STRUKTUR ORGANISASI LAPANGAN

KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

PROJECT MANAGER
Anwar, ST

SITE ENGINEER SITE MANAGER STAF ADMINISTRASI


Amiruddin, ST Noviar Chaliq, ST Ilyas

DRAFTER
Ir. Mafrizal PELAKSANA LAPANGAN
Anton, ST

MEKANIKAL/ELEKTRIKAL
Syakban

PELAKSANA K3
Sahrul, ST

Banda Aceh, 27 Juli 2014


PT. GUNAKARYA NUSANTARA
Ir. TAUFIK RAMADHI
Direktur VIII
ORGANISASI LAPANGAN

STAF ADMINISTRASI
Ilyas
STRUKTUR ORGANISASI PPK
KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

PPK
Lilik Lastantyo A, ST.MT

TENAGA INDIVIDUAL
Albert Hutapea, ST

PENGAWAS PADA PPK PELAKSANA TEKNIS PADA P


Iswanto, ST Khalisah Nur Arafah, ST

Pengawas Bangunan Pada PPK ADMINISTRASI


Ahmad Nasir Adriani, ST
Noval Diansyah, ST T. Andrian Ferdian
Safrial, ST T.M Ikhsan
Ari Lesmana, ST
UR ORGANISASI PPK

TENAGA INDIVIDUAL
Albert Hutapea, ST

PELAKSANA TEKNIS PADA PPK


Khalisah Nur Arafah, ST

ADMINISTRASI
Adriani, ST
T. Andrian Ferdian
T.M Ikhsan
STRUKTUR ORGANISASI PROYEK
KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD
: SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

PPK PELAKSANAAN
SNVT PBL NAD

TENAGA INDIVIDUAL
PPK Pelaksanaan SNVT PBL NA

TEAM DIREKSI LAPANGAN


PPK Pelaksanaan SNVT PBL NA

KONSULTAN MK
PT. CAIXA CONSULTANT

KONTRAKTOR PELAKSANA
PT. GUNAKARYA NUSANTARA

KETERANGAN :

: GARUS KOORDINASI
: GARUS PERINTAH
ORGANISASI PROYEK

TENAGA INDIVIDUAL
PPK Pelaksanaan SNVT PBL NAD

TEAM DIREKSI LAPANGAN


PPK Pelaksanaan SNVT PBL NAD
JADWAL PELAKSANAAN PEKERJAAN
KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

HARGA NILAI JADWAL PELAKSANAAN PEKERJAAN


NO. URAIAN PEKERJAAN SAT VOLUME SATUAN JUMLAH BOBOT JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
(Rp.) (Rp.) ( %) 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04
PEKERJAAN ARSITEKTUR DAN STRUKTUR
I PEKERJAAN PESIAPAN
1 Pengukuran dan pasang bouplank m1 222.00 42,190.00 9,366,180.00 0.057 0.057
2 Pembuatan bedeng kerja dan gudang m2 12.00 951,037.50 11,412,450.00 0.070 0.070
3 Pembuatan Direksi Keet lengkap meja,kursi,whiteboard,ac m2 24.00 1,038,950.00 24,934,800.00 0.152 0.152
4 Pagar pengaman sementara keliling m1 141.20 75,000.00 10,590,000.00 0.065 0.032 0.032
5 Dokumentasi proyek set 3.00 600,000.00 1,800,000.00 0.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 ADM Pembuatan IMB Ls 1.00 4,500,000.00 4,500,000.00 0.028 0.014 0.014
7 Sewa genset & BBM Bln 5.00 400,000.00 2,000,000.00 0.012 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
8 Sumur & pompa untuk air kerja Ls 1.00 9,000,000.00 9,000,000.00 0.055 0.055
9 Papan nama proyek Bh 1.00 600,000.00 600,000.00 0.004 0.004
10 Pembersihan lokasi m2 2,591.00 3,350.00 8,679,850.00 0.053 0.053
11 Sewa mobilecrane kap 2 ton bln 4.00 8,000,000.00 32,000,000.00 0.196 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

II PEKERJAAN TURAP BATU KALI KELILING SITE


1 Galian tanah pondasai turap m3 106.56 46,750.00 4,981,680.00 0.030 0.015 0.015
2 Lapisan pasir urug bawah turap m3 26.64 144,700.00 3,854,808.00 0.024 0.012 0.012
3 Pasang turap batu kali m3 333.00 593,325.00 197,577,225.00 1.207 0.402 0.402 0.402
4 Cor sloof 15 x 20 cm sisi atas turab batu kali m3 6.66 4,427,434.10 29,486,711.11 0.180 0.090 0.090
5 Urugan tanah peninggian bangunan & halaman m3 4,145.60 93,500.00 387,613,600.00 2.369 1.184 1.184
7 Plester & acian beton sloof M2 122.10 42,492.00 5,188,273.20 0.032 0.011 0.011 0.011
8 Siar batu kali Keliling Site sisi luar batu kali m2 172.30 41,229.50 7,103,842.85 0.043 0.022 0.022

III PEKERJAAN STRUKTUR


A PEKERJAAN PONDASI
1 Pengadaan Tiang Pnc. Beton Pracetak Ukuran Dia.40cm m' 2,992.00 932,000.00 2,788,544,000.00 17.042 4.260 4.260 4.260 4.260
2 Pemancangan Tiang Pancang Beton Pracetak m' 2,992.00 56,000.00 167,552,000.00 1.024 0.256 0.256 0.256 0.256
3 Galian Tanah pile cap & tie beam m3 633.59 46,750.00 29,620,332.50 0.181 0.045 0.045 0.045 0.045
5 Urugan kembali tanah galian m3 190.08 19,050.00 3,621,024.00 0.022 0.022
6 Pasir Urug bawah pilecap dan sloof m3 30.11 144,700.00 4,356,917.00 0.027 0.013 0.013
7 Lantai Kerja bawah pile cap dan sloof m3 11.91 544,916.67 6,489,194.66 0.040 0.020 0.020
8 Potong Kepala tiang 400x400 ttik 187.00 104,000.00 19,448,000.00 0.119 0.059 0.059
9 Sambung pancang uk 400x400 dg plat baja ttik 187.00 1,050,000.00 196,350,000.00 1.200 0.300 0.300 0.300 0.300
10 Mob-demob alat berat pancang ls 1.00 35,000,000.00 35,000,000.00 0.214 0.107 0.107
12 Loading Test PDA nos 5.00 4,850,000.00 24,250,000.00 0.148 0.148
13 Pile cap type PC1 (K-350, ) m3 2.05 7,209,353.27 14,779,174.20 0.090 0.090
14 Pile cap type PC2 (K-350, ) m3 107.52 7,067,494.05 759,896,960.26 4.644 2.322 2.322
15 Balok beton TB 1 300x400 (K-350, ) m3 22.42 7,229,985.96 162,096,285.22 0.991 0.991
16 Balok beton TB 2 350x600 (K-350, ) m3 45.44 6,070,956.61 275,864,268.36 1.686 0.843 0.843
17 Balok beton TB 3 400x800 (K-350, ) m3 15.68 5,326,018.57 83,511,971.18 0.510 0.510

B PEKERJAAN LANTAI DASAR ( Elevasi + 0.00 s/d +4.00)


1 Pasir urug bawah lantai t. 10 cm m3 108.60 144,700.00 15,714,420.00 0.096 0.096
2 Lantai kerja beton K 100 t. 5 cm m3 54.30 544,916.67 29,588,975.18 0.181 0.181
3 Cor beton lantai t. 10 cm (K.350, besi wiremash M6 ) m3 108.60 2,500,920.43 271,599,958.70 1.660 1.660
4 Balok beton BA 1 300X400 (K-350, ) m3 7.87 7,229,985.96 56,899,989.51 0.348 0.348
5 Balok beton BB 1 350x500 (K-350, ) m3 18.27 6,590,498.37 120,408,405.22 0.736 0.368 0.368
6 Kolom Beton K1 (dia 600 ) (K-350, ) m3 120.90 7,909,246.65 956,227,919.99 5.844 1.948 1.948 1.948
7 Beton lantai tangga ( K350, ) m3 8.42 8,400,579.59 70,732,880.15 0.432 0.432
8 Beton lantai ramp (K-350, ) m3 20.88 8,400,579.59 175,404,101.84 1.072 1.072

C PEKERJAAN LANTAI VOID ( Elevasi +4.00 s/d +8.00 )


1 Balok beton BA 1 300x400 (K-350, ) m3 26.35 7,229,985.96 190,510,130.05 1.164 1.164
2 Balok beton BB 1 350x500 (K-350, ) m3 51.55 6,590,498.37 339,740,190.97 2.076 0.742 1.335
3 Kolom Beton K1 (dia 600 ) (K-350, ) m3 101.74 7,909,246.65 804,686,754.17 4.918 2.459 2.459
4 Plat lantai tebal 12 cm ( K 350, ) m3 9.60 8,400,579.59 80,645,564.06 0.493 0.493
5 Beton lantai tangga ( K350, ) m3 8.42 8,400,579.59 70,732,880.15 0.432 0.432
6 Beton lantai ramp (K-350, ) m3 19.01 8,400,579.59 159,695,018.01 0.976 0.976

D PEKERJAAN LANTAI SATU ( Elevasi +. 8.00 s/d +. 12.00 )


1 Balok beton BA 2 300x400 (K-350, ) m3 32.51 8,602,859.95 279,678,976.97 1.709 1.709
2 Balok beton BB 1 350x500 (K-350, ) m3 49.15 6,590,498.37 323,922,994.89 1.980 1.980
3 Balok beton BC 1 400x700 (K-350, ) m3 13.64 6,221,344.74 84,859,142.25 0.519 0.519
4 Balok beton BD 1 150x700 (K-350, ) m3 8.77 7,100,544.62 62,271,776.32 0.381 0.381
5 Kolom Beton K2(dia 600 ) (K-350, ) m3 101.74 6,743,736.37 686,107,738.28 4.193 1.677 2.516
6 Plat beton t. 120 mm ( K-350, ) m3 133.32 8,400,579.59 1,119,965,270.94 6.844 2.738 4.107
7 Beton lantai tangga ( K350, ) m3 8.42 8,400,579.59 70,732,880.15 0.432 0.432
8 Beton lantai ramp (K-350, ) m3 10.58 8,400,579.59 88,878,132.06 0.543 0.543

E PEKERJAAN LANTAI ATAP ( Elevasi +12.00 s/d+15.00)


1 Balok beton BA 3 300x400 (K-350, ) m3 35.24 7,229,985.96 254,784,705.23 1.557 1.557
2 Balok beton BB 2 350x500 (K-350, ) m3 38.85 6,590,498.37 256,040,861.67 1.565 1.565
3 Balok beton BC 2 400x700 (K-350, ) m3 13.64 5,044,595.61 68,808,284.12 0.421 0.421
4 Balok beton BD 1 150x700 (K-350, ) m3 7.52 7,100,544.62 53,396,095.54 0.326 0.326
5 Balok beton BE 1 150x300 (K-350,) m3 9.40 10,421,520.13 97,962,289.22 0.599 0.599
- Balok beton BB 3 350x500 (K-350, ) m3 9.42 5,649,099.07 53,214,513.24 0.325 0.325
6 Kolom Beton K3 (dia 600 ) (K-350,) m3 35.61 5,578,226.09 198,640,631.06 1.214 1.214
7 Plat beton lantai t. 120 mm ( K-350, ) m3 133.32 8,400,579.59 1,119,965,270.94 6.844 3.422 3.422
8 Plat beton atap dak tangga t. 120 mm ( K-350,) m3 14.04 8,400,579.59 117,944,137.44 0.721 0.721
9 Plat beton atap dak ramp t. 120 mm ( K-350, ) m3 19.80 8,400,579.59 166,331,475.88 1.016 0.508 0.508

IV PEKERJAAN DINDING
A DINDING LANTAI DASAR ( Elevasi +0.00 s/d +4.00)
1 Pasang dinding bata merah 15 cm ad. 1 pc ; 5 psr m2 221.96 86,499.00 19,199,318.04 0.117 0.117
2 Plester dan acian dinding bata ad 1 pc : 5 psr m2 443.92 41,481.20 18,414,334.30 0.113 0.113
3 Acian kolom beton m2 630.76 25,418.75 16,033,130.75 0.098 0.098
4 Acian balok beton m2 660.74 25,418.75 16,795,184.88 0.103 0.103
5 Kolom praktis 15 x15 cm ad. 1 : 2 : 3 m3 1.38 8,158,663.75 11,258,955.98 0.069 0.069
6 Balok praktis 15x15 cm m3 6.04 8,495,210.26 51,311,069.97 0.314 0.314

B DINDING LANTAI VOID ( Elevasi +4.00 s/d +8.00)


