BAB 1
PENDAHULUAN.................................................................................1-1
BAB 2
BAB 3
3.1
3.2
3.3
3.3.1
3.3.2
3.4
3.4.1
3.4.2
3.4.3
3.4.4
BAB 4
KLASIFIKASI TANAH.............................................................................3-1
PROFIL LAPISAN TANAH .........................................................................3-2
PARAMETER TANAH ................................................................................3-9
Hasil Uji Laboratorium..........................................................................3-9
Korelasi Parameter Tanah...................................................................3-10
ANALISIS PENURUNAN 1-D KONSOLIDASI TERZAGHI ...........................3-11
Immediate atau Elastic Settlement (Si) ................................................3-11
Consolidation Settlement (Sc) ..............................................................3-11
Time Rate Consolidation......................................................................3-12
Hasil Analisis Penurunan Konsolidasi ................................................3-13
ANALISIS DAYA DUKUNG PONDASI TIANG ............................4-1
4.1
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.2
4.3
4.4
BAB 5
KESIMPULAN.....................................................................................5-1
ii
Daftar Gambar
GAMBAR 1-1
GAMBAR 2-1
GAMBAR 2-2
GAMBAR 2-3
GAMBAR 3-1
GAMBAR 3-2
GAMBAR 3-3
GAMBAR 3-4
GAMBAR 3-5
GAMBAR 3-6
GAMBAR 3-7
GAMBAR 3-8
GRAFIK
GAMBAR 3-9
GAMBAR 3-10
GAMBAR 3-11
GAMBAR 3-12
GRAFIK
GAMBAR 3-13
VS KEDALAMAN ......................................................................3-9
iii
GAMBAR 4-1
GAMBAR 4-2
GAMBAR 4-3
GAMBAR 4-4
GAMBAR 4-5
GAMBAR 4-6
GAMBAR 4-7
GAMBAR 4-8
iv
Daftar Tabel
TABEL 3-1
TABEL 3-2
TABEL 3-3
TABEL 4-1
TABEL 4-2
Bab 1 PENDAHULUAN
Sehubungan dengan detail desain kolam renang di Tanjung Redeb Berau, Kalimantan Timur,
PT. Byma Arsihas telah melakukan penyelidikan tanah untuk mendapatkan data keadaan tanah
untuk selanjutnya data tersebut digunakan untuk keperluan analisis geoteknik di lokasi kolam
renang tersebut. Penyelidikan tanah yang dilakukan berupa pemboran sebanyak 5 titik, uji
sondir sebanyak 12 titik, dan pengujian laboratorium. Penyelidikan tanah tersebut dilakukan
mulai tanggal 29 Januari 2007 hingga tanggal 11 Februari 2007. Adapun lokasi penyelidikan
tanah tersebut dapat dilihat pada Gambar 1-1.
BH-1
S-06
S-01
S-02
BH-04
S-03
S-09
BH-02
S-07
S-05
BH-03
BH-05
S-04
S-08
1-1
LINGKUP PEKERJAAN
Lingkup pekerjaan penyelidikan tanah ini meliputi penyelidikan lapangan dan pengujian
laboratorium yang terdiri dari:
1. Penyelidikan lapangan yang dilakukan meliputi:
a. 3 (tiga) titik pemboran mesin hingga kedalaman 40 m
b. 2 (dua) titik pemboran mesin hingga kedalaman 30 m
c. 12 (dua belas) titik penyondiran dengan alat sondir kapasitas 2-ton
d. Standard Penetration Test
e. Pengambilan undisturbed soil samples
2. Pengujian laboratorium yang dilakukan meliputi:
a. Uji index properties
b. Analisis butiran tanah
c. Triaxial UU Test
d. Consolidation Test
2.2
Penyelidikan tanah yang dilakukan sesuai dengan American Standard for Testing Material
(ASTM). Penyelidikan tanah ditujukan untuk memahami struktur tanah dan sifat mekanika
tanah di wilayah proyek. Lingkup pekerjaan penyelidikan tanah yang dilakukan meliputi:
2.2.1
Pemboran
Pemboran inti sebanyak 5 titik bor. Sebanyak 3 titik dilakukan hingga mencapai kedalaman
pemboran sedalam 40 m dan 2 titik dilakukan hingga kedalaman 30 m. Selama pengeboran,
dilakukan pengamatan secara visual terhadap perlapisan tanah. Pada kedalaman tertentu
dilakukan pengambilan contoh tanah (disturbed sample dan undisturbed sample) dan Standard
Penetration Test (SPT).
Prosedur pelaksanaan dan peralatan pemboran dalam mengacu pada ASTM D 1452-80,
Standard Practice for Soil Investigation and Sampling by Auger Borings, ASTM D 420 - 93,
Standard Guide for Investigating and Sampling Soil and Rock, ASTM D 2488 - 93,
Standard Practice for Description and Identification of Soils (Visual-Manual Procedure) dan
ASTM D 2113 83, Standard Practice for Diamond Core Drilling for Site Investigation.
Data hasil pemboran dalam disajikan dalam field logs (Bore - Logs) yang didalamnya tercakup:
identifikasi proyek, nomor boring, lokasi, orientasi, tanggal mulai pemboran, tanggal akhir
pemboran, dan nama operator, elevasi koordinat bagian atas bore hole, klasifikasi/deskripsi
tanah (kekerasan, warna, derajat pelapukan, dan identifikasi lainnya yang masih berhubungan),
deskripsi litologi, kondisi air tanah, pengambilan contoh tanah, in situ test di bore hole, dst.
2-2
2.2.2
Undisturbed samples yang dilaksanakan adalah sebanyak 20 tabung untuk keperluan uji
laboratorium. Pelaksanaan pengambilan contoh tanah tidak terganggu mengacu pada ASTM
D 1587-94 Standard Practice for Thin-Walled Tube Geotechnical Sampling of Soils.
Contoh tanah undisturbed diambil dari kedalaman tertentu dengan menggunakan Shelby tube
sampler (thin walled tube sampler). Kemudian contoh tanah dilindungi dari goncangan,
getaran dan perubahan kadar air, yang bertujuan untuk menjaga struktur tanah dan komposisi
fisiknya tetap seperti kondisi aslinya, sampai contoh tersebut dikeluarkan untuk kemudian diuji
di laboratorium. Kedalaman bagian atas contoh dan panjang sampler dicatat di boring log.
2.2.3
SPT (Standard Penetration Test) yang dilakukan adalah sebanyak 110 test dengan interval
kedalaman lebih kurang setiap 1.5 m. Prosedur pelaksanaan dan peralatan Standard
Penetration Test mengacu pada ASTM D 1586 84, "Standard Method for Penetration Test
and Split Barrel Sampling of Soils". Hammer yang digunakan seberat 140 lbs (63 kg) dengan
tinggi jatuh 30 (76.2 cm). Jumlah total tumbukan yang dibutuhkan untuk penetrasi tanah 3
15 cm dicatat. Nilai SPT, dinyatakan dengan nilai N, didapat dari jumlah tumbukan yang
diperlukan untuk penetrasi 2 15 cm terakhir.
2.2.4
Prosedur pelaksanaan Dutch Cone Penetration Test (DCPT) dilakukan berdasarkan standar
ASTM D 3441-86, Method for Deep Quasi-Static, Cone and Friction Cone Penetration Tests
of Soil. Nilai tahanan ujung konus, qc, dan friksi lokal atau friksi selimut, fs, diukur untuk
setiap interval 20 cm.
2.3
Index properties
Grainsize analysis
Triaxial UU
Consolidation
2-4
2.3.1
Specific Gravity
Specific gravity dari tanah, Gs, didefinisikan sebagai perbandingan massa volume partikel
tanah di udara dengan massa volume yang sebanding dengan gas free distilled water di udara
pada suhu kamar (umumnya 68 F {20 C}). Specific gravity ditentukan berdasarkan jumlah
dari pycnometer yang sudah dikalibrasi, dimana massa dan suhu dari contoh tanah deaerasi/air distilasi diukur.
Test dilakukan berdasarkan ASTM D 854-92, Standard Test Method for Specific Gravity of
Soils. Metoda ini digunakan pada contoh tanah dengan komposisi ukuran partikel lebih kecil
daripada saringan No. 4 (4.75 mm). Untuk partikel dengan ukuran lebih besar dari saringan
tersebut, prosedur pelaksanaan mengacu pada Test Method Specific Gravity and Absorption
of Coarse Aggregate (ASTM C 127-88). Specific gravity dari tanah diperlukan untuk
menentukan hubungan antara berat dan volume tanah, dan digunakan untuk perhitungan test
laboratorium lainnya.
2.3.2
Moisture content, w, didefinisikan sebagai perbandingan antara berat air di dalam contoh
tanah dengan berat partikel solid. Contoh basah mula-mula ditimbang, kemudian dikeringkan
di dalam oven pada suhu 230 F (110 C) hingga mencapai berat konstan. Berat contoh
setelah dikeringkan adalah berat partikel solid. Perubahan berat yang terjadi selama proses
pengeringan setara dengan berat air. Untuk tanah organik, terkadang disarankan untuk
menurunkan suhu pengeringan hingga mencapai 140 F (60 C).
Test dilakukan mengacu pada ASTM D 2216-92, Test Method for Laboratory Determination
of Water (Moisture) Content of Soil and Rock. Moisture content diperlukan untuk
menentukan properties tanah dan dapat dikorelasikan dengan parameter-parameter lainnya.
