

3.5

4.5

Tinggi Timbunan (m)


Penurunan Konsolidasi

Gambar 3-12 Grafik penurunan konsolidasi untuk beberapa variasi tinggi timbunan
Waktu Konsolidasi (bulan)
0

100

200

300

400

500

600

700

800

900

1000

1100

0.00

10.00

20.00

Derajat Konsolidasi (%)

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Waktu Konsolidasi

Gambar 3-13 Grafik time rate consolidation

3-14

1200

1300

1400

1500

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 4 ANALISIS DAYA DUKUNG PONDASI


TIANG
4.1

KAPASITAS DAYA DUKUNG PONDASI TIANG

Pondasi tiang biasa digunakan untuk memastikan suatu bangunan berada dalam kondisi aman.
Situasi yang memerlukan tiang sebagai sistem pondasi adalah sebagai berikut:
5
Lapisan tanah pada lokasi pekerjaan merupakan lapisan yang sangat kompresibel dan
memiliki daya dukung yang rendah.
5
Struktur atas menerima gaya horizontal.
5
Struktur atas menerima gaya uplift.
Pondasi tiang menahan beban kompresi melalui tahanan selimut dan tahanan ujung, beban
uplift ditahan melalui tahanan selimut dan beban lateral ditahan oleh kekakuan tiang dan tanah
disekelilingnya. Perhitungan kapasitas daya dukung pondasi dilakukan dengan meninjau
beberapa kondisi sebagai berikut:
1. Kapasitas daya dukung tiang
- Kapasitas daya dukung aksial tiang tunggal
- Kapasitas daya dukung group tiang
2. Interaksi tanah dan group tiang

P
P

TRANS

LONG

- Panjang pondasi tiang


- Penulangan Pile Cap

Daya Dukung Pondasi Tiang Tunggal


Analisa group tiang untuk gaya-gaya
yang bekerja pada tiang pondasi

Gambar 4-1 Ruang Lingkup Perhitungan Pondasi

4-1

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

4.1.1

Kapasitas Daya Dukung Aksial Tiang Tunggal

Secara umum, kapasitas daya dukung ultimate aksial dari pondasi tiang, dapat diperoleh
dengan menjumlahkan kapasitas daya dukung ujung dan tahanan geser selimut tiang. Kapasitas
daya dukung tersebut dapat ditulis seperti terlihat pada persamaan dibawah ini.
Qu = Qp + Qs
dimana:
Qu

= kapasitas daya dukung ultimate

Qp

= kapasitas daya dukung ujung ultimate

Qs

= tahanan geser selimut tiang ultimate

Qs

Qp

Gambar 4-2 Daya Dukung Aksial Pondasi Tiang

4.1.2

Tahanan Geser Selimut Tiang

Tahanan geser selimut tiang ultimate dari pondasi pada tanah c- dapat dihitung berdasarkan
persamaan sebagai berikut:
Qs = Qsc + Qs
dimana:
Qs

= tahanan geser selimut tiang ultimate

Qsc

= kontribusi dari kohesi tanah, c (pada tanah lempung)

Qs

= kontribusi dari sudut geser dalam tanah, (pada tanah pasir)

Secara umum, kontribusi kohesi tanah untuk tahanan geser selimut tiang ultimate dapat
diperoleh dengan menggunakan persamaan sebagai berikut:

4-2

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Qsc = cu i li p

dimana:

= faktor adhesi

cu-i

= kohesi tanah undrained pada lapisan ke-i

li

= panjang tiang pada lapisan ke-i

= keliling tiang

Besarnya nilai faktor adhesi, , khususnya untuk tiang pancang, dapat ditentukan dengan
menggunakan metoda dari API sebagai berikut:

Gambar 4-3 Faktor Adhesi API Method 2 (1986)

4.1.3

Tahanan Ujung Tiang

Secara umum, kapasitas daya dukung ujung pondasi tiang yang terletak pada lapisan tanah c-
dapat dihitung berdasarkan persamaan sebagai berikut:
Qp = Ap (c Nc* + q Nq*)
dimana:
Ap

= luas penampang bagian ujung tiang

= kohesi tanah pada bagian ujung tiang

= tegangan vertikal efektif pada daerah ujung tiang

Nc*, Nq*

= Faktor daya dukung

Tahanan ujung tiang diperhitungkan untuk jenis tanah lempung, yaitu:


Qp = 9 c Ap

4-3

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

4.1.4

Kapasitas Tarik Tiang

Desain tiang terhadap beban tarik sangat penting untuk struktur yang mengalami beban
seismik. Pada beberapa kondisi, kapasitas tarik tiang menentukan kedalaman penetrasi
minimum yang diperlukan.
Menurut Nicola dan Randolph (1993), pada tanah kohesif berbutir halus (fine grained), dimana
pembebanan diasumsikan terjadi pada kondisi undrained, tahanan sisi tiang pada kondisi tekan
dihitung sama dengan kondisi tarik. Sedangkan pada tanah non-kohesif atau tanah teralirkan
bebas (free-draining), Nicola dan Randolph (1993) menyatakan bahwa tahanan sisi biasanya
dihitung 70% dari tahanan sisi untuk kondisi tekan. Karena tanah dasar pada lokasi proyek
terdiri dari tanah kohesif dan non kohesif, tahanan sisi untuk kondisi tarik dihitung 70% dari
tahanan sisi untuk kondisi tekan.
4.1.5

Kapasitas Lateral Tiang Tunggal

Defleksi lateral tiang akibat beban aksial pada pondasi dapat meningkatkan kisaran tekanan
elastik pada tiang. Akibatnya metoda yang digunakan harus mempertimbangkan kondisi tanah
pada saat yields plastically up to end pada saat selama keruntuhan geser terjadi. Dengan
menggunakan metoda p-y dari Matlock maka tegangan tanah dapat dianalisis. Metoda ini juga
dapat memperhitungkan efek deformasi tanah plastis pada reaksi tiang. Berikut ini diuraikan
penjelasan mengenai metoda p-y, yang diambil dari Pile Design and Construction Practice oleh
Tomlinson. Bentuk dari kurva p-y dapat dilihat dalam Gambar 4-4 Kurva P-Y untuk Tiang
dengan Beban Lateral
. Tiap-tiap kurva menggambarkan tahanan lateral tanah pada kedalaman tertentu.

Gambar 4-4 Kurva P-Y untuk Tiang dengan Beban Lateral

Metoda untuk menggambarkan kurva p-y telah disusun untuk tanah dengan kenaikan modulus
yang linear, misalnya pada lempung soft firm normally consolidated dan tanah granular.
Faktor empirik diperoleh Matlock melalui pengujian pembebanan tiang lateral. Dalam metoda
ini, langkah pertama adalah menghitung tahanan lateral ultimate tanah lempung akibat beban
lateral. Pada dasarnya metoda Matlock serupa dengan metoda konvensional. Namun, faktor
daya dukung untuk beban lateral Nc didapatkan melalui pendekatan yang sedikit berbeda.
Di bawah kedalaman kritis, rx, koefisien Nc, diambil sebesar 9 (sembilan). Di atas kedalaman
tersebut, Nc, diperoleh melalui persamaan berikut ini:
4-4

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Nc = 3 +

x Jx
+
cu B

dimana:

= density dari tanah

= kedalaman dihitung dari permukaan tanah

cu

= undrained cohesion lapisan lempung

= factor empiris

= lebar pondasi tiang

Pengujian yang dilakukan oleh Matlock memberikan harga J pada saat keruntuhan berkisar dari
0.5 untuk lempung lunak hingga 0.25 untuk lempung yang lebih kaku. Kedalaman kritis
diperoleh melalui persamaan berikut:
xr=

6B
B
+J
cu

Tahanan ultimate di atas dan di bawah kedalaman kritis dinyatakan dalam kurva p-y sebagai
gaya (pu) per unit panjang tiang, yang tergantung pada undrained strength tanah (Cu).
pu = Nc cu B
Dari titik nol hingga titik a dalam Gambar 4-5, terlihat bahwa bentuk dari kurva p-y dihasilkan
dari kurva tegangan-regangan yang diperoleh dari pengujian contoh tanah pada undrained
triaxial compression, atau dari kurva load-settlement hasil plate loading test.

Gambar 4-5 Penentuan Bentuk Kurva P-Y Lempung Lunak Hingga Kaku (Matlock)

Bentuk kurva ditentukan berdasarkan persamaan berikut ini:

p
y
= 0.53
pu
yc
yc adalah defleksi regangan pada saat tegangan sama dengan tegangan maksimum yang
dihasilkan dari kurva tegangan-regangan laboratorium. Matlock merekomendasikan nilai ratarata sebesar 0.010 untuk lempung normally consolidated untuk digunakan pada persamaan
berikut ini:
yc = 2.5 c B
4-5

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Prosedur yang sama juga dapat diterapkan untuk tanah pasir. Penurunan tahanan tanah lateral
untuk pasir diberikan oleh Reese dkk. seperti terlihat pada Gambar 4-6 dan Gambar 4-7
berikut ini.

Gambar 4-6 Penentuan Kedalaman Kritis Tiang Dengan Beban Lateral Pada Tanah NonKohesif (Reese, Cox, dan Coop)

Gambar 4-7 Penentuan Kurva P-Y Pasir (Reese, Cox, dan Coop)

Dimana x adalah kedalaman di bawah permukaan tanah yang dipilih untuk kurva p-y tertentu.

4.2

PENENTUAN PARAMETER

Dalam melakukan analisis untuk desain pondasi diperlukan parameter-parameter yang akurat.
Penentuan parameter tersebut dilakukan berdasarkan hasil penyelidikan tanah. Parameter
tanah yang digunakan harus memenuhi persyaratan kedalaman dari pondasi tersebut seperti
terlihat pada Gambar 4-8.

4-6

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

a=4B

b=6-8 B

Le/B > 2.5


3-4B

Gambar 4-8 Minimal Tebal Data Tanah Di Bawah Dasar Pondasi Untuk Perhitungan
Kapasitas Daya Dukung Ujung

Tabel 4-1 berikut ini menunjukkan besarnya koreksi terhadap nilai N-SPT yang diperoleh di
lapangan tergantung dari metoda pelaksanaan yang digunakan.
Tabel 4-1 Koreksi Nilai N-SPT
Countr

Correction Factor fo r
60% Rod Energy

Free Fall
Rope an Pulley with
special throw release

78
67

78/60 = 1.30
67/60 = 1.12

Safety
Donut

Rope and Pulley


Rope and Pulley

60
45

60/60 = 1.00
45/60 = 0.75

Donut
Donut

Rope and Pulley


Free Fall

45
60

45/60 = 0.75
60/60 = 1.00

Donut

Rope and Pulley

50

50/60 = 0.83

Hammer Release

Japan

Donut
Donut

US
Argentina
China

4.3

Estimated Rod
Energy (%)

Hammer
Type

KAPASITAS DAYA DUKUNG IJIN TIANG

Dalam analisis dengan metoda statik, beban desain dari tiang dengan panjang yang diketahui,
secara umum telah diperhitungkan dengan cara membagi daya dukung ultimate pada lapisan
tanah pendukung atau:
Q all =

Qu
SF

dimana:
SF

= angka keamanan

4-7

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Kisaran angka keamanan terutama tergantung pada reliabilitas dari metoda analisis statik
tertentu dengan pertimbangan-pertimbangan sebagai berikut:

Faktor ketidakpastian data tanah yang ada.

Variasi dari lapisan tanah.

Efek dan konsistensi dari metoda instalasi tiang yang diusulkan.

Tingkat pengawasan konstruksi.

Pada umumnya, angka keamanan yang sering digunakan berkisar antara 2 4 untuk kondisi
operasional atau untuk beban yang bekerja selama operasi.
Menurut Tomlinson (1977), penentuan kapasitas ijin dari tiang adalah seperti ditunjukkan pada
persamaan berikut:
Kapasitas ijin tiang =

Kapasitas ultimate tiang


2,5

Canadian Foundation Engineering Manual dan AASHTO 1992 menyarankan penggunaan


angka keamanan sebesar 2.5 untuk kapasitas tiang.
Selain harus mampu menahan beban yang bekerja pada kondisi operasional maka pondasi
tiang juga harus mampu menahan beban yang bekerja pada kondisi gempa. Untuk itu, pondasi
harus mampu mengantisipasi momen dan gaya cabut yang terjadi akibat kondisi gempa.
Kapasitas tekan pondasi tiang terhadap beban gempa (temporary load) dimana beban gempa
didasarkan pada Peraturan Gempa baru (2003) yang berlaku adalah 1.3 lebih besar daripada
kapasitas ijin untuk kondisi operasi.
Berdasarkan hal tersebut, untuk memenuhi persyaratan angka keamanan dalam seluruh desain
pondasi tiang pada Kolam Renang Tanjung Redeb Kab. Berau ini, diambil angka keamanan
sebagai berikut:
o Angka keamanan tekan pondasi tiang pada kondisi operasi = 2.0
o Kapasitas ijin tekan saat kondisi gempa adalah 1,3 x kapasitas ijin untuk kondisi
operasi, atau SF = 1.6
o Angka keamanan tarik pondasi tiang =2.5

4.4

HASIL ANALISIS DAYA DUKUNG PONDASI TIANG

Pada analisis daya dukung pondasi tiang, digunakan tiang pancang (spun pile) dengan diameter
0.40 m, 0.45 m, 0.50 m dan 0.60 m. Rangkuman hasil perhitungan pondasi tiang dapat dilihat
pada . Perhitungan pondasi tiang secara lengkap dapat dilihat pada Lampiran D.