1 Pasang dinding bata merah 15 cm ad. 1 pc ; 5 psr m2 255.40 86,499.00 22,091,844.60 0.135 0.135
2 Plester dan acian dinding bata m2 510.80 41,481.20 21,188,596.96 0.129 0.129
3 Acian kolom beton m2 610.42 25,418.75 15,516,113.38 0.095 0.095
4 Acian balok beton m2 598.91 25,418.75 15,223,543.56 0.093 0.093
5 Kolom praktis 15 x15 cm ad. 1 : 2 : 3 m3 2.12 8,158,663.75 17,296,367.15 0.106 0.106
6 Balok praktis 15x15 cm m3 5.58 8,495,210.26 47,403,273.25 0.290 0.290

C DINDING LANTAI SATU (Elevasi +8.00 s/d +12.00)


1 Pasang dinding bata merah 15 cm transram ad. 1 pc: 3 psr m2 41.70 91,434.75 3,812,829.08 0.023 0.023
2 Pasang dinding bata merah 15 cm ad. 1 pc: 5 psr m2 317.10 86,499.00 27,428,832.90 0.168 0.168
3 Plester dan acian dinding bata trasram ad 1 pc : 3 psr m2 41.70 44,181.80 1,842,381.06 0.011 0.011
4 Plester dan acian dinding bata ad 1 pc : 5 psr m2 634.20 41,481.20 26,307,377.04 0.161 0.161
5 Acian kolom beton m2 610.42 25,418.75 15,516,113.38 0.095 0.095
6 Acian balok beton m2 578.07 25,418.75 14,693,816.81 0.090 0.090
7 Kolom praktis 15 x15 cm ad. 1 pc: 2 krl : 3 psr m3 2.96 8,158,663.75 24,149,644.70 0.148 0.148
8 Ornamen dinding Lingkaran bh 2.00 110,000.00 220,000.00 0.001 0.001
9 Lapisan keramik dinding toilet 20x20 cm m2 44.00 149,187.10 6,564,232.40 0.040 0.040
10 Lapisan keramik meja pantry 20x20 cm m2 7.80 149,187.10 1,163,659.38 0.007 0.007

D DINDING LANTAI ATAP ( Elevasi +12.00 s/d +15.00)


1 Pasang dinding bata merah 15 cm ad. 1 pc: 5 psr m2 181.29 86,499.00 15,681,403.71 0.096 0.096
2 Plester dan acian dinding bata ad 1 pc : 5 psr m2 362.58 41,481.20 15,040,253.50 0.092 0.092
3 Acian kolom beton m2 205.73 25,418.75 5,229,399.44 0.032 0.032
4 Acian balok beton m2 226.43 25,418.75 5,755,567.56 0.035 0.035
5 Dinding rouster keliling tangki air m2 36.00 96,586.25 3,477,105.00 0.021 0.021
6 Kolom praktis 15 x15 cm ad. 1 pc: 2 krl : 3 psr m3 1.47 8,158,663.75 11,993,235.71 0.073 0.073
7 Ringbalk dinding rouster 15X15 CM m3 0.41 8,495,210.26 3,440,560.16 0.021 0.021

V PEKERJAAN LANTAI
A PEK. LANTAI LANTAI DASAR ( Elevasi +.0.00)
1 Pasang floor hardener lantai dosis 5 kg/m2 non metalic m2 1,086.00 76,800.00 83,404,800.00 0.510 0.510
2 Pondasi rollag bata merah ad 1 pc a; 5 psr m1 80.40 86,499.00 6,954,519.60 0.043 0.043
3 Pasang step nozing tangga 8x30 cm keramik m1 100.80 52,022.42 5,243,859.94 0.032 0.032
4 Pasang floor hardener lantai tangga & ramp dosis 5 kg/m2 m2 247.80 76,800.00 19,031,040.00 0.116 0.116
5 Urugan sirtu 15 cm dibawah paving blok m3 168.80 292,750.00 49,416,200.00 0.302 0.302
6 Urugan pasir 10 cm dibawah paving blok m3 84.40 144,700.00 12,212,680.00 0.075 0.075
7 Pasing paving blok t. 6 cm m2 844.00 124,500.00 105,078,000.00 0.642 0.642
8 Kansteen beton K 300 15x20x28x40 m1 178.80 181,284.75 32,413,713.30 0.198 0.198

B PEK.LANTAI LANTAI VOID ( Elevasi +4.00 s/d +.8.00)


1 Pasang step nozing tangga 8x30 cm keramik M2 100.80 52,022.42 5,243,859.94 0.032 0.032
2 Pasang floor hardener lantai tangga & ramp dosis 5 kg/m2 M2 234.00 76,800.00 17,971,200.00 0.110 0.110
3 Water profing dak atap canopy M2 32.00 42,900.00 1,372,800.00 0.008 0.008
4 Screed atap dak canopy t. 3 cm m2 32.00 70,948.50 2,270,352.00 0.014 0.014

C PEK.LANTAI LANTAI SATU ( Elevasi +8.00 s/d +12.00)


1 Pasang lantai ruang.dalam keramik 40x40 cm m2 1,076.00 139,130.00 149,703,880.00 0.915 0.915
2 Pasang lantai KM/WC & pantry keramik 20x20 cm m2 35.50 112,216.80 3,983,696.40 0.024 0.024
3 Pasang step nozing tangga 8x30 cm keramik m1 100.80 52,022.42 5,243,859.94 0.032 0.032
4 Pasang floor hardener lantai tangga & ramp dosis 5 kg/m2 m2 150.00 76,800.00 11,520,000.00 0.070 0.070
5 Beton meja pantry m3 3.00 8,400,579.59 25,201,738.77 0.154 0.154
6 Water profing lantai KM/WC m2 35.50 42,900.00 1,522,950.00 0.009 0.009

D PEK.LANTAI LT.ATAP( Elevasi +12.00)


1 Pasang floor hardener lantai dosis 5 kg/m2 non metalic m2 1,071.00 76,800.00 82,252,800.00 0.503 0.503
2 Pasang floor hardener r.pompa & genset dosis 5 kg/m2 non m2 18.00 76,800.00 1,382,400.00 0.008 0.008
3 Water profing cair dak elevasi + 16.000 m2 282.00 42,900.00 12,097,800.00 0.074 0.074
4 Lapisan screed dak elevasi + 16.00 m2 282.00 70,948.50 20,007,477.00 0.122 0.122

VI PEKERJAAN LANGIT-LANGIT
A LANGIT-LANGIT LANTAI DASAR ( elevasi + 4.00)
1 Expose tangga beton dengan acian m2 73.80 25,418.75 1,875,903.75 0.011 0.011
2 Expose ramp beton dengan acian m2 174.00 25,418.75 4,422,862.50 0.027 0.027

B LANGIT-LANGIT LANTAI VOID ( Elevasi +7.80)


1 Expose plat dak dengan acian m2 972.65 25,418.75 24,723,547.19 0.151 0.151
2 Expose tangga beton dengan acian m2 72.00 25,418.75 1,830,150.00 0.011 0.011
3 Expose ramp beton dengan acian m2 162.00 25,418.75 4,117,837.50 0.025 0.025

C LANGIT-LANGIT LANTAI SATU ( Elevasi + 11.80 )


1 Expose plat dak dengan acian m2 871.77 25,418.75 22,159,303.69 0.135 0.135
2 Expose tangga beton dengan acian m2 72.00 25,418.75 1,830,150.00 0.011 0.011
3 Expose ramp beton dengan acian m2 78.00 25,418.75 1,982,662.50 0.012 0.012

D LANGIT-LANGIT LANTAI ATAP, ( Elevasi + 14.80)


1 Expose plat dak dengan acian m2 282.00 25,418.75 7,168,087.50 0.044 0.044

VII PEKERJAAN PINTU DAN JENDELA


A LANTAI SATU ( Elevasi +8.00)
1 Pintu Type P.1 buah 5.00 2,583,037.80 12,915,189.00 0.079 0.079
2 Pintu Type P.2 ( toilet) buah 2.00 2,289,572.00 4,579,144.00 0.028 0.028
3 Pintu Type P.3 (TOILETt) buah 4.00 1,888,957.10 7,555,828.40 0.046 0.046
4 Jendela Type J.1 buah 7.00 1,441,037.20 10,087,260.40 0.062 0.062
5 Jendela Type BV 1 buah 6.00 337,500.80 2,025,004.80 0.012 0.012

B LANTAI ATAP
1 Pintu Type PB ( Pintu besi ) buah 2.00 2,108,740.00 4,217,480.00 0.026 0.026

VIII PEKERJAAN RAILING


A LANTAI DASAR ( Elevasi +0.00 s/d +8.00)
1 Railing tangga utama (handreel) m1 65.00 250,000.00 16,250,000.00 0.099 0.099
2 Railing ramp ( handreel) m1 144.00 250,000.00 36,000,000.00 0.220 0.220

B LANTAI VOID ( Elevasi +4.00 s/d +8.00)


1 Railing tangga utama (handreel) m1 54.00 225,000.00 12,150,000.00 0.074 0.074
2 Railing ramp ( handreel) m1 132.00 225,000.00 29,700,000.00 0.182 0.182

C LANTAI SATU ( elevasi +8.00 s/d 12.00)


1 Railing besi tangga utama m1 102.80 600,000.00 61,680,000.00 0.377 0.377
2 Railing besi ramp m1 56.90 600,000.00 34,140,000.00 0.209 0.209
3 Railing besi mendatar M1 129.00 600,000.00 77,400,000.00 0.473 0.237 0.237

D LANTAI ATAP ( Elevasi + 12.00 s/d +15.00)


1 Railing besi mendatar m1 94.00 600,000.00 56,400,000.00 0.345 0.345

IX PEKERJAAN FINISHING
A FINISHING LANTAI DASAR (Elevasi +0.00 s/d 4.00)
1 Cat dinding m2 443.92 18,321.00 8,133,058.32 0.050 0.025 0.025
2 Cat kolom beton m2 630.76 18,321.00 11,556,153.96 0.071 0.035 0.035
3 Cat balok beton m2 660.74 18,321.00 12,105,417.54 0.074 0.037 0.037
4 Cat besi railing hanrell tangga M1 65.00 45,226.00 2,939,690.00 0.018 0.009 0.009
5 Cat besi railing hanrell ramp M1 144.00 45,226.00 6,512,544.00 0.040 0.020 0.020

B FINISHING LANTAI VOID ( Elevasi +4.00 s/d 8.00 )


1 Cat dinding m2 510.80 18,321.00 9,358,366.80 0.057 0.029 0.029
2 Cat kolom beton m2 610.42 18,321.00 11,183,504.82 0.068 0.034 0.034
3 Cat balok beton m2 598.91 18,321.00 10,972,630.11 0.067 0.034 0.034
4 Cat besi railing hanrell tangga M1 54.00 45,226.00 2,442,204.00 0.015 0.007 0.007
5 Cat besi railing hanrell ramp M1 132.00 45,226.00 5,969,832.00 0.036 0.018 0.018

C FINISHING LANTAI SATU ( Elevasi +8.00 s/d 12.00)


1 Cat dinding m2 675.90 18,321.00 12,383,163.90 0.076
2 Cat kolom beton m2 610.42 18,321.00 11,183,504.82 0.068
3 Cat balok beton m2 578.07 18,321.00 10,590,820.47 0.065
4 Cat besi railing tangga m2 102.80 45,226.00 4,649,232.80 0.028
5 Cat besi railing ramp m2 56.90 45,226.00 2,573,359.40 0.016
6 Cat besi railing tepi m2 129.00 45,226.00 5,834,154.00 0.036
7 Polytur daun pintu m2 41.60 27,523.50 1,144,977.60 0.007

D FINISHING LANTAI ATAP ( Elevasi +12.00 s/d 15.00)


1 Cat dinding m2 362.58 18,321.00 6,642,828.18 0.041
2 Cat kolom beton m2 205.73 18,321.00 3,769,179.33 0.023
3 Cat balok beton m2 226.43 18,321.00 4,148,424.03 0.025
4 Cat besi railing tepi m2 94.00 45,226.00 4,251,244.00 0.026
5 Cat besi pintu genset & pompa m2 7.20 45,226.00 325,627.20 0.002

X PEKERJAAN SANITARY
A SANITARY LANTAI SATU ( Elevasi +8.00)
1 Pasang Closet jongkok buah 2.00 435,090.00 870,180.00 0.005 0.005
2 Pasang washtafel & kran buah 1.00 832,700.00 832,700.00 0.005 0.005
3 Pasang kran standart buah 4.00 77,462.50 309,850.00 0.002 0.002
4 Kichent Zink 1 lubang buah 2.00 225,000.00 450,000.00 0.003 0.003
5 Kran Leher Angsa buah 2.00 140,000.00 280,000.00 0.002 0.002
6 Floor drain stainless steel buah 7.00 31,850.00 222,950.00 0.001 0.001