2.3.3
Test ini dilakukan dalam dua tahapan, yaitu: analisis saringan untuk tanah berbutir kasar (pasir,
kerikil), dan analisis hidrometer untuk tanah berbutir halus (lempung, lanau). Tanah yang
mengandung butiran kasar dan butiran halus di uji secara berurutan. Material dengan ukuran
lebih kecil dari saringan No. 200 (0.075 mm atau lebih kecil) dianalisis dengan menggunakan
hidrometer.
Analisis saringan memberikan pengukuran secara langsung terhadap distribusi ukuran partikel
tanah dengan cara melewatkan contoh pada sejumlah wire screens, dari ukuran yang terbesar
hingga terkecil. Jumlah material yang tertahan di tiap-tiap saringan kemudian ditimbang.
Prosedur pelaksanaan pengujian ini mengacu pada ASTM C 136-95a, Method for Sieve
Analysis of Fine and Coarse Aggregates.
Pelaksanaan uji hidrometer mengacu pada Hukum Stokes. Diameter partikel tanah
didefinisikan sebagai diameter bola yang memiliki unit massa dan kecepatan jatuh yang sama
dengan partikel tanah. Jadi distribusi ukuran partikel didapatkan dengan menggunakan sebuah
hydrometer untuk mengukur perubahan specific gravity, suspensi tanah-air seperti partikel
tanah mengendap.
Hasil analisis dicatat dalam combined grain size distribution plot sebagai persentase contoh
yang lebih kecil beratnya versus log diameter partikel. Data ini diperlukan di dalam klasifikasi
tanah. Kurva tersebut juga dapat menunjukkan parameter-parameter lainnya, seperti diameter
2-5
efektif (D10) dan koefisien uniformity (Cu). Test dilakukan berdasarkan ASTM D 422-63
Method for Particle Size Analysis of Soils, dan ASTM D 1140 92 Test Method for
Amount of Material in Soils Finer than the No.200 (75-m) Sieve.
2.3.4
Atterbergs Limit
Liquid limit dilakukan dengan cara meletakkan pasta tanah dalam mangkuk kuningan
kemudian digores tepat ditengahnya dengan alat penggores standar. Dengan menjalankan alat
pemutar, mangkuk kemudian dinaikturunkan dari ketinggian 0.4 inci (10 mm) dengan
kecepatan 2 drop/detik. Liquid limit dinyatakan sebagai moisture content dari tanah yang
dibutuhkan untuk menutup goresan yang berjarak 0.5 inci (13 mm) sepanjang dasar contoh
tanah dalam mangkuk sesudah 25 pukulan. Pengujian dilakukan menurut ASTM D 4318.
Plastic limit ditentukan dengan mengetahui secara pasti moisture content terkecil, dimana
material dapat digulung hingga diameter 0.125 inches (3.2 mm) tanpa mengalami keretakan.
Pengujian dilakukan sesuai dengan ASTM D 4318-95, Test Method for Liquid Limit, Plastic
Limit and Plasticity Index of Soils.
Shrinkage limit (SL) didefinisikan sebagai water content maksimum dimana pengurangan
water content tidak akan menurunkan volume dari massa tanah. Pengujian dilakukan dengan
mengacu pada ASTM D 427-93, Test Method for Shrinkage Factors of Soils.
Nilai-nilai ini digunakan didalam klasifikasi tanah dan dapat dikorelasikan dengan parameterparameter lainnya.
2.3.5
Triaxial-UU
Tujuan test ini adalah untuk memperoleh parameter kekuatan tanah dalam kondisi undrained.
Pada uji ini contoh yang diuji tidak diperkenankan untuk mengalami konsolidasi akibat
tekanan confining dan selama geser berlangsung tidak diperkenankan adanya aliran
(undrained). Dibutuhkan minimal tiga buah pengujian dengan tekanan confining yang
berbeda-beda untuk mendapatkan parameter tegangan total. Jika selama pengujian tekanan air
pori diukur, maka parameter tegangan efektif juga dapat diukur. Pengujian dilakukan menurut
ASTM D 2850-95, Test Method for Unconsolidated, Undrained Compressive Strength of
Cohesive Soils in Triaxial Compression.
2.3.6
Consolidation Test
Test ini bertujuan untuk memperoleh nilai koefisien konsolidasi Cc dan Cv yang selanjutnya
dipergunakan untuk memprediksi lamanya konsolidasi dan besarnya settlement. Metode yang
digunakan dalam pengujian konsolidasi adalah pengujian konsolidasi satu dimensi. Pada uji ini
spesimen diletakkan pada konsolidometer (oedometer) diantara dua batu pori sehingga
memungkinkan terjadinya drainase. Berbagai prosedur pembebanan dapat digunakan selama
pengujian. Pengujian dengan peningkatan pembebanan adalah yang paling umum digunakan.
Pada prosedur ini, spesimen diberikan beban yang semakin bertambah. Biasanya beban awal
yang digunakan besarnya 1/16 tsf (5 kPa) dan ditambah menjadi dua kalinya hingga mencapai
16 tsf (1600 kPa). Setelah pemberian beban, perubahan tingga sampel dimonitor umumnya
selama 24 jam. Untuk mengevaluasi parameter rekompresi, siklus pembebanan unload/reload
dapat dilakukan selama pembebanan. Agar diperoleh hasil pengamatan parameter rekompresi
yang lebih baik untuk lempung terkonsolidasi berlebih (over consolidated clay), siklus
2-6
2-7
KLASIFIKASI TANAH
Dengan menggunakan nilai N-SPT dapat ditentukan konsistensi dari lapisan tanah lempung
dan pasir seperti yang terlihat pada Tabel 3-1. Sedangkan untuk menentukan besarnya sudut
geser dalam berdasarkan nilai N-SPT pada tanah pasir dapat digunakan Tabel 3-2.
Tabel 3-1 Klasifikasi Tanah Lempung Berdasarkan N-SPT
Very stiff
Hard
OCR
increasing
Medium
Stiff
Young
clay
Soft
Aged/
cemented
NC
Very soft
N70
Remarks
0-2
3-5
6-9
10-16
17-30
> 30
Very Loose
0
Loose
0.15
Medium
0.35
Dense
0.65
Very dense
0.85
1-2
2-3
3-6
3-6
4-7
5-9
7-15
8-20
10-25
16-30
21-40
26-45
?
> 40
> 45
Fine
Medium
Coarse
26-28
27-28
28-30
28-30
30-32
30-34
30-34
32-36
33-40
33-38
36-42
40-50
< 50
wet (kN/m3)
11-16
14-18
17-20
17-22
20-23
3-1
3.2
Lapisan tanah di lokasi kolam renang secara umum terbagi atas tanah lempung lanauan dengan
konsistensi sangat lunak (very soft), sedang hingga keras (medium stiff hard) dan batuan
lempung (claystone) pada kedalaman tanah keras. Selain itu, dijumpai batubara (coal) dan
tanah organik (peat) di beberapa lokasi. Simplifikasi lapisan tanah yang dijumpai di lokasi
kolam renang ini dapat dilihat pada Gambar 3-1 - Gambar 3-6.
3-2
BH-1
S-06
A
S-01
S-02
BH-04
S-03
S-09
BH-02
S-07
S-05
BH-03
BH-05
S-04
25.00m
S-06
15.00m
S-01
BH-01
qc (kg/cm2 )
qc (kg/cm2 )
2
1
1
2
1
1
1
1
1
1
1
3
qc>150
21
qc>150
73
100
100
100
100
100
100
100
100
100
100
CLAYSTONE
N>100
KETERANGAN :
SILTY CLAY,
very soft
SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard
COAL
PEAT
CLAYSTONE
Gambar 3-1 Profil lapisan tanah potongan A-A di lokasi Kolam Renang Tanjung Redep
3-3
S-08
BH-1
S-06
S-01
S-02
B BH-04
S-03
S-09
BH-02
S-07
S-05
BH-03
BH-05
S-04
30.00m
BH-04
28.00m
S-05
BH-02
qc (kg/cm2 )
1
8
2
25
45
26
50
qc>150
14
55
86
SILTY CLAY, hard
N>45
50
50
90
50
82
50
82
19
SILTY CLAY, very stiff
N=19-26
20
52
100
100
COAL
N=40-100
???
???
26
40
68
PEAT
N<1
???
40
100
100
100
100
100
100
100
100
CLAYSTONE
N>100
100
KETERANGAN :
SILTY CLAY,
very soft
SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard
COAL
PEAT
CLAYSTONE
Gambar 3-2 Profil lapisan tanah potongan B-B di lokasi Kolam Renang Tanjung Redep
3-4
S-08
BH-1
S-06
S-01
S-02
BH-04
S-03
BH-02
S-09
S-07
S-05
BH-03
BH-05
S-04
U
25.00m
S-09
25.00m
S-07
qc (kg/cm2 )
33.00m
BH-03
qc (kg/cm2)
BH-05
qc>150
???
qc>150
2
1
5
12
100
100
100
4
5
5
7
100
100
100
100
100
100
100
100
100
100
CLAYSTONE
N>100
100
KETERANGAN :
SILTY CLAY,
very soft
SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard
COAL
PEAT
CLAYSTONE
Gambar 3-3 Profil lapisan tanah potongan C-C di lokasi Kolam Renang Tanjung Redep
3-5
S-08
BH-1
S-01
S-06
S-02
BH-04
S-03
S-09
BH-02
S-07
S-05
BH-03
BH-05
D
S-04
30.00m
S-06
30.00m
BH-04
qc (kg/cm2)
S-07
qc (kg/cm2)
1
1
SILTY CLAY, very soft
N=1-2
1
1
1
1
1
8
25
qc>150
45
50
55
qc>150
50
???