4-8

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Tabel 4-2 Rangkuman hasil perhitungan kapasitas pondasi tiang


Kapasitas Tiang
Ultimate (kN)

Properti Tiang
Ref.
Boring No.

Jenis
Tiang

Diameter

Compression

Pull
Out

(m)

Perkiraan
Kedalaman
Tiang
(m)

BH-1

Spun
Pile

0.40
0.45
0.50
0.60

25.00
25.00
25.00
25.00

1341.99
1602.51
1883.65
2507.79

498.64
562.85
628.85
759.56

BH-2

Spun
Pile

0.40
0.45
0.50
0.60

20.00
20.00
20.00
20.00

1185.01
1407.36
1646.20
2173.36

476.90
538.02
600.57
724.64

BH-3

Spun
Pile

0.40
0.45
0.50
0.60

16.00
16.00
16.00
16.00

1147.08
1383.25
1640.02
2215.43

354.62
400.15
446.83
539.36

BH-4

Spun
Pile

0.40
0.45
0.50
0.60

18.00
18.00
18.00
18.00

1117.10
1304.45
1502.41
1930.12

559.63
630.94
703.54
847.80

BH-5

Spun
Pile

0.40
0.45
0.50
0.60

21.00
21.00
21.00
21.00

1306.55
1562.65
1839.36
2454.63

470.46
530.85
592.74
715.44

4-9

Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik


Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 5 KESIMPULAN
Hasil penyelidikan lapangan dan test laboratorium di atas dapat disimpulkan sebagai berikut:
1.

Lapisan tanah pada lokasi kolam renang Tanjung Redep, Kab Berau pada umumnya
adalah sebagai berikut :
- Lapisan atas, merupakan tanah lunak (very soft soft silty clay) yang merupakan
jenis tanah aluvial endapan dari sungai Segah. Lapisan ini hingga pada elevasi -16.00
s/d -25.00 dari permukaan tanah. Lapisan ini sangat lunak dan sangat compresible.
- Pada beberapa lokasi,dibawah lapisan lunak terdapat lapisan lempung sedang
(medium silty clay).
- Pada kedalaman 16.00 25.00 terdapa lapisan lempung keras (very stiff hard clay),
lapisan ini merupakan lapisan bearing stratum atau lapisan pendukung.

2.

Karena sifatnya yang lunak pada permkaan, timbunan langsung yang sifatnya struktural
tidak direkomendasikan. Jika pekerjaan timbunan akan dilaksanakan perlu dilakukan
perbaikan tanah.

3.

Direkomendasikan untuk setiap bangunan dipikul oleh pondasi tiang untuk menghindari
penurunan yang besar dan differential settlement.

4.

Struktur yang dibangunan dengan melakukan galian hendaknya mempertimbangkan gaya


up-lift karena muka air tanah pada lokasi tersebut cukup tinggi.

5-1

LAMPIRAN A
BORING LOG

P.T. PETROSOL

BORING LOG

CORING & SAMPLING


Automatic hammer
February 09 to 11, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-1
40.00 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

40 80

SILTY CLAY, few fine sand, very soft.

0.00

1.20

02/30

3.00

01/52

4.50

01/53

6.70

02/30

8.00

01/50

9.50

01/53

11.55

01/50

13.00

01/55

14.55

01/52

16.55

01/46

18.00

01/52

19.70

03/30

21.70

08/30

23.15

21/30

24.70

73/30

26.15

50/10

27.55

50/13

29.00

50/12

2.50
3.00

6.00
6.55

CH

11.00
11.55

16.00
16.55

21.00 21.00

SILTY CLAY, yellowish brown to brownish grey,


stiff to very stiff.

21.55

CH
24.50

CLAY / CLAYSTONE, brownish grey, hard.

N > 100

B1.TXT - Times-Normal

N > 100

N > 100

30.00

CONTINUE TO NEXT PAGE.

Plate

P.T. PETROSOL

BORING LOG

CORING & SAMPLING


Automatic hammer
February 09 to 11, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

40 80

N > 100

CLAY / CLAYSTONE, brownish grey, hard.

30.00

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-1
40.00 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

30.55

50/12

32.15

50/10

33.70

50/05

35.00

50/11

36.55

50/10

38.00

50/10

39.55

50/10

N > 100

32.00

CLAYEY GRAVEL, brownish grey, very dense.

N > 100

N > 100

GP

N > 100

N > 100

N > 100
39.50
40.00

PT

PEAT / COAL, black, dense.


END OF THIS BORING.

B1a.TXT - Times-Normal

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

Plate

P.T. PETROSOL

BORING LOG

CORING & SAMPLING


Automatic hammer
February 03 to 04, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-2
40.00 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

40 80

SILTY CLAY, grey to yellowish grey, few sand,


very soft.

0.00

1.00

01/62

3.00

01/76

4.50

01/54

6.50

01/63

8.00

01/59

9.50

01/54

11.50

01/51

13.15

02/31

14.65

02/30

16.65

26/30

18.15

14/30

19.70

86/30

21.15

90/25

22.70

50/13

24.15

82/27

25.70

82/30

27.15

52/30

28.70

26/30

2.50
3.00

6.00
6.50

CH

11.00
11.50

16.00
16.50 16.50

SILTY CLAY, yellowish grey to brownish grey,


stiff to very stiff.

CH
19.50

SILTY CLAY, brownish grey, hard.

N > 100

N > 100

27.50

SILTY CLAY, brownish grey, very stiff.

CH
30.00

B2.TXT - Times-Normal

CH

CONTINUE TO NEXT PAGE.

Plate

P.T. PETROSOL

BORING LOG

30.00

CORING & SAMPLING


Automatic hammer
February 03 to 04, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

SILTY CLAY, brownish grey, hard.

30.15

68/30

PEAT, black, very soft.

31.55

01/50

CLAY / CLAYSTONE, dark grey, hard.

33.15

40/30

34.15

50/12

36.00

50/12

37.55

50/10

39.15

50/05

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-2
40.00 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

40 80

CH
31.50

PT
33.00

N > 100

N > 100

N > 100

39.00
40.00

N > 100

SANDSTONE, brownish grey, very dense.


END OF THIS BORING.

B2a.TXT - Times-Normal

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

Plate

P.T. PETROSOL

BORING LOG

CORING & SAMPLING


Automatic hammer
January 31, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-3
25.12 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

40 80

SILTY CLAY, grey, very soft to soft.

0.00

3.00

1.00

01/71

2.50

01/52

4.65

02/30

6.50

01/53

8.00

01/52

9.65

02/30

11.70

02/30

13.15

05/30

14.70

12/30

16.00

50/08

17.55

50/08

19.00

50/10

20.55

50/08

22.00

50/06

23.55

50/11

25.00

50/12

3.52

6.00

CH

6.50

11.00
11.55

13.00

As above, medium stiff to stiff.

CH

N > 100
16.00

CLAY / CLAYSTONE, grey to dark grey, hard.

N > 100

N > 100

N > 100

N > 100

N > 100

N > 100
END OF THIS BORING.

B3.TXT - Times-Normal

25.12

Plate

P.T. PETROSOL

BORING LOG

CORING & SAMPLING


Automatic hammer
February 05 to 07, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-4
40.00 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

40 80

SILTY CLAY, grey to dark grey, few sand, very soft.

0.00

1.00

01/69

3.00

01/52

4.50

01/50

6.50

01/53

8.00

01/61

9.50

01/55

11.50

01/50

13.15

08/30

14.65

25/30

16.70

45/30

18.15

50/30

19.70

55/30

21.15

50/12

22.55

50/12

24.15

50/10

25.70

19/30

27.70

20/30

29.15

40/30

2.50
3.00

6.00

CH

6.50

11.00
11.50

13.00

SILTY CLAY, yellowish grey, some sand, few fine gravel,


stiff to very stiff.

CH
16.00
16.55 16.55

SILTY CLAY, reddish grey, few sand & gravel, hard.

CH

N > 100

21.00

As above, hard.

N > 100

CH

N > 100

24.50

SILTY CLAY, brownish grey, very stiff.

29.00
30.00

PT

PEAT, black, dense.

B4.TXT - Times-Normal

CH

CONTINUE TO NEXT PAGE.

Plate

P.T. PETROSOL

BORING LOG

CORING & SAMPLING


Automatic hammer
February 05 to 07, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

40 80

N > 100

PEAT, black, dense.

30.00

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-4
40.00 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

30.55

50/08

32.00

50/10

33.55

50/07

35.00

50/08

36.55

50/10

38.00

50/10

39.55

50/12

N > 100

PT

N > 100
33.50

CLAY / CLAYSTONE, dark grey, hard.

N > 100

N > 100

N > 100

N > 100
40.00

END OF THIS BORING.

B4a.TXT - Times-Normal

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

Plate

P.T. PETROSOL

BORING LOG

CORING & SAMPLING


Automatic hammer
February 02, 2007
Endin A.M.
Widoyoko
Jeffrey

SPT - N value
BLOWS N PER FOOT
PER
CM
40
80

(%)

ROCK/SOIL DESCRIPTION

:
:
:
:
:
:

RECOVERY

BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY

Depth
(m)

PT.
Tanjung Redep - Berau, Kaltim
B-5
30.10 m
0.00m (at the surface)

qu
(kg/cm2)

:
:
:
:
:
:
:
:

DEPTH
(meter)

GRAPH
SYMBOL

USCS
CHART

DEPTH
(meter)

SAMPLE

CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL

40 80

SILTY CLAY, green to dark grey, very soft.

0.00

1.15

02/30

3.00

01/51

4.65

02/30

6.50

01/60

8.00

01/52

9.50

01/50

11.65

02/30

13.15

05/30

14.60

04/30

16.70

05/30

18.15

05/30

19.70

07/30

21.00

50/12

22.55

50/13

24.00

50/12

25.55

50/10

27.00

50/10

28.55

50/12

30.00

50/10

2.50
3.00

6.00

CH

6.50

11.00
11.50

13.00

As above, medium stiff.

16.00
16.55

CH

N > 100

21.00

CLAY / CLAYSTONE, grey to dark grey, hard.

N > 100

N > 100

N > 100

B5.TXT - Times-Normal

N > 100

N > 100

N > 100

30.10

END OF THIS BORING.

Plate

LAMPIRAN B
CPT LOG

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.01
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

12
2400
240

N =
E =
02 February, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

:
:
:
:
:

15

S01.TXT - Times-Normal

20

CONE RESISTANCE >200 KG/CM2


Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.02
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

:
:
:
:
:

12
2400
240

N =
E =
01 February, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

M E T E R

D E P T H

i n

10

S02.TXT - Times-Normal

15

20
CONE RESISTANCE >200 KG/CM2

Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.03
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

:
:
:
:
:

12
2400
240

N =
E =
01 February, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

S03.TXT - Times-Normal

15

CONE RESISTANCE >200 KG/CM2


20
Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.04
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

:
:
:
:
:

12
2400
240

N =
E =
31 January, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

15

S04.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2

20
Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.05
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

:
:
:
:
:

12
2400
240

N =
E =
31 January, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

S05.TXT - Times-Normal

15

CONE RESISTANCE >200 KG/CM2

20
Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.06
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

12
2400
240

N =
E =
02 February, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

:
:
:
:
:

S06.TXT - Times-Normal

15

20

CONE RESISTANCE >200 KG/CM2


Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.07
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

:
:
:
:
:

12
2400
240

N =
E =
30 January, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

15

S07.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2

20
Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.08
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

:
:
:
:
:

12
2400
240

N =
E =
30 January, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

15

S08.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2

20
Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.09
0.00 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

12
2400
240

M E T E R

N =
E =
29 January, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

CONE RESISTANCE >200 KG/CM2

10

D E P T H

i n

:
:
:
:
:

S09.TXT - Times-Normal

15

20
Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.10
+0.20 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

12
2400
240

N =
E =
03 February, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

15

20

S10.TXT - Times-Normal

D E P T H

i n

M E T E R

:
:
:
:
:

CONE RESISTANCE >200 KG/CM2


25
Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.11
+0.20 (at the surface)

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

12
2400
240

N =
E =
03 February, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

10

D E P T H

i n

M E T E R

:
:
:
:
:

15

S11.TXT - Times-Normal

20

CONE RESISTANCE >200 KG/CM2

Plate

P.T. PETROSOL

GRAPHS OF 2-ton DCPT


CLIENT
PROJECT
LOCATION
POINT
GROUND WATER LEVEL

0
0
0

2
400
40

:
:
:
:
:

PT.
Tanjung Redep - Berau, Kaltim
S.12
-0.80

4
800
80

6
1200
120

8
1600
160

COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED

10
2000
200

12
2400
240

M E T E R

N =
E =
29 January, 2007.
Edi Suryono
Jeffrey

LF/CR (%)
TF (kg/cm)
CR (kg/cm2)

NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE

CONE RESISTANCE >200 KG/CM2


10

D E P T H

i n

:
:
:
:
:

S12.TXT - Times-Normal

15

20
Plate

LAMPIRAN C
HASIL UJI LABORATORIUM

ATTERBERG LIMIT

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 01
16,00 - 16,50

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

85

WATER CONTENT (%)

80
75
70
65
60
55
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

ML-OL
20

30

40

72.89
27.21

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

45.68
CH

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 01
21,00 - 21,55

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

WATER CONTENT (%)

40
35
30
25
20
15
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

ML-OL
20

30

40

26.09
14.90

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

11.19
CL

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 02
11,00 - 11,50

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

95

WATER CONTENT (%)

90
85
80
75
70
65
60
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

ML-OL
20

30

40

77.41
29.73

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

47.68
CH

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 02
16,00 - 16,50

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

55

WATER CONTENT (%)