XI. PEKERJAAN LAIN -LAIN


1 Ornamen besi depan tangga utama M2 24.20 325,000.00 7,865,000.00 0.048 0.024
2 Ornamen besi depan ramp M2 24.20 325,000.00 7,865,000.00 0.048 0.024
3 cat besi ornamen depan tangga dan ramp m2 48.40 45,226.00 2,188,938.40 0.013 0.007
4 Teks tulisan gedung (tulisan timbul metal cat duco) buah 1.00 3,500,000.00 3,500,000.00 0.021 0.011
5 Logo gedung (logo evakuasi 150x150 cm ,plat alluminium) buah 1.00 4,000,000.00 4,000,000.00 0.024 0.012
6 Signed petunjuk dalam gedung bahan acrylic disablon buah 3.00 275,000.00 825,000.00 0.005 0.003

XII PEKERJAAN LANSEKAP RUANG LUAR


1 Lapisan sirtu tebal 20 cm padat m3 168.80 292,750.00 49,416,200.00 0.302
2 Lapisan pasir urug darat bawah pavingblock tebal 10 cm pa m3 84.40 144,700.00 12,212,680.00 0.075
3 Pasang paving block motif kotak 10x20 cm, t. 8 cm m2 844.00 124,500.00 105,078,000.00 0.642
4 Tanam rumput gajah mini m2 569.00 66,000.00 37,554,000.00 0.230
5 Pohon pucuk merah t. 1 meter buah 20.00 134,800.00 2,696,000.00 0.016
6 Pohon tabebuya t. 3 meter buah 10.00 430,823.32 4,308,233.20 0.026

XIII PEKERJAAN PAGAR KELILING


1 Pagar BRC tinggi 150 x240 cm, dia 7 mm panel 80.00 400,000.00 32,000,000.00 0.196 0.065 0.065
2 Pipa dia 2 " pagar BRC tinggi 175 cm buah 35.00 125,000.00 4,375,000.00 0.027

XIV PEKERJAAN SALURAN KELILING & SEPTICTANK ,RESAPAN


1 Galian saluran , septictank dan sumur resapan m3 79.94 46,750.00 3,737,195.00 0.023 0.023
2 Pasir urug bawah saluran m3 6.89 144,700.00 996,983.00 0.006 0.006
3 Saluran buis beton dia. 30 cm m1 172.20 197,424.18 33,996,443.80 0.208
4 Dinding bata saluran m2 83.40 88,407.50 7,373,185.50 0.045
5 Plesteran dinding bata saluran m2 166.80 42,492.00 7,087,665.60 0.043
6 Dinding bata septictank ad. 1:3 m2 28.80 91,434.75 2,633,320.80 0.016
7 Plester dinding bata septictank ad 1 pc : 3 psr m2 57.60 44,181.80 2,544,871.68 0.016
8 Kolom 15 x 20 septictank m3 0.48 8,638,728.41 4,146,589.64 0.025
9 Balok 15x20 septictank m3 0.32 9,866,823.57 3,196,850.84 0.020
10 Lantai beton septictank t.20 cm m3 1.30 682,152.22 884,069.28 0.005
11 Plat beton tutup septictank m3 0.65 8,400,579.59 5,443,575.57 0.033
12 Koral resapan m3 2.24 292,750.00 655,760.00 0.004
13 Ijuk resapan m2 12.80 25,000.00 320,000.00 0.002
14 Pipa PVC dia 4 " septictank & resapan m1 24.00 150,000.00 3,600,000.00 0.022
15 Pipa vent PVC dia.2 " m1 12.00 65,000.00 780,000.00 0.005

XV PEKERJAAN PEMBUATAN JEMBATAN SALURAN


1 Galian pondasi m3 26.88 46,750.00 1,256,640.00 0.008
2 Pasir urug bawah pondasi m3 1.68 144,700.00 243,096.00 0.001
3 Pasangan batu kali m3 15.12 593,325.00 8,971,074.00 0.055
4 Balok beton 20x40 K 350 m3 - 8,374,431.75 - -
5 Plat beton tebal 20 cm ( K350, ) m3 8.96 5,019,851.73 44,977,871.50 0.275

XVI PEKERJAAN AKHIR


1 Pembersihan Akhir Ls 1.00 3,500,000.00 3,500,000.00 0.021
2 Pembuangan Puing Ls 1.00 3,500,000.00 3,500,000.00 0.021
PEKERJAAN MEKANIKAL
A. PEKERJAAN PLAMBING
A.1. PERALATAN POMPA
Jet Pump type : PDH600 setara:sanyo unit 1.00 24,342,878.00 24,342,878.00 0.149
Kapasitas : 46 l/m
Daya hisap max: 39 m
Daya Pancar : 14 m
PI : 0,6 KW/220V/50Hz/1Ph
termasuk pengeboran , izin dan panel kontrol,
dikontrol dgn WLC di Tanki air atas

B. INSTALASI AIR BERSIH


B.1. SITE PLAN
PVC-AW, termasuk fitting & accessories :
dia.32 m 11.00 35,820.00 394,020.00 0.002 0.002
dia.25 m 12.00 32,580.00 390,960.00 0.002 0.002
dia.20 m 195.00 29,178.00 5,689,710.00 0.035 0.035
Kran taman, termasuk dudukan/ pondasi bh 8.00 77,462.50 619,700.00 0.004 0.004
dia.15

B.2. LANTAI VOID


PVC-AW, termasuk fitting & accessories :
dia.32 m 5.00 35,820.00 179,100.00 0.001 0.001 0.001
dia.25 m 5.00 32,580.00 162,900.00 0.001 0.001
B.3. LANTAI 1
PVC-AW, termasuk fitting & accessories :
dia.50 m 20.00 43,758.00 875,160.00 0.005 0.005
dia.32 m 70.00 35,820.00 2,507,400.00 0.015 0.015
dia.25 m 6.00 32,580.00 195,480.00 0.001 0.001
dia.20 m 2.00 29,178.00 58,356.00 0.000 0.000
dia.15 m 84.00 20,747.52 1,742,791.68 0.011 0.011
Gate Valve
dia. 25 bh 1.00 219,690.00 219,690.00 0.001 0.001

B.4. LANTAI ATAP


PVC-AW, termasuk fitting & accessories :
dia 50 (Pipa Tegak) m 5.00 43,758.00 218,790.00 0.001 0.001 0.001
dia 32 (Pipa Tegak) m 5.00 35,820.00 179,100.00 0.001 0.001

B.5. LANTAI ATAP TANGGA


PVC-AW, termasuk fitting & accessories :
dia 50 m 7.00 43,758.00 306,306.00 0.002 0.002
dia 32 m 7.00 35,820.00 250,740.00 0.002 0.002
Tanki air atas ( FRP ) unit 2.00 5,176,890.00 10,353,780.00 0.063 0.063
Kapasitas : 2 m3, Dengan dudukan dari concrete H=10 cm
Accessories tanki air atas
Gate Valve
dia. 50 bh 1.00 528,840.00 528,840.00 0.003 0.003
dia. 32 bh 4.00 243,990.00 975,960.00 0.006 0.006
dia. 15 ( drain ) bh 2.00 141,390.00 282,780.00 0.002 0.002

C AIR KOTOR
C.1. SITE PLAN DAN LANTAI DASAR
Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia 100 m 12.00 87,660.00 1,051,920.00 0.006 0.006

C.2. LANTAI VOID


Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia 100 m 5.00 87,660.00 438,300.00 0.003 0.001 0.001 0.001

C.3. LANTAI 1
Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia 100 m 15.00 87,660.00 1,314,900.00 0.008 0.004 0.004
Clean Eye (CE)
dia. 100 mm bh 2.00 80,000.00 160,000.00 0.001 0.001

D AIR BEKAS
D.1. SITE PLAN DAN LANTAI DASAR
Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia 100 m 12.00 87,660.00 1,051,920.00 0.006 0.006
dia 50 m 6.00 43,758.00 262,548.00 0.002 0.002

D.2. LANTAI VOID


Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia 100 m 5.00 87,660.00 438,300.00 0.003 0.001 0.001
dia 50 m 5.00 43,758.00 218,790.00 0.001 0.001

D.3. LANTAI 1
Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia 100 m 5.00 87,660.00 438,300.00 0.003 0.003
dia 80 m 20.00 52,020.00 1,040,400.00 0.006 0.003 0.004
dia 50 m 25.00 43,758.00 1,093,950.00 0.007 0.003 0.003
Floor Drain (FD)
dia. 50 mm bh 4.00 31,850.00 127,400.00 0.001 0.001

E. INSTALASI VENT
E.1. LANTAI 1
Pipa PVC Kelas D, (Incl. Fitting & Accessories)
dia.50 mm (Pipa Tegak) m 5.00 25,290.00 126,450.00 0.001 0.001
dia.40 mm m 2.00 22,860.00 45,720.00 0.000 0.000
dia.32 mm m 73.00 21,726.00 1,585,998.00 0.010 0.010

E.2. LANTAI ATAP


Pipa PVC Kelas D, (Incl. Fitting & Accessories)
dia.50 mm (Pipa Tegak) m 5.00 25,290.00 126,450.00 0.001 0.000 0.000
Vent cup, dia.50 bh 1.00 160,000.00 160,000.00 0.001 0.001

F. INSTALASI AIR HUJAN


F.1. SITE PLAN DAN LANTAI DASAR
Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia. 150 mm (instalasi) m 45.00 166,230.00 7,480,350.00 0.046 0.046
dia. 150 mm (Pipa Tegak) m 52.00 166,230.00 8,643,960.00 0.053 0.053
dia. 100 mm (instalasi) m - 87,660.00 - - 0.000
dia. 100 mm (Pipa Tegak) m - 87,660.00 - - 0.000

F.2. LANTAI VOID


Pipa PVC kelas AW Wavin (Incl. Fitting & All Accessories)
dia. 150 mm (Pipa Tegak) m 52.00 166,230.00 8,643,960.00 0.053 0.026 0.026
dia. 100 mm (Pipa Tegak) m - 87,660.00 - - 0.000

F.3. LANTAI 1
dia. 150 mm (Pipa Tegak) m 52.00 166,230.00 8,643,960.00 0.053 0.026 0.026
dia. 100 mm (Pipa Tegak) m - 87,660.00 - - 0.000

F.4. LANTAI ATAP


dia. 150 mm (instalasi) m 10.00 166,230.00 1,662,300.00 0.010 0.010
dia. 150 mm (Pipa Tegak) m - 166,230.00 - - 0.000
dia. 100 mm (Pipa Tegak) m 27.00 87,660.00 2,366,820.00 0.014 0.007 0.007
Cast Iron Roof Drain, dia.150 bh 10.00 207,540.00 2,075,400.00 0.013 0.013

F.5. LANTAI-ATAP TANGGA


dia. 100 mm (Pipa Tegak) m 5.00 87,660.00 438,300.00 0.003 0.003
Cast Iron Roof Drain, dia.100 bh 6.00 140,040.00 840,240.00 0.005 0.005

G. TESTING COMMISIONING lot 1.00 2,400,000.00 2,400,000.00 0.015 0.015


H. PEKERJAAN PEMADAM KEBAKARAN
1 LANTAI 1
Fire Extiunguisher Tabung Cat Oven sesuai SPEK & Skedul :
Type CO2 ( 2~3 kg) Stored Pressure bh 2.00 790,740.00 1,581,480.00 0.010 0.010
2 LANTAI ATAP
Fire Extiunguisher Tabung Cat Oven sesuai SPEK & Skedul :
Type DCP ( 3,5 kg) Stored Pressure bh 1.00 391,140.00 391,140.00 0.002 0.002

PEKERJAAN ELEKTRIKAL -
1 PEKERJAAN GENSET -
Genset capacity 10 kVA,3,50 Hz,380v Silent type / Stand b unit 1.00 99,616,082.00 99,616,082.00 0.609 0.304 0.304
Tangki Harian (Dailly Tank) kapasitas 200 liter c/w kaki tank unit 1.00 12,000,000.00 12,000,000.00 0.073 0.037 0.037
Grounding Genset
Grounding Box Genset set 1.00 400,000.00 400,000.00 0.002 0.002
Grounding Rod (untuk R lebih kecil dari 3 Ohm) set 1.00 1,750,000.00 1,750,000.00 0.011 0.011
Termination R. Supporting Material lot 1.00 250,000.00 250,000.00 0.002 0.002
NYY 10 mm2 m 40.00 27,746.00 1,109,840.00 0.007 0.007
Testing commisioning lot 1.00 325,000.00 325,000.00 0.002 0.002

2 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )


PDTR Unit 1.00 54,016,082.00 54,016,082.00 0.330 0.330
PSD-LT.D Unit 1.00 4,444,082.00 4,444,082.00 0.027 0.027
PSD-LT.1 Unit 1.00 12,220,082.00 12,220,082.00 0.075 0.075
3 PEKERJAAN PENGKABELAN
KWH PLN ke PDTR
NYY 4 x 10 mm2+NYA 10 mm2 m 42.00 93,482.00 3,926,244.00 0.024 0.024
GENSET ke PDTR
NYY 4 x 10 mm2+NYA 10 mm2 m 8.00 93,482.00 747,856.00 0.005 0.005
PDTR ke PSD-LT.D
NYY 4 x 6 mm2+NYA 6 mm2 m 25.00 65,402.00 1,635,050.00 0.010 0.010
PDTR ke PSD-LT.1
NYY 4 x 6 mm2+NYA 6 mm2 m 20.00 65,402.00 1,308,040.00 0.008 0.008
4 PEKERJAAN LAMPU
a Site Plant
Lampu Taman Sl-23 W (FITTING-E27) c/w Pondasi dan Tian bh 17.00 962,882.00 16,368,994.00 0.100 0.100
Instalasi penerangan NYFGbY 3 x 2,5 mm2 ttk 17.00 500,000.00 8,500,000.00 0.052 0.052
Lantai dasar
Lampu TL V-SHAFE 1x36 watt bh 73.00 184,082.00 13,437,986.00 0.082 0.082
Lampu TL V-SHAFE 1x36 watt c/w Nicad Battery 2 jam bh 10.00 658,082.00 6,580,820.00 0.040 0.040
Lampu TL TKO-2 x 36 watt bh 12.00 188,882.00 2,266,584.00 0.014 0.014
Grid switch 10 gang bh 2.00 400,000.00 800,000.00 0.005 0.005
Instalasi penerangan NYM 3 x 2,5 mm2 ttk 95.00 135,000.00 12,825,000.00 0.078 0.078
in konduit HI dia 20 mm2
c Lantai Void
Lampu TL V-SHAFE 1x36 watt bh 9.00 184,082.00 1,656,738.00 0.010 0.010
Lampu TL V-SHAFE 1x36 watt c/w Nicad Battery 2 jam bh 7.00 658,082.00 4,606,574.00 0.028 0.028
Instalasi penerangan NYM 3 x 2,5 mm2 ttk 16.00 135,000.00 2,160,000.00 0.013 0.013
in konduit HI dia 20 mm2
d Lantai 1
Lampu TL V-SHAFE 1x36 watt bh 112.00 184,082.00 20,617,184.00 0.126 0.126
Lampu TL V-SHAFE 1x36 watt c/w Nicad Battery 2 jam bh - 658,082.00 - -
Lampu Down Out Bow -14 watt bh 6.00 129,482.00 776,892.00 0.005 0.005
Saklar satu gang bh 7.00 44,882.00 314,174.00 0.002 0.002
Saklar dua gang bh 2.00 47,282.00 94,564.00 0.001 0.001
Grid switch 12 gang bh 2.00 394,082.00 788,164.00 0.005 0.005
Instalasi penerangan NYM 3 x 2,5 mm2 ttk 118.00 135,000.00 15,930,000.00 0.097 0.097
in konduit HI dia 20 mm2
e Lantai atap
Lampu TL V-SHAFE 1x36 watt bh 11.00 184,082.00 2,024,902.00 0.012 0.012
Lampu TL V-SHAFE 1x36 watt c/w Nicad Battery 2 jam bh 6.00 658,082.00 3,948,492.00 0.024 0.024
Lampu Taman Sl-26 W c/w Tiang GIP 2" H=2 m bh 6.00 962,882.00 5,777,292.00 0.035 0.035
Saklar satu gang bh 2.00 44,882.00 89,764.00 0.001 0.001
Saklar dua gang bh 1.00 47,282.00 47,282.00 0.000 0.000
Instalasi penerangan NYM 3 x 2,5 mm2 ttk 23.00 135,000.00 3,105,000.00 0.019 0.019
in konduit HI dia 20 mm2
5 PEKERJAAN STOP KONTAK
a. Lantai-Dasar
Stop Kontak, 1 , 13 A, 220 v ,Wall type, warna putih bh 1.00 38,762.00 38,762.00 0.000 0.000
Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 ttk 1.00 68,800.00 68,800.00 0.000 0.000
b. Lantai-1
Stop Kontak, 1 , 13 A, 220 v ,Wall type, warna putih bh 11.00 38,762.00 426,382.00 0.003 0.003
Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 ttk 11.00 68,800.00 756,800.00 0.005 0.005
c. Lantai-Atap
Stop Kontak, 1 , 13 A, 220 v ,Wall type, warna putih bh 2.00 38,762.00 77,524.00 0.000 0.000
Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 ttk 2.00 68,800.00 137,600.00 0.001 0.001
6 PEKERJAAN PENANGKAL PETIR
Penangkal Petir tipe Elektrostatis H= 3 Meter Radius 60 M bh 1.00 9,736,082.00 9,736,082.00 0.059 0.059
Termasuk Izin sesuai gambar
GIP dia.50 m 3.00 142,740.00 428,220.00 0.003 0.003
Kabel NYY 70 mm2 m 45.00 53,522.00 2,408,490.00 0.015 0.015
Pipa PVC 10 K Dia 50 mm m 45.00 43,758.00 1,969,110.00 0.012 0.012
Termination & Supporting Material lot 1.00 250,000.00 250,000.00 0.002 0.002
Grounding Box lot 1.00 400,000.00 400,000.00 0.002 0.002
Grounding Rod ( R < 3 Ohm ) lot 1.00 1,800,000.00 1,800,000.00 0.011 0.011
Testing &Commissioning lot 1.00 1,400,000.00 1,400,000.00 0.009 0.009
7 PEKERJAAN PENTANAHAN
Grounding Box Netral set 1.00 350,000.00 350,000.00 0.002 0.002
Grounding Rod (untuk R lebih kecil dari 3 Ohm) set 1.00 1,750,000.00 1,750,000.00 0.011 0.011
Termination R. Supporting Material lot 1.00 225,000.00 225,000.00 0.001 0.001
NYY 10 mm2 m 40.00 27,746.00 1,109,840.00 0.007 0.007
Material Bantu lot - 350,000.00 - -
Testing commisioning lot 1.00 300,000.00 300,000.00 0.002 0.002
8 PENYAMBUNGAN DAYA lot 1.00 9,000,000.00 9,000,000.00 0.055 0.055
BP (Biaya penyambungan ) 10600 VA
SLO ( Standart layak operasi) 10600 VA
Jasa pengurusan
PEKERJAAN ELEKTRONIKAL
1 TELEPHONE SYSTEM
Penyambungan Line telp bh 1.00 1,400,000.00 1,400,000.00 0.009 0.009
Outlet Telepon, Wall Type bh 1.00 65,000.00 65,000.00 0.000 0.000
Instalasi telepon, ITC 2x2x0.6 mm.dalam konduit PVC dia.2 ttk 1.00 170,000.00 170,000.00 0.001 0.001
2 ALARM SYSTEM
Pengadaan dan Pemasangan Alarm
lengkap dengan accessories yang diperlukan.
Push Button unit 1.00 325,000.00 325,000.00 0.002 0.002
Horn Sirine + Sounder + Battery unit 1.00 1,500,000.00 1,500,000.00 0.009 0.009
Instalasi Alarm NYA 2x1,5 mm2 dalam konduit PVC dia.20 ttk 1.00 700,000.00 700,000.00 0.004 0.004
3 SOUND SYSTEM
a Main Equipment Sound System
DVD dan Tuner AM/FM Antenna unit 1.00 1,700,000.00 1,700,000.00 0.010 0.010
Tape Deck Compact Disc bh 1.00 1,400,000.00 1,400,000.00 0.009 0.009
Mic Paging microphone ( carcall dan Paging ) bh 1.00 6,000,000.00 6,000,000.00 0.037 0.037
Power amplifier 120 W bh 1.00 2,400,000.00 2,400,000.00 0.015 0.015
Cabinet rack c/w accessories lot 1.00 6,000,000.00 6,000,000.00 0.037 0.037
b SITE PLAN
Horn speaker,10 w bh 4.00 750,000.00 3,000,000.00 0.018 0.018
Horn speaker installation, NYMHY 3 x 2.5mm2 dalam kondui ttk 4.00 320,000.00 1,280,000.00 0.008 0.008
c Lantai - 1
Coulomb speaker,10 w bh 2.00 700,000.00 1,400,000.00 0.009 0.009
Horn speaker installation, NYMHY 3 x 2.5mm2 dalam kondui ttk 2.00 320,000.00 640,000.00 0.004 0.004
d Lantai - Atap
Coulomb speaker,10 w bh 1.00 700,000.00 700,000.00 0.004 0.004
Horn speaker installation, NYMHY 3 x 2.5mm2 dalam kondui ttk 1.00 320,000.00 320,000.00 0.002 0.002
4 PEKERJAAN PENTANAHAN
a Pentanahan sistem elektronik
Grounding Rod (untuk R lebih kecil dari 0,5 Ohm) lot 1.00 2,000,000.00 2,000,000.00 0.012 0.012
NYY 10 mm2 m 40.00 27,746.00 1,109,840.00 0.007 0.007
Termination & Supporting Material lot 1.00 250,000.00 250,000.00 0.002 0.002
Testing commisioning lot 1.00 130,000.00 130,000.00 0.001 0.001

JUMLAH NILAI PEKERJAAN 16,363,225,847.23 100.00


Bobot Rencana Mingguan ( %) 0.286 5.161 5.362 5.459 7.800 5.874 2.282 4.293 4.858 4.295 4.130 6.307 5.073 6.386 8.002 5.012 3.397 3.798 4.758 4.616
Bobot Kumulatif Rencana Mingguan ( % ) 0.286 5.446 10.809 16.268 24.067 29.942 32.223 36.516 41.374 45.669 49.800 56.106 61.180 67.565 75.567 80.579 83.975 87.773 92.531 97.147
Bobot Realisasi Mingguan ( % )
Bobot Kumulatif Realisasi Mingguan ( % )
Deviasi ( % )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Mengetahui/Menyetujui Oleh: Diperiksa Oleh :


Pejabat Pembuat Komitmen (PPK) Konsultan Manajemen Konstruksi/Supervisi
Pelaksana Penataan Bangunan Dan Lingkungan PT. CAIXA CONSULTANT
Provinsi Nanggroe Aceh Darussalam

Lilik Lastantyo. A, ST, MT Renaldi Bestari, ST


Nip. 19750702 200312 1 001 Team Leader
Pengecetan Tembok Beton dan Sandaran
ERJAAN

JADWAL PELAKSANAAN PEKERJAAN


DESEMBER
21 22 23 24 KET.
05 - 11 12 - 18 19 - 25 26 - 30

100%

0.000 0.000 0.000 0.000

0.001 0.001

90%
80%

70%
0.038 0.038
0.034 0.034
0.032 0.032
0.014 0.014
0.008 0.008
0.018 0.018
0.003 0.003
60%

0.041
0.023
0.025
0.026
0.002

0.024
0.024
0.007
0.011
0.012
0.003

0.302
0.075
0.642
0.230
0.016
0.026

0.065
0.013 0.013

0.208
0.045
0.043
0.016
0.016
0.025
0.020
0.005
0.033
0.004
0.002
0.022
0.005 50%