50
50
SILTY CLAY, very stiff
N=19-20
19
???
20
40
100
???
???
COAL
N=40-100
???
100
100
100
???
100
100
CLAYSTONE
N>100
100
KETERANGAN :
SILTY CLAY,
very soft
SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard
COAL
PEAT
CLAYSTONE
Gambar 3-4 Profil lapisan tanah potongan D-D di lokasi Kolam Renang Tanjung Redep
3-6
S-08
S-06
BH-1
S-01
S-02
BH-04
S-03
BH-02
S-09
S-05
S-07
BH-03
BH-05
S-04
25.00m
25.00m
S-02
BH-01
2
25.00m
BH-02
qc (kg/cm2)
2
1
1
1
2
1
12 N=5-26
100
26
100
14
qc>150
100
86
100
90
100
50
21
100
82
73
100
100
82
100
52
26
100
68
100
PEAT
N<1
100
CLAYSTONE
N>100
1
40
100
100
100
100
100
100
100
100
100
KETERANGAN :
SILTY CLAY,
very soft
SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard
COAL
PEAT
qc (kg/cm2)
S-08
qc (kg/cm2)
25.00m
S-04
BH-03
CLAY
20.00m
S-08
CLAYSTONE
Gambar 3-5 Profil lapisan tanah potongan E-E di lokasi Kolam Renang Tanjung Redep
3-7
qc>150
qc>150
F
BH-1
S-06
S-01
S-02
BH-04
S-03
S-09
BH-02
S-05
S-07
BH-03
BH-05
U
64.00m
S-01
20.00m
S-05
qc (kg/cm2 )
BH-05
qc (kg/cm2 )
CH, SILTY CLAY, very soft
2
1
2
1
1
1
2
5
4
qc>150
5
5
7
100
qc>150
100
100
100
100
CLAYSTONE
N>100
100
100
KETERANGAN :
SILTY CLAY,
very soft
SILTY CLAY,
SILTY CLAY,
med. stiff to very stiff hard
COAL
PEAT
CLAYSTONE
Gambar 3-6 Profil lapisan tanah potongan F-F di lokasi Kolam Renang Tanjung Redep
3-8
S-08
S-04
3.3
3.3.1
PARAMETER TANAH
Grafik parameter-parameter tanah hasil uji laboratorium ditunjukkan pada Gambar 3-7 Gambar 3-9.
UU, c (kN/m2)
0.00
0.05
0.10
0.15
0.20
0
BH-01
BH-02
BH-03
BH-04
BH-05
Kedalaman (m)
8
10
12
14
16
18
20
Kedalaman (m)
0
2
BH-01
BH-02
BH-03
BH-04
BH-05
8
10
12
14
16
18
20
Cc
0
0.2
0.4
0.6
0.8
0
2
Kedalaman (m)
4
6
8
10
12
BH-01
BH-02
16
BH-03
BH-04
18
BH-05
14
20
3.3.2
Parameter tanah ditentukan berdasarkan hasil penyelidikan tanah. Pada kondisi dimana tidak
terdapat hasil pengujian tanah atau properti tanah sulit diukur secara langsung, parameter
tanah ditentukan berdasarkan engineering judgment maupun korelasi terhadap properti tanah.
Korelasi properti tanah disajikan dalam Gambar 3-10 dan Gambar 3-11.
CH
Sowers
CL
SC-ML
Gambar 3-10 Korelasi Antara Nilai N-SPT Dengan Kuat Geser Undrained
(Terzaghi & Peck, 1967)
3-10
Gambar 3-11 Korelasi Antara Nilai N-SPT Dengan Sudut Geser Dalam (Terzaghi)
3.4
Settlement dari suatu lapisan tanah yang dibebani dapat dibedakan menjadi 2 (dua) jenis, yaitu :
immediate/elastic settlement dan consolidation settlement.
3.4.1
Elastic settlement dari tanah terjadi sewaktu atau setelah masa konstruksi suatu struktur.
Persamaan untuk mengevaluasi besarnya elastic settlement rata-rata dari pondasi fleksibel di tanah
lempung jenuh (saturated clay) menurut Janbu, Bjerrum, dan Kjaernsli adalah sebagai berikut:
Si
A1 A 2
qo B
Es
dimana,
qo
beban luar
Es
Youngs modulus
A1
A2
Berdasarkan kondisi aktual di lapangan, elastic settlement pada lokasi kolam renang dapat
diantisipasi dengan penimbunan kembali lokasi tanah yang sebelumnya digali untuk kebutuhan
konstruksi, hingga mencapai kedalaman yang diinginkan (levelling).
3.4.2
Consolidation settlement merupakan settlement yang bergantung pada waktu dan terjadi sebagai
hasil dari pengaliran air pori dari rongga yang berada pada tanah lempung jenuh (saturated
clayey soils). Pengaliran air pori dari rongga terjadi saat tanah lempung jenuh dikenai beban
tambahan. Persamaan settlement konsolidasi satu dimensi adalah sebagai berikut :
3-11
Cc Hc
p + p av
log 0
1 + e0
pc
SC
Cs H c
p
C Hc
p + p av
log c + c
log 0
1 + e0
p0
1 + e0
pc
dimana,
po
=
pav =
pc
=
eo
=
Cc =
Cs
=
Hc =
S i + Sc
Konsolidasi adalah hasil disipasi dari excess tekanan air pori pada lapisan lempung. Disipasi
tekanan air pori, pada suatu waktu, meningkatkan tekanan efektif, yang kemudian
menyebabkan settlement. Untuk memperkirakan tingkat konsolidasi dari lapisan lempung
pada waktu (t) setelah dikenai beban, tingkat disipasi excess tekanan air pori harus diketahui
terlebih dahulu.
Besar konsolidasi rata-rata dari lapisan lempung adalah sebagai berikut:
U
St
S max
dimana,
= settlement lapisan lempung pada waktu (t) setelah dikenai beban
St
Smax = settlement konsolidasi maksimum pada lempung bila dikenai beban
Lamanya waktu (t) untuk mencapai tingkat konsolidasi yang diinginkan dapat diperkirakan
dengan menggunakan formula:
t
Tv H 2
Cv
dimana,
H
= drainage path maksimum
Cv = koefisien konsolidasi (hasil uji laboratorium)
3-12
Tv
U%
4 100
Penurunan konsolidasi dihitung berdasarkan teori konsolidasi satu dimensi dari Terzaghi:
=
Sc =
cc H
q + p
log 0
1 + e0
q0
dimana:
3.4.4
Sc
: penurunan konsolidasi
cc
: koefisien konsolidasi
e0
q0
Berdasarkan data tanah di lokasi kolam renang, parameter yang digunakan untuk melakukan
analisis konsolidasi ditunjukkan pada Tabel 3-3 .
Tabel 3-3 Parameter untuk perhitungan penurunan dan waktu konsolidasi
Bor. No. Kedalaman (m)
Cc
Cv
(cm /detik)
2
BH-01
16.00 - 16.55
0.594
0.00050
BH-02
16.00 - 16.55
0.143
0.00115
BH-03
2.50 - 3.00
0.560
0.00080
BH-04
11.00 - 11.55
0.561
0.00040
BH-04
27.00 - 27.50
0.207
0.00040
BH-05
2.50 - 3.00
0.617
0.00120
BH-05
16.00 - 16.50
0.587
0.00140
Analisis penurunan dilakukan pada analisis penurunan konsolidasi saja, mengingat kebiasaan di
lapangan immediate settlement (penurunan elastis) akan diperbaiki langsung saat konstruksi
dengan melakukan leveling pada elevasi design.
Hasil analisis konsolidasi untuk kolam renang tanjung redeb ditunjukkan pada Gambar 3-12
dan Gambar 3-13.
3-13
90.0
80.0
70.0
60.0
50.0
40.0
30.0
20.0
10.0
0.0
0
0.5
1.5
2.5
3.5
4.5
Gambar 3-12 Grafik penurunan konsolidasi untuk beberapa variasi tinggi timbunan
Waktu Konsolidasi (bulan)
0
100
200
300
400
500
600
700
800
900
1000
1100
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
Waktu Konsolidasi
3-14
1200
1300
1400
1500
Pondasi tiang biasa digunakan untuk memastikan suatu bangunan berada dalam kondisi aman.
Situasi yang memerlukan tiang sebagai sistem pondasi adalah sebagai berikut:
5
Lapisan tanah pada lokasi pekerjaan merupakan lapisan yang sangat kompresibel dan
memiliki daya dukung yang rendah.
5
Struktur atas menerima gaya horizontal.
5
Struktur atas menerima gaya uplift.
Pondasi tiang menahan beban kompresi melalui tahanan selimut dan tahanan ujung, beban
uplift ditahan melalui tahanan selimut dan beban lateral ditahan oleh kekakuan tiang dan tanah
disekelilingnya. Perhitungan kapasitas daya dukung pondasi dilakukan dengan meninjau
beberapa kondisi sebagai berikut:
1. Kapasitas daya dukung tiang
- Kapasitas daya dukung aksial tiang tunggal
- Kapasitas daya dukung group tiang
2. Interaksi tanah dan group tiang
P
P
TRANS
LONG
4-1
4.1.1
Secara umum, kapasitas daya dukung ultimate aksial dari pondasi tiang, dapat diperoleh
dengan menjumlahkan kapasitas daya dukung ujung dan tahanan geser selimut tiang. Kapasitas
daya dukung tersebut dapat ditulis seperti terlihat pada persamaan dibawah ini.