50
45
40
35
30
25
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

ML-OL

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

20

30

40

40.82
24.00

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

16.82
CL

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 03
2,50 - 3,00

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

95

WATER CONTENT (%)

90
85
80
75
70
65
60
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

ML-OL

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

20

30

40

78.36
30.25

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

48.11
CH

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 03
11,00 - 11,55

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

WATER CONTENT (%)

75
70
65
60
55
50
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

ML-OL

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

20

30

40

63.45
26.06

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

37.39
CH

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 04
11,00 - 11,50

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

85

WATER CONTENT (%)

80
75
70
65
60
55
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

ML-OL

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

20

30

40

73.14
28.67

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

44.47
CH

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 04
16,00 - 16,55

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

WATER CONTENT (%)

50
45
40
35
30
25
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

ML-OL

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

20

30

40

38.84
20.95

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

17.89
CL

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 04
27,00 - 27,55

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

65

WATER CONTENT (%)

60
55
50
45
40
35
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

ML-OL

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

20

30

40

50.00
25.27

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

24.73
CL - CH

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 05
16,00 - 16,50

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

90

WATER CONTENT (%)

85
80
75
70
65
60
55
50
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

ML-OL
20

30

40

66.92
24.14

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

42.78
CH

100

LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION :
SAMPLE No.
DEPTH (M)

TANJUNG REDEB
B - 05
2,50 - 3,00

TESTED BY :
DATE :
REMARKS :

Tatang
Feb. 2007

95

WATER CONTENT (%)

90
85
80
75
70
65
60
NUMBER OF BLOWS

10

100

UNIFIED CLASSIFICATION
Platicity Index %

60
50

CH

CL

40
30

OH - MH

20
10
CL-ML

0
0

10

Liquid Limit, LL (%) =


Plastic Limit,PL (%) =

ML-OL
20

30

40

73.73
29.55

50
60
Liquid Limit %

70

80

Plastic Index, IP (%) =


Classification =

90

44.18
CH

100

TRIAXIAL UU

(UNCONSOLIDATED UNDRAINED)

TRIAXIAL COMPRESSION TEST

Location
Boring
Depth

TJ. REDEB - KALTIM


B - 01
16,00 - 16,55

Tested by:
Date :
Method :

Maman U
Feb, 2007
Unconsolidated Undrained

1' - 3'

3'

1'

(1 + 3)

0.50
1.00
1.50

0.411
0.457
0.499

0.500
1.000
1.500

0.000
0.000
0.000

0.911
1.457
1.999

0.911
1.457
1.999

0.706
1.229
1.750

1.0

Shear Stress kg/cm2

0.8

0.6

0.4

0.2

0.0
0.0

0.2

0.4

0.6

0.8
1.0
1.2
Principal Stress kg/cm2

Cohesion (c)
Angle of Int. Friction :

0.176
2.4

1.4

1.6

kg/cm2
o

1.8

2.0

TRIAXIAL COMPRESSION TEST

Location
Boring
Depth

TJ. REDEB - KALTIM


B - 02
11,00 - 22,50

Tested by:
Date :
Method :

Maman U
Feb, 2007
Unconsolidated Undrained

1' - 3'

3'

1'

(1 + 3)

0.50
1.00
1.50

0.130
0.143
0.166

0.500
1.000
1.500

0.000
0.000
0.000

0.630
1.143
1.666

0.630
1.143
1.666

0.565
1.072
1.583

1.0

Shear Stress kg/cm2

0.8

0.6

0.4

0.2

0.0
0.0

0.2

0.4

0.6

0.8
1.0
1.2
Principal Stress kg/cm2

Cohesion (c)
Angle of Int. Friction :

0.056
0.9

1.4

1.6

kg/cm2
o

1.8

2.0

TRIAXIAL COMPRESSION TEST

Location
Boring
Depth

TJ. REDEB - KALTIM


B - 03
2,50 - 3,00

Tested by:
Date :
Method :

Maman U
Feb, 2007
Unconsolidated Undrained

1' - 3'

3'

1'

(1 + 3)

0.50
1.00
1.50

0.248
0.280
0.306

0.500
1.000
1.500

0.000
0.000
0.000

0.748
1.280
1.806

0.748
1.280
1.806

0.624
1.140
1.653

1.0

Shear Stress kg/cm2

0.8

0.6

0.4

0.2

0.0
0.0

0.2

0.4

0.6

0.8
1.0
1.2
Principal Stress kg/cm2

Cohesion (c)
Angle of Int. Friction :

0.106
1.6

1.4

1.6

kg/cm2
o

1.8

2.0

TRIAXIAL COMPRESSION TEST

Location
Boring
Depth

TJ. REDEB - KALTIM


B - 03
11,00 - 22,50

Tested by:
Date :
Method :

Maman U
Feb, 2007
Unconsolidated Undrained

1' - 3'

3'

1'

(1 + 3)

0.50
1.00
1.50

0.319
0.372
0.416

0.500
1.000
1.500

0.000
0.000
0.000

0.819
1.372
1.916

0.819
1.372
1.916

0.660
1.186
1.708

1.0

Shear Stress kg/cm2

0.8

0.6

0.4

0.2

0.0
0.0

0.2

0.4

0.6

0.8
1.0
1.2
Principal Stress kg/cm2

Cohesion (c)
Angle of Int. Friction :

0.128
2.7

1.4

1.6

kg/cm2
o

1.8

2.0

TRIAXIAL COMPRESSION TEST

Location
Boring
Depth

TJ. REDEB - KALTIM


B - 04
11,00 - 11,50

Tested by:
Date :
Method :

Maman U
Feb, 2007
Unconsolidated Undrained

1' - 3'

3'

1'

(1 + 3)

0.50
1.00
1.50

0.178
0.202
0.220

0.500
1.000
1.500

0.000
0.000
0.000

0.678
1.202
1.720

0.678
1.202
1.720

0.589
1.101
1.610

1.0

Shear Stress kg/cm2

0.8

0.6

0.4

0.2

0.0
0.0

0.2

0.4

0.6

0.8
1.0
1.2
Principal Stress kg/cm2

Cohesion (c)
Angle of Int. Friction :

0.075
1.1

1.4

1.6

kg/cm2
o

1.8

2.0

TRIAXIAL COMPRESSION TEST

Location
Boring
Depth

TJ. REDEB - KALTIM


B - 05
2,50 - 3,00

Tested by:
Date :
Method :

Maman U
Feb, 2007
Unconsolidated Undrained

1' - 3'

3'

1'

(1 + 3)

0.50
1.00
1.50

0.314
0.385
0.460

0.500
1.000
1.500

0.000
0.000
0.000

0.814
1.385
1.960

0.814
1.385
1.960

0.657
1.193
1.730

1.0

Shear Stress kg/cm2

0.8

0.6

0.4

0.2

0.0
0.0

0.2

0.4

0.6

0.8
1.0
1.2
Principal Stress kg/cm2

Cohesion (c)
Angle of Int. Friction :

0.110
3.9

1.4

1.6

kg/cm2
o

1.8

2.0

TRIAXIAL COMPRESSION TEST

Location
Boring
Depth

TJ. REDEB - KALTIM


B - 05
16,00 - 16,55

Tested by:
Date :
Method :

Maman U
Feb, 2007
Unconsolidated Undrained

1' - 3'

3'

1'

(1 + 3)

0.50
1.00
1.50

0.213
0.252
0.277

0.500
1.000
1.500

0.000
0.000
0.000

0.713
1.252
1.777

0.713
1.252
1.777

0.607
1.126
1.639

1.0

Shear Stress kg/cm2

0.8

0.6

0.4

0.2

0.0
0.0

0.2

0.4

0.6

0.8
1.0
1.2
Principal Stress kg/cm2

Cohesion (c)
Angle of Int. Friction :

0.087
1.8

1.4

1.6

kg/cm2
o

1.8

2.0

CONSOLIDATION

CONSOLIDATION TEST

Location :
Boring No:
Depth :

TANJUNG REDEB - KALTIM


B - 01
16,00 - 16,55

2.10

Done by : Cecep
Date :
February, 2007
Remarks :

cc =

CC = 0.594

Void Ratio

1.60

1.10

0.60
0.01

0.1

10

100

10

100

Coef.Consol (Cv) x 10-3 CM2/SEC

Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00

0.01

0.1

CONSOLIDATION TEST

Location :
Boring No:
Depth :

TANJUNG REDEB - KALTIM


B - 02
16,00 - 16,50

1.00

Done by : Cecep
Date :
February, 2007
Remarks :

cc =

CC = 0.143

Void Ratio

0.80

0.60

0.40
0.01

0.1

10

100

10

100

Coef.Consol (Cv) x 10-3 CM2/SEC

Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00

0.01

0.1

CONSOLIDATION TEST

Location :
Boring No:
Depth :

TANJUNG REDEB - KALTIM


B - 03
2,50 - 3,00

2.10

Done by : Cecep
Date :
February, 2007
Remarks :

cc =

CC = 0.560

Void Ratio

1.60

1.10

0.60
0.01

0.1

10

100

10

100

Coef.Consol (Cv) x 10-3 CM2/SEC

Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00

0.01

0.1

CONSOLIDATION TEST

Location :
Boring No:
Depth :

TANJUNG REDEB - KALTIM


B - 04
11,00 - 11,50

2.10

Done by : Cecep
Date :
February, 2007
Remarks :

cc =

CC = 0.561

Void Ratio

1.60

1.10

0.60
0.01

0.1

10

100

10

100

Coef.Consol (Cv) x 10-3 CM2/SEC

Log - P (kg/cm 2)
1.00
0.80
0.60
0.40
0.20
0.00

0.01

0.1

CONSOLIDATION TEST

Location :
Boring No:
Depth :

TANJUNG REDEB - KALTIM


B - 04
27,00 - 27,55

1.10

Done by : Cecep
Date :
February, 2007
Remarks :

cc =

CC = 0.207

Void Ratio

0.90

0.70

0.50

0.30
0.01

0.1

10

100

10

100

Coef.Consol (Cv) x 10-3 CM2/SEC

Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00

0.01

0.1

CONSOLIDATION TEST

Location :
Boring No:
Depth :

TANJUNG REDEB - KALTIM


B - 05
2,50 - 3,00

2.60

Done by : Cecep
Date :
February, 2007
Remarks :

cc =

CC = 0.617

Void Ratio

2.10

1.60

1.10

0.60
0.01

0.1

10

100

10

100

Coef.Consol (Cv) x 10-3 CM2/SEC

Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00

0.01

0.1

CONSOLIDATION TEST

Location :
Boring No:
Depth :

TANJUNG REDEB - KALTIM


B - 05
16,00 - 16,55

2.10

Done by : Cecep
Date :
February, 2007
Remarks :

cc =

CC = 0.587

Void Ratio

1.60

1.10

0.60
0.01

0.1

10

100

10

100

Coef.Consol (Cv) x 10-3 CM2/SEC

Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00

0.01

0.1

LAMPIRAN D
PERHITUNGAN DAYA DUKUNG
PONDASI TIANG

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-1

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.40
0.075
1.26
0.13
0.08
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
7.5
7.5
15.1
15.1
9.5
24.6
15.1
30.2
11.6
41.7
7.5
37.7
6.8
44.5
7.5
45.2
7.8
53.0
7.5
52.8
6.8
59.6
15.1
67.9
13.6
81.4
15.1
82.9
13.6
96.5
7.5
90.5
6.8
97.3
7.5
98.0
6.8
104.8
7.5
105.6
6.8
112.3
7.5
113.1
6.8
119.9
7.5
120.6
6.8
127.4
7.5
128.2
6.8
135.0
7.5
135.7
6.8
142.5
7.5
143.3
6.8
150.0
7.5
150.8
6.8
157.6
7.5
158.3
6.8
165.1
7.5
165.9
6.8
172.7
22.6
188.5
20.4
208.9
22.6
211.1
20.4
231.5
46.4
257.6
54.3
311.8
46.4
304.0
54.3
358.3
79.2
383.2
142.5
525.7
79.2
462.3
142.5
604.8
219.9
682.3
659.7
1342.0
219.9
902.2
659.7
1561.9
219.9
1122.1
659.7
1781.8
219.9
1342.0
659.7
2001.7
219.9
1561.9
659.7
2221.6
219.9
1781.8
659.7
2441.5
219.9
2001.7
659.7
2661.5
219.9
2221.6
659.7
2881.4
219.9
2441.6
659.7
3101.3
219.9
2661.5
659.7
3321.2
219.9
2881.4
659.7
3541.1
219.9
3101.3
659.7
3761.0
219.9
3321.2
659.7
3980.9
219.9
3541.1
659.7
4200.8
219.9
3761.0
659.7
4420.8
219.9
3980.9
659.7
4640.7

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
10.6
10.6
0.8
10.6
21.1
1.7
5.3
26.4
2.5
5.3
31.7
3.4
5.3
36.9
4.2
10.6
47.5
5.1
10.6
58.1
5.9
5.3
63.3
6.7
5.3
68.6
7.6
5.3
73.9
8.4
5.3
79.2
9.3
5.3
84.4
10.1
5.3
89.7
11.0
5.3
95.0
11.8
5.3
100.3
12.6
5.3
105.6
13.5
5.3
110.8
14.3
5.3
116.1
15.2
15.8
131.9
16.0
15.8
147.8
16.8
32.5
180.3
17.7
32.5
212.8
18.5
55.4
268.2
19.4
55.4
323.6
20.2
153.9
477.6
21.1
153.9
631.5
21.9
153.9
785.5
22.7
153.9
939.4
23.6
153.9
1093.3
24.4
153.9
1247.3
25.3
153.9
1401.2
26.1
153.9
1555.1
27.0
153.9
1709.1
27.8
153.9
1863.0
28.6
153.9
2017.0
29.5
153.9
2170.9
30.3
153.9
2324.8
31.2
153.9
2478.8
32.0
153.9
2632.7
32.9
153.9
2786.7
33.7

