LAMPIRAN D
PERHITUNGAN UTILITAS
5. Spesifikasi Boiler
Tipe : Fire Tube Boiler
Heating Surface : 789,7467 ft2
Tekanan : 18 atm
PRA RANCANGAN PABRIK ASAM SALISILAT DARI FENOL DAN NATRIUM
HIDROKSIDA DENGAN PROSES KOLBE SCHMITT KAPASITAS 10.000 TON/TAHUN
D-3
LAMPIRAN D PERHITUNGAN UTILITAS
Temperatur : 250 oC
Bahan Bakar : Feul Oil Grade 1
Rate Bahan Bakar : 72,8086 l/jam
Air Poliklinik
Jika, kebutuhan air poliklinik adalah 1000 - 1500 lt/hari, maka ditetapkan:
Kebutuhan air poliklinik = 1000 lt/hari
= 41,6667 lt/jam
= 41,4867 kg/jam
1. Unit Proses
Tabel D.6 Kebutuhan Listrik Unit Proses
Banya
No Alat Hp Hp Total
k
1 Pompa 1 7 7
Screw
2 1 2 2
Conveyor
3 Belt conveyor 1 2 2
4 Reactor 2 3 6
5 Mixer 2 2 4
Total 21
Sehingga, kebutuhan listrik unit proses:
= 21 Hp x 0,746KW/Hp
= 15,6597 KW
2. Unit Utilitas
Tabel D.7 Kebutuhan Listrik Unit Utilitas
No Alat Hp Banyak Total Hp
1 Pompa raw material 21 1 21
2 P-clasifier 21 1 21
3 P-Sand filter 21 1 21
4 P-air sanitasi 6 1 6
5 P-IE 12 1 12
6 P-umpan boiler 12 1 12
7 P-air pendingin 18 1 18
8 P-penampungan 21 1 21
9 Fan 30 1 30
Total 162
Sehingga, kebutuhan listrik unit utilitas:
= 162 Hp x 0,7456KW/Hp
= 120,8034 KW
4. Listrik untuk AC
Listrik untuk AC diperkirakan sebesar 30.000 Watt = 30 KW
Ditetapkan input generator 1000 KW, sehingga untuk keperluan lain masih
tersedia
= (1000 - 401,35) x 80%
= 478,92 KW
Spesifikasi Generator
Tipe : AC Generator
Kapasitas Total : 550 KW
Tegangan : 220/360 Volt
Effisiensi : 80%
Bahan Bakar : Feul Oil
jumlah : 3 buah