Qu = Qp + Qs
dimana:
Qu
Qp
Qs
Qs
Qp
4.1.2
Tahanan geser selimut tiang ultimate dari pondasi pada tanah c- dapat dihitung berdasarkan
persamaan sebagai berikut:
Qs = Qsc + Qs
dimana:
Qs
Qsc
Qs
Secara umum, kontribusi kohesi tanah untuk tahanan geser selimut tiang ultimate dapat
diperoleh dengan menggunakan persamaan sebagai berikut:
4-2
Qsc = cu i li p
dimana:
= faktor adhesi
cu-i
li
= keliling tiang
Besarnya nilai faktor adhesi, , khususnya untuk tiang pancang, dapat ditentukan dengan
menggunakan metoda dari API sebagai berikut:
4.1.3
Secara umum, kapasitas daya dukung ujung pondasi tiang yang terletak pada lapisan tanah c-
dapat dihitung berdasarkan persamaan sebagai berikut:
Qp = Ap (c Nc* + q Nq*)
dimana:
Ap
Nc*, Nq*
4-3
4.1.4
Desain tiang terhadap beban tarik sangat penting untuk struktur yang mengalami beban
seismik. Pada beberapa kondisi, kapasitas tarik tiang menentukan kedalaman penetrasi
minimum yang diperlukan.
Menurut Nicola dan Randolph (1993), pada tanah kohesif berbutir halus (fine grained), dimana
pembebanan diasumsikan terjadi pada kondisi undrained, tahanan sisi tiang pada kondisi tekan
dihitung sama dengan kondisi tarik. Sedangkan pada tanah non-kohesif atau tanah teralirkan
bebas (free-draining), Nicola dan Randolph (1993) menyatakan bahwa tahanan sisi biasanya
dihitung 70% dari tahanan sisi untuk kondisi tekan. Karena tanah dasar pada lokasi proyek
terdiri dari tanah kohesif dan non kohesif, tahanan sisi untuk kondisi tarik dihitung 70% dari
tahanan sisi untuk kondisi tekan.
4.1.5
Defleksi lateral tiang akibat beban aksial pada pondasi dapat meningkatkan kisaran tekanan
elastik pada tiang. Akibatnya metoda yang digunakan harus mempertimbangkan kondisi tanah
pada saat yields plastically up to end pada saat selama keruntuhan geser terjadi. Dengan
menggunakan metoda p-y dari Matlock maka tegangan tanah dapat dianalisis. Metoda ini juga
dapat memperhitungkan efek deformasi tanah plastis pada reaksi tiang. Berikut ini diuraikan
penjelasan mengenai metoda p-y, yang diambil dari Pile Design and Construction Practice oleh
Tomlinson. Bentuk dari kurva p-y dapat dilihat dalam Gambar 4-4 Kurva P-Y untuk Tiang
dengan Beban Lateral
. Tiap-tiap kurva menggambarkan tahanan lateral tanah pada kedalaman tertentu.
Metoda untuk menggambarkan kurva p-y telah disusun untuk tanah dengan kenaikan modulus
yang linear, misalnya pada lempung soft firm normally consolidated dan tanah granular.
Faktor empirik diperoleh Matlock melalui pengujian pembebanan tiang lateral. Dalam metoda
ini, langkah pertama adalah menghitung tahanan lateral ultimate tanah lempung akibat beban
lateral. Pada dasarnya metoda Matlock serupa dengan metoda konvensional. Namun, faktor
daya dukung untuk beban lateral Nc didapatkan melalui pendekatan yang sedikit berbeda.
Di bawah kedalaman kritis, rx, koefisien Nc, diambil sebesar 9 (sembilan). Di atas kedalaman
tersebut, Nc, diperoleh melalui persamaan berikut ini:
4-4
Nc = 3 +
x Jx
+
cu B
dimana:
cu
= factor empiris
Pengujian yang dilakukan oleh Matlock memberikan harga J pada saat keruntuhan berkisar dari
0.5 untuk lempung lunak hingga 0.25 untuk lempung yang lebih kaku. Kedalaman kritis
diperoleh melalui persamaan berikut:
xr=
6B
B
+J
cu
Tahanan ultimate di atas dan di bawah kedalaman kritis dinyatakan dalam kurva p-y sebagai
gaya (pu) per unit panjang tiang, yang tergantung pada undrained strength tanah (Cu).
pu = Nc cu B
Dari titik nol hingga titik a dalam Gambar 4-5, terlihat bahwa bentuk dari kurva p-y dihasilkan
dari kurva tegangan-regangan yang diperoleh dari pengujian contoh tanah pada undrained
triaxial compression, atau dari kurva load-settlement hasil plate loading test.
Gambar 4-5 Penentuan Bentuk Kurva P-Y Lempung Lunak Hingga Kaku (Matlock)
p
y
= 0.53
pu
yc
yc adalah defleksi regangan pada saat tegangan sama dengan tegangan maksimum yang
dihasilkan dari kurva tegangan-regangan laboratorium. Matlock merekomendasikan nilai ratarata sebesar 0.010 untuk lempung normally consolidated untuk digunakan pada persamaan
berikut ini:
yc = 2.5 c B
4-5
Prosedur yang sama juga dapat diterapkan untuk tanah pasir. Penurunan tahanan tanah lateral
untuk pasir diberikan oleh Reese dkk. seperti terlihat pada Gambar 4-6 dan Gambar 4-7
berikut ini.
Gambar 4-6 Penentuan Kedalaman Kritis Tiang Dengan Beban Lateral Pada Tanah NonKohesif (Reese, Cox, dan Coop)
Gambar 4-7 Penentuan Kurva P-Y Pasir (Reese, Cox, dan Coop)
Dimana x adalah kedalaman di bawah permukaan tanah yang dipilih untuk kurva p-y tertentu.
4.2
PENENTUAN PARAMETER
Dalam melakukan analisis untuk desain pondasi diperlukan parameter-parameter yang akurat.
Penentuan parameter tersebut dilakukan berdasarkan hasil penyelidikan tanah. Parameter
tanah yang digunakan harus memenuhi persyaratan kedalaman dari pondasi tersebut seperti
terlihat pada Gambar 4-8.
4-6
a=4B
b=6-8 B
Gambar 4-8 Minimal Tebal Data Tanah Di Bawah Dasar Pondasi Untuk Perhitungan
Kapasitas Daya Dukung Ujung
Tabel 4-1 berikut ini menunjukkan besarnya koreksi terhadap nilai N-SPT yang diperoleh di
lapangan tergantung dari metoda pelaksanaan yang digunakan.
Tabel 4-1 Koreksi Nilai N-SPT
Countr
Correction Factor fo r
60% Rod Energy
Free Fall
Rope an Pulley with
special throw release
78
67
78/60 = 1.30
67/60 = 1.12
Safety
Donut
60
45
60/60 = 1.00
45/60 = 0.75
Donut
Donut
45
60
45/60 = 0.75
60/60 = 1.00
Donut
50
50/60 = 0.83
Hammer Release
Japan
Donut
Donut
US
Argentina
China
4.3
Estimated Rod
Energy (%)
Hammer
Type
Dalam analisis dengan metoda statik, beban desain dari tiang dengan panjang yang diketahui,
secara umum telah diperhitungkan dengan cara membagi daya dukung ultimate pada lapisan
tanah pendukung atau:
Q all =
Qu
SF
dimana:
SF
= angka keamanan
4-7
Kisaran angka keamanan terutama tergantung pada reliabilitas dari metoda analisis statik
tertentu dengan pertimbangan-pertimbangan sebagai berikut:
Pada umumnya, angka keamanan yang sering digunakan berkisar antara 2 4 untuk kondisi
operasional atau untuk beban yang bekerja selama operasi.
Menurut Tomlinson (1977), penentuan kapasitas ijin dari tiang adalah seperti ditunjukkan pada
persamaan berikut:
Kapasitas ijin tiang =
4.4
Pada analisis daya dukung pondasi tiang, digunakan tiang pancang (spun pile) dengan diameter
0.40 m, 0.45 m, 0.50 m dan 0.60 m. Rangkuman hasil perhitungan pondasi tiang dapat dilihat
pada . Perhitungan pondasi tiang secara lengkap dapat dilihat pada Lampiran D.
4-8
Properti Tiang
Ref.
Boring No.
Jenis
Tiang
Diameter
Compression
Pull
Out
(m)
Perkiraan
Kedalaman
Tiang
(m)
BH-1
Spun
Pile
0.40
0.45
0.50
0.60
25.00
25.00
25.00
25.00
1341.99
1602.51
1883.65
2507.79
498.64
562.85
628.85
759.56
BH-2
Spun
Pile
0.40
0.45
0.50
0.60
20.00
20.00
20.00
20.00
1185.01
1407.36
1646.20
2173.36
476.90
538.02
600.57
724.64
BH-3
Spun
Pile
0.40
0.45
0.50
0.60
16.00
16.00
16.00
16.00
1147.08
1383.25
1640.02
2215.43
354.62
400.15
446.83
539.36
BH-4
Spun
Pile
0.40
0.45
0.50
0.60
18.00
18.00
18.00
18.00
1117.10
1304.45
1502.41
1930.12
559.63
630.94
703.54
847.80
BH-5
Spun
Pile
0.40
0.45
0.50
0.60
21.00
21.00
21.00
21.00
1306.55
1562.65
1839.36
2454.63
470.46
530.85
592.74
715.44
4-9
Bab 5 KESIMPULAN
Hasil penyelidikan lapangan dan test laboratorium di atas dapat disimpulkan sebagai berikut:
1.