Qpu
0.0
11.4
22.8
28.9
35.0
41.2
52.6
64.0
70.1
76.2
82.3
88.4
94.6
100.7
106.8
112.9
119.0
125.2
131.3
148.0
164.6
198.0
231.3
287.6
343.9
498.6
653.4
808.2
963.0
1117.8
1272.5
1427.3
1582.1
1736.9
1891.7
2046.4
2201.2
2356.0
2510.8
2665.6
2820.3

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-1

Diameter

: 0.4 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

Ult. Pull Out (kN)


6000

7000

8000

0
2
1
-5

NOTE:

-5

-5

-10

-10

-15

-15

3
8

-20

Depth (m)

Depth (m)

Depth (m)

-20

-20

CH
21
73

-25
CLAYSTONE

-25

-25

-30

-30

-35

-35

-40

-40

100
100
100

-30

100
100
100

-35

100
100
100

-40

100

7000

Qpu

1
1

6000

Wp

1
1

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

8000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-1

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.45
0.080
1.41
0.16
0.09
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
9.5
9.5
17.0
17.0
12.1
29.0
17.0
33.9
14.6
48.5
8.5
42.4
8.6
51.0
8.5
50.9
9.8
60.7
8.5
59.4
8.6
68.0
17.0
76.3
17.2
93.5
17.0
93.3
17.2
110.5
8.5
101.8
8.6
110.4
8.5
110.3
8.6
118.9
8.5
118.8
8.6
127.3
8.5
127.2
8.6
135.8
8.5
135.7
8.6
144.3
8.5
144.2
8.6
152.8
8.5
152.7
8.6
161.3
8.5
161.2
8.6
169.8
8.5
169.6
8.6
178.2
8.5
178.1
8.6
186.7
8.5
186.6
8.6
195.2
25.4
212.1
25.8
237.8
25.4
237.5
25.8
263.3
52.3
289.8
68.7
358.5
52.3
342.0
68.7
410.7
89.1
431.1
180.4
611.4
89.1
520.1
180.4
700.5
247.4
767.5
835.0
1602.5
247.4
1014.9
835.0
1849.9
247.4
1262.3
835.0
2097.3
247.4
1509.7
835.0
2344.7
247.4
1757.1
835.0
2592.1
247.4
2004.5
835.0
2839.5
247.4
2251.9
835.0
3086.9
247.4
2499.3
835.0
3334.3
247.4
2746.7
835.0
3581.7
247.4
2994.1
835.0
3829.1
247.4
3241.5
835.0
4076.5
247.4
3488.9
835.0
4323.9
247.4
3736.3
835.0
4571.3
247.4
3983.7
835.0
4818.7
247.4
4231.2
835.0
5066.1
247.4
4478.6
835.0
5313.5

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
11.9
11.9
1.0
11.9
23.8
2.0
5.9
29.7
3.1
5.9
35.6
4.1
5.9
41.6
5.1
11.9
53.4
6.1
11.9
65.3
7.2
5.9
71.3
8.2
5.9
77.2
9.2
5.9
83.1
10.2
5.9
89.1
11.3
5.9
95.0
12.3
5.9
100.9
13.3
5.9
106.9
14.3
5.9
112.8
15.3
5.9
118.8
16.4
5.9
124.7
17.4
5.9
130.6
18.4
17.8
148.4
19.4
17.8
166.3
20.5
36.6
202.8
21.5
36.6
239.4
22.5
62.3
301.8
23.5
62.3
364.1
24.5
173.2
537.3
25.6
173.2
710.5
26.6
173.2
883.6
27.6
173.2
1056.8
28.6
173.2
1230.0
29.7
173.2
1403.2
30.7
173.2
1576.4
31.7
173.2
1749.5
32.7
173.2
1922.7
33.8
173.2
2095.9
34.8
173.2
2269.1
35.8
173.2
2442.3
36.8
173.2
2615.4
37.8
173.2
2788.6
38.9
173.2
2961.8
39.9
173.2
3135.0
40.9

Qpu
0.0
12.9
25.8
32.8
39.7
46.7
59.6
72.5
79.4
86.4
93.4
100.3
107.3
114.2
121.2
128.2
135.1
142.1
149.0
167.9
186.7
224.3
261.9
325.3
388.6
562.8
737.1
911.3
1085.5
1259.7
1433.9
1608.1
1782.3
1956.5
2130.7
2304.9
2479.1
2653.3
2827.5
3001.7
3175.9

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-1

Diameter

: 0.45 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

Ult. Pull Out (kN)


6000

7000

8000

0
2
1
-5

NOTE:

-5

-5

-10

-10

-15

-15

3
8

-20

Depth (m)

Depth (m)

Depth (m)

-20

-20

CH
21
73

-25
CLAYSTONE

-25

-25

-30

-30

-35

-35

-40

-40

100
100
100

-30

100
100
100
100

-35

100
GR
-40

100
100

7000

Qpu

1
1

6000

Wp

1
1

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

8000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-1

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.50
0.090
1.57
0.20
0.12
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
11.8
11.8
18.8
18.8
14.9
33.8
18.8
37.7
18.0
55.7
9.4
47.1
10.6
57.7
9.4
56.5
12.2
68.7
9.4
66.0
10.6
76.6
18.8
84.8
21.2
106.0
18.8
103.7
21.2
124.9
9.4
113.1
10.6
123.7
9.4
122.5
10.6
133.1
9.4
131.9
10.6
142.6
9.4
141.4
10.6
152.0
9.4
150.8
10.6
161.4
9.4
160.2
10.6
170.8
9.4
169.6
10.6
180.2
9.4
179.1
10.6
189.7
9.4
188.5
10.6
199.1
9.4
197.9
10.6
208.5
9.4
207.3
10.6
217.9
28.3
235.6
31.8
267.4
28.3
263.9
31.8
295.7
58.1
322.0
84.8
406.8
58.1
380.0
84.8
464.8
99.0
479.0
222.7
701.6
99.0
577.9
222.7
800.6
274.9
852.8
1030.8
1883.7
274.9
1127.7
1030.8
2158.5
274.9
1402.6
1030.8
2433.4
274.9
1677.5
1030.8
2708.3
274.9
1952.4
1030.8
2983.2
274.9
2227.3
1030.8
3258.1
274.9
2502.2
1030.8
3533.0
274.9
2777.0
1030.8
3807.9
274.9
3051.9
1030.8
4082.8
274.9
3326.8
1030.8
4357.7
274.9
3601.7
1030.8
4632.6
274.9
3876.6
1030.8
4907.4
274.9
4151.5
1030.8
5182.3
274.9
4426.4
1030.8
5457.2
274.9
4701.3
1030.8
5732.1
274.9
4976.2
1030.8
6007.0

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
13.2
13.2
1.3
13.2
26.4
2.6
6.6
33.0
3.8
6.6
39.6
5.1
6.6
46.2
6.4
13.2
59.4
7.7
13.2
72.6
8.9
6.6
79.2
10.2
6.6
85.8
11.5
6.6
92.4
12.8
6.6
99.0
14.0
6.6
105.6
15.3
6.6
112.2
16.6
6.6
118.8
17.9
6.6
125.3
19.1
6.6
131.9
20.4
6.6
138.5
21.7
6.6
145.1
23.0
19.8
164.9
24.2
19.8
184.7
25.5
40.6
225.4
26.8
40.6
266.0
28.1
69.3
335.3
29.3
69.3
404.6
30.6
192.4
597.0
31.9
192.4
789.4
33.2
192.4
981.8
34.4
192.4
1174.2
35.7
192.4
1366.7
37.0
192.4
1559.1
38.3
192.4
1751.5
39.5
192.4
1943.9
40.8
192.4
2136.4
42.1
192.4
2328.8
43.4
192.4
2521.2
44.6
192.4
2713.6
45.9
192.4
2906.0
47.2
192.4
3098.5
48.5
192.4
3290.9
49.7
192.4
3483.3
51.0

Qpu
0.0
14.5
28.9
36.8
44.7
52.6
67.0
81.5
89.4
97.2
105.1
113.0
120.9
128.7
136.6
144.5
152.3
160.2
168.1
189.2
210.2
252.1
294.1
364.6
435.2
628.9
822.6
1016.2
1209.9
1403.6
1597.3
1791.0
1984.7
2178.4
2372.1
2565.8
2759.5
2953.2
3146.9
3340.6
3534.3

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-1

Diameter

: 0.5 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

Ult. Pull Out (kN)


6000

7000

8000

0
2
1

-5

NOTE:

-5

-5

-10

-10

-15

-15

1
1

3
8

-20

Depth (m)

-20

Depth (m)

Depth (m)

1
1

-20

CH
21
73

-25
CLAYSTONE

-25

-25

-30

-30

-35

-35

-40

-40

100
100
100

-30

100
100
100

-35

100
100
100

-40

100

5000

6000

7000

Qpu

-15

4000

Qu

3000

Friction*
Wp

1
-10

2000

Friction
End

CH

1000

8000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-1

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.60
0.100
1.88
0.28
0.16
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
17.0
17.0
22.6
22.6
21.5
44.1
22.6
45.2
26.0
71.2
11.3
56.5
15.3
71.8
11.3
67.9
17.5
85.4
11.3
79.2
15.3
94.4
22.6
101.8
30.5
132.3
22.6
124.4
30.5
154.9
11.3
135.7
15.3
151.0
11.3
147.0
15.3
162.3
11.3
158.3
15.3
173.6
11.3
169.6
15.3
184.9
11.3
181.0
15.3
196.2
11.3
192.3
15.3
207.5
11.3
203.6
15.3
218.8
11.3
214.9
15.3
230.2
11.3
226.2
15.3
241.5
11.3
237.5
15.3
252.8
11.3
248.8
15.3
264.1
33.9
282.7
45.8
328.5
33.9
316.7
45.8
362.5
69.7
386.3
122.1
508.5
69.7
456.0
122.1
578.2
118.8
574.8
320.6
895.4
118.8
693.5
320.6
1014.1
329.9
1023.4
1484.4
2507.8
329.9
1353.3
1484.4
2837.7
329.9
1683.1
1484.4
3167.5
329.9
2013.0
1484.4
3497.4
329.9
2342.9
1484.4
3827.3
329.9
2672.7
1484.4
4157.1
329.9
3002.6
1484.4
4487.0
329.9
3332.5
1484.4
4816.9
329.9
3662.3
1484.4
5146.7
329.9
3992.2
1484.4
5476.6
329.9
4322.1
1484.4
5806.5
329.9
4651.9
1484.4
6136.3
329.9
4981.8
1484.4
6466.2
329.9
5311.7
1484.4
6796.1
329.9
5641.5
1484.4
7125.9
329.9
5971.4
1484.4
7455.8

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
15.8
15.8
1.7
15.8
31.7
3.5
7.9
39.6
5.2
7.9
47.5
6.9
7.9
55.4
8.6
15.8
71.3
10.4
15.8
87.1
12.1
7.9
95.0
13.8
7.9
102.9
15.6
7.9
110.8
17.3
7.9
118.8
19.0
7.9
126.7
20.7
7.9
134.6
22.5
7.9
142.5
24.2
7.9
150.4
25.9
7.9
158.3
27.6
7.9
166.3
29.4
7.9
174.2
31.1
23.8
197.9
32.8
23.8
221.7
34.6
48.8
270.4
36.3
48.8
319.2
38.0
83.1
402.3
39.7
83.1
485.5
41.5
230.9
716.4
43.2
230.9
947.3
44.9
230.9
1178.2
46.7
230.9
1409.1
48.4
230.9
1640.0
50.1
230.9
1870.9
51.8
230.9
2101.8
53.6
230.9
2332.7
55.3
230.9
2563.6
57.0
230.9
2794.5
58.7
230.9
3025.4
60.5
230.9
3256.4
62.2
230.9
3487.3
63.9
230.9
3718.2
65.7
230.9
3949.1
67.4
230.9
4180.0
69.1

Qpu
0.0
17.6
35.1
44.8
54.4
64.1
81.6
99.2
108.8
118.5
128.1
137.8
147.4
157.0
166.7
176.3
186.0
195.6
205.3
230.8
256.2
306.7
357.2
442.1
526.9
759.6
992.2
1224.8
1457.5
1690.1
1922.7
2155.4
2388.0
2620.6
2853.3
3085.9
3318.6
3551.2
3783.8
4016.5
4249.1

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-1

Diameter

: 0.6 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

Ult. Pull Out (kN)


6000

7000

8000

0
2
1
-5

NOTE:

-5

-5

-10

-10

-15

-15

3
8

-20

Depth (m)

Depth (m)

Depth (m)