0.008
0.001
0.055
0.000
0.275

0.021
0.021

0.149
40%

30%
20%

10%
0%

0.757 1.278 0.732 0.086


97.904 99.182 99.914 100.000

21 22 23 24

Banda Aceh, 27 Juli 2014


Dibuat/Diajukan Oleh,
Kontraktor Pelaksana
PT. GUNAKARYA NUSANTARA

ANWAR, ST
Project Manager
18

21

100.00
99.82
99.63
99.45
99.26
99.08
98.89
98.70
98.52
98.33
98.15
97.96
97.78
97.59
97.41
97.22
97.04
96.85
96.67
96.48
96.30
96.11
95.93
95.74
95.56
95.37
95.19
95.00
94.82
94.63
94.45
94.26
94.08
93.89
93.71
93.52
93.34
93.15
92.97
92.78
92.59
92.41
92.22
92.04
91.85
91.67
91.48
91.30
91.11
90.93
90.74
90.56
90.37
90.19
90.00
89.82
89.63
89.45
89.26
89.08
88.89
88.71
88.52
88.34
88.15
87.97
87.78
87.60
87.41
87.23
87.04
86.86
86.67
86.49
86.30
86.11
85.93
85.74
85.56
85.37
85.19
85.00
84.82
84.63
84.45
84.26
84.08
83.89
83.71
83.52
83.34
83.15
82.97
82.78
82.60
82.41
82.23
82.04
81.86
81.67
81.49
81.30
81.12
80.93
80.75
80.56
80.38
80.19
80.00
79.82
79.63
79.45
79.26
79.08
78.89
78.71
78.52
78.34
78.15
77.97
77.78
77.60
77.41
77.23
77.04
76.86
76.67
76.49
76.30
76.12
75.93
75.75
75.56
75.38
75.19
75.01
74.82
74.64
74.45
74.27
74.08
73.89
73.71
73.52
73.34
73.15
72.97
72.78
72.60
72.41
72.23
72.04
71.86
71.67
71.49
71.30
71.12
70.93
70.75
70.56
70.38
70.19
70.01
69.82
69.64
69.45
69.27
69.08
68.90
68.71
68.53
68.34
68.16
67.97
67.78
67.60
67.41
67.23
67.04
66.86
66.67
66.49
66.30
66.12
65.93
65.75
65.56
65.38
65.19
65.01
64.82
64.64
64.45
64.27
64.08
63.90
63.71
63.53
63.34
63.16
62.97
62.79
62.60
62.42
62.23
62.05
61.86
61.67
61.49
61.30
61.12
60.93
60.75
60.56
60.38
60.19
60.01
59.82
59.64
59.45
59.27
59.08
58.90
58.71
58.53
58.34
58.16
57.97
57.79
57.60
57.42
57.23
57.05
56.86
56.68
56.49
56.31
56.12
55.94
55.75
55.57
55.38
55.19
55.01
54.82
54.64
54.45
54.27
54.08
53.90
53.71
53.53
53.34
53.16
52.97
52.79
52.60
52.42
52.23
52.05
51.86
51.68
51.49
51.31
51.12
50.94
50.75
50.57
50.38
50.20
50.01
49.83
49.64
49.46
49.27
49.08
48.90
48.71
48.53
48.34
48.16
47.97
47.79
47.60
47.42
47.23
47.05
46.86
46.68
46.49
46.31
46.12
45.94
45.75
45.57
45.38
45.20
45.01
44.83
44.64
44.46
44.27
44.09
43.90
43.72
43.53
43.35
43.16
42.97
42.79
42.60
42.42
42.23
42.05
41.86
41.68
41.49
41.31
41.12
40.94
40.75
40.57
40.38
40.20
40.01
39.83
39.64
39.46
39.27
39.09
38.90
38.72
38.53
38.35
38.16
37.98
37.79
37.61
37.42
37.24
37.05
36.86
36.68
36.49
36.31
36.12
35.94
35.75
35.57
35.38
35.20
35.01
34.83
34.64
34.46
34.27
34.09
33.90
33.72
33.53
33.35
33.16
32.98
32.79
32.61
32.42
32.24
32.05
31.87
31.68
31.50
31.31
31.13
30.94
30.75
30.57
30.38
30.20
30.01
29.83
29.64
29.46
29.27
29.09
28.90
28.72
28.53
28.35
28.16
27.98
27.79
27.61
27.42
27.24
27.05
26.87
26.68
26.50
26.31
26.13
25.94
25.76
25.57
25.39
25.20
25.02
24.83
24.64
24.46
24.27
24.09
23.90
23.72
23.53
23.35
23.16
22.98
22.79
22.61
22.42
22.24
22.05
21.87
21.68
21.50
21.31
21.13
20.94
20.76
20.57
20.39
20.20
20.02
19.83
19.65
19.46
19.28
19.09
18.91
18.72
18.54
18.35
18.16
17.98
17.79
17.61
17.42
17.24
17.05
16.87
16.68
16.50
16.31
16.13
15.94
15.76
15.57
15.39
15.20
15.02
14.83
14.65
14.46
14.28
14.09
13.91
13.72
13.54
13.35
13.17
12.98
12.80
12.61
12.43
12.24
12.05
11.87
11.68
11.50
11.31
11.13
10.94
10.76
10.57
10.39
10.20
10.02
9.83
9.65
9.46
9.28
9.09
8.91
8.72
8.54
8.35
8.17
7.98
7.80
7.61
7.43
7.24
7.06
6.87
6.69
6.50
6.32
6.13
5.94
5.76
5.57
5.39
5.20
5.02
4.83
4.65
4.46
4.28
4.09
3.91
3.72
3.54
3.35
3.17
2.98
2.80
2.61
2.43
2.24
2.06
1.87
1.69
1.50
1.32
1.13
0.95
0.76
0.58
0.39
0.21
0.19
-
-
JADWAL PENGGUNAAN PER
KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

NO. NAMA PERSONIL INTI JABATAN JUMLAH SATUAN


JULI 2014 AGUSTUS 2014 SEPTEMB
18 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07

1 ANWAR, ST PROJECT MANAGER 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

2 NOVIAR CHALIQ, ST SITE MANAGER 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

3 ANTON, ST PELAKSANA LAPANGAN 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

4 AMIRUDDIN, ST AHLI ARSITEKTUR 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

5 SAHRUL, ST PELAKSANA K3 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

6 IR. MAHRIZAL TENAGA DRAFTER 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

7 ILYAS PELAKSANA ADMINISTRASI 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

8 SYAKBAN MEKANIKAL ELEKTRIKAL 1.00 Org 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
ENGGUNAAN PERSONIL INTI

JADWAL PENGGUNAAN PERSONIL INTI


KET.
SEPTEMBER 2014 OKTOBER 2014 NOPEMBER 2014 DESEMBER 2014
08 - 14 15 - 21 22 - 28 29 - 05 06 - 12 13 - 19 20 - 26 27 - 02 03 - 09 10 -16 17 - 23 24 - 30 01 - 07 08 - 14 15 - 21 24 - 30

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Banda Aceh, 27 Juli 2014


PT. GUNAKARYA NUSANTARA

Ir. TAUFIK RAMADHI


Direktur VIII
JADWAL PEMAKAIAN PERALATAN
KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

JADWAL PEM
NO. URAIAN JUMLAH SAT
JULI 2014 AGUSTUS 2014 SEPTEMBER 2014
18 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21

PEKERJAAN ARSITEKTUR DAN STRUKTUR


I PEKERJAAN PESIAPAN
- Theodolit 1.00 Unit 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- Waterpass 1.00 Unit 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

II PEKERJAAN TURAP BATU KALI KELILING SITE


- Molen 2.00 Unit 2.00 2.00 2.00 2.00 2.00 2.00
- Gerobak Sorong 3.00 Bh 3.00 3.00 3.00 3.00 3.00 3.00
- Alat - alat Tukang 1.00 Ls 1.00 1.00 1.00 1.00 1.00 1.00

III PEKERJAAN STRUKTUR


A PEKERJAAN PONDASI
B PEKERJAAN LANTAI DASAR ( Elevasi + 0.00 s/d +4.00)
C PEKERJAAN LANTAI VOID ( Elevasi +4.00 s/d +8.00 )
D PEKERJAAN LANTAI SATU ( Elevasi +. 8.00 s/d +. 12.00 )
E PEKERJAAN LANTAI ATAP ( Elevasi +12.00 s/d+15.00)
- Molen 2.00 Unit 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
- Bar Cutter 1.00 Unit 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- Bar Bender 1.00 Unit 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
- Gerobak Sorong 3.00 Bh 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
- Alat - alat Tukang 1.00 Ls 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

IV PEKERJAAN DINDING
A DINDING LANTAI DASAR ( Elevasi +0.00 s/d +4.00)
B DINDING LANTAI VOID ( Elevasi +4.00 s/d +8.00)
C DINDING LANTAI SATU (Elevasi +8.00 s/d +12.00)
D DINDING LANTAI ATAP ( Elevasi +12.00 s/d +15.00)
- Molen 1.00 Unit 1.00 1.00 1.00
- Gerobak Sorong 2.00 Bh 2.00 2.00 2.00
- Alat - alat Tukang 1.00 Ls 1.00 1.00 1.00

V PEKERJAAN LANTAI
A PEK. LANTAI LANTAI DASAR ( Elevasi +.0.00)
B PEK.LANTAI LANTAI VOID ( Elevasi +4.00 s/d +.8.00)
C PEK.LANTAI LANTAI SATU ( Elevasi +8.00 s/d +12.00)
D PEK.LANTAI LT.ATAP( Elevasi +12.00)
- Molen 1.00 Unit
- Gerobak Sorong 2.00 Bh
- Mesin Potong Keramik 2.00 Bh
- Alat - alat Tukang 1.00 Ls

VI PEKERJAAN LANGIT-LANGIT
A LANGIT-LANGIT LANTAI DASAR ( elevasi + 4.00)
B LANGIT-LANGIT LANTAI VOID ( Elevasi +7.80)
C LANGIT-LANGIT LANTAI SATU ( Elevasi + 11.80 )
D LANGIT-LANGIT LANTAI ATAP, ( Elevasi + 14.80)
- Bor Tangan 2.00 Unit
- Alat - alat Tukang 1.00 Ls

VII PEKERJAAN PINTU DAN JENDELA


A LANTAI SATU ( Elevasi +8.00)
B LANTAI ATAP
- Mesin Ketam Kayu 1.00 Bh
- Mesin Bor 1.00 Bh
- Alat - alat Tukang 1.00 Ls

VIII PEKERJAAN RAILING


A LANTAI DASAR ( Elevasi +0.00 s/d +8.00)
B LANTAI VOID ( Elevasi +4.00 s/d +8.00)
C LANTAI SATU ( elevasi +8.00 s/d 12.00)
D LANTAI ATAP ( Elevasi + 12.00 s/d +15.00)
- Mesin Las 1.00 Unit
- Alat - alat Tukang 1.00 Ls

IX PEKERJAAN FINISHING
A FINISHING LANTAI DASAR (Elevasi +0.00 s/d 4.00)
B FINISHING LANTAI VOID ( Elevasi +4.00 s/d 8.00 )
C FINISHING LANTAI SATU ( Elevasi +8.00 s/d 12.00)
D FINISHING LANTAI ATAP ( Elevasi +12.00 s/d 15.00)
- Molen 2.00 Unit
- Gerobak Sorong 3.00 Bh
- Alat - alat Tukang 1.00 Ls

X PEKERJAAN SANITARY
A SANITARY LANTAI SATU ( Elevasi +8.00)
- Alat - alat Tukang 1.00 Ls

XI. PEKERJAAN LAIN -LAIN


- Alat - alat Tukang 1.00 Ls

XII PEKERJAAN LANSEKAP RUANG LUAR


- Gerobak Sorong 3.00 Bh
- Alat - alat Tukang 1.00 Ls

XIII PEKERJAAN PAGAR KELILING


- Molen 2.00 Unit
- Gerobak Sorong 2.00 Bh
- Alat - alat Tukang 1.00 Ls

XIV PEKERJAAN SALURAN KELILING & SEPTICTANK ,RESAPAN


- Molen 2.00 Unit
- Gerobak Sorong 2.00 Bh
- Alat - alat Tukang 1.00 Ls

XV PEKERJAAN PEMBUATAN JEMBATAN SALURAN


- Molen 1.00 Unit
- Gerobak Sorong 2.00 Bh
- Alat - alat Tukang 1.00 Ls
XVI PEKERJAAN AKHIR

PEKERJAAN MEKANIKAL
A. PEKERJAAN PLAMBING
A.1. PERALATAN POMPA
- Alat - alat Teknisi 1.00 Ls

B. INSTALASI AIR BERSIH


B.1. SITE PLAN
B.2. LANTAI VOID
B.3. LANTAI 1
B.4. LANTAI ATAP
B.5. LANTAI ATAP TANGGA
- Alat - alat Tukang 1.00 Ls 1.00 1.00 1.00 1.00 1.00 1.00

C AIR KOTOR
C.1. SITE PLAN DAN LANTAI DASAR
C.2. LANTAI VOID
C.3. LANTAI 1
- Alat - alat Tukang 1.00 Ls 1.00 1.00 1.00 1.00 1.00 1.00

D AIR BEKAS
D.1. SITE PLAN DAN LANTAI DASAR
D.2. LANTAI VOID
D.3. LANTAI 1
- Alat - alat Tukang 1.00 Ls 1.00 1.00 1.00 1.00 1.00 1.00

E. INSTALASI VENT
E.1. LANTAI 1
E.2. LANTAI ATAP
- Alat - alat Tukang 1.00 Ls

F. INSTALASI AIR HUJAN


F.1. SITE PLAN DAN LANTAI DASAR
F.2. LANTAI VOID
F.3. LANTAI 1
F.4. LANTAI ATAP
F.5. LANTAI-ATAP TANGGA
- Alat - alat Tukang 1.00 Ls 1.00 1.00 1.00 1.00 1.00 1.00

G. TESTING COMMISIONING
H. PEKERJAAN PEMADAM KEBAKARAN
- Alat - alat Teknisi 1.00 Ls

PEKERJAAN ELEKTRIKAL
1 PEKERJAAN GENSET
2 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
3 PEKERJAAN PENGKABELAN
4 PEKERJAAN LAMPU
5 PEKERJAAN STOP KONTAK
6 PEKERJAAN PENANGKAL PETIR
7 PEKERJAAN PENTANAHAN
8 PENYAMBUNGAN DAYA
- Alat - alat Teknisi 1.00 Ls 1.00 1.00

PEKERJAAN ELEKTRONIKAL
1 TELEPHONE SYSTEM
2 ALARM SYSTEM
3 SOUND SYSTEM
4 PEKERJAAN PENTANAHAN
- Alat - alat Teknisi 1.00 Ls
PEMAKAIAN PERALATAN