Lapisan tanah pada lokasi kolam renang Tanjung Redep, Kab Berau pada umumnya
adalah sebagai berikut :
- Lapisan atas, merupakan tanah lunak (very soft soft silty clay) yang merupakan
jenis tanah aluvial endapan dari sungai Segah. Lapisan ini hingga pada elevasi -16.00
s/d -25.00 dari permukaan tanah. Lapisan ini sangat lunak dan sangat compresible.
- Pada beberapa lokasi,dibawah lapisan lunak terdapat lapisan lempung sedang
(medium silty clay).
- Pada kedalaman 16.00 25.00 terdapa lapisan lempung keras (very stiff hard clay),
lapisan ini merupakan lapisan bearing stratum atau lapisan pendukung.
2.
Karena sifatnya yang lunak pada permkaan, timbunan langsung yang sifatnya struktural
tidak direkomendasikan. Jika pekerjaan timbunan akan dilaksanakan perlu dilakukan
perbaikan tanah.
3.
Direkomendasikan untuk setiap bangunan dipikul oleh pondasi tiang untuk menghindari
penurunan yang besar dan differential settlement.
4.
5-1
LAMPIRAN A
BORING LOG
P.T. PETROSOL
BORING LOG
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-1
40.00 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
40 80
0.00
1.20
02/30
3.00
01/52
4.50
01/53
6.70
02/30
8.00
01/50
9.50
01/53
11.55
01/50
13.00
01/55
14.55
01/52
16.55
01/46
18.00
01/52
19.70
03/30
21.70
08/30
23.15
21/30
24.70
73/30
26.15
50/10
27.55
50/13
29.00
50/12
2.50
3.00
6.00
6.55
CH
11.00
11.55
16.00
16.55
21.00 21.00
21.55
CH
24.50
N > 100
B1.TXT - Times-Normal
N > 100
N > 100
30.00
Plate
P.T. PETROSOL
BORING LOG
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
40 80
N > 100
30.00
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-1
40.00 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
30.55
50/12
32.15
50/10
33.70
50/05
35.00
50/11
36.55
50/10
38.00
50/10
39.55
50/10
N > 100
32.00
N > 100
N > 100
GP
N > 100
N > 100
N > 100
39.50
40.00
PT
B1a.TXT - Times-Normal
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
Plate
P.T. PETROSOL
BORING LOG
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-2
40.00 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
40 80
0.00
1.00
01/62
3.00
01/76
4.50
01/54
6.50
01/63
8.00
01/59
9.50
01/54
11.50
01/51
13.15
02/31
14.65
02/30
16.65
26/30
18.15
14/30
19.70
86/30
21.15
90/25
22.70
50/13
24.15
82/27
25.70
82/30
27.15
52/30
28.70
26/30
2.50
3.00
6.00
6.50
CH
11.00
11.50
16.00
16.50 16.50
CH
19.50
N > 100
N > 100
27.50
CH
30.00
B2.TXT - Times-Normal
CH
Plate
P.T. PETROSOL
BORING LOG
30.00
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
30.15
68/30
31.55
01/50
33.15
40/30
34.15
50/12
36.00
50/12
37.55
50/10
39.15
50/05
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-2
40.00 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
40 80
CH
31.50
PT
33.00
N > 100
N > 100
N > 100
39.00
40.00
N > 100
B2a.TXT - Times-Normal
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
Plate
P.T. PETROSOL
BORING LOG
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-3
25.12 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
40 80
0.00
3.00
1.00
01/71
2.50
01/52
4.65
02/30
6.50
01/53
8.00
01/52
9.65
02/30
11.70
02/30
13.15
05/30
14.70
12/30
16.00
50/08
17.55
50/08
19.00
50/10
20.55
50/08
22.00
50/06
23.55
50/11
25.00
50/12
3.52
6.00
CH
6.50
11.00
11.55
13.00
CH
N > 100
16.00
N > 100
N > 100
N > 100
N > 100
N > 100
N > 100
END OF THIS BORING.
B3.TXT - Times-Normal
25.12
Plate
P.T. PETROSOL
BORING LOG
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-4
40.00 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
40 80
0.00
1.00
01/69
3.00
01/52
4.50
01/50
6.50
01/53
8.00
01/61
9.50
01/55
11.50
01/50
13.15
08/30
14.65
25/30
16.70
45/30
18.15
50/30
19.70
55/30
21.15
50/12
22.55
50/12
24.15
50/10
25.70
19/30
27.70
20/30
29.15
40/30
2.50
3.00
6.00
CH
6.50
11.00
11.50
13.00
CH
16.00
16.55 16.55
CH
N > 100
21.00
As above, hard.
N > 100
CH
N > 100
24.50
29.00
30.00
PT
B4.TXT - Times-Normal
CH
Plate
P.T. PETROSOL
BORING LOG
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
40 80
N > 100
30.00
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-4
40.00 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
30.55
50/08
32.00
50/10
33.55
50/07
35.00
50/08
36.55
50/10
38.00
50/10
39.55
50/12
N > 100
PT
N > 100
33.50
N > 100
N > 100
N > 100
N > 100
40.00
B4a.TXT - Times-Normal
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
Plate
P.T. PETROSOL
BORING LOG
SPT - N value
BLOWS N PER FOOT
PER
CM
40
80
(%)
ROCK/SOIL DESCRIPTION
:
:
:
:
:
:
RECOVERY
BORING METHOD
SPT
DATE
DRILLER
LOGGER
RECORDED BY
Depth
(m)
PT.
Tanjung Redep - Berau, Kaltim
B-5
30.10 m
0.00m (at the surface)
qu
(kg/cm2)
:
:
:
:
:
:
:
:
DEPTH
(meter)
GRAPH
SYMBOL
USCS
CHART
DEPTH
(meter)
SAMPLE
CLIENT
PROJECT
LOCATION
BORE HOLE NO.
DEPTH
COORDINATE
ELEVATION
GROUND WATER LEVEL
40 80
0.00
1.15
02/30
3.00
01/51
4.65
02/30
6.50
01/60
8.00
01/52
9.50
01/50
11.65
02/30
13.15
05/30
14.60
04/30
16.70
05/30
18.15
05/30
19.70
07/30
21.00
50/12
22.55
50/13
24.00
50/12
25.55
50/10
27.00
50/10
28.55
50/12
30.00
50/10
2.50
3.00
6.00
CH
6.50
11.00
11.50
13.00
16.00
16.55
CH
N > 100
21.00
N > 100
N > 100
N > 100
B5.TXT - Times-Normal
N > 100
N > 100
N > 100
30.10
Plate
LAMPIRAN B
CPT LOG
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.01
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
12
2400
240
N =
E =
02 February, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
:
:
:
:
:
15
S01.TXT - Times-Normal
20
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.02
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
:
:
:
:
:
12
2400
240
N =
E =
01 February, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
M E T E R
D E P T H
i n
10
S02.TXT - Times-Normal
15
20
CONE RESISTANCE >200 KG/CM2
Plate
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.03
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
:
:
:
:
:
12
2400
240
N =
E =
01 February, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
S03.TXT - Times-Normal
15
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.04
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
:
:
:
:
:
12
2400
240
N =
E =
31 January, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
15
S04.TXT - Times-Normal
20
Plate
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.05
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
:
:
:
:
:
12
2400
240
N =
E =
31 January, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
S05.TXT - Times-Normal
15
20
Plate
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.06
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
12
2400
240
N =
E =
02 February, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
:
:
:
:
:
S06.TXT - Times-Normal
15
20
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.07
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
:
:
:
:
:
12
2400
240
N =
E =
30 January, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
15
S07.TXT - Times-Normal
20
Plate
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.08
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
:
:
:
:
:
12
2400
240
N =
E =
30 January, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
15
S08.TXT - Times-Normal
20
Plate
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.09
0.00 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
12
2400
240
M E T E R
N =
E =
29 January, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
:
:
:
:
:
S09.TXT - Times-Normal
15
20
Plate
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.10
+0.20 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
12
2400
240
N =
E =
03 February, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
15
20
S10.TXT - Times-Normal
D E P T H
i n
M E T E R
:
:
:
:
:
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.11
+0.20 (at the surface)
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
12
2400
240
N =
E =
03 February, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
10
D E P T H
i n
M E T E R
:
:
:
:
:
15
S11.TXT - Times-Normal
20
Plate
P.T. PETROSOL
0
0
0
2
400
40
:
:
:
:
:
PT.