-20

-20

CH
21
73

-25
CLAYSTONE

-25

-25

-30

-30

-35

-35

-40

-40

100
100
100

-30

100
100
100

-35

100
100
100

-40

100

7000

Qpu

1
1

6000

Wp

1
1

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

8000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-2

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.40
0.075
1.26
0.13
0.08
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
3.8
3.8
7.5
7.5
4.8
12.3
7.5
15.1
5.8
20.9
7.5
22.6
6.8
29.4
7.5
30.2
7.8
37.9
7.5
37.7
6.8
44.5
7.5
45.2
6.8
52.0
7.5
52.8
6.8
59.6
7.5
60.3
6.8
67.1
7.5
67.9
6.8
74.6
7.5
75.4
6.8
82.2
7.5
82.9
6.8
89.7
7.5
90.5
6.8
97.3
15.1
105.6
13.6
119.1
15.1
120.6
13.6
134.2
15.1
135.7
13.6
149.3
98.0
233.7
176.4
410.2
98.0
331.8
176.4
508.2
52.8
384.5
95.0
479.5
52.8
437.3
95.0
532.3
219.9
657.2
527.8
1185.0
219.9
877.1
527.8
1404.9
188.5
1065.6
452.4
1518.0
188.5
1254.1
452.4
1706.5
219.9
1474.0
527.8
2001.8
219.9
1694.0
527.8
2221.7
219.9
1913.9
527.8
2441.7
196.0
2109.9
470.5
2580.4
98.0
2207.9
235.2
2443.2
98.0
2305.9
235.2
2541.2
219.9
2525.8
527.8
3053.6
219.9
2745.8
527.8
3273.5
7.5
2753.3
9.0
2762.3
150.8
2904.1
452.4
3356.5
219.9
3124.0
659.7
3783.7
219.9
3343.9
659.7
4003.7
219.9
3563.8
659.7
4223.6
219.9
3783.7
659.7
4443.5
219.9
4003.7
659.7
4663.4
219.9
4223.6
659.7
4883.3
219.9
4443.5
659.7
5103.2

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
5.3
5.3
0.8
5.3
10.6
1.7
5.3
15.8
2.5
5.3
21.1
3.4
5.3
26.4
4.2
5.3
31.7
5.1
5.3
36.9
5.9
5.3
42.2
6.7
5.3
47.5
7.6
5.3
52.8
8.4
5.3
58.1
9.3
5.3
63.3
10.1
10.6
73.9
11.0
10.6
84.4
11.8
10.6
95.0
12.6
68.6
163.6
13.5
68.6
232.2
14.3
36.9
269.2
15.2
36.9
306.1
16.0
153.9
460.1
16.8
153.9
614.0
17.7
131.9
745.9
18.5
131.9
877.9
19.4
153.9
1031.8
20.2
153.9
1185.8
21.1
153.9
1339.7
21.9
137.2
1476.9
22.7
68.6
1545.5
23.6
68.6
1614.2
24.4
153.9
1768.1
25.3
153.9
1922.0
26.1
5.3
1927.3
27.0
105.6
2032.9
27.8
153.9
2186.8
28.6
153.9
2340.7
29.5
153.9
2494.7
30.3
153.9
2648.6
31.2
153.9
2802.6
32.0
153.9
2956.5
32.9
153.9
3110.4
33.7

Qpu
0.0
6.1
12.2
18.4
24.5
30.6
36.7
42.8
49.0
55.1
61.2
67.3
73.4
84.8
96.2
107.6
177.1
246.5
284.3
322.1
476.9
631.7
764.5
897.3
1052.0
1206.8
1361.6
1499.7
1569.1
1638.6
1793.4
1948.1
1954.3
2060.7
2215.4
2370.2
2525.0
2679.8
2834.6
2989.3
3144.1

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-2

Diameter

: 0.4 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1

-5

NOTE:

-5

-5

-10

-10

-15

-15

86
90

-20

Depth (m)

Depth (m)

Depth (m)

CH

-20

-20

50
82
-25

CH

82

-25

-25

-30

-30

-35

-35

-40

-40

52
26
-30

68
1

PT
40
100

-35

CLAYSTONE
100
100
100

-40

7000

8000

Qpu

26
14

6000

Wp

2
2

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-2

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.45
0.080
1.41
0.16
0.09
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
4.8
4.8
8.5
8.5
6.0
14.5
8.5
17.0
7.3
24.3
8.5
25.4
8.6
34.0
8.5
33.9
9.8
43.8
8.5
42.4
8.6
51.0
8.5
50.9
8.6
59.5
8.5
59.4
8.6
68.0
8.5
67.9
8.6
76.4
8.5
76.3
8.6
84.9
8.5
84.8
8.6
93.4
8.5
93.3
8.6
101.9
8.5
101.8
8.6
110.4
17.0
118.8
17.2
135.9
17.0
135.7
17.2
152.9
17.0
152.7
17.2
169.9
110.3
263.0
223.3
486.2
110.3
373.2
223.3
596.5
59.4
432.6
120.2
552.8
59.4
492.0
120.2
612.2
247.4
739.4
668.0
1407.4
247.4
986.8
668.0
1654.8
212.1
1198.8
572.6
1771.4
212.1
1410.9
572.6
1983.4
247.4
1658.3
668.0
2326.3
247.4
1905.7
668.0
2573.7
247.4
2153.1
668.0
2821.1
220.5
2373.6
595.5
2969.1
110.3
2483.9
297.7
2781.6
110.3
2594.2
297.7
2891.9
247.4
2841.6
668.0
3509.6
247.4
3089.0
668.0
3757.0
8.5
3097.5
11.5
3108.9
169.6
3267.1
572.6
3839.7
247.4
3514.5
835.0
4349.5
247.4
3761.9
835.0
4596.9
247.4
4009.3
835.0
4844.3
247.4
4256.7
835.0
5091.7
247.4
4504.1
835.0
5339.1
247.4
4751.5
835.0
5586.5
247.4
4998.9
835.0
5833.9

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
5.9
5.9
1.0
5.9
11.9
2.0
5.9
17.8
3.1
5.9
23.8
4.1
5.9
29.7
5.1
5.9
35.6
6.1
5.9
41.6
7.2
5.9
47.5
8.2
5.9
53.4
9.2
5.9
59.4
10.2
5.9
65.3
11.3
5.9
71.3
12.3
11.9
83.1
13.3
11.9
95.0
14.3
11.9
106.9
15.3
77.2
184.1
16.4
77.2
261.3
17.4
41.6
302.8
18.4
41.6
344.4
19.4
173.2
517.6
20.5
173.2
690.7
21.5
148.4
839.2
22.5
148.4
987.6
23.5
173.2
1160.8
24.5
173.2
1334.0
25.6
173.2
1507.2
26.6
154.4
1661.5
27.6
77.2
1738.7
28.6
77.2
1815.9
29.7
173.2
1989.1
30.7
173.2
2162.3
31.7
5.9
2168.2
32.7
118.8
2287.0
33.8
173.2
2460.2
34.8
173.2
2633.3
35.8
173.2
2806.5
36.8
173.2
2979.7
37.8
173.2
3152.9
38.9
173.2
3326.1
39.9
173.2
3499.2
40.9

Qpu
0.0
7.0
13.9
20.9
27.8
34.8
41.8
48.7
55.7
62.6
69.6
76.6
83.5
96.4
109.3
122.2
200.4
278.6
321.2
363.8
538.0
712.2
861.7
1011.2
1185.4
1359.6
1533.8
1689.2
1767.4
1845.6
2019.8
2194.0
2201.0
2320.7
2494.9
2669.1
2843.3
3017.5
3191.7
3366.0
3540.2

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-2

Diameter

: 0.45 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1

-5

NOTE:

-5

-5

-10

-10

-15

-15

86
90

-20

Depth (m)

Depth (m)

Depth (m)

CH

-20

-20

50
82
-25

CH

82

-25

-25

-30

-30

-35

-35

-40

-40

52
26
-30

68
1

PT
40
100

-35

CLAYSTONE
100
100
100

-40

7000

8000

Qpu

26
14

6000

Wp

2
2

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-2

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.50
0.090
1.57
0.20
0.12
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
5.9
5.9
9.4
9.4
7.5
16.9
9.4
18.8
9.0
27.9
9.4
28.3
10.6
38.9
9.4
37.7
12.2
49.9
9.4
47.1
10.6
57.7
9.4
56.5
10.6
67.2
9.4
66.0
10.6
76.6
9.4
75.4
10.6
86.0
9.4
84.8
10.6
95.4
9.4
94.2
10.6
104.9
9.4
103.7
10.6
114.3
9.4
113.1
10.6
123.7
18.8
131.9
21.2
153.2
18.8
150.8
21.2
172.0
18.8
169.6
21.2
190.9
122.5
292.2
275.7
567.8
122.5
414.7
275.7
690.4
66.0
480.7
148.4
629.1
66.0
546.6
148.4
695.1
274.9
821.5
824.7
1646.2
274.9
1096.4
824.7
1921.1
235.6
1332.0
706.9
2038.9
235.6
1567.7
706.9
2274.5
274.9
1842.5
824.7
2667.2
274.9
2117.4
824.7
2942.1
274.9
2392.3
824.7
3217.0
245.0
2637.4
735.1
3372.5
122.5
2759.9
367.6
3127.5
122.5
2882.4
367.6
3250.0
274.9
3157.3
824.7
3982.0
274.9
3432.2
824.7
4256.9
9.4
3441.6
14.1
3455.8
188.5
3630.1
706.9
4337.0
274.9
3905.0
1030.8
4935.8
274.9
4179.9
1030.8
5210.7
274.9
4454.8
1030.8
5485.6
274.9
4729.7
1030.8
5760.5
274.9
5004.6
1030.8
6035.4
274.9
5279.5
1030.8
6310.3
274.9
5554.3
1030.8
6585.2

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
6.6
6.6
1.3
6.6
13.2
2.6
6.6
19.8
3.8
6.6
26.4
5.1
6.6
33.0
6.4
6.6
39.6
7.7
6.6
46.2
8.9
6.6
52.8
10.2
6.6
59.4
11.5
6.6
66.0
12.8
6.6
72.6
14.0
6.6
79.2
15.3
13.2
92.4
16.6
13.2
105.6
17.9
13.2
118.8
19.1
85.8
204.5
20.4
85.8
290.3
21.7
46.2
336.5
23.0
46.2
382.6
24.2
192.4
575.1
25.5
192.4
767.5
26.8
164.9
932.4
28.1
164.9
1097.4
29.3
192.4
1289.8
30.6
192.4
1482.2
31.9
192.4
1674.6
33.2
171.5
1846.2
34.4
85.8
1931.9
35.7
85.8
2017.7
37.0
192.4
2210.1
38.3
192.4
2402.5
39.5
6.6
2409.1
40.8
131.9
2541.1
42.1
192.4
2733.5
43.4
192.4
2925.9
44.6
192.4
3118.4
45.9
192.4
3310.8
47.2
192.4
3503.2
48.5
192.4
3695.6
49.7
192.4
3888.0
51.0

Qpu
0.0
7.9
15.7
23.6
31.5
39.4
47.2
55.1
63.0
70.9
78.7
86.6
94.5
108.9
123.4
137.9
224.9
312.0
359.4
406.9
600.6
794.3
960.5
1126.7
1320.4
1514.1
1707.8
1880.6
1967.6
2054.7
2248.4
2442.1
2449.9
2583.2
2776.9
2970.6
3164.3
3358.0
3551.7
3745.4
3939.1

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-2

Diameter

: 0.5 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1

-5

NOTE:

-5

-5

-10

-10

-15

-15

86
90

-20

Depth (m)

Depth (m)

Depth (m)

CH

-20

-20

50
82
-25

CH

82

-25

-25

-30

-30

-35

-35

-40

-40

52
26
-30

68
1

PT
40
100

-35

CLAYSTONE
100
100
100

-40

7000

8000

Qpu

26
14

6000

Wp

2
2

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-2

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.60
0.100
1.88
0.28
0.16
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
8.5
8.5
11.3
11.3
10.7
22.0
11.3
22.6
13.0
35.6
11.3
33.9
15.3
49.2
11.3
45.2
17.5
62.7
11.3
56.5
15.3
71.8
11.3
67.9
15.3
83.1
11.3
79.2
15.3
94.4
11.3
90.5
15.3
105.7
11.3
101.8
15.3
117.1
11.3
113.1
15.3
128.4
11.3
124.4
15.3
139.7
11.3
135.7
15.3
151.0
22.6
158.3
30.5
188.9
22.6
181.0
30.5
211.5
22.6
203.6
30.5
234.1
147.0
350.6
397.0
747.6
147.0
497.6
397.0
894.6
79.2
576.8
213.8
790.6
79.2
656.0
213.8
869.7
329.9
985.8
1187.5
2173.4
329.9
1315.7
1187.5
2503.2
282.7
1598.4
1017.9
2616.3
282.7
1881.2
1017.9
2899.1
329.9
2211.1
1187.5
3398.6
329.9
2540.9
1187.5
3728.4
329.9
2870.8
1187.5
4058.3
294.1
3164.8
1058.6
4223.4
147.0
3311.9
529.3
3841.2
147.0
3458.9
529.3
3988.2
329.9
3788.8
1187.5
4976.3
329.9
4118.6
1187.5
5306.2
11.3
4129.9
20.4
4150.3
226.2
4356.1
1017.9
5374.0
329.9
4686.0
1484.4
6170.4
329.9
5015.9
1484.4
6500.3
329.9
5345.7
1484.4
6830.1
329.9
5675.6
1484.4
7160.0
329.9
6005.5
1484.4
7489.9
329.9
6335.4
1484.4
7819.8
329.9
6665.2
1484.4
8149.6

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
7.9
7.9
1.7
7.9
15.8
3.5
7.9
23.8
5.2
7.9
31.7
6.9
7.9
39.6
8.6
7.9
47.5
10.4
7.9
55.4
12.1
7.9
63.3
13.8
7.9
71.3
15.6
7.9
79.2
17.3
7.9
87.1
19.0
7.9
95.0
20.7
15.8
110.8
22.5
15.8
126.7
24.2
15.8
142.5
25.9
102.9
245.4
27.6
102.9
348.3
29.4
55.4
403.8
31.1
55.4
459.2
32.8
230.9
690.1
34.6
230.9
921.0
36.3
197.9
1118.9
38.0
197.9
1316.8
39.7
230.9
1547.7
41.5
230.9
1778.6
43.2
230.9
2009.6
44.9
205.8
2215.4
46.7
102.9
2318.3
48.4
102.9
2421.2
50.1
230.9
2652.1
51.8
230.9
2883.0
53.6
7.9
2891.0
55.3
158.3
3049.3
57.0
230.9
3280.2
58.7
230.9
3511.1
60.5
230.9
3742.0
62.2
230.9
3972.9
63.9
230.9
4203.8
65.7
230.9
4434.7
67.4
230.9
4665.7
69.1