JADWAL PEMAKAIAN PERALATAN


KET.
SEPTEMBER 2014 OKTOBER 2014 NOPEMBER 2014 DESEMBER 2014
22 - 28 29 - 05 06 - 12 13 - 19 20 - 26 27 - 02 03 - 09 10 -16 17 - 23 24 - 30 01 - 07 08 - 14 15 - 21 24 - 30

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00


2.00 2.00 2.00 2.00
2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00

2.00 2.00 2.00 2.00


1.00 1.00 1.00 1.00

1.00 1.00
1.00 1.00
1.00 1.00

1.00 1.00 1.00 1.00


1.00 1.00 1.00 1.00

2.00 2.00 2.00 2.00 2.00 2.00 2.00


3.00 3.00 3.00 3.00 3.00 3.00 3.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00

1.00 1.00

3.00 3.00 3.00


1.00 1.00 1.00

2.00 2.00 2.00 2.00 2.00


2.00 2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00 1.00

2.00 2.00 2.00 2.00


2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00

1.00
2.00
1.00
-

1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00

1.00 1.00

1.00 1.00

1.00 1.00 1.00

1.00

1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00 1.00

Banda Aceh, 27 Juli 2014


PT. GUNAKARYA NUSANTARA

Ir. TAUFIK RAMADHI


Direktur VIII
JADWAL PEMAKAIAN B
KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

NO. NAMA BAHAN VOLUME SAT


JULI 2014 AGUSTUS 2014 SEPTEM
18 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07

PEKERJAAN ARSITEKTUR DAN STRUKTUR


I PEKERJAAN PESIAPAN
- Kayu Kaso 5/7 (Kayu Kelas II) 1.00 M3 0.33 0.33 0.33
- Paku Biasa 4.50 Kg 1.50 1.50 1.50
- Kayu Papan Klas III (Bowplank) 2.00 M3 0.67 0.67 0.67

II PEKERJAAN TURAP BATU KALI KELILING SITE


- Pasir Urug 32.00 M3 5.33 5.33 5.33 5.33 5.33 5.33
- Batu Belah 15 Cm/20 cm 400.00 M3 66.67 66.67 66.67 66.67 66.67 66.67
- Pasir Pasang 175.00 M3 29.17 29.17 29.17 29.17 29.17 29.17
- Semen Portland 1,356.00 Zak 226.00 226.00 226.00 226.00 226.00 226.00

III PEKERJAAN STRUKTUR


A PEKERJAAN PONDASI
B PEKERJAAN LANTAI DASAR ( Elevasi + 0.00 s/d +4.00)
C PEKERJAAN LANTAI VOID ( Elevasi +4.00 s/d +8.00 )
D PEKERJAAN LANTAI SATU ( Elevasi +. 8.00 s/d +. 12.00 )
E PEKERJAAN LANTAI ATAP ( Elevasi +12.00 s/d+15.00)
- Pasir Beton 98.00 Kg 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90
- Kerikil Beton (Maximum 30 mm) 150.00 Kg 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50
- Semen Portland 1,800.00 Zak 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00
- Besi Beton Polos 32,800.00 Kg 1,640 1,640 1,640 1,640 1,640 1,640 1,640 1,640
- Kawat Beton 328.00 Lbr 16.40 16.40 16.40 16.40 16.40 16.40 16.40 16.40
- Kayu Kelas III 54.00 M3 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70
- Paku Biasa 360.00 Kg 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
- Minyak Bekisting 120.69 Liter 6.03 6.03 6.03 6.03 6.03 6.03 6.03 6.03

IV PEKERJAAN DINDING
A DINDING LANTAI DASAR ( Elevasi +0.00 s/d +4.00)
B DINDING LANTAI VOID ( Elevasi +4.00 s/d +8.00)
C DINDING LANTAI SATU (Elevasi +8.00 s/d +12.00)
D DINDING LANTAI ATAP ( Elevasi +12.00 s/d +15.00)
- Pasir Pasang 206.64 M3 17.22
- Batu Bata 71,200.00 Buah 5,933
- Semen Portland 1,143.38 Zak 95.28

V PEKERJAAN LANTAI
A PEK. LANTAI LANTAI DASAR ( Elevasi +.0.00)
B PEK.LANTAI LANTAI VOID ( Elevasi +4.00 s/d +.8.00)
C PEK.LANTAI LANTAI SATU ( Elevasi +8.00 s/d +12.00)
D PEK.LANTAI LT.ATAP( Elevasi +12.00)
- Semen 290.00 Zak
- Pasir pasang 190.00 M3
- Keramik 29,455.00 Bh

VI PEKERJAAN LANGIT-LANGIT
A LANGIT-LANGIT LANTAI DASAR ( elevasi + 4.00)
B LANGIT-LANGIT LANTAI VOID ( Elevasi +7.80)
C LANGIT-LANGIT LANTAI SATU ( Elevasi + 11.80 )
D LANGIT-LANGIT LANTAI ATAP, ( Elevasi + 14.80)

VII PEKERJAAN PINTU DAN JENDELA


A LANTAI SATU ( Elevasi +8.00)
B LANTAI ATAP
- Pintu Type P.1 5.00 Bh
- Pintu Type P.2 ( toilet) 2.00 Bh
- Pintu Type P.3 (TOILETt) 4.00 Bh
- Jendela Type J.1 7.00 Bh
- Jendela Type BV 1 6.00 Bh
- Pintu Type PB ( Pintu besi ) 2.00 Bh

VIII PEKERJAAN RAILING


A LANTAI DASAR ( Elevasi +0.00 s/d +8.00)
B LANTAI VOID ( Elevasi +4.00 s/d +8.00)
C LANTAI SATU ( elevasi +8.00 s/d 12.00)
D LANTAI ATAP ( Elevasi + 12.00 s/d +15.00)
- Railing tangga 778.00 M

IX PEKERJAAN FINISHING
A FINISHING LANTAI DASAR (Elevasi +0.00 s/d 4.00)
B FINISHING LANTAI VOID ( Elevasi +4.00 s/d 8.00 )
C FINISHING LANTAI SATU ( Elevasi +8.00 s/d 12.00)
D FINISHING LANTAI ATAP ( Elevasi +12.00 s/d 15.00)
- Plamir 610.00 Kg
- Cat Dasar 610.00 Kg
- Cat Tembok 1,590.00 Kg

X PEKERJAAN SANITARY
A SANITARY LANTAI SATU ( Elevasi +8.00)
- Closet jongkok 2.00 buah
- Washtafel & kran 1.00 buah
- Kran standart 4.00 buah
- Kichent Zink 1 lubang 2.00 buah
- Kran Leher Angsa 2.00 buah
- Floor drain stainless steel 7.00 buah

XI. PEKERJAAN LAIN -LAIN

XII PEKERJAAN LANSEKAP RUANG LUAR


- Pasir Urug 303.00 M3
- Pasir Pasang 170.00 M3
- Paving Block 32,920.00 Bh

XIII PEKERJAAN PAGAR KELILING


- Pagar BRC tinggi 150 x240 cm, dia 7 mm 80.00 Panel
- Pipa dia 2 " pagar BRC tinggi 175 cm 35.00 Bh

XIV PEKERJAAN SALURAN KELILING & SEPTICTANK ,RESAPAN


- Pasir Pasang 11.00 M3
- Batu Bata 7,854.00 Bh
- Semen Portland 57.00 Zak

XV PEKERJAAN PEMBUATAN JEMBATAN SALURAN


- Pasir urug 2.00 M3
- Pasir Pasang 8.00 M3
- Semen 62.00 Zak

XVI PEKERJAAN AKHIR

PEKERJAAN MEKANIKAL
A. PEKERJAAN PLAMBING
A.1. PERALATAN POMPA
- Pompa 1.00 Unit

B. INSTALASI AIR BERSIH


B.1. SITE PLAN
B.2. LANTAI VOID
B.3. LANTAI 1
B.4. LANTAI ATAP
B.5. LANTAI ATAP TANGGA
- PVC dia.50 20.00 m 5.00 5.00 5.00 5.00
- PVC dia.32 70.00 m 10.00
- PVC dia.25 6.00 m
- PVC dia.20 2.00 m
- PVC dia.15 84.00 m 12.00 12.00
- Gate Valve
- PVC dia. 25 1.00 bh
- PVC dia 50 (Pipa Tegak) 5.00 m

C AIR KOTOR
C.1. SITE PLAN DAN LANTAI DASAR
C.2. LANTAI VOID
C.3. LANTAI 1
- PVC dia.32 32.00 m 4.00 4.00 4.00 4.00

D AIR BEKAS
D.1. SITE PLAN DAN LANTAI DASAR
D.2. LANTAI VOID
D.3. LANTAI 1
- PVC dia.100 22.00 m 11.00 11.00
- PVC dia.80 20.00 m 4.00 4.00
- PVC dia.50 40.00 m

E. INSTALASI VENT
E.1. LANTAI 1
E.2. LANTAI ATAP
- PVC dia.50 10.00 m
- PVC dia.40 2.00 m
- PVC dia.32 72.00 m

F. INSTALASI AIR HUJAN


F.1. SITE PLAN DAN LANTAI DASAR
F.2. LANTAI VOID
F.3. LANTAI 1
F.4. LANTAI ATAP
F.5. LANTAI-ATAP TANGGA
- PVC dia. 150 97.00 m 14.00 14.00 14.00 14.00
- PVC dia. 100 104.00 m 15.00 15.00 15.00 15.00

G. TESTING COMMISIONING
H. PEKERJAAN PEMADAM KEBAKARAN

PEKERJAAN ELEKTRIKAL
1 PEKERJAAN GENSET
2 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
3 PEKERJAAN PENGKABELAN
4 PEKERJAAN LAMPU
5 PEKERJAAN STOP KONTAK
6 PEKERJAAN PENANGKAL PETIR
7 PEKERJAAN PENTANAHAN
8 PENYAMBUNGAN DAYA
- Genset capacity 10 kVA,3,50 Hz,380v Silent type / Stand by 1.00 unit
- Tangki Harian (Dailly Tank) kapasitas 200 liter c/w kaki tanki 1.00 unit
- Grounding Box Genset 1.00 set
- Grounding Rod (untuk R lebih kecil dari 3 Ohm) 1.00 set
- Termination R. Supporting Material 1.00 lot
- NYY 10 mm2 40.00 m
- Testing commisioning 1.00 lot

PEKERJAAN ELEKTRONIKAL
1 TELEPHONE SYSTEM
2 ALARM SYSTEM
3 SOUND SYSTEM
4 PEKERJAAN PENTANAHAN
WAL PEMAKAIAN BAHAN

JADWAL PEMAKAIAN BAHAN


KET.
SEPTEMBER 2014 OKTOBER 2014 NOPEMBER 2014 DESEMBER 2014
08 - 14 15 - 21 22 - 28 29 - 05 06 - 12 13 - 19 20 - 26 27 - 02 03 - 09 10 -16 17 - 23 24 - 30 01 - 07 08 - 14 15 - 21 24 - 30

4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90
7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50
90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00
1,640 1,640 1,640 1,640 1,640 1,640 1,640 1,640 1,640 1,640 1,640 1,640
16.40 16.40 16.40 16.40 16.40 16.40 16.40 16.40 16.40 16.40 16.40 16.40
2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70
18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
6.03 6.03 6.03 6.03 6.03 6.03 6.03 6.03 6.03 6.03 6.03 6.03

17.22 17.22 17.22 17.22 17.22 17.22 17.22 17.22 17.22 17.22 17.22
5,933 5,933 5,933 5,933 5,933 5,933 5,933 5,933 5,933 5,933 5,933
95.28 95.28 95.28 95.28 95.28 95.28 95.28 95.28 95.28 95.28 95.28

72.50 72.50 72.50 72.50


47.50 47.50 47.50 47.50
7,364 7,364 7,364 7,364
5.00
2.00
4.00
7.00
6.00
2.00

194.50 194.50 194.50 194.50

101.67 101.67 101.67 101.67 101.67 101.67


101.67 101.67 101.67 101.67 101.67 101.67
265.00 265.00 265.00 265.00 265.00 265.00

2.00
1.00
4.00
2.00
2.00
7.00

101.00 101.00 101.00


56.67 56.67 56.67
10,973 10,973 10,973

20.00 20.00 20.00 20.00


7.00 7.00 7.00 7.00 7.00

2.75 2.75 2.75 2.75


1,964 1,964 1,964 1,964
14.25 14.25 14.25 14.25
2.00
8.00
62.00

1.00

5.00
10.00 10.00 10.00 10.00 10.00 10.00
6.00
2.00
12.00 12.00 12.00 12.00 12.00

1.00
5.00

4.00 4.00 4.00 4.00

4.00 4.00 4.00


10.00 10.00 10.00 10.00

10.00
1.00 1.00
24.00 24.00 24.00

14.00 14.00 13.00


15.00 15.00 14.00
1.00
1.00
0.50 0.50
0.50 0.50
0.50 0.50
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
1.00