Tanjung Redep - Berau, Kaltim
S.12
-0.80
4
800
80
6
1200
120
8
1600
160
COORDINATES
ELEVATION
DATE
OPERATOR
RECORDED
10
2000
200
12
2400
240
M E T E R
N =
E =
29 January, 2007.
Edi Suryono
Jeffrey
LF/CR (%)
TF (kg/cm)
CR (kg/cm2)
NOTE :
CR : CONE RESISTANCE IN KG
PER CM2
TF : TOTAL FRICTION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICTION TO CONE
RESISTANCE
D E P T H
i n
:
:
:
:
:
S12.TXT - Times-Normal
15
20
Plate
LAMPIRAN C
HASIL UJI LABORATORIUM
ATTERBERG LIMIT
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 01
16,00 - 16,50
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
85
80
75
70
65
60
55
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
0
0
10
ML-OL
20
30
40
72.89
27.21
50
60
Liquid Limit %
70
80
90
45.68
CH
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 01
21,00 - 21,55
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
40
35
30
25
20
15
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
0
0
10
ML-OL
20
30
40
26.09
14.90
50
60
Liquid Limit %
70
80
90
11.19
CL
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 02
11,00 - 11,50
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
95
90
85
80
75
70
65
60
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
0
0
10
ML-OL
20
30
40
77.41
29.73
50
60
Liquid Limit %
70
80
90
47.68
CH
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 02
16,00 - 16,50
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
55
50
45
40
35
30
25
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
ML-OL
0
0
10
20
30
40
40.82
24.00
50
60
Liquid Limit %
70
80
90
16.82
CL
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 03
2,50 - 3,00
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
95
90
85
80
75
70
65
60
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
ML-OL
0
0
10
20
30
40
78.36
30.25
50
60
Liquid Limit %
70
80
90
48.11
CH
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 03
11,00 - 11,55
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
75
70
65
60
55
50
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
ML-OL
0
0
10
20
30
40
63.45
26.06
50
60
Liquid Limit %
70
80
90
37.39
CH
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 04
11,00 - 11,50
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
85
80
75
70
65
60
55
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
ML-OL
0
0
10
20
30
40
73.14
28.67
50
60
Liquid Limit %
70
80
90
44.47
CH
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 04
16,00 - 16,55
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
50
45
40
35
30
25
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
ML-OL
0
0
10
20
30
40
38.84
20.95
50
60
Liquid Limit %
70
80
90
17.89
CL
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 04
27,00 - 27,55
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
65
60
55
50
45
40
35
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
ML-OL
0
0
10
20
30
40
50.00
25.27
50
60
Liquid Limit %
70
80
90
24.73
CL - CH
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 05
16,00 - 16,50
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
90
85
80
75
70
65
60
55
50
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
0
0
10
ML-OL
20
30
40
66.92
24.14
50
60
Liquid Limit %
70
80
90
42.78
CH
100
LOCATION :
SAMPLE No.
DEPTH (M)
TANJUNG REDEB
B - 05
2,50 - 3,00
TESTED BY :
DATE :
REMARKS :
Tatang
Feb. 2007
95
90
85
80
75
70
65
60
NUMBER OF BLOWS
10
100
UNIFIED CLASSIFICATION
Platicity Index %
60
50
CH
CL
40
30
OH - MH
20
10
CL-ML
0
0
10
ML-OL
20
30
40
73.73
29.55
50
60
Liquid Limit %
70
80
90
44.18
CH
100
TRIAXIAL UU
(UNCONSOLIDATED UNDRAINED)
Location
Boring
Depth
Tested by:
Date :
Method :
Maman U
Feb, 2007
Unconsolidated Undrained
1' - 3'
3'
1'
(1 + 3)
0.50
1.00
1.50
0.411
0.457
0.499
0.500
1.000
1.500
0.000
0.000
0.000
0.911
1.457
1.999
0.911
1.457
1.999
0.706
1.229
1.750
1.0
0.8
0.6
0.4
0.2
0.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Principal Stress kg/cm2
Cohesion (c)
Angle of Int. Friction :
0.176
2.4
1.4
1.6
kg/cm2
o
1.8
2.0
Location
Boring
Depth
Tested by:
Date :
Method :
Maman U
Feb, 2007
Unconsolidated Undrained
1' - 3'
3'
1'
(1 + 3)
0.50
1.00
1.50
0.130
0.143
0.166
0.500
1.000
1.500
0.000
0.000
0.000
0.630
1.143
1.666
0.630
1.143
1.666
0.565
1.072
1.583
1.0
0.8
0.6
0.4
0.2
0.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Principal Stress kg/cm2
Cohesion (c)
Angle of Int. Friction :
0.056
0.9
1.4
1.6
kg/cm2
o
1.8
2.0
Location
Boring
Depth
Tested by:
Date :
Method :
Maman U
Feb, 2007
Unconsolidated Undrained
1' - 3'
3'
1'
(1 + 3)
0.50
1.00
1.50
0.248
0.280
0.306
0.500
1.000
1.500
0.000
0.000
0.000
0.748
1.280
1.806
0.748
1.280
1.806
0.624
1.140
1.653
1.0
0.8
0.6
0.4
0.2
0.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Principal Stress kg/cm2
Cohesion (c)
Angle of Int. Friction :
0.106
1.6
1.4
1.6
kg/cm2
o
1.8
2.0
Location
Boring
Depth
Tested by:
Date :
Method :
Maman U
Feb, 2007
Unconsolidated Undrained
1' - 3'
3'
1'
(1 + 3)
0.50
1.00
1.50
0.319
0.372
0.416
0.500
1.000
1.500
0.000
0.000
0.000
0.819
1.372
1.916
0.819
1.372
1.916
0.660
1.186
1.708
1.0
0.8
0.6
0.4
0.2
0.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Principal Stress kg/cm2
Cohesion (c)
Angle of Int. Friction :
0.128
2.7
1.4
1.6
kg/cm2
o
1.8
2.0
Location
Boring
Depth
Tested by:
Date :
Method :
Maman U
Feb, 2007
Unconsolidated Undrained
1' - 3'
3'
1'
(1 + 3)
0.50
1.00
1.50
0.178
0.202
0.220
0.500
1.000
1.500
0.000
0.000
0.000
0.678
1.202
1.720
0.678
1.202
1.720
0.589
1.101
1.610
1.0
0.8
0.6
0.4
0.2
0.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Principal Stress kg/cm2
Cohesion (c)
Angle of Int. Friction :
0.075
1.1
1.4
1.6
kg/cm2
o
1.8
2.0
Location
Boring
Depth
Tested by:
Date :
Method :
Maman U
Feb, 2007
Unconsolidated Undrained
1' - 3'
3'
1'
(1 + 3)
0.50
1.00
1.50
0.314
0.385
0.460
0.500
1.000
1.500
0.000
0.000
0.000
0.814
1.385
1.960
0.814
1.385
1.960
0.657
1.193
1.730
1.0
0.8
0.6
0.4
0.2
0.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Principal Stress kg/cm2
Cohesion (c)
Angle of Int. Friction :
0.110
3.9
1.4
1.6
kg/cm2
o
1.8
2.0
Location
Boring
Depth
Tested by:
Date :
Method :
Maman U
Feb, 2007
Unconsolidated Undrained
1' - 3'
3'
1'
(1 + 3)
0.50
1.00
1.50
0.213
0.252
0.277
0.500
1.000
1.500
0.000
0.000
0.000
0.713
1.252
1.777
0.713
1.252
1.777
0.607
1.126
1.639
1.0
0.8
0.6
0.4
0.2
0.0
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Principal Stress kg/cm2
Cohesion (c)
Angle of Int. Friction :
0.087
1.8
1.4
1.6
kg/cm2
o
1.8
2.0
CONSOLIDATION
CONSOLIDATION TEST
Location :
Boring No:
Depth :
2.10
Done by : Cecep
Date :
February, 2007
Remarks :
cc =
CC = 0.594
Void Ratio
1.60
1.10
0.60
0.01
0.1
10
100
10
100
Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00
0.01
0.1
CONSOLIDATION TEST
Location :
Boring No:
Depth :
1.00
Done by : Cecep
Date :
February, 2007
Remarks :
cc =
CC = 0.143
Void Ratio
0.80
0.60
0.40
0.01
0.1
10
100
10
100
Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00
0.01
0.1
CONSOLIDATION TEST
Location :
Boring No:
Depth :
2.10
Done by : Cecep
Date :
February, 2007
Remarks :
cc =
CC = 0.560
Void Ratio
1.60
1.10
0.60
0.01
0.1
10
100
10
100
Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00
0.01
0.1
CONSOLIDATION TEST
Location :
Boring No:
Depth :
2.10
Done by : Cecep
Date :
February, 2007
Remarks :
cc =
CC = 0.561
Void Ratio
1.60
1.10
0.60
0.01
0.1
10
100
10
100
Log - P (kg/cm 2)
1.00
0.80
0.60
0.40
0.20
0.00
0.01
0.1
CONSOLIDATION TEST
Location :
Boring No:
Depth :
1.10
Done by : Cecep
Date :
February, 2007
Remarks :
cc =
CC = 0.207
Void Ratio
0.90
0.70
0.50
0.30
0.01
0.1
10
100
10
100
Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00
0.01
0.1
CONSOLIDATION TEST
Location :
Boring No:
Depth :
2.60
Done by : Cecep
Date :
February, 2007
Remarks :
cc =
CC = 0.617
Void Ratio
2.10
1.60
1.10
0.60
0.01
0.1
10
100
10
100
Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00
0.01
0.1
CONSOLIDATION TEST
Location :
Boring No:
Depth :
2.10
Done by : Cecep
Date :
February, 2007
Remarks :
cc =
CC = 0.587
Void Ratio
1.60
1.10
0.60
0.01
0.1
10
100
10
100
Log - P (kg/cm 2)
2.00
1.50
1.00
0.50
0.00
0.01
0.1
LAMPIRAN D