Qpu
0.0
9.6
19.3
28.9
38.6
48.2
57.9
67.5
77.2
86.8
96.4
106.1
115.7
133.3
150.9
168.4
273.1
377.7
434.9
492.0
724.6
957.3
1156.9
1356.6
1589.2
1821.8
2054.5
2262.0
2366.7
2471.3
2704.0
2936.6
2946.3
3106.3
3339.0
3571.6
3804.2
4036.9
4269.5
4502.1
4734.8

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-2

Diameter

: 0.6 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1

-5

NOTE:

-5

-5

-10

-10

-15

-15

86
90

-20

Depth (m)

Depth (m)

Depth (m)

CH

-20

-20

50
82
-25

CH

82

-25

-25

-30

-30

-35

-35

-40

-40

52
26
-30

68
1

PT
40
100

-35

CLAYSTONE
100
100
100

-40

7000

8000

Qpu

26
14

6000

Wp

2
2

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-3

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.40
0.075
1.26
0.13
0.08
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
3.8
3.8
7.5
7.5
4.8
12.3
7.5
15.1
5.8
20.9
7.5
22.6
6.8
29.4
15.1
37.7
15.6
53.3
15.1
52.8
13.6
66.4
7.5
60.3
6.8
67.1
7.5
67.9
6.8
74.6
7.5
75.4
6.8
82.2
15.1
90.5
13.6
104.0
15.1
105.6
13.6
119.1
15.1
120.6
13.6
134.2
15.1
135.7
13.6
149.3
35.8
171.5
33.9
205.5
48.0
219.5
81.4
300.9
48.0
267.4
81.4
348.9
219.9
487.4
659.7
1147.1
219.9
707.3
659.7
1367.0
219.9
927.2
659.7
1586.9
219.9
1147.1
659.7
1806.8
219.9
1367.0
659.7
2026.7
219.9
1586.9
659.7
2246.6
219.9
1806.8
659.7
2466.6
219.9
2026.7
659.7
2686.5
219.9
2246.6
659.7
2906.4
219.9
2466.6
659.7
3126.3

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
5.3
5.3
0.8
5.3
10.6
1.7
5.3
15.8
2.5
10.6
26.4
3.4
10.6
36.9
4.2
5.3
42.2
5.1
5.3
47.5
5.9
5.3
52.8
6.7
10.6
63.3
7.6
10.6
73.9
8.4
10.6
84.4
9.3
10.6
95.0
10.1
25.1
120.1
11.0
33.6
153.6
11.8
33.6
187.2
12.6
153.9
341.1
13.5
153.9
495.1
14.3
153.9
649.0
15.2
153.9
803.0
16.0
153.9
956.9
16.8
153.9
1110.8
17.7
153.9
1264.8
18.5
153.9
1418.7
19.4
153.9
1572.7
20.2
153.9
1726.6
21.1

Qpu
0.0
6.1
12.2
18.4
29.8
41.2
47.3
53.4
59.5
70.9
82.3
93.7
105.1
131.0
165.4
199.8
354.6
509.4
664.2
819.0
973.7
1128.5
1283.3
1438.1
1592.9
1747.6

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-3

Diameter

: 0.4 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
1
1

-5

NOTE:

Wp
Qpu

-5

-10

-10

-15

12

Depth (m)

5
CH

-15

-15

-20

-20

-25

-25

100
CLAYSTONE
100
100
-20
100
100
100
-25

100

5000

Qu

-5

Depth (m)

Depth (m)

4000

Friction*

3000

End

-10

2000

Friction

CH

1000

6000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-3

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.45
0.080
1.41
0.16
0.09
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
4.8
4.8
8.5
8.5
6.0
14.5
8.5
17.0
7.3
24.3
8.5
25.4
8.6
34.0
17.0
42.4
19.7
62.1
17.0
59.4
17.2
76.6
8.5
67.9
8.6
76.4
8.5
76.3
8.6
84.9
8.5
84.8
8.6
93.4
17.0
101.8
17.2
119.0
17.0
118.8
17.2
135.9
17.0
135.7
17.2
152.9
17.0
152.7
17.2
169.9
40.3
193.0
42.9
235.9
53.9
246.9
103.1
350.0
53.9
300.9
103.1
403.9
247.4
548.3
835.0
1383.2
247.4
795.7
835.0
1630.6
247.4
1043.1
835.0
1878.0
247.4
1290.5
835.0
2125.4
247.4
1537.9
835.0
2372.8
247.4
1785.3
835.0
2620.3
247.4
2032.7
835.0
2867.7
247.4
2280.1
835.0
3115.1
247.4
2527.5
835.0
3362.5
247.4
2774.9
835.0
3609.9

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
5.9
5.9
1.0
5.9
11.9
2.0
5.9
17.8
3.1
11.9
29.7
4.1
11.9
41.6
5.1
5.9
47.5
6.1
5.9
53.4
7.2
5.9
59.4
8.2
11.9
71.3
9.2
11.9
83.1
10.2
11.9
95.0
11.3
11.9
106.9
12.3
28.2
135.1
13.3
37.8
172.8
14.3
37.8
210.6
15.3
173.2
383.8
16.4
173.2
557.0
17.4
173.2
730.1
18.4
173.2
903.3
19.4
173.2
1076.5
20.5
173.2
1249.7
21.5
173.2
1422.9
22.5
173.2
1596.1
23.5
173.2
1769.2
24.5
173.2
1942.4
25.6

Qpu
0.0
7.0
13.9
20.9
33.8
46.7
53.6
60.6
67.6
80.5
93.4
106.3
119.2
148.4
187.2
226.0
400.2
574.4
748.6
922.8
1097.0
1271.2
1445.4
1619.6
1793.8
1968.0

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-3

Diameter

: 0.45 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
1
1

-5

NOTE:

Wp
Qpu

-5

-10

-10

-15

12

Depth (m)

5
CH

-15

-15

-20

-20

-25

-25

100
CLAYSTONE
100
100
-20
100
100
100
-25

100

5000

Qu

-5

Depth (m)

Depth (m)

4000

Friction*

3000

End

-10

2000

Friction

CH

1000

6000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-3

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.50
0.090
1.57
0.20
0.12
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
5.9
5.9
9.4
9.4
7.5
16.9
9.4
18.8
9.0
27.9
9.4
28.3
10.6
38.9
18.8
47.1
24.3
71.4
18.8
66.0
21.2
87.2
9.4
75.4
10.6
86.0
9.4
84.8
10.6
95.4
9.4
94.2
10.6
104.9
18.8
113.1
21.2
134.3
18.8
131.9
21.2
153.2
18.8
150.8
21.2
172.0
18.8
169.6
21.2
190.9
44.8
214.4
53.0
267.4
59.9
274.4
127.2
401.6
59.9
334.3
127.2
461.5
274.9
609.2
1030.8
1640.0
274.9
884.1
1030.8
1914.9
274.9
1159.0
1030.8
2189.8
274.9
1433.9
1030.8
2464.7
274.9
1708.7
1030.8
2739.6
274.9
1983.6
1030.8
3014.5
274.9
2258.5
1030.8
3289.4
274.9
2533.4
1030.8
3564.3
274.9
2808.3
1030.8
3839.1
274.9
3083.2
1030.8
4114.0

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
6.6
6.6
1.3
6.6
13.2
2.6
6.6
19.8
3.8
13.2
33.0
5.1
13.2
46.2
6.4
6.6
52.8
7.7
6.6
59.4
8.9
6.6
66.0
10.2
13.2
79.2
11.5
13.2
92.4
12.8
13.2
105.6
14.0
13.2
118.8
15.3
31.3
150.1
16.6
42.0
192.0
17.9
42.0
234.0
19.1
192.4
426.4
20.4
192.4
618.9
21.7
192.4
811.3
23.0
192.4
1003.7
24.2
192.4
1196.1
25.5
192.4
1388.5
26.8
192.4
1581.0
28.1
192.4
1773.4
29.3
192.4
1965.8
30.6
192.4
2158.2
31.9

Qpu
0.0
7.9
15.7
23.6
38.1
52.6
60.4
68.3
76.2
90.6
105.1
119.6
134.1
166.7
209.9
253.1
446.8
640.5
834.2
1027.9
1221.6
1415.3
1609.0
1802.7
1996.4
2190.1

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-3

Diameter

: 0.5 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
1
1

-5

NOTE:

Wp
Qpu

-5

-10

-10

-15

12

Depth (m)

5
CH

-15

-15

-20

-20

-25

-25

100
CLAYSTONE
100
100
-20
100
100
100
-25

100

5000

Qu

-5

Depth (m)

Depth (m)

4000

Friction*

3000

End

-10

2000

Friction

CH

1000

6000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-3

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.60
0.100
1.88
0.28
0.16
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
8.5
8.5
11.3
11.3
10.7
22.0
11.3
22.6
13.0
35.6
11.3
33.9
15.3
49.2
22.6
56.5
35.0
91.6
22.6
79.2
30.5
109.7
11.3
90.5
15.3
105.7
11.3
101.8
15.3
117.1
11.3
113.1
15.3
128.4
22.6
135.7
30.5
166.3
22.6
158.3
30.5
188.9
22.6
181.0
30.5
211.5
22.6
203.6
30.5
234.1
53.7
257.3
76.3
333.6
71.9
329.2
183.2
512.4
71.9
401.2
183.2
584.4
329.9
731.0
1484.4
2215.4
329.9
1060.9
1484.4
2545.3
329.9
1390.8
1484.4
2875.2
329.9
1720.6
1484.4
3205.0
329.9
2050.5
1484.4
3534.9
329.9
2380.4
1484.4
3864.8
329.9
2710.2
1484.4
4194.6
329.9
3040.1
1484.4
4524.5
329.9
3370.0
1484.4
4854.4
329.9
3699.8
1484.4
5184.2

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
7.9
7.9
1.7
7.9
15.8
3.5
7.9
23.8
5.2
15.8
39.6
6.9
15.8
55.4
8.6
7.9
63.3
10.4
7.9
71.3
12.1
7.9
79.2
13.8
15.8
95.0
15.6
15.8
110.8
17.3
15.8
126.7
19.0
15.8
142.5
20.7
37.6
180.1
22.5
50.4
230.5
24.2
50.4
280.8
25.9
230.9
511.7
27.6
230.9
742.6
29.4
230.9
973.5
31.1
230.9
1204.4
32.8
230.9
1435.3
34.6
230.9
1666.3
36.3
230.9
1897.2
38.0
230.9
2128.1
39.7
230.9
2359.0
41.5
230.9
2589.9
43.2

Qpu
0.0
9.6
19.3
28.9
46.5
64.1
73.7
83.3
93.0
110.6
128.1
145.7
163.2
202.6
254.6
306.7
539.4
772.0
1004.6
1237.3
1469.9
1702.5
1935.2
2167.8
2400.4
2633.1

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-3

Diameter

: 0.6 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
1
1

-5

NOTE:

Wp
Qpu

-5

-10

-10

-15

12

Depth (m)

5
CH

-15

-15

-20

-20

-25

-25

100
CLAYSTONE
100
100
-20
100
100
100
-25

100

5000

Qu

-5

Depth (m)

Depth (m)

4000

Friction*

3000

End

-10

2000

Friction

CH

1000

6000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-4

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.40
0.075
1.26
0.13
0.08
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
3.8
3.8
7.5
7.5
4.8
12.3
7.5
15.1
5.8
20.9
7.5
22.6
6.8
29.4
7.5
30.2
7.8
37.9
7.5
37.7
6.8
44.5
7.5
45.2
6.8
52.0
7.5
52.8
6.8
59.6
7.5
60.3
6.8
67.1
7.5
67.9
6.8
74.6
7.5
75.4
6.8
82.2
7.5
82.9
6.8
89.7
7.5
90.5
6.8
97.3
46.4
136.9
54.3
191.2
94.2
231.2
169.6
400.8
94.2
325.4
169.6
495.1
94.2
419.7
169.6
589.3
169.6
589.3
305.4
894.7
188.5
777.8
339.3
1117.1
207.3
985.2
373.2
1358.4
207.3
1192.5
373.2
1565.7
188.5
1381.0
339.3
1720.3
188.5
1569.5
339.3
1908.8
188.5
1758.0
339.3
2097.3
188.5
1946.5
339.3
2285.8
71.6
2018.1
128.9
2147.0
71.6
2089.7
128.9
2218.7
75.4
2165.1
135.7
2300.9
75.4
2240.5
135.7
2376.3
150.8
2391.3
452.4
2843.7
219.9
2611.2
659.7
3271.0
219.9
2831.2
659.7
3490.9
219.9
3051.1
659.7
3710.8
219.9
3271.0
659.7
3930.7
219.9
3490.9
659.7
4150.6
219.9
3710.8
659.7
4370.5
219.9
3930.7
659.7
4590.5
219.9
4150.6
659.7
4810.4
219.9
4370.5
659.7
5030.3
219.9
4590.5
659.7
5250.2
219.9
4810.4
659.7
5470.1

