meter
Cb
meter
Cp
meter
meter
Volume Displacement
meter
Persentase
meter
knots
110
109.86
107
11.45
3.65
5.75
14
Loa
Lwl
Lpp
B
T
H
Vs
Water Ballast Tank
1 (trapesium)
2 (Persegi Panjang)
3 (Persegi Panjang)
4 (Persegi Panjang)
5 (Persegi Panjang)
6 (Persegi Panjang)
Panjang a (m)
5.215
Panjang b (m)
2.952
1.18
14
14
14
14
Total Luas Water Ballast Tank
216000
575
1025
1.2
Panjang (m)
707250
3.2743055556
Volume (m^3)
41.0587758
11.1392
132.3
132.3
132.16
125.58
574.5379758
inier type C
0.814
0.82
olume Displacement
Persentase
lebar (m)
9.44
9.45
9.45
9.44
8.97
3737.3377767 m^3
15.372920783 %
Tinggi (m)
2.1
Luas (m^2)
8.57535
11.1392
132.3
132.3
132.16
125.58
542.05455