PERHITUNGAN DAYA DUKUNG
PONDASI TIANG
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.40
0.075
1.26
0.13
0.08
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
11.4
22.8
28.9
35.0
41.2
52.6
64.0
70.1
76.2
82.3
88.4
94.6
100.7
106.8
112.9
119.0
125.2
131.3
148.0
164.6
198.0
231.3
287.6
343.9
498.6
653.4
808.2
963.0
1117.8
1272.5
1427.3
1582.1
1736.9
1891.7
2046.4
2201.2
2356.0
2510.8
2665.6
2820.3
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-1
Diameter
: 0.4 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
7000
8000
0
2
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
3
8
-20
Depth (m)
Depth (m)
Depth (m)
-20
-20
CH
21
73
-25
CLAYSTONE
-25
-25
-30
-30
-35
-35
-40
-40
100
100
100
-30
100
100
100
-35
100
100
100
-40
100
7000
Qpu
1
1
6000
Wp
1
1
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
8000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.45
0.080
1.41
0.16
0.09
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
12.9
25.8
32.8
39.7
46.7
59.6
72.5
79.4
86.4
93.4
100.3
107.3
114.2
121.2
128.2
135.1
142.1
149.0
167.9
186.7
224.3
261.9
325.3
388.6
562.8
737.1
911.3
1085.5
1259.7
1433.9
1608.1
1782.3
1956.5
2130.7
2304.9
2479.1
2653.3
2827.5
3001.7
3175.9
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-1
Diameter
: 0.45 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
7000
8000
0
2
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
3
8
-20
Depth (m)
Depth (m)
Depth (m)
-20
-20
CH
21
73
-25
CLAYSTONE
-25
-25
-30
-30
-35
-35
-40
-40
100
100
100
-30
100
100
100
100
-35
100
GR
-40
100
100
7000
Qpu
1
1
6000
Wp
1
1
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
8000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.50
0.090
1.57
0.20
0.12
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
14.5
28.9
36.8
44.7
52.6
67.0
81.5
89.4
97.2
105.1
113.0
120.9
128.7
136.6
144.5
152.3
160.2
168.1
189.2
210.2
252.1
294.1
364.6
435.2
628.9
822.6
1016.2
1209.9
1403.6
1597.3
1791.0
1984.7
2178.4
2372.1
2565.8
2759.5
2953.2
3146.9
3340.6
3534.3
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-1
Diameter
: 0.5 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
7000
8000
0
2
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
1
1
3
8
-20
Depth (m)
-20
Depth (m)
Depth (m)
1
1
-20
CH
21
73
-25
CLAYSTONE
-25
-25
-30
-30
-35
-35
-40
-40
100
100
100
-30
100
100
100
-35
100
100
100
-40
100
5000
6000
7000
Qpu
-15
4000
Qu
3000
Friction*
Wp
1
-10
2000
Friction
End
CH
1000
8000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.60
0.100
1.88
0.28
0.16
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
3
18.0
C1
3
18.0
C2
8
48.0
C2
8
48.0
C2
21
126.0
C2
21
126.0
C3
73
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
GR
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
17.6
35.1
44.8
54.4
64.1
81.6
99.2
108.8
118.5
128.1
137.8
147.4
157.0
166.7
176.3
186.0
195.6
205.3
230.8
256.2
306.7
357.2
442.1
526.9
759.6
992.2
1224.8
1457.5
1690.1
1922.7
2155.4
2388.0
2620.6
2853.3
3085.9
3318.6
3551.2
3783.8
4016.5
4249.1
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-1
Diameter
: 0.6 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
7000
8000
0
2
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
3
8
-20
Depth (m)
Depth (m)
Depth (m)
-20
-20
CH
21
73
-25
CLAYSTONE
-25
-25
-30
-30
-35
-35
-40
-40
100
100
100
-30
100
100
100
-35
100
100
100
-40
100
7000
Qpu
1
1
6000
Wp
1
1
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
8000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.40
0.075
1.26
0.13
0.08
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
6.1
12.2
18.4
24.5
30.6
36.7
42.8
49.0
55.1
61.2
67.3
73.4
84.8
96.2
107.6
177.1
246.5
284.3
322.1
476.9
631.7
764.5
897.3
1052.0
1206.8
1361.6
1499.7
1569.1
1638.6
1793.4
1948.1
1954.3
2060.7
2215.4
2370.2
2525.0
2679.8
2834.6
2989.3
3144.1
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-2
Diameter
: 0.4 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
86
90
-20
Depth (m)
Depth (m)
Depth (m)
CH
-20
-20
50
82
-25
CH
82
-25
-25
-30
-30
-35
-35
-40
-40
52
26
-30
68
1
PT
40
100
-35
CLAYSTONE
100
100
100
-40
7000
8000
Qpu
26
14
6000
Wp
2
2
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.45
0.080
1.41
0.16
0.09
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
7.0
13.9
20.9
27.8
34.8
41.8
48.7
55.7
62.6
69.6
76.6
83.5
96.4
109.3
122.2
200.4
278.6
321.2
363.8
538.0
712.2
861.7
1011.2
1185.4
1359.6
1533.8
1689.2
1767.4
1845.6
2019.8
2194.0
2201.0
2320.7
2494.9
2669.1
2843.3
3017.5
3191.7
3366.0
3540.2
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-2
Diameter
: 0.45 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
86
90
-20
Depth (m)
Depth (m)
Depth (m)
CH
-20
-20
50
82
-25
CH
82
-25
-25
-30
-30
-35
-35
-40
-40
52
26
-30
68
1
PT
40
100
-35
CLAYSTONE
100
100
100
-40
7000
8000
Qpu
26
14
6000
Wp
2
2
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.50
0.090
1.57
0.20
0.12
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
7.9
15.7
23.6
31.5
39.4
47.2
55.1
63.0
70.9
78.7
86.6
94.5
108.9
123.4
137.9
224.9
312.0
359.4
406.9
600.6
794.3
960.5
1126.7
1320.4
1514.1
1707.8
1880.6
1967.6
2054.7
2248.4
2442.1
2449.9
2583.2
2776.9
2970.6
3164.3
3358.0
3551.7
3745.4
3939.1
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-2
Diameter
: 0.5 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
86
90
-20
Depth (m)
Depth (m)
Depth (m)
CH
-20
-20
50
82
-25
CH
82
-25
-25
-30
-30
-35
-35
-40
-40
52
26
-30
68
1
PT
40
100
-35
CLAYSTONE
100
100
100
-40
7000
8000
Qpu
26
14
6000
Wp
2
2
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.60
0.100
1.88
0.28
0.16
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C2
26
156.0
C2
26
156.0
C2
14
84.0
C2
14
84.0
C3
86
350.0
C3
90
350.0
C3
50
300.0
C3
50
300.0
C3
82
350.0
C3
82
350.0
C3
82
350.0
C3
52
312.0
C3
26
156.0
C3
26
156.0
C3
68
350.0
C3
68
350.0
PT
1
6.0
C4
40
240.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
C4
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
9.6
19.3
28.9
38.6
48.2
57.9
67.5
77.2
86.8
96.4
106.1
115.7
133.3
150.9
168.4
273.1
377.7
434.9
492.0
724.6
957.3
1156.9
1356.6
1589.2
1821.8
2054.5
2262.0
2366.7
2471.3
2704.0
2936.6
2946.3
3106.3
3339.0
3571.6
3804.2
4036.9
4269.5
4502.1
4734.8
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-2
Diameter
: 0.6 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
-5
-5
-10
-10
-15
-15
86
90
-20
Depth (m)
Depth (m)
Depth (m)
CH
-20
-20
50
82
-25
CH
82
-25
-25
-30
-30
-35
-35
-40
-40
52
26
-30
68
1
PT
40
100
-35
CLAYSTONE
100
100
100
-40
7000
8000
Qpu
26
14
6000
Wp
2
2
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.40
0.075
1.26
0.13
0.08
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
6.1
12.2
18.4
29.8
41.2
47.3
53.4
59.5
70.9
82.3
93.7
105.1
131.0
165.4
199.8
354.6
509.4
664.2
819.0
973.7
1128.5
1283.3
1438.1
1592.9
1747.6
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-3
Diameter
: 0.4 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
1
1
-5
NOTE:
Wp
Qpu
-5
-10
-10
-15
12
Depth (m)
5
CH
-15
-15
-20
-20
-25
-25
100
CLAYSTONE
100
100
-20
100
100
100
-25
100
5000
Qu
-5
Depth (m)
Depth (m)
4000
Friction*
3000
End
-10
2000
Friction
CH
1000
6000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.45
0.080
1.41
0.16
0.09
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
7.0
13.9
20.9
33.8
46.7
53.6
60.6
67.6
80.5
93.4
106.3
119.2
148.4
187.2
226.0
400.2
574.4
748.6
922.8
1097.0
1271.2
1445.4
1619.6
1793.8
1968.0
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-3
Diameter
: 0.45 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
1
1
-5
NOTE:
Wp
Qpu
-5
-10
-10
-15
12
Depth (m)
5
CH
-15
-15
-20
-20
-25
-25
100
CLAYSTONE
100
100
-20
100
100
100
-25
100
5000
Qu
-5
Depth (m)
Depth (m)
4000
Friction*
3000
End
-10
2000
Friction
CH
1000
6000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.50
0.090
1.57
0.20
0.12
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
7.9
15.7
23.6
38.1
52.6
60.4
68.3
76.2
90.6
105.1
119.6
134.1
166.7
209.9
253.1
446.8
640.5
834.2
1027.9
1221.6
1415.3
1609.0
1802.7
1996.4
2190.1
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-3