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
5.3
5.3
0.8
5.3
10.6
1.7
5.3
15.8
2.5
5.3
21.1
3.4
5.3
26.4
4.2
5.3
31.7
5.1
5.3
36.9
5.9
5.3
42.2
6.7
5.3
47.5
7.6
5.3
52.8
8.4
5.3
58.1
9.3
5.3
63.3
10.1
32.5
95.8
11.0
66.0
161.8
11.8
66.0
227.8
12.6
66.0
293.8
13.5
118.8
412.5
14.3
131.9
544.5
15.2
145.1
689.6
16.0
145.1
834.8
16.8
131.9
966.7
17.7
131.9
1098.6
18.5
131.9
1230.6
19.4
131.9
1362.5
20.2
50.1
1412.7
21.1
50.1
1462.8
21.9
52.8
1515.6
22.7
52.8
1568.4
23.6
105.6
1673.9
24.4
153.9
1827.9
25.3
153.9
1981.8
26.1
153.9
2135.8
27.0
153.9
2289.7
27.8
153.9
2443.6
28.6
153.9
2597.6
29.5
153.9
2751.5
30.3
153.9
2905.4
31.2
153.9
3059.4
32.0
153.9
3213.3
32.9
153.9
3367.3
33.7

Qpu
0.0
6.1
12.2
18.4
24.5
30.6
36.7
42.8
49.0
55.1
61.2
67.3
73.4
106.8
173.6
240.4
307.2
426.8
559.6
705.6
851.6
984.4
1117.2
1250.0
1382.8
1433.7
1484.7
1538.3
1592.0
1698.4
1853.1
2007.9
2162.7
2317.5
2472.3
2627.0
2781.8
2936.6
3091.4
3246.2
3401.0

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-4

Diameter

: 0.4 m

Based on N-SPT

N-SPT
0

20

40

Ult. Compression (kN)

60

80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1
-5

NOTE:

CH

-5

-5

-10

-10

-15

-15

CH

50

-20

Depth (m)

Depth (m)

Depth (m)

55

-20

-20

50
50
-25

19

-25

-25

-30

-30

-35

-35

-40

-40

CH
20
40
-30

100
PT

100
100
100

-35
CLAYSTONE

100
100
-40

100

7000

8000

Qpu

45
50

6000

Wp

8
25

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-4

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.45
0.080
1.41
0.16
0.09
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
4.8
4.8
8.5
8.5
6.0
14.5
8.5
17.0
7.3
24.3
8.5
25.4
8.6
34.0
8.5
33.9
9.8
43.8
8.5
42.4
8.6
51.0
8.5
50.9
8.6
59.5
8.5
59.4
8.6
68.0
8.5
67.9
8.6
76.4
8.5
76.3
8.6
84.9
8.5
84.8
8.6
93.4
8.5
93.3
8.6
101.9
8.5
101.8
8.6
110.4
52.3
154.0
68.7
222.7
106.0
260.1
214.7
474.8
106.0
366.1
214.7
580.8
106.0
472.1
214.7
686.8
190.9
663.0
386.5
1049.5
212.1
875.0
429.4
1304.5
233.3
1108.3
472.4
1580.7
233.3
1341.6
472.4
1813.9
212.1
1553.6
429.4
1983.0
212.1
1765.7
429.4
2195.1
212.1
1977.7
429.4
2407.2
212.1
2189.8
429.4
2619.2
80.6
2270.4
163.2
2433.6
80.6
2351.0
163.2
2514.1
84.8
2435.8
171.8
2607.5
84.8
2520.6
171.8
2692.4
169.6
2690.3
572.6
3262.8
247.4
2937.7
835.0
3772.6
247.4
3185.1
835.0
4020.0
247.4
3432.5
835.0
4267.4
247.4
3679.9
835.0
4514.8
247.4
3927.3
835.0
4762.2
247.4
4174.7
835.0
5009.6
247.4
4422.1
835.0
5257.0
247.4
4669.5
835.0
5504.4
247.4
4916.9
835.0
5751.8
247.4
5164.3
835.0
5999.2
247.4
5411.7
835.0
6246.6

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
5.9
5.9
1.0
5.9
11.9
2.0
5.9
17.8
3.1
5.9
23.8
4.1
5.9
29.7
5.1
5.9
35.6
6.1
5.9
41.6
7.2
5.9
47.5
8.2
5.9
53.4
9.2
5.9
59.4
10.2
5.9
65.3
11.3
5.9
71.3
12.3
36.6
107.8
13.3
74.2
182.0
14.3
74.2
256.3
15.3
74.2
330.5
16.4
133.6
464.1
17.4
148.4
612.5
18.4
163.3
775.8
19.4
163.3
939.1
20.5
148.4
1087.5
21.5
148.4
1236.0
22.5
148.4
1384.4
23.5
148.4
1532.9
24.5
56.4
1589.3
25.6
56.4
1645.7
26.6
59.4
1705.0
27.6
59.4
1764.4
28.6
118.8
1883.2
29.7
173.2
2056.4
30.7
173.2
2229.5
31.7
173.2
2402.7
32.7
173.2
2575.9
33.8
173.2
2749.1
34.8
173.2
2922.3
35.8
173.2
3095.4
36.8
173.2
3268.6
37.8
173.2
3441.8
38.9
173.2
3615.0
39.9
173.2
3788.2
40.9

Qpu
0.0
7.0
13.9
20.9
27.8
34.8
41.8
48.7
55.7
62.6
69.6
76.6
83.5
121.1
196.4
271.6
346.9
481.5
630.9
795.2
959.6
1109.0
1258.5
1407.9
1557.4
1614.8
1672.3
1732.7
1793.1
1912.8
2087.0
2261.2
2435.5
2609.7
2783.9
2958.1
3132.3
3306.5
3480.7
3654.9
3829.1

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-4

Diameter

: 0.45 m

Based on N-SPT

N-SPT
0

20

40

Ult. Compression (kN)

60

80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1
-5

NOTE:

CH

-5

-5

-10

-10

-15

-15

CH

50

-20

Depth (m)

Depth (m)

Depth (m)

55

-20

-20

50
50
-25

19

-25

-25

-30

-30

-35

-35

-40

-40

CH
20
40
-30

100
PT

100
100
100

-35
CLAYSTONE

100
100
-40

100

7000

8000

Qpu

45
50

6000

Wp

8
25

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-4

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.50
0.090
1.57
0.20
0.12
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
5.9
5.9
9.4
9.4
7.5
16.9
9.4
18.8
9.0
27.9
9.4
28.3
10.6
38.9
9.4
37.7
12.2
49.9
9.4
47.1
10.6
57.7
9.4
56.5
10.6
67.2
9.4
66.0
10.6
76.6
9.4
75.4
10.6
86.0
9.4
84.8
10.6
95.4
9.4
94.2
10.6
104.9
9.4
103.7
10.6
114.3
9.4
113.1
10.6
123.7
58.1
171.2
84.8
256.0
117.8
289.0
265.1
554.0
117.8
406.8
265.1
671.8
117.8
524.6
265.1
789.7
212.1
736.6
477.1
1213.8
235.6
972.3
530.1
1502.4
259.2
1231.4
583.2
1814.6
259.2
1490.6
583.2
2073.8
235.6
1726.2
530.1
2256.4
235.6
1961.9
530.1
2492.0
235.6
2197.5
530.1
2727.6
235.6
2433.1
530.1
2963.3
89.5
2522.6
201.5
2724.1
89.5
2612.2
201.5
2813.6
94.2
2706.4
212.1
2918.5
94.2
2800.7
212.1
3012.7
188.5
2989.2
706.9
3696.0
274.9
3264.1
1030.8
4294.9
274.9
3538.9
1030.8
4569.8
274.9
3813.8
1030.8
4844.7
274.9
4088.7
1030.8
5119.6
274.9
4363.6
1030.8
5394.5
274.9
4638.5
1030.8
5669.3
274.9
4913.4
1030.8
5944.2
274.9
5188.3
1030.8
6219.1
274.9
5463.2
1030.8
6494.0
274.9
5738.1
1030.8
6768.9
274.9
6013.0
1030.8
7043.8

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
6.6
6.6
1.3
6.6
13.2
2.6
6.6
19.8
3.8
6.6
26.4
5.1
6.6
33.0
6.4
6.6
39.6
7.7
6.6
46.2
8.9
6.6
52.8
10.2
6.6
59.4
11.5
6.6
66.0
12.8
6.6
72.6
14.0
6.6
79.2
15.3
40.6
119.8
16.6
82.5
202.3
17.9
82.5
284.7
19.1
82.5
367.2
20.4
148.4
515.6
21.7
164.9
680.6
23.0
181.4
862.0
24.2
181.4
1043.4
25.5
164.9
1208.4
26.8
164.9
1373.3
28.1
164.9
1538.2
29.3
164.9
1703.2
30.6
62.7
1765.8
31.9
62.7
1828.5
33.2
66.0
1894.5
34.4
66.0
1960.5
35.7
131.9
2092.4
37.0
192.4
2284.8
38.3
192.4
2477.3
39.5
192.4
2669.7
40.8
192.4
2862.1
42.1
192.4
3054.5
43.4
192.4
3247.0
44.6
192.4
3439.4
45.9
192.4
3631.8
47.2
192.4
3824.2
48.5
192.4
4016.6
49.7
192.4
4209.1
51.0

Qpu
0.0
7.9
15.7
23.6
31.5
39.4
47.2
55.1
63.0
70.9
78.7
86.6
94.5
136.4
220.1
303.9
387.6
537.3
703.5
886.2
1068.9
1235.2
1401.4
1567.6
1733.8
1797.7
1861.7
1928.9
1996.2
2129.4
2323.1
2516.8
2710.5
2904.2
3097.9
3291.6
3485.3
3679.0
3872.7
4066.4
4260.1

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-4

Diameter

: 0.5 m

Based on N-SPT

N-SPT
0

20

40

Ult. Compression (kN)

60

80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1
-5

NOTE:

CH

-5

-5

-10

-10

-15

-15

CH

50

-20

Depth (m)

Depth (m)

Depth (m)

55

-20

-20

50
50
-25

19

-25

-25

-30

-30

-35

-35

-40

-40

CH
20
40
-30

100
PT

100
100
100

-35
CLAYSTONE

100
100
-40

100

7000

8000

Qpu

45
50

6000

Wp

8
25

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-4

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.60
0.100
1.88
0.28
0.16
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
8.5
8.5
11.3
11.3
10.7
22.0
11.3
22.6
13.0
35.6
11.3
33.9
15.3
49.2
11.3
45.2
17.5
62.7
11.3
56.5
15.3
71.8
11.3
67.9
15.3
83.1
11.3
79.2
15.3
94.4
11.3
90.5
15.3
105.7
11.3
101.8
15.3
117.1
11.3
113.1
15.3
128.4
11.3
124.4
15.3
139.7
11.3
135.7
15.3
151.0
69.7
205.4
122.1
327.5
141.4
346.8
381.7
728.5
141.4
488.1
381.7
869.8
141.4
629.5
381.7
1011.2
254.5
884.0
687.1
1571.0
282.7
1166.7
763.4
1930.1
311.0
1477.7
839.7
2317.5
311.0
1788.8
839.7
2628.5
282.7
2071.5
763.4
2834.9
282.7
2354.2
763.4
3117.6
282.7
2637.0
763.4
3400.4
282.7
2919.7
763.4
3683.1
107.4
3027.2
290.1
3317.3
107.4
3134.6
290.1
3424.7
113.1
3247.7
305.4
3553.1
113.1
3360.8
305.4
3666.2
226.2
3587.0
1017.9
4604.9
329.9
3916.9
1484.4
5401.3
329.9
4246.7
1484.4
5731.1
329.9
4576.6
1484.4
6061.0
329.9
4906.5
1484.4
6390.9
329.9
5236.3
1484.4
6720.7
329.9
5566.2
1484.4
7050.6
329.9
5896.1
1484.4
7380.5
329.9
6225.9
1484.4
7710.4
329.9
6555.8
1484.4
8040.2
329.9
6885.7
1484.4
8370.1
329.9
7215.6
1484.4
8700.0

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
7.9
7.9
1.7
7.9
15.8
3.5
7.9
23.8
5.2
7.9
31.7
6.9
7.9
39.6
8.6
7.9
47.5
10.4
7.9
55.4
12.1
7.9
63.3
13.8
7.9
71.3
15.6
7.9
79.2
17.3
7.9
87.1
19.0
7.9
95.0
20.7
48.8
143.8
22.5
99.0
242.7
24.2
99.0
341.7
25.9
99.0
440.7
27.6
178.1
618.8
29.4
197.9
816.7
31.1
217.7
1034.4
32.8
217.7
1252.1
34.6
197.9
1450.0
36.3
197.9
1648.0
38.0
197.9
1845.9
39.7
197.9
2043.8
41.5
75.2
2119.0
43.2
75.2
2194.2
44.9
79.2
2273.4
46.7
79.2
2352.6
48.4
158.3
2510.9
50.1
230.9
2741.8
51.8
230.9
2972.7
53.6
230.9
3203.6
55.3
230.9
3434.5
57.0
230.9
3665.4
58.7
230.9
3896.3
60.5
230.9
4127.3
62.2
230.9
4358.2
63.9
230.9
4589.1
65.7
230.9
4820.0
67.4
230.9
5050.9
69.1

Qpu
0.0
9.6
19.3
28.9
38.6
48.2
57.9
67.5
77.2
86.8
96.4
106.1
115.7
166.2
266.9
367.6
468.3
648.2
847.8
1067.2
1286.7
1486.3
1686.0
1885.6
2085.3
2162.2
2239.2
2320.1
2400.9
2561.0
2793.6
3026.3
3258.9
3491.6
3724.2
3956.8
4189.5
4422.1
4654.7
4887.4
5120.0