Banda Aceh, 27 Juli 2014


PT. GUNAKARYA NUSANTARA

Ir. TAUFIK RAMADHI


Direktur VIII
DAFTAR INSPEKSI DAN TEST
INSPEKSI DAN TES
NO. STANDAR PROSEDUR STANDARD MUTU
FREKWENSI ALAT METODA

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank - Pasangan bouwplank kuat dan kokoh 1 kali - Meteran Cheklist
- Jarak as dan level bouwplank sesuai
gambar
2 Pembuatan Bedeng Kerja dan Gudang - Aman dan layak untuk menyimpan do- 1 kali Visual
kumen lapangan dan berteduh
- Dibangun dekat dengam lokasi kerja.
3 Pagar Pengaman Sementara Keliling - Ketinggian pagar 2 m 1 kali Visual
- Pagar kokoh dan kuat
4 Dokumentasi Proyek - Pengambilan titik dari lokasi yg tetap Saat termijn Camera Satu arah
5 Pembersihan Lokasi - Lokasi bersih dari material yang meng 1 kali Visual
ganggu pelaksanaan proyek.
6 Gambar Pelaksanaan - Gambar sudah disetujui owneer. Setiap ada Visual
- Gambar disiapkan di kertas A3 perubahan
- Notasi - notasi dan skala pada gambar
jelas.
B PEKERJAAN STRUKTUR
1 Pondasi Tiang Pancang - Mutu beton K-500 1 kali / titik Meteran Cheklist
- Dimensi tiang pancang yang diguna -
kan sesuai gambar.
2 Galian tanah - Posisi galian, dimensi dan kedalaman 1 kali / lubang Meteran Manual
sesuai gambar.
- Hasil bersih dari bahan - bahan long -
soran dll
3 Urugan Pasir - Butiran pasir tajam, keras dan bebas 1 kali / lubang Meteran Manual
dari lumpur, tanah lembung dsb
- Air penyiraman dipakai air tawar
bersih
- Tebal urugan pasir sesuai gambar
4 Urugan Kembali - Bahan yang digunakan tanah bekas ga- 3 kali Visual
lian atau tanah yang didatangkan.
5 Timbunan Tanah didatangkan - Tanah bersih, tidak terdapat akar atau 3 kali Cheklist

INSPEKSI DAN TES


NO. STANDAR PROSEDUR STANDARD MUTU
FREKWENSI ALAT METODA

6 Timbunan Tanah didatangkan - Tanah bersih, tidak terdapat akar atau 3 kali Cheklist
kotoran - kotoran lainnya.
6 Pemadatan - Lokasi pemadatan bebas dari lumpur 3 kali Visual
- Hasil test dianggap cukup setelah ha-
sil test disetujui owneer
7 Pekerjaan Beton - Mutu beton K-350 Tiap selesai - Alat test beton
- Hasil pengecoran baik, tidak berubah cor - Meteran Manual
dimensi.
- Hasil pengecoran tidak keropos Visual
8 Pekerjaan Konstruksi Baja - Baja yang digunakan baja baru. Setiap datang Visual
- Baja tidak berkarat
- Permukaan baja yang akan dilas harus Setiap akan
dibersihkan dari cat, minyak dll mengelas
C PEKERJAAN ARSITEKTUR
1 Pasangan Batu Bata - Bentuk bata prisma empat persegi Tiap selesai - Jidar Manual
- Permukaan bata rata dan tidak retak. pasangan - Meteran
Berasal dari sumber yang sama.
- Adukan pasangan bata rata.
- Pasangan bata rapi dan tegak
2 Pekerjaan Plesteran - Permukaan dinding rata dan tegak Tiap selesai - Jidar Manual
dan tidak gembung pasangan - Meteran
- Permukaan plesteran bersih
3 Pasangan Keramik Lantai - Sambungan keramik sama lebar Tiap selesai - Jidar Manual
- Pasangan lurus, rata dan tidak berge - pasangan - Meteran
lombang
- Pasangan tidak ada yang retak
- Tidak terdapat cacat
4 Pasangan Keramik Dinding - Sambungan keramik sama lebar Tiap selesai - Jidar Manual
- Nat pasangan bertemu pasangan - Meteran
- Pasangan lurus, rata dan tidak berge -
lombang
- Pasangan tidak ada yang retak

INSPEKSI DAN TES


NO. STANDAR PROSEDUR STANDARD MUTU
FREKWENSI ALAT METODA

5 Pasangan Plint Keramik - Pasangan plint lurus dan rata Tiap selesai - Jidar Manual
- Pasangan nat ikut nat lantai pasangan - Meteran
- Pasangan tidak ada yang retak
- Tidak terdapat cacat
6 Pekerjaan Cat Dinding - Dinding yang akan dicat bersih Tiap selesai Manual
- Lapisan cat dasar dan plamir merata pasangan
- Warna cat jadi merata dan Rapi
7 Pekerjaan cat Besi - Bersih yang akan dicat harus bersih Tiap selesai Manual
- Lapisan cat dasar dan plamir merata pasangan
- Warna cat jadi merata dan Rapi
D PEKERJAAN LANDSCAP
1 Urugan Sirtu - Tebal urugan 20 cm Tiap selesai - Meteran Manual
- Material sudah disetujui owneer pasangan
- Air penyiraman dipakai air tawar
2 Penanaman Rumput' - Jenis rumput yang dipakai rumput ga
jah mini
- Kedalaman yang digemburkan 20cm Tiap selesai Visual Cheklist
- Pasangan rumpout subur, rapi pasangan
- Hindari genangan air agar tidak mem -
busuk.
3 Pasangan Paving Block - Tebal urugan pasir 10 cm Selama Jidar Cheklist
- Dimensi paving 10 x 30 x 8cm Pemasangan
- Pasangan lurus, rata dan tidak berge -
lombang.
- Pasir mengisi nat pasangan secara me -
rata .
E PEKERJAAN ELEKTRIKAL
1 Pekerjaan Instalasi Listrik Jenis kabel yang digunakan : Tiap selesai - Test pen Manual
- Dari KWH PLN kr PDTR
NYY 4x10mm2
NYA 10mm2

INSPEKSI DAN TES


NO. STANDAR PROSEDUR STANDARD MUTU
FREKWENSI ALAT METODA

Dari Genset ke PDTR


NYY 4x10mm2
NYA 10mm2

Dari PDTR ke PSD-LT.D


NYY 4x6mm2
NYA 6mm2
F PEKERJAAN Mekanikal
1 Pekerjaan Instalasi Air Berih - Pipa yang digunakan Tiap selesai Manual
dia. 32, 25, 20, 15
- Pasangan baik dan tidak booor
- Air mengallr dengan baik'
2 Pekerjaan Instalasi Air Kotor - Pipa yang digunakan Tiap selesai Manual
dia. 100
- Pasangan baik dan tidak booor
- Terhubung baik ke Septictank
3 Pekerjaan Instalasi Air Bekas - Pipa yang digunakan Tiap selesai Manual
dia. 100, 80 dan 50
- Pasangan baik dan tidak booor
- Air mengallr dengan baik'
4 Pekerjaan Instalasi Hujan - Pipa yang digunakan Tiap selesai Manual
dia. 150
- Pasangan baik dan tidak booor
- Air mengallr dengan baik'
INSPEKSI DAN TES PENANGGUNG
JAWAB
BUKTI

Berita Acara Surveyor


Pemasangan
Bouwplank
Bangunan Site Manager

Pagar Site Manager

Foto Site Engineer


Lokasi kerja Site Manager

Gambar Site Engineer

Hasil chekclist Site Manager

Cheklist Site Manager

Cheklist Site Manager

Lapangan Site Manager


Hasil chekclist Site Manager

INSPEKSI DAN TES PENANGGUNG


JAWAB
BUKTI

Hasil chekclist Site Manager

Lapangan Site Manager

Hasil test Site Manager


Hasil chekclist

Hasil cor
Rangka Baja Site Manager

Cheklist Site Manager

Cheklist Site Manager

Cheklist Site Manager

Cheklist Site Manager


INSPEKSI DAN TES PENANGGUNG
JAWAB
BUKTI

Cheklist Site Manager

Cheklist Site Manager

Cheklist Site Manager

Cheklist Site Manager

Hasil test Site Manager

Hasil test Site Manager

Cheklist Site Manager


INSPEKSI DAN TES PENANGGUNG
JAWAB
BUKTI

Cheklist Site Manager

Cheklist Site Manager

Cheklist Site Manager

Cheklist Site Manager


JADWAL PELAKSANAAN PEKERJAAN ( KURVA S )
KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2014

JUMLAH BOBOT
HARGA PEKERJAAN
JADWAL PELAKSANAAN PEKERJAAN ( KURVA S )
No. Div
URAIAN (Rp.) (%) JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27

PEKERJAAN ARSITEKTUR DAN STRUKTUR


I PEKERJAAN PESIAPAN 114,883,280.00 0.702 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029
II PEKERJAAN TURAP BATU KALI KELILING SITE 635,806,140.16 3.886 0.648 0.648 0.648 0.648 0.648 0.648
III PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI 4,571,380,127.38 27.937 1.862 3.991 3.991 3.991 3.991 3.991 3.991 2.129
B PEKERJAAN LANTAI DASAR ( Elevasi + 0.00 s/d +4.00) 1,696,576,650.58 10.368 1.728 1.728 1.728 1.728 1.728 1.728
C PEKERJAAN LANTAI VOID ( Elevasi +4.00 s/d +8.00 ) 1,646,010,537.41 10.059 2.012 2.012 2.012 2.012 2.012
D PEKERJAAN LANTAI SATU ( Elevasi +. 8.00 s/d +. 12.00 ) 2,716,416,911.86 16.601 4.150 4.150 5.150 3.150
E PEKERJAAN LANTAI ATAP ( Elevasi +12.00 s/d+15.00) 2,387,088,264.36 14.588 2.847 2.847 2.947 2.847 1.847

IV PEKERJAAN DINDING
A DINDING LANTAI DASAR ( Elevasi +0.00 s/d +4.00) 133,011,993.91 0.813 0.406 0.406
B DINDING LANTAI VOID ( Elevasi +4.00 s/d +8.00) 138,719,738.90 0.848 0.283 0.283 0.283
C DINDING LANTAI SATU (Elevasi +8.00 s/d +12.00) 121,698,886.74 0.744 0.248 0.248 0.248
D DINDING LANTAI ATAP ( Elevasi +12.00 s/d +15.00) 60,617,525.07 0.370 0.123 0.123 0.123

V PEKERJAAN LANTAI
A PEK. LANTAI LANTAI DASAR ( Elevasi +.0.00) 313,754,812.84 1.917 0.639 0.639 0.639
B PEK.LANTAI LANTAI VOID ( Elevasi +4.00 s/d +.8.00) 26,858,211.94 0.164 0.164
C PEK.LANTAI LANTAI SATU ( Elevasi +8.00 s/d +12.00) 197,176,125.11 1.205 1.205
D PEK.LANTAI LT.ATAP( Elevasi +12.00) 115,740,477.00 0.707 0.707

VI PEKERJAAN LANGIT-LANGIT
A LANGIT-LANGIT LANTAI DASAR ( elevasi + 4.00) 6,298,766.25 0.038 0.038
B LANGIT-LANGIT LANTAI VOID ( Elevasi +7.80) 30,671,534.69 0.187 0.187
C LANGIT-LANGIT LANTAI SATU ( Elevasi + 11.80 ) 25,972,116.19 0.159 0.159
D LANGIT-LANGIT LANTAI ATAP, ( Elevasi + 14.80) 7,168,087.50 0.044

VII PEKERJAAN PINTU DAN JENDELA


A LANTAI SATU ( Elevasi +8.00) 37,162,426.60 0.227 0.227
B LANTAI ATAP 4,217,480.00 0.026 0.026

VIII PEKERJAAN RAILING


A LANTAI DASAR ( Elevasi +0.00 s/d +8.00) 52,250,000.00 0.319 0.319
B LANTAI VOID ( Elevasi +4.00 s/d +8.00) 41,850,000.00 0.256 0.256
C LANTAI SATU ( elevasi +8.00 s/d 12.00) 173,220,000.00 1.059 0.353 0.353 0.353
D LANTAI ATAP ( Elevasi + 12.00 s/d +15.00) 56,400,000.00 0.345

IX PEKERJAAN FINISHING
A FINISHING LANTAI DASAR (Elevasi +0.00 s/d 4.00) 41,246,863.82 0.252 0.126 0.126
B FINISHING LANTAI VOID ( Elevasi +4.00 s/d 8.00 ) 39,926,537.73 0.244 0.122
C FINISHING LANTAI SATU ( Elevasi +8.00 s/d 12.00) 48,359,212.99 0.296
D FINISHING LANTAI ATAP ( Elevasi +12.00 s/d 15.00) 19,137,302.74 0.117