Diameter
: 0.5 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
1
1
-5
NOTE:
Wp
Qpu
-5
-10
-10
-15
12
Depth (m)
5
CH
-15
-15
-20
-20
-25
-25
100
CLAYSTONE
100
100
-20
100
100
100
-25
100
5000
Qu
-5
Depth (m)
Depth (m)
4000
Friction*
3000
End
-10
2000
Friction
CH
1000
6000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.60
0.100
1.88
0.28
0.16
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
5
30.0
C2
12
72.0
C2
12
72.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.53
0.53
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
9.6
19.3
28.9
46.5
64.1
73.7
83.3
93.0
110.6
128.1
145.7
163.2
202.6
254.6
306.7
539.4
772.0
1004.6
1237.3
1469.9
1702.5
1935.2
2167.8
2400.4
2633.1
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-3
Diameter
: 0.6 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
1
1
-5
NOTE:
Wp
Qpu
-5
-10
-10
-15
12
Depth (m)
5
CH
-15
-15
-20
-20
-25
-25
100
CLAYSTONE
100
100
-20
100
100
100
-25
100
5000
Qu
-5
Depth (m)
Depth (m)
4000
Friction*
3000
End
-10
2000
Friction
CH
1000
6000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.40
0.075
1.26
0.13
0.08
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
6.1
12.2
18.4
24.5
30.6
36.7
42.8
49.0
55.1
61.2
67.3
73.4
106.8
173.6
240.4
307.2
426.8
559.6
705.6
851.6
984.4
1117.2
1250.0
1382.8
1433.7
1484.7
1538.3
1592.0
1698.4
1853.1
2007.9
2162.7
2317.5
2472.3
2627.0
2781.8
2936.6
3091.4
3246.2
3401.0
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-4
Diameter
: 0.4 m
Based on N-SPT
N-SPT
0
20
40
60
80
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
CH
-5
-5
-10
-10
-15
-15
CH
50
-20
Depth (m)
Depth (m)
Depth (m)
55
-20
-20
50
50
-25
19
-25
-25
-30
-30
-35
-35
-40
-40
CH
20
40
-30
100
PT
100
100
100
-35
CLAYSTONE
100
100
-40
100
7000
8000
Qpu
45
50
6000
Wp
8
25
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.45
0.080
1.41
0.16
0.09
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
7.0
13.9
20.9
27.8
34.8
41.8
48.7
55.7
62.6
69.6
76.6
83.5
121.1
196.4
271.6
346.9
481.5
630.9
795.2
959.6
1109.0
1258.5
1407.9
1557.4
1614.8
1672.3
1732.7
1793.1
1912.8
2087.0
2261.2
2435.5
2609.7
2783.9
2958.1
3132.3
3306.5
3480.7
3654.9
3829.1
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-4
Diameter
: 0.45 m
Based on N-SPT
N-SPT
0
20
40
60
80
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
CH
-5
-5
-10
-10
-15
-15
CH
50
-20
Depth (m)
Depth (m)
Depth (m)
55
-20
-20
50
50
-25
19
-25
-25
-30
-30
-35
-35
-40
-40
CH
20
40
-30
100
PT
100
100
100
-35
CLAYSTONE
100
100
-40
100
7000
8000
Qpu
45
50
6000
Wp
8
25
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.50
0.090
1.57
0.20
0.12
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
7.9
15.7
23.6
31.5
39.4
47.2
55.1
63.0
70.9
78.7
86.6
94.5
136.4
220.1
303.9
387.6
537.3
703.5
886.2
1068.9
1235.2
1401.4
1567.6
1733.8
1797.7
1861.7
1928.9
1996.2
2129.4
2323.1
2516.8
2710.5
2904.2
3097.9
3291.6
3485.3
3679.0
3872.7
4066.4
4260.1
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-4
Diameter
: 0.5 m
Based on N-SPT
N-SPT
0
20
40
60
80
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
CH
-5
-5
-10
-10
-15
-15
CH
50
-20
Depth (m)
Depth (m)
Depth (m)
55
-20
-20
50
50
-25
19
-25
-25
-30
-30
-35
-35
-40
-40
CH
20
40
-30
100
PT
100
100
100
-35
CLAYSTONE
100
100
-40
100
7000
8000
Qpu
45
50
6000
Wp
8
25
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.60
0.100
1.88
0.28
0.16
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
-35.0
-36.0
-37.0
-38.0
-39.0
-40.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C2
8
48.0
C2
25
150.0
C2
25
150.0
C2
25
150.0
C3
45
270.0
C3
50
300.0
C3
55
330.0
C3
55
330.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C3
50
300.0
C4
19
114.0
C4
19
114.0
C4
20
120.0
C4
20
120.0
PT
40
240.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
PT
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
C5
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.77
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
9.6
19.3
28.9
38.6
48.2
57.9
67.5
77.2
86.8
96.4
106.1
115.7
166.2
266.9
367.6
468.3
648.2
847.8
1067.2
1286.7
1486.3
1686.0
1885.6
2085.3
2162.2
2239.2
2320.1
2400.9
2561.0
2793.6
3026.3
3258.9
3491.6
3724.2
3956.8
4189.5
4422.1
4654.7
4887.4
5120.0
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-4
Diameter
: 0.6 m
Based on N-SPT
N-SPT
0
20
40
60
80
100
1000
2000
3000
4000
5000
6000
8000
9000
0
1
1
-5
NOTE:
CH
-5
-5
-10
-10
-15
-15
CH
50
-20
Depth (m)
Depth (m)
Depth (m)
55
-20
-20
50
50
-25
19
-25
-25
-30
-30
-35
-35
-40
-40
CH
20
40
-30
100
PT
100
100
100
-35
CLAYSTONE
100
100
-40
100
7000
8000
Qpu
45
50
6000
Wp
8
25
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
9000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.40
0.075
1.26
0.13
0.08
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
11.4
22.8
28.9
40.3
51.7
57.8
64.0
70.1
76.2
82.3
93.7
105.1
131.0
153.0
174.9
200.8
226.8
252.7
284.2
315.7
470.5
625.2
780.0
934.8
1089.6
1244.4
1399.1
1553.9
1708.7
1863.5
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-5
Diameter
: 0.4 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
2
1
-5
NOTE:
Wp
Qpu
-5
-5
-10
-10
-15
Depth (m)
Depth (m)
Depth (m)
5
4
-15
CH
5
-20
-20
-20
-25
-25
-30
-30
100
100
CLAYSTONE
100
-25
100
100
100
-30
100
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
6000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.45
0.080
1.41
0.16
0.09
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
12.9
25.8
32.8
45.7
58.6
65.5
72.5
79.4
86.4
93.4
106.3
119.2
148.4
173.2
197.9
227.2
256.4
285.6
321.1
356.6
530.8
705.1
879.3
1053.5
1227.7
1401.9
1576.1
1750.3
1924.5
2098.7
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-5
Diameter
: 0.45 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
2
1
-5
NOTE:
Wp
Qpu
-5
-5
-10
-10
-15
Depth (m)
Depth (m)
Depth (m)
5
4
-15
CH
5
-20
-20
-20
-25
-25
-30
-30
100
100
CLAYSTONE
100
-25
100
100
100
-30
100
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
6000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.50
0.090
1.57
0.20
0.12
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
14.5
28.9
36.8
51.3
65.8
73.6
81.5
89.4
97.2
105.1
119.6
134.1
166.7
194.3
222.0
254.6
287.2
319.8
359.4
399.0
592.7
786.4
980.1
1173.8
1367.5
1561.2
1754.9
1948.6
2142.3
2336.0
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-5
Diameter
: 0.5 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
2
1
-5
NOTE:
Wp
Qpu
-5
-5
-10
-10
-15
Depth (m)
Depth (m)
Depth (m)
5
4
-15
CH
5
-20
-20
-20
-25
-25
-30
-30
100
100
CLAYSTONE
100
-25
100
100
100
-30
100
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
6000
Project
Pile type
: PC PILE
Calculation method:
Ref.
: BH-5
Diameter
: 0.6 m
Based on N-SPT
N-SPT
0
20
40
60
100
1000
2000
3000
4000
6000
0
2
1
-5
NOTE:
Wp
Qpu
-5
-5
-10
-10
-15
Depth (m)
Depth (m)
Depth (m)
5
4
-15
CH
5
-20
-20
-20
-25
-25
-30
-30
100
100
CLAYSTONE
100
-25
100
100
100
-30
100
5000
Qu
-15
4000
Friction*
1
1
3000
End
-10
2000
Friction
CH
1000
6000
Project
Ref.
:
:
Pile Properties
Type
Diameter
Thick.
Perimeter
Areaout
Areapile
Unit weight
:
:
:
:
:
:
:
PC PILE
0.60
0.100
1.88
0.28
0.16
21.00
Depth
(m)
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
Soil Properties
cu
Layer N-SPT
2
(kN/m )
C1
2
12.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
1
6.0
C1
2
12.0
C1
2
12.0
C2
5
30.0
C2
4
24.0
C2
4
24.0
C2
5
30.0
C2
5
30.0
C2
5
30.0
C2
7
42.0
C2
7
42.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
C3
100
350.0
Calc. Method
cu
Compression
Skin Friction (Qs)
m
m
m
m2
m2
kN
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
1.00
1.00
0.95
0.95
0.95
0.83
0.83
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Based on N-SPT
6.00 *N-SPT
=
=
=
=
Ultimate (Qu)
*cu*perimeter*l
2*N-SPT*perimeter*l
Nc*cu*area
40*N-SPTav*l/D
400*N-SPTav
Qs + Qp
Pull out
Skin Friction (Qs)
Pile weight (Wp)
Ultimate (Qpu)
=
=
=
:
=
(c-soil)
(-soil)
(c-soil)
(-soil)
Qpu
0.0
17.6
35.1
44.8
62.3
79.9
89.5
99.2
108.8
118.5
128.1
145.7
163.2
202.6
236.0
269.4
308.7
348.0
387.4
435.1
482.8
715.4
948.1
1180.7
1413.4
1646.0
1878.6
2111.3
2343.9
2576.5
2809.2