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-4

Diameter

: 0.6 m

Based on N-SPT

N-SPT
0

20

40

Ult. Compression (kN)

60

80

100

1000

2000

3000

4000

5000

6000

Ult. Pull Out (kN)


7000

8000

9000

0
1
1
-5

NOTE:

CH

-5

-5

-10

-10

-15

-15

CH

50

-20

Depth (m)

Depth (m)

Depth (m)

55

-20

-20

50
50
-25

19

-25

-25

-30

-30

-35

-35

-40

-40

CH
20
40
-30

100
PT

100
100
100

-35
CLAYSTONE

100
100
-40

100

7000

8000

Qpu

45
50

6000

Wp

8
25

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

9000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-5

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.40
0.075
1.26
0.13
0.08
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
7.5
7.5
15.1
15.1
9.5
24.6
15.1
30.2
11.6
41.7
7.5
37.7
6.8
44.5
15.1
52.8
15.6
68.3
15.1
67.9
13.6
81.4
7.5
75.4
6.8
82.2
7.5
82.9
6.8
89.7
7.5
90.5
6.8
97.3
7.5
98.0
6.8
104.8
7.5
105.6
6.8
112.3
15.1
120.6
13.6
134.2
15.1
135.7
13.6
149.3
35.8
171.5
33.9
205.5
30.2
201.7
27.1
228.8
30.2
231.9
27.1
259.0
35.8
267.7
33.9
301.6
35.8
303.5
33.9
337.4
35.8
339.3
33.9
373.2
43.8
383.1
47.5
430.6
43.8
426.9
47.5
474.4
219.9
646.8
659.7
1306.6
219.9
866.7
659.7
1526.5
219.9
1086.6
659.7
1746.4
219.9
1306.6
659.7
1966.3
219.9
1526.5
659.7
2186.2
219.9
1746.4
659.7
2406.1
219.9
1966.3
659.7
2626.0
219.9
2186.2
659.7
2845.9
219.9
2406.1
659.7
3065.8
219.9
2626.0
659.7
3285.8

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
10.6
10.6
0.8
10.6
21.1
1.7
5.3
26.4
2.5
10.6
36.9
3.4
10.6
47.5
4.2
5.3
52.8
5.1
5.3
58.1
5.9
5.3
63.3
6.7
5.3
68.6
7.6
5.3
73.9
8.4
10.6
84.4
9.3
10.6
95.0
10.1
25.1
120.1
11.0
21.1
141.2
11.8
21.1
162.3
12.6
25.1
187.4
13.5
25.1
212.4
14.3
25.1
237.5
15.2
30.7
268.2
16.0
30.7
298.8
16.8
153.9
452.8
17.7
153.9
606.7
18.5
153.9
760.6
19.4
153.9
914.6
20.2
153.9
1068.5
21.1
153.9
1222.5
21.9
153.9
1376.4
22.7
153.9
1530.3
23.6
153.9
1684.3
24.4
153.9
1838.2
25.3

Qpu
0.0
11.4
22.8
28.9
40.3
51.7
57.8
64.0
70.1
76.2
82.3
93.7
105.1
131.0
153.0
174.9
200.8
226.8
252.7
284.2
315.7
470.5
625.2
780.0
934.8
1089.6
1244.4
1399.1
1553.9
1708.7
1863.5

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-5

Diameter

: 0.4 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
2
1

-5

NOTE:

Wp
Qpu

-5

-5

-10

-10

-15

Depth (m)

Depth (m)

Depth (m)

5
4

-15

CH

5
-20

-20

-20

-25

-25

-30

-30

100
100
CLAYSTONE
100
-25
100
100
100
-30

100

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

6000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-5

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.45
0.080
1.41
0.16
0.09
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
9.5
9.5
17.0
17.0
12.1
29.0
17.0
33.9
14.6
48.5
8.5
42.4
8.6
51.0
17.0
59.4
19.7
79.1
17.0
76.3
17.2
93.5
8.5
84.8
8.6
93.4
8.5
93.3
8.6
101.9
8.5
101.8
8.6
110.4
8.5
110.3
8.6
118.9
8.5
118.8
8.6
127.3
17.0
135.7
17.2
152.9
17.0
152.7
17.2
169.9
40.3
193.0
42.9
235.9
33.9
226.9
34.4
261.3
33.9
260.8
34.4
295.2
40.3
301.1
42.9
344.1
40.3
341.4
42.9
384.4
40.3
381.7
42.9
424.6
49.3
431.0
60.1
491.1
49.3
480.3
60.1
540.4
247.4
727.7
835.0
1562.6
247.4
975.1
835.0
1810.0
247.4
1222.5
835.0
2057.4
247.4
1469.9
835.0
2304.8
247.4
1717.3
835.0
2552.3
247.4
1964.7
835.0
2799.7
247.4
2212.1
835.0
3047.1
247.4
2459.5
835.0
3294.5
247.4
2706.9
835.0
3541.9
247.4
2954.3
835.0
3789.3

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
11.9
11.9
1.0
11.9
23.8
2.0
5.9
29.7
3.1
11.9
41.6
4.1
11.9
53.4
5.1
5.9
59.4
6.1
5.9
65.3
7.2
5.9
71.3
8.2
5.9
77.2
9.2
5.9
83.1
10.2
11.9
95.0
11.3
11.9
106.9
12.3
28.2
135.1
13.3
23.8
158.8
14.3
23.8
182.6
15.3
28.2
210.8
16.4
28.2
239.0
17.4
28.2
267.2
18.4
34.5
301.7
19.4
34.5
336.2
20.5
173.2
509.4
21.5
173.2
682.5
22.5
173.2
855.7
23.5
173.2
1028.9
24.5
173.2
1202.1
25.6
173.2
1375.3
26.6
173.2
1548.5
27.6
173.2
1721.6
28.6
173.2
1894.8
29.7
173.2
2068.0
30.7

Qpu
0.0
12.9
25.8
32.8
45.7
58.6
65.5
72.5
79.4
86.4
93.4
106.3
119.2
148.4
173.2
197.9
227.2
256.4
285.6
321.1
356.6
530.8
705.1
879.3
1053.5
1227.7
1401.9
1576.1
1750.3
1924.5
2098.7

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-5

Diameter

: 0.45 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
2
1

-5

NOTE:

Wp
Qpu

-5

-5

-10

-10

-15

Depth (m)

Depth (m)

Depth (m)

5
4

-15

CH

5
-20

-20

-20

-25

-25

-30

-30

100
100
CLAYSTONE
100
-25
100
100
100
-30

100

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

6000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-5

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.50
0.090
1.57
0.20
0.12
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
11.8
11.8
18.8
18.8
14.9
33.8
18.8
37.7
18.0
55.7
9.4
47.1
10.6
57.7
18.8
66.0
24.3
90.3
18.8
84.8
21.2
106.0
9.4
94.2
10.6
104.9
9.4
103.7
10.6
114.3
9.4
113.1
10.6
123.7
9.4
122.5
10.6
133.1
9.4
131.9
10.6
142.6
18.8
150.8
21.2
172.0
18.8
169.6
21.2
190.9
44.8
214.4
53.0
267.4
37.7
252.1
42.4
294.5
37.7
289.8
42.4
332.2
44.8
334.6
53.0
387.6
44.8
379.3
53.0
432.4
44.8
424.1
53.0
477.1
54.8
478.9
74.2
553.1
54.8
533.6
74.2
607.9
274.9
808.5
1030.8
1839.4
274.9
1083.4
1030.8
2114.2
274.9
1358.3
1030.8
2389.1
274.9
1633.2
1030.8
2664.0
274.9
1908.1
1030.8
2938.9
274.9
2183.0
1030.8
3213.8
274.9
2457.9
1030.8
3488.7
274.9
2732.8
1030.8
3763.6
274.9
3007.6
1030.8
4038.5
274.9
3282.5
1030.8
4313.4

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
13.2
13.2
1.3
13.2
26.4
2.6
6.6
33.0
3.8
13.2
46.2
5.1
13.2
59.4
6.4
6.6
66.0
7.7
6.6
72.6
8.9
6.6
79.2
10.2
6.6
85.8
11.5
6.6
92.4
12.8
13.2
105.6
14.0
13.2
118.8
15.3
31.3
150.1
16.6
26.4
176.5
17.9
26.4
202.9
19.1
31.3
234.2
20.4
31.3
265.5
21.7
31.3
296.9
23.0
38.3
335.2
24.2
38.3
373.5
25.5
192.4
566.0
26.8
192.4
758.4
28.1
192.4
950.8
29.3
192.4
1143.2
30.6
192.4
1335.7
31.9
192.4
1528.1
33.2
192.4
1720.5
34.4
192.4
1912.9
35.7
192.4
2105.3
37.0
192.4
2297.8
38.3

Qpu
0.0
14.5
28.9
36.8
51.3
65.8
73.6
81.5
89.4
97.2
105.1
119.6
134.1
166.7
194.3
222.0
254.6
287.2
319.8
359.4
399.0
592.7
786.4
980.1
1173.8
1367.5
1561.2
1754.9
1948.6
2142.3
2336.0

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-5

Diameter

: 0.5 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
2
1

-5

NOTE:

Wp
Qpu

-5

-5

-10

-10

-15

Depth (m)

Depth (m)

Depth (m)

5
4

-15

CH

5
-20

-20

-20

-25

-25

-30

-30

100
100
CLAYSTONE
100
-25
100
100
100
-30

100

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

6000

Project

: TANJUNG REDEP, BERAU

Pile type

: PC PILE

Calculation method:

Ref.

: BH-5

Diameter

: 0.6 m

Based on N-SPT

N-SPT
0

20

40

60

Ult. Compression (kN)


80

100

1000

2000

3000

4000

Ult. Pull Out (kN)


5000

6000

0
2
1

-5

NOTE:

Wp
Qpu

-5

-5

-10

-10

-15

Depth (m)

Depth (m)

Depth (m)

5
4

-15

CH

5
-20

-20

-20

-25

-25

-30

-30

100
100
CLAYSTONE
100
-25
100
100
100
-30

100

5000

Qu

-15

4000

Friction*

1
1

3000

End

-10

2000

Friction

CH

1000

6000

Project
Ref.

:
:

TANJUNG REDEP, BERAU


BH-5

Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight

:
:
:
:
:
:
:

PC PILE
0.60
0.100
1.88
0.28
0.16
21.00

Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0

Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0

Calc. Method
cu
Compression
Skin Friction (Qs)

m
m
m
m2
m2
kN

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

Based on N-SPT
6.00 *N-SPT

=
=
=
=

Ultimate (Qu)

*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp

Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)

=
=
=

0.7 *Qs (Compression)


Areapile * Unit weight of Pile * l
Qs + Wp

End Bearing (Qp)

:
=

Compression Capacity (kN)


Friction
Qu
End
Local
Cumm.
0.0
0.0
17.0
17.0
22.6
22.6
21.5
44.1
22.6
45.2
26.0
71.2
11.3
56.5
15.3
71.8
22.6
79.2
35.0
114.2
22.6
101.8
30.5
132.3
11.3
113.1
15.3
128.4
11.3
124.4
15.3
139.7
11.3
135.7
15.3
151.0
11.3
147.0
15.3
162.3
11.3
158.3
15.3
173.6
22.6
181.0
30.5
211.5
22.6
203.6
30.5
234.1
53.7
257.3
76.3
333.6
45.2
302.5
61.1
363.6
45.2
347.8
61.1
408.8
53.7
401.5
76.3
477.8
53.7
455.2
76.3
531.6
53.7
508.9
76.3
585.3
65.7
574.6
106.9
681.5
65.7
640.4
106.9
747.2
329.9
970.2
1484.4
2454.6
329.9
1300.1
1484.4
2784.5
329.9
1630.0
1484.4
3114.4
329.9
1959.8
1484.4
3444.2
329.9
2289.7
1484.4
3774.1
329.9
2619.6
1484.4
4104.0
329.9
2949.4
1484.4
4433.8
329.9
3279.3
1484.4
4763.7
329.9
3609.2
1484.4
5093.6
329.9
3939.0
1484.4
5423.4

(c-soil)
(-soil)
(c-soil)
(-soil)

Pull Out Capacity (kN)


Friction*
Wp
Local
Cumm.
0.0
0.0
0.0
15.8
15.8
1.7
15.8
31.7
3.5
7.9
39.6
5.2
15.8
55.4
6.9
15.8
71.3
8.6
7.9
79.2
10.4
7.9
87.1
12.1
7.9
95.0
13.8
7.9
102.9
15.6
7.9
110.8
17.3
15.8
126.7
19.0
15.8
142.5
20.7
37.6
180.1
22.5
31.7
211.8
24.2
31.7
243.4
25.9
37.6
281.0
27.6
37.6
318.7
29.4
37.6
356.3
31.1
46.0
402.3
32.8
46.0
448.3
34.6
230.9
679.2
36.3
230.9
910.1
38.0
230.9
1141.0
39.7
230.9
1371.9
41.5
230.9
1602.8
43.2
230.9
1833.7
44.9
230.9
2064.6
46.7
230.9
2295.5
48.4
230.9
2526.4
50.1
230.9
2757.3
51.8

Qpu
0.0
17.6
35.1
44.8
62.3
79.9
89.5
99.2
108.8
118.5
128.1
145.7
163.2
202.6
236.0
269.4
308.7
348.0
387.4
435.1
482.8
715.4
948.1
1180.7
1413.4
1646.0
1878.6
2111.3
2343.9
2576.5
2809.2

Anda mungkin juga menyukai