X PEKERJAAN SANITARY
A SANITARY LANTAI SATU ( Elevasi +8.00) 2,965,680.00 0.018 0.018

XI. PEKERJAAN LAIN -LAIN 26,243,938.40 0.160


XII PEKERJAAN LANSEKAP RUANG LUAR 211,265,113.20 1.291
XIII PEKERJAAN PAGAR KELILING 36,375,000.00 0.222 0.044
XIV PEKERJAAN SALURAN KELILING & SEPTICTANK ,RESAPAN 77,396,510.70 0.473
XV PEKERJAAN PEMBUATAN JEMBATAN SALURAN 55,448,681.50 0.339
XVI PEKERJAAN AKHIR 7,000,000.00 0.043

PEKERJAAN MEKANIKAL
A. PEKERJAAN PLAMBING
A.1. PERALATAN POMPA 24,342,878.00 0.149

B. INSTALASI AIR BERSIH


B.1. SITE PLAN 7,094,390.00 0.043 0.043
B.2. LANTAI VOID 342,000.00 0.002 0.001 0.001 0.001
B.3. LANTAI 1 5,598,877.68 0.034 0.011 0.011 0.011
B.4. LANTAI ATAP 397,890.00 0.002 0.001 0.001 0.001
B.5. LANTAI ATAP TANGGA 12,698,406.00 0.078 0.039 0.039

C AIR KOTOR
C.1. SITE PLAN DAN LANTAI DASAR 1,051,920.00 0.006 0.006
C.2. LANTAI VOID 438,300.00 0.003 0.001 0.001 0.001
C.3. LANTAI 1 1,474,900.00 0.009 0.003 0.003 0.003

D AIR BEKAS
D.1. SITE PLAN DAN LANTAI DASAR 1,314,468.00 0.008 0.008
D.2. LANTAI VOID 657,090.00 0.004 0.001 0.001 0.001
D.3. LANTAI 1 2,700,050.00 0.017 0.006 0.006 0.006
E. INSTALASI VENT
E.1. LANTAI 1 1,758,168.00 0.011 0.005 0.005
E.2. LANTAI ATAP 286,450.00 0.002 0.002

F. INSTALASI AIR HUJAN


F.1. SITE PLAN DAN LANTAI DASAR 16,124,310.00 0.099 0.049 0.049
F.2. LANTAI VOID 8,643,960.00 0.053 0.026 0.026
F.3. LANTAI 1 8,643,960.00 0.053 0.026 0.026
F.4. LANTAI ATAP 6,104,520.00 0.037 0.019 0.019
F.5. LANTAI-ATAP TANGGA 1,278,540.00 0.008 0.008

G. TESTING COMMISIONING 2,400,000.00 0.015


H. PEKERJAAN PEMADAM KEBAKARAN 1,972,620.00 0.012

PEKERJAAN ELEKTRIKAL
1 PEKERJAAN GENSET 115,450,922.00 0.706
2 PEKERJAAN PANEL TEGANGAN RENDAH ( TR ) 70,680,246.00 0.432
3 PEKERJAAN PENGKABELAN 7,617,190.00 0.047 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
4 PEKERJAAN LAMPU 122,716,406.00 0.750 0.375
5 PEKERJAAN STOP KONTAK 1,505,868.00 0.009
6 PEKERJAAN PENANGKAL PETIR 18,391,902.00 0.112
7 PEKERJAAN PENTANAHAN 3,734,840.00 0.023
8 PENYAMBUNGAN DAYA 9,000,000.00 0.055

PEKERJAAN ELEKTRONIKAL
1 TELEPHONE SYSTEM 1,635,000.00 0.010
2 ALARM SYSTEM 2,525,000.00 0.015 0.005
3 SOUND SYSTEM 24,840,000.00 0.152
4 PEKERJAAN PENTANAHAN 3,489,840.00 0.021

JUMLAH NILAI PEKERJAAN 16,363,225,847.23 100.00 1.892 4.668 4.668 4.668 4.717 6.503 6.425 3.942 4.229 4.219 4.085 6.500 6.480 6.111 7.277 5.399 4.335 3.895 3.102
KEMAJUAN PEKERJAAN KOMULATIF ### 1.892 6.560 11.227 15.895 20.612 27.115 33.541 37.482 41.711 45.930 50.015 56.514 62.994 69.106 76.382 81.781 86.116 90.011 93.113
NAAN PEKERJAAN ( KURVA S )

JADWAL PELAKSANAAN PEKERJAAN ( KURVA S )


KET.
NOVEMBER BULAN VI
20 21 22 23 24
28 - 04 05 - 11 12 - 18 19 - 25 26 - 30

100 %
0.029 0.029 0.029 0.029 0.029

1.253

90 %

80 %

0.044

70 %

0.345

0.122
0.287 0.009
60 %
0.117

0.080 0.080
0.530 0.530 0.230
0.044 0.044 0.044 0.044
0.135 0.135 0.135 0.068
0.339
50 %
0.043

0.149

40 %

30 %
20 %

0.007 0.007
0.004 0.004 0.004

0.353 0.353
0.270 0.162

0.375 10 %
0.009
0.102 0.010
0.011 0.011
0.018 0.018 0.018

0.005 0.005
0.005 0.005
0.091 0.031 0.031
0.011 0.011 0%

2.433 0.866 1.258 1.812 0.517


95.546 96.412 97.670 99.483 100.00

Banda Aceh, 27 Juli 2014


PT. GUNAKARYA NUSANTARA

Ir. TAUFIK RAMADHI


Direktur VIII
REKAPITULASI
RENCANA ANGGARAN BIAYA ( R A B )

KEGIATAN : PPK PELAKSANAAN PENATAAN BANGUNAN DAN LINGKUNGAN NAD


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN NAD
PEKERJAAN : PEMBANGUNAN GEDUNG TEMPAT EVAKUASI SEMENTARA ( TES)
LOKASI : KEC. PEUKAN BADA , KAB .ACEH BESAR
TAHUN ANGGARAN : APBN 2013

NO. URAIAN PEKERJAAN


1 2
PEKERJAAN ARSITEKTUR DAN STRUKTUR
I PEKERJAAN PESIAPAN
II PEKERJAAN TURAP BATU KALI KELILING SITE
III PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI
B PEKERJAAN LANTAI DASAR ( Elevasi + 0.00 s/d +4.00)
C PEKERJAAN LANTAI VOID ( Elevasi +4.00 s/d +8.00 )
D PEKERJAAN LANTAI SATU ( Elevasi +. 8.00 s/d +. 12.00 )
E PEKERJAAN LANTAI ATAP ( Elevasi +12.00 s/d+15.00)
IV PEKERJAAN DINDING
A DINDING LANTAI DASAR ( Elevasi +0.00 s/d +4.00)
B DINDING LANTAI VOID ( Elevasi +4.00 s/d +8.00)
C DINDING LANTAI SATU (Elevasi +8.00 s/d +12.00)
D DINDING LANTAI ATAP ( Elevasi +12.00 s/d +15.00)
V PEKERJAAN LANTAI
A PEK. LANTAI LANTAI DASAR ( Elevasi +.0.00)
B PEK.LANTAI LANTAI VOID ( Elevasi +4.00 s/d +.8.00)
C PEK.LANTAI LANTAI SATU ( Elevasi +8.00 s/d +12.00)
D PEK.LANTAI LT.ATAP( Elevasi +12.00)
VI PEKERJAAN LANGIT-LANGIT
A LANGIT-LANGIT LANTAI DASAR ( elevasi + 4.00)
B LANGIT-LANGIT LANTAI VOID ( Elevasi +7.80)
C LANGIT-LANGIT LANTAI SATU ( Elevasi + 11.80 )
D LANGIT-LANGIT LANTAI ATAP, ( Elevasi + 14.80)
VII PEKERJAAN PINTU DAN JENDELA
A LANTAI SATU ( Elevasi +8.00)
B LANTAI ATAP
VIII PEKERJAAN RAILING
A LANTAI DASAR ( Elevasi +0.00 s/d +8.00)
B LANTAI VOID ( Elevasi +4.00 s/d +8.00)
C LANTAI SATU ( elevasi +8.00 s/d 12.00)
D LANTAI ATAP ( Elevasi + 12.00 s/d +15.00)
IX PEKERJAAN FINISHING
A FINISHING LANTAI DASAR (Elevasi +0.00 s/d 4.00)
B FINISHING LANTAI VOID ( Elevasi +4.00 s/d 8.00 )
C FINISHING LANTAI SATU ( Elevasi +8.00 s/d 12.00)
D FINISHING LANTAI ATAP ( Elevasi +12.00 s/d 15.00)
X PEKERJAAN SANITARY
A SANITARY LANTAI SATU ( Elevasi +8.00)
XI. PEKERJAAN LAIN -LAIN
XII PEKERJAAN LANSEKAP RUANG LUAR
XIII PEKERJAAN PAGAR KELILING
XIV PEKERJAAN SALURAN KELILING & SEPTICTANK ,RESAPAN
XV PEKERJAAN PEMBUATAN JEMBATAN SALURAN
XVI PEKERJAAN AKHIR

PEKERJAAN MEKANIKAL
A. PEKERJAAN PLAMBING
A.1. PERALATAN POMPA
B. INSTALASI AIR BERSIH
B.1. SITE PLAN
B.2. LANTAI VOID
B.3. LANTAI 1
B.4. LANTAI ATAP
B.5. LANTAI ATAP TANGGA
C AIR KOTOR
C.1. SITE PLAN DAN LANTAI DASAR
C.2. LANTAI VOID
C.3. LANTAI 1
D AIR BEKAS
D.1. SITE PLAN DAN LANTAI DASAR
D.2. LANTAI VOID
D.3. LANTAI 1
E. INSTALASI VENT
E.1. LANTAI 1
E.2. LANTAI ATAP
F. INSTALASI AIR HUJAN
F.1. SITE PLAN DAN LANTAI DASAR
F.2. LANTAI VOID
F.3. LANTAI 1
F.4. LANTAI ATAP
F.5. LANTAI-ATAP TANGGA
G. TESTING COMMISIONING
H. PEKERJAAN PEMADAM KEBAKARAN

PEKERJAAN ELEKTRIKAL
1 PEKERJAAN GENSET
2 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
3 PEKERJAAN PENGKABELAN
4 PEKERJAAN LAMPU
5 PEKERJAAN STOP KONTAK
6 PEKERJAAN PENANGKAL PETIR
7 PEKERJAAN PENTANAHAN
8 PENYAMBUNGAN DAYA

PEKERJAAN ELEKTRONIKAL
1 TELEPHONE SYSTEM
2 ALARM SYSTEM
3 SOUND SYSTEM
4 PEKERJAAN PENTANAHAN

A. Jumlah Harga Pekerjaan


B. Pajak Pertambahan Nilai ( PPN ) = 10% x (A)
C. Jumlah Total Harga Pekerjaan = (A) + (B)
D. Dibulatkan
Terbilang : Tujuh Belas Milyar Sembilan Ratus Sembilan Puluh Sembilan Juta Lima Ratus Empat Puluh Delapa

BANDUNG, 15 April 2014


Penawar,
PT. GUNAKARYA NUSANTARA

Ir. TAUFIK RAMADHI


Direktur VIII
JUMLAH HARGA
(Rp)
3

114,883,280.00
635,806,140.16

4,571,380,127.38
1,696,576,650.58
1,646,010,537.41
2,716,416,911.86
2,387,088,264.36

133,011,993.91
138,719,738.90
121,698,886.74
60,617,525.07

313,754,812.84
26,858,211.94
197,176,125.11
115,740,477.00

6,298,766.25
30,671,534.69
25,972,116.19
7,168,087.50

37,162,426.60
4,217,480.00

52,250,000.00
41,850,000.00
173,220,000.00
56,400,000.00

41,246,863.82
39,926,537.73
48,359,212.99
19,137,302.74

2,965,680.00
26,243,938.40
211,265,113.20
36,375,000.00
77,396,510.70
55,448,681.50
7,000,000.00

24,342,878.00
7,094,390.00
342,000.00
5,598,877.68
397,890.00
12,698,406.00

1,051,920.00
438,300.00
1,474,900.00

1,314,468.00
657,090.00
2,700,050.00

1,758,168.00
286,450.00

16,124,310.00
8,643,960.00
8,643,960.00
6,104,520.00
1,278,540.00
2,400,000.00
1,972,620.00

115,450,922.00
70,680,246.00
7,617,190.00
122,716,406.00
1,505,868.00
18,391,902.00
3,734,840.00
9,000,000.00

1,635,000.00
2,525,000.00
24,840,000.00
3,489,840.00

16,363,225,847.23
1,636,322,584.72
17,999,548,431.95
17,999,548,000.00
Empat Puluh Delapan Ribu Rupiah